SMB
1
BIM SMB/SE
29/03/2019INDICO: 806937
SMB
2
EVENT AGENDA
SMB
3
BIM GENERAL PRESENTATION
SMB/SE/TOD
29/03/2019EDMS:2131872
Raul Fernandez Ortega
SMB
4
1. BIM2. BIM Dimensions3. BIM Maturity degree and LOD4. BIM Process-Roles5. BIM in the World / Europe6. BIM at TOD Section. Timeline7. BIM & alt. at CERN8. Next steps
PRESENTATION OVERVIEW
SMB
5
1. BIM2. BIM Dimensions3. BIM Maturity degree and LOD4. BIM in the World / Europe5. BIM Process-Roles6. BIM at TOD Section. Timeline7. BIM & alt. at CERN8. Next steps
SMB
6
BIM
B I M
BUILDING INFORMATION MODELING
MODELING -> 3D MODEL
INFORMATION -> LINKED
BUILDING -> CONSTRUCTION
BIM or Building Information Modelling is a process for creating and managing information
on a construction project across the project lifecycle. One of the key outputs of this
process is the Building Information Model, the digital description of every aspect of the built
asset. This model draws on information assembled collaboratively and updated at key
stages of a project. Creating a digital Building Information Model enables those who
interact with the building to optimize their actions, resulting in a greater whole life value
for the asset.
SMB
7
BIM
Calculations (structural, thermal…)Preliminary/Tender design
Feasibility
Strategy
Construction Design
ConstructionPlaningCost control
ManufacturePrecast
Logistics
TransformationNew uses
Demolition
Facility management
FULL COORDINATION
SMB
8
BIM PROCESS
Strategy -> IPP – example SF8
SMB
9
BIM PROCESS
Feasibility -> IPP – example 179
SMB
10
BIM PROCESS
Preliminary/Tender -> example 196
SMB
11
BIM PROCESS
Calculations -> Integration for false floors
SMB
12
BIM PROCESS
Construction -> example 255-355
SMB
13
BIM PROCESS
Manufacture -> Include in new blanket contracts (Toilet refurbishment, steel structure)Planning -> Include from IPP (coordination with Microsoft Project – other)Logistics -> delivery by element (external firms)
Use/Facility management -> Introduction of the FM (GMAO – Infor, others) -> example 376
SMB
14
BIM PROCESS
Transformation/demolition -> example 212; Include a new phase in the 3D model for upgrade
SMB
15
BIM BENEFITS
Control of Cost Estimation
Easy coordination, better designMore information in the model
Maintenance & FM
Control of the whole lifecycle,To the dismantling of the building
Control of PlanningEnergetic efficiency integrated
Easy to adapt and modify
Be a Reference
SMB
16
1. BIM2. BIM Dimensions3. BIM Maturity degree and LOD4. BIM Process-Roles5. BIM in the World / Europe6. BIM at TOD Section. Timeline7. BIM & alt. at CERN8. Next steps
SMB
17
BIM Dimensions
1. Isolated work
2. Collaboration, sharing separated models3. Direct collaborative work. Integration
4. Schedule, planing, time.
5. Cost estimation6. Sustainability, energy
7. Facility management
SMB
18
1. BIM2. BIM Dimensions3. BIM Maturity degree and LOD-LOI4. BIM Process-Roles5. BIM in the World / Europe6. BIM at TOD Section. Timeline7. BIM & alt. at CERN8. Next steps
SMB
19
BIM Maturity degree
OLD METHODOLOGYHAND MADE DRAFTING
COLABORATION, USER GUIDES FULLY INTEGRATEDGLOBAL STANDARDS3D DRAWINGS BIM OBJECTS
SMB
20
BIM LOD/LOI
SMB
21
BIM LOD
https://bimforum.org/lod/
Uniformat codeB2010.20.30
Omniclass code21-02 20 10 20 30
Exterior Wall Construction (Masonry)
200
300
350
400
SMB
22
BIM LOI
SMB
23
1. BIM2. BIM Dimensions3. BIM Maturity degree and LOD4. BIM Process-Roles5. BIM in the World / Europe6. BIM at TOD Section. Timeline7. BIM & alt. at CERN8. Next steps
SMB
24
BIM Process-Roles
ROLES IN THE PROJECT FUNCTIONS MAIN ROLES/BIM ROLES
Owner Strategic plan (CERN, Masterplan…) Owner
Client Definition of needs, budget Client
Contract manager Responsible of contracts, tenders, etc. Procurement, legal advice
Project Manager Global Management Project Manager
BIM Manager Responsible for BIM execution BIM Manager
BIM Coordinator Integration of the models BIM Coordinator
BIM Architect Responsible for architectural design BIM designer per discipline
Build Manager Responsible for building operations
Structural engineer Responsible for structural design
MEP engineer (electricity, plumbing, heating, ventilation)
Responsible for MEP design
Interior architect Responsible for interior design
Bioclimatic designer Responsible of the energetic studies
Construction manager Work supervisor/work manager Construction manager
FM-Facility management Responsible of the maintenance BIM FM-Facility management
Quantity surveyor Responsible of cost estimation/control
Health and safety coordinator Responsible of health and safety Health and safety coordinator
SMB
25
1. BIM2. BIM Dimensions3. BIM Maturity degree and LOD4. BIM Process-Roles5. BIM in the World / Europe6. BIM at TOD Section. Timeline7. BIM & alt. at CERN8. Next steps
PRESENTATION OVERVIEW
SMB
26
BIM in the world
SMB
27
BIM IN THE WORLD
MEXICO (2017)
PERU (2022)
BRAZIL (2021)
CHILE (2020)
NORWAY (2016)
RUSIA (2017)
UK (2016)
SWITZERLAND (?)
France (2020)
NETHERLANDS (2012)
SPAIN (2020)
ITALY (2022)
DUBAI (2019)
QUATAR (2019)
SINGAPORE (2015)
KOREA (2012)
JAPAN (?)
CHINA (?) HONG KONG (2014)
AUSTRALIA (2019)
NEW ZEALAND (?)
SWEDEN (2019)
BELGIUM (?)GERMANY (2020)
AUSTRIA (2015)PORTUGAL (?)
CZECH REPUBLIC (?)CANADA (2014)
UNITED STATES (2008)
FINLAND (2007)
DENMARK (2012)
SMB
28
1. BIM2. BIM Dimensions3. BIM Maturity degree and LOD4. BIM Process-Roles5. BIM in the World / Europe6. BIM at TOD Section. Timeline7. BIM & alt. at CERN8. Next steps
PRESENTATION OVERVIEW
SMB
29
BIM Timeline at TOD
2015 201820172016 2019
LS1 LS2E-YETS YETS
Revit and BIM TrainingRevit Training
Revit designer«BIM» technical student
Revit and BIM Training
General implementation ?
DocumentationInternal tests and projects
New projects with external consultantsImplementation in DOP
Training
Development
Implementation
SMB
30
BIM Timeline at TOD
2015 201820172016 2019
LS1 LS2E-YETS YETS
Revit and BIM TrainingRevit Training
Revit designers
Revit and BIM Training
General implementation ?
DocumentationInternal tests and projects
New projects with external consultantsImplementation in DOP
Training
Development
Implementation
2020 2021 2022
RUN 3 LS3
Training
Development
Implementation
Continuous Revit and BIM Training
Update standards and documents (templates, guidelines, BEP, …)
95% in TOD work; support to other servicesProvide internal training
Connection to GIS and EDMS
Building permit
SMB
31
BIM at TOD Section
NOWADAYS AT TOD
• Done• BIM Protocol/guidelines for the new projects (Basic BPEP-BIM Project Execution Plan)• Revit template• Basic library• Style guidelines• BIP (BIM Implementation Plan)
• In preparation• General BEP (BIM Execution Plan)• Detailed BPEP (BIM Project Execution Plan)
• To continue• Regular update of all the documents (Style guidelines, BEP)• Update of the template• Update of the library
SMB
32
100 buildings in Revit
20 buildings with good 3D models20 partial buildings for specific studies20 schematic buildings for support to other projects40 new buildings 2019-2023
BIM at TOD Section (REVIT MODELS)
SMB
33
BIM at TOD Section (CATIA MODELS)
SMB
34
1. BIM2. BIM Dimensions3. BIM Maturity degree and LOD4. BIM Process-Roles5. BIM in the World / Europe6. BIM at TOD Section. Timeline7. BIM & alt. at CERN8. Next steps
PRESENTATION OVERVIEW
SMB
35
BIM & alt at CERN
• SMB-SE-TOD• Coordination with Patrimoine -> Topo, GIS-GIS3D information, Planotheque
• SMB-SE-HE• Coordination with HE -> BIM 3D – Collaborative work in Revit
• SMB-SE-MP/TP• Coordination for new projects
• SMB-SE-CBS/TP/MP• Coordination to complete data-materials sheet -> BIM 7D facility management
• EN-CV• Coordination with CV -> BIM 3D – Collaborative work in Revit
• EN-EL• Not collaboration for the moment (EL is still using CATIA)
• OTERS….. (EN-ACE -> PLM and multicad platforms)
TEAMS WORKING WITH THE BIM METHODOLOGY
SMB
36
BIM & alt at CERN
• CAEC (Computer Aided Engineering Committee)
• Official group for DAO/CAD, Standards, etc. (activities concerning tools and
support for computer aided mechanical engineering and related fields at CERN)(Recognition of BIM platforms as a possible Tool/Standard for CERN)
• MULTICAD PLATFORMS (IT-CAD SUPPORT)(Possibility to use different software for each discipline)
• INTEGRATION (EN-ACE)• In charge of the integration for the machine projects (3D Models)(Possibility to use BIM models without any/minimum transformation)
• CAD 2021 (working group)• PLM software replacement(Compatible PLM system with BIM software – Focus on Revit -)• Smarteam-CDD synchronization
OTHER RELATED WORKING GROUPS
SMB
37
1. BIM2. BIM Dimensions3. BIM Maturity degree and LOD4. BIM Process-Roles5. BIM in the World / Europe6. BIM at TOD Section. Timeline7. BIM & alt. at CERN8. Next steps
PRESENTATION OVERVIEW
SMB
38
Next steps
Organization:• Complete the documentation (Templates, Guidelines, BEP, BIP, etc.)• PLM system (analysis and implementation plan)
Management:• New projects in BIM (Using Revit for the moment)• Projects in different phases -> Different relation internal teams and external
consultants
Coordination:• Revit / Catia• Work with other groups/departments (Integration, CAEC, etc) using Revit• Work with external consultants using Revit
SMB
39
EVENT AGENDA
SMB
40
Summary
SUMMARY & FUTURE
SMB
41
Summary
All the projects in BIM (Revit in priority)All medium-big projects in RevitFull integration (3D models, 2D drawings, materials, FM, …)
Automatic update of the geometry , annotations, dimensions, schedules …Facilitate synchronization between all the drawings : plans, elevations, sections, perspective, etc...Multidisciplinary approach (coordination)Enhanced detail and qualitySaving time and effort in modification tasksNo (re)work is being duplicated : implementation of plans according to project phases / level of detail / level of information
BIM Model contains:Graphic informationIntegrated database (Bill of quantities, lists, planning, cost, materials, …)Integrated GMAO in the 3D models
COORDINATION – INTEGRATION – SHARING INFORMATIONExchange in both directions CATIA REVITCE models shared with every serviceCE geometry databaseAccess to services modelsExternal CE consultants working in BIM/Revit
SMB
42
Future
3D SCAN
GISPLM
VR-AR
HOLOLENS
BUILDING PERMIT
SMB
43
Next steps
THANK YOU
SMB
45
BIM Examples
BLD 3179-Extension