Post on 02-Aug-2020
transcript
01
0102
02
05
05
04 04
VENTILATION
+80.600
Creche Waste Store12.1 m²
Ram
p access 1:21
+80.6
00
BLOCK 'D
' LIFT LOBBY
+80.600+80.600
ESB SUB STATION32.0 m²
SWITCH ROOM 0215.5 m²
SWITCH ROOM 0114.9 m²
CENTRAL WASTECOMPOUND
54.5 m²
TUG CHARGER13.5 m²
WATER STORAGE &HEATING CENTRE
124.6 m²
LOBBY13.7 m²
+81.3
00
STAIR17.2 m²
BLOCK 'F'
ACCESSLOBBY28.0 m²
COMPACTOR ROOM01
101.9 m²
Lobby6.4 m²
3m ENTRY LANE (AS PER 4.7 STD)
3m EXIT LANE (AS PER 4.7 STD)
2m CYCLE RAMP (2 WAY)
LOBBY10.8 m² LOBBY
7.0 m²
BLOCK 'E' ACCESS
WET RISER TANK 0124.2 m²
WET RISER TANK 0221.1 m²
WATER FEATUREPLANT ROOM
30.7 m²
Cold Water StorageTank
Duty/Standby PumpsPipework and
Ancillaires161.2 m²
Administration100.8 m²
MOTORCYCLE
PARKING x 6
LOBBY6.9 m²
LOBBY9.2 m²
STAIR15.7 m²
BLOCK 'B'
ACCESS
GENERATOR ROOM29.6 m²
LOBBY12.3 m²
LOBBY9.9 m²
STAIR23.0 m²
Comms room19.6 m²
BLOCK 'A'
ACCESS
254 CAR PARKING SPACES(10 Universal Accessible, 25 Electric Charge Point)
21 MOTORBIKE SPACES888 BICYCLE SPACES
Public Lobby28.8 m²
Escape Lobby9.6 m²
+80.600
LETTER BOXES
Comms3.0 m²
+80.600
+80.600
+80.600
+80.600
VENTILATION MEDIAN/ KERB
KERB
KERB
3.5m WIDE CURVE (AS PER 4.6 STD WITH 7.5 r AS PER 4.5 STD) INSIDE CLEARANCE OF 0.3m AND
OUTSIDE CLEARANCE OF 0.6m AS PER 4.5 STD)
Carpark perimeter ventilation grilles
RAMP 1:14
7% FOR BICYCLE ACCESS
PROPOSED PEDESTRIAN AND ROAD
INFRASTRUCTURE (SET`DOWN) TO BE
PROVIDED IN CONJUNCTION WITH DUN
LAOGHAIRE RATHDOWN COUNTY
COUNCIL
BARRIER
BARRIER
+81.300
CA
RM
AN
HA
LL
RO
AD
BL
AC
KT
HO
RN
D
RI
VE
PROPOSED PEDESTRIAN
AND ROAD
INFRASTRUCTURE
(SETDOWN) TO BE
PROVIDED IN
CONJUNCTION WITH DUN
LAOGHAIRE RATHDOWN
COUNTY COUNCIL
WC5.5 m²
Changing7.1 m²
Changing7.2 m²
Gym reception21.5 m²
Gym253.6 m²
Café Store18.8 m²
Post Room23.0 m²
Lounge95.6 m²
Lobby5.3 m²
Maintenance42.8 m²
Changing5.3 m²
WC5.0 m²
Lobby6.7 m²
COMPACTOR ROOM01
75.3 m²
GENERATOR ROOM32.2 m²
Bicycle parking82.5 m²
Bicycle parking86.3 m²Bicycle parking 02
85.4 m²Bicycle parking
55.1 m²Bicycle parking
125.5 m²
+81.300
+80.600RAMP
1:12
Lobby3.0 m²
Comms room13.3 m²
Cleaners9.9 m²
+80.600
+81.300
EXISTING AREA OWNED BY ROCKBROOK'S DEVELOPMENT WITHIN THE APLICANT'S BOUNDARY
14075
11284
12301
58087
3947
Sprinkler TankDuty/Standby
PumpsPipework and
Ancillaries57.5 m²
For landscaping
details refer to
landscape architect's
drawings
MOTORCYCLE PARKING x 6MOTORCYCLE PARKING x 3
MOTORCYCLE
PARKING x 4
MOTORCYCLE
PARKING x 2
Carpark ventilation above
Carpark ventilation above
Carpark ventilation above
+81.400
+82.167
23554
176 Bicycles 62 Bicycles 136 Bicycles 124 Bicycles 134 Bicycles
74 Bicycles
80 Bicycles
Bicycle parking108.2 m²
Stairs E17.9 m²
Sheffield type Bicycle parking
(36 Bicylces)
Sheffield type Bicycle parking (12 Bicylces)
Sheffield type Bicycle parking (54 Bicylces)
e-charge e-charge e-charge e-charge e-charge e-charge e-charge
e-charge e-charge
e-charge e-charge
e-charge e-charge
e-charge e-charge e-chargee-charge
e-charge
e-charge
e-charge
e-charge
e-charge
e-charge
e-charge
e-charge
Stacked Bicycle parking(786 Bicycles)
03
03
4956
29220
27953 107249 26745 1550
3400
24959 3032
12132
Stacked parking (x6) Stacked parking (x6)
Stacked parking (x6) Stacked parking (x6)
Stacked parking (x6) Stacked parking (x6)
NOTE:
N
ISSUED FOR PLANNING APPROVAL
A1
ISSUED FOR PLANNING APPROVAL
A1
ALL DIMENSIONS TO BE CHECKED ON SITE
NO DIMENSIONS TO BE SCALED FROM THIS DRAWING
DRAWING IS TO BE READ IN CONJUNCTION WITH RELEVANT CONSULTANTS DRAWINGS
CLIENT
PROJECT
SCALE@ A0:
DRAWING
DRAWN/CHECKED:
DATE
DRAWING NUMBER REVISIONSTATUS CODE:
PROJECT NUMBER
Architecture + Interiors
henryjlyons.com+353 1 888 3333
info@henryjlyons.com
51-54 Pearse Street
Dublin D02 KA66
STATUS CODE DESCRIPTION
OUTLINE OF DEVELOPMENT OUTSIDE THE APPLICATION LINE BOUNDARY IS INDICATIVE AND IS PROVIDED FOR CONTEXT INFORMATION ONLY.
PLEASE REFER TO BERNARD SEYMOUR LANDSCAPE ARCHITECTS DRAWINGS AND REPORT FOR ALL INFORMATION ON LANDSCAPE.
A2
1 : 200
SANDYFORD GP Ltd.
PROPOSED LEVEL 0 LOWER GROUND FLOOR PLAN
18/07/2019
BM/ RJ
SANDYFORD CENTRAL
950572
SFC-HJL-00-00-DR-A-1010
1 : 200
00 - LOWER GROUND1
BLOCK CLIFT LOBBY+80.60
FOOT PATH+80.60
REV DATE DESCRIPTION CKH DRN
A1 18.07.2019 ISSUED FOR ABP PRE APPLICATION RJ BM
A2 15.11.2019 ISSUED FOR PLANNING APPROVAL RJ HJL
N