- Thursday 23 July 2009 CloudSat
- Slide 2
- Exciting News of the Day Goodbye Hello
- Slide 3
- Things Accomplished water table prototype successful pressed
onward with the integration continued work on PCBs done with sphere
attachment done with actuator holders
- Slide 4
- Slide 5
- Tasks for All Begin documentation in force Dani permanent
assembly of OctoPump Molly finish sphere attachment finish actuator
holders Dani and Molly flesh out water table design build it Clay
integration of the system Steve PCB shenanigans
- Slide 6
- WEDNESDAY Sphere attachment system Actuator holders water table
prototype THURSDAY finish sphere guts complete water table design
FRIDAY PCBs ordered get materials, start building BY MONDAY full
integration of the mass balance system at least half of mechanical
integration