07Tribal Transit Feasibility Study –Existing Conditions Preliminary Findings

February 6, 2007

Tribal Transit Feasibility Study –Existing Conditions Preliminary Findings

Feb

07Tribal Transit Feasibility Study –Existing Conditions Preliminary Findings

• SANDAG Awarded Caltrans Grant to Study Transit Feasibility and Unique Approaches to Improving Regional Mobility and Tribal Lands Accessibility

• Study Designed to Assist in Leveraging Additional Funding

• 2005 SAFETEA-LU Reinforces the Importance of Inter-governmental Cooperation

Project Description and Overview

Feb

07Tribal Transit Feasibility Study –Existing Conditions Preliminary Findings

Scope of Work

• Review Existing Conditions • Consult With Tribal Councils to Identify Key

Transit Corridors • Identify Transit Alternatives• Conduct Feasibility Study:

- Develop Evaluation Criteria- Evaluate Alternate Transit Options- Costs/ Potential Funding Sources

• Discuss Findings with Tribal Councils• Prepare Draft and Final Report

Feb

07Tribal Transit Feasibility Study –Existing Conditions Preliminary Findings

• Collaboration Between:- SANDAG/ IBI Group- RTA- Transit Agencies (MTS, NCTD)

• Importance of Tribal Councils in Ongoing Collection of Data and Existing Conditions- 2 Workshops- Self-Reported Data

Project Team and Study Structure

Feb

07Tribal Transit Feasibility Study –Existing Conditions Preliminary Findings

Project Schedule

Feb

07Tribal Transit Feasibility Study –Existing Conditions Preliminary Findings

• 17 Federally-Recognized Tribal Governments with Jurisdiction over 18 Reservations in San Diego County (124,000 acres)

• 6,285 Residents on Reservation Lands as of 2000 Census.

• Predominantly Rural North and East County Locations

• Limited Connectivity to Regional Transportation Networks

Regional Overview

Feb

07Tribal Transit Feasibility Study –Existing Conditions Preliminary Findings

Potential Corridors and Existing Transit Connectivity

Feb

07Tribal Transit Feasibility Study –Existing Conditions Preliminary Findings

• Comprehensive Data Collection as Part of Census 2000

• Nearly Half of the 6,285 Reservation Residents on Either the Rincon or Pala Reservations

• Greater Concentration of Young (Under 18) Residents Than Elderly (Over 65)

• Potential Self-Reported Data

Demographic Data - Initial Findings

Feb

07Tribal Transit Feasibility Study –Existing Conditions Preliminary Findings

Percentage of Population Over 65 on Reservation Lands

Feb

07Tribal Transit Feasibility Study –Existing Conditions Preliminary Findings

Percentage of Population Under 18 on Reservation Lands

Feb

07Tribal Transit Feasibility Study –Existing Conditions Preliminary Findings

66:12A - 7:03PMonday -Friday

MTS 894: El Cajon - Campo

68 M - F;49 Sat, Sun.

5:01A - 11:47PMonday -Sunday

MTS 864: El Cajon - Viejas

125:15A - 9:05PMonday -Sunday

NCTD 388: Escondido - Pala

20 M - F;14 Sat.

4:35A - 8:37P M-F;7:20A - 9:37P Sat.

Monday -Saturday

NCTD 386: Escondido - Ramona

27:45A - 10:35A;2:30A - 5:26P

Thursday and Friday

MTS 891/ 892: Borrego Springs -Ramona - El Cajon

29:40A - 12:10P; 4:10P - 6:38P

Monday and Friday

MTS 888: El Cajon - Jacumba

Number of One-Way Trips Daily

Advertised Hours of Operation

Days of OperationRoute

Route Descriptions Effective 1/29/06

Existing Transit Services

Feb

07Tribal Transit Feasibility Study –Existing Conditions Preliminary Findings

Up to 267:45A - 9:30PMonday -Sunday; Some Limited Service

Valley View Casino, San Pasqual

Up to 445:10A - 12:30AMonday -Sunday; Some Limited Service

Viejas

Up to 627:30A - 3:30AMonday -Sunday; Some Limited Service

Harrah’s Rincon

Other ?

Up to 985:15A - 2:45AMonday -Sunday; Some Limited Service

Barona Valley Ranch

Preliminary Number of One-Way Trips Daily*

Advertised Hours of Pick-Up and Latest Casino

DepartureDays of

OperationCasino Shuttle

Existing Casino Shuttle Services

*Total Number of Departures, Including Non-San Diego County Origins

Feb

07Tribal Transit Feasibility Study –Existing Conditions Preliminary Findings

• Approximately 1-2% of Residents Use Transit For Work-Related Trips

• Highest Percentage on Campo, Viejas, and Mesa Grande Reservations (up to 4.3%)

• Commuter Transit Usage Exclusively by Bus

• Potential Self-Reported Data

Source: Census 2000 Long Form

Transit Usage Amongst Residents

Feb

07Tribal Transit Feasibility Study –Existing Conditions Preliminary Findings

Reservations and Transit Usage

Feb

07Tribal Transit Feasibility Study –Existing Conditions Preliminary Findings

• Finalize Existing Conditions

• Interactive Tribal Workshops and Corridor Assessments (RTA to take lead)

• Develop Criteria for Selecting Tribal Transit Corridors

• Evaluate Alternative Transit Options (Public/ Private Partnerships, Expanded Role of Employee Shuttles, etc.)

• Draft and Final Report