Vasilikos Power Station - A Seveso Establishement

Post on 14-Apr-2018

217 views 0 download

transcript

7/30/2019 Vasilikos Power Station - A Seveso Establishement

http://slidepdf.com/reader/full/vasilikos-power-station-a-seveso-establishement 1/43

 

ECONOMOU EFTHYVOULOS

Safety Officer 

Electricity Authority of Cyprus SEPTEMBER 2012

VASILIKOS POWER STATION

A SEVESO ESTABLISHMENT

7/30/2019 Vasilikos Power Station - A Seveso Establishement

http://slidepdf.com/reader/full/vasilikos-power-station-a-seveso-establishement 2/43

Contents • Cyprus Power Generation System• Vasilikos Power Station

• Vasilikos Power Station as a Seveso

Establishment• Vasilikos Power Station: The explosion

incident

• Restoration Project• The Power Station Today

• Suggestions for measures

7/30/2019 Vasilikos Power Station - A Seveso Establishement

http://slidepdf.com/reader/full/vasilikos-power-station-a-seveso-establishement 3/43

Cyprus Power Generation

System(data from year 2010)

• Electricity production is the responsibility of the

Electricity Authority of Cyprus (EAC), which is

an independent semi-government corporation.• EAC operates three power stations:

1. Moni Power Station : 330 MW2. Dhekelia Power Station : 462 MW

3. Vasilikos Power Station : 648 MW

7/30/2019 Vasilikos Power Station - A Seveso Establishement

http://slidepdf.com/reader/full/vasilikos-power-station-a-seveso-establishement 4/43

• Total installed capacity before the

explosion was 1440 MW within Cyprus.

•  Annual Generation: 5205GWh

• Peak Demand: 1148MW

• Power generation system is small and

isolated with no interconnections.

7/30/2019 Vasilikos Power Station - A Seveso Establishement

http://slidepdf.com/reader/full/vasilikos-power-station-a-seveso-establishement 5/43

 EAC Power Stations

7/30/2019 Vasilikos Power Station - A Seveso Establishement

http://slidepdf.com/reader/full/vasilikos-power-station-a-seveso-establishement 6/43

Vasilikos Power Station Before

the Explosion

• Capacity: 788MW (approximately 60% of the country’senergy)

• Units operating to generate the above capacity:

• UNIT 1, 2 & 3 3x130MW = 390 MW

• UNIT 4 1x220MW = 220 MW

• Gas turbine Unit 5* 2x70MW = 140 MW

• Gas turbine Black Start 1x38MW = 38 MW

--------------788 MW

========• * Unit 5 under test period. Excluded from installed capacity

7/30/2019 Vasilikos Power Station - A Seveso Establishement

http://slidepdf.com/reader/full/vasilikos-power-station-a-seveso-establishement 7/43

• Vasilikos Power station employs 152 membersof staff covering operational, administrational

and maintenance aspects.

• In view of the frequent extended dry seasons in

Cyprus, EAC was granted permission for theconstruction of a SW-RO Desalination Plant60000 m3/day at Vasilikos Power Station takingadvantage of the co-location synergies betweenthe Power Station and the Desalination Plant.

• The Plant was planned to be completed inFebruary 2013.

7/30/2019 Vasilikos Power Station - A Seveso Establishement

http://slidepdf.com/reader/full/vasilikos-power-station-a-seveso-establishement 8/43

Vasilikos Power Station

as a Seveso Establishment

The E.U. SEVESO II Directive

• Requires for establishments handling dangerous

substances, to take all measures necessary to preventmajor accidents and to limit their consequences for the

people and the environment.

• Vasilikos Power Station has to implement the Seveso II

Regulations due to the storage of 69000 tones of dieseloil and 1.9 tones of Hydrazine [35% concentration]

(upper Tier)

7/30/2019 Vasilikos Power Station - A Seveso Establishement

http://slidepdf.com/reader/full/vasilikos-power-station-a-seveso-establishement 9/43

• Vasilikos Power Station Established:

I. Major Accident Prevention Policy

II. Safety Management System

III. Internal Emergency Plan

IV. Methods to Inform the public (if necessary)V. A Safety report including information on:

i. Environment of the establishment

ii. Description of the installation including a listing of hazard

on substances

iii. Risk analysis and Prevention methods

iv. Control and limitation of the consequences of an accident

7/30/2019 Vasilikos Power Station - A Seveso Establishement

http://slidepdf.com/reader/full/vasilikos-power-station-a-seveso-establishement 10/43

• In addition

i. The EAC, provided the Civil Defense Department with all

the information required for the realization of an externalemergency plan, completed on November 2010.

ii. Safety Report was completed in September 2007.

iii. The final evaluations of the Safety Report from theresponsible authority (Department of Labour Inspection)was in October 2008.

iv. Once a year there was an inspection from theDepartment of Labour Inspection (2009, 2010).

v. Every 5 years there is a revision of the Safety Report(October 2013).

7/30/2019 Vasilikos Power Station - A Seveso Establishement

http://slidepdf.com/reader/full/vasilikos-power-station-a-seveso-establishement 11/43

 

EVANGELOS FLORAKIS

NAVAL BASE

EXPLOSION INCIDENT 11TH 

JULY 2011

IMPACT

ON VASILIKOS POWER

STATION

7/30/2019 Vasilikos Power Station - A Seveso Establishement

http://slidepdf.com/reader/full/vasilikos-power-station-a-seveso-establishement 12/43

  BEFORE THE INCIDENT

7/30/2019 Vasilikos Power Station - A Seveso Establishement

http://slidepdf.com/reader/full/vasilikos-power-station-a-seveso-establishement 13/43

 

VASILIKOS POWER PLANT (before explosions)

• Vasilikos Power Station is the newest of the 3 Power Stations

operated by EAC. It is located on the SE coast between

Larnaca and Limassol.

• The Station is manned by about 152 persons and includes

 Administration, Operation and Maintenance Departments.

Shift personnel man the Plant 24 hrs a day on a 5 cycle (3x8

hrs) shift roster.

• The Station has been provided with a Health and SafetyOfficer to support the development and implementation of Site

Health and Safety policies and procedures. 

7/30/2019 Vasilikos Power Station - A Seveso Establishement

http://slidepdf.com/reader/full/vasilikos-power-station-a-seveso-establishement 14/43

7/30/2019 Vasilikos Power Station - A Seveso Establishement

http://slidepdf.com/reader/full/vasilikos-power-station-a-seveso-establishement 15/43

7/30/2019 Vasilikos Power Station - A Seveso Establishement

http://slidepdf.com/reader/full/vasilikos-power-station-a-seveso-establishement 16/43

Εμπορευματοκιβώτια

7/30/2019 Vasilikos Power Station - A Seveso Establishement

http://slidepdf.com/reader/full/vasilikos-power-station-a-seveso-establishement 17/43

 

JUST AFTER THE EXPLOSION INCIDENT

AT THE ADJACENT

EVANGELOS FLORAKIS NAVAL BASE

(11TH JULY 2011)

7/30/2019 Vasilikos Power Station - A Seveso Establishement

http://slidepdf.com/reader/full/vasilikos-power-station-a-seveso-establishement 18/43

7/30/2019 Vasilikos Power Station - A Seveso Establishement

http://slidepdf.com/reader/full/vasilikos-power-station-a-seveso-establishement 19/43

7/30/2019 Vasilikos Power Station - A Seveso Establishement

http://slidepdf.com/reader/full/vasilikos-power-station-a-seveso-establishement 20/43

7/30/2019 Vasilikos Power Station - A Seveso Establishement

http://slidepdf.com/reader/full/vasilikos-power-station-a-seveso-establishement 21/43

7/30/2019 Vasilikos Power Station - A Seveso Establishement

http://slidepdf.com/reader/full/vasilikos-power-station-a-seveso-establishement 22/43

7/30/2019 Vasilikos Power Station - A Seveso Establishement

http://slidepdf.com/reader/full/vasilikos-power-station-a-seveso-establishement 23/43

 

VASILIKOS POWER PLANT

(after the explosions)

• On July 11th 2011, a series of explosions took place

soon after 03:00 and a severe shock wave occurred at

5:48 am.

• It has been estimated that the explosion was of a

magnitude equivalent to ~ 400 tones of TNT.• This was due to explosives and other material(gun

powder, propellants and metal parts for the

manufacturing of ammunition) stored in a pile of 98

containers at the naval base. These containers wereconfiscated by the Government of Cyprus at Limassol

Port on its way to Syria (February 2009), in compliance

with a UN Security Council resolution enforcing an arms

embargo against Syria.

7/30/2019 Vasilikos Power Station - A Seveso Establishement

http://slidepdf.com/reader/full/vasilikos-power-station-a-seveso-establishement 24/43

 

VASILIKOS POWER PLANT

(after the explosions)

• Thirteen (13) people were killed and 65 were

injured, including twelve (12) members of the

Power Station Night Shift personnel

• The neighboring Vasilikos Power Plant (500 m)

was severely damaged. A hill about 30 meters

high was a barrier and prevented a complete

destruction of the Plant. 

7/30/2019 Vasilikos Power Station - A Seveso Establishement

http://slidepdf.com/reader/full/vasilikos-power-station-a-seveso-establishement 25/43

 

VASILIKOS POWER PLANT (after the explosions)

• The blasts resulted in an uncontrolled shutdown

of the generating Units of the Station.

• Fires broke out in the Administration building,

Turbine hall, contractor’s area and the trees onthe hill west of the Station due to hot molten

metal pieces, landing on them. Fortunately the

metal pieces did not ignite the HFO or DFO

tanks.

• The affected area around the explosion site, was

around 8km2 where about 4.200 people are

living.

7/30/2019 Vasilikos Power Station - A Seveso Establishement

http://slidepdf.com/reader/full/vasilikos-power-station-a-seveso-establishement 26/43

 • The fires were brought under control by theCyprus Fire Brigade. Twelve (12) fire

appliances and thirty (30) fire fighters wereinvolved.

• The environment impact of the accident waslow as no major releases were experienced.Small scale spillages of substances like

lubricants and fuel occurred inside buildings,but were effectively collected and stored bythe station’s personnel

7/30/2019 Vasilikos Power Station - A Seveso Establishement

http://slidepdf.com/reader/full/vasilikos-power-station-a-seveso-establishement 27/43

Serious threat to personnel/visitors/contractors

• The main Fire System was not operative.

• Transfer fuel oil from damaged Tanks• Falling objects (cladding) from heights.

• Dust in the atmosphere from insulation materials

• Openings all over the plant

• Major structures were critical for collapsing

• Munitions fragments scattered all over in the Plant

• Hazardous substances:

- fuels (flammable)

- H2SO4 (corrosive)

-Hydrazine (toxic)

-dust

7/30/2019 Vasilikos Power Station - A Seveso Establishement

http://slidepdf.com/reader/full/vasilikos-power-station-a-seveso-establishement 28/43

IMMEDIATE MEASURES TAKEN TO COPE

WITH THE CRISIS ON SITE

• Survey of all buildings by civil engineers team

•  All buildings were secured with suitable fencing andaccess restricted.

•  All personnel, visitors and contractors received SafetyInduction Course on arrival. This Induction Course

provided information and details of the hazards on siteand what to do in case of an emergency.

• Basic sanitary facilities were established

7/30/2019 Vasilikos Power Station - A Seveso Establishement

http://slidepdf.com/reader/full/vasilikos-power-station-a-seveso-establishement 29/43

 

• Removal of all Heavy Fuel Oil in the HFO Tanksand exported to Dhekelia and Moni Power Stations

• Transfer of chemicals to safer locations e.g.Hydrazine

• EAC developed an overall Health and Safety Planfor the site in conjunction with the maincontractors.

•  A Cyprus Fire Brigade fire team was stationed atthe Power Station until the 15th November, 2011when the Station Fire System was repaired.

• First Aid arrangements were made.

7/30/2019 Vasilikos Power Station - A Seveso Establishement

http://slidepdf.com/reader/full/vasilikos-power-station-a-seveso-establishement 30/43

• EAC personnel Fire Assembly Points wererevised.

• EAC Emergency Plan Arrangements werereviewed.

• Police Experts checked and cleared for explosiveOrdinance Disposal.

• Permit for Hot Work and Electrical Work wereissued.

• Health & Safety Officer supported by 2 moreofficers.

• Removal of dangerous falling objects (e.g.

claddings), and cleaning of the main access road.

7/30/2019 Vasilikos Power Station - A Seveso Establishement

http://slidepdf.com/reader/full/vasilikos-power-station-a-seveso-establishement 31/43

Immediate measures to cope with

electricity demand/supply problems

1. Dhekelia and Moni Power Stations-All generating units made available

-All personnel summer annual leaves withdrawn

2. Black Start Gas Turbine (38MW) was employedsince it didn’t suffer severe damages. 

3. Temporary Generators (total capacity 180MW)were hired and installed.

4. 120MW made available from Turkish occupiedareas.

5 EU Civil Protection mechanism

7/30/2019 Vasilikos Power Station - A Seveso Establishement

http://slidepdf.com/reader/full/vasilikos-power-station-a-seveso-establishement 32/43

5. EU Civil Protection mechanism

• Mechanism activated on July 13th 2011

• 15 ECP experts arrived on the island on July 16th

2011

• Largest team ever deployed by the mechanism

within EU

• Mission Risk assessment

• Health & Safety Issues

• Damage assessment

• Evaluation of reconstruction costs

• The mechanism experts report was submitted on

July 27th 2011 

7/30/2019 Vasilikos Power Station - A Seveso Establishement

http://slidepdf.com/reader/full/vasilikos-power-station-a-seveso-establishement 33/43

6. Electricity consumption savings by appealing tothe consumers via the mass media.

7. Power interruption by rotation (consumers dividedto 22 groups with interruption time 2-2.5 hours)

8. Main target: to maintain all economic activity

giving priority to:-Tourist Industry

-Industrial zones

-Basic services

Interruption measures removed: August 14th 2011

7/30/2019 Vasilikos Power Station - A Seveso Establishement

http://slidepdf.com/reader/full/vasilikos-power-station-a-seveso-establishement 34/43

 Vasilikos Power Station

Restoration Project • For the restoration of the station, the

largest team in the history of EAC was

assembled.• The main aim was the safe, quick and

cost effective restoration of the Power 

Station.

7/30/2019 Vasilikos Power Station - A Seveso Establishement

http://slidepdf.com/reader/full/vasilikos-power-station-a-seveso-establishement 35/43

7/30/2019 Vasilikos Power Station - A Seveso Establishement

http://slidepdf.com/reader/full/vasilikos-power-station-a-seveso-establishement 36/43

Restoration Program

7/30/2019 Vasilikos Power Station - A Seveso Establishement

http://slidepdf.com/reader/full/vasilikos-power-station-a-seveso-establishement 37/43

 

VASILIKOS POWER PLANT

CURRENT SITUATION

C t Sit ti

7/30/2019 Vasilikos Power Station - A Seveso Establishement

http://slidepdf.com/reader/full/vasilikos-power-station-a-seveso-establishement 38/43

Current Situation

• The organizational structure at the site iscurrently the existing operational Power Stationstructure, supplemented by contractors who areworking on the restoration sites.

• Most of the main Fire System is operative.

• Chemical substances have been transferred toMoni and Dhekelia Power Stations.

•  A Temporary Emergency Plan was developed

and implemented.

7/30/2019 Vasilikos Power Station - A Seveso Establishement

http://slidepdf.com/reader/full/vasilikos-power-station-a-seveso-establishement 39/43

 •  All main contractors have a Health & Safety Plan in

place and a Safety Coordinator, written riskassessments and method statements adapted at anyrisks of work that will be executed at the constructionsite.

• Smoking is strictly prohibited at all areas of VasilikosPower Station with the exception of designated areas.

• Induction course is given to the Contractors Safety

Coordinators by the EAC Safety Officer prior to workscommencing. The contractors give induction courses totheir personnel. Newcomers are inducted by thecontractor Safety Coordinator. A list of those inducted isissued against their signature.

7/30/2019 Vasilikos Power Station - A Seveso Establishement

http://slidepdf.com/reader/full/vasilikos-power-station-a-seveso-establishement 40/43

7/30/2019 Vasilikos Power Station - A Seveso Establishement

http://slidepdf.com/reader/full/vasilikos-power-station-a-seveso-establishement 41/43

7/30/2019 Vasilikos Power Station - A Seveso Establishement

http://slidepdf.com/reader/full/vasilikos-power-station-a-seveso-establishement 42/43

SUGGESTIONS FOR MEASURES

IS SEVESO II & III “STRONG” ENOUGH? 

FULFIL IT’S “SUBJECT MATTER”? 

MILITARY INSTALLATIONS ARE EXCLUDED BY THE SEVESO

DIRECTIVE AND THIS IS SOMETHING THAT NEEDS, IN MY OPINION,

TO CHANGE.

Include military establisments in the Seveso regulation for:

• Land Use planning (SEVESO III, Reg. 13)

• Domino effect (SEVESO III, Reg. 9)

7/30/2019 Vasilikos Power Station - A Seveso Establishement

http://slidepdf.com/reader/full/vasilikos-power-station-a-seveso-establishement 43/43

Dear guest

Thank you for your patience.

We wish you a pleasant visit at

Vasilikos Power Station