Post on 18-Jan-2018
description
transcript
THE SPEZIALIST FOR PUBLIC CONSULTING1
Support Mechanisms for sustainable small hydropower plants, case of AustriaChristian Oberleitner Vienna, November 2014
THE SPEZIALIST FOR PUBLIC CONSULTING
2
Table of Contents
Profile of KPC
Austrian Experiences with different Financial Supporting Schemes
Project cycle
Conclusion
THE SPEZIALIST FOR PUBLIC CONSULTING
3
Table of Contents
Profile of KPC
Austrian Experiences with different Financial Supporting Schemes
Project Cycle
Conclusion
THE SPEZIALIST FOR PUBLIC CONSULTING
4
Fields of Business Support scheme and programme management
– Environmental support under Environmental Support Act (municipal water management, in-plant environmental protection measures, rehabilitation of contaminated sites)
– Austrian JI/CDM Programme– Climate and Energy Fund– Klima:aktiv mobil support programme– ERDF/EAFRD management in seven Austrian provinces– Management of provincial support programmes since 2011
Salzburg Climate and Environment PactEconomic support programmes of the Province of TyrolPhotovoltaics for private residential buildings in Vienna
– Waste Avoidance Initiative– Eco-Electricity Investment Support (OeMAG)
National and international consulting for the Environment & Energy segment
Climate Austria - Voluntary Carbon Offsetting
Management of the Environmental and Water Management Fund (UWF)
THE SPEZIALIST FOR PUBLIC CONSULTING
5
National and International Consulting Examples of international consulting projects
– EU study on engaging the private sector in development and extending the blending activities of the EU
– EBRD Consultancy Services to support the implementation of the Residential Window (RuSEFF-Residential) under the Russian Sustainable Energy
& Carbon Finance Facility– GIZ Support to municipalities in Moldova for improving municipal service
provision – OECD Study on improving water management and climate change adaptation in
the water sector in Moldova– World Bank Support in the set-up of a Homeowners Association Resource Center in
Ukraine – EIB EIB - Consultancy services in support of EU Programmes on energy
efficiency– ADA Policy advice for and support of water and waste-water projects within the
framework of Austria‘s cooperation with CEE
Examples of national consulting projects– BMLFUW* Technical support for NER300 programme
Technical, economic and financial consulting according to ISO 9001:2008 Quality Management Standard
* Federal Ministry of Agriculture, Forestry, Environment and Water Management
THE SPEZIALIST FOR PUBLIC CONSULTING
6
Table of Contents
Profile of KPC
Austrian Experiences with different Financial Supporting Schemes
Project Cycle
Conclusion
THE SPEZIALIST FOR PUBLIC CONSULTING
Stakeholders usually have different approach – Involved beneficiaries & Target groups
7
THE SPEZIALIST FOR PUBLIC CONSULTING
Austria tried different supporting schemes
8
THE SPEZIALIST FOR PUBLIC CONSULTING
FIT tariff not always preferable for SSHP operators
FIT has been introduced in 2003
9
THE SPEZIALIST FOR PUBLIC CONSULTING
Investment subsidies to boost SSHP development
• Available only for SSHP up to 10 MW
• Different level of support (400 – 1.500 €/kW), depending on capacity
• Estimated economic performance is considered
• Cap on 30% of eligible costs
• For new and for up-grading of existing SSHP
• 16 Million € / annum available
BUT: Market asked for FIT
10
THE SPEZIALIST FOR PUBLIC CONSULTING
11
THE SPEZIALIST FOR PUBLIC CONSULTING
Findings
• There is no „one-and-only“ subsidy scheme available
• Design parameter are important to enable successful development
• Stable subsidy scheme is mandatory to attract investors
• Administration of subsidy scheme must be designed to capacity of market players
• Subsidy scheme as only instrument will not boost the market
• Flexibility is required to response market needs
12
THE SPEZIALIST FOR PUBLIC CONSULTING
13
Table of Contents
Profile of KPC
Austrian Experiences with different Financial Supporting Schemes
Project cycle
Conclusion
THE SPEZIALIST FOR PUBLIC CONSULTING
Project cycle
14
THE SPEZIALIST FOR PUBLIC CONSULTING
15
Table of Contents
Profile of KPC
General purpose of Financial Support Schemes
Austrian Experiences with different Financial Supporting Schemes
Essential Design Parameters
Conclusion & Findings
THE SPEZIALIST FOR PUBLIC CONSULTING
Investment costs per kW installed capacity
Source: Oe-mag16
THE SPEZIALIST FOR PUBLIC CONSULTING
Support level per kW installed capacity
Source: oe-mag
17
THE SPEZIALIST FOR PUBLIC CONSULTING
Financial support needs assistance
Nominate reliable and independent body
Raise awareness for subsidy scheme
Motivate investors
Provide additional support such as technical assistance
Set minimum quality criteria
Ensure stable distribution networks
18
THE SPEZIALIST FOR PUBLIC CONSULTING
Detail design needs to consider at least the following: Enable upfront financing
Enable different options for project developers
Secure long-time financing of subsidy scheme
Customer friendly verification & fast decision making
Blending of different models (Guarantees, soft loans, investment subsidies, FIT, tax incentives, risk sharing models …) is recommended
Consider impact on industry, households and infrastructure
19
THE SPEZIALIST FOR PUBLIC CONSULTING
General requirements on a supporting scheme are:
Fair, clear and transparent design, public available
Simple to understand and easy to administrate („One-stop-shop“)
Enable flexibility but stable framework conditions
Clear technical standards and legal documents
Tailored to needs of market -> more than one option possible
20
THE SPEZIALIST FOR PUBLIC CONSULTING
How to design a financial support scheme
21
Set clear and achievable goals
Define target groups that needs to be approached
Design different support models tailored to the market needs
Secure sufficient financing for providing financial support
Consider in advance additional activities needed
Liaise with neighboring countries to run international programs
THE SPEZIALIST FOR PUBLIC CONSULTING
Apart from financing following shall be considered
Nominate intermediate body
Set clear, simple, fair and transparent procedures
Develop costumer friendly administration of support scheme
Monitor and verify success of support scheme
Adopt scheme when needed carefully
Make use of technical assistance in designing and implementing supporting scheme
22
THE SPEZIALIST FOR PUBLIC CONSULTING23
Kommunalkredit Public Consulting GmbH
www.publicconsulting.at
Türkenstraße 9, 1092 WienTel +43 1 31631-222Fax +43 1 31631-104
c.oberleitner@kommunalkredit.at