UAH Course Scheduler3/8/2012 Status
Team Pegasus:John Gleason
Julie PooleSteven Boyer
John Gleason
Code•Completed Student Profile
•STU02, STU03, STU05, STU07•Connect page operations to the database•Decided to keep current information since we are still in development.
•Test data• inserted for one student account.•Have an advisor for the one official student test account.
• Upcoming Semester Page• Connect page operations to the database• Insert test data
• Current Semester Page• Connect page operations to the database• Insert test data
• Advisor• Connect page operations to the database• Insert test data
Julie Poole
• 69 approved requirements• 29 requirements completed • Current code count numbers are 13,679• Total SLOC for completion is 30,000 including SQL code.
• Connection for Advisor tab to each student in order to verify information about the student
• Working on algorithm and code set in order to satisfy the pre and post check of the proposed schedule for the semester closing out 12 more requirements when completed
Lines of Code Count
1/14
/201
2
1/17
/201
2
1/20
/201
2
1/23
/201
2
1/26
/201
2
1/29
/201
2
2/1/
2012
2/4/
2012
2/7/
2012
2/10
/201
2
2/13
/201
2
2/16
/201
2
2/19
/201
2
2/22
/201
2
2/25
/201
2
2/28
/201
2
3/2/
2012
3/5/
2012
3/8/
2012
3/11
/201
2
3/14
/201
2
3/17
/201
2
3/20
/201
2
3/23
/201
2
3/26
/201
2
3/29
/201
2
4/1/
2012
4/4/
2012
4/7/
2012
4/10
/201
2
4/13
/201
2
4/16
/201
2
4/19
/201
2
4/22
/201
2
4/25
/201
2
4/28
/201
20
2000
4000
6000
8000
10000
12000
14000
16000
Lines of Code
Week Completed
Lin
es O
f Cod
e
Requirements Coded
1/14
/201
2
1/17
/201
2
1/20
/201
2
1/23
/201
2
1/26
/201
2
1/29
/201
2
2/1/
2012
2/4/
2012
2/7/
2012
2/10
/201
2
2/13
/201
2
2/16
/201
2
2/19
/201
2
2/22
/201
2
2/25
/201
2
2/28
/201
2
3/2/
2012
3/5/
2012
3/8/
2012
3/11
/201
2
3/14
/201
2
3/17
/201
2
3/20
/201
2
3/23
/201
2
3/26
/201
2
3/29
/201
2
4/1/
2012
4/4/
2012
4/7/
2012
4/10
/201
2
4/13
/201
2
4/16
/201
2
4/19
/201
2
4/22
/201
2
4/25
/201
2
4/28
/201
2
-11
-1
9
19
29
39
49
59
69
Requirements Coded
Week Completed
Num
ber
of R
equi
rem
ents
Steven Boyer
• Working on updating the STP for the test cases• Testing Requirements as they become coded• Preparing for Beta test
• Writing up actions we want the users to be able to do during the Beta
• Writing up the “Elevator Speech”
Test Metrics
1/14
/201
2
1/17
/201
2
1/20
/201
2
1/23
/201
2
1/26
/201
2
1/29
/201
2
2/1/
2012
2/4/
2012
2/7/
2012
2/10
/201
2
2/13
/201
2
2/16
/201
2
2/19
/201
2
2/22
/201
2
2/25
/201
2
2/28
/201
2
3/2/
2012
3/5/
2012
3/8/
2012
3/11
/201
2
3/14
/201
2
3/17
/201
2
3/20
/201
2
3/23
/201
2
3/26
/201
2
3/29
/201
2
4/1/
2012
4/4/
2012
4/7/
2012
4/10
/201
2
4/13
/201
2
4/16
/201
2
4/19
/201
2
4/22
/201
2
4/25
/201
2
4/28
/201
20
2
4
6
8
10
12
14
Test Cases
Test Metrics
1/14
/201
2
1/17
/201
2
1/20
/201
2
1/23
/201
2
1/26
/201
2
1/29
/201
2
2/1/
2012
2/4/
2012
2/7/
2012
2/10
/201
2
2/13
/201
2
2/16
/201
2
2/19
/201
2
2/22
/201
2
2/25
/201
2
2/28
/201
2
3/2/
2012
3/5/
2012
3/8/
2012
3/11
/201
2
3/14
/201
2
3/17
/201
2
3/20
/201
2
3/23
/201
2
3/26
/201
2
3/29
/201
2
4/1/
2012
4/4/
2012
4/7/
2012
4/10
/201
2
4/13
/201
2
4/16
/201
2
4/19
/201
2
4/22
/201
2
4/25
/201
2
4/28
/201
2
-11
-1
9
19
29
39
49
59
69
Requirements Tested
For Next Week
Code•Student
•Work on class management pages•Instructor
•Work on profile page•Work on classes viewing page.•Complete Advisor Page
•Continue with development towards the final product
Documents •New test cases generated•STD updated with new tests
Demonstration
• http://code.google.com/p/uah-course-scheduler/source/browse/#svn%2Ftrunk%2FResources%2F2012-03-01%20-%20Demo
• http://peg.gleasonater.com
Questions?