USSOUTHCOM HUMANITARIAN ASSISTANCE PROGRAM Facilitating “Security Cooperation”

Post on 29-Dec-2015

222 views 2 download

Tags:

transcript

USSOUTHCOMUSSOUTHCOMHUMANITARIAN ASSISTANCE PROGRAMHUMANITARIAN ASSISTANCE PROGRAM

Facilitating “Security Cooperation”Facilitating “Security Cooperation”

• Disaster Preparedness

– Capacity Building– Infrastructure Improvement

• National and Regional Focused Support• Bottom-line: make an impact as CINC’s key engagement program

USSOUTHCOMHumanitarian Assistance Program (HAP)

OBJECTIVES

USSOUTHCOMHumanitarian Assistance Program (HAP)

OBJECTIVES

• Strategy =– Vision (CINC vision)– Goals (achievable, supports vision)– Objectives (attainable, measurable, supports goals)– Desired Outcome (Enhances security cooperation through effective humanitarian assistance

programs)• Bottom-line: Facilitate Security Cooperation throughout the Area of Responsibility.

USSOUTHCOMHumanitarian Assistance Program (HAP)

Strategy

USSOUTHCOMHumanitarian Assistance Program (HAP)

Strategy

Types of Projects and ActivitiesTypes of Projects and Activities

• Excess Property (EP):• Disaster Relief Supplies/Equip• Medical Supplies/Equip• School Supplies/Equip

• Humanitarian Assistance Other:• Engineer Technical Support• Disaster Management Training• EOC Management/Training• Disaster Relief Warehouse Management

• Disaster preparedness Assessments

• Medical:• Disease/Vector Control• Bio-Med Equip Repair and Training• Disease Surveillance System• Medical First Responder Training• Post Disaster Stress Management Training

Building a Quality Disaster PreparednessHA Program

“It begins and ends with the USMILGP”

Building a Quality Disaster PreparednessHA Program

“It begins and ends with the USMILGP”

“Building Self-sufficiency!”

Humanitarian Assistance Program (HAP) Process

Humanitarian Assistance Program (HAP) Process

US COUNTRYTEAM

HAPPLAN

USSOUTHCOMHAP

HAPPLAN

OSD/DSCAHAP

HAPPLAN $ EXECUTE

HAP LEGAL AUTHORITY: US TITLE X, SEC 2557 & 2561“TO BENEFIT THE CIVILIAN POPULATION”

(OHDACA $ = 2 Year Funding)

HNINPUT

RegionalMechamismSupport

Disaster PrepAssessment

NationalEOC SOPs

EOC Training/Simulation

LocalEOCSOPs

NationalDPWarehouse

WarehouseMgtTraining

Logistics/TransportProtocols

SARProtocols/Training

MFR Protocols/Training

Water/Sanitation Training

CommProtocols

• Civil-Military Workshops

ALL COUNTRIES: Disaster Preparedness Status Chart

ALL COUNTRIES: Disaster Preparedness Status Chart

Green = FY01:Working C:Complete

Yellow = FY03:Projected Blue=FY02: Projected Orange = FY04:Projected R=Red: Required

Regional Mechamism Support

Disaster Prep Asses

National EOC SOPs

EOC Training/ Simulation

Local EOC SOPs

National DP Whse

Whse Mgt Train

Logistics/ Transport Protocols

SAR Protocols/Training

MFR Protocols/Training

Water/ Sanitation Training

Comm Protocols

CARIBBEANAnguilla C C C FY01 R C R R R FY04Antigua/Barbuda C C C FY01 C C C R FY 02 R R FY04Bahamas C C C FY01 R C R FY01 R FY04Barbados C C C FY01 C C C R FY01/FY02 R R FY04Dominica C C C FY01 FY01 C FY 02 FY 02 R FY04Grenada C C C FY01 FY01 FY03 C R FY 02 R FY04Guyana C C C FY01 C C C FY 02 FY 02 R FY04Jamaica C C C FY01 FY01 C C R FY 02 FY 02 R FY04Montserrat C C C FY01 R C R R R FY04St Kitts & Nevis C C C FY01 FY01 C R FY 02 R FY04Saint Lucia C C C FY01 FY01 FY03 C R FY 02 R FY04St Vincent/Grenadines C C C FY01 FY01 FY03 C R FY03 R FY04Suriname C C C FY01 R C R FY 02 R FY04Trinidad & Tobago C C C FY01 FY01 C C R FY01 R R FY04Turks & Caicos C C C FY01 C C C R R R FY04Dominican Republic C C FY01 R FY03 R FY03 FY 02 FY03 R FY04CENTRAL AMERICA

Belize C C C FY01 C C FY01 R R R FY04Costa Rica C C C FY01 R C C FY 02 FY 02 FY 02 FY01 FY04El Salvador C C C FY01 R C C R FY 02 FY 02 FY01 FY04Guatemala C C C FY01 R C C C FY01 FY 02 FY01 FY04Honduras C C C FY01 FY 02 C C C FY01/FY02 FY01 FY01 FY04Nicaragua C C C FY01 R FY 02 C R FY 02 FY 02 FY01 FY04Panama C C C FY01 FY 02 FY 02 C FY 02 FY01/FY02 FY 02 FY01/FY02 FY04

ANDEAN RIDGEBolivia FY01 R FY03 FY03 FY03 FY 02 FY 02 R R R R RColombia FY01 FY02 R R R FY 02 FY 02 R FY01 FY01 R REcuador FY01 FY02 FY03 FY03 FY03 FY 02 FY 02 R FY04 FY01 FY03 RPeru FY01 FY03 FY03 R FY03 FY 02 FY 02 R FY 02 FY 02 R RVenezuela FY01 FY03 R FY03 R R R R FY01 FY01 R R

SOUTHERN CONEArgentina R R R FY 02 Brazil

Chile R FY03 R FY 02 Paraguay C FY03 R FY03 FY03 R R FY04 FY03 FY 02 RUruguay R R R R R R R R R R

*EOC training simulation done in FA HUM 02 Honduras

USG HA-DP Programs Interaction

Countries ResponseCapacity Building

Requirements/ Needs

CapacityBuilding

Testing/Validation

An Investment in Preparedness“Applying Lessons Learned”

An Investment in Preparedness“Applying Lessons Learned”

Humanitarian & Civic Aid(HCA) Program

Disaster Preparedness(DP) Seminars

Subject Matter ExpertExchanges (SMEEs)

OFDA, PAHO, DLA,CDERA, FEMA, NGOs,CEPREDENAC, Civil Defense

DisasterPreparedness

HAP

SYNERGY

CINC ENGAGEMENT TOOLS Theater Engagement

Disaster Relief Warehouses(Building Self Sufficiency)

Disaster Relief Warehouses(Building Self Sufficiency)

JAMAICAANTIGUA

BARBADOS

TRINIDAD

?

CDERA

CEPREDENAC

REGIONAL

NATIONAL

REMARKS:• CDERA Warehouses Stocked• Training Conducted (Phase I and II)• CDERA/Caribbean Better Prepared

2 2 2 2 2 2 2 2 2 1 2 1 2 2 3 2 2 2

3 2 3 3 2 2 2 1 2 2 3 2 3 2 2 2 1 2

2 2 2 2 2 2 2 2 2 2 2 2 3 2 3 2 2 2

3 2 3 2 2 2 2 2 3 2 2 2 3 3 3 3 2 2

1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1

1 2 2 2 2 2 2 1 2 2 1 1 2 2 2 2 2 2

2 1 2 1 1 1 1 1 3 2 1 1 2 2 3 1 1 2

2 3 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2

2 1 2 1 2 2 2 2 2 2 2 1 2 2 2 2 2 2

1 1 2 2 1 1 22

2 1 2 1 2 2 2 2 2 2 2

Air transportation

Sea transportation

Motor transportation

Port facilities

Carrier Agreements

Engineer Equipment

Helicopters

Flatbeds/ Containers

Storage Facilities

Bar

bad

os

Dom

inic

aS

t Luc

ia

St V

ince

ntT

rin

idad

Tob

ago

Guy

ana

Gre

nada

An

tig

ua

Mon

tser

rat (

B)

St K

itts

& N

evis

Ang

uilla

(B

)B

ritis

h V

irgin

Isan

dsJa

mai

caB

eliz

e

Bah

amas

Tur

ks &

Cai

cos

Isla

nds

TO

TA

L

(Ave

rag

e)

Warehouse Equipment

Disaster Preparedness Transportation Assessment

3 - Fully Prepared

2 - Partially Prepared

1 - Not Prepared

Legend

2 2 2 2 2 2 2 2 2 2 1 2 2 2 2 2 2 2TOTAL (Average)

REMARKS:

Disaster Relief Warehouse System - Warehouses construction / renovation planned for FY02(Bolivia, Colombia, Ecuador) - Excess Property Supplies, and Equipment planned for FY 02

- FY 01 Andean Ridge Regional Mechanism Assessment and planned development for Execution in FY 02

Bolivia

PeruBrazil

Chile

Colombia

Ecuador

Andean Ridge and Southern ConeAndean Ridge and Southern Cone

HAP

CEDRA

OFDA

FAVA/CA

ADEAN RIDGE

PAHO

CREPENAC

FY02 HAP Engineer Projects

El Salvador• Well Tech Assessment

• $20K (MILGP)• Waiting on funding.

Guatemala• Well Tech Assessment

• $20K (MILGP)• Waiting on funding.

Honduras• Bridge Tech Assessment

• $75K (COE)• Waiting on funding for COE.

• Well Tech Assessment• $20K (MILGP)• Waiting on funding.

Panama• Warehouse Renovation

• $100K (MILGP)• SCEN assessment delayed.

• EOC Renovation• $200K (MILGP- $200K)• SCEN assessment working.

• Water-Sewage Assessment• $50K (MILGP- $25K/COE - $25K)• SCEN assessment 21-22 Feb.

Nicaragua• Warehouse Renovation

• $100K (MILGP- $85K/COE - $15K)• SCEN scheduling assessment (May).

• Facilities Assessment• $25K (COE - $25K)• SCEN scheduling assessment.

Central America

South America

Caribbean

Delayed Delayed

Delayed

Delayed

Delayed

Delayed

Delayed

FY02 HAP Engineer Projects

Bolivia• Warehouse Construction

• $300K (MILGP- $254K/COE - $46K)• Awaiting site survey.

Colombia• Warehouse Renovation

• $200K (MILGP- $169K/COE - $31K)• Awaiting funds.

Peru •Well assessment/repair.

• $20K (MILGP)• Assessment by COE and SCEN pending.

Ecuador• Warehouse Renovation.

• $250K (MILGP- $212K/COE - $38K)• Awaiting site survey.

• Well assessment/repair.• $20K (MILGP)• Assessment coordinated by MilGp.

Belize• Warehouse Renovation.

• $250K (MILGP- $212K/COE - $38K)• Working bid packet with COE.

• Hospital Renovation.• $300K (MILGP- $254K/COE - $46K)• Awaiting funds.

Jamaica•Well assessment/repair.

• $20K (MILGP)• Assessment by COE and SCEN pending.

Central America

South America

Caribbean

Delayed

Delayed

Delayed

Delayed

U. S. Southern CommandEl Salvador Earthquake Relief -- $1.168M

OHDACA

13 Projects• 8 Schools• 5 Medical Clinics

Projects include: - Disaster Preparedness/Mitigation - EOC Management / Training - Disaster Relief Supplies

FY02 HA Program Main Effort: - Disaster Relief and Regional Mechanisms- Conf & Exercises validate projects - Supplies/Equipment donations (Establish Disaster Relief Warehouses) FY02 HA Program (The Way Ahead):

- 164 projects approved, 31 countries supported - Coordinate a Regional Response Agency in Andean Ridge - Focus is leveraging Disaster Management Tools using HAP projects

FY02 HAP Continued: Disaster Relief Assessments to Develop Plans/SOPs for Search & Rescue, Medical First Responders Capability and Emergency Operation Center SOPs and training

Humanitarian Assistance Program

Humanitarian Assistance Program

POC List

Humanitarian Assistance Program

POC List

• Mr. Harry Turner, SOUTHCOM HAP Manager, (305) 437-1420, DSN: 567-1420, FAX: 1440/1443, turnerh@hq.southcom.mil

• MSgt Dave Gallardo, SOUTHCOM HAP NCOIC, x-1741, gallardd@hq.southcom.mil

• TSgt Yvette Berrios, SOUTHCOM HAP Support Br, x-1405, berriosy@hq.southcom.mil• Send unclass email with attachments to schapmanager@aol.com or hapncoic@aol.com or IBHAP33@aol.com