Updated emergency planning zones in Germany

and the importance of release source term

Florian Gering

Emergency management division

Federal Office for Radiation Protection (BfS)

2

3

Nuclear Power Plants in Germany – after Fukushima

in operation

decommissioned

4

German lessons learned from the Fukushima accident

5

German lessons learned from the Fukushima accident

6

Source terms used as basis for NPP emergency planning

6

0 I II III Plant Status

PetaBecquerel I131-eq

Source Terms

(examples)

0,5 5 50

Figure 3: Plant status and associated releases

INES 5 INES 6 INES 7 INES rating

AtHLET description „could lead to

core melt,

no indication of

loss of contain.“

„could lead to

core melt,

loss of

containment“

Q1 Q2 Q3

7

Quellterm-abschätzung

Ausbreitungs-modellierung

Bei Überschreitungvon Richtwerten=> Maßnahmen

Quellterm-abschätzung

Ausbreitungs-modellierung

Bei Überschreitungvon Richtwerten=> Maßnahmen

Optimised

strategy

(including

EPZ)

Radiological

consequences

Source terms

(for planning) Scenario

list

Emergency

response plans Quellterm-abschätzung

Ausbreitungs-modellierung

Bei Überschreitungvon Richtwerten=> Maßnahmen

Quellterm-abschätzung

Ausbreitungs-modellierung

Bei Überschreitungvon Richtwerten=> Maßnahmen

1. NPP accident in Germany

Assessment of potential consequences of an emergency

8

Assessment of potential consequences

• Selection of „reference source terms“ for each

accident/release category

• Selection of representative NPP sites (Unterweser,

Grohnde, Philippsburg)

• Simulations performed with RODOS based on

numerical weather prediction data

(Nov. 2011 - Oct. 2012; releases for each day)

9

• Selection of „reference source terms“ for each

accident/release category

• Selection of representative NPP sites (Unterweser,

Grohnde, Philippsburg)

• Simulations performed with RODOS based on

numerical weather prediction data

(Nov. 2011 - Oct. 2012; releases for each day)

• More than 5000 separate simulations

• Definition of analysis procedures

(Statistical analysis based on national and generic dose

intervention limits)

RODOS Beispielgrafik

RODOS Beispielgrafik

Affected area

Maximum distance

Affected sectors

Assessment of potential consequences

10

RODOS Beispielgrafik

Maximum distance

RODOS Beispielgrafik

RODOS Beispielgrafik …

Massnahme Evakuierung (Grohnde, Quellterm FKA)

0

10

20

30

40

50

60

70

80

90

100

0 50 100 150 200 250 300 350

Tag

Maxim

ale

Dis

tan

z (

km

)

day

dis

tance (

km

)

cu

mula

tive

pro

babili

ty

distance (km)

cu

mula

tive

pro

babili

ty

distance (km)

Assessment of potential consequences

11

E.g., maximum distances in which ITB for children is required

(„FKA source term / Q1“)

Results of the assessment of potential consequences

12

Results of the RODOS simulation Maximum distance for evacuation, source term FKA / Q1

50%-

Percentile

80%-

Percentile

90%-

Percentile

North (Unterweser) 9 15 22

Central (Grohnde) 11 20 26

South (Philippsburg) 18 25 31

Adult Maximum distance (km) in which

intervention level for evacuation is

exceeded

Central (Grohnde) - FKF 0 0 0

Central (Grohnde) - FKI 0 0 0

13

Results of RODOS simulations

Now available in English on request:

fgering@bfs.de

Will be published on BfS website soon

14

Changes in emergency planning zones in Germany

Sheltering, evacuation (6h), ITB (6h)

Sheltering, evacuation (24h), ITB (12h)

Sheltering, ITB

ITB only for children and pregnant women

15

Emergency planning zones for NPPs (before 2014)

<100 km:

ITB for children and

pregnant women

<25 km:

ITB for all persons

< 45 years

<10 km:

Evacuation,

Sheltering

Emergency planning

zones:

16

<100 km:

ITB for all persons

< 45 years,

sheltering

<20 km:

Evacuation,

Sheltering

<5 km:

Evacuation (priority),

Sheltering

Emergency planning

zones:

Emergency planning zones for NPPs (since 2014)

Territory of Germany:

ITB for children and pregnant women

17

German lessons learned from the Fukushima accident

18

Quellterm-abschätzung

Ausbreitungs-modellierung

Bei Überschreitungvon Richtwerten=> Maßnahmen

„Dirty Bomb“

Quellterm-abschätzung

Ausbreitungs-modellierung

Bei Überschreitungvon Richtwerten=> Maßnahmen

Optimised

strategy

Radiological

consequences

Source terms

(for planning) Scenario

list

Emergency

response plans

Optimised

strategy

Quellterm-abschätzung

Ausbreitungs-modellierung

Bei Überschreitungvon Richtwerten=> Maßnahmen

Quellterm-abschätzung

Ausbreitungs-modellierung

Bei Überschreitungvon Richtwerten=> Maßnahmen

0. Unclear situation

1. NPP accident in Germany

2. NPP accident in

neighbouring countries

3. NPP accident within

Europe

4. NPP accident outside

Europe

5. Accident in a nuclear

facility

6. Terroristic attack

7. Transport accident

8. Radiological emergency

situations

9. Satellite crash

Development of enhanced list of planning scenarios

19

German lessons learned from the Fukushima accident

20

Thank you for your attention!

21

Supplementary

NERDA

approach:

Protective actions to be recommended to the decision makers be decided on the basis of the plant status and weather conditions:

Quellterm-abschätzung

Ausbreitungs-modellierung

Bei Überschreitungvon Richtwerten=> Maßnahmen

„Standard

approach“:

Source term

assessment

Dispersion

modelling

Intervention limits:

protective actions

?

?

Decision about protective actions

22

Class I, II Class III

Weather conditions

unknown or unstable

Wind direction stable

Dispersion calculation

available and

wind direction stable

Identifying actions (graded approach)

ITB Children

ITB + Sheltering

Evacuation

Shelter 1st, Evacuate later

For

an im

media

te t

hre

at

23

24

25

Planungsgebiete für den Notfallschutz in der

Umgebung bereits stillgelegter Kernkraftwerke

Die Planungsgebiete, die in der

Umgebung der in 2011 stillgelegten

Kernkraftwerke entsprechend BMU

2008 ausgewiesen sind, können

beibehalten werden.

Die Fernzone kann aufgehoben

werden.

Die Planung der Iodblockade für die

Umgebung der in 2011 endgültig

stillgelegten Kernkraftwerke muss

nicht mehr aufrechterhalten werden.

26

Planungsgebiete für den Notfallschutz in der

Umgebung zukünftig stillzulegender Kernkraftwerke

Für die Umgebung der künftig in Deutschland

endgültig stillgelegten Kernkraftwerke empfiehlt

die SSK, dass die Planungsgebiete

entsprechend SSK 2014-2 solange

aufrechterhalten werden, solange Brennstoff in

der Anlage verwahrt wird jedoch längstens für

die Dauer von drei Jahren ab dem

Tag der letzten Abschaltung.

Für den Fall, dass nach Ablauf von drei Jahren

noch Brennstoff in der Anlage vorhanden ist,

können die Planungsgebiete entsprechend den

o.g. Regelungen für heute bereits stillgelegte

Kernkraftwerke festgelegt werden.

Für die Umgebung aller künftig in Deutschland endgültig stillgelegten

Kernkraftwerke empfiehlt die SSK, dass die Planung der Iodblockade für die

Dauer eines Jahres entsprechend 12 Monaten ab dem Tag der letzten

Abschaltung beibehalten werden muss.

27

Nuclear Power in Germany

and Neighboring States