CONSTRUCTION FOR TETRAPOD PRESENTATION

Subcontractor: Phuc HungPrepared by:

1

LACH HUYEN PORT INFRASTRUCTURE CONSTRUCTION PROJECT

CONSTRUCTION SEQUENCE FOR CONSTRUCTION TETRAPOD BLOCK

1. Site preparation

2. Operate & transport Tetrapod’s formwork to the site

3. Installation formwork

4. Installation scaffolding

5. Casting conscrete

6. Dismantling scaffoiding, formwork

7. Curing, transport to Tetrapod’s storage yard & go to the other

blocks

Prepared by: 2

LACH HUYEN PORT INFRASTRUCTURE CONSTRUCTION PROJECT

1. SITE PREPARATION

Prepared by: 3

LACH HUYEN PORT INFRASTRUCTURE CONSTRUCTION PROJECT

Construction for auxiliaries building & Casting Tetrapod’s yard

2. OPERATE & TRANSPORT TETRAPOD’S FORMWORK TO THE SITE

Prepared by: 4

LACH HUYEN PORT INFRASTRUCTURE CONSTRUCTION PROJECT

Tetrapod’s Formwork

2. OPERATE & TRANSPORT TETRAPOD’S FORMWORK TO THE SITE

Prepared by: 5

LACH HUYEN PORT INFRASTRUCTURE CONSTRUCTION PROJECT

Installation for concrete mixed plant

2. OPERATE & TRANSPORT TETRAPOD’S FORMWORK TO THE SITE

Prepared by: 6

LACH HUYEN PORT INFRASTRUCTURE CONSTRUCTION PROJECT

Installation for concrete mixed plant

3. INSTALLATION FORMWORK

Prepared by: 7

LACH HUYEN PORT INFRASTRUCTURE CONSTRUCTION PROJECT

Installation for Tetrapod’sformwork

3. INSTALLATION FORMWORK

Prepared by: 8

LACH HUYEN PORT INFRASTRUCTURE CONSTRUCTION PROJECT

Installation for Tetrapod’sformwork

3. INSTALLATION FORMWORK

Prepared by: 9

LACH HUYEN PORT INFRASTRUCTURE CONSTRUCTION PROJECT

Installation for Tetrapod’sformwork & scaffolding

4. CASTING CONCRETE

Prepared by: 10

LACH HUYEN PORT INFRASTRUCTURE CONSTRUCTION PROJECT

Casting concrete

5. DISMANTLING SCAFFOIDING, FORMWORK

Prepared by: 11

LACH HUYEN PORT INFRASTRUCTURE CONSTRUCTION PROJECT

Dismantling scaffoiding, formwork

6. CURING CONCRETE

Prepared by: 12

LACH HUYEN PORT INFRASTRUCTURE CONSTRUCTION PROJECT

Curing concrete

7. TRANSPORT TO TETRAPOD’S STORAGE YARD

Prepared by: 13

LACH HUYEN PORT INFRASTRUCTURE CONSTRUCTION PROJECT

Transport to tetrapod’s storage yard

AS ABOVE, ALL THE IMAGES WERE COLLECTED BY OUR

ENGINEERS WHEN THEY WERE CARYING OUT FOR CASTING

TETRAPOD BLOCK IN DA NANG PORT IMPROVEMENT PROJECT.

Prepared by: 14

LACH HUYEN PORT INFRASTRUCTURE CONSTRUCTION PROJECT

THANK YOU SO MUCH !!!