South End Construction CoordinationSODO Transportation Forum

June 2008

Things are popping

Undertaking major construction:

– Summer 2008: First Avenue Paving Phase I

– Fall 2008: Spokane Viaduct Project

– Fall 2008: SR 519 Intermodal Access Project

– Fall 2008: Intelligent Transportation Systems

– Summer 2009: First Avenue Paving Phase II

– Summer 2009: E. Marginal Way/SR99 Grade Separation

– Fall 2009: South End of Alaskan Way Viaduct

– Winter 2010: Airport/Argo Bridge Retrofit

First Avenue paving phases I and II

Summer 2008 Fall 2008 Spring 2009Winter 2009 Summer 2009 Fall 2009 Winter 2010

Spokane Street Viaduct Widening and Fourth Avenue Off-Ramp Project

Spokane Street Viaduct Widening and Fourth Avenue Off-Ramp ProjectToday Future

4th Ave S Ramp

Spokane Viaduct Widening

SR519 Intermodal Access Project

Summer 2008 Fall 2008 Spring 2009Winter 2009 Summer 2009 Fall 2009 Winter 2010

Alaskan Way Viaduct and Seawall ProgramSouth End Replacement

Summer 2008 Fall 2008 Spring 2009Winter 2009 Summer 2009 Fall 2009 Winter 2010

Airport Way S. over Argo Bridge

Summer 2008 Fall 2008 Spring 2009Winter 2009 Summer 2009 Fall 2009 Winter 2010

Intelligent Transportation Systems (ITS) Real-time traffic information

Summer 2008 Fall 2008 Spring 2009Winter 2009 Summer 2009 Fall 2009 Winter 2010

Enhancing options to driving alone

Link Light Rail starts operating mid 2009 Promote options to driving alone

SDOT’s SWAT Team

Construction and detour mapping

• Model and display projects and detours

• Minimize conflicts before they happen

• Analyze quarterly