TURNKEY CONSTRUCTION, MANUFACTURING AND ERECTION OF BUILDINGS, INDUSTRIAL PLANTS, POWER PLANTS;...

Post on 20-Jan-2016

220 views 0 download

transcript

• TURNKEY CONSTRUCTION, MANUFACTURING AND ERECTION OF BUILDINGS, INDUSTRIAL PLANTS, POWER PLANTS;

• CIVIL CONSTRUCTION OF HIGH RISE BUILDINGS, DAMS, COMMERCIAL CENTERS, HOUSING COMPLEXES, HIGHWAYS AND BRIDGES;

• ERECTION OF HEAVY STEEL STRUCTURES, INDUSTRIAL STEAM BOILERS, PRESSURE VESSELS AND SPECIALTY EQUIPMENT.

FIELDS OF ACTIVITY

HIGHLIGHTS…• AKON INTERNATIONAL JSC, is registered in both in

Turkey, Kingdom of Saudi Arabia, and Russian Federation.

• AKON undertakes Construction jobs in Saudi Arabia since 2009

• Head office is located in Ankara, and KSA office is in Jeddah, and Russian Federation office is in Moscow

• Mainly structural construction projects of faculty buildings, infrastructure and high rise towers are constructed in K.S.A. to date.

• AKON employs 850+ various skilled personnel in K.S.A. sites as of January 2013. With the new job awards, the number is likely to increase to 1000+ by April 2013.

• Parent company, AKON International JSC, located in Ankara, TURKEY

• Full management, supervisory, financial and equipment support from parent company.

• AKON Partners have long term experience in the field and in Turkey & KSA for more than 15 years.

FACTS & FIGURES

ONGOING PROJECTS

PMT Camp, JV Main Offices, Permanent Admin Building, Product Warehouses, Laboratuary Bldg., Maintenance Bldg.,Fire Marshall Bldg., Main Cafeteria Bldg. Construction and operations for 1500 days in our scope.

PETRORABIGH NON PROCESS BUILDINGS S.A. BAYTUR / SAUDI ARAMCO & SUMITOMO

PETRORABIGH NON PROCESS BUILDINGS PROJECT for PRB II EXPANSION. TURNKEY PROCUREMENT, CONSTRUCTION & OPERATIONS

COMPLETE STRUCTURAL CONSTRUCTION OF GENERAL ADMINISTRATION (GA-01) & GRAND CELEBRATION HALL (GA-02) BUILDINGS

KING KHALED UNIVERSITY PHASE IIISA BAYTUR CO. / MINISTRY of H. EDUCATION

TOTAL 62,000 sqm of CONSTRUCTION AREAGA-01 – 13+2 floorsGA-02 – 4+2 floors

COMPLETED PROJECTS

STRUCTURAL CONSTRUCTION OF HAJJ PILGRIMS TRAIN

STATION in MADINAH, K.S.A. FOR THE HARAMAIN HIGH

SPEED RAILWAY

HARAMAIN RAILWAY – MADINAH STATIONYAPI MERKEZI / SAUDI RAILWAYS ORG.

800 x 600 meters, with a concourse, a platform and a 5 storey car park. Total 85,000 cum concrete

JABAL OMAR DEVELOPMENT PROJECTNESMA & PARTNERS / JABAL OMAR DEVELOPMENT CO.

COMPLETE STRUCTURAL CONSTRUCTION of TWO HOTEL TOWERS, H8 & H9, HAVING TOTAL 82,000 sqm CLOSED AREA, IN THE PRESTIGIOUS JABAL OMAR PROJECT, NEXT TO HOLY HARAM, MAKKAH, K.S.A

JABAL OMAR DEVELOPMENT PROJECTS.A. BAYTUR/ JABAL OMAR DEVELOPMENT CO.

MOBILIZATION and PROJECT BIDDING / CONSTRUCTION CONSULTANCY SERVICES for S1 AREA TOWERS PROJECT for JABAL OMAR DEVELOPMENT CO / SAUDI ARABIAN BAYTUR CO.

PRINCESS NOURA UNIVERSITYRENAISSANCE SAUDIA / SAUDI OGER / MIN. of FINANCE

TOTAL 80,000 sqm CONSTRUCTION AREA

BUILDING 1.4.0 FAMILY and CONSUMER

SCIENCES FACULTY

COMPLETE STRUCTURAL CONSTRUCTION of FACULTY BUILDING IN THE PRESTIGIOUS PRINCESS NOURA UNIVERSITY for WOMEN PROJECT, IN RIYADH, K.S.A.

KING SAUD UNIVERSITY EXPANSION PROJECTRENAISSANCE SAUDIA / SAUDI BIN LADIN / MIN. of H. EDUCATION

TOTAL 12,500 sqm CONSTRUCTION AREA

BUILDING B68 AGRICULTURAL SCIENCES

FACULTY

COMPLETE STRUCTURAL CONSTRUCTION of FACULTY BUILDING IN THE PRESTIGIOUS KING SAUD UNIVERSITY for GIRLS PROJECT, IN RIYADH, K.S.A.

PROJECTS MANAGED by AKON PARTNERS

HUNTSTOWN POWER PLANT PROJECTIRISH ELECTRICITY / GAMA POWER/ 2001

Construction of 380 MW Combined Cycle Power Plant for Irish Electricity Co.

Full design, civil, mechanical, electrical & instrumentation fabrication & installation contract.

DENIS COAL HANDLING PROJECTTEK / GAMA / 1989

Construction of coal handling facility for Soma Thermal Power Plant in Manisa, Turkey

Contract value : USD 55 M

Contract finish : March 1989

Full civil, mechanical, electrical & instrumentation supply, fabrication & installation contract.

CAYIRHAN THERMAL POWER PLANTTEAS / GAMA-KBL CONSORTIUM / 1991

Construction of EPC Flue Gas Desulphurization System of 2x150 MW Thermal Power Plant

Full detail design, civil, mechanical, electrical & instrumentation fabrication & installation contract.

SOMA B POWER PLANT UNITS 3&4 PROJECTTEK / SKODA / GAMA / 1986

Construction 2x135 MW Soma B Thermal Power Plant, Units 3&4 in Manisa, Turkey

Contract finish : January 1986

Full civil, mechanical, electrical & instrumentation supply, fabrication & installation contract.

YAMULA DAM & HEPP PROJECTKAYSERI ELECTRICITY/ AYDINER/ 2004

Construction of Yamula Dam and auxiliary structures

Full design, civil, mechanical, electrical & instrumentation fabrication & installation and commissioning

RABIGH CEMENT PLANT PROJECTACC / OEMAG / GAMA / 2008

Construction of 6000 tpd extension for Arabian Cement Co. (ACC) in Rabigh, increasing total capacity to 20,000 tpd.

Civil & structural supply and erection, equipment erection, commissioning assistance are some scope items…

Completion : June 2008

NATPET PP PROJECTTECNIMONT / NATPET / GAMA / 2007

Construction of 400k tpy PP Plant for NATPET – YANBU PDH/PP Facilities

Contract finish : March 2007

Full civil, mechanical, electrical & instrumentation fabrication & installation contract.

PETRORABIGH LLDPE / EPPE PLANT PROJECTPETRORABIGH / TECNIMONT / GAMA / 2009

Construction of 1,000,000 tpy EPPE/ LLDPE Polymers plant for Petrorabigh

Civil & structural supply and erection, equipment erection, commissioning assistance are some scope items

Completion : Jan 2009

Turnkey construction of 19,700 tonnes/year Epoxy Resin Plant and Port facilities.

NAMA EPOXY RESIN PLANTMITSUI / GAMA / 1999

Epoxy resins plant and epichlorohydrine supply port loading and tank facilities, along with a 22 km transport pipeline is constructed as turnkey

IBN ZAHR PP-II PROJECT SABIC / PARSONS / GAMA / 2001

Mechanical construction and erection main contract for 320,000 TONS/YR capacity Polypropylene plant & 8 km. Propylene feed pipeline from Petrokemya plant…

Heavy lifts, steel structure, tie-ins, clean piping fabrication, erection & preservation, aluminum construction are some critical aspects…

HAWIYAH GAS PLANT PROJECT SAUDI ARAMCO / TECHNIP / GAMA / 2001

Civil & Mechanical supply, construction and erection main contract for Hawiyah Gas Plant, Sulfur Recovery unit.

Heavy lifts, sour service piping fabrication and installation, steel structure erection, underground RTR piping network, non-utility buildings design,supply & construction, according to Saudi Aramco standards…

PETROKEMYA POLYETHYLENE PROJECT SABIC / SABIC / SATEC / GAMA 2003

Construction and erection of 800.000 TPY Polyethylene Plant, GC-2 and RC Buildings Packages.

Turnkey civil, structural and mechanical erection, E&I installation contract

Four Reinforced concrete buildings, one main plant building, two pre-engineered buildings, 23000 m3 concrete, 3500 mT Structural Steel, 3250 mT equipment, 196.000 wdi piping, including OSBL 60” FRP pipeline and full E&I works.

SAFCO AMMONIA / UREA PROJECTSABIC / UHDE / GAMA / 2005

Civil & underground works contract for the SAFCO Fertilizer Plant expansion works. (SAFCO IV)

. 216,776 m3 excavation works, 55,000 m3 concrete works, including works at KFI Port and working plant

EASTERN PROVINCE CEMENT PLANT PROJECTEPCC / KRUPP POLYSIUS / GAMA / 2004

Construction of 3500 tpd extension for EPCC Plant in Khursaniyah

Civil & structural design, supply and erection, equipment erection

Completed by October 2004

BERRI GAS PLANT SRU PROJECTSAUDI ARAMCO / TECHNIP / GAMA 2006

Full civil, structural, equipment, piping fabrication & erection of SRU unit for Berri Gas Plant, Qatif Facilities Program.

The job is commenced in a live plant in seven different locations on site. Some major scope items consist of 69 tie-ins including hot taps, 700,000 wdi piping fabrication with different alloys, heavy lifts and 27 buildings, adding up to 35,000 m3 of concrete, 7250 mT of structural steel and 10000 mT of equipment erection

WAFA COASTAL GAS PLANT PROJECTAGIPGAS / TECNIMONT / GAMA 2004

Full civil, structural, equipment, piping fabrication & erection of Wafa Coastal Gas Plant in Mellitah, LIBYA, within 25 months…

YAMAMA SAUDI CEMENT PLANT PROJECTYSCC / KRUPP POLYSIUS / GAMA / 2005

Construction of 10000 tpd extension forYSCC Plant in RIYADH

Proud to be part of the construction for the World’s largest single line capacity cement plant..

178 m high preheater tower, 21000 mT of steel structure, 110000 m3 of concrete are major scope items… Commissioned by December 2005

PETROKEMYA EPS / SPS WAREHOUSE PROJECTSABIC / GAMA / 1999

Expansion of the Explosion Proof Warehouse (EPS) and the new construction of SPS warehouse in Petrokemya facility

Complete design, supply, erection and integration of existing Fire Water and Instrumentation networks

Completed on July 1999