Post on 12-Mar-2015
transcript
As on 30.04.2011
Land
Acqusition
Civi works
completed
Structure,
transformer,
sub station
eqpt.received
Structure,
sub station
eqpt.erected
Transf.
erected&
tested
Original
Target
Date
Actual/ Now
Anticipated
date
1 2 3 4 5 6 7 8 9 10 11 12 13
A 765/400kV Substations
(a) Central Sector
1 Aug-08
a Gaya 765/400 3x1500 A 60% 60% 20% Yet to be
started.
Aug-12 Mar-12 Efforts being made to complete the sub
station earlier. Threats from Maoist
extremis is hampering progress
b Sasaram 765/400 2x1500 U A * Aug-12 Aug-12 * To be accomodated in the existing
HVDC station. Efforts being made to
complete progressively from Dec'11
matching with associate line completion.
c Fatehpur 765/400 2x1500 A 60% 60% 40% Yet to be
started.
Aug-12 Mar-12 Engg., civil works & erection under
progress.
d Lucknow 765/400 2x1500 A 70% 80% 50% Yet to be
started.
Aug-12 Mar-12 Engg., civil works & erection under
progress.
e Ranchi 765/400 2x1500 A 20% Aug-12 Aug-12 Engg. & supply under progress.
Serious local problem being faced in
land acquisation. Critical
f 400 kV Balia Aug. to 765 kV 2x1500 A 70% 80% 50% Yet to be
started.
Aug-12 Mar-12 Engg., civil works & erection under
progress.
g 400 kV Agra Aug. to 765 kV 2x1500 A 40% 70% 30% Yet to be
started.
Aug-12 Aug-12 Engg., civil works & erection under
progress. Completion affected due to
delay in land acquisation.
2 Aug-08
a Fatehpur Extn. 765/400 2x315 A 70% 70% 40% Aug-12 Mar-12 Engg. ,civil works & erection in
progress
b Gaya Extn. 765/400 2x315 A 0% Aug-12 Mar-12 * Being constructed under DVC
(main) project. Award placed in
Aug'09.
Date of
Award
Common Scheme for 765kV pooling Station and
Network Associated with DVC & Maithon RB Project
and import by NR & WR via ER
STATUS OF CONSTRUCTION OF ONGOING SUB-STATIONS(220 KV and above) DURING 2011-12
Cummulative progress till date CommissioningSl.
No.
RemarksName of the Sub-Station Voltage
ratio
(kV/kV)
Capacity
MW/MVA
Supplementary Transmission system Associated
with DVC & Maithon Right Bank Project
pspm(cea) Sub Stns 1 of 21
Land
Acqusition
Civi works
completed
Structure,
transformer,
sub station
eqpt.received
Structure,
sub station
eqpt.erected
Transf.
erected&
tested
Original
Target
Date
Actual/ Now
Anticipated
date
1 2 3 4 5 6 7 8 9 10 11 12 13
Date of
Award
Cummulative progress till date CommissioningSl.
No.
RemarksName of the Sub-Station Voltage
ratio
(kV/kV)
Capacity
MW/MVA
3 Mar-10
a Vindhyachal Pooling station 765/400 2x1500 Nov-12 Award placed in Feb'11..
Completion affected due to land
acquisation.
4 Dec-10
a Jabalpur Pooling station 765/400 2x1500 Dec-13 Tendering under progress.
Northern Region
5 Jul-09
a Jhatikara 765/400 4x1500 A 40% 60% 10% Jan-12 Award placed in Sep'09. Engg. civil
works & erection in progress.
b Meerut (Aug.) 765/400 2x1500 A 30% 40% Jan-12 Engg. & civil works under progress.
c Moga (Aug.) 765/400 2x1500 A 40% 20% Jan-12 Award placed in Nov'09. Engg. & civil
works under progress.
6
a Bhiwani 765/400 2x1500 Part land
acquired
May-12 Award placed in Dec'09. Engg. in
progress. Delay in commencement of
works due to now availability of S/S
land. Now part land handed over &
work being started. Completion
expected by Mar'13.
7 Aug-10
a Bareilly (with 125 MVAR
Reactor)
765/400 2x1500 U A Apr-13 Award under progress.
Western Region
8 Jul-09
a Wardha 765/400 3x1500 A 88% 30% 15% Oct-12 Oct-12 Engg., supply & civil works under
progress.
765KV System for Central Part of Northern Grid -
PART-III
765KV System for Central Part of Northern Grid -
PART-II
Trans. System associated with Mundra Ultra Mega
Power Project
Transmission System for Phase-I
Generation Projects in ORISSA - Part - B.
Transmission System of Vindhyachal-IV and Rihand -
III (1000MW each) Gen. Proj.
Northern Regional System Strengthening
Scheme - XXI
pspm(cea) Sub Stns 2 of 21
Land
Acqusition
Civi works
completed
Structure,
transformer,
sub station
eqpt.received
Structure,
sub station
eqpt.erected
Transf.
erected&
tested
Original
Target
Date
Actual/ Now
Anticipated
date
1 2 3 4 5 6 7 8 9 10 11 12 13
Date of
Award
Cummulative progress till date CommissioningSl.
No.
RemarksName of the Sub-Station Voltage
ratio
(kV/kV)
Capacity
MW/MVA
9 Oct-08
a Satna 765/400 2x1000 A 90% 81% 4% Dec-12 Jun-13 Engg., supply & civil works under
progress.
a Indore 765/400 2x1500 A Dec-12 Dec-12 Award placed in Aug'10.
b Bina 765/400 2x1000 A 40% 80% 28% Dec-12 Dec-12 Engg., supply & civil works under
progress.
c Gwalior 765/400 2x1500 A Dec-12 Dec-12 Award placed in Aug'10.
10 Feb-09
a WR Pooling Station near Sipat 765/400 2x1500 A 72% 28% 13% Feb-12 Feb-12 Engg., civil works & erection in
progress.
11 Feb-09
a WR Pooling Station near Sipat
(3rd ICT)
765/400 1x1500 A 10% Feb-12 Feb-12 Engg. & supply under progress.
12
a Raigarh Pooling Station 765/400 4x1500 Aug-13
b Raipur Pooling Station 765/400 1x1500 Aug-13
Eastern Region
13 Sep-10
a Jharsuguda Pooling Station 765/400 2x1500 U A Mar-13 Award placed in Mar'11.
* Land acquisation critical.
b Angul Pooling Station 765/400 4x1500 U A Mar-13 Award placed in Mar'11.
* Land acquisation critical.
(b) State Sector
UTTAR PRADESH (UPPCL) :
Trans. System associated with Sasan Ultra Mega
Power Project
Establishment of Pooling Station at
Raigarh (Korba) and Raipur for IPP Gen.
Proj. in Chhatisgsrh
Part-B- Regional System Strengthening in WR for
Sasan
Western Region System Strengthening-XI
Part-A- Tr. System of Sasan(4000) UMPP
Transmission System for Phase-I
Generation Projects in ORISSA - Part - A.
Western Region System Strengthening-X
pspm(cea) Sub Stns 3 of 21
Land
Acqusition
Civi works
completed
Structure,
transformer,
sub station
eqpt.received
Structure,
sub station
eqpt.erected
Transf.
erected&
tested
Original
Target
Date
Actual/ Now
Anticipated
date
1 2 3 4 5 6 7 8 9 10 11 12 13
Date of
Award
Cummulative progress till date CommissioningSl.
No.
RemarksName of the Sub-Station Voltage
ratio
(kV/kV)
Capacity
MW/MVA
1 Unnao 765/400 2x1000 Mar-11 May-11 LOI issued on 23.01.2010.Work
awarded to M/s Crompton Greaves.
Soil testing completed.Foundation
work of Towers in Progress.
2 Anpara C 765/400 2x600 +
1000
Mar-11 May-11 Work awarded to Ms Areva. Soil
testing completed .Pile testing for soil
stablisation in ash dump yard area is
in progress.
3 Mainpuri 765/400 2x1000 May-12 May-12 Proposed under PPP mode
B 400/220kV Substations
(a) Central Sector
1
a Misa (2nd ICT) 400/220 315 A Feb-13 Feb-13 Awarded. Engg. in progres.
2 Feb-09
a Biswanath Chariyali Pooling
Station
400/132 2x200 U A Aug-13 Aug-13 Packages under tendering.
Completion affected due to delayed in
award (ant. in Mar'14)
b Aug. of 400KV Agra S/Stn. 400/220 4x105 A Aug-13 Aug-13 Completion matching with Gen.
NORTHERN REGION
3 Sep-07
a Part-I, GIS Pooling Station near
Chamera-II HEP
400/220 630 ACompleted Completed 95%
Yet to be
received
Mar-10 Aug-11 Testing & commissioning under
progress.
4 Feb-09
a Extn. Patiala (1x500) 400/220 500 A40% 80% 30%
Aug-11 Aug-11 Award placed in July'09. Engg. & civil
works under progress.
b Extn. Malerkotla (1x500) 400/220 500 Commissioned 3/11
5 Dec-09Northern Region System Strengthening-XXIII
Eastablishment of 400/220 kV GIS Pooling Station
near Chamera-II HEP
Part-A : North East - Northern/ Western
Interconnector -I
Northern Region System Strengthening-XIV
North East - NR/WR Inter - connector (Subansiri &
Kameng)
pspm(cea) Sub Stns 4 of 21
Land
Acqusition
Civi works
completed
Structure,
transformer,
sub station
eqpt.received
Structure,
sub station
eqpt.erected
Transf.
erected&
tested
Original
Target
Date
Actual/ Now
Anticipated
date
1 2 3 4 5 6 7 8 9 10 11 12 13
Date of
Award
Cummulative progress till date CommissioningSl.
No.
RemarksName of the Sub-Station Voltage
ratio
(kV/kV)
Capacity
MW/MVA
a Extn. Bahadurgarh 400/220 1x500 A 30% 30% Dec-11 Award placed in Mar'10.Engg. & civil
works under progress.
b Extn. Lucknow 400/220 1x500 A 40% 60% 20% Dec-11 Award placed in Mar'10. Engg. & civil
works under progress.
6 Feb-09
a Neemrana 400/220 2x315 A 10% 40% Nov-11 Feb-12 Engg. & civil works under progress.
Completion affectted due to delay in
land acquisation.
b Kotputli 400/220 2x315 U A Nov-11 Feb-12 Engg. in progress. Completion
delayed due to land acquisation (ant.
in Dec'12).
7 Feb-09
a Dehradun 400/220 2x315 U A Nov-11 Feb-13 Engg. in progress. Completion
delayed due to land acquisation (ant.
in Mar'13).
8 Feb-09
a Bagpat (GIS) 400/220 2x500 Feb-12 Mar-13 Engg. in progress. Completion
delayed due to land acquisation (ant.
in Mar'13).
9 Feb-09
a Manesar (GIS) 400/220 2x500 A 2% 10% Nov-11 Mar-12 Engg. & civil works under progress.
Completion matching with line.
10 Dec-09
a Sikar 400/220 2x315 A 40% 40% 10% Aug-12 Award placed in Mar'10. Civil works
under progress.
b Panchkula 400/220 2x315 30% 30% Aug-12 Award placed in Mar'10. Engg. in
progress. Civil works under progress.
11 Mar-10
a Sohawal 400/220 2x315 A 20% Nov-12 Award placed in Aug'10
Northern Region System Strengthening Scheme -
XV
Northern Region System Strengthening
Scheme - XVIII
System Strengthening in Northern Region
for SASAN & MUNDRA (UMPP)
Northern Region System Strengthening
Scheme - XIX
Northern Region Transmission
Strengthening Scheme
Northern Region System Strengthening Scheme -
XIII
pspm(cea) Sub Stns 5 of 21
Land
Acqusition
Civi works
completed
Structure,
transformer,
sub station
eqpt.received
Structure,
sub station
eqpt.erected
Transf.
erected&
tested
Original
Target
Date
Actual/ Now
Anticipated
date
1 2 3 4 5 6 7 8 9 10 11 12 13
Date of
Award
Cummulative progress till date CommissioningSl.
No.
RemarksName of the Sub-Station Voltage
ratio
(kV/kV)
Capacity
MW/MVA
b Shahajanpur 400/220 2x315 A 20% Nov-12 Award placed in Aug'10
c Saharanpur 400/220 2x315 U A Nov-12 Award placed in Nov'10
d Jind 400/220 2x315 U A Mar-13 Tendering under progress.
Land acquiation delayed . Section -6
awaited. State Govt. asking for
repeating Section-4 as one year
lapsed after Sec-4.
e Jaipur (South) 400/220 2x500 A 5% 20% Nov-12 Engg. & civil works under progress.
f Bhiwadi Extn. 400/220 1x315 A 10% Mar-13 Award placed in Nov'10
12 Jul-10
a Wanpoh 400/220 2x315 A Jul-13 Award placed in July'10. Engg. in
progress. Land hand-over in Dec'10.
13 Aug-10
a Hamirpur GIS (with 80 MVAR B.
Reactor)
400/220 2x315 U A Mar-13 Award placed in Nov'10. Engg. in
progress. Land acqusition to be
expedited.
14 Dec-10
a Samba (with 80 MVAR B.
Reactor)
400/220 2x315 U A Aug-13 Award under progress.
15 Nov-09
a Bhiwani 765/400 2x315 Part land
acquired
May-12 Award placed in Dec'09. Engg. in
progress. Delay in commencement of
works due to now availability of S/S
land. Now part land handed over &
work being started. Completion
expected by Mar'13.
WESTERN REGION
Northern Regional System Strengthening
Scheme - XXII
765KV System for Central Part of Northern Grid -
PART-III
Northern Regional System Strengthening
Scheme - XVI
Northern Regional System Strengthening
Scheme - XX
pspm(cea) Sub Stns 6 of 21
Land
Acqusition
Civi works
completed
Structure,
transformer,
sub station
eqpt.received
Structure,
sub station
eqpt.erected
Transf.
erected&
tested
Original
Target
Date
Actual/ Now
Anticipated
date
1 2 3 4 5 6 7 8 9 10 11 12 13
Date of
Award
Cummulative progress till date CommissioningSl.
No.
RemarksName of the Sub-Station Voltage
ratio
(kV/kV)
Capacity
MW/MVA
16 Dec-07
a Navi Mumbai (GIS) 400/220 630 A 95% 95% 50% Sep-10 Mar-13 Engg., supply, civil works & erection
under progress. Sub station to be
completed matching with commissioning
associated line.
17 Feb-08
a Wardha Extn. 400/220 315 A A A 85% Nov-10 Dec-11 Supply & erection under progress.
b Pune Extn. 400/220 315 A A A 98% Nov-10 Dec-11 Supply & erection under progress.
c Raipur Extn. 400/220 315 A Complected Complected 90% 80% Nov-10 Jun-11 Erection under progress.
18 Apr-08
a Shujalpur 400/220 630 A 95% 95% 78% Jan-11 Oct-11 Engg.,Supply ,civil works & erection in
progress
19 Oct-08
a Bachchau 400/220 630 A Complected Complected 75% 50% Oct-12 May-11 Efforts being made to prepone the
S/Stn. matching with Gen. proj.
b Navsari GIS 400/220 630 A 15% 80% 10% 80% Oct-12 Mar-12 Award placed in July'09. Engg. & civil
works under progress.
c Aurangabad 400/220 630 U A Oct-12 Oct-12 Tendering under progress.
SOUTHERN REGION
20 Kaiga 3 & 4 Trans. System Mar-05
a Kozhikode S/Stn. (2x315) 400/220 630 A Completed Completed Completed 95% Dec-07 Mar-13 Civil work & erection under progress.
Completion matching with line.
21 Kundankulam - APP
Transmission System (Balance
portion)
Mar-05
a Muvattapuzha ( 2nd Trf.) 400/220 315 A Completed Completed Completed 80% Nov-08 Mar-12 * Completion matching with line.
22 Mar-09
a Chulliar (Palakkad) 400/220 2x315 A 30% 70% 10% Jul-11 Feb-12 civil works under progress.
Transmission System Associated with Mundra Ultra
Mega Power Project
System Strenghthening -XI of SR
WESTERN REGION Strengthening Scheme-VI
WESTERN REGION Strengthening Scheme-IX
Western Region System Strengthening-V
pspm(cea) Sub Stns 7 of 21
Land
Acqusition
Civi works
completed
Structure,
transformer,
sub station
eqpt.received
Structure,
sub station
eqpt.erected
Transf.
erected&
tested
Original
Target
Date
Actual/ Now
Anticipated
date
1 2 3 4 5 6 7 8 9 10 11 12 13
Date of
Award
Cummulative progress till date CommissioningSl.
No.
RemarksName of the Sub-Station Voltage
ratio
(kV/kV)
Capacity
MW/MVA
23 Dec-09
a Bidadi (GIS) 400/220 2x500 A 70% 80% 10% Mar-12 Award placed in Dec'09.
Engg.,supply, civil works & erection
under progress.
24 Feb-10
a Yelahanka (GIS) 400/220 2x500 A 40% 20% Jun-12 Supply & Civil works under progress.
EASTERN REGION
25 May-10
a Kishanganj 400/220 2x315 U A Jan-13 Award placed in Jun'10. Engg. in
progress.* Land acquisation critical.
26 Jul-10
a Daltonganj 400/220 2x315 U A Nov-12 Tendering under progress.
Completion likely to be delayed (ant.
in Mar13). Land yet to be acquired.
b Bolangir 400/220 2x315 A Nov-12 Award placed in July'10.
c Kenonjhar 400/220 2x315 A Nov-12 Award placed in July'10.
d Chaibasa 400/220 2x315 U A Nov-12 Tendering under progress.
Completion likely to be delayed (ant.
in Mar13). Land yet to be acquired.
e Uttara 400/220 2x315 U A Nov-12 Tendering under progress.
Completion likely to be delayed (ant.
in Mar13). Land yet to be acquired.
f Lakhisarai 400/132 2x200 U A Nov-12 Award placed in Feb'11.Engg. In
progress.
g Banka 400/132 2x200 A Nov-12 Award placed in Feb'11.Engg. In
progress.
System Strengthening - XII of SR
Transmission System for Transfer of
Power from Generation Project in SIKKIM
to NR/WR Part - A.
System Strengthening - X of SR GRID
Eastern Region Strengthening Scheme -
III
pspm(cea) Sub Stns 8 of 21
Land
Acqusition
Civi works
completed
Structure,
transformer,
sub station
eqpt.received
Structure,
sub station
eqpt.erected
Transf.
erected&
tested
Original
Target
Date
Actual/ Now
Anticipated
date
1 2 3 4 5 6 7 8 9 10 11 12 13
Date of
Award
Cummulative progress till date CommissioningSl.
No.
RemarksName of the Sub-Station Voltage
ratio
(kV/kV)
Capacity
MW/MVA
27 Mar-11
a Rangpo (GIS) 400/220/
132KV
16x105
3x100
U A Nov-13 Tendering under progress.
28 Feb-10
a Silchar (New) 400/220 2x200 A 40% Mar-12 Work under progress.
(b) STATE SECTOR (SS)
NORTHERN REGION (NR) :
1 Harsh Vihar GIS 400/220 Dec-11
2 Loni S/S (2x315) 400/220 630 Dec-10 Sep-11 (i) Contract awarded on 31.3.2010 with
18 months completion period .Soil testing
done. (ii) Out of 80 hec.,60
hec.land has been accquired.
(iii) Boundary wall construction obstructed
by villagers
System Strengthening
1 Nawada 400/220 2x315 Mar-11 Jun-11
2 Nuhiawali 400/220 3x315 Jun-11 Aug-11 Purchase order placed to M/s GET
Power private Ltd Chennai.
3 Dhanoda(Mohindergarh) 400/220 2x315 Mar-11 Dec-11
UTTAR PRADESH (UPPCL) :
Parichha TPS (2x250MW)
1 Orai S/S 400/220 2x315 Apr-11 May-12 Land available.
2 Paricha Ext. 400/220 2x315 Dec-10 Jun-12
WESTERN REGION (WR) :
DELHI (DTL)
Transmission System associated with
Pallatana gas Based Power Project and
Bongaigaon Thermal Power Station
(BTPS)
HARYANA (HVPNL)
Transmission System for Transfer of
Power from Generation Project in SIKKIM
to NR/WR Part - B.
pspm(cea) Sub Stns 9 of 21
Land
Acqusition
Civi works
completed
Structure,
transformer,
sub station
eqpt.received
Structure,
sub station
eqpt.erected
Transf.
erected&
tested
Original
Target
Date
Actual/ Now
Anticipated
date
1 2 3 4 5 6 7 8 9 10 11 12 13
Date of
Award
Cummulative progress till date CommissioningSl.
No.
RemarksName of the Sub-Station Voltage
ratio
(kV/kV)
Capacity
MW/MVA
Bhilai TPP (P) (JV- NSPCL)
1 NSPCL (2x315 MVA) ICT - II 400/220 630 Oct.07 Jun-11 Failed during S C test. Under repair
Korba (W)
1 Raipur (2x315 MVA) 400/220 630 Oct.07 Mar-12 Order placed 7/09,WIP.
GUJARAT (GETCO) :
1 Rajkot(Hadala) ICT-II 400/220 1x315 Mar-08 Jun-11
system strengthening
1 Halvad 400/220
Khaperkheda TPS
1 Khaperkheda S/S (2x500) 400/220 1000 Oct-10 May-11
System Strengthening
1 Bhusaval (2x500) 400/220 1000 Mar-11 May-11 Test charged
2 Koradi -II 400/220 500 Sep-11 Dec-11
3 Warora 400/220 500 Sep-11
4 Lonikhand 400/220 500 Sep-11
5 Chandrapur-II 400/220 500 Sep-11
SOUTHERN REGION (SR) :
KARNATKA (KPTCL):
1 Nelamangala (Addl. 3rd Trf.) 400/220 500 Existing Dec-11 LOA issued on 04.02.11 . Work to be
commenced.
1 S V Chatram 400/230 2x315 A 100% 100% 80% 80% Jul-10 Jun-11
EASTERN REGION (ER) :
System Strengthening
MAHARASHTRA(MSETCL)
ORISSA (OPTCL)
Chhattisgarh (CSPTCL)
TAMILNADU (Tantransco) :
Adani Power Limited (State) 1000 MW (Bid-1)
pspm(cea) Sub Stns 10 of 21
Land
Acqusition
Civi works
completed
Structure,
transformer,
sub station
eqpt.received
Structure,
sub station
eqpt.erected
Transf.
erected&
tested
Original
Target
Date
Actual/ Now
Anticipated
date
1 2 3 4 5 6 7 8 9 10 11 12 13
Date of
Award
Cummulative progress till date CommissioningSl.
No.
RemarksName of the Sub-Station Voltage
ratio
(kV/kV)
Capacity
MW/MVA
1 Dubri 400/220 (2x315) 400/220 630 May-08 Jun-11 220 kV portion charged.Pre
commissioning test of 2 nos. ICT &400
kV Bay to be taken up after completion of
Meramundali-Duburi line by PGCIL.Oil
filtration work is in progress.
System Strengthening
1 Kharagpur 400/220 2x315 Apr-09 A Partially
completed.
Partially
received.
Yet to be
started
Mar-10 Mar-12 Equipment supply work in progress.
2 Arambag (Aug.) 400/220 315 Mar-12
3 Jeerat (Aug.) 400/220 315 Mar-12
EASTERN REGION (ER) :
1 Palatana Gas Power Project ,
(2x363.3MW)
a Surajmaninagar S/S 400/132 2x200 Dec-11
1 Palatana Gas Power Project ,
(2x363.3MW)
a Kukurmara S/S (2x315) 400/220 630 Dec-11
1 Palatana Gas Power Project ,
(2x363.3MW)
a Killing (Byrnihat) S/S 400/220 630 Dec-11
C 220 KV Substations
(a) CENTRAL SECTOR (CS)
POWERGRID (PGCIL) :
1
WEST BENGAL (WBSTCL) :
Augmentation of 220/132KV Transformation
Capacity at Raebareli (PG) by 1x100 MVA
Transformer
TRIPURA (TSECL)
ASSAM (AEGCL)
MEGHALAYA (MePTCL)
pspm(cea) Sub Stns 11 of 21
Land
Acqusition
Civi works
completed
Structure,
transformer,
sub station
eqpt.received
Structure,
sub station
eqpt.erected
Transf.
erected&
tested
Original
Target
Date
Actual/ Now
Anticipated
date
1 2 3 4 5 6 7 8 9 10 11 12 13
Date of
Award
Cummulative progress till date CommissioningSl.
No.
RemarksName of the Sub-Station Voltage
ratio
(kV/kV)
Capacity
MW/MVA
a Raebareli (POWERGRID) 220/132 100 Aug-10 A Mar-12 Mar-12
2 Feb-10
a Mokokchung (New) 220/132 2x50 A Dec-12 Engg. in progress.
DAMODER VALLEY CORPORATION (DVC) :
Mejia TPS Unit-6 (1x250MW)
1 Gola (2x50 MVA) 220/33 2x80 Jun-11 Jun-12 Order placed in Nov.2009 with
completion time of 12 months. Work
could not be started due to ROW
problem on the substation land
acquisition.Matter has been taken up
with district adminstration .supply &
erection awarded.
Chandrapura TPS Extn.(2x250)
1 Giridih (2x150+2x80) 220/132 460 A Partially
received
Partially
erected
Oct-10 Mar-12 Order placed on 27-08-09 and WIP.
2 Dhanbad (1x80) MVA 220/33 80 Mar-09 May-11 Work in progress, Order placed in
July 08 and erection of equipment
almost completed.
3 Dhanbad (2x150) MVA 220/132 300 Jul-10 Jun-11 WIP
4 Koderma (2x80) MVA 220/33 160 A 98% 95% 95% Jul-10 Jun-11 WIP
5 Koderma (2x150 ) MVA 220/132 300 A 98% 95% 95% Jul-10 Jun-11 WIP
(b) STATE SECTOR (SS) :
NORTHERN REGION (NR) :
DELHI (DTL) :
Commonwealth Games
1 Electric Lane (GIS) 220/33 2x100 Mar-08 May-11 Delay due to tree cutting permission
from forest department.
2 Trauma Centre/AIIMS (GIS) 220/33 2x100 Mar-08 May-11 S/Stn is ready. Electircal Inspector
clearance awaited.
Transmission System associated with Pallatana gas
Based Power Project and Bongaigaon Thermal
Power Station (BTPS)
pspm(cea) Sub Stns 12 of 21
Land
Acqusition
Civi works
completed
Structure,
transformer,
sub station
eqpt.received
Structure,
sub station
eqpt.erected
Transf.
erected&
tested
Original
Target
Date
Actual/ Now
Anticipated
date
1 2 3 4 5 6 7 8 9 10 11 12 13
Date of
Award
Cummulative progress till date CommissioningSl.
No.
RemarksName of the Sub-Station Voltage
ratio
(kV/kV)
Capacity
MW/MVA
System Strengthening
1 Wazirpur 220/33 100 Sep-11
2 Rohini 220/66 160 Sep-11
3 Harsh Vihar GIS 220/66 160 Dec-11
System Strengthening
1 Masudpur 220/132 100 Sep-11
2 A-5 Faridabad 220/66 100 Sep-11
3 Dhanonda 220/132 100 Sep-11
4 Lula Ahir 220/66 100 Sep-11
5 Sampla 220/132 100 Commissioned 3/11
6 Mohana 220/132 100 Dec-11
7 IMT Manesar (2nd) 220/66 1x100 Mar-06 May-11 Trf. Received at site erection by
HSIDC.
8 Tepla Aug 220/132 2x100 Jun-09 May-11
9 Nuhiawali 220/132 2x100 Mar-11 Jun-11
1 Baddi (Addl.) 1x100 MVA 220/66 1x100 Mar-08 Mar-12 Delay due to forest case in HC
JAMMU & KASHMIR (J&K):
1 Alusteng 220/132 320 A 30% 10% 10% Trf.
Received
Sep-09 Dec-11 Levelling&construction walls/ control
room building under progress.
2 Mirbazar 220/132 320 A 70% 65% 65% Trf.
Received
Mar-09 Jun-11 transformers received
3 Budgam 220/132 320 A 70% 60% 60% Trf.
Received
Mar-09 Jun-11 transformers received
4 Amargarh 220/132 160 A 80% 60% 60% Trf.
Received
Sep-09 Jul-11 WIP
5 Bishnah 220/132 2x160 Mar-09 Dec-11 Laying of earth mat in progress,
equipment foundations completed,
control room in progress.
6 Ramban (3x40) 220/132 1x120 Jun-09 Mar-12 WIP
7 Ziankote 220/132 3x150 Jun-09 Mar-12
HARYANA (HVPNL) :
HIMACHAL PRADESH (HPSEB Ltd.) :
pspm(cea) Sub Stns 13 of 21
Land
Acqusition
Civi works
completed
Structure,
transformer,
sub station
eqpt.received
Structure,
sub station
eqpt.erected
Transf.
erected&
tested
Original
Target
Date
Actual/ Now
Anticipated
date
1 2 3 4 5 6 7 8 9 10 11 12 13
Date of
Award
Cummulative progress till date CommissioningSl.
No.
RemarksName of the Sub-Station Voltage
ratio
(kV/kV)
Capacity
MW/MVA
System Strengthening
1 Mastewala 220/66 100 May-11
2 Jhunir 220/66 100 Commissioned 3/11
3 Mandi Govindgarh 220/66 100 May-11
4 Mehal Kalan 220/66 100 Dec-11
5 Rehana Jattan 220/66 100 Dec-11
6 Ghobaya 220/66 100 Commissioned 3/11
7 Patran 220/66 100 Dec-11
8 Lalru 220/66 100 Sep-11
9 Ferozepur Road Ludhiana
(1x100 MVA)
220/66 100 Mar-07 Feb-12 Civil/Erection work in progress
10 Doraha (U/G) (1x100 MVA) 220/66 100 Jun-10 May-11 Civil work in progress
System Strengthening
1 Madri (Udaipur) 220/132 100 Jul-11
2 Kishangarh 220/132 100 Commissioned 3/11
3 Dechu 220/132 100 Dec-11
4 Gajner 220/132 100 Dec-11
5 Gangapurcity 220/132 100 Dec-11
6 Barli 220/132 100 Dec-11
7 Manoharpur 220/132 100 Dec-11
8 Padampur 220/132 100 Mar-12
9 Aspur 220/132 100 Mar-12
10 Jhalmand 220/132 100 Mar-12
11 Sawa 220/132 100 Commissioned 3/11
PUNJAB (PSTCL) :
RAJASTHAN (RRVPNL) :
pspm(cea) Sub Stns 14 of 21
Land
Acqusition
Civi works
completed
Structure,
transformer,
sub station
eqpt.received
Structure,
sub station
eqpt.erected
Transf.
erected&
tested
Original
Target
Date
Actual/ Now
Anticipated
date
1 2 3 4 5 6 7 8 9 10 11 12 13
Date of
Award
Cummulative progress till date CommissioningSl.
No.
RemarksName of the Sub-Station Voltage
ratio
(kV/kV)
Capacity
MW/MVA
12 Sanchore(1x100) 220/132 100 Jun-09 May-11 Test charged
UTTAR PRADESH (UPPCL) :
System Strengthening
1 Bhelupur 220/33 120 Dec-11
2 Gajokhar 220/132 100 Dec-11
3 Jhansi 220/132 100 Dec-07 Dec-11 Earthmat laying 85% completed.
Transf.plingth 75% completed.
4 Bithoor 220/132 160 Sep-11
5 Kanpur South 220/132 160 Sep-11
6 Partapgarh 220/132 100 Mar-12
7 Jhusi 220/132 160 Mar-12
UTTARAKHAND (PTCUL) :
1 Dehradun 220/132 1x160 Jun-06 Dec-11 Land acquisition under progress.
2 Ghansali 220/132 2x50 Dec-10 Jun-11 Bid evaluation completed.WIP.
3 Mahnabheraganj 220/132 2x100 Dec-10 Jun-11 Work in progress.Equipment supply
completed.WESTERN REGION (WR) :
System Strengthening
1 Mungeli 220/132 160 Mar-12
2 Saraipally 220/132 160 Mar-12
3 Vishrampur 220/132 1x160 Apr-07 Dec-11 Order placed in Aug.2009.Site handed
over.
System Strengthening
1 Shapur 220/132 315 Mar-12
2 Vadala 220/66 100 Mar-12
3 Popda 220/66 100 Mar-12
4 Suva 220/66 100 Mar-12
5 Bhatiya 220/132 100 Mar-12
GUJARAT(GETCO) :
CHHATTISGARH (CSPTCL) :
pspm(cea) Sub Stns 15 of 21
Land
Acqusition
Civi works
completed
Structure,
transformer,
sub station
eqpt.received
Structure,
sub station
eqpt.erected
Transf.
erected&
tested
Original
Target
Date
Actual/ Now
Anticipated
date
1 2 3 4 5 6 7 8 9 10 11 12 13
Date of
Award
Cummulative progress till date CommissioningSl.
No.
RemarksName of the Sub-Station Voltage
ratio
(kV/kV)
Capacity
MW/MVA
6 Lunawada 220/66 100 Mar-12
7 Jasdan 220/132 100 Mar-12
8 Tankara 220/66 100 Mar-12
9 Saria 220/132 100 Mar-12
10 Vyankatpura 220/66 100 Mar-12
11 Kalawad 220/66 100 Mar-12
12 Kosamba 220/66 1x100 Mar-08 Jun-11
GOA :
1 Cuncolim 220/33 3x50 Dec-10 Jun-11 Work order with IRCON.
MADHYA PRADESH (MPPTCL) :
System Strengthening
1 Daloda 220/132 160 Mar-12
2 Chichali 220/132 160 Mar-12
3 Astha 220/132 160 Dec-11
4 Seoni 220/132 160 Mar-12
MAHARASHTRA (MSETCL) :
System Strengthening
1 Paranda 220/132 200 Jun-11
2 Patoda 220/33 50 Dec-11
3 Bhokardhan 220/132 100 Dec-11
4 Jath 220/132 100 Sep-11
5 Bhambori (Jalgaon) 220/132 100 Sep-11
6 Vasai 220/100 200 Sep-11
7 Bapgaon 220/132
220/33
2x200
2x50
Mar-08 Jun-11 WIP
8 Shendra 220/132 2x100 Mar-08 Jun-11 WIP
SOUTHERN REGION (SR) :
ANDHRA PRADESH (APTRANSCO) :
System Strengthening
pspm(cea) Sub Stns 16 of 21
Land
Acqusition
Civi works
completed
Structure,
transformer,
sub station
eqpt.received
Structure,
sub station
eqpt.erected
Transf.
erected&
tested
Original
Target
Date
Actual/ Now
Anticipated
date
1 2 3 4 5 6 7 8 9 10 11 12 13
Date of
Award
Cummulative progress till date CommissioningSl.
No.
RemarksName of the Sub-Station Voltage
ratio
(kV/kV)
Capacity
MW/MVA
1 Rachagunneri 220/132 2x100 Partially
received.
Partially
erected.
Dec-11 Foundation works and structure
erection works under progress.
2 Osmania University 220/132 2x160 Partially
completed.
Dec-11
3 Erragadda 220/132 3x160 Partially
completed.
Dec-11 Work commenced and are in
progress.
4 lmliban (GIS) 220/132 2x160 Partially
completed.
Sep-11
5 Gunrock 220/132 2x160 Partially
completed.
Dec-11 Site levelling is under progress.
6 Nagari 220/132 2x100
+2x50
Partially
received.
Partially
erected.
Dec-11 Foundation works, Structure erection
and euipment erection works under
progress.
7 Palamaneru 220/132 2x100 Dec-09 Jun-11 All works completed . Connected line
works are under progress.
8 Bellampally (Mandamarri) 220/132 2x100 Oct-08 May-11 All works completed. Connected line
work in progress.
9 Sadasivpet 220/132 2x100 Partially
received.
Partially
erected.
May-11 Substation is charged from 132 kV
side. Change of scope of line works
due to 400 kV Yeddumailaram
evacuation lines. LOI issued for
revised 220 kV line.
10 Jurala 220/132 2x100 Erection
completed.
Yet to be
erected.May-11 Substations work complected.
11 Settipally 220/11 3x25 99% May-11
12 Yellanur 220/11 2x25 70% May-11
13 Gaddamvaripalli 220/11 2x25 75% May-11
14 Goddumarri 220/11 2x50 50% Jul-11
15 Kambalapadu 220/11 3x25 100% May-11
16 Thimmapuram 220/11 2x25 95% May-11
17 Kondapuram 220/132 2x100 100% May-11
18 Nansuralla 220/11 3x25 100% May-11
19 Vemnur 220/11 2x50 70% Jun-11
20 Medaram 220/11 2x50 15% Aug-11
pspm(cea) Sub Stns 17 of 21
Land
Acqusition
Civi works
completed
Structure,
transformer,
sub station
eqpt.received
Structure,
sub station
eqpt.erected
Transf.
erected&
tested
Original
Target
Date
Actual/ Now
Anticipated
date
1 2 3 4 5 6 7 8 9 10 11 12 13
Date of
Award
Cummulative progress till date CommissioningSl.
No.
RemarksName of the Sub-Station Voltage
ratio
(kV/kV)
Capacity
MW/MVA
21 Krishnagiri 220/11 3x25 22% Aug-11
22 Lakkasagaram 220/11 3x25 100% May-11
23* Brahmanakotkur 220/11 3x25 Apr-11 25 MVA Trf. Commissioned 4/11.
24* Malyala 220/11 126 Apr-11 95 MVA Trf. Commissioned 4/11.
KARNATAKA (KPTCL) :
1 Jigani (2x150) MVA 220/66 300 A Near
completion.
Received Partially
erected
Erected Sep-11
2 Vikas Tech Park (2x150) MVA 220/66 300 A Partially
complection.
Partially
received
Partially
erected
Partially
erectedDec-11
3 Halbarga (2x100) MVA 220/110 200 A Partially
complected
Partially
received
Partially
erectedDec-11
4 Ramanagar(Kothipura) 220/66 100 A Completed Received Erected Erected Jun-11
5 Chikkmagalur (2nd Trf.) 220/66 100 A complected Received Erected Erected Jun-11 All equipments erected. Road
formation and PC test under progress.
6 Kushalanagara (2nd Trf.) 220/66 100 A complected Received Erected Erected Jun-11 All work complected.
7 Somanahalli (Addl.) 220/66 100 A CR existing. Existimg. Erected Erected Jun-11 Oil to be filtered. Work stopped by the
firm.KERALA (KSEB) :
1 Punnapra 220/110 2x100 Jun-07 Dec-11 Erectionof yard structure,cable
trench,Equipment foundation completed.
Overall 92% completed.
2 Kanjikkod(Add.Tr.) (2x25) 220/110 50 Mar-12
3 Pothencode(3rd
Trf.) 220/110 200 Commissioned 3/11
4 Kattakkada(New) 220/110 200 Mar-12
1 Karambayam 230/110 2x100 A 100% Partially
Received
50% Dec-10 Jun-11
2 Karamdai (2x100) 230/110 100 A 20% Mar-12
3 Aliyar (2x100) 230/110 100 A 100% Partially
Received
80% Dec-11
4 Nallamanaickenpaty (2x100) 230/110 100 A 50% Partially
Received
10% Sep-11
5 Vyasarpadi 230/110 100 A 20% Mar-12
TAMILNADU (Tantransco) :
pspm(cea) Sub Stns 18 of 21
Land
Acqusition
Civi works
completed
Structure,
transformer,
sub station
eqpt.received
Structure,
sub station
eqpt.erected
Transf.
erected&
tested
Original
Target
Date
Actual/ Now
Anticipated
date
1 2 3 4 5 6 7 8 9 10 11 12 13
Date of
Award
Cummulative progress till date CommissioningSl.
No.
RemarksName of the Sub-Station Voltage
ratio
(kV/kV)
Capacity
MW/MVA
6 Athipet 230/110 100 A 100% Received 90% 5% Jun-12
7* Sadayapalayam 230/33 100 Apr-11 Commissioned 4/11.
8* Oragadom 230/110 100 Apr-11 Commissioned 4/11.
9* Alundur (Aug.) (100-50) 230/110 50 Apr-11 50 MVATrf. Commissioned 4/11.
1 Thondamanatham 230/110 2x100 Jun-10 May-11 Both transformers placed on plinth
EASTERN REGION (ER) :
BIHAR (BSEB) :
System Strengthening
1 Hazipur (2x100) 220/132 2x100 May-08 Dec-11 Order placed and work has been
stated.
2 Sipara (Patna) (2x150) 220/132 2x150 May-08 Sep-11 Works are being executed by PGCIL.
3 Madhepura (2x100) 220/132 2x100 Jun-11 Work in progress
4 Dehri (Aug.) 220/132 1x100 May-11
5 Muzaffarpur TPS (kanti) (Aug.) 220/132 1x100 Dec-08 May-11 Work in progress
1 Chaibasa 220/132 2x150 Jun-10 Jun-11 Land under development.
ORISSA (OPTCL ) :
System Strengthening
1 Bolangir 220/132 100 Commissioned 3/11
2 Mendhasal 220/33 20 Mar-12
3 Bonai 220/33 80 Dec-11 Substations boundary wall in
progress. Contour survey of the S/S
site complected.
System Strengthening
1 Kharagpur 220/132 320 Apr-09 A Partially
received.
yet to be
started.
Mar-12 Mar-12 Equipment supply work in progress.
WEST BENGAL (WBSETCL) :
PUDUCHERRY
JHARKHAND (JSEB) :
pspm(cea) Sub Stns 19 of 21
Land
Acqusition
Civi works
completed
Structure,
transformer,
sub station
eqpt.received
Structure,
sub station
eqpt.erected
Transf.
erected&
tested
Original
Target
Date
Actual/ Now
Anticipated
date
1 2 3 4 5 6 7 8 9 10 11 12 13
Date of
Award
Cummulative progress till date CommissioningSl.
No.
RemarksName of the Sub-Station Voltage
ratio
(kV/kV)
Capacity
MW/MVA
2 Dalkhola 220/132 320 Jun-09 Partially
completed.
Partially
received.
Partially
complted.
Jun-11 Sep-11 Control room building is completed.
Equipment erection work in progress.
3 Kasba (Aug) 220/132 160 Mar-12
4 Laxmikantapur (Aug) 220/132 160 Mar-12
5 Howrah (Aug) 220/132 160 Mar-12
6 Rishra(aug.) 220/132 100 Jul-09 90% 100% Partially
completed.
Yet to be
started.
May-11 Equipment erection work in progress.
NORTH-EASTERN REGION (NER) :
1 ATS of Palatana Gas Power
Project , (2x363.3MW)
a Kukurmara S/S (2x50) 220/132 100 Dec-11
2 ATS of BongaigaonTPS
(Salakati)
a Rangia S/S (2x100) 220/132 200 Dec-11
1 Nangalbibra 220/132 100 Dec-11
LEGEND: * Outside programme
S/C Single circuit MVA Mega Volt Ampere
D/C Double circuit MW Mega watt
M/C Multi circuit ckt Circuit
S/C on
D/C
Single circuit on Double circuit S/S Sub-station
kV Kilo- volt PGCIL Powergrid corporation of India limited
CKm Circuit kilometer UPPCL Uttar Pradesh Power corporation Limited
LILO Loop in Loop out PFC Power Finance Corporation
TPS Thermal Power station C.R. Control Room
CR Panel Control and Relay panel Struct. Structure
NHPC National Hydro Power Corporation Transf. TransformerNR Northern Region
AEGCL
MEGHALAYA(MeSEB)
pspm(cea) Sub Stns 20 of 21
Land
Acqusition
Civi works
completed
Structure,
transformer,
sub station
eqpt.received
Structure,
sub station
eqpt.erected
Transf.
erected&
tested
Original
Target
Date
Actual/ Now
Anticipated
date
1 2 3 4 5 6 7 8 9 10 11 12 13
Date of
Award
Cummulative progress till date CommissioningSl.
No.
RemarksName of the Sub-Station Voltage
ratio
(kV/kV)
Capacity
MW/MVA
Aug Augmentation SG Switch gearWR Western Region
CS Central Sector NR Northern Region SR Southern Region
SS State Sector SR Southern Region ER Eastern Region
NER North-East Region A Available/Acquired
U A Under Acquisition
pspm(cea) Sub Stns 21 of 21