Post on 08-Sep-2018
transcript
State of Nebraska
State of Nebraska State of Nebraska State of Nebraska State of Nebraska State of Nebraska State of Nebraska State of
Nebraska State of Nebraska State of Nebraska State of Nebraska State of Nebraska State of Nebraska State of Nebraska State
of Nebraska State of Nebraska State of Nebraska State of Nebraska State
of Nebraska State of Nebraska State of Nebraska State of Nebraska State of Nebraska State of Nebraska State of
Nebraska State of Nebraska State of Nebraska State of Nebraska State of Nebraska State of Nebraska State of Nebraska State of
Nebraska State of Nebraska State of Nebraska State of Nebraska State of
Nebraska State of Nebraska State of Nebraska State of Nebraska State of Nebraska State of Nebraska State of
Nebraska State of Nebraska State of Nebraska State of Nebraska State of Nebraska
a
!
!
!!
!
!
!
!
ASHLAND RD.
LITTLE SALT RD.
AGNEW RD.AGNEW RD.
LITTLE SALT RD.
ROCK CREEK RD.
DAVEY RD.
BRANCHED OAK RD.
RAYMOND RD.
MILL RD.
WAVERLY RD.
BLUFF RD.
McKELVIE RD.
ALVO RD.
FLETCHER AV.
HAVELOCK AV.
ADAMS ST.
HOLDREGE ST.
"O" ST.
"A" ST.
VAN DORN ST.
PIONEERS BLVD.
OLD CHENEY RD.
PINE LAKE RD.
YANKEE HILL RD.
ROKEBY RD.
SALTILLO RD.
BENNET RD.
WITTSTRUCK RD.
ROCA RD.
MARTELL RD.
HICKMAN RD.
STAGECOACH RD.
PANAMA RD.
OLIVE CREEK RD.
PRINCETON RD.
PELLA RD.
FIRTH RD.
GAGE RD.
S. 19
0TH
ST.
S. 17
6TH
ST.
S. 16
2TH
ST.
S. 14
8TH
ST.
S. 13
4TH
ST.
S. 12
0TH
ST.
S. 11
0TH
ST.
S. 96
TH ST
.
S. 82
TH ST
.
S. 68
TH ST
.
S. 54
TH ST
.
S. 38
TH ST
.
S. 25
TH ST
.
S. 12
TH ST
.
S.W. 2
ND ST
.
S.W. 1
4TH
ST.
S.W. 2
9TH
ST.
S.W. 4
2ND
ST.
S.W. 5
8TH
ST.
S.W. 7
2ND
ST.
S.W. 8
6TH
ST.
S.W. 1
00TH
ST.
S.W. 1
14TH
ST.
S.W. 1
28TH
ST.
S.W. 1
42TH
ST.
W. GAGE RD.
W. HALLAM RD.
W. PELLA RD.
W. PRINCETON RD.
W. OLIVE CREEK RD.
W. PANAMA RD.
W. STAGECOACH RD.
W. SPRAGUE RD.
W. MARTELL RD.
W. ROCA RD.
W. WITTSTRUCK RD.
W. BENNET RD.
W. SALTILLO RD.
W. ROKEBY RD.
W. YANKEE HILL RD.
W. DENTON RD.
W. OLD CHENEY RD.
W. PIONEERS BLVD.
W. VAN DORN ST.
W. "A" ST.
W. "O" ST.
W. HOLDREGE ST.
W. ADAMS ST.
W. SUPERIOR ST.
W. FLETCHER AV.
W. ALVO RD.
W. McKELVIE RD.
W. BLUFF RD.
W. WAVERLY RD.
W. MILL RD.
W. RAYMOND RD.
W. BRANCHED OAK RD.
W. DAVEY RD.
W. ROCK CREEK RD.
W. AGNEW RD.
W. LITTLE SALT RD.
W. ASHLAND RD.
N.W.
140T
H ST
.
N.W.
126T
H ST
.
N.W.
112T
H ST
.N.
W. 10
5TH
ST.
N.W.
98TH
ST.
N.W.
84TH
ST.
N.W.
70TH
ST.
N.W.
56TH
ST.
N.W.
48TH
ST.
N.W.
40TH
ST.
N.W.
27TH
ST.
N.W.
12TH
ST.
N.W.
1ST S
T.
N. 14
TH S
T.
N. 27
TH S
T.
N. 40
TH S
T.
N. 56
TH S
T.
N. 70
TH S
T.
N. 84
TH S
T.
N. 98
TH S
T.
N. 11
2TH
ST.
N. 12
0TH
ST.
N. 13
4TH
ST.
N. 14
1TH
ST.
N. 14
8TH
ST.
N. 16
2ND
ST.
N. 17
6TH
ST.
N. 19
0TH
ST.
Lincoln
F:\ITS\Projects\TIP\tip11121314\NDORProjects17.mxd ncsser
µ2 0 2 4 6 81
Miles
Consult the detailed project descriptions and funding summary for further information.
1
Lincoln's Future Service Limit Shown as Grey
Lincoln Metropolitan Planning Organization Nebraska Dept of RoadsFY 2018 - 2021Transportation Improvement Program
3
8
2
7
6
4
10
5
#1 Emerald West#2 Lincoln South Beltway#3 Denton Spur#4 N-2, US 77 to Yankee Hill Rd#5 US-77, Princeton to Lincoln#6 N-43 to Bennet#7 I-80 Barrier#8 US 77 Ceresco South#9 I-80 District 1, CCTV Towers#10 N-33, Crete to US-77#11 I-80, Lincoln to Greenwood#12 Denton South#13 Emerald East Culverts#14 I-180/I -80 Interchange#15 I-180 South to Adams St#16 Agnew North & South
9
12
11
13
ROAD IMPROVEMENTFUTURE SERVICE LIMIT
INTERCHANGE/BRIDGE
14 15
16
AGENCY:
DIVISION:
PROJ NO
(Map) (Location) (Distance)
(Control Number) (Project Number) (Work Phase) FS 2017-18 FS 2018-19 FS 2019-20 FS 2020-21 FS
1 US‐6 3.9 Miles PE 110.0 NE
Emerald West ROW 100.0 NE
US-6 from approx 0.3 mi east Jct N-103, east to approx 0.8 mi west Jct S-55A Const/CE 758.0 NE
Mill, Conc repair, widen/resurf 24' rdwy to 28', br repair, conc surf Const/CE 2,672.0 STP
C.N. 11845 STP‐6‐6 (146) Const/CETOTAL 210.0 3,430.0 0.0 0.0 0.0 0.0 3,640.0
2 N-2 11.0 Miles PE 4,592.0 DPU 1,840.0 DPU
Lincoln South Beltway PE 348.0 LN 230.0 LN
New alignment (Future N-2) south of Lincoln PE 468.0 NE 230.0 NE
4-lane divided expressway ROW 2,920.0 DPU 6,482.0 DPU
C.N. 12578E DPU-LIN-2-6 (121) ROW 330.0 LN 4,571.0 LN
ROW 330.0 NE 15,852.0 NE
Util 39.0 LN
Util 155.0 NE 6,000.0 NE 40,000.0 NE 40,000.0 NE
Const/CE 6,400.0 LN1 199.0 LN1
Const/CE 10,000.0 LN2 10,000.0 LN2 146,329.0TOTAL 25,582.0 39,404.0 6,000.0 40,000.0 40,000.0 146,329.0 297,315.0
3 S-55A 5.2 MilesDenton Spur ROW 46.0 NE
Denton Spur (S-55A) from US-6 to Denton Const/CE 3,086.0 STP
Mill, asph widen/resurf 24' rdwy to 28 w/4' earth shld, br Const/CE 875.0 NE
C.N. 12967 STP-S55A(105) TOTAL 4,007.0 0.0 0.0 0.0 0.0 0.0 4,007.0
4 N-2 10.5 Miles PE 100.0 NE
N-2 US-7 - Yankee Hill Rd, Lincoln Const/CE 5,270.0N-2 from US-77 to Yankee Hill Rd in LincolnN-Repair
C.N. 13211 RD-2-6(1033) TOTAL 0.0 0.0 0.0 0.0 100.0 5,270.0 5,370.0
Department of Roads
State of Nebraska
(Improvement Description)
2018-2021 LINCOLN CITY/LANCASTER COUNTY, NEBRASKA
PROJECT
PRIORITY PROJECTSCOST
BEYOND PROGRAM
PRIOR FISCAL YEARS
TOTAL PROJECT
COSTS
TRANSPORTATION IMPROVEMENT PROGRAM
PROGRAMMED EXPENDITURES & FUNDING SOURCES (FS) (000's)
10/31/2017 A-1 Lincoln Metropolitan Planning Organization
AGENCY:
DIVISION:
PROJ NO
(Map) (Location) (Distance)
(Control Number) (Project Number) (Work Phase) FS 2017-18 FS 2018-19 FS 2019-20 FS 2020-21 FS
Department of Roads
State of Nebraska
(Improvement Description)
2018-2021 LINCOLN CITY/LANCASTER COUNTY, NEBRASKA
PROJECT
PRIORITY PROJECTSCOST
BEYOND PROGRAM
PRIOR FISCAL YEARS
TOTAL PROJECT
COSTS
TRANSPORTATION IMPROVEMENT PROGRAM
PROGRAMMED EXPENDITURES & FUNDING SOURCES (FS) (000's)
5 US-77 12.4 Miles PE 214.0 NE
Princeton - South of Warlick Blvd. Const/CE 5,460.0 NH
US-77 from approx 0.4 mi south of Princeton to just north of south limits of Lincoln Const/CE 1,365.0 NE
Conc repair, mill/resurf rdwy segments, br repair, crack & joint seal, fog sealC.N. 13237 NH-77-2 (162) TOTAL 214.0 6,825.0 0.0 0.0 0.0 0.0 7,039.0
6 N-43 16.0 Miles PE 136.0 NE
N-41 - Bennet ROW 30.0N-43 from Jct N-41 to north limits of Bennet, includes Panama Spur (S-55D) Const/CE 2,430.0Mill, widen/resurf existing rdwy to 28', culv, br repair, br replacement, gdrl Const/CE 9,722.0
C.N. 13271 STP-43-1 (102) TOTAL 0.0 0.0 0.0 0.0 136.0 12,182.0 12,318.0
7 I-80 6.6 Miles PE 1.0 NE
I-80 Barrier, Lincoln Const/CE 211.0I-80 from 0.3 mi west of Lincoln northeast to 27th St Const/CE 53.0Power wash and seal concrete barriers, bridge rails and bridge piers
C.N. 13283 NH-80-9(92) TOTAL 0.0 0.0 0.0 0.0 1.0 264.0 265.0
8 US-77 4.6 Miles PE 5.0 NE
Ceresco South Const/CE 1,020.0 NH
US-77 from approx 0.9 mi north Davey Spur (S55E) to approx 0.6 mi north Const/CE 255.0 NE
of CerescoConc repair, diamond grinding, joint/crack sealing, retrofit granular subdrains
C.N. 13286 NH-77-2(164) TOTAL 5.0 1,275.0 0.0 0.0 0.0 0.0 1,280.0
9 I-80 0.0 Miles PE 17.0 NE
District 1 CCTV Towers Const/CE 35.0 STP
At eleven district 1 locations in Seward, Lancaster and Cass Counties Const/CE 344.0 NH
Deploy CCTV camera towers Const/CE 95.0 NE
C.N. 13303 STP-33-6(110) TOTAL 17.0 474.0 0.0 0.0 0.0 0.0 491.0
10 N-33 13.2 Miles PE 20.00 NE
Crete - US-77 Const/CE 1,488.00 NE
N-33 from Crete, east to US-77 Const/CE 5,953.00 STP
Mill, patch, resurf and intersectionsC.N. 13298 ITS-STP-80-8 (156) TOTAL 0.0 0.0 0.0 20.0 7,441.0 0.0 7,461.0
10/31/2017 A-2 Lincoln Metropolitan Planning Organization
AGENCY:
DIVISION:
PROJ NO
(Map) (Location) (Distance)
(Control Number) (Project Number) (Work Phase) FS 2017-18 FS 2018-19 FS 2019-20 FS 2020-21 FS
Department of Roads
State of Nebraska
(Improvement Description)
2018-2021 LINCOLN CITY/LANCASTER COUNTY, NEBRASKA
PROJECT
PRIORITY PROJECTSCOST
BEYOND PROGRAM
PRIOR FISCAL YEARS
TOTAL PROJECT
COSTS
TRANSPORTATION IMPROVEMENT PROGRAM
PROGRAMMED EXPENDITURES & FUNDING SOURCES (FS) (000's)
11 I-80 13.4 Miles PE 10.0 NE
Lincoln - Greenwood Const/CE 115.0 NE
I-80 from just west N 70th St. east to just west of Greenwood Interchange Const/CE 1,035.0 NH
Conc repair, joint sealC.N. 13304 NH-80-9 (97) TOTAL 0.0 0.0 0.0 10.0 1,150.0 0.0 1,160.0
12 N-33 0.4 Miles PE 17.0 NE
Denton South ROW 25.0 NE
N-33 on east and west legs of the intersection with SW 100th St (Denton Road) Const/CE 444.0 HS
ROW, construct left turn lanes, lighting Const/CE 62.0 NE
C.N. 13332 HSIP-33-6 (111) TOTAL 17.0 25.0 506.0 0.0 0.0 0.0 548.0
13 US-6 0.0 Miles Const/CE 965.0 NE
Emerald East CulvertsUS-6 bridge sized CBC's approx 0.7 and 1.2 mi east of EmeraldReplace two bridge sized CBC's
C.N. 13343 STR-6-6(1056) TOTAL 0.0 0.0 965.0 0.0 0.0 0.0 965.0
14 I-180 0.0 Miles PE 1.0 NE
I-180 / I-80 Interchange, Lincoln Const/CE 346.0 HS
I-180 / I-80 Interchange and at I-180/Superior St interchange Const/CE 38.0 NE
Replace overhead guide signs and two guide sign structuresC.N. 13349 HSIP-180-9 (4) TOTAL 1.0 384.0 0.0 0.0 0.0 0.0 385.0
15 I-180 1.6 Miles PE 1.0 NE
I-180 - Cornhusker, Lincoln Const/CE 5.0 NE
I-180 from N Jct US-34, south to just north of Adams St in Lincoln Const/CE 48.0 NH
Fog seal existing rdwy and s-shldC.N. 13357 NH-180-9(5) TOTAL 0.0 1.0 53.0 0.0 0.0 0.0 54.0
16 Nebraska Highway N-79 8.5 Miles PE 1,448.0 NE
Agnew North & South ROW 904.0 NE
N-79 from 0.2 mi north of Raymond Spur (S-55J) north to Valparaiso Const/CE 4,574.0 NE
Asph conc resurf 24' rdwy, add 8' shld, 6' turf Const/CE 10,305.0Const/CE 10,305.0 STP
Const/CE -10,305.0 NE
C.N. 10584A STP-79-2(108) TOTAL 17,231.0 0.0 0.0 0.0 0.0 0.0 17,231.0
STP-AC (NE)
10/31/2017 A-3 Lincoln Metropolitan Planning Organization
AGENCY:
DIVISION:
PROJ NO
(Map) (Location) (Distance)
(Control Number) (Project Number) (Work Phase) FS 2017-18 FS 2018-19 FS 2019-20 FS 2020-21 FS
Department of Roads
State of Nebraska
(Improvement Description)
2018-2021 LINCOLN CITY/LANCASTER COUNTY, NEBRASKA
PROJECT
PRIORITY PROJECTSCOST
BEYOND PROGRAM
PRIOR FISCAL YEARS
TOTAL PROJECT
COSTS
TRANSPORTATION IMPROVEMENT PROGRAM
PROGRAMMED EXPENDITURES & FUNDING SOURCES (FS) (000's)
STATE OPERATIONS & MAINTENANCE FUNDING SOURCE
Operations & Maintenance of the Federal Aid System in Lancaster County 3,803.1 NE 3,917.2 NE 4,034.7 NE 4,155.7 NE 4,280.4 NE
NE (State Revenue / Aids)3,803.1 3,917.2 4,034.7 4,155.7 4,280.4 0.0 20,191.1
FUNDING SUMMARY
FEDERAL FUNDSDPU (Federal Discretionary Funds) 7,512.0 8,322.0 0.0 0.0 0.0 15,834.0HS (HSIP - Highway Safety Improvement Program) 0.0 346.0 444.0 0.0 0.0 790.0IM (Interstate Maintenance) 0.0 0.0 0.0 0.0 0.0 0.0LC (LCLC - STP-Urbanized Areas > 200,000 (Lincoln)) 0.0 0.0 0.0 0.0 0.0 0.0NH (NHPP - National Highway Performance Progam) 0.0 6,824.0 48.0 0.0 1,035.0 7,907.0RZ (Railroad - Hwy Crossing - Hazardous Funds) 0.0 0.0 0.0 0.0 0.0 0.0STP (STP-Flexible) 3,086.0 13,012.0 0.0 0.0 5,953.0 22,051.0TAP (STP - Block Grant set aside) 0.0 0.0 0.0 0.0 0.0 0.0
10,598.0 28,504.0 492.0 0.0 6,988.0 0.0 46,582.0
STATE FUNDSNE (State Revenue / Aids) 13,067.1 12,231.2 11,066.7 44,185.7 46,120.4 126,671.1STP-AC (NE) (State Revenue / Aids (Advanced Construction)) 10,305.0 0.0 0.0 0.0 0.0 10,305.0TM (State Train/Mile Tax) 0.0 0.0 0.0 0.0 0.0 0.0
23,372.1 12,231.2 11,066.7 44,185.7 46,120.4 0.0 136,976.1
LOCAL FUNDSCO (Lancaster County) 0.0 0.0 0.0 0.0 0.0 0.0LN (City of Lincoln, Funds Committed prior to LSB Agreement) 717.0 4,801.0 0.0 0.0 0.0 5,518.0LN1 (City of Lincoln, Based upon the LSB Agreement) 6,400.0 199.0 0.0 0.0 0.0 6,599.0LN2 (RTSD, Based upon the LSB Agreement) 10,000.0 10,000.0 0.0 0.0 0.0 20,000.0OTH (Dial Realty Corp.) 0.0 0.0 0.0 0.0 0.0 0.0* AC - Advance Construction
17,117.0 15,000.0 0.0 0.0 0.0 0.0 32,117.0
TOTAL: 51,087.1 55,735.2 11,558.7 44,185.7 53,108.4 164,045.0 379,720.1
SUB-TOTAL STATE FUNDING:
SUBTOTAL OPERATIONS & MAINTENANCE:
SUB-TOTAL FEDERAL FUNDING:
SUB-TOTAL LOCAL FUNDING
10/31/2017 A-4 Lincoln Metropolitan Planning Organization
AGENCY:
DIVISION:
PROJ NO
(Map) (Location) (Distance)
(Control Number) (Project Number) (Work Phase) FS 2017-18 FS 2018-19 FS 2019-20 FS 2020-21 FS
Department of Roads
State of Nebraska
(Improvement Description)
2018-2021 LINCOLN CITY/LANCASTER COUNTY, NEBRASKA
PROJECT
PRIORITY PROJECTSCOST
BEYOND PROGRAM
PRIOR FISCAL YEARS
TOTAL PROJECT
COSTS
TRANSPORTATION IMPROVEMENT PROGRAM
PROGRAMMED EXPENDITURES & FUNDING SOURCES (FS) (000's)
STATUS OF PREVIOUS YEARS PROJECTS
Projects Completed
I‐80, 27th St. Interchange PE 1,200.0 ERP
Ramp reconstruction Const/CE 3,264.0 NH
Const/CE 29.0 LN
Const/CE 467.0 NE
Const/CE 360.0 LN
Const/CE 590.0 LC
C.N. 13111 NH‐80‐9 (74) Const/CE 850.0
L55-W, Warlick Blvd (L-55W) from US-77 to N-2 Const/CE 8,071.0 NE
Conc repair, conc mill & resurf, conc pvmt, rebuild surf median, br repairC.N. 13224A S-L55W (1022)
I-180, Cornhusker Hwy - S Jct US-34, Lincoln Const/CE 63.0 NH
0.1 mi south of Oak Creek east to the S Jct US-34, crack seal dual 24' Const/CE 16.0 NE
divided interstate
C.N. 13282 NH-180-9 (3)
LC-AC(LN)
10/31/2017 A-5 Lincoln Metropolitan Planning Organization