Team Legados Detailed Design Presentation Team members: Mohammed Sharara 3488 Amir Almazrouei 3529...

Post on 29-Mar-2015

214 views 0 download

Tags:

transcript

Team Legado’s Detailed Design PresentationTeam members:•Mohammed Sharara 3488•Amir Almazrouei 3529•Mohammed Abdullah 3633•Fahad Altamimi 3464

Outline

•Introduction•Aim and scope of the project•Objectives•Modifications•Surfacing•Maintenance•Estimated cost of materials•Summary

Introduction

•Client statement: The requested to conceive a design for a

playground for the ( SNC ) that is:1. Safe2. Affordable 3. Reliable

Aim and scope of the project

•Aim of the project:

Designing a device for a playground that satisfies the objectives and obey the restrictions.

•Scope of the project:

Designing at least 2 devices for the playground that will be used by children in ( SNC ).

Objectives

•Objectives:SafeAffordable ReliableEasy to maintainEasy to assemble

Evaluation and generation of alternatives•Identifying the objectives using metrics.

•Identifying the functions using requirements.

•Building a Morph Chart using means.

•Choosing the design using Numerical Evaluation Matrices.

Modifications

•Design 1: ( before modification )

Modifications

•Design 1 ( after modification )

Modifications

Modifications

Modifications

Modifications

Modifications

•Changes and modifications: Adding of mind challenging gamesAlternating some of the features of the

original designChanging the design of the climbing ropesModification of the design to accommodate

with the different symptoms of the childrenExtra safety measures to ensure safety

Modifications

•Design 2: ( before modification )

Modifications

•Design 2 ( after modification )

Modifications

•Changes and modifications: Changing the design to an assembly based see-

sawAddition of safety meansInstalling barriers to the springs to restrict it’s

movementModification of the design to accommodate with

the different symptoms of the children

Surfacing

•safety zones:For both the playhouse and see-saw

•Materials used and why:1. Pea gravel2. Shredded/recycled rubber mulch

Maintenance

•Aim is to decrease maintenance rate by using :

Materials with available spare parts.Materials with low maintenance rate.Materials with no need for specialist to

assemble.Materials that takes short time to assemble.

• Decrease maintenance rate Decrease cost.

Estimated cost of materialsMaterial Amount Total cost

(AED)Rubber mulch 72 square ft 1100

Plastic 260 square ft 1600

Metal sheets 8 square ft 5300

Metal poles (15) 1125 kg 4000

Ropes 8.4 m 100

The total cost of the equipments add up to 12100 (AED)

Summary

•Team Legado’s assignment.•Most important features of the detailed

design:Extra safety measures.Changing the designs to reduce the cost. Improving the design to suit different

children with different symptoms.•Testing the detailed design.•Getting approval to start building device.