The 20th
NORTH SEA OFFSHORE CRANES & LIFTING CONFERENCE21st - 23rd April 2015,Stavanger Forum, Stavanger, Norway
www.liftingoffshore.com
State Supervision of MinesMinistry of Economic A�airs
The Norwegian Society of Lifting Technology(NSLT) together with the Offshore MechanicalHandling Equipment Committee (OMHEC)are again proud to announce this year’s NorthSea Offshore Cranes & Lifting Conference.
The conference alternates between the “oil capitals” ofNorway and Scotland - Stavanger and Aberdeen - theseare the most important places of business for the NorthSea oil and gas industry and home for regulators, the major duty holders, oil and gas contractors, service companies etc. During the conference, the participants will have a chance to meet and share their experiences with North Sea offshore petroleum regulators, experts and industry leaders from the offshore crane and lifting operations community.
The conference has the goal to cover a wide range of new topics in offshore cranes and lifting technology, subsea and heavy lifting, crane standardisation and regulatory and industry safety initiatives. Participants will have ample opportunity to enter into discussions with the speakers and spend time interacting with companies demonstrating their goods and services in the Crane Expo area.
Why you need to attend “The 20th NSOCLC in Stavanger, 21st - 23rd April 2015”
You’ll get the most up-to-date information in the offshore crane and lifting business industry, as well as answers to all of your crane and lifting questions. Additionally, world renowned crane business leaders, endusers, consultants, petroleum regulators and vendors will all be gathered, solely for the purposes of learning, exchanging information, networking, see and try new technology and developing long lasting business relationships in order to contribute to enhance safety and improve business.
What sets this conference apart from the rest?
The 20th North Sea Offshore Cranes and Lifting Conference is the only conference with a complete focus on the offshore crane & lifting business in the North Sea and beyond.The conference is not a series of sales orientated pitches but a dynamic gathering of like-minded people involved in the offshore lifting industry. Our unique blend of presentations, case studies and exhibitions provides you with an unique opportunity to walk away from the summit with all of the critical information you need to get the most out of your daily lifting operational tasks. This conference gives the lifting community the platform that it truly deserves as it provides many hours of dedicated networking time for you to talk openly with your peers, suppliers and customers and the opportunity to conduct business face-to-face.
WELCO ME TO THE 20TH NORTH SEAOFFSHORE CRANES & LIFTING CONFERENCE
Afternoon session Chairman: Mr. John Morrison, Enermech Ltd., UK
08.00 Registration / Coffee / Exhibition
09.30 Welcoming Remarks Mr. Svein Anders Eriksson, Section head, Petroleum Safety Authority, N
09.40 Welcome to Stavanger Opening Address Mr. Finn Carlsen, Director of Professional Competence, Petroleum Safety Authority, N
Regulation/Safety
10.00 HSE Focus Mr. Colin Martin, Health and Safety Executive, HSE, UK
10.30 Coffee Break / Exhibition
11.00 PSA Focus • Summaryincidentsandaccidents • MarketSurveillance Mr. Svein Anders Eriksson, Section head, Petroleum Safety Authority, N
11.30 OMHEC Update Mr. Sigmund Andreassen, Leader OMHEC / Principle Engineer, Petroleum Safety Authority, N
12.00 Lunch / Exhibition
13.00 Historic View and Development of Offshore Cranes Mr. Svein Anders Eriksson, Section head and Mr. Sigurd Førsund, Principle Engineer, Petroleum Safety Authority, N
13.30 HSE Report on Lifting Incidents and Accidents • Directandunderlyingcauses • Safetyliftingequipment • Expectationstotheindustry • Needfornewharmonizedstandards Mr. Colin Martin, Health and Safety Executive, HSE, UK
14.00 Coffee Break / Exhibition
TUESDAY 21ST APRIL
MONDAY 20TH APRIL
WEDNESDAY 22ND APRIL
14.30 Adequate Planning for Safe and Efficient Complex Rigging Operations • Choiceofliftingmethodisthekeysuccess factorformakingacomplexliftingoperation safeandefficient • Agoodliftingmethodfacilitatesthedetailed planningphase,andplanningofthe complexliftingoperationcanbedoneright thefirsttime Mr. Magnus Gabrielsen, Service Manager Safe Lifting, Axess, N
15.00 Crane Operator View Mr. Mr. Bjørn Eirik Larsen, DOF Management, Crane Operator, N
15.30 Coffee Break / Exhibition
Human Factors and training
16.00 Human Factors and Team Leadership: Maintaining Safety in Crane Operations • It’shumantomakemistakes-humanfactor trainingisaboutcontrollingandbreakingthe chainoferrorswhilemaintainingefficient operations. • Whatcanwelearnfromcrewresource managementtraininginshippingand aviation? Mrs. Aud Wahl instructur “human factor” SMSC, N
16.30 End of day 1
SOCIAL ARRANGEMENT
19.00 Aperitif at DNB Arena
19.30 Dinner at Clarion Hotel Energy, Master of ceremonies: Mr Peter Mitchell, UK
08.30 Developing Situation Awareness: Case Studies for Offshore Deck Crews • WhatisSituationAwareness? • CaseStudy1–OffshoreDeckOperations • CaseStudy2–OffshoreDrillingSector • Takingthisforward–Growyourown! Mrs. Andrea De Cort, Health & Safety Executive, Energy Division – Offshore, UK
Lifting Operations and Planning
09.15 Weather-restricted Sea Transports Aboard Heavy Lift Ships • Designingseatransportsofheavyandbulky cargotakingintoaccounttherouteandtime oftheyear
Program
20.00 Get together at Scandic Forum Hotel
Morning session Chairman: Mr. Svein Anders Eriksson, Petroleum Safety Authority, N
Morning session Chairman: Mr. Colin Martin, Health and Safety Executive, HSE, UK
Program
• Mitigationofriskforcargodamageorloss ofcargobymonitoringsignificantwave heightsandaccelerationsontransit Mr. Helge Rathje, Senior Project Engineer, SAL Heavy Lift GmbH, D
09.45 Inspection of Drilling Equipment: In-service Inspection According to API and EoC Inspection Combined • Inspectionandcompetencerequirements • AnychallengesinimplementingEoC requirements? Mr. Kenneth Bjørset, Service Manager Enterprise of Competence, Axess, N
10.15 Coffee Break / Exhibition
10.45 Weather Window Improvements in Offshore Lifting • CranemasterTechnologyenablessignificant improvementofweatherwindowinoffshore liftingoperations • Thecurrentpresentationwilldemonstrate anddocumentthebenefitsusing Cranemasterinactualoffshoreoperations, visualizedbysimulationsandoffshorevideos Mr. Kristian Helland, Product manager, Cranemaster, N
Sharing Best Practices – experience transfer
11.15 From Selection to use – an Operation Perspective to Lifting Gear • Liftinggearinprojectsneedtobefirst selected,thenaccepted,andfinallyused. • Existinggreyareasofthisprocesswillbe presented,showingexamplesofpossible dysfunctionalsituations,callingfora developmentdialogue Mr. Bartlomiej Kolosowski, Project Manager Marine Operations DNV GL, D
11.45 Load Testing of Offshore Cranes: Why we do it and what are we Trying to Achieve? • Thereasonswhyweconductloadtestsare oftenmisunderstoodresultinginmisinter- pretationofwhenatestshouldbeperformed • Athoroughunderstandingofwhywedoit andwhatwewanttoachievecanhelp reduceoperationrisksandensurelegislation compliance Mr. Alan Smiles, Engineering Services Manager, The Sparrows Group, UK
12.15 Lunch / Exhibition
WEDNESDAY 22ND APRIL CONTINUED
Standards
13.15 Crisis intervention - the Company model • Preparednessforcrisesandcompetencein handlingdangersituationscomeoutasthe twomostimportantfactorsincopingwith extremeevents. Mr.Lars Weisæth, Division of Psychic Health, Institute of Clinical Medicine, University of Oslo, N
13.45 New Guidance to Push Boundaries and Create the magic in Offshore Lifting Operations • UseoftheIMCAsafetyflashsystemforthe reportingorliftingincidents • UpdateofongoingrevisionsofIMCAM187 ‘GuidelinesforLiftingOperations’andIMCA M179Cable-laidSlings&Grommets Mr. Mark Ford, Technical Adviser, IMCA Marine, UK,
14.15 Coffee Break / Exhibition
14.45 Status - NORSOK R- Lifting equipment standards • NORSOKR-003Revision3 • NORSOKR-002Editorialchangestorevision2 Mr. Stein Ove Dyngeland, Advisor Lifting Equipment & Lifting Operations, Statoil ASA, N
New Technology
15.30 NOV`s All Electric Offshore Crane • Highuptime • ImprovedSafety • LowLife-cyclecost Mr. Tor Raknestangen, Product Champion Lattice Boom Crane, NOV, N
16.00 Subsea Cranes, the Next Generation. • Enhancedsubseaconstructionfunctionality andcapability • HightliftingcapacityatUtra-deep waterdepts • Increasingfunctionalityandredundancy Mr. Jan Thore Lygren, Business Development Manager Cranes, Huisman Norway AS, N
16.30 End of day 2
18.30 Drink reception – Stavanger Consert Hall
Afternoon session Chairman: Mr. Tor Inge Hystad, Statoil, N
New Technology
08.30 Condition Monitoring of Crane Bolted Joints • ConditionMonitoringUsingRotaBolts • ContinuousMonitoringUsingRotaBoltsNew WirelessSystem Mr. Robert A M Blacklock, Product Engineer, Rotabolt, UK
Personell transfer
09.00 Transfer of Personnel in the Arctic - Challenges and Solutions • Thispaperwilldiscussthechallenges involvedinthemovementofcrewsto offshoreoilandgasinstallationsinthe Arcticsector. • Thetechnologicaladvancesinmarine methodsofcrewtransfersuitableforusein theseenvironmentswillbediscussed. Mr. Andrew Morrison, Business Manager of Reflex Marine Ltd, UK
09.30 Motion Compensated Access Offshore • Experiences • Challenges Mr. Bjørnar Huse, CEO, Uptime, N
10.00 Coffee Break / Exhibition/ Check out
10.30 Development in Offshore Access • LatesttrendsinWalktoWork • Technologyupdate • RulesandRegulations Mr. Joël Jansen, Manager QHSE, Ampelmann Operations B.V., NL
Lifting Ropes
11.00 Influences on winch drums arising from variations of the transverse compressive stiffness of wire ropes in correlation to their service life • Variationofropestiffnessduringservice lifeanditsinfluenceontheloaddistribution ofwinchdrums Mr. Harald Dauböck, Business Unit Manager Crane Wire Ropes, Teufelberer and Mr. Armin Lohrengel Institut fuer Maschinenwesen, Technische Universitaet Clausthal, D
THURSDAY 23RD APRIL Lifting Ropes
11.30 Non-Destructive Test Methods for Synthetic Fiber Rope • Magneticbasedandx-raynon-destructive test(NDT)methodsforsyntheticfiberrope areindevelopment. • Dataanalysisisdiscussedandplanned futureworkisoutlined. Mrs. Elizabeth W. Huntley, COO, Whitehill Manufacturing Corp, US
12.00 Lunch/ exhibition
Morning session Chairman: Mr. Maro Hartmann, Lloyd’s Register Marine, D
Afternoon session Chairman: Mr. Robert Oftedal, DNV GL, N
13.00 “Heavy Lift Fiber Roundslings for Offshore and Subsea – a Manufacturer’s Experience and Solutions” • Customer’scomplexrequirementsneed innovativesolutions • Manufacturersmustfullyunderstandthe challengestobeabletoprovidesolutions Mr. Jeff Susman, President, Slingmax Inc., US
13.30 The Challenges with Regulations & Rules in the Lifting Industry • AviewonthechallengesintheIndustrywith manyregulations,lawsandstandards • Misunderstandings,unspecificcriterias, interpretations.Couldwemakethingseasier? Mr. Roger Øvstetun, Technical Department Manager, W. Giertsen, Services AS, N
14.00 Closing/ Adjour
14.15 Bus transport to airport
Program
Monday 20th April 201520.00 Get together atScandicForumHotel
Tuesday 21st April 2015Conference dinner:
19.00 AperitifDNBArena
19.30 DinneratClarionHotelEnergy PeterMitchellwillbetheMasterofCeremonies. Dresscode:Formal
Wednesday 22nd April 201518.30- VisitingStavangerConsertHall-drinkreception.
19.30
Conference no.: 1540100
Time: 21st-23rdApril2015
Place:StavangerForum,Stavanger,Norway
Conference Committee:• Mr.SveinAndersEriksson, Petroleum Safety Authority,N
• Mr.TorIngeHystad,Statoil, N
• Mr.ColinMartin, HSE, UK
• Mr.JanKetilMoberg, Petroleum Safety Authority, N
• Mr.JohnMorrison,EnerMech, UK
• Mr.MaroHartmann,Lloyds Register Ltd, D
• Mr.RobertOftedal,DNV GL, N
• Mrs.AnneLineRosenlund, Norwegian Society of Lifting Technology, N
GENERAL INFORMATION
Conference Fees:
• Participants:NOK12.500,-excl.VAT
• Earlyreg.:NOK11.500,-excl.VAT(15thMarch)
• Singledayregistration:NOK4.900,-excl.VAT
• Lecturers:NOK5.200,-excl.VAT
• Co-authors:NOK8.500,-excl.VAT
• Sponsorship:NOK20.000,-excl.VAT
• Exhibitor:NOK20.000,-excl.VAT
• Daytimepackagesincludes lunchandrefreshments NOK550,-/dayexcl.VAT
In addition / Options:Gettogether20thAprilNOK300,-excl.VATConferencedinner21stAprilNOK950,-excl.VATStavangerConsertHall22ndApril: NOK150,-excl.VAT
General information and registration
REGISTRATION
Accommodation:ScandicForumHotel:NOK1495,-pr.nightClarionHotelEnergy:NOK1515,-pr.night
Payment:TheRegistrationfee,conferencepackagesandsocial activitieswillbepayabletoNSLT.Paymentoptions:
1.Byindividualinvoice.Anindividualinvoicefortheregis- trationfeesandselectedoptions(exclaccommodation costs)willbesentbymail,payabletoNSLF.Duedateis Tuesday14thApril2015.Pleasebringacopyofthe remittanceattheconferenceifpaymentismadeafterthis.
2.Byon-sitepayment.Ifitismoreconvenientforyou,bring theinvoicewithyoutothecheck-indesk,whereyoucan paywithcreditcard(VISA/Diners/Mastercard/AmEx). Remembertoadviseusinadvanceifyouselectthispayment
Cancellation:Cancellationmustbemadewithinthreebusinessdaysbeforetheseminarstartunlessfullfeemustbepaid.Cancellationfeeis20%offullregistrationfeeaftertheregistrationdeadline.Onlywrittencancellationis accepted.
Location / venue:StavangerForumisoneofNorway’sfewconferenceandexhibitioncentres,abletooffer25meetingrooms.TheScandicForumHotel,with182rooms,ispartofthesamecomplexasourconferencecentre,andwecooperatewithallthehotelsintheregion.http://www.stavanger-forum.no
Registration office:TheNorwegianSocietyofLiftingTechnology,NSLTMs.AnneLineRosenlundP.O.Box73,N-1325Lysaker,NorwayPhone:+4767526012Fax:+4767526011e-mail:anne.line@tfsk.no
1540100 The 20th North Sea Offshore Cranes & Lifting ConferencePLEASE USE CAPITAL LETTERS
Registration by: 24th March 2015Online registration: www.ktf.no
Name:...................................................................................... Company:.........................................................................................
Address:.............................................................................................................................................................................................
Postcode................................................................................. Country:............................................................................................
E-mail:..................................................................................... Telephone:........................................................................................
PLEASE REGISTER ME FOR THE FOLLOWING OPTIONS:
Full-timeconferenceRegisterforone-dayonlyApril21stApril22ndApril23rdNOK4.900,-/dayexcl.VAT+daytimepackageGettogether,Monday(NOK300,-excl.VAT)Conferencedinner,Tuesday(NOK950,-excl.VAT)ConsertHall,Wednesday(NOK150,-excl.VAT)Bustotheairport,Thursday(Free)
HOTEL: ScandicForumHotel:NOK1495,-pr.night,incl.breakfast ClarionHotelEnergy:NOK1515,-pr.night,incl.breakfast
Arrivaldate.............................................................................. Departuredate..................................................................................
PAYMENT: Ipreferon-sitepaymentwithcreditcard,seegeneralinformation(above).
Date:........................................................................................ Signature:..........................................................................................
Returadresse:Tekniske Foreningers ServicekontorPostboks 73, No-1325 Lysaker
Registration by: March 24th 2015Online registration: www.ktf.no
Conference website: www.liftingoffshore.com