The Refuge’s Final CCP/EIS is AvailableBighorn sheep are just one of the many majestic native wildlife species you can find at the Refuge
The Final Comprehensive Conservation Plan and Environmental Impact Statement (CCP/EIS) for Sheldon National Wildlife Refuge is available. We, the U.S. Fish and Wildlife Service (Service), are pleased to announce that we completed our analysis of the alternatives in the CCP/EIS, and identified Alternative 2 as our preferred alternative for managing the Refuge. Thirty days after the CCP/EIS is available to the public, our Regional Director will select an alternative to implement on the Refuge in a Record of Decision.
We developed the CCP/EIS to provide reasonable, scientifically grounded guidance for managing fish and wildlife populations. Under the preferred alternative, we would manage habitats for priority sagebrush-dwelling species, stock and maintain native trout species, and control feral horse and burro populations for the long-term conservation of native fish, wildlife, plants, and their habitats.
Actions for protecting and sustaining the Refuge’s habitats, migratory bird populations, and other fish and wildlife species are
identified in the CCP/EIS. Our priority public uses—wildlife observation, photography, environmental education and interpretation, hunting, and fishing; along with commercial guiding, rock collecting, and scientific research are evaluated in the CCP/EIS as well.
Public Comments on the Draft CCP/EIS We sincerely appreciate everyone who provided comments and participated in our planning process. We reviewed your comments on the Draft CCP/EIS, and responded to them by revising our alternatives and summarizing the comments and our responses in Appendix N of the CCP/EIS. A copy of the CCP/EIS can be obtained by downloading it from our website or by contacting the Refuge. See page 4 for details.
Thank you for commenting on the Draft CCP/EIS
SheldonNational Wildlife RefugePlanning Update 5, August 2012
U.S. Fish & Wildlife Service
CCP/EIS Highlights................................2 Summary of Public Involvement........3What Happens Next?...............................3CCP/EIS is Available from the Refuge...4
Bur
eau
of R
ecla
mat
ion
Rya
n H
ager
ty/U
SF
WS
Lahontan cutthroat trout
In this issueIn this issue:: OOOOOOOOOOOOOOOOOOOOOOOOOOOOOOOOOOOOOO
Sheldon National Wildlife RefugeP.O. Box 111Lakeview, OR 97630
The Final CCP/EIS is Available from the RefugePlease contact Aaron Collin as follows, to obtain a CD-ROM copy of the Final CCP/EIS:
Aaron Collins, Planning Team LeaderSheldon National Wildlife RefugeP.O. Box 111Lakeview, OR 97630
Phone: 541/947-3315 ext. 223
Fax: 541/947-4414
E-mail: SheldonCCP@fws.gov
Mule deer
You can download the Final CCP/EIS and other planning documents online at: www.fws.gov/pacifi c/planning/main/docs/NV/docssheldon.htm
A printed copy of the Final CCP/EIS is available at each of the following libraries:
Humboldt County Library85 East Fifth StreetWinnemucca, NV 89445
Washoe County Library301 South Center StreetReno, NV 89501
Modoc County Library212 W. 3rd StAlturas, CA 96101
Lake County Library513 Center StreetLakeview, OR 97630
4
© T
uppe
r A
nsel
Bla
ke
Highlights of our Preferred Alternative How would Refuge management change?
Under Alternative 2, our preferred alternative, we would manage for a natural mosaic of Great Basin habitats and the native species that depend on them. We would use a broad range of management tools, including prescribed and natural fire, mechanical treatments, and water management.
Opportunities for wildlife-dependentrecreation on the Refuge such aswildlife observation and photography, environmental education and interpretation, hunting, and fishing, would improve, see the map insert.
The Refuge staff would also conduct the following management actions, often with partners.• Improve native habitat conditions
by removing all feral horses and burros within five years.
• Stock and maintain indigenous trout species, such as Lahontan cutthroat trout, Alvord cutthroat trout, or redband trout, in Big Spring Reservoir and Virgin Creek (instead of nonnative rainbow trout).
• Increase control of nonnative and invasive plants.
• Remove western juniper where it isencroaching upon sagebrush habitats.
• Restore springs and playas by removing abandoned water control developments where appropriate and beneficial to wildlife.
• Improve recreation opportunities by relocating and expanding the visitor contact station, upgrading campground facilities, developing an accessible interpretive trail, creating a self-guided auto tour route, and designating and improving signage of routes open to vehicle use.
• Manage 424,360 acres for wilderness character.
2
US
FW
S
What Happens Next?Now that the CCP/EIS is available, after 30 days our Regional Director will make a decision regarding which alternative to implement. The decision will be documented in a Record of Decision (ROD). We can begin implementing CCP strategies at the Refuge once the ROD is signed. Some actions may require new funding; those actions will be implemented as funding becomes available. We will publish a final approved CCP, which will include the ROD and final compatibility determinations for public uses.
Public Involvement Wrap-up Our mailing list includes 4,500 participants We initiated our planning and public involvement process in 2008 by announcing our intention to complete a CCP/EIS in the Federal Register. Simultaneously, we issued a press release and distributed Planning Update 1 announcing the planning process and a series of open house meetings, and requesting public comments.
We held five public open house meetings in 2008, and several additional meetings were held with county, state, and federal agencies, and key stakeholder groups.
Planning Update 2 was distributed in April 2009, in it we summarized the significant planning issues we identified in public comments.
In Planning Update 3, distributed in June 2010, we included our three preliminary management alternatives that we drafted based on public comments, the Refuge’s resource needs, and our management policy. We requested
public comments on the alternatives, including Alternative 2, our preferred alternative.
Additional meetings were held with Nevada’s Department of Wildlife (NDOW) and key stakeholder groups after we released Planning Update 3. We modified our preliminary alternatives based onthe comments we received from thepublic, NDOW, and our stakeholders,and presented our refined alternatives in the Draft CCP/EIS.
We announced the availability of the Draft CCP/EIS in the Federal Register in September 2011, andsimultaneously sent a news releaseto local media outlets and distributedPlanning Update 4 to more than 4,500 interested individuals, organizations, and agencies.
We included descriptions and a summary table of the alternatives, including the Service’s preferred alternative, in Planning Update 4, and requested comments. The public comments we received
on the Draft CCP/EIS have been addressed in the Final CCP/EIS.
We appreciate all the comments we received during the planning process and encourage you to stay involved in the Refuge’s activities. Successful implementation of the CCP is largely dependent upon continued public support, partnerships, funding, and volunteer efforts.
Pronghorn antelopes and other fish and wildlife species native to the Refuge will benefit from habitat improvements
3
How were comments addressed?
Public comments on the Draft CCP/EIS resulted in additions and corrections that helped clarify the intent of management direction in the Final CCP/EIS. The primary changes and additions included: • Expanding our rationale for Refuge
goals, objectives, and strategies. • Adding information regarding the
Refuge’s wilderness stewardship. • Expanding descriptions contained
in our alternatives of actions needed to maintain wildlife guzzlers.
• Updating our public involvement appendix.
• Adding an appendix summarizing public comments and our responses.
• Adding an appendix summarizing the Refuge’s integrated pest management program.
• Increase inventory, protection, and the quality of interpretation for historic and cultural resources.
!(
!(
!(
!(
"@ BogHot
Val ley
Sum mit Lak eIndian R eser vat ion
Orego nEnd
Tab le
Guan
o R
im
Grass y Can yon
Black Rock
Range
Pueb
lo M
ounta
ins
O R E G O NN E VA D A
LAKE
C
OUNT
YHA
RNE Y
CO
UNT Y
COUN
TYCO
UNTY
WASH
OEHU
MBOL
DT
Hart MountainNational Antelope
Refuge
Sheldon National Wildlife Refuge
Modo
c NF
Trout Cre e k
Badger Creek
Cotto
nwood
CreekWall
Creek
Sand
Cre
ek
Mud
Cre
ek
De ep
Creek
Honey Creek
Sage Hen
Creek
Home Creek
Thousand Creek
Whitehors e Cr e ek
Will ow Creek
Bilk Cre
e k
Mud Meadow
Creek
Rabbit
Cree k
Quinn Rive
r
Craine Creek
Plush
Adel
Vya
GooseLake
WarnerLakes
CrumpLake
MiddleAlkali Lake
LowerLake
UpperLake Alkali
LakeMassacre
Lake
AlvordLake
¬«447
¬«292
¬«31
¬«299
¬«81
¬«34A
¬«8A
¬«34
¬«205
¬«140
£¤395
LEGEND"@ Refuge Headquarters
Sheldon NWR Approved BoundaryCounty BoundaryState Line
!( City/TownIntermittent StreamPerennial Stream
Land OwnershipBureau of Indian AffairsBureau of Land ManagementState LandsUS Fish and WildlifeUS Forest ServicePrivate/Unclassified
UTM Zone 11NNAD 83
0 157.5 Mi
0 3015 Km.
Produced by USFWS Region 1Refuge Information BranchPortland, OregonMap Date: 8/8/2012File: 12-132-2.mxd
!]
!]
!]
!]
!]
[ e [ e
[ e
[ e
[ e[ e
[ e
[ e[ e[ e
[ e
[ e
!9
!9
!9
!9
!9!9
!9
!9!9
!9
!9
!9
!9
!9!9
!9
" @
"̂ Onion
Lake
Swan
Lake
Massa
cre La
ke
Calcu
ttaLa
ke
Conti
nenta
lLak
e
Thousa
nd C
r ee k
Bad g er C ree k
Black Rock
Range
UV140
UV140
UV34
UV34A
UV8A
OREG
ONNE
VADA
LAKE
C
OUNT
YHA
RNEY
C
OUNT
Y
HUMBOLDT COUNTY
WASHOE COUNTY
Piute Creek
WASH
OE C
OUNT
YHU
MBOL
DT C
OUNT
Y
Virgin Creek
Repla
ce no
n-nati
ve tro
ut wit
h ind
igeno
us tro
ut
Appro
ximate
locat
ion of
prop
osed
visito
r con
tact s
tation
(VSC
)
Reloc
ate he
adqu
arters
to ne
w VSC
Little
Catni
pSp
ring
West
Rock
Sprin
g
Gooc
hSp
ring
Fish
Sprin
gNo
rth He
llCr
eek
Badg
er
Whee
lerSp
ring
Batem
anSp
ring
Deva
ney
East
Rock
Sprin
g
Catni
pRe
servo
irBig
Sprin
gRe
servo
ir
Virgin
Valle
y
Kinney
Camp
Virgin
Valley
Ranch
Gooch
Camp
IXL Ranch
Last C
hance
Ranch
Little
Sheld
on
Andy'
sPla
ce
Badge
rCa
binAlk
aliRa
nch
Pruett
Home
stead
Thous
and Cr
eekRa
nch &
Bunkh
ouse
CCC G
ate Ho
use
LEGE
ND Appro
ved Re
fuge B
ound
ary
" @Re
fuge H
eadqu
arters
"̂Pro
posed
Visit
or Co
ntact
Statio
n
!9Ca
mpgro
unds
!9Alt
ernati
ve 2
Camp
groun
d Imp
rovem
ents
[ eHis
toric S
tructu
res
!]Kio
skEx
isting
Publi
c Veh
icle Ro
utes
Altern
ative
2 Prop
osed
Open
Publi
c Veh
icle Ro
utes
Exist
ing Ro
utes t
o be
Reha
bilita
ted or
Reloc
ated
Altern
ative
2 Prop
osed
Route
s to
be Re
habil
itated
or Re
locate
dHu
nting
Not A
llowe
d
04
2Mi
08
4Km.
Produc
ed by
USFW
S Reg
ion 1
Refug
e Infor
mation
Branc
hPo
rtland,
Oreg
onMa
p Date
: 8/8/2
012File
: 12-13
2-1.m
xd
In this issue: OOOOOOOOOOOOOOOOOOO
Sheldon National Wildlife RefugeP.O. Box 111Lakeview, OR 97630
The Final CCP/EIS is Available from the RefugePlease contact Aaron Collin as follows, to obtain a CD-ROM copy of the Final CCP/EIS:
Aaron Collins, Planning Team LeaderSheldon National Wildlife RefugeP.O. Box 111Lakeview, OR 97630
Phone: 541/947-3315 ext. 223
Fax: 541/947-4414
E-mail: SheldonCCP@fws.gov
Mule deer
You can download the Final CCP/EIS and other planning documents online at: www.fws.gov/pacifi c/planning/main/docs/NV/docssheldon.htm
A printed copy of the Final CCP/EIS is available at each of the following libraries:
Humboldt County Library85 East Fifth StreetWinnemucca, NV 89445
Washoe County Library301 South Center StreetReno, NV 89501
Modoc County Library212 W. 3rd StAlturas, CA 96101
Lake County Library513 Center StreetLakeview, OR 97630
4
© T
uppe
r A
nsel
Bla
ke