Suburban Park Master Plan Update - imageserv11.team-logic.com · Agenda - Public Meeting No. 2...

Post on 12-Mar-2020

0 views 0 download

transcript

Suburban Park Master Plan Update

Agenda - Public Meeting No. 2 Introductions Overview of planning process Suburban Park Existing Conditions Summary of Previous Work Summary of Research and Outreach Conceptual Alternative Designs Presentation of the Pre-Final Design Public input Next steps

Master Planning Process Goal setting Site analysis Needs assessment and research Conceptual alternative designs Pre-final design Final design Cost analysis Phasing plan

Youth Baseball

Field

Tennis & Pickleball

Courts

Basketball Court

Playground Areas

Trails & BikePaths

Undeveloped and Natural

Areas

Drainage Swale

Previous Master Plan 2003 and Stormwater Studies 2014 and 2015

Previous Study

Site Constraints

Research and Outreach Working with a Study Committee Key Person Interviews Public Meeting No. 1 Public Opinion Survey

Conceptual Alternatives

Nature Play

YourThoughts

Next Steps Goal setting Site analysis Needs assessment and research Preliminary conceptual designs Pre-final design / Public meeting No. 2 Final design Cost analysis Phasing Plan Public Meeting No. 3 (March 27, 2019) Check out

the

On-Line Survey

Thank you for Attending(717) 812-9959

anny@ysmla.com

chucks@ysmla.com

Mark Your Calendars

Next Public Meeting

March 27, 2019