The Power of Metrics in Enterprise-wide Project · PDF filein Enterprise-wide Project...

Post on 04-Feb-2018

222 views 0 download

transcript

1International Metrics Congress 2007

The Power of Metrics in Enterprise-wide

Project Management

Dennis L. Bolles, PMP andDarrel G. Hubbard, PE

brought to you by the PMI MetSIG and Cheetah Learning

2International Metrics Congress 2007

Brought To You By

Cheetah Learning is Global Leader in PMP Exam prep and PM Training with classes covering the globe from the U.S. and Canada to South America, Europe, New Zealand and Australia, India and Asia, the Middle East and Africa.

Our accelerated learning techniques speed learning and retention and drive our 97% pass rate on the PMP exam.

Michelle LaBrosse, Founder & Chief Cheetah, recently named one of 25 Influential Women in PM in the world.

Cheetah Learning strives to raise the profile of PM with our webinars and our Know How Network column which is published in over 200 publications around the world.

3International Metrics Congress 2007

Presentation OverviewManaging Metrics is a Project Business Management (PBM) Function

Project Business Management Methodology (PBMM)is needed for Enterprise-wide Project Management

4International Metrics Congress 2007

Driving Forces - PBM & Metrics

PAIN!NEED

ACTION

Loosing Market ShareCompetition is Faster to MarketFewer Resources AvailableCost Cutting – Budget ReductionsNeed to Manage Dynamic GrowthRequired to Financially SurviveNeed to Determine Project Success

5International Metrics Congress 2007

PBM & Metrics Management

Project Business Management is the integration of General Business Management and Project Management policies, processes, and procedures and it provides a methodology that facilitates good Metrics Management practices.

Metrics Management begins with the Strategic and Tactical Planning processes, where the Business Objectives are developed along with associated defined values and benefits to be derived from accomplishing those objectives. and continues with establishing the supporting metricsfor the related Portfolios, Programs and Projects.

6International Metrics Congress 2007

EPBM Metrics Creation

Establishing Enterprise-wide Project Business Management (EPBM) Metrics is a mindset, a way of defining, analyzing, and determining metrics that is supported by metric measurement techniques.

EPBM organizes Metrics into direct alignment with the enterprise’s vision, mission, strategic initiatives, and business objectives (VMSO) Metrics.

EPBM enables the enterprise to translate VMSO Metrics into supporting execution of portfolios, programs, and projects.

7International Metrics Congress 2007

Cultural Changes Required

KnowledgeKnowledge – the extent to which the enterprise’s management knows what metrics exist and what their importance is – Governance.

ConsistencyConsistency – the efficiency, effectiveness, and support of the company’s information systems and processes in defining, measuring and analyzing metrics - Standardization

CommitmentCommitment – the degree to which individuals at all levels of the enterprise are engaged in Metrics Management in their own areas – Capability

AgilityAgility – the ability to know what Metrics are necessary and sufficient for the organization to meet internal & external Customers needs, and the degree to which the enterprise can respond to those requirements – Execution

8International Metrics Congress 2007

Metrics Mgmt Enterprise-wide

Plan to Achieve Your Desired State of Enterprise-wide Metrics Management

Assess the Current StateDefine the Future StatePlan to Fill the Gap

9International Metrics Congress 2007

Important Steps to Take

1. Obtain top executive commitment and support for Metrics Management

2. Get middle management commitment & support

3. Assess the current situation4. Create a Metrics Management Charter and get

it formally adopted by the senior management team

5. Make a big splash in establishing metrics management to get everyone’s attention

10International Metrics Congress 2007

Important Steps to Take – Cont’d

6. Create a standard list of Metrics 7. Implement a Project Management Metrics

standard8. Provide Metrics Education & Training9. Sell the concept of enterprise-wide Metrics

Management

Establishing EPBM Metrics ManagementIs Not A Trivial Pursuit!

11International Metrics Congress 2007

Establish EPBM Metrics ManagementEstablish EPBM Metrics Management

Critical Success Factors

Establish Governance

Define Standardization

Develop Capability

Enable Execution

12International Metrics Congress 2007

Metrics Governance

13International Metrics Congress 2007

Metrics Mgmnt Vision & Mission

Metrics Management VisionMetrics Management VisionTo create an environment that enables world-class

proficiency in managing project business management metrics enterprise-wide.

Metrics Management MissionMetrics Management Mission

To provide the leadership that will guide the enterprise in implementing enterprise-wide Metrics Management by utilizing ‘best-in-class’ project business management

methodologies, tools, templates, and technology.

14International Metrics Congress 2007

Metrics Mgmt. Strategy & ObjectivesMetrics Management Strategy

Create an environment within the enterprise that embraces Metrics Management as an intrinsic enabler for achieving its strategic initiatives and project business management

objectives.

Metrics Management Business ObjectivesTo establish and institutionalize Metrics Management

practices as the natural way to achieve project business management objectives and treats it as a business

function to the degree that it becomes an enterprises core competency .

15International Metrics Congress 2007

Metrics Standardization

16International Metrics Congress 2007

Develop Metrics Mgmt. Standards

Establish Project Business Management Metrics Management Standards

Include therein: policies, procedures, processes, tools and templates

Develop to be commonly applied to planningstrategic initiatives, developing business objectives, and executing all enterprise portfolios, programs, and projects.

17International Metrics Congress 2007

Publish Metrics Methodology

Seven PBM Standards incorporate Metrics Management processes

Strategy Development ProcessesBusiness Objective Development processesPortfolio Management ProcessesProgram Management ProcessesProject Management ProcessesEducation & TrainingEducation & TrainingPBM TemplatesPBM Templates

18International Metrics Congress 2007

Metrics Capabilities

19International Metrics Congress 2007

Education & Training

Develop a Metrics ManagementEducation & Training program,

which defines education and training requirements, testing criteria, and validation processes

for developing metrics during strategic planning, objectives development, and portfolio, program, and

project planning

and for metrics measurements during portfolio, program, and project execution.

20International Metrics Congress 2007

Education & Training ProgramEducation & Training Program

General Population

Project Teams

Project Managers

Executives &

Managers

Knowledge Objectives

Learning Objectives

Assessment Methods

Metrics Management Curriculum

21International Metrics Congress 2007

Enabling Metrics CapabilitiesEnabling Metrics Capabilities

Provide Hands-on Mentoring & CoachingAssist With Metrics Plan: Assist With Metrics Plan:

Metrics DevelopmentMetrics DevelopmentCost Benefit AnalysisCost Benefit AnalysisScope Statement Scope Statement Risk ManagementRisk ManagementProject ScheduleProject ScheduleCommunications PlanCommunications PlanMetrics Measurement

22International Metrics Congress 2007

Metrics Execution

23International Metrics Congress 2007

Strategy Metrics Planning

PBMM Business Strategic Initiative Development Data Flow

Basic business value and benefits documented in a business case for each strategic initiative

24International Metrics Congress 2007

Strategic Metrics Processes

PBMM Business Strategy Metric Development & Measurement Process

25International Metrics Congress 2007

Business Objectives Metrics Planning

PBMM Business Objectives Development Data Flow

Specific business value and benefits documentedin the business case for each business objective

26International Metrics Congress 2007

Business Objectives Metrics Process

PBMM Business Objective Metrics Development & Measurement Process

27International Metrics Congress 2007

Project Performance Metrics

Project Business Management Methodology

Specific metrics to address each business objective is documented in a plan for each portfolio/program/project

28International Metrics Congress 2007

Performance Metrics Processes

PBMM Portfolio / Program / Project Performance Metrics Development & Measurement Processes

29International Metrics Congress 2007

Metrics Monitoring

Planning Phase

Executing Phase

Closing Phase

Review Gate

Review Gate

Metrics Management Plan

Review Gate

Lessons Learned Metrics Review

Capture Lessons Learned Metrics

Capture Lessons Learned Metrics

Capture Lessons Learned Metrics

Initiating Phase

30International Metrics Congress 2007

Metrics Maturity

MATURITY

31International Metrics Congress 2007

Metrics Metrics MgmntMgmnt Maturity ModelMaturity Model

Baseline

1. Repeatable Metrics management standards are consistently applied to all portfolio, programs projects

3. DistributedMetrics Management is fully distributed and it is a core competency

4. SustainedContinuous improvement and innovation is common

2. Managed Metrics and project business management processes are fully integrated

A Baseline – Metrics Management is established

32International Metrics Congress 2007

EMM Maturity Time Lime

Develop EMM Design

Stage One EMM Maturity

Distribute EMM

Timing Depends on Level of SupportTiming Depends on Level of Support

EMM Training

Establish EMM

Enterprise-wide Metrics Management (EMM)Stage 1 Implementation Time Line

33International Metrics Congress 2007

EPBM Benefits of Metrics Mgmt.

Expands Enterprise-wide Knowledge on usingMetrics to Manage Obtaining Benefits & Values

Facilitates Internal Benchmarking of Work

Establishes Metrics Management Best Practicesfor use in Project Business Management (PBM)

Adds Management Value to Lessons Learned

Enables Metrics Training and Development

Provides Ability to Determine Project Successes

34International Metrics Congress 2007

Thank You!

Dennis L. Bolles, PMP andDarrel G. Hubbard, PE

Email: dbolles@chartermi.net, hubbardd@ix.netcom.com

Thank You from the MetSIG…The Information Highway For the Metrics of the World