UTILITIES UNDERGROUNDING PROGRAM - San Diego · Market St. 25th St. 28th St. 30th St. 32nd St....

Post on 16-Sep-2020

0 views 0 download

transcript

UTILITIES  UNDERGROUNDING  PROGRAM

1PAGEContact 

Information

Information Line: (619) 533-3841Email: undergrounding@sandiego.govWebsite: www.sandiego.gov/undergrounding

24

44

24

15

24

30

24

45

24

22

24

40

3 3 1

3 3 3

24

52

2 5 2 7

2 4

1 3 724

17

24

24

5 0

2 1 2 1

24

68

24

60

2 2 2 6

3

24

31

25

36

0

00

2 2 4

26

80

26

14

2 5 8 6

2 3 4

26

37

1 3 7

0

26

23

26

27

4 3 2

26

87

3 2 0

25

69

25

75

26

43

26

39

26

19

24

21

3 2 7

24

67

24

70

25

02

25

11

2 5 2 5

24

78

4 1 6

24

46

2 2 9

25

01

24

80

25

23

24

44

24

16

2 2 6

0

20

2

24

22

2 0

26

65

2 0 5

25

82

26

37

25

71

2 1 0

26

19

1 3 7

11 8

26

67

4

2 2 9

26

65

26

46

26

27

25

52

0

5 4 0

26

61

25

92

2 4 8

4 2 7

26

44

25

65

25

68

26

74

26

51

26

42

2 3 3

24

65

24

51

0

25

10

24

61

24

38

24

62

1 6

24

82

25

15

24

58

1 2 3

26

38

25

67

26

89

1 2 0

26

40

25

52

1 4 3

0

3 5

0

26

24

0

26

27

25

67

26

73

26

94

26

16

44

6

26

30

26

03

24

91

24

25

24

62

24

48

2 5 1 2

30

6

25

10

24

60

8

22

33

1 3 224

43

24

23

24

42

24

49 2

50

5

1 2 7

25

51

2 0 9

2 1 1

2 3 0

26

79

26

68

25

58

25

75

0

2 2 2

2 0 6

26

80

2 4 0

2 6 8 2

26

86

26

81

26

34

4 3 7

25

63

5 1 9

26

48

26

55

25

43

2 4 5

25

32

2 3 7

0

24

11

25

35

0

25

25

2 5 2 9

24

19

3 2 5

4 3 0

24

60

4 1 3

24

67

24

38

22

57

24

54

0

24

61

24

34

24

37

37

24

34

-24

38

7

24

32

2 2 2 2

26

53

25

46

9

2 2 1

26

67

119

0

26

12

26

02

19

0

25

48

5 2 8

34

6

2 6 1 1

26

30

26

67

26

29

25

67

25

60

25

61

25

75

26

68

26

02

26

07

26

19

24

61

2 4 8 7

2 3 824

35

24

75

24

50

24

18

2 5 0 2

2 1 2

24

66

24

28

24

55

2 2 0

24

46

2 1 5

11 4

26

17

25

54

26

42

25

96

26

56

26

38

26

94

26

64

26

75

25

41

26

76

26

25

1 2 7

0

3 3 4

26

39

2 3 6 26

75

26

05

26

60

26

88

25

53

26

06

25

51

26

76

24

85

24

86

2 5 3 1

24

46

24

63

24

74

32

8

24

49

0

1 2 8

2 9

24

17

24

66

20

5

1 4 6

25

35

3 2

24

22

25

09

26

41

20

25

45

26

16

25

80

26

30

2 1 6

1 2 8 2 6 8 1

0

26

52

25

57

2 4 4

26

95

25

36

5 1 8

0

0

33

0

26

35

26

43

2 6 0 2

26

59

24

28

3 1 5

3 1 9

24

29

4 2 5

24

09

24

12

35

5

24

18

24

12

25

28

24

11

24

11

24

29

1 2 9

3 3

22

60

24

27

24

30

24

01

24

45

26

942

62

8

25

74

26

21

0

25

77

2 2 5

26

74

26

79

26

52

25

53

26

56

26

47

5 3 4

0

2 4 0

5 4 8

2 4 4

2 3 3

0

0

2 5 7 9

0

2 5 8 5

2 5 2 8

0

2 4 9 0

24

80

2 4 9 4

24

70

24

52

-24

56

26

69

-26

71 2 6 6 3 -2 6 8 3

24

63

-24

71

24

73

-24

75

25

20

24

83

-24

85

24

75

-24

77

22

37

-22

49

24

50

-24

52

11 2 , 1 2 1

26

57

-26

59

24

19

-24

19

24

51

-24

53

24

75

-24

77

22

50

-25

52

26

45

-26

55

26

68

-26

70

26

22

-26

26

26

03

26

11

3 2 1

4 1 9 -4 2 1

24

38

-24

44

25

26

-25

32

2 1 7 -2 2 3

2 2 0 5

5 7

26

22

-26

32

1 2 4 -1 2 6

26

14

-26

18

24

86

-24

88

3 2 0 -3 2 4

1 2 0 1

2 5 3 7

40

-44

24

67

-24

69

24

72

25

81

-25

89

25

63

-25

65

26

63

-26

63

33

0-3

32

2 4 2 9 -2 4 2 9

2 5 0 5 -3 4 9

25

30

22

71

-22

73

26

09

-26

21

25

57

-25

59

25

76

-25

78

25

60

-25

62

26

82

-26

84

26

49

-26

53

24

73

-24

81

24

58

-24

62

24

35

-24

37

26

89

-26

91

26

36

-26

38

25

42

26

96

51

4

26

25

-26

31

24

94

-24

96

4 4 5 , 2 5 0 5

30

24

83

26

52

-26

85

25

64

-25

72

2 5 8 0

25

44

-25

48

25

34

24

12

-24

16

2 2 9 -2 3 1

22

48

-22

50

25

47

-25

51

11 6 -1 2 0

2 6 6 5 -2 6 7 5

6 3 0 -6 3 2

22

9-2

45

24

61

-24

63

2 5 1 6 -2 5 2 2

26

61

-26

63

26

92

-2

69

4

26

74

-26

76

24

39

-24

41

24

35

-24

37

24

80

-24

82

26

01

, 2

7

25

62

-25

66

26

19

-26

21

4 3 7 -4 3 9

2 0 9 -2 1 1

26

31

-26

35

5 0 9 -5 1 1

25

51

-25

55

24

55

-24

57

6 4 4 -6 4 6

24

74

-24

76

24

79

-24

81

25

26

-25

34

2 4 8 4 -2 4 8 6

26

95

, 3

4

26

03

-26

05

24

33

-24

35

24

53

-24

55

22

79

-22

97

25

68

-25

70

26

61

-26

63

26

83

-2

68

5

26

51

-26

57

20TH

STR

EET

21ST

STR

EET

22N

D S

TREE

T

24TH

STR

EET

25TH

STR

EET

27TH

STR

EET

29TH

STR

EET

24TH

STR

EET

25TH

STR

EET

27TH

STR

EET

26TH

STR

EET

26TH

STR

EET

LAN

GLE

Y ST

REET

28TH

STR

EET

HO

ITT

STRE

ET

EVA

N S

TREE

T

HEN

SLEY

STR

EET

26TH

STR

EET

S 21

ST S

TREE

T

S 22

ND

STR

EET

ISLAND AVENUE ISLAND AVENUE

MARKET STREET

G STREET

MARKET STREET

K STREET K STREET K STREET K STREET

L STREET

J STREET

IMPERIAL AVENUE IMPERIAL AVENUE

27TH

STR

EET

28TH

STR

EET

FRANKLIN AVE

OCEAN VIEW BLVD

HARRISON AVE

IRVING AVENUE DEWEY

ST

PUEBLO STREET

COMMERCIAL STREETCOMMERCIAL STREET

GRANT WAY

K STREET

L STREET

J STREET J STREET

L STREET

27TH

STR

EET

ALLEY

CURRENT CONSTRUCTION  AREA MAP:   SHERMAN  HEIGHTS

UTILITIES   UNDERGROUNDING   PROGRAM    DESCRIPTIONThe City of San Diego has been undergrounding utility lines since1970. Approximately 1,200 miles of overhead utility lines remain to be undergrounded. The City, in cooperation with SDG&E, Cox Communications, Time Warner and AT&T, is currently under-grounding the utility lines in your community.

PROJECT    BLOCK   8F    HIGHLIGHTS• 2.4 miles of utilities will be undergrounded• 489 private residences will have their utilities undergrounded• 40 street lights will be installed• 62 shade trees will be installed• 139 curb ramps will be installed• Streets will be resurfaced or slurry sealed curb-to-curb

Sherman    Heights -   Project   Block   8FNovember 2012

WELCOME   TO   THE   UTILITIES    UNDERGROUNDING    PROGRAM    E-NEWS   #29This is the twenty-ninth e-news update to inform you of the progress of the Utilities Undergrounding Program in the Sherman Heights/8FProject Block area. Approximately once a month during construction, or when significant events occur, you will receive an e-mail update.

La Jolla Scenic Drive

Gilm

an Drive

5

52La Jolla Parkway

Governor Drive

Regents Road

Was

hington Street

Market St.

25th

St.

28th

St.

30th

St.

32nd

St.

Imperial Ave.

Commercial St.

Broadway

F St.

Ocean View Blvd.

National Ave

43rd St.

54th

St.

Adams Avenue

El Cajon Blvd.

Morena Blvd.

Fairm

ont Ave

nue

Monroe Avenue

Montezuma Rd.

Lake Shore Drive

Murray Park Drive

Madra Aven u e

Del Cerro Boulevard

College Avenue

Imperial Avenue

Imperial Avenue

Logan Avenue

Roswell Street

Federal Blvd.

Aldine Avenue

Montazuma Road

Montazuma Road

Cam

ino

Del

Rio

Genesee Ave.

Clairemont Dr.

Moraga Ave.

Jutland Dr.

Paradise Valley Rd.

Alsacia St.

Skyline Dr.

Alta View D

r.

S. Worthington Sw

eet water Rd.

M

anza

na W

ay

Luna Avenue Cla

irem

ont M

esa

Blv

d.

Market Street

47th

Stre

et

Eucl

id A

venu

e

Market Street

Orange Avenue

Eucl

idAv

enue

52nd

St.

Collw

ood

Bou

levard

Orange Line Trolley

Paradise Valley Rd.Broo

khave

n Rd.

Rose

cran

s St.

Chatsworth Blvd.

Cata

lina

Blvd

.

Nimitz Blvd.

Talbot St.

Hill St.

Point Loma Ave.

N. Harbor Dr.

SAN DIEGOBAY

CURRENTCONSTRUCTION

Area

CURRENTCONSTRUCTIONArea

CURRENTCONSTRUCTIONArea

Rosecrans St.

Canon Street

94

52

54

94

5

5

5 8 8

8

15

15

Taylo

r Stre

et

Rosc

rans

St.

Juan Street

Pacific Highway

Pacific Hwy. Hotel Circle North

Mor

ena

Blv

d.

Sunset Boulevard Ft. Stockton Drive

Goldfinch Street

Washington StreetUniversity Avenue

CURRENTCONSTRUCTIONArea

ProjectArea

ProjectArea

ProjectArea

Lake

Mur

ray B

oulev

ar

d

70th

Stre

et

LAKE MURRAY

805

25th

Str

eet

28th

Str

eet

30th

Str

eet

32nd

Str

eet

Broadway

F Street

Ocean View Boulevard

Ocean View Blvd.

National Avenue

National Avenue

94

5

5

Market Street

Imperial AvenueCommercial Street

G Street

Genesee Ave.

Clai

rem

ont D

rive

Cla

irem

ont M

esa

Blv

d.

Luna Avenue

52

5

Jutla

nd Driv e

CURRENTCONSTRUCTIONAreaS

Island Avenue

K Street

20th

Str

eet

24th

Str

eet

ProjectArea

CURRENTCONSTRUCTIONArea

ProjectArea

Clair e mon

t

Mesa Bo ulev

ard

Morena Bou

levar

d

94

5

5

VICINITY   MAP:   SHERMAN   HEIGHTS

PROJECT    BLOCK   8F CONSTRUCTION    ACTIVITY PHASES• Construction start: October 2009• Panel and trench work: Oct. 2009 - May 2012• Cabling, cut-overs and streetlights: March 2012 - March. 2013• Overhead line removal: Winter - Spring 2013• Street resurfacing: 2014

PROJECT    BLOCK   8F CONSTRUCTION  ACTIVITIES• Cabling work is taking place throughout the project block.

CURRENTCONSTRUCTION

area

JOB  AREABORDERS

JOB 1  JOB  2 

JOB  3 

LegendSidewalk repairs, cabling, cut-over and overhead line removal activities throughout project block

Current Construction AreaNORTHNo Scale

2PAGEContact 

Information

Information Line: (619) 533-3841Email: undergrounding@sandiego.govWebsite: www.sandiego.gov/undergrounding

Utilities   Undergrounding   Program:   E-News   #29Sherman   Heights - Project Block 8F November 2012

CUSTOMER NOTICES

Permission to Enter Forms: Before construction began on this project, property owners were sent a Permission to Enter (PTE) form. By signing this form, you enroll your property in the Utilities Undergrounding Program and grant crews access to the exterior of your property to complete the undergrounding work at no up-front cost. Property owners within this Project Block who have not signed a PTE form or failed to return it by the required deadline date, will be responsible for all costs and permits needed for con-verting their property to receive underground utility service.

Currently, there are 10 property owners in Job 3 of Project Block 8F/Sherman Heights who need to submit their PTE form.

Correction Notices: If you need to make a correction to your prop-erty in order to pass final inspection, you will receive a door hanger or letter from a City of San Diego inspector. The door hanger and letter have a description of the correction needed. Please do not delay in contacting the inspector whose name and phone number appear on these notices, so that the problem can be resolved.

Most of these corrections are minor and are the responsibility of the property owner. Corrections need to be completed before we can cut customers over to the new underground system. Final Non-Compliance Notices were sent to customers who need to make corrections in August 2012. Property owners have until January 1, 2013 before the City will authorize the Utility Companies to discontinue services if the corrections are incomplete.

Currently, there are 37 residences in Job 1, 38 residences in Job 2, and 20 residencies in Job 3 that need to make corrections to their services or properties.

CUSTOMER RESOURCESProject Satisfaction: In the event that you are not satisfied or pleased with the work that was done on your property or your street, please let us know. Please do not attempt to make corrections, adjustments or improvements yourself. We will not be able to switch your services to the new underground system if any modifications were done to our work.

Safety: All project crew members should be wearing properidentification while on the job site. If you see anyone suspicious on your property, please call the Information Line at (619) 533-3841 or the San Diego Police Department.

Program Info: Visit www.sandiego.gov/undergrounding to access more information on the program, including a video and brochure.

We thank you in advance for your patience and support while we complete the Utilities Undergrounding Program project in your community.

PANEL  AND  TRENCHING   ACTIVITIES

Panel work is when electricians prepare the electrical panel at your home to receive underground service. Trenching activities involves digging a mainline trench in the street and a lateral customer service trench that connects the mainline trench to your utility box. Conduit lines, which house the underground utility cabling, are then installed and buried in the trenches.

Panel work is 99% complete in Project Block 8F.

Trench work is 100% complete.

CABLING,  CUT-OVER  AND   OVERHEAD   LINE   REMOVAL  Cabling involves technicians placing new utility lines in the new conduits, so that the new lines can be “energized” and brought into service. Once the new system has been energized, the process to “cut-over” customers from overhead to underground services will begin. Once customers have been cut-over, the overhead lines will be removed. This process is not nearly as disruptive as the trenching work, which is why you may not even see us working. A door hanger will be left prior to the contractor visiting your property. Here is the current status of these activities:

Cox Communications is 10% complete with cabling in Job 1, Job 2, and Job 3.

SDG&E is 100% complete with cabling in Job 1, Job 2, and Job 3. They are 59% complete with cut-overs in Job 1, 68% complete in Job 2, and 38% complete in Job 3.

AT&T is 100% complete with cabling and 70% complete with cut-overs in Job 1.

Crew members install communication cabling to the customer’s utility panel.