TRANSMISSION SCHEMES (TRANSMISSION LINES & SUB-STATIONS) FOREVACUATION OF POWER FROM THE GENERATION PROJECTS 2015-2016
As on 31-AUG-2015
State/AgencyExecutingAsociated
Trans.Works
AssociatedTransmission
Lines and Substations
VoltageLevel(KV)
Ckm/MVA
Construction progress Status
Monthof
Completion
Remark
TL(Nos)/LandAcq.(%)
STC(Nos)/CivilWork(%)
TE(Nos)/Recp.Materia
l(%)
STG(Ckm)/Erection (%)
2. 1. 4. 5. 6. 7. 8. 9. 12. 13.
OriginalTargetDate
10.
RevisedTargetDate
11.
Ckts(S/C)
&(D/C)
3.
Adhunik Power TPP (Mahadev Prasad TPP) (2x270 MW), PS,Jhk, APCL.U1-11/12(C),U2-3/13 (C),
Commissioned. 7/121400Adhunik - Jamshedupur (PG) (Padampur) 1 JUL-12JUL-121. D/CADHUNIK
Remark:
Agartala (AGTP) (4x21 MW), PS NEEPCO, Tripura,
132AGTP - Agartala line1. D/CTSECL
132AGTP - Kumarghat line2. S/CTSECL
Remark:
Akaltara (Naiyara) TPP, (4x600 MW),PS,Chg,WP(KSK), U1-8/13(C),U2-08/14 (C),U3-1/16,U4-4/16, U5-7/16, U6-1/17,
Ready for Commissioning 06/15.105400KSK Mahanadi (Warda Power) - ChampaPooling Station
164 164 164 105 JUN-15JUN-151. 2xD/CKSK LTD.
Commissioned 04/15. (Interim)71400LILO of both ckt, of Raigarh - Raipur atAkaltara TPP
118 118 118 71 APR-15APR-152. 2xD/CKSK LTD.
Remark:
Alaknanda HEP (6x50 MW), PS, UK, Badrinath, U1,U2,U3,U4,U5,U6,,
.220Alaknanda HEP - Joshimath1. D/CGMR
Survey work is in progress in the alternative route proposed byM//s cobra.The go ahead was issued through this alternate routeon dated 24/12/2014.detailed surey of 168 Km completed.Forestcase preparation in progress and profile potting in progress
304400Sringar - Kashipur DEC-182. D/CPTCUL
Legends
TL: Total Location STC: Stubs Cast TE: Towers Erected STG: Stringing Completed Page 1 of67
As on 31-AUG-2015
State/AgencyExecutingAsociated
Trans.Works
AssociatedTransmission
Lines and Substations
VoltageLevel(KV)
Ckm/MVA
Construction progress Status
Monthof
Completion
Remark
TL(Nos)/LandAcq.(%)
STC(Nos)/CivilWork(%)
TE(Nos)/Recp.Materia
l(%)
STG(Ckm)/Erection (%)
2. 1. 4. 5. 6. 7. 8. 9. 12. 13.
OriginalTargetDate
10.
RevisedTargetDate
11.
Ckts(S/C)
&(D/C)
3.
Remark: Construction yet to be taken up.
Amravati, TPS,-Phase-I (2x270 MW),U1-3/13(C),U2-6/13,U3-1/15 (C) ,U4-3/15 (C),U5-3/15 (C), Phase-II,(5x270),
Commissioned 10/12.14400LILO of Koradi -Akola at Amravati 22 22 22 14 OCT-12OCT-121. D/CIBPL
Commissioned 03/15.207400Amravati - Akola (Bableshwar) - I 279 279 279 207 MAR-15MAR-152. D/CIBPL
Remark:
Anpara C (2X600 MW),PS,UP,LANCO,U1&2-11/11(C),
Work completed. 6/10.400Extn. of Bus from Anpara B to Anpara C. JUN-10JUN-101. D/CLEPP
Line charged at 400 kV Oct'111765Shiffting of 765 kV Anpara- Unnao atUnnao
3 3 3 1 OCT-11OCT-112. S/CUPPTCL
Commissioned 3/12.1765Shifting of Anpara B-Unnao terminationpoint from Anpara B to Anpara C sw. yard.
6 6 6 1 MAR-12MAR-123. S/CUPPTCL
Commissioned 3/12.1000765/400Unnao 100 100 100 100 MAR-12MAR-124. UPPTCL
Remark:
Anpara-D TPP (2x500 MW),SS,UP,UPRVUNL, U6-6/15 (C),U7-6/14,
Contract of the firm M/s Maharashtra Power TransmissionStructures Ltd. has been terminated on 20.05.2014 and LOI issuedon 30.12.14 by SE, Mirzapur for the balance work. Work inprogress.
10400Anpara B-Anpara D 23 23 21 6 SEP-151. D/CUPPTCL
Commissioned 06/14.3765Anpara C - Anpara D 11 11 11 3 JUN-14JAN-12 JUN-142. S/CUPPTCL
1.Apnara D - Jhusi section.(a) Wild life approval: line passes through Kaimpur Wild LifeSanctuary (45.132 Ha). Govt. of U.P. forwarded recommendationto MOEF on 24-12-2013.Proposal has been approved by National Wild Life Board. WritPetition IA no. 3846-3847/2015, dated- 24.02.2015, has been filedat Supreme Court, New Delhi.
416765Anpara D - Unnao 1215 1033 985 300 JAN-12 DEC-153. S/CUPPTCL
Legends
TL: Total Location STC: Stubs Cast TE: Towers Erected STG: Stringing Completed Page 2 of67
As on 31-AUG-2015
State/AgencyExecutingAsociated
Trans.Works
AssociatedTransmission
Lines and Substations
VoltageLevel(KV)
Ckm/MVA
Construction progress Status
Monthof
Completion
Remark
TL(Nos)/LandAcq.(%)
STC(Nos)/CivilWork(%)
TE(Nos)/Recp.Materia
l(%)
STG(Ckm)/Erection (%)
2. 1. 4. 5. 6. 7. 8. 9. 12. 13.
OriginalTargetDate
10.
RevisedTargetDate
11.
Ckts(S/C)
&(D/C)
3.
Case was listed on 5 & 6 May, 2015 but could not be heard andcourt closed. After summer vacation court has been openedhowever hearing of the case is pending in Green Bench.(b). Forest Clearance: 765 kV S/C Anpara D - Jhusi line (315.716Ha) Proposal has been submitted by Secretary (Forest), Govt. ofU.P. to MOEF on 21-06-2013.Regional empowered committee in meeting dated 28.05.2015 hasdeferred the case due to non receipt of essential document soughtfrom Nodal Officer, Lucknow and also instructed to get fresh siteinspection done to know the status of violation and to submit list oftrees to be felled.
Commissioned 06/14.1000765/400Anpara D. S/S 100 100 100 100 JUN-14JUN-144. UPPTCL
Remark:
Anuppur TPP Ph-I, (2x600 MW),PS,MP,Moser Baer Power MP, U1-4/15 (C),U2-2/15 (C),
Commissioned 11/12.16220LILO of Amarkantak - Korba at Anooppur 18 18 18 16 NOV-12NOV-121. D/CMPPTCL
Commissioned in Dec'13.31400Jabalpur Pooling Station - Jabalpur (HighCapacity) line
45 45 45 31 DEC-13DEC-132. D/CPGCIL
Commissioned 08/14.492400Anuppur (Moser Baer) - Jabalpur PoolingStation
600 600 600 492 AUG-14AUG-143. D/CPGCIL
Remark:
Avantha (Jhabua Power) (2x600 MW), PS,Seoni,MP, BHEL, U1-03/14 (C),
Commissioned 05/15.131400Jhabua Power TPS - Jabalpur PoolingStation.
207 207 207 131 MAY-15MAY-151. D/CJHAPL
Remark:
Avantha Bhandar TPS, (2x600 MW), PS,Chhattisgarh,Korba West Power Comany Limited U1-3/14(C),,
There are RoW issues involved at 8 locations.46400Avantha Bhandar TPS (Korba West) -Raigarh (Kotra)
64 53 43 14 AUG-151. D/CKWPCL
Interim arrangement.10400LILO of on Ckt of Raigarh - Raipur atAvantha Bhandar (Korba west ) TPS
22 22 22 10 DEC-132. D/CKWPCL
Legends
TL: Total Location STC: Stubs Cast TE: Towers Erected STG: Stringing Completed Page 3 of67
As on 31-AUG-2015
State/AgencyExecutingAsociated
Trans.Works
AssociatedTransmission
Lines and Substations
VoltageLevel(KV)
Ckm/MVA
Construction progress Status
Monthof
Completion
Remark
TL(Nos)/LandAcq.(%)
STC(Nos)/CivilWork(%)
TE(Nos)/Recp.Materia
l(%)
STG(Ckm)/Erection (%)
2. 1. 4. 5. 6. 7. 8. 9. 12. 13.
OriginalTargetDate
10.
RevisedTargetDate
11.
Ckts(S/C)
&(D/C)
3.
Remark: Generating company is to expedite the completion of ATS. and remove the interim arrangement (LILO) line at the earliest.
Babandh - (Dhenkanal) TPS , (2x660 MW), PS Orissa, Lanco Infratech U1-3/14,U2-7/14,,
Work yet to start.48400Babandh TPP - Angul Pooling Station 72 DEC-161. D/CLEPP
Remark:
Baglihar-II HEP (3x150MW) SS,J&K, JKPDC, U1-9/15,U2-9/15,U3- 2015-17,
Work yet to start.400LILO of one ckt of Kishanpur - New wanpohat Baglihar HEP
DEC-151. D/CJKPDD
Remark:
Bairasul HEP, NHPC,
Work yet to stared.80220Bairasuil HEP - Sarna1. D/CPGCIL
Remark:
Balco TPS PS,Chg,Sterlite,U1-6/15 (C),U2-4/13,U3-2/14,(4x300 MW, 4x67.5 (CPP) ) 4x67.5 (C),
Stage-I Clearance is awaited.46400Balco - Dharamjaygar Pooling Station 72 72 70 42 OCT-151. D/CBALCO
commissioned 3/12 (Interim)35400LILO of one ckt of Korba - Birsinghpur atBalco
35 MAR-12JUN-122. D/CBALCO
Remark: Balco is to expedite completion of ATS line and remove the interim arrangement line is earliest.
Bandakhar TPP, (300 MW), PS,Chg, MCC&PL, U1-6/15 (C),
Commissioned 06/14.6400LILO of ACBIL-Baraari (Bilaspur) PS atBandakhar (Maruti Clean Coal)
14 14 14 6 JUN-14JUN-141. D/CMCCPL
Remark:
Banswara Super Critical TPS (2x660 MW), SS,Raj, U1 & U2 -2016/2017,
360400Banswara TPS- Chittorgarh MAR-171. D/CRVPNL
320400Banswara TPS- Udaipur MAR-172. D/CRVPNL
Legends
TL: Total Location STC: Stubs Cast TE: Towers Erected STG: Stringing Completed Page 4 of67
As on 31-AUG-2015
State/AgencyExecutingAsociated
Trans.Works
AssociatedTransmission
Lines and Substations
VoltageLevel(KV)
Ckm/MVA
Construction progress Status
Monthof
Completion
Remark
TL(Nos)/LandAcq.(%)
STC(Nos)/CivilWork(%)
TE(Nos)/Recp.Materia
l(%)
STG(Ckm)/Erection (%)
2. 1. 4. 5. 6. 7. 8. 9. 12. 13.
OriginalTargetDate
10.
RevisedTargetDate
11.
Ckts(S/C)
&(D/C)
3.
Commissioned 11/14.315400/220Chitorgarh S/S 100 100 100 100 NOV-14NOV-143. RVPNL
2x315400/220Jodhpur (New) S/S4. RVPNL
Remark:
Banswara and Pratpgarh Wind Project,
140220Banswara (Switching Station) - Pratapgarh 313 MAR-161. D/CRVPNL
240220Pratapgarh- Chittorgarh 314 83 JAN-162. D/CRVPNL
100220/132Pratapgarh (Upgradation) 100 85 90 43 DEC-153. RVPNL
Remark:
Bara TPP (3x660MW),PS,UP,PPGCL,U1-9/15,U2-9/15,U3-9/15 (C),
Karchana gantry not finalised80400Bara - Karchana 124 FEB-161. D/CSEUPPTCL
186400Mainpuri - Aligarh 219 214 193 18 FEB-162. D/CSEUPPTCL
Commissioned 03/15.65400Bara - Meza line 83 83 83 65 MAR-15MAR-153. D/CUPPTCL
Commissioned 03/15.1400LILO of Panki - Obra at Rewa Road 2 2 2 1 MAR-15MAR-154. D/CUPPTCL
Commissioned 03/15.68400Rewa Road - Meza line 91 91 91 68 MAR-15MAR-155. D/CUPPTCL
3 locations are under hold since long due to land allocated forwomen PAC camp in line corridor at Mainpuri. Matter has beentaken up with DM Mainpuri.Approx 3.8 km route of each line passing through proposed refineryof BPCL near Bara. Matter is pending with High Power committeeas per directives of High Courte Allahabad.
375765Mainpuri - Bara Ckt-I 889 608 315 FEB-166. S/CSEUPPTCL
3 locations are under hold since long due to land allocated forwomen PAC camp in line corridor at Mainpuri. Matter has beentaken up with DM Mainpuri.Approx 3.8 km route of each line passing through proposed refineryof BPCL near Bara. Matter is pending with High
375765Mainpuri - Bara Ckt-II 899 814 624 116 FEB-167. S/CSEUPPTCL
Legends
TL: Total Location STC: Stubs Cast TE: Towers Erected STG: Stringing Completed Page 5 of67
As on 31-AUG-2015
State/AgencyExecutingAsociated
Trans.Works
AssociatedTransmission
Lines and Substations
VoltageLevel(KV)
Ckm/MVA
Construction progress Status
Monthof
Completion
Remark
TL(Nos)/LandAcq.(%)
STC(Nos)/CivilWork(%)
TE(Nos)/Recp.Materia
l(%)
STG(Ckm)/Erection (%)
2. 1. 4. 5. 6. 7. 8. 9. 12. 13.
OriginalTargetDate
10.
RevisedTargetDate
11.
Ckts(S/C)
&(D/C)
3.
Power committee as per directives of High Courte Allahabad.
Remark:
Baradarha TPP (2x600 MW), PS,D.B.P.C.L, Dist.. Jangir Champa ,Chhattisgarh,U1-8/13, U2-2/14,
Commissioned 08/14.36400DB Power (Baradarha) - Raigarh (Kotra)Pooling Station
54 54 54 36 AUG-14AUG-141. D/CDBPCL
Line completed. (Interim)30400LILO of Raigarh - Raipur (3rd Ckt) atBaradhara TPP ( Interim arrangement)
44 44 44 30 MAY-132. D/CDBPCL
Remark:
Barauni TPS Extn (2x250 + 150 MW), Bihar, BSPGCL,
Work yet to start.200220Barauni TPS Exte. - Hazipur 350 JUN-16 JUN-161. D/CBSEB
work yet to be awarded220LILO of Both Ckt of Purnea - Begusarai atBTPS Extn
2. D/CBSEB
4220LILO of Both ckt of Biharsharif - Begusaraiat BTPS Extn.
9 5 2 AUG-153. D/CBSEB
Award under process.300220/132Barauni (TPS ) (ICT)4. BSEB
Remark:
Barethi Super Critical TPP (6x660 MW), CS, MP, NTPC, U1 & U6,
.765LILO of Satna - Gwalior at Barethi TPS1. D/CNTPC Ltd.
Remark:
Barh STPP -Stage-I (3x660 MW), Stage-2 (2x660 MW), CS, Bihar, U1-1/17,U2-6/17,U3-3/18,U4-11/13(C),U5-3/15 (C),
Commissioned 06/10.488400Barh-Balia (Quad) 645 645 645 488 JUN-10SEP-09 JUN-101. D/CPGCIL
Commissioned 05/15.698400Barh-II - Gorakhpur 944 944 944 698 MAY-15AUG-14 MAY-152. D/CPGCIL
Commissioned 6/121250±500Balia & Bhiwadi convertor Stn. (Pole-II) 100 100 100 100 JUN-12JUN-123. PGCIL
Remark:
Legends
TL: Total Location STC: Stubs Cast TE: Towers Erected STG: Stringing Completed Page 6 of67
As on 31-AUG-2015
State/AgencyExecutingAsociated
Trans.Works
AssociatedTransmission
Lines and Substations
VoltageLevel(KV)
Ckm/MVA
Construction progress Status
Monthof
Completion
Remark
TL(Nos)/LandAcq.(%)
STC(Nos)/CivilWork(%)
TE(Nos)/Recp.Materia
l(%)
STG(Ckm)/Erection (%)
2. 1. 4. 5. 6. 7. 8. 9. 12. 13.
OriginalTargetDate
10.
RevisedTargetDate
11.
Ckts(S/C)
&(D/C)
3.
Barkhera TPP (2x45 MW), PS,UP, Bajaj,,
Line energized on 26.05.14. Barkhera-pilibhit Section,I ckt.Energised on10.02.12.II ckt. On 14.2.12
132Barkhera (Bajaj) - Dohna 203 203 203 129 MAR-151. D/CUPPTCL
132Bayas - Dohna2. D/CUPPTCL
132Bayas - Pilibhit3. D/CUPPTCL
Remark:
Bela TPP (1x270 MW),PS,Maha,IEPL,U1-3/13(C),
The progress of Koradi-Wardha line is slow . Forest clearenceawaited.
50400LILO of Koradi II- Wardh(PG) at Bela TPP 75 75 75 50 DEC-151. D/CIEPL
Completed (Interim).3400LILO of Mouda - Wardha at Bela 2 2 2 NOV-122. D/CIEPL
Remark:
Bellary TPP (3X500 MW),SS,KAR,KPCL,U1-12/07(C),U2-6/14,U3-11/14,
Commissioned 3/12313400BTPS- Hiriyur 440 440 440 313 MAR-12DEC-08 MAR-121. D/CKPTCL
Commissioned 6/082400LILO of RTPS - Guttur at BTPS. 3 3 3 2 JUN-08JUN-082. D/CKPTCL
Remark:
Bhasmay HEP (3x17MW),PS,Sikkim,Gati Infra,U1,2&3-2017-18,
.220LILO of one circuit of Rongnichu - Randpoat Bhasmay
APR-131. S/CGATI
Remark: Status Not reported.
Bhavanagar Padva (2x250MW),SS,Guj,BHEL,U1-11/14,U2-2/15,
WIP188220BECL (Padva) - Botad line 292 138 87 MAR-161. D/CGETCO
Commissioned 03/14.82220BECL (Padva)- Sagapara line 139 139 139 83 MAR-14MAR-142. D/CGETCO
Commissioned 06/13.56220LILO of Savarkundla - Vartej at BECL(Padva)
97 97 97 56 JUN-13JUN-133. D/CGETCO
Legends
TL: Total Location STC: Stubs Cast TE: Towers Erected STG: Stringing Completed Page 7 of67
As on 31-AUG-2015
State/AgencyExecutingAsociated
Trans.Works
AssociatedTransmission
Lines and Substations
VoltageLevel(KV)
Ckm/MVA
Construction progress Status
Monthof
Completion
Remark
TL(Nos)/LandAcq.(%)
STC(Nos)/CivilWork(%)
TE(Nos)/Recp.Materia
l(%)
STG(Ckm)/Erection (%)
2. 1. 4. 5. 6. 7. 8. 9. 12. 13.
OriginalTargetDate
10.
RevisedTargetDate
11.
Ckts(S/C)
&(D/C)
3.
Remark:
Bhavanapaddu TPP, (4x660MW),PS, AP,East cost Energy, U1-10/15,U2-3/16.,
.400Bhavanapaddu TPP - Sri Kakulam1. D/C
400LILO of Gazuwaka - Behrampure atBhavanapaddu TPP
2. D/C
Remark:
Bhawani Barrage HEP -II & III (4x15 MW), SS,TN, TANGEDCO, BB-II (U1-8/13 (C ),U2-9/13(C), BB-III (U1-12/12 (C),U2-9/13(C),
Energised on 23.08.12.15110BKB-II - Common Point line 30 30 30 15 AUG-12AUG-121. D/CTANTRANS
Energised on 13.08.12.6110BKB-III - Common point line. 13 13 13 6 AUG-12AUG-122. D/CTANTRANS
Energised on 06/115110LILO of BKB-I - SP Budur at BKB-II line 10 10 10 5 JUN-11JUN-113. D/CTANTRANS
Commissioned 09/13.4110LILO of Mettupalayam - Irumborai line atBKB-II
12 12 12 4 SEP-12SEP-134. D/CTANTRANS
Energised on 23.08.12.2110BKB-II Common point - Pallipalayam line 7 7 7 2 AUG-12AUG-125. S/CTANTRANS
Energised on 23.08.12.9110BKB-II Common point - Thirucengode line 40 40 40 9 AUG-12AUG-126. S/CTANTRANS
Energised 6/1222110BKB-III Common point - BKB-II line 69 69 69 22 JUN-12JUN-127. S/CTANTRANS
Energised on 13.08.12.10110BKB-III Common point - Nallur line 36 36 36 10 AUG-12AUG-128. S/CTANTRANS
Remark:
Bhognipur TPP Ph-I (2x660 MW),Ph- II(2x660 MW) ,PS,UP,Lanco Infratech,Northen Region,
.765Bhognipur - Orai (PG)1. 2xS/CUPPTCL
.765Bhognipur - Gatampur2. S/CUPPTCL
765Bhognipur - Jawarharpur3. S/CUPPTCL
765Bhognipur - Moradabad/Rampur4. S/CUPPTCL
Legends
TL: Total Location STC: Stubs Cast TE: Towers Erected STG: Stringing Completed Page 8 of67
As on 31-AUG-2015
State/AgencyExecutingAsociated
Trans.Works
AssociatedTransmission
Lines and Substations
VoltageLevel(KV)
Ckm/MVA
Construction progress Status
Monthof
Completion
Remark
TL(Nos)/LandAcq.(%)
STC(Nos)/CivilWork(%)
TE(Nos)/Recp.Materia
l(%)
STG(Ckm)/Erection (%)
2. 1. 4. 5. 6. 7. 8. 9. 12. 13.
OriginalTargetDate
10.
RevisedTargetDate
11.
Ckts(S/C)
&(D/C)
3.
Remark: Construction work yet to be start. UP Share for Ph-I (1188 MW), UP share for Ph-II (1188 MW)
Bhusaval TPS (2x500 MW),SS,MAHA,MSPGCL,U4-3/12 (C),U5-3/12 (C),
Commissioed 11/11197220Bhusaval - II - Amalner 331 331 331 197 NOV-11NOV-111. D/CMSETCL
Commissioned 12/11.185400Bhusaval - II - Aurangabad 283 283 283 185 DEC-11DEC-112. D/CMSETCL
Commissioned 4/10.15400Bhusaval - II - existing Khadka 26 26 26 15 APR-10DEC-09 APR-103. D/CMSETCL
Commissioned 9/11.500400/220Bhusaval (ICT -II) S/S 100 100 100 100 SEP-11SEP-114. MSETCL
Commissioned 8/11.500400/220Bhusaval (ICT-I) S/S 100 100 100 100 AUG-11AUG-115. MSETCL
Remark:
Bilhaur (2x660 MW),PS,UP, NTPC,,
400Bilhaur - Kanpur (PG)1. D/CUPPTCL
765LILO of Bhognipur - Mbd at Bilhaur2. D/CUPPTCL
.765LILO of Unnao - Mainpur at Bilhaur3. D/CUPPTCL
765Bilhaur - Sandila4. S/CUPPTCL
Remark: Construction work yet to be started. (UP Share is 792MW)
Bina TPS (2x250 MW),PS,MP,Bina power,U1-8/12(C),U2-3/13(c ),
Commissioned 01/15.40400Bina TPS - Suitable location (along Bina(PG) - Bina (MPPTCL)
40 JAN-15JAN-151. D/CJV(PG&JP)
Commissioned.400Termination of Ckt of above at Bina (PG) &otuer ckt at Bina (MPTCL)
JAN-15JAN-152. D/CJV(PG&JP)
Remark:
Binjkote TPP (4x300 MW),PS,Chg,SKS Power, U1-6/14,U2-9/14,U3-3/15, U4-6/15,
Commissioned 05/15.55400Binjkote - Raigarh (Kotra) Pooling Station 93 93 93 55 MAY-15MAY-151. D/CSKS
Legends
TL: Total Location STC: Stubs Cast TE: Towers Erected STG: Stringing Completed Page 9 of67
As on 31-AUG-2015
State/AgencyExecutingAsociated
Trans.Works
AssociatedTransmission
Lines and Substations
VoltageLevel(KV)
Ckm/MVA
Construction progress Status
Monthof
Completion
Remark
TL(Nos)/LandAcq.(%)
STC(Nos)/CivilWork(%)
TE(Nos)/Recp.Materia
l(%)
STG(Ckm)/Erection (%)
2. 1. 4. 5. 6. 7. 8. 9. 12. 13.
OriginalTargetDate
10.
RevisedTargetDate
11.
Ckts(S/C)
&(D/C)
3.
Interim arrangement removed.400LILO of one ckt of Raigarh - Raipur atBinjkote TPP
2. D/CSKS
Remark:
Bokaro TPS,
Commissioned 12/14.200400Bokaro TPS Extn.- Koderma TPS 276 276 276 200 DEC-14AUG-12 DEC-141. D/CPGCIL
Remark:
Bongaigaon TPS (3x250 MW),CS, Assam, NTPC, U1-6/15 (C),U2-6/16,U3-3/17,
1. Delay due to re alignment of line such as proposed airport atBTAD area, 800 kV line of PGCIL, ROW, Local Problem etc. areattributing to the delay.
322220Bongaigaon TPS - Rangia 517 491 452 77 JUN-161. D/CAEGCL
Commissioned 12/12.6400Bongaigaon TPS - Bongaigaon 11 11 11 6 DEC-12DEC-122. D/CPGCIL
commissioned 9/1465220BTPS-Agia-Sarusajai (2nd Circuit, Balanceportion)
195 195 195 65 SEP-14SEP-143. S/CAEGCL
Frequent Bandhs in BTAD area, forest clearance received, RoW atLoc 21,22 in forest area etc. are making the project slipped.
10132BTPS - Kokrajhar line 39 37 28 5 DEC-13 JAN-164. S/C onD/C
AEGCL
Work in progress. Clearance and RoW63132Kokrajhar - Bilashipara - Gauripur 203 199 121 22 SEP-13 FEB-165. S/C onD/C
AEGCL
Remark:
Budhil HEP (2x35 MW), PS, H.P., LANCO Green, U1-5/12(C),U2-5/12.(C),
Commissioned 3/1240220Budhil -Chamera III 62 62 62 40 MAR-12MAR-121. S/C onD/C
LEPP
Remark:
Butibori (2x300 MW) TPS Phase -II,PS,Maha,RPL,U1-8/12(C),U2-11/12,
Commissioned on 26.03.2013100220/132butibori III 100 90 100 90 MAR-13MAR-131. MSETCL
Commissioned 12/11.1220Buttibori TPS -Buttibori-III 1 DEC-11DEC-112. D/CMSETCL
Legends
TL: Total Location STC: Stubs Cast TE: Towers Erected STG: Stringing Completed Page 10 of67
As on 31-AUG-2015
State/AgencyExecutingAsociated
Trans.Works
AssociatedTransmission
Lines and Substations
VoltageLevel(KV)
Ckm/MVA
Construction progress Status
Monthof
Completion
Remark
TL(Nos)/LandAcq.(%)
STC(Nos)/CivilWork(%)
TE(Nos)/Recp.Materia
l(%)
STG(Ckm)/Erection (%)
2. 1. 4. 5. 6. 7. 8. 9. 12. 13.
OriginalTargetDate
10.
RevisedTargetDate
11.
Ckts(S/C)
&(D/C)
3.
Remark:
Chamera-II HEP,CS,HP,,
Commissioned 3/11.1400Chamera-II HEP (Part-I)- ChameraPooling Station
3 3 3 1 MAR-11APR-10 MAR-111. S/CPGCIL
Remark:
Chamera-III HEP (3x77 MW), CS,H.P.,NHPC, U1-6/12,( C) U2-6/12(C), U3-6/12 (C ),
Commissioned 03/13.324400Chamera-II HEP - Jullandur line 444 444 444 324 MAR-13MAR-131. D/CPGCIL
Commissioned 8/1130220Chamera-III - Pooling Station NearChamera-II HEP
46 46 46 30 AUG-11AUG-112. D/CPGCIL
Commisiioned 8/11.630400/220GIS Pooling Station near Chamera-II HEP 100 100 100 100 AUG-11AUG-113. PGCIL
Remark:
Chandrapur TPS, (2x500 MW), SS, Maha, MSPGCL, U1 to 7 (C) U8-3/15 (C), U9-1/14,
Commissioned 4/13.3400LILO of Chandrapur - Parli at Chandrapur II 11 11 11 3 APR-13SEP-131. D/CMSETCL
Commissioned 03/14.4400Chandrapur switching Stn. - Chandrapur IIS/S
11 11 11 4 MAR-14MAR-142. S/CMSETCL
Priority Bay 410, 426, 408 (Tie Bay) and 409 ,411, 412, 428, 429,404, 405 commissioned from 30.12.2013 to 13.3.2014
500400/220Chandrapur-II 100 85.53 96 71 DEC-153. MSETCL
Commissioned 06/13.91400Chandrapur-II - Warora 138 138 137 91 JUN-13JUN-134. D/CMSETCL
Commissioned 01/13.76400Warora-Wardha(2nd Ckt) 223 223 223 76 JAN-13JAN-135. S/CMSETCL
Remark:
Chango Yangthang (140 MW), PS,Distt, Spiti,HP,M/s Malana Power (MPCL),
220Chango Yangthang - Ka Dogri PoolingStation
1. D/CMPCL
.400Ka Dogri - Jangi Pooling Station2. D/CMPCL
Remark:
Legends
TL: Total Location STC: Stubs Cast TE: Towers Erected STG: Stringing Completed Page 11 of67
As on 31-AUG-2015
State/AgencyExecutingAsociated
Trans.Works
AssociatedTransmission
Lines and Substations
VoltageLevel(KV)
Ckm/MVA
Construction progress Status
Monthof
Completion
Remark
TL(Nos)/LandAcq.(%)
STC(Nos)/CivilWork(%)
TE(Nos)/Recp.Materia
l(%)
STG(Ckm)/Erection (%)
2. 1. 4. 5. 6. 7. 8. 9. 12. 13.
OriginalTargetDate
10.
RevisedTargetDate
11.
Ckts(S/C)
&(D/C)
3.
Chhabra Super Critical TPS (2x660 MW), SS , RRVUNL, Rajasthan U1 & U2,
Commissioned 01/15.179400Chhabra TPS - Anta (Baran) 244 244 244 179 JAN-15JAN-151. D/CRVPNL
Remark:
Chhabra TPP Extn. (2x250 MW) SS,Raj, RRVUNL, U3-9/13(C),U4-6/14 (C),
Commissioned 4/10342400Chhabra TPS -Hindaun 803 803 803 342 APR-10APR-101. S/CRVPNL
Commissioned 8/11.101220Chhabra TPS - Jhalawar 329 329 329 101 AUG-11AUG-112. S/CRVPNL
Remark:
Chitrangi TPP Ph-I (6x660 MW), Ph-II (3x660 MW),SS,MP,Ph-I,U1-9/13,U2-12/13,U3-3/14,U4-6/14,U5-9/14,U6-12/14, Ph-II,U1-3/15,U2-6/15,U3-9/19,
.765Chitrangi TPS - Vindhyachal PoolingStation
1. D/C
Remark:
Chujachen HEP (2x49.5 MW)PS,Sikkim,GIL,U1-4/13(C),U2-4/13 (C).,
Commissioned 04/13. (Interim arrangement)47132LILO of Melli - Gantok at Chuzachen (LILOpoint at namthang)
91 91 91 47 APR-131. D/CGATI
Line commissioned.132Chujachen HEP - Rangpo PS2. D/CGATI
Remark:
Chutak-HEP (4x11 MW), CS, J&K, NHPC, U1-11/12( C), U2- 11/12( C), U3- 11/12(C), U4-1/13(C),
Commissioned.566Chutak HEP-Gramthong -II 29 29 29 5 SEP-121. S/CJKPDD
Commissioned.1066Chutak HEP-Kargil-I 55 55 55 10 OCT-122. S/CJKPDD
Commissioned.2766Gramthong -II - Sankoo 154 154 154 27 SEP-143. S/CJKPDD
Commissioned2366Khangral - Mulbek -II 117 117 117 23 SEP-144. S/CJKPDD
Commissioned.2866Mulbek-II - Kargil -I 124 124 124 28 SEP-145. S/CJKPDD
Legends
TL: Total Location STC: Stubs Cast TE: Towers Erected STG: Stringing Completed Page 12 of67
As on 31-AUG-2015
State/AgencyExecutingAsociated
Trans.Works
AssociatedTransmission
Lines and Substations
VoltageLevel(KV)
Ckm/MVA
Construction progress Status
Monthof
Completion
Remark
TL(Nos)/LandAcq.(%)
STC(Nos)/CivilWork(%)
TE(Nos)/Recp.Materia
l(%)
STG(Ckm)/Erection (%)
2. 1. 4. 5. 6. 7. 8. 9. 12. 13.
OriginalTargetDate
10.
RevisedTargetDate
11.
Ckts(S/C)
&(D/C)
3.
Commissioned.6066/11Gramthong S/S 100 100 100 100 SEP-126. JKPDD
Commissioned.6066/11Kargil S/S 100 100 100 100 SEP-127. JKPDD
Commissioned.6066/11Khangral (Bodhkharbu) 100 100 100 100 SEP-148. JKPDD
Commissioned.6066/11Mulbeck 100 100 100 100 SEP-159. JKPDD
Commissioned.6066/11Sankoo S/S 100 100 100 100 SEP-1410. JKPDD
Remark:
Cosmos Sponge TPS, (1x350 MW), PS,Chh,CSPL,U1-6/13,
.400CSPL TPS - Raigarh Pooling Station (NearKotra)
1. D/C
Remark: Details not available.
DGEN TPS (3x400MW), Torrent Power Ltd, Gujarat,
Work awarded to M/s Instalaciones. Inabemsa. Spian on May2014. Route changed after survey observations.
400DGEN - Vadodara1. D/CTOR. POW.
.400DGEN TPS - Bharuch/Dahej PoolingStation
2. D/CTOR. POW.
Work awarded to M/s Instalaciones. Inabemsa. Spian on May2014. Route changed after survey observations.
220Navseri - Bhasten3. D/CTOR. POW.
.1500765/400Bharuch/Dahej4. TOR. POW.
Remark:
Dada Dhuni wale TPP, Khandwa (2x800 MW) SS,MP, U1-7/15,1U2-12/16,
80400Dada Dhuniwale TPP - Moondi PoolingPoint
1. D/CMPPTCL
630400/220Badnawar (2x315)2. MPPTCL
.630400/220Handia S/S3. MPPTCL
Legends
TL: Total Location STC: Stubs Cast TE: Towers Erected STG: Stringing Completed Page 13 of67
As on 31-AUG-2015
State/AgencyExecutingAsociated
Trans.Works
AssociatedTransmission
Lines and Substations
VoltageLevel(KV)
Ckm/MVA
Construction progress Status
Monthof
Completion
Remark
TL(Nos)/LandAcq.(%)
STC(Nos)/CivilWork(%)
TE(Nos)/Recp.Materia
l(%)
STG(Ckm)/Erection (%)
2. 1. 4. 5. 6. 7. 8. 9. 12. 13.
OriginalTargetDate
10.
RevisedTargetDate
11.
Ckts(S/C)
&(D/C)
3.
Remark:
Dahanu Solar (40 MW), PS,Tehsil Pokaran, Distt, Jaisalmer,Raj,M/s Dahanu Solar Power Pvt. Ltd.,
.132Dahanu - Degchu GSS1. D/CRVPNL
Remark: LTA for Transfer of 33 MW to Maharashtra is to be granted
Damodaram Sanjeevaiah(Krishnapatnam) TPP, (2x800MW) SS,AP, APPDCL, U1-9/14, U2-9/14,
Commissioned 02/15.196400Bonapally - Chittoor (Quad) 281 281 281 196 FEB-15FEB-151. D/CAPTRANSC
Commissioned 11/12.72400Krishnapatnam TPS - Nellore. 112 112 112 72 NOV-12NOV-122. D/CAPTRANSC
Commissioned 07/15.180400Krishnapatnam TPS- Chittoor(Balance) 180 JUL-15JUL-153. D/CAPTRANSC
Remark:
Derang TPP (2x600MW) PS, Orissa, JIPL, U1-5/14 (C), U2-1/15 (C),
Interim arrangement removed.110400LILO of Meramundali - Jaypore at Derang 163 163 163 110 JUN-141. D/CJPL
Commissioned 08/14.154400Derang - Angul Pooling Station 231 231 231 154 AUG-14AUG-142. MC+D/CJPL
Remark:
Dhariwal TPS (2x300 MW), PS, Maharashtra, DIPL, U1-11/13(C),U2-5/14 (C),
Commissioned 09/13.10400Dhariwal TPS -Channdrapur II (1st Ckt) 29 29 29 10 SEP-13SEP-131. S/CDIPL
Commissioned 08/14.31400LILO of one ckt of Bhadravati (PG) - Parli atDhariwal
51 51 51 31 AUG-14AUG-142. D/CDIPL
Remark:
Dharmpura TPP (4x300 MW), Jain Energy, P.S,,
.400Jain Energy TPS - Dharamjaygarh KorbaPooling station
1. D/CJAIN ETL
Remark: Details not available
Legends
TL: Total Location STC: Stubs Cast TE: Towers Erected STG: Stringing Completed Page 14 of67
As on 31-AUG-2015
State/AgencyExecutingAsociated
Trans.Works
AssociatedTransmission
Lines and Substations
VoltageLevel(KV)
Ckm/MVA
Construction progress Status
Monthof
Completion
Remark
TL(Nos)/LandAcq.(%)
STC(Nos)/CivilWork(%)
TE(Nos)/Recp.Materia
l(%)
STG(Ckm)/Erection (%)
2. 1. 4. 5. 6. 7. 8. 9. 12. 13.
OriginalTargetDate
10.
RevisedTargetDate
11.
Ckts(S/C)
&(D/C)
3.
Dhuvaran CCPP-III,360 MW,SS ,GSECL,
Work in Progress.60220LILO of Karmsad -Vartej at Dhuvaran 152 143 94 18 DEC-151. D/CGETCO
Remark:
Dikchu HEP (3x32MW)PS,Sikkim,SKPPPL,U1,2&3-2017-18,
.132Dikchu - Gangtok1. D/CSIKKIM
132Dikchu - Mangan2. D/CSIKKIM
Remark:
Dopaha TPP (3x660 MW), SS, UP, U1,U2,U3,
.765Dopaha - Anpara1. D/CUPPTCL
765Dopaha - Ghazipur2. D/CUPPTCL
765Dopaha - Varanasi / Jaunpur3. D/CUPPTCL
765Meja - Bargarh4. D/CUPPTCL
Remark: Status Not Reported
Durgapur (DPL) Extn. (250 MW), SS,WB, U8-3/14 (C),
Existing line.400DPL - Bidhan nagar MAR-121. D/CDPL
Remark:
Durgapur TPS (2x500 MW),CS,WB,DVC,U1-7/11(C),U2-3/1 (C),
Commissioned 07/13.138400Durgapur STPS - Raghunathpur 208 208 208 138 JUL-13MAY-10 JUL-131. D/CDVC
Commissioned 3/11.7400LILO of Durgapur-Jamshedpur (PG) atDurgapur STPS
14 14 14 7 JAN-11MAY-09 MAR-112. D/CDVC
Commissioned 4/12.276400Durgapur-Jamshedpur (Part Line) 519 469 451 276 APR-12APR-123. D/CPGCIL
Legends
TL: Total Location STC: Stubs Cast TE: Towers Erected STG: Stringing Completed Page 15 of67
As on 31-AUG-2015
State/AgencyExecutingAsociated
Trans.Works
AssociatedTransmission
Lines and Substations
VoltageLevel(KV)
Ckm/MVA
Construction progress Status
Monthof
Completion
Remark
TL(Nos)/LandAcq.(%)
STC(Nos)/CivilWork(%)
TE(Nos)/Recp.Materia
l(%)
STG(Ckm)/Erection (%)
2. 1. 4. 5. 6. 7. 8. 9. 12. 13.
OriginalTargetDate
10.
RevisedTargetDate
11.
Ckts(S/C)
&(D/C)
3.
Remark:
Dwarkesh Energy Ltd TPP (2x660 MW) PS, Khandwa, MP,,
765Dwarkesh Energy TPP - Indore1. D/C
Remark: Status Not Reported.
EMCO Warora TPP (2x300 MW), PS,Maha,GMR, U1-2/13 (C),U2-8/13(C),
Commissioned 01/13.80400EMCO - Bhadrawathi (PG) 96 96 96 80 JAN-13JAN-131. D/CGMR
Remark:
Ellora TPP (4x660 MW), PS,Maha,EPML, U1,U2,U3,U4,
765Ellora TPP - Seoni1. D/C
Remark: Status Not Reported.
GEPL Ph -1 (2x60 MW ), U1-60 MW,9/12 (C) & Ph-2 (2x270 MW) TPS,PS,Maha,GEPL,U2-4/12(C),
Commissioned 9/1420220GEPL -MIDC S/S 20 SEP-14SEP-141. D/CGEPL
.400LILO of one ckt of Bhadrawati -Parli atGEPL TPS
2. D/CGEPL
Remark:
Ghatampur TPP (3x660 MW), CS, UP, JVN,UPRVUNL,,
.765Ghatampur - Moradabad / Rampur1. 2xS/CUPPTCL
400Ghatampur - Kanpur (PG)2. D/CUPPTCL
Remark: Status Not Reported. (UP share is 1485 MW)
Ghazipur (2x660 MW), PS, UP, BEL Spun,,
Commissioned 09/14.59220Ghazipur - Rasra 186 186 186 59 SEP-14FEB-11 SEP-141. S/CUPPTCL
Legends
TL: Total Location STC: Stubs Cast TE: Towers Erected STG: Stringing Completed Page 16 of67
As on 31-AUG-2015
State/AgencyExecutingAsociated
Trans.Works
AssociatedTransmission
Lines and Substations
VoltageLevel(KV)
Ckm/MVA
Construction progress Status
Monthof
Completion
Remark
TL(Nos)/LandAcq.(%)
STC(Nos)/CivilWork(%)
TE(Nos)/Recp.Materia
l(%)
STG(Ckm)/Erection (%)
2. 1. 4. 5. 6. 7. 8. 9. 12. 13.
OriginalTargetDate
10.
RevisedTargetDate
11.
Ckts(S/C)
&(D/C)
3.
400LILO of Anpara - Mau at Ghazipur2. D/CUPPTCL
Work not Started.400LILO of Sarnath - Azamgarh at Varanasi /Jaunpur
3. D/CUPPTCL
400Varanasi / Jaunpur - Gorakhpur4. D/CUPPTCL
400Varanasi/Jaunpur - Aurai5. D/CUPPTCL
400Varanasi/Jaunpur - Azamgarh6. D/CUPPTCL
765Varanasi/Jaunpur - Meja7. D/CUPPTCL
400Ghazipur - Varanasi / Jaunpur8. S/CUPPTCL
Remark: Status Not Reported (UP share is 1320 MW)
Goindwal Sahib (2x270MW), PS,Punjab,GVK, U1-6/13,U2-8/13,
Work is in progress.80220Goindwal Sahib - Bottianwala 201 152 121 DEC-151. D/CPSTCL
Work in progress.55220Goindwal Sahib - Chola Sahib 92 92 92 54 SEP-152. D/CPSTCL
Commissioned 8/1238220Goindwal Sahib - Sultanpur Lodhi 60 60 60 38 AUG-12AUG-123. D/CPSTCL
Remark:
Harduaganj TPS (2x250 MW),SS,UP,UPRVUNL,U8-9/11(C),U9-5/12(C),
Commissioned 11/14.99220Harduaganj - Jahangirabad 151 151 151 99 NOV-14AUG-09 NOV-141. D/CUPPTCL
Remark:
Hazaira CCPP (351 MW),SS,GUJ,GSECL,,GT+ST-2/12(c ),
W I P/Row problems111220Hazaira (GSEC) - Mota 182 107 94 20 MAR-161. D/CGETCO
Commissioned 9/11.125220Hazaira (GSEC)-Kosamba 211 211 211 125 SEP-11APR-11 SEP-112. D/CGETCO
Remark: Work slow of Hazaira (GSEC) - Mota line. needs to be expedited for full load evacuation.
Legends
TL: Total Location STC: Stubs Cast TE: Towers Erected STG: Stringing Completed Page 17 of67
As on 31-AUG-2015
State/AgencyExecutingAsociated
Trans.Works
AssociatedTransmission
Lines and Substations
VoltageLevel(KV)
Ckm/MVA
Construction progress Status
Monthof
Completion
Remark
TL(Nos)/LandAcq.(%)
STC(Nos)/CivilWork(%)
TE(Nos)/Recp.Materia
l(%)
STG(Ckm)/Erection (%)
2. 1. 4. 5. 6. 7. 8. 9. 12. 13.
OriginalTargetDate
10.
RevisedTargetDate
11.
Ckts(S/C)
&(D/C)
3.
Hindustan Electricity GCL TPP (1x350+3x379 MW), PS, Maha, U1-3/14, U2, & U3,
110400HEGCL TPP - Pune (AIS) (PG)1. D/C
400LILO of Lonikhand - Kalwa at HEGCL TPP2. D/C
Remark: Status Not Reported.
Ind Barath TPP (2x350MW),PS,Orissa,Barath, U1-1/15, U2-3/15,
84400Ind Barath - Jharsuguda pooling Station 125 119 115 60 AUG-151. D/CIBPIL
47400LILO of Rouekila - Raigarh at Ind Barath 72 72 72 47 JUN-152. D/CIBPIL
Remark:
Ind Barath Tamil Nadu TPP, (660MW) U1-7/13,
.400LILO of Tuticorin - Madurai at Ind BarathTPP (madras)
1. D/C
Remark: Status Not Reported.
JSW Ratnagiri TPP (4x300 MW) ,PS,MAHA,JSW Energy ,U1-8/10(C),U2-12/10(C),U3-5/11(C),U4-10/11(C),
Commissioned 10/11.219400Jaigad - karad. 300 300 300 218 SEP-11OCT-111. D/CJSWEL
Ckt 1 commissioned 7/10 & ckt 2 commissioned 8/10.110400Jaigad - New Koyna 160 160 160 110 AUG-10MAY-10 AUG-102. D/CJSWEL
Remark:
Jal Churk (4x60 MW), PS,UP, M/S Jal ,,
Commissioned 01/14.13220Churk - Robertsganj 13 JAN-14JAN-141. D/CUPPTCL
Remark:
Jallipa - Kapurdi TPP (8x135 MW),PS,RAJ, Raj West Power,U1-10/09(C),U2-7/10(C),U3&U4-11/11(C),U5-2/13(C),
Commissioned 8/105220LILO of Giral - Barmer Ckt 1 at Raj WestLTPS.
10 10 10 5 AUG-08AUG-081. D/CRVPNL
Legends
TL: Total Location STC: Stubs Cast TE: Towers Erected STG: Stringing Completed Page 18 of67
As on 31-AUG-2015
State/AgencyExecutingAsociated
Trans.Works
AssociatedTransmission
Lines and Substations
VoltageLevel(KV)
Ckm/MVA
Construction progress Status
Monthof
Completion
Remark
TL(Nos)/LandAcq.(%)
STC(Nos)/CivilWork(%)
TE(Nos)/Recp.Materia
l(%)
STG(Ckm)/Erection (%)
2. 1. 4. 5. 6. 7. 8. 9. 12. 13.
OriginalTargetDate
10.
RevisedTargetDate
11.
Ckts(S/C)
&(D/C)
3.
1 ckt Commissioned 5/1030400Rajwest- Barmer 44 44 44 30 MAY-10APR-10 MAY-102. D/CRVPNL
Commissioned 5/10417400Rajwest- Jodhpur 560 560 560 417 MAY-10APR-09 MAY-103. D/CRVPNL
Commisisoned 3/1283220Raj West-Dhorimana 283 283 283 83 MAR-12MAR-124. S/CRVPNL
Remark:
Jawaharpur TPP, (3x660 MW), PS,UP, Jawaharpur Vidyut Utpadan Nigam Ltd..,
765Jawaharpur - G Noida1. D/CUPPTCL
765Jawaharpur - Agra (UP)2. D/CUPPTCL
765Jawarpur - Mainpuri3. D/CUPPTCL
220LILO Mainpuri (PG) - Harduaganj at Jwrpur4. D/CUPPTCL
400LILO of Mainpur (765) Aligarh (400) atJwrpur
5. D/CUPPTCL
220LILO of Mainpur - Etah at Jwrpur6. D/CUPPTCL
.400LILO of Panki - Muradnagar at Jwrpur7. D/CUPPTCL
Remark: Status Not Reported (UP Share is 1980 MW)
Jhajjar Mahatama Gandhi (CLP) (2x660 MW), PS, U1-1/12(C),U2-4/12(C),
Commissioned 05/13.25220Deepalpur-Barhi 95 95 95 25 MAY-13MAY-131. D/CHVPNL
Commissioned 2/12.40400Jhajjar -Dhanonda 64 64 64 64 FEB-12FEB-122. D/CHVPNL
Commissioned 2/12.70400Jhajjar - Kabulpur 95 95 95 95 FEB-12FEB-123. D/CHVPNL
Commissioned 09/1346220Kabalpur - Badhan 97 97 97 46 SEP-13SEP-134. D/CHVPNL
Commissoned 2/12.133400Kabulpur-Deepalpur FEB-12FEB-125. D/CHVPNL
Commissioned 10/11.10400LILO of Jhajjar (APCPL) - Daultabad line atMG Jhajjar (CLP)
23 23 23 10 OCT-11OCT-116. D/CHVPNL
Legends
TL: Total Location STC: Stubs Cast TE: Towers Erected STG: Stringing Completed Page 19 of67
As on 31-AUG-2015
State/AgencyExecutingAsociated
Trans.Works
AssociatedTransmission
Lines and Substations
VoltageLevel(KV)
Ckm/MVA
Construction progress Status
Monthof
Completion
Remark
TL(Nos)/LandAcq.(%)
STC(Nos)/CivilWork(%)
TE(Nos)/Recp.Materia
l(%)
STG(Ckm)/Erection (%)
2. 1. 4. 5. 6. 7. 8. 9. 12. 13.
OriginalTargetDate
10.
RevisedTargetDate
11.
Ckts(S/C)
&(D/C)
3.
commissioned 2/12.2400LILO of abdullapur-Bawana at deepalpur 3 3 3 2 FEB-12FEB-127. D/CHVPNL
Commissioned 11/13.47220LLIO of Bahadurgarh- Rohtak at Kabulpur 94 94 94 47 NOV-13NOV-138. D/CHVPNL
Due to dismal progress of contractor the firm has been blacklisted.The work was re-awarded in January 2015 with schedulecompletion period of one year.The nomenclature of work is Const.of multi-circuit line emanting from 400 kV Sub station Deepalpur -RGEC enrouting 220 kV HSIIDC Rai & 132 kV HSIIDC Rai,Khewra.(RS Infra)
42220Deepalpur-Sonepat HSIIDC Rai 113 96 13 MAY-13 JAN-169. M/CHVPNL
Commissioned 2/12.2x100220/132Deepalpur S/S 100 100 100 100 FEB-12FEB-1210. HVPNL
Commissioned 2/12.2x315400/220Deepalpur S/S 100 100 100 FEB-12FEB-1211. HVPNL
Commissioned 2/12.2x100220/132Kabulpur S/S 100 100 100 100 FEB-12FEB-1212. HVPNL
Commissioned 2/12.2x315400/220Kabulpur S/S 100 100 100 100 FEB-12FEB-1213. HVPNL
Remark:
Jhajjar TPS (Indira Gandhi ) TPS (3x500 MW),CS,HR,ACPCL,U1- (C),U2-(C),U3-12/12,
1st cket commissioned 9/10 & 2nd ckt in 11/10.132400Jhajjar - Mundka 186 186 186 132 NOV-10MAR-10 NOV-101. D/CAPCPL
Commissioned 2/12.136400Jhajjar - Daultabad 175 175 175 136 FEB-12FEB-122. D/CHVPNL
Commissioned 3/11.160220/66Mundka (1st ICT) 100 100 100 MAR-11MAR-113. DTL
Commissioned 9/12.160220/66Mundka (2nd ICT) 100 100 100 100 SEP-12SEP-124. DTL
1st Trans. Commissioned 9/10.2nd trf 3/11.
630400/220Mundka (2x315) S/S MAR-11MAR-115. DTL
Commissioned 12/103x315400/220Daultabad S/S DEC-10DEC-106. HVPNL
Remark:
Jharsuguda (Sterlite TPP),PS, Ori,Sterlite, U1-12/10(C), U2-10/10(C),U3-8/11(C),U4-6/12 (c),
Legends
TL: Total Location STC: Stubs Cast TE: Towers Erected STG: Stringing Completed Page 20 of67
As on 31-AUG-2015
State/AgencyExecutingAsociated
Trans.Works
AssociatedTransmission
Lines and Substations
VoltageLevel(KV)
Ckm/MVA
Construction progress Status
Monthof
Completion
Remark
TL(Nos)/LandAcq.(%)
STC(Nos)/CivilWork(%)
TE(Nos)/Recp.Materia
l(%)
STG(Ckm)/Erection (%)
2. 1. 4. 5. 6. 7. 8. 9. 12. 13.
OriginalTargetDate
10.
RevisedTargetDate
11.
Ckts(S/C)
&(D/C)
3.
Ist ckt commissioned, 2nd ckt commissioned 8/10.9220Sterlite TPP - Sterlite captive plant D/C 9 AUG-10AUG-101. 2xD/CSEL
Commissioned 03/14. (Interim arrangement).60400LILO of Rourkela - Raigarh at Sterlite TPP (2nd LILO)
92 92 92 60 MAR-14MAR-142. D/CSEL
Commissioned 2/11. (Interim arrangement).49400LILO of Rourkela - Raigarh at Sterlite TPP(Existing line)
85 85 85 49 FEB-10FEB-113. D/CSEL
Construction of line yet to be started from LILO Point to JhasugdaS/S.
400Sterlite TPP - Jharsuguda4. 2xD/CSEL
Remark:
Jorethang Loop HEP (2x48MW)PS,Sikkim,DANS,U1-9/15, U2-10/15.,
Tower foundation work and erection of all tower upto the interconnection point as been completed. Stringing of only 2 spans outof a total of 15 spans is balance.
20220Jorethang HEP - New Melli 35 35 33 AUG-151. S/CDEPL
Remark:
Kaiga APP (220 MW),CS,KAR,NPCIL,U4-11/10(C),
Work completely held-up in stretch since more than 05 year due tosevere ROW problem in Karnataka portion of line forest clearancein Karnataka. Work re-started from DOct'14 with admn. support asdirected by court.
418400Mysore - Kozhikode 614 614 614 394 DEC-07 OCT-151. D/CPGCIL
Commissioned 03/08310400Narendra - Davangere 422 422 422 310 MAR-08MAR-082. D/CPGCIL
Commissioned 03/08315400/220Hirriyur (Extn.) S/S 100 100 100 100 MAR-08MAR-083. PGCIL
Completion matching with line.630400/220Kozhikode S/Stn. (2x315) 100 100 100 100 DEC-07 OCT-154. PGCIL
Remark:
Kakatiya TPP Extn (2x600 MW) SS,TCTL, APGENCO, U1-5/10 (C),U2-5/14,
Commissioned 09/13.262400Bhoopalapally (Kakatiya) - Gajwel 363 363 363 262 SEP-13SEP-131. D/CAPTRANSC
Remark:
Legends
TL: Total Location STC: Stubs Cast TE: Towers Erected STG: Stringing Completed Page 21 of67
As on 31-AUG-2015
State/AgencyExecutingAsociated
Trans.Works
AssociatedTransmission
Lines and Substations
VoltageLevel(KV)
Ckm/MVA
Construction progress Status
Monthof
Completion
Remark
TL(Nos)/LandAcq.(%)
STC(Nos)/CivilWork(%)
TE(Nos)/Recp.Materia
l(%)
STG(Ckm)/Erection (%)
2. 1. 4. 5. 6. 7. 8. 9. 12. 13.
OriginalTargetDate
10.
RevisedTargetDate
11.
Ckts(S/C)
&(D/C)
3.
Kalisindh TPS (2x600 MW), SS,Raj,RRVUNL, U1-5/14 (C),U2-6/15 (C),
Commissioned 4/12.19220Kalisindh-Jhalawar line 35 35 35 19 APR-12APR-121. D/CRVPNL
Commissioned 03/14.159400Kalisndh TPS - Anta (Baran) PoolingStation (Quad)
220 220 220 159 MAR-14MAR-142. D/CRVPNL
Work order withdrawn from M/s. GET and placed to M/s VarsanaIspat on 02.02.15. Likely to be completed up to Dec,15.
89400Phagi GSS (Jaipur) - Heerpura 123 121 100 17 DEC-153. D/CRVPNL
Work order withdrawn from M/s. GET and placed to M/s VarsanaIspat on 02.02.15. Likely to be completed up to Dec,15.
213400Phagi(Jaipur south-765 kV)-Ajmer line 283 257 184 DEC-11 DEC-154. D/CRVPNL
Commissioned 03/14.212765Anta - Phagi (Jaipur South Ckt-1) 586 586 586 212 MAR-14MAR-145. S/CRVPNL
Charged at 400 kV 01/14.214765Anta - Phagi (Jaipur South Ckt-2)(Chargedat 400 kV)
570 570 570 214 JAN-14JAN-146. S/CRVPNL
315400/220Ajmer S/S 100 95 100 98 AUG-157. RVPNL
Commissioned 02/15.3000765/400Anta (Distt. Banra) Pooling Station 100 100 100 100 FEB-15FEB-158. RVPNL
Commissioned 02/15.3000765/400Phagi (jaipur South ) (2x1500 ) S/S 100 100 100 100 FEB-15FEB-159. RVPNL
Remark:
Kalpakkam PBR (500 MW),
Commissioned 3/12.213230Kalpakkam - Arni 213 MAR-12MAR-121. D/CPGCIL
Commissioned 8/12.160230Kalpakkam PFBR-Kanchepurram 306 306 306 160 AUG-12AUG-122. D/CPGCIL
Line commissioned in Nov'1172230Kalpakkam PFBR-Sirucheri 140 140 140 72 NOV-11NOV-113. D/CPGCIL
Remark:
Kamalanga TPP (3x350MW),PS,GMR, Orissa, U1-3/13(C),U2-9/13(C),U3-9/13,
Commissioned 12/14.60400Kamalanga (GMR) - Angul pooling station 103 103 103 60 DEC-14DEC-141. D/CGMR
Legends
TL: Total Location STC: Stubs Cast TE: Towers Erected STG: Stringing Completed Page 22 of67
As on 31-AUG-2015
State/AgencyExecutingAsociated
Trans.Works
AssociatedTransmission
Lines and Substations
VoltageLevel(KV)
Ckm/MVA
Construction progress Status
Monthof
Completion
Remark
TL(Nos)/LandAcq.(%)
STC(Nos)/CivilWork(%)
TE(Nos)/Recp.Materia
l(%)
STG(Ckm)/Erection (%)
2. 1. 4. 5. 6. 7. 8. 9. 12. 13.
OriginalTargetDate
10.
RevisedTargetDate
11.
Ckts(S/C)
&(D/C)
3.
For start up power,work completed 5/12.1400LILO of Talchar -Meramundli at KamalangaTPP
3 3 3 1 MAY-122. D/CGMR
Remark:
Kameng HEP,(4x150 MW) SS,ArP,U2-12/14,U3-12/14. 2016-17,
Matching with Gen. of Kameng. * Gen. proj. delayed. (expected in2016-17).
110400Kameng - Balipara 149 133 99 AUG-13 DEC-161. D/CPGCIL
Remark:
Karcham Shongtong HEP ( 4x250 MW)PS, HP, JKHCL, U1-5/11(C), U2-6/11( C), U3-9/11 (C), U4,9/11 (C).,
Commissioned. 7/12432400Karcham Wangtoo-Abdullapur 518 518 518 432 JUL-12JUL-121. D/CJV(PG&JP)
Commissioned 3/11.291400Abdullapur - Sonepat 403 395 385 230 MAR-11SEP-11 MAR-112. D/CPGCIL
Remark:
Karchana TPP (2x660MW),,
400Karchanna - Rewa Road Allahabad1. D/C
Remark: Status Not Reported.
Kasaipalli TPP (2x135 MW),PS,Cha,ACB,U1- 12/11(C),U2-6/12(C),
Commissioned. 7/12112400Kasaipalli TPP -Bharai (Sipat) Poolingstation
181 181 181 112 JUL-12JUL-121. D/CACB
Commissioned 11/11.6400LILO of Korba - Bhatapara at Kasaipalli 6 NOV-11NOV-112. D/CACB
Remark:
Kashang-I,II & III (1x65+2x65MW),SS,HP,U1 -3/16,U2 & 3 -2017-18,
Yet to award, PGCIL is to construction Jhangi Pooling Station.220Kashang - Jangi Pooling Station1. D/CHPPTCL
Remark:
Kashipur Stg. I- 225 MW , Stg. II- 225 MW(Gas),UK,
Legends
TL: Total Location STC: Stubs Cast TE: Towers Erected STG: Stringing Completed Page 23 of67
As on 31-AUG-2015
State/AgencyExecutingAsociated
Trans.Works
AssociatedTransmission
Lines and Substations
VoltageLevel(KV)
Ckm/MVA
Construction progress Status
Monthof
Completion
Remark
TL(Nos)/LandAcq.(%)
STC(Nos)/CivilWork(%)
TE(Nos)/Recp.Materia
l(%)
STG(Ckm)/Erection (%)
2. 1. 4. 5. 6. 7. 8. 9. 12. 13.
OriginalTargetDate
10.
RevisedTargetDate
11.
Ckts(S/C)
&(D/C)
3.
Commissioned 08/14.34220Mahuakheraganj-Kashipur S/S 61 61 61 34 AUG-141. D/CPTCUL
Remark:
Kawai Super Critical TPS (2x660 MW),Raj, PS,Adani , Unit 1-5/13 (C),U2-12/13 (C),
Commissioned 01/14.101400Kawai - Anta (Baran) 136 136 136 101 JAN-14JAN-141. D/CRVPNL
Commissioned 12/12.16400Chhabra TPS-Kawai SCTPS 46 46 46 16 DEC-12DEC-122. S/CRVPNL
Remark:
Khaperkheda (500 MW),SS,MAHA,MSPGCL,U1-8/11(C),
Commissioned 3/12.12220Khaperkheda TPS - Khaperkheda(Existing)
19 19 19 12 MAR-12MAR-121. 2xD/CMSETCL
Commissioned 11/93400LILO of Koradi - Chandrapur atKhaperkheda TPS.
8 8 8 3 NOV-09NOV-092. D/CMSETCL
Commissioned 12/11.1000400/220Khaperkheda S/S (2x500) 100 100 100 100 DEC-11DEC-113. MSETCL
Remark:
Khargone Super Critical TPP(2x660 MW),CS,MP,NTPC,
400Khargone TPP-Indore DEC-151. D/CPGCIL
Remark: Status Not Reported.
Khurja (2x660 MW), PS, UP, THDC,,
4.4LILO of Agra - Muradnagar at Kurja1. D/CUPPTCL
Line energised date not issued due to incomplition of Aligarhsubstation. Balance work of line on hold due to DFCC work.Restoration work is in progress on 9 towers. The proposed date ofenergization is 25.09.2015
400LILO of Aligarh - Sikandarabad 258 254 254 166 AUG-152. D/CUPPTCL
765LILO of Mainpuri - Gr Noida at Khurja3. D/CUPPTCL
765Khurja - Hapur4. S/CUPPTCL
Legends
TL: Total Location STC: Stubs Cast TE: Towers Erected STG: Stringing Completed Page 24 of67
As on 31-AUG-2015
State/AgencyExecutingAsociated
Trans.Works
AssociatedTransmission
Lines and Substations
VoltageLevel(KV)
Ckm/MVA
Construction progress Status
Monthof
Completion
Remark
TL(Nos)/LandAcq.(%)
STC(Nos)/CivilWork(%)
TE(Nos)/Recp.Materia
l(%)
STG(Ckm)/Erection (%)
2. 1. 4. 5. 6. 7. 8. 9. 12. 13.
OriginalTargetDate
10.
RevisedTargetDate
11.
Ckts(S/C)
&(D/C)
3.
Remark: Status Not Reported. (UP Share is 792 MW)
Kishanganga HEP (3x110MW) CS, J&K, NHPC, U1,2 & 3- 2016-17,
Award for tower pkgs. placed in march 2015. Engg. & survey underprogress.
206220Kishanganga - Amargarh 515 MAR-18 JUL-171. D/CPGCIL
Award for tower pkgs. placed in march 2015. Engg. & survey underprogress.
78220Kishanganga - Wagoora 78 MAR-18 MAR-182. D/CPGCIL
Remark:
Koderma TPS 2x500 MW,CS,JHA,DVC,U1-7/11 (C),U2-2/13 (C),
Commissioned 8/1032132LILO of Barhi-Koderma at Koderma S/S 66 66 66 32 AUG-10AUG-101. D/CDVC
Commissioned 5/11.222400Koderma-Biharshariff (Quad) 294 294 294 222 MAY-11APR-10 MAY-112. D/CPGCIL
Remark:
Koldam HEP (4x200 MW),CS,HP,NTPC, U3-4/15 (C), U4-6/15,
Commissioned 03/10.93400Koldam - Nalagarh 127 127 127 93 MAR-10MAR-101. D/CPGCIL
Commissioned 09/14.301400Koldam - Ludhinana (JV Portion) 423 423 423 301 SEP-14SEP-08 SEP-142. D/CPKTCL
Remark:
Koradi TPP Expn. (3x660 MW), SS,Maha, MSPGCL, U8-3/15 (C) ,U9-5/15 ,U10-9/15,
Forest: 16.9392 Ha (Wardha :3.85 & Nagpur:13.0892 )FRA certificate received from Nagpur collector on dt: 18.02.2015 &FRA Certificate from wardhacollector received vide ltr no. AK/land/FRA/ws-140/15 dt:29.04.2015.ROW: 6 cases are under hearing at Collector office Nagpur, forLoc no. 11/1 (3 leg),11/1 (1leg),11/2,36/6, AP-15 (2 leg) & AP-1305 case for Loc No.11/1 (1leg),11/2,36/6, AP-15 (2 leg) & AP-13solved through negotiation01 case for Loc No, 11/1 (3 leg) order received on dt:
239400Koradi TPS - Wardha 336 336 334 224 APR-11 DEC-151. D/CMSETCL
Legends
TL: Total Location STC: Stubs Cast TE: Towers Erected STG: Stringing Completed Page 25 of67
As on 31-AUG-2015
State/AgencyExecutingAsociated
Trans.Works
AssociatedTransmission
Lines and Substations
VoltageLevel(KV)
Ckm/MVA
Construction progress Status
Monthof
Completion
Remark
TL(Nos)/LandAcq.(%)
STC(Nos)/CivilWork(%)
TE(Nos)/Recp.Materia
l(%)
STG(Ckm)/Erection (%)
2. 1. 4. 5. 6. 7. 8. 9. 12. 13.
OriginalTargetDate
10.
RevisedTargetDate
11.
Ckts(S/C)
&(D/C)
3.
06.04.2015Railway:For Loc. No. AP 18 - AP 19 WORK NOT TAKEN UP.Approval received from from SRDEE, TRD, Central Rly Nagpur &Traffic Block charges paid. Traffice block on22.07.2014 differed due to heavy rains.National highway: : 'National Highway crossing proposal submittedto project manager NHAI Amravatifor crossing NH-6 (near village Gondkhairi) vide letter No 255 dt21.01.2012 & Nagpur for NH-69 near Village Koradi vide letter No256 dt.21.01.2012.Forest area involved 4.122 Ha. Final Compliance (FRA) submittedto Addl PCCF (Central) from Addl PCCF & nodal officer forapproval vide ltr no. 172 dt: 06.05.2015.PTCC aprroval is awaited from Mumbai office.
29220Koradi TPS-New Khaparhkeda 72 68 65 22 DEC-13 DEC-152. D/CMSETCL
Remark:
Korba (E) (2x250 MW), SS, Chg, U2-7/12 (C),
Commissioned 08/14.153220Korba -Vishrampur 505 505 505 153 AUG-14MAR-12 AUG-141. S/CCSPTCL
Charged on 22.8.2014160220/132Bishrampur S/S 100 100 100 100 DEC-12 JUN-142. CSPTCL
Remark:
Korba (W) (1x500 MW),SS,Cha,CSEB,U5-3/13(C),
Commissioned 12/12.447400Korba (W)-Bhilai (khedamara) 640 640 640 447 DEC-12DEC-121. D/CCSPTCL
Commissioned 9/12.47400LILO Korba (West)-Bhilai at Raipur(CSPTCL)
70 70 70 47 SEP-12MAR-10 SEP-122. D/CCSPTCL
Charged on 31.3.2014315400/220Raipur (2nd Trf.) 100 100 100 100 DEC-133. CSPTCL
Remark:
Koteshwar HEP (4x100 MW),CS,UK, THDC,U3-1/12,U4-3/12.,
Legends
TL: Total Location STC: Stubs Cast TE: Towers Erected STG: Stringing Completed Page 26 of67
As on 31-AUG-2015
State/AgencyExecutingAsociated
Trans.Works
AssociatedTransmission
Lines and Substations
VoltageLevel(KV)
Ckm/MVA
Construction progress Status
Monthof
Completion
Remark
TL(Nos)/LandAcq.(%)
STC(Nos)/CivilWork(%)
TE(Nos)/Recp.Materia
l(%)
STG(Ckm)/Erection (%)
2. 1. 4. 5. 6. 7. 8. 9. 12. 13.
OriginalTargetDate
10.
RevisedTargetDate
11.
Ckts(S/C)
&(D/C)
3.
Commissioned 6/11.13765LILO of Tehri - Meerut at Tehri PoolingPoint (to be charged at 400 KV)
59 59 59 13 JUN-11JUN-08 JUN-111. 2xD/CPGCIL
Commissioned 3/11.5400Koteshwar -Tehri Pooling Point 9 9 9 5 APR-11JUN-08 MAR-112. D/CPGCIL
Remark:
Kundankulam - APP (2x1000 MW),CS,TN,APCIL, U1-12/14 (C),,
Completion uncertain due to severe ROW problem. Work to startafter assesment of compensation & payment by stateGovt./KSEB.Revised G.O. with enhansed compensation issued inJan'15.Recently G.O. issued on 30.07.15 in which compensation tobe done on land value, to be finalised by concern DC.
297400Edamon (KSEB) - Muvattupuzha (PG) 438 159 105 29 NOV-08 DEC-161. D/CPGCIL
Commissioned 03/09.145400Kudankulam-Tirunelveli (Quad) 1st. 199 199 199 145 MAR-09MAR-092. D/CPGCIL
Commissioned 03/09.160400Kudankulam-Tirunelveli (Quad) 2nd. 213 213 213 160 MAR-09MAR-093. D/CPGCIL
Commissioned 4/08.213400LILO of Madurai - Trivandrum at Tirunelveli2 X D/C
300 300 300 213 APR-08APR-084. D/CPGCIL
Line commissioned in Nov'11.157400Muvattupuzha (PG) - North Trichur (PG) 224 224 224 157 NOV-11NOV-115. D/CPGCIL
Commissioned 03/09.533400Tirunelveli - Udumaplet 730 730 730 533 MAR-09MAR-096. D/CPGCIL
Commissioned 03/10.327400Tirunelveli - Edamon 235 235 235 327 MAR-10MAR-107. M/CPGCIL
ICT-II commissioned in Nov'11.1x315400/220Muvattapuzha s/s (2 nd ICT) 100 100 100 100 NOV-11NOV-118. PGCIL
ICT-I Commissioned 4/08, ICT-II Commissioned 11/08.630400/220Tirunelveli S/S 100 100 100 100 NOV-08APR-089. PGCIL
Commissioned 6/09.315400/220Trivandrum 100 100 100 100 JUN-09JUN-0910. PGCIL
Commissioned 3/09315400/200Udumalpet (PG) Ext. 100 100 100 100 MAR-09MAR-0911. PGCIL
Remark:
Lakhwar (300 MW) & Vyasi (120 MW),SS,UK,UJVNL - 2018-19,
Legends
TL: Total Location STC: Stubs Cast TE: Towers Erected STG: Stringing Completed Page 27 of67
As on 31-AUG-2015
State/AgencyExecutingAsociated
Trans.Works
AssociatedTransmission
Lines and Substations
VoltageLevel(KV)
Ckm/MVA
Construction progress Status
Monthof
Completion
Remark
TL(Nos)/LandAcq.(%)
STC(Nos)/CivilWork(%)
TE(Nos)/Recp.Materia
l(%)
STG(Ckm)/Erection (%)
2. 1. 4. 5. 6. 7. 8. 9. 12. 13.
OriginalTargetDate
10.
RevisedTargetDate
11.
Ckts(S/C)
&(D/C)
3.
DPR prepared. DPR submission to funding agency is in progress.146220Almora-Pithoragarh JUN-161. D/CPTCUL
Construction of line as per Connectivity Schedule of Generators inYamuna Valley.
94220Arakot -Mori and LILO of Arakot -Mori atHanol Tuni
MAR-182. D/CPTCUL
Construction of line as per Connectivity Schedule of Generatiors inYamuna Valley.
52220Devsari-Karanprayag NOV-173. D/CPTCUL
Construction of line as per Connectivity Schedule of Generators inYamuna Valley.
76220Jakhol -Sankri -Mori and LILO of Jakhol -Sankri -Mori at Natwar Mori
MAR-184. D/CPTCUL
Construction of line as per Schedule of construction of Langrasu.16220LILO of Nandprayag -Karanprayag atLangrasu
NOV-175. D/CPTCUL
LoA is to be issued.10220LILO of Roshnabad -Puhana atPirankaliyar S/S
JUN-156. D/CPTCUL
Tender has been floated.70220LILO of Vyasi HEP - Dehradun at Dehradun(PG) S/S
APR-167. D/CPTCUL
Construction of line as per Connectivity Schedule of Generators inYamuna Valley.
200220Mori -Dehradun MAR-188. D/CPTCUL
Remark: Construction yet to be taken up.
Lalitpur Ph-I (3x660MW), Ph-II (3x660 MW )PS,UP,BHL, U1-06/15 (C),U2-1/15,U3-3/15,
Foundation WIP.142400Agra(UP) - Agra (South) 212 123 13 AUG-16 MAY-161. D/CUPPTCL
Tower erection shall start from 8/2015, material for 12 towerssupplied.
64400LILO of Agra - Muradnagar at Mathura 88 33 AUG-16 MAY-162. D/CUPPTCL
Foundation WIP.68400LILO of existing Agra (UP) - Agra (PG) atAgra (UP)
123 28 AUG-16 MAY-163. D/CUPPTCL
Foundation WIP.158400LILO of existing Agra (UP) - Muradnagar atAgra (UP)
233 57 AUG-16 MAY-164. D/CUPPTCL
Commissioned 04/15.19220Lalitpur - Lalitpur TPS (Ckt-II) 19 APR-15APR-155. D/CUPPTCL
Commissioned 03/15.19220Lalitpur TPS - Lalitpur TPS S/S (Ckt-I) 57 57 57 19 MAR-15MAR-156. D/CUPPTCL
Commissioned 06/14.185220Lalitpur TPS - Jhansi 301 301 301 185 JUN-14JUN-147. D/CUPPTCL
Foundation WIP.142400Agra (UP) - Mathura line 388 189 AUG-16 MAY-168. S/CUPPTCL
Foundation and Tower erection work in progress.332765Lalitpur TPS - Agra (UP) Ckt-I 925 671 226 AUG-16 MAY-169. S/CUPPTCL
Legends
TL: Total Location STC: Stubs Cast TE: Towers Erected STG: Stringing Completed Page 28 of67
As on 31-AUG-2015
State/AgencyExecutingAsociated
Trans.Works
AssociatedTransmission
Lines and Substations
VoltageLevel(KV)
Ckm/MVA
Construction progress Status
Monthof
Completion
Remark
TL(Nos)/LandAcq.(%)
STC(Nos)/CivilWork(%)
TE(Nos)/Recp.Materia
l(%)
STG(Ckm)/Erection (%)
2. 1. 4. 5. 6. 7. 8. 9. 12. 13.
OriginalTargetDate
10.
RevisedTargetDate
11.
Ckts(S/C)
&(D/C)
3.
Fdn & Ere work is in progress.334765Lalitpur TPS - Agra (UP) Ckt-II 900 692 188 AUG-16 MAY-1610. S/CUPPTCL
600400/132Agra (South) S/S 100 1 AUG-16 AUG-1611. UPPTCL
3000765/400Agra (UP) S/S 100 2 AUG-16 AUG-1612. UPPTCL
Remark:
Lanco Amarkantak TPS -II, (2x660 MW), PS,Chg,LPT, U3 -5/14,U4-9/14,
.95400Lanco Amarkantak - Champa PoolingStation
158 96 12 APR-161. D/CLEPP
Remark:
Lanco Vidarbha (Dhenkanal )TPS (2x660 MW), PS,,LIL, U1-9/14,U2-1/15,
15765LILO of Seoni - Wardha at Lanco VidarbhaTPS
16 DEC-131. D/CLEPP
Remark:
Lara STPP-I (2x800 MW), CS, Chh, NTPC, U1-5/15,U2-4/16,
.765Lara-I TPS - Raigarh Pooling Station(Kotra)
1. D/CNTPC Ltd.
Remark: Status Not Reported.
Lata Tapovan (3x57 MW),CS,UK,NTPC- 2019-20,
Contract has been awarded on 06.05.11 to M/s TATA Project Ltd.,contract effective date is 14.10.11 and GMVN has not given thepermission to cross the Auli Ropeway, hence crossing byunderground cable is proposed at Joshimath. Land sliding zonebeing encountered at village Malli Tangri and Talli Tangri thesurvey and forest case yet to be completed. Forest Case of 51.3Hect. is under preparation. Total Progress 6%.
40220Joshimath - Kunwari Pass (Pipalkoti) JUN-181. D/CPTCUL
Regarding Forest land Transfer proposal nodal officer24220Lata Tapovan- Joshimath 36 DEC-152. D/CPTCUL
Legends
TL: Total Location STC: Stubs Cast TE: Towers Erected STG: Stringing Completed Page 29 of67
As on 31-AUG-2015
State/AgencyExecutingAsociated
Trans.Works
AssociatedTransmission
Lines and Substations
VoltageLevel(KV)
Ckm/MVA
Construction progress Status
Monthof
Completion
Remark
TL(Nos)/LandAcq.(%)
STC(Nos)/CivilWork(%)
TE(Nos)/Recp.Materia
l(%)
STG(Ckm)/Erection (%)
2. 1. 4. 5. 6. 7. 8. 9. 12. 13.
OriginalTargetDate
10.
RevisedTargetDate
11.
Ckts(S/C)
&(D/C)
3.
Dehradun raised queries vide letter no 3042 dated 01-06-2013.Reply of the same is being done. Total progress 10%Contract has been awarded on 06.05.11 to M/s TATA Project Ltd.contract effective date is 03.09.11 Forest case prepared for 43.694Hect. and submitted to DFO Joshimath/ DM Chamoli. NOC from04 Nos. village panchyat Naurakh Agthalla, Tangri Talli and TangriMalli is pending. Matter is being pursued GOU/DistrictAdministration.
40400Vishnugad - Kuwari Pass (Pipalkoti) 62 DEC-153. D/CPTCUL
Remark:
Loharinagpala (NTPC),CS,UK,NTPC,Unit-14/15.,
The work at Loharinagpala HEP stopped as per GOI order.180400Loharinagpala-Koteshwar line1. D/CPTCUL
The work at Pala Maneri HEP stopped as per GOI order.10400LILO of Loharinagpala - Koteshwar at Pala- Maneri
2. D/CPTCUL
Remark:
Lower Jurala HEP (6x40MW) SS,TCTL,TSGENCO,U1-9/15,U2-8/15,U3-9/15,U4-12/15,U5-6 - 2016-17,
Commissioned 12/13.9220LILO of Veltoor -Jurala at Lower JuralaHEP
17 17 17 9 DEC-13DEC-131. D/CAPTRANSC
Works are under progress. JC foundation works are underprogress.
22220Lower Jurala HEP - Upper Jurala 36 29 25 3 AUG-142. D/CTCTL
Remark:
Mahan TPP Ph-1(2x600 MW),PS, MP,ESSAR Power TCL, U1-2/13 (c), U2-11/13,
Commissioned 3/13.208400Gandhar-Hazira 287 287 287 208 MAR-13MAR-131. D/CEPTCL
Commissioned 3/12. (Interim)44400LILO of Viindhyachal -Korba line at MahanS/S
67 67 67 44 MAR-13MAR-122. D/CEPTCL
Due to monsoon the work progress of MSTL is very slow.670400Mahan -Sipat 942 938 909 394 MAR-163. D/CEPTCL
commissioned in March 2013. Reported in July 2015.2x500400/220Hazira S/S 100 100 100 100 JUL-15JUL-154. EPTCL
Remark:
Legends
TL: Total Location STC: Stubs Cast TE: Towers Erected STG: Stringing Completed Page 30 of67
As on 31-AUG-2015
State/AgencyExecutingAsociated
Trans.Works
AssociatedTransmission
Lines and Substations
VoltageLevel(KV)
Ckm/MVA
Construction progress Status
Monthof
Completion
Remark
TL(Nos)/LandAcq.(%)
STC(Nos)/CivilWork(%)
TE(Nos)/Recp.Materia
l(%)
STG(Ckm)/Erection (%)
2. 1. 4. 5. 6. 7. 8. 9. 12. 13.
OriginalTargetDate
10.
RevisedTargetDate
11.
Ckts(S/C)
&(D/C)
3.
Maheshwar HEP (10x40 MW),PS,MP,SMHPCL,U1-12/12,U2-1/13,U3-2/13. 2016-17,
Commissioned 5/10.54220Maheshwar - Nimrani 90 90 90 54 MAY-10APR-09 MAY-101. D/CMPPTCL
Commissioned 2/12.115220Maheshwar - Pithampur 195 195 195 115 FEB-12FEB-122. D/CMPPTCL
Remark:
Maithon RBTPP (2x525 MW),PS,JHA,DVC-JV TATA ,U1-6/11(C),U2-3/12 (C),
Commissioned 12/11.376400Maithon (RB) - Ranchi 534 534 534 376 DEC-11DEC-111. D/CPGCIL
Commissioned 09/1062400Maithon RB - Maithon (PG) 94 94 94 62 SEP-10APR-10 SEP-102. D/CPGCIL
Remark:
Maitrishi Usha TPP (Corporate Power) (Chandwa) (Abhijit) (4x270MW), U1-7/13,U2-11/13,U3 -1/14, U2-3/14.,
6400Corporate TPP - Jharkhand Pooling Station 11 DEC-121. D/CCPL
.216400Latehar - Namkum 320 293 274 132 DEC-122. D/CCPL
Remark: Status Not Reported.
Malana - II HEP (2x50 MW)PS,HP,EPPL,U1-8/11(C),U2-8/11(C),,
Commissioned 9/11.2220LILO of Allain Duhangan- Nalagarh atChhaur
4 4 4 2 SEP-11SEP-09 SEP-111. D/CEPCL
Commissioned 9/11.36132Malana - II HEP - Chhaur. 51 51 51 36 SEP-11SEP-112. D/CEPCL
Commissioned 9/114x42.5132/220Chhaur SEP-11SEP-113. EPCL
Remark:
Malibrahmini (2x525MW),PS,Orissa, MPL.,
62400Malibrahmani - Angul 108 100 80 20 MAR-161. D/COPTCL
Remark:
Legends
TL: Total Location STC: Stubs Cast TE: Towers Erected STG: Stringing Completed Page 31 of67
As on 31-AUG-2015
State/AgencyExecutingAsociated
Trans.Works
AssociatedTransmission
Lines and Substations
VoltageLevel(KV)
Ckm/MVA
Construction progress Status
Monthof
Completion
Remark
TL(Nos)/LandAcq.(%)
STC(Nos)/CivilWork(%)
TE(Nos)/Recp.Materia
l(%)
STG(Ckm)/Erection (%)
2. 1. 4. 5. 6. 7. 8. 9. 12. 13.
OriginalTargetDate
10.
RevisedTargetDate
11.
Ckts(S/C)
&(D/C)
3.
Malwa TPP, Shree Singhaji TPP, Ph-I (2x600 MW),Ph-II (2x600 MW), SS,MP,MPPGCL, U1-11/13(C), U2-10/14 (C),
Commissioned 11/14.225400Chhegaon - Julwania 340 340 340 225 NOV-14NOV-141. D/CMPPTCL
Commissioned 02/13105400Malwa TPP - Chhegaon 158 158 158 105 FEB-13FEB-132. D/CMPPTCL
Commissioned 11/13.272400Malwa TPP - Pithampur 397 397 397 268 NOV-13NOV-133. D/CMPPTCL
Commisioned 3/1295220Malwa TPP - Chhegaon 160 160 160 95 MAR-12MAR-124. D/CMPPTCL
Commissioned 03/14.128400Pithampur-Indore 193 193 193 128 MAR-14MAR-145. D/CMPPTCL
Commissioned 12/12.315400/220Chhegaon S/S 100 100 100 100 DEC-12DEC-126. MPPTCL
Commissioned 4/13.630400/220Pithampur S/S 100 100 100 100 APR-13APR-137. MPPTCL
Commissioned 09/13.6220LILO of both ckts of Nimrani-Julwania atJulwania
9 9 9 5 SEP-13SEP-138. D/CMPPTCL
Commissioned 11/14.630400/220Julwania S/S 100 100 100 100 NOV-14NOV-149. MPPTCL
Remark:
Marwa TPP (2x500 MW) SS,Chg,CSPGCL U1-3/14 (C), U2 -1/15,
Commissioned 1/13. (Loc 39 to 51 charged on 7.11.12)28220Marwa - Banari (Start up power) 55 55 55 28 JAN-13JAN-131. D/CCSPTCL
Commissioned 05/15.116400LILO of One ckt of Korba (W) - Khedamaraat Marwa
161 161 161 116 MAY-15MAR-13 MAY-152. D/CCSPTCL
Commissioned 06/13.281400Marwa - Raipur (Raitha) 379 379 379 281 JUN-13JUN-133. D/CCSPTCL
Remark:
Mauda TPS (500 MW),Phase-II (2x660 MW) CS, Maha, NTPC, U1-4/12 (C), U2-3/13(C),U3-7/16,U4-1/17,
Commisisoned 05/12124400Mauda - Wardha (2nd Ckt) MAY-12MAY-121. S/CPGCIL
Commissioned 3/12.124400Mauda - Wardha line (Quad)(Ckt-1) 345 345 345 124 MAR-12MAR-122. S/CPGCIL
Remark:
Legends
TL: Total Location STC: Stubs Cast TE: Towers Erected STG: Stringing Completed Page 32 of67
As on 31-AUG-2015
State/AgencyExecutingAsociated
Trans.Works
AssociatedTransmission
Lines and Substations
VoltageLevel(KV)
Ckm/MVA
Construction progress Status
Monthof
Completion
Remark
TL(Nos)/LandAcq.(%)
STC(Nos)/CivilWork(%)
TE(Nos)/Recp.Materia
l(%)
STG(Ckm)/Erection (%)
2. 1. 4. 5. 6. 7. 8. 9. 12. 13.
OriginalTargetDate
10.
RevisedTargetDate
11.
Ckts(S/C)
&(D/C)
3.
Meja TPP Ph-I (2x660 MW), Ph-II (2x660 MW),SS (Jonit Venture,UPPCL & NTPC), U1-7/16,U2-12/16,
Completed.64400Meja - Bara 83 83 83 64 FEB-161. D/CSEUPPTCL
Work yet to be awarded.400Allahabad (PG) - Rewa Road (Allahabad)2. D/CUPPTCL
Remark:
Mettur TPS Stage III (600 MW), SS,TN,U1-10/12(C),
MTPS III- Malco energised 2/11 for start up power.3230LILO of MTPS -Malco at MTPS Stage III 9 9 9 3 FEB-11FEB-111. D/CTANTRANS
Commissioned 01/13.220400MTPS St.III - Arasur 325 325 325 220 JAN-13JAN-132. D/CTANTRANS
Dharmapuri 400 KV SS has been sanctioned. Hence, work will betaken up according to that BP.
200400MTPS St.III - Singarpet JUN-163. D/CTANTRANS
Commissioned 3/123230MTPS Stage-III - Gobi 8 8 8 3 MAR-12MAR-124. S/CTANTRANS
Remark:
Monarchak CCPP (101 MW), CS,Tripura, NEEPCO, GT - 3/15 (C), ST - 2/15.,
Work in progress.42132Monarchak - Surajmani Nagar 150 49 38 6 MAR-151. D/CTSECL
Completed 9/133132Surajmani Nagar - Rabindra nagar 13 13 13 3 SEP-132. D/CTSECL
Remark:
Moti Khavdi (500 MW), PS,Guj,RPL,U1,
.400Moti Khavdi TPP - Jam Nagar1. D/CRPTL
Remark: Status Not Reported.
Mundra TPP Ph. III (3x660 MW),PS,Guj, Adani, U1-11/11 (C),U2-3/12(C), U3-3/12(C),
Commissioned 3/121980±500+/- 500 kV Mundra - Bipole Mohindergarh 2693 2693 2693 1980 MAR-12MAR-121. BIPOLEAPL
Commissioned. 7/12100400Mohindergarh HVDC - Bhiwani 139 139 139 100 JUL-12APR-11 JUL-122. D/CAPL
Legends
TL: Total Location STC: Stubs Cast TE: Towers Erected STG: Stringing Completed Page 33 of67
As on 31-AUG-2015
State/AgencyExecutingAsociated
Trans.Works
AssociatedTransmission
Lines and Substations
VoltageLevel(KV)
Ckm/MVA
Construction progress Status
Monthof
Completion
Remark
TL(Nos)/LandAcq.(%)
STC(Nos)/CivilWork(%)
TE(Nos)/Recp.Materia
l(%)
STG(Ckm)/Erection (%)
2. 1. 4. 5. 6. 7. 8. 9. 12. 13.
OriginalTargetDate
10.
RevisedTargetDate
11.
Ckts(S/C)
&(D/C)
3.
Commissioned. 7/1210400Mohindergarh HVDC- Mohindergarh HVPNl(Dhanonda)
15 15 15 10 JUL-12APR-11 JUL-123. D/CAPL
Commissioned 1/13.146400Daultabad -Dhanonda 219 219 219 146 JAN-13JAN-134. D/CHVPNL
Commissioned 4/12315400/220Dhanoda (Mohindergarh) 100 100 100 100 APR-12APR-125. HVPNL
Remark:
Mundra TPP Ph.II (2x660 MW) ,PS,GUJ,Adani ,U1-12/10(C),U2-7/11(C),
WIP/Severe RoW Issue664400Mundra (Adani) - Zerda line 1 997 453 275 JUN-161. D/CGETCO
WLine terminated at 400kV Varsana S/s (2x80.26kM) on31.03.2015 under stop gap arrangement. W I P (Severe RoWproblems)
664400Mundra (Adani) - Zerda line 2 956 956 950 595 DEC-152. D/CGETCO
Remark:
Mundra UMPP (5x800 MW),PS,GUJ,TATA,U1-2/12(C),U2-7/12(C),U3-10/12 (C),U4 -1/13(C) , U5-3/13(C),
Commissioned 9/11.566400Bachchau - Ranchodpura 755 755 755 566 SEP-11SEP-111. D/CPGCIL
Commissioned 8/11198400Mundra - Bachchau 285 285 285 198 AUG-11AUG-112. D/CPGCIL
Commissioned 02/12.244400Mundra - Limbdi 863 863 863 244 FEB-12FEB-123. D/CPGCIL
Commissioned 12/12.358400Mundra - Jetpur (Balance portion) 918 918 918 358 DEC-12DEC-124. S/CPGCIL
Commissioned 8/12.314400Mundra - Jetpur (Part line) 424 424 424 314 AUG-12AUG-125. S/CPGCIL
192 Ckm part line commissioned 11/11.384400Mundra -Limbdi ( part Line) 192 NOV-11NOV-116. S/CPGCIL
Remark:
Mundra UMPP WR system Strengething,
Commissioned 5/12.217220LILO of Halvad-Morbi I at Bhachau 315 315 315 217 MAY-12MAY-121. D/CGETCO
Commissioned 5/12.216220LILO of Halvad-Morbi II at Bhachau 333 333 333 216 MAY-12MAY-122. D/CGETCO
Legends
TL: Total Location STC: Stubs Cast TE: Towers Erected STG: Stringing Completed Page 34 of67
As on 31-AUG-2015
State/AgencyExecutingAsociated
Trans.Works
AssociatedTransmission
Lines and Substations
VoltageLevel(KV)
Ckm/MVA
Construction progress Status
Monthof
Completion
Remark
TL(Nos)/LandAcq.(%)
STC(Nos)/CivilWork(%)
TE(Nos)/Recp.Materia
l(%)
STG(Ckm)/Erection (%)
2. 1. 4. 5. 6. 7. 8. 9. 12. 13.
OriginalTargetDate
10.
RevisedTargetDate
11.
Ckts(S/C)
&(D/C)
3.
Commisisoned 7/12204400Gandhar - Navsari 288 288 288 204 JUL-12JUL-123. D/CPGCIL
Commisisoned 7/12.82220LILO of both ckts of Kawas-Navsari atNavsari.
145 145 145 82 JUL-12JUL-124. D/CPGCIL
Line is now proposed to be terminated at Boisor S/Stn in place ofMumbai new loc. Forest clearance awaited.Contigrncyarrangement to connect Navsari-Boisar with Vapi-Navi Mumbai lineby passing forest area to form Vapi-Navsari line (212 Ckm)commissioned in Mar'13.FC proposal submitted to MoEF on28.07.14 (57 Hac.)
432400Navsari - Boisor 575 480 447 287 OCT-12 MAR-165. D/CPGCIL
Contract terminated 01 out of 02 nos due to unsatisfactoryperformanc and fresh tender being taken up.The pkg. has beenbifurcated into two pkgs.. 01 pkg. award in Dec'14 & 2nd pkg.awarded in Feb'15.Remaning 01 pkg. also terminated in Aug'15dueto poor performance & fresh tender is being taken up.
7001200Wardha - Aurangabad (on 1200 kV) 961 851 604 145 OCT-12 DEC-166. D/CPGCIL
Commissioned 01/14.630400/220Aurangabad S/S 100 100 100 100 JAN-14JAN-147. PGCIL
Commissioned.630400/220Bachchau S/S 100 100 100 100 AUG-11AUG-118. PGCIL
Commisisoned 7/12630400/220Navsari GIS 100 100 100 100 JUL-12JUL-129. PGCIL
Commissioned 02/12.2x1500765/400Wardha 100 100 100 100 FEB-12FEB-1210. PGCIL
commissioned 3/12.1500765/400Wardha 3rdTrf 100 100 100 100 MAR-12MAR-1211. PGCIL
Commissioned 04/14.118400Aurangabad (PG)-Aurangabad (MSETCL) 118 APR-14OCT-12 APR-1412. D/CPGCIL
Commissioned 01/14.102400Shifting of Ankola -Aurangabad (MSETCL)to Aurangabad (PG)
102 JAN-14JAN-1413. D/CPGCIL
Remark:
Mutiara (Melamaruthur) (Coastal Energen) TPP (2x600 MW),PS,CEPL,U1-12/14 (C),U2-3/15,
commissioned 3/12. (Interim arrangement).52400LILO of Madurai - Tuticorin at CostalEnergen
52 MAR-12MAR-121. D/CCEPL
The total length of line is 38 KM and line will be extended76400Mutiara TPP - Tuticorin Pooling Station 32 32 32 22 DEC-152. D/CCEPL
Legends
TL: Total Location STC: Stubs Cast TE: Towers Erected STG: Stringing Completed Page 35 of67
As on 31-AUG-2015
State/AgencyExecutingAsociated
Trans.Works
AssociatedTransmission
Lines and Substations
VoltageLevel(KV)
Ckm/MVA
Construction progress Status
Monthof
Completion
Remark
TL(Nos)/LandAcq.(%)
STC(Nos)/CivilWork(%)
TE(Nos)/Recp.Materia
l(%)
STG(Ckm)/Erection (%)
2. 1. 4. 5. 6. 7. 8. 9. 12. 13.
OriginalTargetDate
10.
RevisedTargetDate
11.
Ckts(S/C)
&(D/C)
3.
from 22 ckm is completed of Mudrai - Tuticorin LILO line.
Ready for commissioning 08/15.120400Salem Pooling Station - Salem 165 165 165 120 AUG-15SEP-14 AUG-153. D/CPGCIL
Contractual issue.739765Tuticorin Pooling Station - Salem PoolingStation
1000 990 549 99 SEP-14 JUN-164. D/CPGCIL
Severe ROW being faced in Karnataka.Critical.244765Salem Pooling Station - Madhugiri PoolingStation line
647 594 482 77 SEP-14 DEC-155. S/CPGCIL
Remark: PGCIL is to expedited construction of Transmission lines.
Muzaffarpur TPP Exp, Kanti-II (2x195MW) CS, Bihar, JV-NTPC U3-03/15 (C), U4-3/15,
Commissioned 09/14.68220Kanti - Darbhanga (2nd Ckt) 68 SEP-14SEP-141. S/CBSEB
Severe ROW issues.101220Kanti - Gopalganj (2nd Ckt.) MAR-162. S/CBSEB
Remark:
Myntdu (Leshka) HEP (3x42 MW),SS,Meg,MeECL, U1&U2-3/13,U3-3/13 (C),
Charged at 33 kV.52132Leshka Myntu - Khliehriat 85 85 85 52 JUL-10JUL-101. D/CMeECL
Remark:
NCC Power Project Ltdl, Super-critical TPP (2x660 MW),PS,AP,Nellore, U1-3/16, U2-8/16,
.400NCC Power TPP - Nellore Pooling Station(PG)
1. D/C
Remark: Status Not Reported.
NSL TPP (2x660 MW), PS, Orrisa, NPPL,,
Project Authority intimated that PGCIL yet to award construction ofwork.
46400NSL TPP - Angul1. D/CNSLNPPL
Remark: Status Not Reported.
Nabi Nagar TPP (4x250 MW), CS,Bihar, NTPC, U1-11/13,U2-4/14,U3-5/14,U4-8/14,
Commissioned 05/12.164400Nabinagar - Sasaram line (Twin lapwing) 216 216 216 164 MAY-12MAY-121. D/CPGCIL
Legends
TL: Total Location STC: Stubs Cast TE: Towers Erected STG: Stringing Completed Page 36 of67
As on 31-AUG-2015
State/AgencyExecutingAsociated
Trans.Works
AssociatedTransmission
Lines and Substations
VoltageLevel(KV)
Ckm/MVA
Construction progress Status
Monthof
Completion
Remark
TL(Nos)/LandAcq.(%)
STC(Nos)/CivilWork(%)
TE(Nos)/Recp.Materia
l(%)
STG(Ckm)/Erection (%)
2. 1. 4. 5. 6. 7. 8. 9. 12. 13.
OriginalTargetDate
10.
RevisedTargetDate
11.
Ckts(S/C)
&(D/C)
3.
Remark:
Nagarujana Sagar TR HEP ( 2x25 MW),SS,AP,APGENCO,Unit-1 & 2 - 2015/16,
Commissioned 11/082220LILO of VTS - Tallapally line atRentachintala
2 NOV-08NOV-081. D/CAPTRANSC
Commissioned 3/13.17132Rentachintala - Macherla S/S 58 58 58 15 MAR-132. S/CAPTRANSC
Commissioned 08/14.16132Rentachintala - Nagarjuna Sagar Plant 34 34 34 16 AUG-143. S/CAPTRANSC
Commissioned 11/082x100220/132Rentachintala S/S 100 100 100 100 NOV-08NOV-084. APTRANSC
Remark:
Namrup CCGT (100 MW),SS, Assam,GT/ST,
Railway Crossing & Gantry is not ready at Namrup GSS.141220Namrup - Mariani 448 448 448 145 DEC-13 JUN-161. S/C onD/C
AEGCL
Remark:
Nasik (5x270 MW) TPS, PS, Maharashtra, India Bulls, U1-2/14 (C),U2-7/14,U3-11/14,U4-1/15,U5 - 3/15,,
Commissioned 03/14.57400Nasik-Bableshwar (1st Ckt) 152 152 152 57 MAR-14MAR-141. D/CIBPL
Ready for commissioning 08/15.57400Nasik - Bobleshwar (2nd Ckt) 152 152 152 57 AUG-15AUG-152. D/CIBPL
Work yet to be started by MSETCL.400Nasik TPP - Nasik (MSETCL) MAR-153. D/CMSETCL
Remark:
Navbharat TPP Ph-1 (2x525 MW), PS,Chh, U1&2,
.400Navbharat TPP - Angul P.S. (PG)1. D/CEPTCL
Remark: Status Not Reported.
Nawapura TPP (TRN ) (2x300 MW), Chhattisgarh Pvt. Sector , TRN Energy Pvt. Ltd. U1-6/14, U2,
Line under construction.30400TRN TPP - Raighar (near Tamnar) PoolingStation
JUN-151. D/C
Legends
TL: Total Location STC: Stubs Cast TE: Towers Erected STG: Stringing Completed Page 37 of67
As on 31-AUG-2015
State/AgencyExecutingAsociated
Trans.Works
AssociatedTransmission
Lines and Substations
VoltageLevel(KV)
Ckm/MVA
Construction progress Status
Monthof
Completion
Remark
TL(Nos)/LandAcq.(%)
STC(Nos)/CivilWork(%)
TE(Nos)/Recp.Materia
l(%)
STG(Ckm)/Erection (%)
2. 1. 4. 5. 6. 7. 8. 9. 12. 13.
OriginalTargetDate
10.
RevisedTargetDate
11.
Ckts(S/C)
&(D/C)
3.
Remark: Status Not Reported.
New Umtru HEP (2x20 MW),SS,Meg,MeECL,Unit - 1 & 2 - 2016-17.,
No issues of forest clearance. Survey completed. Re-surveycarried out due to construction of a new building in the corridor ofthe approved profile survey & due to crossing of 132 kV D/C Killing-EPIP-II line. Materials procurement is in process.
6132New Umtru HEP - Norbong (EPIP-II) 9 DEC-151. D/CMeECL
Remark:
Neyveli TPS-II Exp. (2x250MW) CS,TN, NLC, U1-1/12(C),U2-1/15 (C),
Commissioned 08/093400Neyveli (Exp-II) - Neyveli TS-II 17 17 17 3 AUG-09AUG-091. 2xS/CNLC
Commissioned 08/09.398400Neyveli TS-II - Pugalur 576 576 576 398 AUG-09AUG-092. D/CNLC
Remark:
Nigri TPP (2x660 MW), PS,MP, JPVL, U1-8/14 (C),U2-2/15 (C),
.400LILO of one ckt of Vindhychal - Satna atNigrie
1. D/CMPPTCL
400Nigri TPP - Satna2. D/CMPPTCL
Remark: Status Not Reported.
Nilachal TPP,(3x350MW), PS,Orissa, KVK U1-1/14,U2-8/15,U3-12/15,
Work yet to Start.16400LILO of Mendasal - Baripada at NilanchalTPP
JUN-161. 2xD/CKVK
Remark:
Nimoo Bazgo (NHPC) (3x15 MW),CS,J & K,NHPC,U1-11/13(C),U2-10/13(C),U3-10/13(C).,
Commissioned.3166Alachi - Khalsi S/S 140 140 140 31 JUN-141. S/CJKPDD
Rerouting of line and ganglas s/s droped. Leh Army S/S shall beconnected with Leh S/S.
966Ganglas - Leh Army base 46 22 SEP-152. S/CJKPDD
Legends
TL: Total Location STC: Stubs Cast TE: Towers Erected STG: Stringing Completed Page 38 of67
As on 31-AUG-2015
State/AgencyExecutingAsociated
Trans.Works
AssociatedTransmission
Lines and Substations
VoltageLevel(KV)
Ckm/MVA
Construction progress Status
Monthof
Completion
Remark
TL(Nos)/LandAcq.(%)
STC(Nos)/CivilWork(%)
TE(Nos)/Recp.Materia
l(%)
STG(Ckm)/Erection (%)
2. 1. 4. 5. 6. 7. 8. 9. 12. 13.
OriginalTargetDate
10.
RevisedTargetDate
11.
Ckts(S/C)
&(D/C)
3.
Slow progress.5166Kharu S/S - Himya S/S 242 239 204 36 SEP-143. S/CJKPDD
Commissioned.2566Leh (C.P.) - Kharu S/S 107 107 107 25 SEP-144. S/CJKPDD
Commissioned 12/12.766Leh (C.P.) - Leh S/S 39 39 39 7 DEC-12DEC-125. S/CJKPDD
Rerouting of line and ganglas s/s droped. Leh Army S/S shall beconnected with Leh S/S.
1066Leh III - Ganglas 53 29 8 2 SEP-156. S/CJKPDD
Commissioned 11/12.466Nimoo Bazgo HEP - Alachi 13 13 13 4 NOV-11NOV-127. S/CJKPDD
Commissioned 09/12.1766Nimoo S/S - Alachi S/S 77 77 77 17 SEP-12SEP-128. S/CJKPDD
Commissioned 03/12.3166Nimoo S/S- Leh S/S 152 152 152 31 MAR-12MAR-129. S/CJKPDD
Commissioned 11/12.6.366/11Alchi. S/S 100 100 100 100 NOV-1210. JKPDD
6066/11Himya 100 30 JUL-1311. JKPDD
Commissioned6066/11Khalsi 100 100 100 100 JUL-1312. JKPDD
Commissioned6066/11Kharu 100 100 100 100 DEC-1313. JKPDD
Commissioned 12/12.2x6.366/11Leh 100 100 100 100 DEC-1214. JKPDD
Commissioned.6066/11Nimoo S/S 100 100 100 100 JUL-1315. JKPDD
Remark:
North Chennai TPS St.II (2x600 MW),SS,TN,U1-9/13(C),U2-3/13 (C).,
Commissioned 01/14.98400Alamathy -Sunguvarchatram (1st Ckt) 161 161 161 98 JAN-14JUN-10 JAN-141. D/CTANTRANS
Commissioned 11/10.2230LILO of NCTPS- Mosur at NCTPS Stage II(for startup power)
2 2 2 2 NOV-10DEC-10 NOV-102. D/CTANTRANS
Commissioned 01/13.136400NCTPS St.II- Alamathy 400 kV S/S 114 114 114 136 JAN-13JAN-133. M/CTANTRANS
Commissioned 03/14.100400Alamathy -Sunguvarchatram (2nd Ckt) 100 MAR-14MAR-144. D/CTANTRANS
Remark:
Legends
TL: Total Location STC: Stubs Cast TE: Towers Erected STG: Stringing Completed Page 39 of67
As on 31-AUG-2015
State/AgencyExecutingAsociated
Trans.Works
AssociatedTransmission
Lines and Substations
VoltageLevel(KV)
Ckm/MVA
Construction progress Status
Monthof
Completion
Remark
TL(Nos)/LandAcq.(%)
STC(Nos)/CivilWork(%)
TE(Nos)/Recp.Materia
l(%)
STG(Ckm)/Erection (%)
2. 1. 4. 5. 6. 7. 8. 9. 12. 13.
OriginalTargetDate
10.
RevisedTargetDate
11.
Ckts(S/C)
&(D/C)
3.
Orissa UMPP (Bedabahal, Orissa), (5x800MW),(Orissa Integrated Power Ltd. (OPIL),
.765Orrisa UMPP - Jharsuguda Pooling Station1. D/C
Remark: Status Not Reported.
Painampuram TPP (2x660MW),PS,AP,Thermal power tech Development Corp (India) ltd.,U1-2/15 (C),U2-12/14,
Commissioned 08/13.65400Thermal Powertech - Nellore PoolingStation
92 92 92 65 AUG-13AUG-131. D/CPGCIL
Remark:
Palatana CCGT (2x363.3 MW),PS,Tri,OTPC, Module 1 (GT-10/12,ST-10/12), Module 2 - 11/14 (C),
Commissioned 9/12.4220LILO of Agia - Sarusajai line at KukurmaraS/S
8 8 8 4 SEP-12SEP-121. D/CAEGCL
Commissioned 01/15.7400LILO of Palatana - Bongaigaon at AzaraS/S
14 14 14 7 JAN-15JAN-152. D/CAEGCL
Commissioned 03/15.201400Azara - Bongaigaon 442 442 442 201 MAR-15DEC-14 MAR-153. D/CNETC
Commissioned 8/12495400Palatana -Silchar 680 680 680 495 AUG-12AUG-124. D/CNETC
Commissioned.428400Silchar - Byrnihat 590 590 590 428 FEB-13FEB-135. D/CNETC
Commissioned 03/13.1400LILO of Kaithalguri - Misa line at Mariani(New) (Charged at 220KV)
4 4 4 1 MAR-13MAR-136. D/CPGCIL
Package under re-tendering.30132LILO of Aizwol (PG) - Zemabawk at Melriat(PG)
45 DEC-12 JUN-167. D/CPGCIL
Commissioned 03/13.1132LILO of Loktak - Imphal at Imphal (New)line
5 5 5 1 DEC-12 MAR-138. D/CPGCIL
Ready for Commissioning 06/15.97220Mariani (New) - Mokikchung (PG) 163 163 163 97 JUN-15DEC-12 JUN-159. D/CPGCIL
Stage-I forest clearance awaited.package under re-tendering.12132Melriat (New) - Sihmui line 30 DEC-12 JUN-1610. D/CPGCIL
Line commissioned in Jul'15.2132Mokokchung (PG) - Mokokchung(Nagaland) line
11 11 11 2 DEC-12 JUL-1511. D/CPGCIL
Commissioned 6/1274400Palatana - Surajmaninagar line (Charged at132 KV)
118 118 118 74 JUN-12JUN-1212. D/CPGCIL
Legends
TL: Total Location STC: Stubs Cast TE: Towers Erected STG: Stringing Completed Page 40 of67
As on 31-AUG-2015
State/AgencyExecutingAsociated
Trans.Works
AssociatedTransmission
Lines and Substations
VoltageLevel(KV)
Ckm/MVA
Construction progress Status
Monthof
Completion
Remark
TL(Nos)/LandAcq.(%)
STC(Nos)/CivilWork(%)
TE(Nos)/Recp.Materia
l(%)
STG(Ckm)/Erection (%)
2. 1. 4. 5. 6. 7. 8. 9. 12. 13.
OriginalTargetDate
10.
RevisedTargetDate
11.
Ckts(S/C)
&(D/C)
3.
Commissioned 4/12.38132Silchar - Badarpur (PG) line. 69 69 69 38 APR-12APR-1213. D/CPGCIL
Line test charged in Jun'12.50132Silchar - Hailakandi (Contingencyarrangement)
65 65 65 39 JUN-1214. D/CPGCIL
Commissioned 03/15.334400Silchar - Imphal (New) line (to be chargedat 132KV)
479 479 479 334 MAR-15DEC-12 MAR-1515. D/CPGCIL
Major portion of line in forest. severe ROW in vicinity of Aizwl towndue to stiff resistance from influential local owner. package underre-tendering.
286400Silchar - Melriat (New) line (charged at132KV)
436 366 211 101 DEC-12 JUN-1616. D/CPGCIL
Commissioned 07/15.254400Silchar - Purba Kanchan Bari line (chargedat 132KV)
373 373 373 254 JUL-15DEC-12 JUL-1517. D/CPGCIL
Line commissioned in Mar'12.2132Silchar - Srikona line 7 7 7 2 MAR-12MAR-1218. D/CPGCIL
Completed 9/1318132Surajmani Nagar - Agartala 79 Tilla GridS/S
71 71 71 18 SEP-1319. D/CTSECL
Fund proposed in World Bank.6132Surajmani Nagar - Badarghat MAR-1520. D/CTSECL
Commissioned 08/12.36132Surajmani Nagar - Budhujngnagar 63 63 63 36 AUG-12AUG-1221. D/CTSECL
3.598 KM line in forest land for which TSECL will apply for forestclearance. LOA issued
20132Surajmani Nagar - Rokhia 80 32 5 DEC-1422. D/CTSECL
Proposed under NEC.50132Surajmani Nagar - Udaipur 50 JUN-1523. D/CTSECL
Fund not yet tied up. Proposed under World Bank Financing/SPA/NEC.
260400Surajmani nagar-P.K.Bari MAR-1524. D/CTSECL
Line test charged on 21.08.2011.12132Udaipur - Palatana 41 41 413 12 AUG-11AUG-1125. D/CTSECL
No issues of forest clearance and no court cases. Work held updue to non payment of compensation to the land owners.At thepresent the assessment is prepared and likely to be cleared withinthis financial year.
17132Killing (Byrnihat)-EPIP-I 19 19 19 8 DEC-1526. M/CMeECL
5132LILO of Zemabawk - W.Phaileng atSihhmui
DEC-1327. S/CP&ED Mizo
Check survey done. Profile drawing approved.5132Kukurmara - Azara line 24 DEC-11 MAR-1628. S/C onD/C
AEGCL
Project has been abandoned25132Kukurmara - Boko line 162 DEC-1429. S/C onD/C
AEGCL
Legends
TL: Total Location STC: Stubs Cast TE: Towers Erected STG: Stringing Completed Page 41 of67
As on 31-AUG-2015
State/AgencyExecutingAsociated
Trans.Works
AssociatedTransmission
Lines and Substations
VoltageLevel(KV)
Ckm/MVA
Construction progress Status
Monthof
Completion
Remark
TL(Nos)/LandAcq.(%)
STC(Nos)/CivilWork(%)
TE(Nos)/Recp.Materia
l(%)
STG(Ckm)/Erection (%)
2. 1. 4. 5. 6. 7. 8. 9. 12. 13.
OriginalTargetDate
10.
RevisedTargetDate
11.
Ckts(S/C)
&(D/C)
3.
progress affected due to ROW problem (geogrephical condition.Critical
70132Pasighat - Roing line. 345 344 342 94 DEC-12 DEC-1530. S/C onD/C
PGCIL
Progress affected due to severe ROW problem.Critical60132Roing - Tezu line 244 179 152 30 APR-12 MAR-1631. S/C onD/C
PGCIL
Progress affecetd due to severe ROW problem.90132Tezu - Namsai line. 332 211 153 32 DEC-12 MAR-1632. S/C onD/C
PGCIL
All testing and test charge completed. Awaiting the Mirza Azara132 kV line to be completed.
100220/132Kukumara S/S (2x50) 100 90 100 98 FEB-1533. AEGCL
Commissioned 05/15.630400/220Kukurmara (Azara) S/S 100 100 100 100 MAY-15SEP-11 MAY-1534. AEGCL
Commissioned 12/1150132/33Panchgram (Aug.) S/S 100 100 100 100 DEC-11DEC-1135. AEGCL
3X33.5132/33Yurembam (Aug.) S/S 100 MAR-1336. ED, Manipur
Ist transformer commissioned.315400/220Killing (Byrnihat) (Ist Trf.)S/S 100 100 100 100 FEB-13FEB-1337. MeECL
ICT-I (50MVA) commissioned in Mar'13 & ICT-II commissioned inApr'13.
2x50132/33Imphal S/S 100 100 100 100 APR-1338. PGCIL
Engg., supply & civil works under progress. Completion matchingwith line.
2x50132/33Melriat S/S (Upgadable to 400 kV) 100 56 20 JUN-1639. PGCIL
Commissioned 07/15.30220/132Mokokchung (New) 100 100 100 100 JUL-15DEC-12 JUL-1540. PGCIL
Supply, Civil works & erection under progress.Completion matching with line
2x15132/33Namsai S/S 100 62 65 18 MAR-1641. PGCIL
Supply, civil works & erection under progress. Completionmatching with associated line
2x15132/33Roing S/S 100 85 95 80 OCT-1542. PGCIL
Commissioned 3/12.2x200400/220Silchar (New) 100 100 100 100 MAR-12MAR-1243. PGCIL
Supply, Civil works & erection under progress. Completionmatching with line.
2x15132/33Tezu S/S 100 88 82 69 MAR-1644. PGCIL
Commissioned 12/122x50132/33Surajmaninagar S/S (Upgrdable to 400 kV) 100 100 100 100 DEC-12DEC-1245. TSECL
commissioned 3/139400LILO of Palatana - Bongaigaon at Killing(Byrnihat)
10 10 10 9 MAR-13MAR-1346. D/CMeECL
Commissioned 08/15.30220/132Mokokchung (ICT-II) 100 100 100 100 AUG-15AUG-1547. PGCIL
Legends
TL: Total Location STC: Stubs Cast TE: Towers Erected STG: Stringing Completed Page 42 of67
As on 31-AUG-2015
State/AgencyExecutingAsociated
Trans.Works
AssociatedTransmission
Lines and Substations
VoltageLevel(KV)
Ckm/MVA
Construction progress Status
Monthof
Completion
Remark
TL(Nos)/LandAcq.(%)
STC(Nos)/CivilWork(%)
TE(Nos)/Recp.Materia
l(%)
STG(Ckm)/Erection (%)
2. 1. 4. 5. 6. 7. 8. 9. 12. 13.
OriginalTargetDate
10.
RevisedTargetDate
11.
Ckts(S/C)
&(D/C)
3.
Remark:
Pallivasal HEP (2x30MW),SS,Kerala,KSEB, U1 & 2-2017-18,
ATS of Pallivasal Extension HEP. Work is yet to start.220LILO of Idukki-Udumalpet at Pallivasal HEP 5 MAR-161. D/CKSEB
Remark:
Parabati-II HEP (PGCIL & JP)CS,HP,NHPC,Unit-14/15.,
Commissioned 9/14.76400Parbati -II- Koldam line -II 157 157 157 76 SEP-14SEP-141. S/CPKTCL
Commissioned 10/14.81400Parbati- II - Koldam line-I 173 173 173 81 OCT-14OCT-142. S/CPKTCL
Remark:
Parbati-III HEP (4x130 MW),CS,HP,NHPC,U1-6/14 (C),U2-2/14 (C),U3-3/14 (C),U4-5/14 (C),
Commissioned 07/2013.1400LILO of Parbati -II - Koldam at ParbatiPooling Point.
5 5 5 1 JUL-13JAN-10 JUL-131. D/CPGCIL
Commissioned 07/2013.4400LILO of Parbati -II - Parbati Pooling Point atParbati -III
7 7 7 4 JUL-13JUL-132. D/CPGCIL
Commissioned 07/2013.501400Parbati Pooling Point - Amritsar 668 668 668 501 JUL-13JUL-133. D/CPGCIL
Remark:
Pare HEP (2x55MW)CS,ARP,NEEPCO,U1-3/15, U2-3/16,
.132LILO of Ranganadi - Nirjuli at Pare HEP1. D/C
Remark:
Parichha Extn. TPS (2x250 MW),SS,UP,UPRVUNL,U5-5/12(C),U6-3/13 (C),
Tower material reached at site.67400LILO of 1st Ckt Bhogaon-Mainpuri atSirsaganj
111 107 46 SEP-151. D/CUPPTCL
Commissioned 01/14.259400Paricha - Mainpuri 2nd Ckt.) 402 402 402 259 JAN-14JAN-142. D/CUPPTCL
Commissioned 12/13.259400Parichha - Mainpuri (1st Ckt.) 301 301 301 259 DEC-13DEC-10 DEC-133. D/CUPPTCL
Legends
TL: Total Location STC: Stubs Cast TE: Towers Erected STG: Stringing Completed Page 43 of67
As on 31-AUG-2015
State/AgencyExecutingAsociated
Trans.Works
AssociatedTransmission
Lines and Substations
VoltageLevel(KV)
Ckm/MVA
Construction progress Status
Monthof
Completion
Remark
TL(Nos)/LandAcq.(%)
STC(Nos)/CivilWork(%)
TE(Nos)/Recp.Materia
l(%)
STG(Ckm)/Erection (%)
2. 1. 4. 5. 6. 7. 8. 9. 12. 13.
OriginalTargetDate
10.
RevisedTargetDate
11.
Ckts(S/C)
&(D/C)
3.
Commissioned 3/12210220Parichha - Banda 606 606 606 210 MAR-12MAR-124. S/CUPPTCL
Commissioned 3/11220Parichha - Bhauti MAR-10MAR-105. S/CUPPTCL
WIP.630400/220Orai S/S 100 73 86 44 DEC-156. UPPTCL
Remark:
Parli TPP Expn. (250 MW), SS,Maha,MSPGCL, U8-12/13,
.220LILO of both ckt Parli (GCR) - Beed at Parli1. D/CMSETCL
Commissioned 10/12.181220Parli TPS-Nanded (waghala) 300 300 300 181 OCT-12APR-11 OCT-122. M/CMSETCL
Remark: MSETCL is to expedited construction of LILO line
Petronet LNG (3x395 MW), PS,Guj,PLNGL, U1,U2,U3,
.400PLNGL TPP - Vadodra1. D/C
Remark: Status Not Reported
Phata Byung HEP (2x38 MW),PS, UK , Lanco, 2017-18,
8220Phata HEP-Baramwari (Rudrpur) 20 DEC-161. D/CLEPP
Forest approval granted on 02.04.2013.Tender scrappedretendering is under progress
182220Rudrapur(Brahmwani) - Ghansali-Srinagarline
248 DEC-162. D/CPTCUL
Substation layout work is in progress.Land has been cleared.notice has been issued to company forslow work
60220/132Ghansali (GIS) 100 JUN-163. PTCUL
Work in progress.total progress 85%
%
630400/220Srinagar S/S 100 77 85 83 DEC-12 DEC-154. PTCUL
Revised Drawings has been submitted by M/s Siemens and hasbeen approved.Total progress 4%.
100220/132Baramwari (GIS) DEC-165. PTCUL
Legends
TL: Total Location STC: Stubs Cast TE: Towers Erected STG: Stringing Completed Page 44 of67
As on 31-AUG-2015
State/AgencyExecutingAsociated
Trans.Works
AssociatedTransmission
Lines and Substations
VoltageLevel(KV)
Ckm/MVA
Construction progress Status
Monthof
Completion
Remark
TL(Nos)/LandAcq.(%)
STC(Nos)/CivilWork(%)
TE(Nos)/Recp.Materia
l(%)
STG(Ckm)/Erection (%)
2. 1. 4. 5. 6. 7. 8. 9. 12. 13.
OriginalTargetDate
10.
RevisedTargetDate
11.
Ckts(S/C)
&(D/C)
3.
Remark: Status Not Reported.
Pipalkoti HEP (THDC) ( Kuwari Pass ) (4x111 MW),SS,UK,PTCUL,U1,U2,U3, U4,
400Pipalkoti HEP - Pipalkoti (THDC) (KuwariPass)
1. D/CPGCIL
2x315400/220Pipalkot (THDC)2. PTCUL
Remark:
Pipavav CCPP(2x351MW),SS,Guj,GSECL,Block-1-2/14 (C), Block-2-3/13 (C).,
Severe ROW Problem.94220GPPC (Pipavav)- Dhokadva 152 152 152 70 MAR-12 OCT-151. D/CGETCO
Commissioned 8/1281220LILO of Savarkundla - Mahva (otha) atPipavav (GPPC) (line-2)
133 133 133 81 AUG-12APR-11 AUG-122. D/CGETCO
Commissioned 3/1291220LILO of Savarkundla - Mahva(otha) atPipavav (GPPC) (line-1)
149 149 149 91 MAR-12AUG-10 MAR-123. D/CGETCO
Commissioned 06/13.96220Otha (Mahuva) - Sagapara (Palitana) 161 161 161 96 JUN-13JUN-134. D/CGETCO
Remark:
Pragati CCGT Ph-III(4X250+2X250MW),SS,DEL,PPCL,GT1-10/10(C),GT2-2/11(C),GT3-6/12,(C)ST1-2/12(C),GT4-5/13(C),ST2-2/14 (C),
commissioned2x315400Extension of bus and connection with DTLSubstation
1. PRAGATI
Remark:
Pulichintala HEP (4x30MW),SS,Telangans,TSGENCO,U1&2- 2015-16,U 3 & 4-2016-17,
220Pulichintala - Huzumnagar DEC-151. D/CTCTL
Remark:
RAPP U-7&8,
Force Majeure event: Delay in forest clearance.Transmissionlicensee granted by CERC. Tariff adoption done by CERC.CERC has granted Liberty for extension of COD and
310400RAPP - Shujalpur 521 494 468 235 FEB-16 NOV-151. D/CSGL
Legends
TL: Total Location STC: Stubs Cast TE: Towers Erected STG: Stringing Completed Page 45 of67
As on 31-AUG-2015
State/AgencyExecutingAsociated
Trans.Works
AssociatedTransmission
Lines and Substations
VoltageLevel(KV)
Ckm/MVA
Construction progress Status
Monthof
Completion
Remark
TL(Nos)/LandAcq.(%)
STC(Nos)/CivilWork(%)
TE(Nos)/Recp.Materia
l(%)
STG(Ckm)/Erection (%)
2. 1. 4. 5. 6. 7. 8. 9. 12. 13.
OriginalTargetDate
10.
RevisedTargetDate
11.
Ckts(S/C)
&(D/C)
3.
additional tariff.TSP has started the work.Project execution plan submitted to CEA & lead LTTC. CriticalRoW Issues in Location No- 11/10, 23/2, and between location no.25/0-26/0 (Dist. Kota & Jhalawar in Rajasthan) and 26/6, 26/8,26/10, 37/6, 37/9(Dist. Agar Malwa & Rajgarh in MadhyaPradesh).Central Excise duty has been increased 12.36% to 12.5% w.e.f 1st March 2015. Service tax has been increased 12.36%to 14% w.e.f 1st June 2015. Custom duty has been changed due toFinance Act. The same has been intimated to all LTTCs. lineexpected to commission by Nov. 2015.
Remark:
RaghunathpurTPS (2x600 MW),CS,WB,DVC,U1-8/14 (C),U2-3/14,
Commissioned 3/11. (Interim arrangement)21400LILO of Maithon-Ranchi (PG) atRaghunathpur
33 33 33 21 MAR-11MAR-111. D/CDVC
Forest: Working clearance obtained in January 2013.PTCCclearance:issued on 18.2.14. Aviation clearance: Obtained.Slow progress due to non-availability of working gang due to fundcrunch of Contractor (M/s Jyoti Structures). Approval has beenarranged for payment to the sub-vendor directly to solve abovefund crisis of M/s JSL.
311400Raghunathpur TPS -Ranchi (PG) 439 439 431 274 AUG-10 MAR-152. D/CDVC
Remark: Slow progress
Raigarh TPP (REL) (2x300 MW), PS, Chh, U1-12/13,U2-7/15,
.400Raigarh TPS - Raigarh Pooling Station(Near Tamnar)
1. D/C
Remark: status not updated
Raikheda TPP (2x685 MW), PS,Chh, GMR, U1-2/15 (C), U2-11/14,
Commissioned in February 2014. Reported in July 2015.131400Raikheda (GMR) - Raipur Pooling Station 181 181 181 131 JUL-15JUL-151. D/CGMR
Remark:
Legends
TL: Total Location STC: Stubs Cast TE: Towers Erected STG: Stringing Completed Page 46 of67
As on 31-AUG-2015
State/AgencyExecutingAsociated
Trans.Works
AssociatedTransmission
Lines and Substations
VoltageLevel(KV)
Ckm/MVA
Construction progress Status
Monthof
Completion
Remark
TL(Nos)/LandAcq.(%)
STC(Nos)/CivilWork(%)
TE(Nos)/Recp.Materia
l(%)
STG(Ckm)/Erection (%)
2. 1. 4. 5. 6. 7. 8. 9. 12. 13.
OriginalTargetDate
10.
RevisedTargetDate
11.
Ckts(S/C)
&(D/C)
3.
Rajasthan New Solar and Wind Power Plant,
Commissioned 11/14.93220Aau-Baithwasia 155 155 155 93 NOV-14NOV-141. D/CRVPNL
50400Akal (1)- Jaisalmer -2 MAR-152. D/CRVPNL
480400Akal -Jodhpur (New) 650 190 112 MAR-173. D/CRVPNL
100220Badisid-Aau 196 196 160 37 MAR-164. D/CRVPNL
30220Badisid-Bap MAR-155. D/CRVPNL
280400Barmer-Bhinmal (PG) MAR-166. D/CRVPNL
1. Forest Clearance required at 22 locations (Indira Gandhi Canalcrossings). Case is pending at DFO (Bikaner, Jaisalmer, Jodhpur).2. Aviation clearance issue is pending at Delhi Airport Authority.3. Severe ROW issues.
360400Bhadla-Bikaner 511 491 468 229 MAR-167. D/CRVPNL
50220Bhadla-Kanasar 83 41 MAR-168. D/CRVPNL
420400Bikaner -Sikar (PG) MAR-179. D/CRVPNL
120220Chatrail-Ramgarh 149 140 132 30 MAR-1610. D/CRVPNL
30220Gajner -Kolayat MAR-1611. D/CRVPNL
260400Jaisalmer -2 -Barmer MAR-1612. D/CRVPNL
20220LILO of Kolayat -Bajju at Kolayat MAR-1613. D/CRVPNL
10220LILO of Aau -Phalodi at Aau MAR-1614. D/CRVPNL
20220LILO of Chandan- Pokaran at Pokaran MAR-1615. D/CRVPNL
.320400LILO of Jodhpur -Merta at Pooling stationBadla
608 63 24 MAR-1616. D/CRVPNL
20220LILO of PS 1- Bajju at PS 1/Bajju MAR-1617. D/CRVPNL
Legends
TL: Total Location STC: Stubs Cast TE: Towers Erected STG: Stringing Completed Page 47 of67
As on 31-AUG-2015
State/AgencyExecutingAsociated
Trans.Works
AssociatedTransmission
Lines and Substations
VoltageLevel(KV)
Ckm/MVA
Construction progress Status
Monthof
Completion
Remark
TL(Nos)/LandAcq.(%)
STC(Nos)/CivilWork(%)
TE(Nos)/Recp.Materia
l(%)
STG(Ckm)/Erection (%)
2. 1. 4. 5. 6. 7. 8. 9. 12. 13.
OriginalTargetDate
10.
RevisedTargetDate
11.
Ckts(S/C)
&(D/C)
3.
1220LILO of both ckts Ramgarh GTPS -Dechuat Ramgarh
1 1 1 1 APR-1518. D/CRVPNL
20220LILO of both ckts Ramgarh GTPP -Dechuline at Pokaran
MAR-1619. D/CRVPNL
200400LILO of one ckt Raj west -Jodhpur atJodhpur (New)
138 138 138 102 MAR-1720. D/CRVPNL
40220PS 1 /Bajju -Bhadla 105 98 76 MAR-1621. D/CRVPNL
200400Ramgarh (Jaisalmer)-Akal (Jaisalmer ) 293 91 MAR-1622. D/CRVPNL
360400Ramgarh -Bhadla 440 347 156 MAR-1623. D/CRVPNL
25220Sirohi-Pindwara 106 59 MAR-1624. S/CRVPNL
Commissioned 05/15.160220/132Aau S/S 100 100 100 100 MAY-15MAY-1525. RVPNL
500400/220Akal (Aug.)26. RVPNL
160220/132Bajju S/S27. RVPNL
3x160220/132Bhadia Pooling Station28. RVPNL
945400/220Bhadia Pooling Station 100 65 65 5229. RVPNL
160220/132Chatrail S/S30. RVPNL
2x500400/220Jaisalmer -2 S/S31. RVPNL
320220/132Kanasar S/S 80 DEC-1532. RVPNL
160220/132Kolayat S/S33. RVPNL
100220/132Kuchera S/S 100 25 25 31 AUG-1534. RVPNL
160220/132Pokaran S/S35. RVPNL
3x160220/132Ramgarh S/S36. RVPNL
Legends
TL: Total Location STC: Stubs Cast TE: Towers Erected STG: Stringing Completed Page 48 of67
As on 31-AUG-2015
State/AgencyExecutingAsociated
Trans.Works
AssociatedTransmission
Lines and Substations
VoltageLevel(KV)
Ckm/MVA
Construction progress Status
Monthof
Completion
Remark
TL(Nos)/LandAcq.(%)
STC(Nos)/CivilWork(%)
TE(Nos)/Recp.Materia
l(%)
STG(Ckm)/Erection (%)
2. 1. 4. 5. 6. 7. 8. 9. 12. 13.
OriginalTargetDate
10.
RevisedTargetDate
11.
Ckts(S/C)
&(D/C)
3.
1500400/220Ramgarh S/S 100 100 85 5337. RVPNL
Remark:
Rajpura (NABA) TPP, (2x700MW) U1-1/13 (C) ,& U2-7/14 (C),
Commissioned 05/13.171400Rajpura - Dhuri 242 242 242 171 MAY-13MAY-131. D/CPSTCL
Commissioned 05/14.279400Rajpura Thermal - Nakodar 381 381 381 279 MAY-14MAY-142. D/CPSTCL
Commissioned 05/13.18400Rajpura Thermal - Rajpura 29 29 29 18 MAY-13MAY-133. D/CPSTCL
Work is in progress1000400/220Rajpura S/S (2x500) 100 85 85 85 SEP-154. PSTCL
Remark:
Ramgarh CCPP Extn.-III, (110+50 MW), SS,Raj, RRVUNL, (GT-3/13(C),ST-5/14 (C),
Commissioned 12/14.202220Chandan - Dechu 322 322 322 202 DEC-14DEC-141. D/CRVPNL
Commissioned 9/12.71220Dechu - Phalodi 119 119 119 71 SEP-12SEP-122. D/CRVPNL
Commissioned 11/14.194220Ramgarh (GTPP) - Chandan 309 309 309 194 NOV-14NOV-143. D/CRVPNL
Remark:
Rampur HEP (6x68.67 MW),CS,HP,SJVNL,U1-2/14 (C),U2-2/14 (C),U3-3/14 (C), U4-6/14(C), U5-3/14 (C), U6 - 12/14(C),
Commissioned 02/14.5400LILO of Nathpa Jhakri - Nalagarh atRampur (Loop in portion)
12 12 12 5 FEB-14NOV-11 FEB-141. D/CPGCIL
Commissioned 8/11.66400LILO of Patiala - Hissar at Kaithal 90 90 90 66 AUG-11NOV-11 AUG-112. D/CPGCIL
Commissioned 9/11.156400Patiala - Ludhiana 217 217 217 156 SEP-11NOV-11 SEP-113. D/CPGCIL
Commissioned 10/14.2400LILO of Nathpa Jhakri - Nalagarh atRampur (2nd Ckt balance)
2 OCT-14OCT-144. D/CPGCIL
Remark:
Ranghit-IV HEP (3x40MW),PS,Sikkim,JPCL,U1,2,&3-2018-19,
Legends
TL: Total Location STC: Stubs Cast TE: Towers Erected STG: Stringing Completed Page 49 of67
As on 31-AUG-2015
State/AgencyExecutingAsociated
Trans.Works
AssociatedTransmission
Lines and Substations
VoltageLevel(KV)
Ckm/MVA
Construction progress Status
Monthof
Completion
Remark
TL(Nos)/LandAcq.(%)
STC(Nos)/CivilWork(%)
TE(Nos)/Recp.Materia
l(%)
STG(Ckm)/Erection (%)
2. 1. 4. 5. 6. 7. 8. 9. 12. 13.
OriginalTargetDate
10.
RevisedTargetDate
11.
Ckts(S/C)
&(D/C)
3.
.220Routing of one circuit of Jorthong - NewMelli via Rangit - IV
DEC-131. D/CLEPP
Remark:
Ratija ( 1x50 MW) TPS,P.S.,Spectrum Coal & Power ltd.,Chh, U1-2/13(C),
Commissioned.24132Ratija-Kasiapalli 241. D/CSCPL
Remark:
Ratle HEP, (4x205+1x300 MW), PS, J&K, GVK, U-I to U-5 2019-20,
.400LILO of one circuit of Dulhasti - Kishenpurat Ratle HEP.
1. D/CPGCIL
400Kishenpur - Ratle, (Dulhasti- KishenpurSecond Ckt stringing extending up to RatleHP)
2. S/CPGCIL
Remark: Work yet to be award.
Reliable TPP (RTPL), (2x660 MW), PS, MP, RTPL,U1-6/16 (Tentative), U2-12/16 (Tentative),
.765Reliable TPP - Vindhyachal Pooling Station1. D/C
Remark:
Rewa TPP, Khandwa (2x800 MW), SS,MP,
180400Handia - Ashta(2nd stage)1. D/CMPPTCL
40220LILO of Handia - Barwaha at Handia2. D/CMPPTCL
.20400LILO of Khandwa (PGCIL) - Rajgarh atChhegaon
3. D/CMPPTCL
Double entrypreviously as LILO of both ckt Nagda - Ujjain at Ujjain
40220LILO of Nagda - Ujjain at Ujjain4. D/CMPPTCL
40220LILO of Ratlam - Badnagar at Badnawar5. D/CMPPTCL
Double entrypreviously as Nagda - Ujjain
150400Nagda - Ujjain line6. D/CMPPTCL
Legends
TL: Total Location STC: Stubs Cast TE: Towers Erected STG: Stringing Completed Page 50 of67
As on 31-AUG-2015
State/AgencyExecutingAsociated
Trans.Works
AssociatedTransmission
Lines and Substations
VoltageLevel(KV)
Ckm/MVA
Construction progress Status
Monthof
Completion
Remark
TL(Nos)/LandAcq.(%)
STC(Nos)/CivilWork(%)
TE(Nos)/Recp.Materia
l(%)
STG(Ckm)/Erection (%)
2. 1. 4. 5. 6. 7. 8. 9. 12. 13.
OriginalTargetDate
10.
RevisedTargetDate
11.
Ckts(S/C)
&(D/C)
3.
Remark: Status Not Reported.
Rosa TPP Extn Ph-II (2x300), PS, UP, Reliance, Northern Region, U3-12/11 (C), U4-3/12 (C),
Commissioned 3/1215400LILO of Lucknow - Bareilly atShahjahanpur
15 MAR-12MAR-121. D/CRPTL
Rly block taken and work completed. The proposed date ofcomplition is 30.09.2015.
216220Rosa - Dohna 340 340 340 216 SEP-152. D/CUPPTCL
Commissioned in March 2012. reported in july 2015.(Line Chargedby passing Shahjehanpur S/S).
16400Rosa - Shahjehanpur (PG) 16 JUL-15JUL-153. D/CRPTL
Remark:
S V Power TPP (63 MW),PS,Cha,KVK,U1-12/11(C),,
Commissioned 11/11.12132LILO of Korba-Mopaka line at S.V. Power 12 NOV-11NOV-111. D/CSVPPL
Remark:
SJK Powergen TPP (2x660 MW),PS, MP GMR, U1-12/14,U2-6/14,
.107400SJK TPS - Jabalpur Pooling Station 339 330 292 591. D/C
Remark:
Sagardighi TPP (2x300 MW) Phase-II (2x660 MW),SS,WB,WBPDCL,U1-12/07(C),U2-7/08(C), U3-7/14, U4-10/14,
Commissioned 4/11.255400Sagardighi - Parulia (PGCIL) 340 340 340 255 APR-11DEC-08 APR-111. S/C onD/C
WBSETCL
Remark:
Sainj HEP (2x50 MW),SS,HP,HPPCL,U1-2016-17,
Yet to award.400LILO of Parbati III - Parbati Pooling stationat Sainj
APR-141. D/CHPPTCL
Remark:
Salaya (Essar Power ) (2x600 MW),PS, Guj, Essar Power U1-2/12(C),U2-6/12 (C),
Commissioned 5/11.226400Vadinar (Essar)-Hadala 353 353 353 226 MAY-11NOV-09 MAY-111. D/CGETCO
Legends
TL: Total Location STC: Stubs Cast TE: Towers Erected STG: Stringing Completed Page 51 of67
As on 31-AUG-2015
State/AgencyExecutingAsociated
Trans.Works
AssociatedTransmission
Lines and Substations
VoltageLevel(KV)
Ckm/MVA
Construction progress Status
Monthof
Completion
Remark
TL(Nos)/LandAcq.(%)
STC(Nos)/CivilWork(%)
TE(Nos)/Recp.Materia
l(%)
STG(Ckm)/Erection (%)
2. 1. 4. 5. 6. 7. 8. 9. 12. 13.
OriginalTargetDate
10.
RevisedTargetDate
11.
Ckts(S/C)
&(D/C)
3.
W I P239400Vadinar(Essar)- Amreli (Balance) 365 309 256 113 NOV-09 JUN-152. D/CGETCO
Commissioned 01/14.117400Vadinar - Amreli (Part line) 294 294 294 117 JAN-14JAN-143. D/CGETCO
Severe ROW problem being encountered.450400Essar Gujarat TPS - Bachau 605 594 590 410 FEB-14 SEP-154. D/CPGCIL
Remark:
Salaya Phase -II (3240MW),PS, Guj,,
Will be in line with generation project which is delayed350400Salaya (EPGCL generating station )-Halvad MAR-181. D/CGETCO
Remark:
Salora TPS (M/s Vandana Vidyut ) (135 MW),
Commissioned. 7/12. (Interim )6400LILO of one ckt Korba- Birsinghpur atVandana
6 JUL-12JUL-121. D/CVVL
Yet to start construction of 400 kV D/C line from Salora TPS -Dhranjaygarh (70 Km). Intrim arrangement available.
140400Salora TPS - Dharamjaigarh (Korba)Pooling Station
2. D/CVVL
Remark:
Sandila TPP (2x660 MW), PS,UP,TPL,,
400Sandila TPP - ATS not defind1. D/CTOR. POW.
765LILO of Ghatampur - Mbd at Sandila2. D/CUPPTCL
400Sandila - Farrukhabad3. S/CUPPTCL
400Sandila - Lucknow Hardoi Road4. S/CUPPTCL
Remark: Status Not Reported (UP share 1188 MW)
Santaldih TPP (250 MW),SS,WB,WBPDCL,U6-6/11(C),
Commissioned 4/084220LILO of STPS - Arambagh at Bishnupur 11 11 11 4 APR-08APR-081. D/CWBSETCL
Commissioned 12/0780220LILO of Santaldih - Durgapur (I Ckt) atAsansol
152 152 152 80 DEC-07DEC-072. D/CWBSETCL
Legends
TL: Total Location STC: Stubs Cast TE: Towers Erected STG: Stringing Completed Page 52 of67
As on 31-AUG-2015
State/AgencyExecutingAsociated
Trans.Works
AssociatedTransmission
Lines and Substations
VoltageLevel(KV)
Ckm/MVA
Construction progress Status
Monthof
Completion
Remark
TL(Nos)/LandAcq.(%)
STC(Nos)/CivilWork(%)
TE(Nos)/Recp.Materia
l(%)
STG(Ckm)/Erection (%)
2. 1. 4. 5. 6. 7. 8. 9. 12. 13.
OriginalTargetDate
10.
RevisedTargetDate
11.
Ckts(S/C)
&(D/C)
3.
PGCIL is executing the work as a deposit work of WBPDCL.The work is stalled due to repeated theft. WBPDCL asked PGCILto take up with the present vendor for resumption of work or deploya new vendor by cancelling the existing contract.
224220Santaldhi TPS-Bishnupur 347 347 325 193 OCT-083. D/CWBSETCL
Remark:
Sasan UMPP (6x660 MW),PS,MP,Reliance,U1-5/14 (C),U2-12/13 (C),U3-5/13 (C),U4-3/14 (C),U5-8/14 (C),U6-3/15 (C),
Commissioned 03/13.1000765/400Bina (ICT-II) S/S 100 100 100 100 MAR-13MAR-131. PGCIL
Commissioned 3/12.13400LILO of both ckt Vindhyachal -Jabalpur atSasan
26 26 26 13 MAR-12MAR-122. 2xD/CPGCIL
Commissioned 01/13.1400Bina - Bina (MPPTCL) 6 6 6 1 JAN-13DEC-12 JAN-133. D/CPGCIL
Commisisoned 03/1250400Indore - Indore (MPPTL)(Partly) 139 139 139 98 MAR-12MAR-124. D/CPGCIL
Commissioned 09/13.334765Fatehpur- Agra line-II 896 896 896 334 SEP-13DEC-12 SEP-135. S/CPGCIL
Commissioned 12/12.241765Sasan - Satna line -I 689 689 689 241 DEC-12DEC-12 DEC-126. S/CPGCIL
Commissioned 4/13.242765Sasan - Satna line -II 670 670 670 242 APR-13APR-137. S/CPGCIL
Commissioned 05/13.355765Sasaram - Fatehpur line-II 954 954 954 355 MAY-13MAY-138. S/CPGCIL
Line commissioned in Jan'12(charged at 400 KV)274765Satna - Bina line -I 738 738 738 274 JAN-12MAR-129. S/CPGCIL
Commissioned 6/12276765Satna - Bina line -II 737 737 737 276 JUN-12JUN-1210. S/CPGCIL
Commissioned 8/12.1000765/400Bina. S/S 100 100 100 100 AUG-12AUG-1211. PGCIL
Commissioned 03/13.2x1500765/400Gwalior 100 100 100 100 MAR-13MAR-1312. PGCIL
Commissioned 06/13.1500765/400Indore (1st Trf.) 100 100 100 100 JUN-13JUN-1313. PGCIL
ICT-I Commissioned 6/12.1000765/400Satna (1st ICT) 100 100 100 100 JUN-12JUN-1214. PGCIL
2nd Ckt Commissioned 06/13.50400Indore - Indore Ckt-II 139 139 139 50 JUN-13JUN-1315. D/CPGCIL
Legends
TL: Total Location STC: Stubs Cast TE: Towers Erected STG: Stringing Completed Page 53 of67
As on 31-AUG-2015
State/AgencyExecutingAsociated
Trans.Works
AssociatedTransmission
Lines and Substations
VoltageLevel(KV)
Ckm/MVA
Construction progress Status
Monthof
Completion
Remark
TL(Nos)/LandAcq.(%)
STC(Nos)/CivilWork(%)
TE(Nos)/Recp.Materia
l(%)
STG(Ckm)/Erection (%)
2. 1. 4. 5. 6. 7. 8. 9. 12. 13.
OriginalTargetDate
10.
RevisedTargetDate
11.
Ckts(S/C)
&(D/C)
3.
Commissioned 09/13.1500765/400Indore (2nd Trf.) 100 100 100 100 SEP-13SEP-1316. PGCIL
Commissioned 8/12.1000765/400Satna (2nd ICT) 100 100 100 100 AUG-12AUG-1217. PGCIL
Remark:
Satpura Ext TPS (250 MW),SS, MP,MPPGCL, U10-3/13 (C), U11-12/13(C),
Commissioned 03/15.482400Satpura - Ashta 651 651 651 482 MAR-15MAR-151. D/CKPTL
Commissioned 02/15.199220Ashta - Indore - II (Jetpura) 317 317 317 199 FEB-15FEB-152. S/C onD/C
MPPTCL
Commissioned 10/11160220/132Ashta (Add.) Trf. S/S 100 100 100 100 OCT-11OCT-113. MPPTCL
Commissioned 09/13.315400/220Ashta New S/S 100 100 100 100 SEP-13SEP-134. MPPTCL
Commissioned 01/15.315400/220Ashta New (2nd Trf.) 100 100 100 100 JAN-15JAN-155. MPPTCL
Remark:
Shapoorji Pallonji,Kodinar,(2x660),PS,Guj, SPEPL. U1-5/15,U2-8/15,
Generation project is delayed so this evacuation line will be in linewith the generation project
220400Shapoorji Pallonji generating station MAR-161. D/CGETCO
Remark:
Sholapur TPP (2x660 MW),CS, Maha, TPL, U1 & U2,
Award placed in May'15.22400Sholapur STPP - Sholapur line - II 35 MAR-17 MAR-171. D/CPGCIL
Ready for commissioning 04/15.22400Sholapur STPP - Sholapur line-I 35 35 35 22 APR-15OCT-15 APR-152. D/CPGCIL
Remark:
Sikka TPP Extn, (2x250 MW) SS, Gujarat, GSECL, U3 -3/15 (C),U4,
WIP120220LILO of Jamnagar - Jetpur line-II at Sikka 187 112 83 APR-151. D/CGETCO
Legends
TL: Total Location STC: Stubs Cast TE: Towers Erected STG: Stringing Completed Page 54 of67
As on 31-AUG-2015
State/AgencyExecutingAsociated
Trans.Works
AssociatedTransmission
Lines and Substations
VoltageLevel(KV)
Ckm/MVA
Construction progress Status
Monthof
Completion
Remark
TL(Nos)/LandAcq.(%)
STC(Nos)/CivilWork(%)
TE(Nos)/Recp.Materia
l(%)
STG(Ckm)/Erection (%)
2. 1. 4. 5. 6. 7. 8. 9. 12. 13.
OriginalTargetDate
10.
RevisedTargetDate
11.
Ckts(S/C)
&(D/C)
3.
Commissioned 08/15.157220Sikka - Moti Paneli line 259 259 259 157 AUG-15AUG-152. D/CGETCO
Remark:
Simhapuri PH-I,(150 MW),PS,U2-7/12(C),
Commissioned 3/1226400Simhapuri-Nellore 26 MAR-12MAR-121. S/CMEL
Remark:
Singareni Colleries Generation Project (2x 600 MW), Telangana,
298400Singareni - Nirmal 174 JUN-171. D/CTCTL
325400Singareni TPS - Gajwel 460 451 444 218 AUG-152. D/CTCTL
630400/220630 MVA, 440/220 kV Nirmal S/S3. TCTL
Remark: Slow progress
Singhitarai TPP (2x600 MW),PS,Chg,, Athena Chhg Power Ltd.,U1-6/13,U2-11/13,
50400Athena Singhitarai - Raigarh PoolingStation (near Kotra)
75 75 72 40 SEP-151. D/C
Remark:
Singoli Bhatwari HEP (3x33MW)PS,UK,L&T,U1,2 &3,2017-18,
Construction of line as per Schedule of construction of Singoli HEPand to be constructed by L&T.
5220LILO of Baramwari - Srinagar at SingoliBhatwari
OCT-161. D/CPTCUL
Remark:
Sorang HEP (2x50 MW),PS,HP,HSPCL, U1- 9/15, U 2-9/15 2015-16,
LILO connection is pending.6.4400LILO of one ckt Karcham wangto -Abdullapur at Sorang
11 11 11 6 AUG-151. D/CHSPPL
Remark:
Srinagar HEP, (4x82.5 MW),PS,UK,AHPC Ltd.,U1-4/15 (C) ,U2-6/15 (C), U3-4/15 (C)U4-6/15 (C),
Legends
TL: Total Location STC: Stubs Cast TE: Towers Erected STG: Stringing Completed Page 55 of67
As on 31-AUG-2015
State/AgencyExecutingAsociated
Trans.Works
AssociatedTransmission
Lines and Substations
VoltageLevel(KV)
Ckm/MVA
Construction progress Status
Monthof
Completion
Remark
TL(Nos)/LandAcq.(%)
STC(Nos)/CivilWork(%)
TE(Nos)/Recp.Materia
l(%)
STG(Ckm)/Erection (%)
2. 1. 4. 5. 6. 7. 8. 9. 12. 13.
OriginalTargetDate
10.
RevisedTargetDate
11.
Ckts(S/C)
&(D/C)
3.
excavation and benching is in progress at tower no. 15,19 and 39Total Progress 12%.
28400Srinagar HEP - Sringar 400 kV S/S. 39 DEC-151. D/CPTCUL
Commissioned 11/14.7400LILO of Muzaffarnagar -Vishnuprayag atSrinagar
20 20 20 7 NOV-14NOV-142. D/CUPPTCL
Remark:
Subhansiri Lower (HEP) (8x250 MW) ,CS,ArP,NHPC,Unit 1 to 8 -2018-20,
Completion uncertain. Works stand still on a/c of localmdisturbance /agitation against big dam. Generation uncertain.
334400Lower Subhansiri - Biswanath Chariyali line-I
444 329 228 64 AUG-13 MAR-161. D/CPGCIL
Completion uncertaion.Works stand still on a/c of localdisturbancec /agitation against big dam. Gen. schedule uncertain.
340400Lower Subhansiri - Biswanath Chariyali line-II
465 327 196 35 AUG-13 MAR-162. D/CPGCIL
Remark:
Suratgarh Super Critical TPS (2x660 MW),SS, Raj,RRVUNL U7 & U8,
case for diverting route due to air force is under process480400Suratgarh TPS - Babai ( Jhunjhunu) 640 542 512 101 MAR-161. D/CRVPNL
340400Suratgarh TPS- Bikaner MAR-172. D/CRVPNL
172400Bikaner- Merta 465 465 465 172 AUG-153. S/CRVPNL
630400/220Babai S/S 100 80 80 63 MAR-164. RVPNL
Remark:
Suzlon wind farm (100 MW), PS,Kutch, GETCO, U1-5/13,
.220Suzlon wind farm - Bhachau (PG)1. D/C
Remark:
Swara Kuddu HPPCL (3x37MW), U1-3, 2017-18,
Delay FAC approval pending for the lest three year. Stage -Iclearance in July 2015.
400LILO of one ckt of Nathpa Jhakri -Abdullapur at Swara Kuddu
MAR-17 JUL-161. D/CHPPTCL
Legends
TL: Total Location STC: Stubs Cast TE: Towers Erected STG: Stringing Completed Page 56 of67
As on 31-AUG-2015
State/AgencyExecutingAsociated
Trans.Works
AssociatedTransmission
Lines and Substations
VoltageLevel(KV)
Ckm/MVA
Construction progress Status
Monthof
Completion
Remark
TL(Nos)/LandAcq.(%)
STC(Nos)/CivilWork(%)
TE(Nos)/Recp.Materia
l(%)
STG(Ckm)/Erection (%)
2. 1. 4. 5. 6. 7. 8. 9. 12. 13.
OriginalTargetDate
10.
RevisedTargetDate
11.
Ckts(S/C)
&(D/C)
3.
Remark:
Swastik TPP, (25 MW), PS,Chg, ACB, U1-12/13,
Commissioned132LILO of Korba-Mopka at Swastic TPP 1321. D/CAPL
Remark:
System Strengthening,
145220Teesta LDP - III - New Jalpaiguri (NJP) 250 250 250 138 SEP-08 SEP-151. D/CWBSETCL
Remark:
Talwandi Sabo TPP (3x660MW),PS,Punjab, Sterlite, U1-6/14 (C),U2-7/14,U3-10/14,
Commissioned 09/14.630400/220Mukatsar (2x315) 100 100 100 100 SEP-14JAN-13 SEP-141. PSTCL
Commissioned 04/14.315400/220Nakodar (1st Trf.) 100 100 100 100 APR-14APR-142. PSTCL
Commissioned 04/14.128400Moga- Nakodar 178 178 178 128 APR-14APR-143. D/CPSTCL
Commissioned 01/13. (Line energised on 21.8.12 but intimated inJan 2013)
175400Talwandi Sabo - Dhuri 250 250 250 175 JAN-13JAN-134. D/CPSTCL
Commissioned 03/13.204400Talwandi Sabo - Moga 287 287 287 204 MAR-13MAR-135. D/CPSTCL
Commissioned 09/14.201400Talwandi Sabo-Mukatsar 277 277 277 201 SEP-14SEP-146. D/CPSTCL
Remark:
Tamnar TPP (4x600 MW),PS,Chatt,JPL, U1-3/14 (C),U2-3/14 (C),U3-1/15 (C),U4-3/15 (C),
Commissioned 01/15.44400Tamnar TPP - Raigarh (Tamnar) PoolingStation
67 67 67 44 JAN-15JAN-151. 2xD/CJPL
Remark:
Tanda TPP (2x660 MW), CS,UP, NTPC,,
.460400Gonda - Shahjehanpur (PG)1. D/CUPPTCL
Legends
TL: Total Location STC: Stubs Cast TE: Towers Erected STG: Stringing Completed Page 57 of67
As on 31-AUG-2015
State/AgencyExecutingAsociated
Trans.Works
AssociatedTransmission
Lines and Substations
VoltageLevel(KV)
Ckm/MVA
Construction progress Status
Monthof
Completion
Remark
TL(Nos)/LandAcq.(%)
STC(Nos)/CivilWork(%)
TE(Nos)/Recp.Materia
l(%)
STG(Ckm)/Erection (%)
2. 1. 4. 5. 6. 7. 8. 9. 12. 13.
OriginalTargetDate
10.
RevisedTargetDate
11.
Ckts(S/C)
&(D/C)
3.
Work not Started.120400LILO of Azamgarh - Sultanpur at Tanda2. D/CUPPTCL
200400Tanda - Gonda3. D/CUPPTCL
Remark:
Tapovan Vishnugad HEP (4x130MW), CS,UK,NTPC,U1,2,3,&4 -2018-19,
Investment approval pending.400LILO of Vishnu Prayag - Muzaffarnagar atTapovan Vishnugarh HEP
MAR-151. D/CPGCIL
Investment approval pending.400Tapovan Vishnugadh - Kunwari Pass MAR-172. D/CPGCIL
Retendering is under Process.184400Kuwari Pass (Pipalkoti)-Karanprayag -Srinagar
JUN-163. D/CPTCUL
Contract has been awarded on 06.05.11 to M/s TATA Project Ltd.contract effective date is 03.09.11 and will be taken after award of400 KV Pipalkoti S/s. Total Progress 11%.
2400LILO of Muzaffarnagar - Vishnu Prayag atKuwari Pass (Pipalkoti)
6 DEC-154. D/CPTCUL
Remark:
Tashiding HEP (2x48.5MW)PS,Sikkim,Shiga Energy,U1&2, 2017-18,
20220Legship - New Malli 33 MAR-161. D/C
Preliminary survey for selection of the final transmission line routeas well as detailed survey along the selected transmission lineroute has been completed. Actions for land acquisition andobtaining various clearances as well as finalizing the designconsultant are in progress.
14220Tashiding - Legship 212. D/C
Remark:
Teesta LD IV HEP (4x40 MW),CS,WB,NHPC,Unit 1 to 4 -2015-17,
21220Teest LDP -III - Teesta LDP-IV 94 83 67 6 SEP-08 DEC-151. S/CWBSETCL
Remark:
Legends
TL: Total Location STC: Stubs Cast TE: Towers Erected STG: Stringing Completed Page 58 of67
As on 31-AUG-2015
State/AgencyExecutingAsociated
Trans.Works
AssociatedTransmission
Lines and Substations
VoltageLevel(KV)
Ckm/MVA
Construction progress Status
Monthof
Completion
Remark
TL(Nos)/LandAcq.(%)
STC(Nos)/CivilWork(%)
TE(Nos)/Recp.Materia
l(%)
STG(Ckm)/Erection (%)
2. 1. 4. 5. 6. 7. 8. 9. 12. 13.
OriginalTargetDate
10.
RevisedTargetDate
11.
Ckts(S/C)
&(D/C)
3.
Teesta Low Dam III (4x33 MW),CS,WB,NHPC, U1-1/13(C) ,(C) U2-1/13(C), U3-2/13(C), U4/13(C),
Commissioned 01/13.81220Teesta LD III-New Jalpaiguri 282 282 282 81 JAN-13DEC-09 JAN-131. S/CWBSETCL
Remark:
Teesta Stage -III (6x200 MW),PS,Sikkim,TUL,Unit- 2016-17,
Stage-II clearance for WB portion is pending. Kishanganj S/S ofPGCIL is expected to commission by Dec.15.
424400Teesta III - Kishanganj 569 393 366 160 MAR-161. D/CTUL
Remark:
Teesta VI HEP (4x125 MW), PS, M/S LANCO Urja, SIKKIM,U1-4 - 2018-19,
Detail survey completed section 164 approval received. Work yet tostarted.
25220Teesta VI HEP - Rangpo Pooling Station1. D/CLEPP
Remark:
Tehri PSP (THDC) (4x250 MW),
16400Tehri PSP - Tehri Pooling Station1. S/CPGCIL
Award placed in Mar'15. Engg. in progress.1500765/400Meerut (Aug.) 100 NOV-172. PGCIL
Remark:
Thamminapatnam (Meenakshi) (2x150 MW ),PS,Ph-I,(U1-9/12,( C ) U2-4/13(C), Ph-II (U3-5/13,U4-8/13),
Commissioned 3/122400Meenakshi - Simhapuri 2 MAR-12MAR-121. D/CMEL
Commissioned 3/1226400Thamminapatnam (Meenakshi) -Nellore 26 MAR-12MAR-122. S/CMEL
Remark:
Thottiyar HEP (1x30+1x10MW)SS,Kerala, KSEB, U1, & 2 2017-18,
ATS of Thottiar HEP.May be deleted, as the work is not targeted in the Annual Plan of2015-16.
220LILO of Ldukki - Kozikode at Kodakpara1. D/CKSEB
Legends
TL: Total Location STC: Stubs Cast TE: Towers Erected STG: Stringing Completed Page 59 of67
As on 31-AUG-2015
State/AgencyExecutingAsociated
Trans.Works
AssociatedTransmission
Lines and Substations
VoltageLevel(KV)
Ckm/MVA
Construction progress Status
Monthof
Completion
Remark
TL(Nos)/LandAcq.(%)
STC(Nos)/CivilWork(%)
TE(Nos)/Recp.Materia
l(%)
STG(Ckm)/Erection (%)
2. 1. 4. 5. 6. 7. 8. 9. 12. 13.
OriginalTargetDate
10.
RevisedTargetDate
11.
Ckts(S/C)
&(D/C)
3.
ATS of Thottiar HEP. May be deleted, as the work is not targeted inthe Annual Plan of 2015-16.
220Thottiyar - Kodakpara2. D/CKSEB
Remark:
Tidong-I HEP (2x50MW)PS,HP,NSL,U1,&2, 2016-17,
Work yet to start220LILO of Kasang - Bhbaba at Tidong-I DEC-161. D/CHPPTCL
Remark:
Tilaiya UMPP,
765LILO of Tilaiya - Balia line at Gaya DEC-161. D/CPGCIL
Remark:
Tiroda TPP (Gondia ) PH-I (2x660 MW),PS,MAHA,ADANI,U1-9/12, (C),U2-11/12 ,PH II (3x660 MW) U1-6/13(C), U2- 8/13,U3-6/13,
218 Ckm Commissioned 8/12218400Tiroda TPP - Warora (2nd ckt) 587 587 587 218 AUG-12AUG-121. D/CAPL
Commissioned 3/13.218400Tiroda TPP -Warora (1st ckt) 587 587 587 218 MAR-13MAR-132. S/CAPL
Commissioned 03/13.500400/220Warora S/S 100 100 100 100 MAR-13SEP-12 MAR-133. MSETCL
765Aurangabad - III - Aurangabad (PG)4. 2xS/CPGCIL
Commissioned 02/14.61400Akola- I - Akola-II 90 90 90 61 FEB-14FEB-145. D/CAPL
Commissioned 02/14.361765Tiroda - Akola-II 1011 1011 1011 361 FEB-14FEB-146. S/CAPL
Commissioned 03/15.575765Tiroda - Koradi - Akola - Aurangabad lineckt-II
1582 1582 1582 575 MAR-15AUG-12 MAR-157. S/CAPL
Commissioned 02/14.1500765/400Akola -II S/S 100 100 100 100 FEB-14FEB-148. APL
Commissioned 03/15.3000765/400Koradi - III S/S 100 100 100 100 MAR-15MAR-159. APL
Commissioned 02/14.1500765/400Tiroda S/S 100 100 100 100 FEB-14FEB-1410. APL
Priority bays expected by Mar-2015. ICTs expected upto3000765/40Aurangabad - III S/S 100 79.79 80 34 AUG-1511. MSETCL
Legends
TL: Total Location STC: Stubs Cast TE: Towers Erected STG: Stringing Completed Page 60 of67
As on 31-AUG-2015
State/AgencyExecutingAsociated
Trans.Works
AssociatedTransmission
Lines and Substations
VoltageLevel(KV)
Ckm/MVA
Construction progress Status
Monthof
Completion
Remark
TL(Nos)/LandAcq.(%)
STC(Nos)/CivilWork(%)
TE(Nos)/Recp.Materia
l(%)
STG(Ckm)/Erection (%)
2. 1. 4. 5. 6. 7. 8. 9. 12. 13.
OriginalTargetDate
10.
RevisedTargetDate
11.
Ckts(S/C)
&(D/C)
3.
Mar-2016.0
Remark:
Tori TPP (2x600 MW),PS,Jhh, Essar, U1-4/15,U2-8/15,
.400Tori - Jhharkhand Pooling Station1. D/CEPTCL
Remark:
Transmission System for Transfer of Power from Generation Project in SIKKIM to NR/WR Part-A,
Award placed in Aug/11. Engg. in progress.19132LILO of Gangtok - Melli at Rangpo 341. S/CPGCIL
Remark:
Transmission System for Transfer of Power from Generation Project in SIKKM to NR/WR Part-B,
Commissioned 11/14.7132LILO of Gangtok - Rangit at Rangpo 21 21 21 7 NOV-14 NOV-141. S/CPGCIL
Remark:
Transmission System of Phase-I Generation Projects in Orissa-Part-A,
Commissioned 05/13.44400LILO of Rourkela - Raigarh at JharsugudaPooling Stn. Ckt-II
120 120 120 44 MAY-13MAY-131. D/CPGCIL
Remark:
Tuirial HEP (2x30MW),CS,Miz,NEEPCO, U1 &2- 2016-17,
132LILO of Jiribam - Aizawl at Turial1. D/CPGCIL
132Turial HEP - Aizawl MAR-142. S/CP&ED Mizo
Remark:
Tuticorin TPS (JV) (2x500 MW), U1-3/14,U2-3/14,
Commissioned 01/12.304400Tuticorin JV - Madurai 423 423 423 304 JAN-12JAN-121. D/CPGCIL
Legends
TL: Total Location STC: Stubs Cast TE: Towers Erected STG: Stringing Completed Page 61 of67
As on 31-AUG-2015
State/AgencyExecutingAsociated
Trans.Works
AssociatedTransmission
Lines and Substations
VoltageLevel(KV)
Ckm/MVA
Construction progress Status
Monthof
Completion
Remark
TL(Nos)/LandAcq.(%)
STC(Nos)/CivilWork(%)
TE(Nos)/Recp.Materia
l(%)
STG(Ckm)/Erection (%)
2. 1. 4. 5. 6. 7. 8. 9. 12. 13.
OriginalTargetDate
10.
RevisedTargetDate
11.
Ckts(S/C)
&(D/C)
3.
Remark:
URI-II HEP (4x60 MW), CS,J&K,NHPC,U1-9/13(C),U2-11/13(C),U3-9/13(C),U4-2/14 (C),
Commissioned 08/11.11400URI I - URI II 32 32 32 11 AUG-11AUG-111. S/CPGCIL
Commissioned 12/11.105400URI II -Wagoora 288 288 288 105 DEC-11MAY-11 DEC-112. S/CPGCIL
Remark:
Uchpinda TPP, (4x360MW), PS,Chg, RKMPPL, U1-1/15,U2-9/15,U3-12/15,U4-3/16,
Commissioned (Interim Arrangement)400LILO of Raigarh (Kotra) - Raipur atUchpinda (Interim Arrangement)
1. D/CRKMPPL
1. Server ROW Issue.2. Bay at Dharmjaygard completed.
57400Uchpinda - Raigarh line 96 96 96 56 SEP-152. D/CRKMPPL
Remark:
Udupi TPP (2x600 MW),PS,KAR,UPCL,U1-7/10(C),U2-4/11(C),
Commissioned 8/12358400Nandikur (UTPS) - Shantigrama (Hassan) 529 529 529 319 AUG-12AUG-121. D/CKPTCL
Commissioned 10/09. (For start up power)48220UTPS-Nandikur - Khemar (partly on Multi-ckt Multi - Voltage towers & partly on D/Ctowers)
919 91 91 48 OCT-09OCT-092. D/CKPTCL
Remark:
Uhl-III BVPCL HEP, (3x33.3MW),SS,HP, HPSEB,U1,2, & 3 -2016-17,
.132Uhl-III - Hamir Pur1. S/C onD/C
BVPCL
Remark: Status Not Reported.
Ukai Extn. (2x490 MW),PS,Guj,GSECL, U6-3/13(C),U7-3/13,
Commissioned 08/14.460400Kosamba-Chorania line 641 641 641 460 AUG-14JUL-11 AUG-141. D/CGETCO
Commissioned 03/13.178220Kosamba-Mobha line 300 300 300 178 MAR-13MAR-132. D/CGETCO
Legends
TL: Total Location STC: Stubs Cast TE: Towers Erected STG: Stringing Completed Page 62 of67
As on 31-AUG-2015
State/AgencyExecutingAsociated
Trans.Works
AssociatedTransmission
Lines and Substations
VoltageLevel(KV)
Ckm/MVA
Construction progress Status
Monthof
Completion
Remark
TL(Nos)/LandAcq.(%)
STC(Nos)/CivilWork(%)
TE(Nos)/Recp.Materia
l(%)
STG(Ckm)/Erection (%)
2. 1. 4. 5. 6. 7. 8. 9. 12. 13.
OriginalTargetDate
10.
RevisedTargetDate
11.
Ckts(S/C)
&(D/C)
3.
Commissioned 1/12.64400LILO of Asoj - Ukai at Kosamba 96 96 96 64 JAN-12JAN-123. D/CGETCO
Commissioned 03/13.145400UKai-Kosamba 215 215 215 145 MAR-13MAR-134. D/CGETCO
Remark:
Unchahar TPS (500 MW), PS,UP,NTPC,
60400Unchahar - Fatehpur SEP-161. D/CPGCIL
Remark:
Utraula IIPP (2x45 MW),PS,UP,BAJAJ,U1-2/12 (C),U2-3/12(C),
Existing line.132Balrampur-Utraula line1. D/CBEPL
Remark:
Utraula TPP, (2x45 MW), PS, UP, Bajaj,
Energised 31.10.1119132Balrampur - Utraula 56 56 56 191. S/CUPPTCL
FdnWIP,Fdn ROW at Loc-32 shall be resolved by month end,under court case, anchor tower excavation work will start on06.09.15. The proposed date of complition is 31.10.15.
132Dumariaganj- - Utraula 114 108 107 32 SEP-152. S/CUPPTCL
Remark:
VallureTPS. (3x500 MW),CS,TN,NTPC,U1-2/12(C), U2-2/13(c), U3-2/14,
Commissioned 03/13.71400Vallure TPS - Melakottaiyur line 104 104 104 71 MAR-13MAR-131. D/CPGCIL
Commissioned 8/12.7400Vallur JV Project-NCTPS St.II 14 14 14 7 AUG-12MAR-11 AUG-122. D/CTANTRANS
Commissioned 7/11131400LILO of Alamathy - Sriperumbdur atVallure TPS
129 129 129 131 JUL-11JUL-10 JUL-113. D/C onM/C
PGCIL
Commissioned 03/14.42400Tiruvelam (PG) - Chitoor 59 59 59 42 MAR-14MAR-144. D/CPGCIL
Remark: ATS no issue.
Vijayawada TPS (Extn. -IV),500 MW,SS,AP,APGENCO, -10/09 (C ),
Legends
TL: Total Location STC: Stubs Cast TE: Towers Erected STG: Stringing Completed Page 63 of67
As on 31-AUG-2015
State/AgencyExecutingAsociated
Trans.Works
AssociatedTransmission
Lines and Substations
VoltageLevel(KV)
Ckm/MVA
Construction progress Status
Monthof
Completion
Remark
TL(Nos)/LandAcq.(%)
STC(Nos)/CivilWork(%)
TE(Nos)/Recp.Materia
l(%)
STG(Ckm)/Erection (%)
2. 1. 4. 5. 6. 7. 8. 9. 12. 13.
OriginalTargetDate
10.
RevisedTargetDate
11.
Ckts(S/C)
&(D/C)
3.
Commissioned 02/13.147400Malkaram-Narsapur 209 209 209 147 FEB-13FEB-131. D/CAPTRANSC
Commissioned 02/13.149400Narsapur-Suryapet 199 199 199 149 FEB-13FEB-132. D/CAPTRANSC
Commissioned 02/13.226400Vijayawada TPS-Suryapeta 316 316 316 226 FEB-13JUN-11 FEB-133. D/CAPTRANSC
Commissioned 8/11.266220Vijayawada TPS-Tallapally 411 411 411 266 AUG-11JAN-11 AUG-114. D/CAPTRANSC
Commisioned 7/0924400LILO of Srisaliam -Nunaa at VijayawadaTPS
22 22 22 24 JUL-09JUL-095. M/CAPTRANSC
Remark:
Vindhyachal-IV ,CS,MP,NTPC, U11-6/12(C) C), U12-3/13(C) Rihand - III,(1000MW each) Gen. U5- U6-11/13(C),
Commissioned 12/13.97400Bassi (PG)- Jaipur (RVPN) 765 KV line (Q) 138 138 138 97 DEC-13DEC-131. D/CPGCIL
Ready for Commissioning in 08/15.31765Rihand - Vindhyachal Pooling Station (2ndCkt)
91 91 91 31 AUG-15NOV-12 AUG-152. D/CPGCIL
Commissioned 12/12.12400Sasan - Vindhyachal Pooling station 18 18 18 12 DEC-12DEC-123. D/CPGCIL
Ready for commissioning 12/12.58400Vindhyachal-IV - Vindhyachal PoolingStation line (Q)
84 84 84 58 DEC-12DEC-124. D/CPGCIL
Commissioned 08/14.300765Satna - Gwalior line (60 Km D/C Portion)Ckt-II
782 782 782 300 AUG-14NOV-12 AUG-145. D/C+S/CPGCIL
Commissioned 03/15.271765Vindhyachal Pooling Station - Satna line (2Km D/C Portion) Ckt-I
586 586 586 271 MAR-15NOV-11 MAR-156. D/C+S/CPGCIL
Commissioned 08/15.305765Gwalior - Jaipur (Ckt 1) 834 834 834 305 AUG-15MAR-14 AUG-157. S/CPGCIL
Commissioned 06/14.31765Rihand - Vindhyachal Pooling Station (1stCkt)
91 91 91 31 JUN-14NOV-12 JUN-148. S/CPGCIL
Commissioned 12/1212765Sasan - Vindhyachal Pooling Station line 19 19 19 12 DEC-12NOV-12 DEC-129. S/CPGCIL
Commissioned 02/14.337765Satna - Gwalior line (Ckt-I) 901 901 901 337 FEB-14FEB-1410. S/CPGCIL
Commissioned 03/15.1500765/400Vindhyachal Pooling Station (ICT-I) 100 100 100 100 MAR-15NOV-12 MAR-1511. PGCIL
Commissioned 08/15.271765Vindhyachal Pooling Station - Satna Ckt-II 586 586 586 271 AUG-15AUG-1512. S/CPGCIL
Legends
TL: Total Location STC: Stubs Cast TE: Towers Erected STG: Stringing Completed Page 64 of67
As on 31-AUG-2015
State/AgencyExecutingAsociated
Trans.Works
AssociatedTransmission
Lines and Substations
VoltageLevel(KV)
Ckm/MVA
Construction progress Status
Monthof
Completion
Remark
TL(Nos)/LandAcq.(%)
STC(Nos)/CivilWork(%)
TE(Nos)/Recp.Materia
l(%)
STG(Ckm)/Erection (%)
2. 1. 4. 5. 6. 7. 8. 9. 12. 13.
OriginalTargetDate
10.
RevisedTargetDate
11.
Ckts(S/C)
&(D/C)
3.
Commissioned 08/15.1500765/400Vindhyachal Pooling Station (ICT-II) 100 100 100 100 AUG-15AUG-1513. PGCIL
Remark:
Visa Power TPP (2x600 MW) PS, Chh, VPL, U1 & U2,
Work is under Construction.26400Visa Power TPP - Raigarh Pooling Station 37 33 26 JUN-151. D/CVISA
Remark:
Vizag (Hinduja National Power) (2x520MW),PS,AP,U1 -3/14, U2-12/13,
Due to standing crops and people are demanding hugcompensation than the compenasation fixed up by Revenueauthories and not allowing the works to be carried out in theirlocations. The frequent rains are also the reason for dlealy to takeup the line works.
212400Kamavarrapukota - Surypet(Kamavarrapukota - Chinnakorukondi)
248 131 103 10 SEP-15 DEC-151. D/CAPTRANSC
The works are getting delayed due to severe resistance fromfarmers and land Owners through their lands. These people aredemanding huge compensation that the compenasation fixed up byRevenue authories and not allowing the works to be carried out.Water logged areas, collasable soil, existing crops and frequentrains are also the reasons for delay to take up the line works.However, construction activity is being continued with the help ofRevenue and other conerned authorites.
500400Vizag TPP - KamavarapukotaKota 716 249 35 NOV-15 MAR-162. D/CAPTRANSC
Commissioned 07/15.14400Vizag TPP - Kalpaka 14 JUL-15JUL-153. D/CAPTRANSC
212400Kamavarrapukota - Surypet (Chinnakorukondi - Suryapet)
234 188 141 18 SEP-15 NOV-154. D/CTCTL
462400Suryapet - Shankarpalli 656 623 546 220 NOV-155. D/CTCTL
Works under progress.630400/220Kamavarapukota 100 30 40 MAR-16 MAR-166. APTRANSC
630400Shankarpally (Extn.)7. TCTL
630400/220Suryapet S/S 100 55 33 MAR-15 OCT-158. TCTL
Legends
TL: Total Location STC: Stubs Cast TE: Towers Erected STG: Stringing Completed Page 65 of67
As on 31-AUG-2015
State/AgencyExecutingAsociated
Trans.Works
AssociatedTransmission
Lines and Substations
VoltageLevel(KV)
Ckm/MVA
Construction progress Status
Monthof
Completion
Remark
TL(Nos)/LandAcq.(%)
STC(Nos)/CivilWork(%)
TE(Nos)/Recp.Materia
l(%)
STG(Ckm)/Erection (%)
2. 1. 4. 5. 6. 7. 8. 9. 12. 13.
OriginalTargetDate
10.
RevisedTargetDate
11.
Ckts(S/C)
&(D/C)
3.
Remark: APTRANSCO AND TSTRANCO are to expedited construction of Transmission Lines works.
Wanakbori TPS, SS, Guj,GSECL, (C),
Yet to award28400LILO of Wanakbori -Soja line at Dehgam(PG) S/S
MAR-161. D/CGETCO
Yet to award280400Soja-Zerda MAR-162. D/CGETCO
Yet to award2400Wanakbori S/y -Wanakbori S/y (existing) APR-163. D/CGETCO
Yet to award200400Wanakbori TPS-Soja JUN-154. D/CGETCO
Remark:
Welspun Energy Annupur,( 2x660 MW), PS,Annupur,MB Power, U1-4/15(C),U2-3/15,
400Welspun Anuppur TPS - VindhyachalPooling Station
1. D/C
Remark:
Yermarus TPS (2 x 800 MW), Karnataka, KPCL,
Tender invited on 7.3.2015. Detailed survey under progress.400Bellary (PS) - C.N. Hally MAR-171. D/CKPTCL
Work under progress.437400Bellary (PS) - New Madhugiri (nearTumakur)
498 313 251 51 DEC-162. D/CKPTCL
LOI issued on 25-Aug-15.5400Bellary (TPS) - Bellary (PS) AUG-163. D/CKPTCL
Tender invited on 28.4.2015.20400JSW TPS - Bellary (PS) MAR-164. D/CKPTCL
Detailed survey under progress.400LILO of Both ckt of Nelamangala -Talaguppa at CN Halli
DEC-165. D/CKPTCL
Detailed survey under progress.400Termination of Nelamangala - Talaguppa atCN Halli
DEC-166. D/CKPTCL
Proposal is before Central Purchase Committee for acceptance ofTender.
284400Yermarus TPS - Bellary Pooling Station7. D/CKPTCL
Line survey work completed.400Yermarus TPS - Gulbarga DEC-158. D/CKPTCL
Legends
TL: Total Location STC: Stubs Cast TE: Towers Erected STG: Stringing Completed Page 66 of67
As on 31-AUG-2015
State/AgencyExecutingAsociated
Trans.Works
AssociatedTransmission
Lines and Substations
VoltageLevel(KV)
Ckm/MVA
Construction progress Status
Monthof
Completion
Remark
TL(Nos)/LandAcq.(%)
STC(Nos)/CivilWork(%)
TE(Nos)/Recp.Materia
l(%)
STG(Ckm)/Erection (%)
2. 1. 4. 5. 6. 7. 8. 9. 12. 13.
OriginalTargetDate
10.
RevisedTargetDate
11.
Ckts(S/C)
&(D/C)
3.
Land has been acquired.1000400/220Gulbarga S/S9. KPTCL
Remark: Progress of ATS is slow KPTCL is to expedited the construction of Transmission works.
Legends
TL: Total Location STC: Stubs Cast TE: Towers Erected STG: Stringing Completed Page 67 of67