Tsinghau Leacture 2012-IA

Post on 21-Dec-2015

216 views 1 download

Tags:

description

good

transcript

©20

04 G

am

mo

n C

ons

tru

ctio

n Li

mite

d. A

ll R

ight

s R

ese

rved

Tsinghau LectureDesign for Safety

Ian Askew, General Manager Lambeth Associates

10 May 2012

©20

04 G

am

mo

n C

ons

tru

ctio

n Li

mite

d. A

ll R

ight

s R

ese

rved

Fatality statistics by region

©20

04 G

am

mo

n C

ons

tru

ctio

n Li

mite

d. A

ll R

ight

s R

ese

rved

“Challenge traditional thinking in roles and responsibilities of project stakeholders…”

©20

04 G

am

mo

n C

ons

tru

ctio

n Li

mite

d. A

ll R

ight

s R

ese

rved

©20

04 G

am

mo

n C

ons

tru

ctio

n Li

mite

d. A

ll R

ight

s R

ese

rved

‘Hazards leading to 60% of construction accidents could have been designed-out’

Designers….do not underestimate your input to safer construction

(ref. European Foundation for the Improvement in Living and Working Conditions)

©20

04 G

am

mo

n C

ons

tru

ctio

n Li

mite

d. A

ll R

ight

s R

ese

rved

Maximize open excavation

©20

04 G

am

mo

n C

ons

tru

ctio

n Li

mite

d. A

ll R

ight

s R

ese

rved

Maximize working space

©20

04 G

am

mo

n C

ons

tru

ctio

n Li

mite

d. A

ll R

ight

s R

ese

rved

not like this….

©20

04 G

am

mo

n C

ons

tru

ctio

n Li

mite

d. A

ll R

ight

s R

ese

rved

or this….

©20

04 G

am

mo

n C

ons

tru

ctio

n Li

mite

d. A

ll R

ight

s R

ese

rved

or this….

©20

04 G

am

mo

n C

ons

tru

ctio

n Li

mite

d. A

ll R

ight

s R

ese

rved

Standardize…make it repetitive …keep it simple!

©20

04 G

am

mo

n C

ons

tru

ctio

n Li

mite

d. A

ll R

ight

s R

ese

rved

Engineer-out, as far as possible, need for workers to enter deep excavations

©20

04 G

am

mo

n C

ons

tru

ctio

n Li

mite

d. A

ll R

ight

s R

ese

rved

The Challenge©

200

4 G

amm

on C

onst

ruct

ion

Lim

ited

. A

ll R

igh

ts R

eser

ved

Marina Bay in the 1950’s

Rock Armour up to 8T

Existing Seawall

©20

04 G

am

mo

n C

ons

tru

ctio

n Li

mite

d. A

ll R

ight

s R

ese

rved

Designing out risk….deep excavations Cofferdam

Dredge

N

©20

04 G

am

mo

n C

ons

tru

ctio

n Li

mite

d. A

ll R

ight

s R

ese

rved

Soil Conditions

Fill

Marine Clay

Old Alluvium (N value > 100)

Existing Ground Level+105

(m)

+100

+90

+80

+70

+60

Seawall

+50

Kallang Alluvial

Marine Clay

60 - 80m

40m

©20

04 G

am

mo

n C

ons

tru

ctio

n Li

mite

d. A

ll R

ight

s R

ese

rved

Typical Cofferdam Wall Arrangement

1.8m & 1.5m Dia. Steel Casing

+80mPD

2.1m

Top of Old Alluvium

Excavation Face

+84mPDExcavation level

Sheetpile & TAM Pipes

©20

04 G

am

mo

n C

ons

tru

ctio

n Li

mite

d. A

ll R

ight

s R

ese

rved

Removal Method – Stage 1

©20

04 G

am

mo

n C

ons

tru

ctio

n Li

mite

d. A

ll R

ight

s R

ese

rved

Removal Method – Stage 2

©20

04 G

am

mo

n C

ons

tru

ctio

n Li

mite

d. A

ll R

ight

s R

ese

rved

Removal Method – Stage 3

©20

04 G

am

mo

n C

ons

tru

ctio

n Li

mite

d. A

ll R

ight

s R

ese

rved

Removal Method – Stage 4

©20

04 G

am

mo

n C

ons

tru

ctio

n Li

mite

d. A

ll R

ight

s R

ese

rved

Excavation Method – Stage 5

©20

04 G

am

mo

n C

ons

tru

ctio

n Li

mite

d. A

ll R

ight

s R

ese

rved

Redundancy for the case of one strut failure

Moveable deflection panels to be provided during grab operation for added protection

Strutting designed for an impact force of 25kN

Protection barrier

Design-in robustness

©20

04 G

am

mo

n C

ons

tru

ctio

n Li

mite

d. A

ll R

ight

s R

ese

rved

Maximize offsite prefabrication of support elements…modularize

Fabrication of Megatruss Struts

©20

04 G

am

mo

n C

ons

tru

ctio

n Li

mite

d. A

ll R

ight

s R

ese

rved

Campaign feedback from frontline workers on buildability

Waling Detail (Improved for Demolition)

Waling Detail (Before)

Strut

Void former

Concrete waling Concrete fill Concrete fill

Concrete waling

©20

04 G

am

mo

n C

ons

tru

ctio

n Li

mite

d. A

ll R

ight

s R

ese

rved

©20

04 G

am

mo

n C

ons

tru

ctio

n Li

mite

d. A

ll R

ight

s R

ese

rved

©20

04 G

am

mo

n C

ons

tru

ctio

n Li

mite

d. A

ll R

ight

s R

ese

rved

Designing out risk….we need fresh thinking!!

©20

04 G

am

mo

n C

ons

tru

ctio

n Li

mite

d. A

ll R

ight

s R

ese

rved

Designing out risk….make it less labour intensive

©20

04 G

am

mo

n C

ons

tru

ctio

n Li

mite

d. A

ll R

ight

s R

ese

rved

Designing out risk….make it less labour intensive

©20

04 G

am

mo

n C

ons

tru

ctio

n Li

mite

d. A

ll R

ight

s R

ese

rved

Designing out risk….make it less labour intensive

©20

04 G

am

mo

n C

ons

tru

ctio

n Li

mite

d. A

ll R

ight

s R

ese

rved

Designing out risk….make it less labour intensive

©20

04 G

am

mo

n C

ons

tru

ctio

n Li

mite

d. A

ll R

ight

s R

ese

rved

Communicating design intent……

©20

04 G

am

mo

n C

ons

tru

ctio

n Li

mite

d. A

ll R

ight

s R

ese

rved

Isometric views

©20

04 G

am

mo

n C

ons

tru

ctio

n Li

mite

d. A

ll R

ight

s R

ese

rved

Isometric views

©20

04 G

am

mo

n C

ons

tru

ctio

n Li

mite

d. A

ll R

ight

s R

ese

rved

Harnessing technology….BIM

Hennessy Centre, Hong Kong

©20

04 G

am

mo

n C

ons

tru

ctio

n Li

mite

d. A

ll R

ight

s R

ese

rved

and….Google Sketch-up….WIL 704

Hennessy Centre, Hong Kong

©20

04 G

am

mo

n C

ons

tru

ctio

n Li

mite

d. A

ll R

ight

s R

ese

rved

and….Google Sketch-up…Austin Station

Hennessy Centre, Hong Kong

©20

04 G

am

mo

n C

ons

tru

ctio

n Li

mite

d. A

ll R

ight

s R

ese

rved

….QR codes..design drawings to 3-D visualizations

©20

04 G

am

mo

n C

ons

tru

ctio

n Li

mite

d. A

ll R

ight

s R

ese

rved

To avoid this….

©20

04 G

am

mo

n C

ons

tru

ctio

n Li

mite

d. A

ll R

ight

s R

ese

rved

and this….

©20

04 G

am

mo

n C

ons

tru

ctio

n Li

mite

d. A

ll R

ight

s R

ese

rved

Work procedure drawings• pictorial and illustrative

in a language workers understand at a glance

©20

04 G

am

mo

n C

ons

tru

ctio

n Li

mite

d. A

ll R

ight

s R

ese

rved

Work procedure drawings• each sequential step

in the erection and dismantling process

• hold points where validation, testing, and/or certification of the erected structure to take up load or to undergo a change in loading is required

©20

04 G

am

mo

n C

ons

tru

ctio

n Li

mite

d. A

ll R

ight

s R

ese

rved

…Pictorial method statements

©20

04 G

am

mo

n C

ons

tru

ctio

n Li

mite

d. A

ll R

ight

s R

ese

rved

…Pictorial method statements

©20

04 G

am

mo

n C

ons

tru

ctio

n Li

mite

d. A

ll R

ight

s R

ese

rved

Identifying residual risks

©20

04 G

am

mo

n C

ons

tru

ctio

n Li

mite

d. A

ll R

ight

s R

ese

rved

Worker access and egress

Steel Post

Top Railing

Kick Board

TemporaryShoring

Diaphragm Wall

TemporaryStaircase

Steel Bracket

Waling

Struts

Concrete Packing

TemporaryWalkway

©20

04 G

am

mo

n C

ons

tru

ctio

n Li

mite

d. A

ll R

ight

s R

ese

rved

Managing field changes

©20

04 G

am

mo

n C

ons

tru

ctio

n Li

mite

d. A

ll R

ight

s R

ese

rved

Managing field changes

As-BuiltOriginal Design

©20

04 G

am

mo

n C

ons

tru

ctio

n Li

mite

d. A

ll R

ight

s R

ese

rved

Temporary works control

• enforcing temporary works procedures

• improving traceability and transparency

• encouraging communication between design and construction team

©20

04 G

am

mo

n C

ons

tru

ctio

n Li

mite

d. A

ll R

ight

s R

ese

rved

The objective …….