The IDMS

Post on 12-Jan-2016

39 views 0 download

Tags:

description

The IDMS. DP1: Portfolio Management. Prov Infr Strat. DP1-1 Infrastructure Planning. DP1-2 Programme Management. Develop/review U-AMP (including prioritised MTEF works list). Develop/review C-AMP (incl portfolio level Work Plans). Develop /review Constr Proc Strat. Develop /review IPMP. - PowerPoint PPT Presentation

transcript

The IDMSProv Infr

Strat

G1(a) G2G1(b)U-AMP C-AMP

PC1

PF1.4PF1.3 PF2.1 PF2.2 PF2.3 PF3 PF4PF5PF1.1 PF1.2

DP1: Portfolio Management

DP1-2 Programme ManagementDP1-1 Infrastructure Planning

Develop/review U-AMP (including prioritised MTEF works list)

Develop/review C-AMP (incl portfolio level Work Plans)

Develop /review Constr

Proc Strat

Develop /review

IPMPManage Implementation

Authorise Implementation

Monitor & Control Close Out

G3 G4 G5 G6(a) G6(b) G7 G8PC2

PC3

PC4a

PC5

PC4b

PF1.4PF1.3 PF2.1 PF2.2 PF2.3 PF3 PF4PF5

T1 T2

PEP2PEP1 IPIP PEP3

DP2: Project Management

DP2-1 Implementation Planning

Prepare Packages

Define Packages

Develop/Review IPIPs (Prgr & Proj level)

DP2-2 Design

Design devlpmt

Detailed design

Compile MFC Info

DP2-3 Works

Construct / Deliver works

Handover works

DP2-4 Close Out

Contracts Close Out

Adminstv Close Out

PEP4 PEP5 PEP6 PEP7

PF1.4PF1.3 PF2.1 PF2.2 PF2.3 PF3 PF4PF5

G8

DP3: Operations & Maintenance

DP3-1 Recognise & accept assets

DP3-2 Mobilisation for Facilities Mgt DP3-3 Operations DP3-4 Maintenance DP3-5 Demobilisation

of Facilities Mgt