Step By Step Guide To Create WBS

Post on 16-Apr-2017

265 views 1 download

transcript

Work Break Down Structure (WBS)

Step by Step Guide to Create WBS

5Only Steps

www.pmcmentor.com

PMBOK

Steps To Create WBS1. Identify the deliverables by reviewing the scope

statement

2. Decide the structure/layout the WBS i.e. Horizontal View, Outline View, Tree View, etc.

3. Decide the organization of the WBS i.e. Organize by phase, organize by deliverables .

4. Decompose the upper level WBS into lower-level detailed components

5. Assign unique identification codes to each WBS components

6. Verify the degree of decomposition is appropriate. Use 8/80 hours rule i.e. if workpackage takes more than 80 hours to complete, decompose it further. If workpackage can be completed within 8 hours, don’t decompose further.

2-Structure WBS Using different layouts

Outline ViewTree View

For more examples of layout, see Practice Standard of WBS on www.pmi.org

3-Organize WBSOrganized by Deliverables

Organized by Phase

5-Assign Unique Identification codes

DOWNLOAD PMP PREP COACH APP ON YOUR SMART PHONE / TABLET FROM BELOW STORES, THE WORLD’S FIRST APP , OFFERING 8 METHODS TO PREPARE FOR EXAM

FROM CONTRIBUTOR OF PMBOK. GOOGLE PLAY STORE: HTTPS://GOO.GL/K9KU4T

APPLE STORE: HTTPS://GOO.GL/DTCR1D

FOLLOW ON SLIDESHAREURL: HTTP://GOO.GL/HHGMKQ

SUBSCRIBE TO YOU TUBE CHANNEL: URL: HTTPS://GOO.GL/WQYX9A

LISTEN TO AUDIO FLASHCARD, THE MOST COMPREHENSIVE AUDIO VOCABULARY ON PMBOK 5TH EDITION INCLUDING ITTO

URL: HTTPS://GOO.GL/PZRCTI

CONNECT ON GOOGLE+pmcmentor@gmail.com

RESOURCES TO PREPARE FOR PMP EXAM