THE DELAWARE RIVER
WATERFRONT CORPORATION
Graffiti Pier Pre-Proposal Meeting June 13, 2019
TODAY’S AGENDA
▪ Introduction to DRWC▪ Past Projects▪ Project Background and Description▪ Questions
DRWC’S CORE RESPONSIBILITIESPlanning / Development
▪ Design and build high quality parks, open space and other public amenities
▪ Promote and support high quality private investment in new development
▪ Connect waterfront to adjacent neighborhoods
Programming
▪ Activate waterfront public spaces with a diverse range of high quality events and activities
▪ Operate highly successful public events (e.g., Spruce Street Harbor Park & Blue Cross RiverRink Winterfest and Summerfest)
▪ Complement DRWC’s development mission by generating more demand for and excitement about the riverfront
Maintenance / Security
▪ Ensure waterfront public spaces are kept free of litter and graffiti and in good repair
▪ Reduce and prevent crime and enhance perception of safety through regular security presence in close collaboration with Philadelphia Police
MASTER PLAN PROJECT AREA
Master Plan covers the waterfront from Oregon Ave. to Allegheny Ave. and east of I-95
OREG
ON
MASTER PLAN VISION: PARKS EVERY HALF MILE
MASTER PLAN VISION: MULTI-MODAL WATERFRONT TRAIL NETWORK
Multi-Use TrailColumbus Boulevard TrailExisting Regional BikewayExisting Local Bikeway
OREG
ON
SPRIN
G GA
RDEN
WASH
INGT
ON
MASTER PLAN VISION: CONNECTOR STREET IMPROVEMENTS
Primary Connector StreetSecondary Connector Street
OREG
ON
MARK
ET
SNYD
ER
COMPLETED AND PLANNED PROJECTS
RACE STREET PIER
WASHINGTON AVENUE PIER
PIER 68
SOUTH WETLANDS PARK
▪ RFP for Design Services released on 5/20
▪ Proposals due to DRWC on 7/8, 4:30pm
▪ Planned Wetland Park on Piers 53 – 70 in South Philadelphia
▪ Create vital fish and aquatic species habitat
▪ Improve access to the waterfront ▪ Increase resiliency to SLR and climate
change impacts
GRAFFITI PIER PROJECT
PROJECT NEED▪ Continue DRWC investment in the northern
waterfront ▪ Connect Port Richmond and Olde Richmond
neighborhoods to the waterfront with better access
▪ Preserve and expand the impact of Graffiti Pier as an artistic resource
Source: Flickr
PROJECT BACKGROUND▪ Conrail owns significant waterfront property
abutting the Port Richmond and Olde Richmond neighborhoods
▪ Conrail and DRWC entered into an MOU in 2019 to transfer the 6 acre site (Pier 18) to DRWC for creation of a public park and to support the further transformation of the space
PROJECT DESCRIPTIONThe RFP is for a comprehensive planning process for:▪ Conceptual design of a new public park▪ Improved access to the waterfront for Port Richmond and Olde Richmond▪ Continuation of the Delaware River Trail beginning at Cumberland Street
Source: BillyPenn
PROJECT DESCRIPTION
OTHER PROJECT GOALS▪ Improved access to and within
the site – improve connections to adjacent neighborhoods and coordinate with Conrail on a future plan for multi-modal access and circulation
▪ Incorporate best practices in sustainability and climate change resiliency – ensure the structural integrity of bulkheads and future impacts from climate change on the waterfront and nearby neighborhoods
The plan should…▪ Be a community-supported vision▪ Reflect the space’s civic value and
artistic heritage ▪ Provide a realistic path forward
towards transformation with a strong implementation focus
▪ Ensure community buy-in –create a sense of ownership and stewardship by engaging neighbors and future users of the space, respect the cultural heritage of the pier
HISTORIC SITE OVERVIEW - 1924
Source: Dallin Aerial Survey Company Photographs
HISTORIC SITE AERIAL
Graffiti Pier (Pier 18)
Originally the site was used as a coal tipping pier to transfer coal from Western PA to ships.
SITE AERIAL TODAY
Graffiti Pier site ~6 acres (in red)
GRAFFITI PIER RFP SCHEDULE
6/4/2019 Request for Proposals released6/13/2019 Pre-Proposal Meeting 6/21/2019 Questions due to DRWC in writing (email
only to kthompson@drwc.org) by 4:30pm6/26/2019 DRWC to post answers to questions
online by 5:00pm 7/12/2019 Proposals due to DRWC by 12:00 pmWeek of 7/15/2019 or 7/22/2019 Interviews with short-listed firmsEnd of July Project awarded
QUESTIONS?