Post on 17-Jun-2018
transcript
Page 1
WHAT TO DO IF YOU SMELL GAS · Do not try to light any appliance · Do not touch any electric switch; do not use any phone in your
building · Immediately call your gas supplier from a neighbor’s phone.
Follow the gas supplier’s instructions. · If you can not reach your gas supplier call the fire department Installation and service must be performed by a qualified installer,
service agency or the gas supplier.
Please Read Instructions Carefully Save for Future Reference
Manufactured by: Biasi S.p.A. Verona, Italy
Distributed By:
QHT QUINCY HYDRONIC TECHNOLOGIES, INC.
80 ROCHESTER AVE. SUITE #12 PORTSMOUTH, NH 03801
PHONE: 603-334-6400 FAX: 603-334-6401
REV. G
Boi
ler
Man
ual A
nd In
stal
latio
n
Inst
ruct
ions
for
Atm
osph
eric
Ven
ting
If the information in this manual is not followed exactly, a fire or explosion may result causing property damage, personal injury or loss of life.
WARNING
DANGER
VEGA B3-B9
Page 2
Page 3
Dear Customer: Thank you for buying a VEGA B10 boiler system. The VEGA B10 boiler system is a cast iron, oil or gas fired hot water boiler, using the famous Biasi B-10 (3-pass) design. The boiler is light, compact, simple, rugged and engineered for maximum home heating efficiency. We realize that it is not possible to answer all questions about the VEGA B10-series boiler system in this manual. Reading this installation manual does not make the reader an expert in all aspects of installation and operation, and does not replace the need for a qualified, licensed heating contractor. We urge you to contact your installing contractor or distributor if you are in question about any aspect of your boiler's performance. Our main concern is that you are satisfied with your boiler and its performance. We require that your contractor complete efficiency tests using instruments. The controls and accessories listed in this manual are intended to serve as guidelines rather than specific recommendations. We realize that other makes and models of such devices are available and can be used as successfully as those we specify. The installing contractor is the best judge of a system's specific requirements, as well as the local availability of certain makes and models of controls and accessories. The preceding does not apply, however, to the equipment that comes with every boiler, such as the overheat control (L4006A or 7248U) and pressure relief valve. The installation of the specific devices supplied with every boiler is absolutely necessary to the safe operation of the boiler and protection of the heating system. All BIASI boiler blocks are built in accordance with the ASME boiler and pressure vessel code, and bear the "H" stamp. The entire range of applications for the VEGA B10 have been tested to standard UL 726 and are ULC compliant. This BIASI B10 boiler block has a limited lifetime warranty (refer to back of manual), a copy of which is provided with the boiler. Please be sure to return the warranty registration card as the warranty will be void without your boiler's serial numbers (located on the plate on the leg of the boiler), date of installation and the name of your installer which will be on record in our files. Thank you for purchasing our VEGA B10 series boiler. If you have questions or comments, please don't hesitate to contact us immediately. Our goal is 100% customer satisfaction.
QHT inc.
4egaP
STNETNOC FO ELBAT
seireS-01B ISAIB egaP noitceS
5 egaP
NOITAMROFNI TNATROPMI .ylluferac egap siht daer esaelP
AN HTIW ECNADROCCA NI DELLATSNI EB TSUM SRELIOB LLA LACOL DNA ETATS ,LANOITOC LACIRTCELE DNA GNITAEH ,GNIBMULP EHT SA LLEW SA ,SECNANIDRO DNA SED
AG DNA RETAW ,LACIRTCELE GNIVRES EHT FO SNOITALUGER .SEITILITU S
pmoc yb dengised eb dluohs smetsys llA snosrep ylno dna ,srotcartnoc tneteni dna tuoyal eht ni elbaegdelwonk dluohs smetsys gnitaeh fo noitallats
r eht si tI .reliob yna fo noitallatsni eht tpmetta gnillatsni eht fo ytilibisnopse slortnoc lla taht ees ot rotcartnoc gnitarepo dna dellatsni yltcerroc era
atsni eht nehw ylreporp .detelpmoc si noitall
,enilosag ,egabrag elitalov nrub ton oD sdiuqil elbammalf rehto ro ahthpan .lio leuf 2 .oN naht rehto cepse( sdiuqil elbammalf llA ,slacimehc ,)enilosag yllai
,.cte ,sirbed ,sparcs doow ,repap ,sgar ta reliob eht morf yawa tpek eb dluohsaelc aera reliob eht peeK .semit lla .sdrazah erif lla fo eerf dna n
eitnarraw dna erutaretil eht daer esaelP eht fo srerutcafunam eht yb deilppus s.tnempiuqe yrossecca suoirav evitcepser eht yb detnarraw si tnempiuqe sihT
cinordyH ycniuQ yb ton ,srerutcafunam fo eceip hcaE .cnI ,seigolonhceTdesu dna dellatsni eb tsum tnempiuqe fo snoitadnemmocer eht ot gnidrocca
.rerutcafunam eht
:snoitalugeR dna sedoC
itcetorP eriF lanoitaN )APFN( noitaicossA no kraP hcraM yrettaB 96220 AM ,ycniuQ gro.apfn.www//:ptth
lanoitanretnI ASC daoR yellaV tnasaelP tsaE 1058
43144 HO ,dnalevelC gro.lanoitanretni-asc.www
6 egaP
HGIH OT ERUSOPXE FEIRB RO ,OC FO SNOITARTNECNOCL OT ERUSOPXE DEGNOLORP YAM OC FO STNUOMA RESSE
NAC ERUSOPXE .GNINOSIOP EDIXONOM NOBRAC NI TLUSER YAM SNOITARTNECNOC HGIH OT ERUSOPXE DNA LATAF EB
EHT NI TLUSER NO NEDDUS GNIDULCNI SMOTPMYS FO TES .SSENSUOICSNOCNU
ot dnet smotpmys fi edixonom nobrac fo ecneserp eht tcepsuS.emoh ruoy evael uoy nehw raeppasid
NOBRAC FO SNGIS EHT FO YNA FI RO ,RUCCO SMOTPMYS EHT FO YNA FITNESERP ERA EDIXONOM DNA YLETAIDEMMI SESIMERP EHT ETACAV
RES GNITAEH DEIFILAUQ A TCATNOC YNAPMOC SAG EHT ,YNAPMOC ECIV.TNEMTRAPED ERIF EHT RO
IVRES DESNECIL ,DEIFILAUQ YLNO MROFREP DLUOHS SROTCARTNOC EC.RELIOB 01-B RUOY NO KROW
GNINRAW
gnitnev ,ecnailppa morf sessag toH otni gnipacse ,yenmihc ro sepip metsys
.ecaps gnivil eht-ilppa eht dnuora tuo gnimoc semalF
.ecna .ecnailppa eht ni semalf deroloc wolleY
.ria yllems ro elatS ro ni nobrac ro toos fo ecneserp ehT
.ecnailppa eht dnuora edisni ytidimuh denialpxenu hgih yreV
.gnidliub eht
7 egaP
stnenopmoC tiK mirT
DNA STNENOPMOC RELIOB DETSIL LU EHT YLNO ESURENRUB SAG RO LIO DETSIL ASC/LU HTIW DEILPPUS STNENOPMOC
.METSYS RELIOB 01B AGEV EHT
ylno smetsys saG(
noitamrofnI lareneG .1
.sehcni ni era snoisnemid llA
8 egaP
rf deppihs era sreliob seires 01B llA reliob delbmessa ni yrotcaf eht mo eb ot sdeen kcolb eht ,revewoh ,fI .skcolb ,yreviled fo esae rof snoitces otni tilps
:gniwollof eht daer esaelptces evom ,skcolb tilps elbmessa oT .rehto hcae gnicaf dna lellarap otni snoi
decalp sdraob gnola dils eb yam snoitceS elppin tcepsnI .snoitces eht htaenrednu srrub yna evomeR .srrub ro egamad rof strop epiW .ylthgil yrev trop eht gniparcs yb
lc a htiw strop elppin dna selppin hsup eht dnuopmoc elppin fo mlif a ylppA .htolc naetsnI .trop dna elppin eht htob ot htiw gnittih yb laes neht dna trop eht ni elppin eht llacolb a htiw denoihsuc remmah a s noitces ylppA .doow fo k ylno noitces eno ot tnalae
nI .rehtegot snoitces edils dna na sdor ward ruof eht llats rehtegot snoitces eht ward d)kcitsdray htiw erusaem( ylneve tegot snoitces eht warD . ekam snoitces litnu reh
a ta tcatnoc nori-ot-nori ottob dna pot eht dnuora tniop .noitces hcae fo strop m SDOR WARD NETHGIT REVO TON OD
ward fo htgnel ssecxe ffo gnittuc nehW :ETON llatsni ot htgnel hguone wolla ,sdor
.sdor ward eht no tekcaj reliob
ylbmessA kcolB relioB .2
straP & stnenopmoC relioB seireS - B ISAIB
:ylbmessA kcolB relioB noitceS tnorF 1
noitceS raeR 2 noitceS etaidemretnI 3
selppiN hsuP leetS 4 doR eiT 5
tuN doR eiT 6 rehsaW doR eiT 7
gnihsuB ”4/3 X "2/1 1 8 teksag gulP 9
gnihsuB "2/1 1 X "2/1 01 rooD gniwS relioB 11
noitalusnI reppU rooD tnorF 21 teksaG reppU rooD tnorF 31
etalP reppU rooD tnorF 41 noitalusnI rewoL rooD tnorF 51
)7 ytQ( dutS rooD tnorF 61 teksaG rewoL rooD tnorF 71
)eloH thgiS( gulP "4/3 81 )seceip 4( egniH rooD relioB 91
)6 ytQ( niP egniH 02 )2 ytQ( stloB egniH ydoB relioB 12
)2 ytQ( stloB gnitnuoM egniH rooD 22 gnihceerB relioB hcni 6 32rooD dexiF tnorF reppU 42
1
2
3
23
675
4
910
98
14
16
1213
1715
24
11
18
19
2021
22
9 egaP
tcerid" a ni dellatsni eb ot si reliob eht fI 01B eht ot refer esaelp ,noitarugifnoc "tnev .tiK tneV tceriD eht htiw deilppus mudneddA tneV tceriD
A RIA NOITSUBMOC ROF SNOISIVORP NI EB TSUM RIA NOITALITNEV DN
,3.5 NOITCES HTIW ECNADROCCA DNA NOITSUBMOC ROF RIA“ LANOITAN EHT FO ,”NOITALITNEV RO ,1.322ZISNA ,EDOC SAG LEUF
HT FO SNOISIVORP ELBACILPPA .SEDOC GNIDLIUB LACOL E TON OD NEEB SAH RIA NOITSUBMOC REPORP LITNU RELIOB EHT LLATSNI
.DEGNARRA
noitacoL relioB .3
ot ecnaraelc muminim eht era gniwollof ehT :slairetam elbitsubmoc ro noitcurtsnoc
,sedis ,pot eht morf ”9 .1 .reliob eht fo raer dna
ni epip eulf eht morf ”81 .2 .noitcerid yna
eht fo tnorf eht morf ”42 .3 .reliob
REGNAD
level ,htooms A .roolf elbitsubmoc-non a no detacol eb tsum reliob ehTt etacoL .dednemmocer si roolf etercnoc eht ot elbissop sa esolc sa reliob eh
itsubmoc no dellatsni si reliob fI .yenmihc rof seitirohtua lacol tlusnoc ,gniroolf elb reliob ehT .roolf gnirevoc fo dohtem reporp .gniteprac no dellatsni eb ton tsum
lf esu ro erots ton oD :noituaC ro slacimehc ,slairetam elbamma
,enilosag yllaicepse ,sdiuqil elbammalf gnitaeh siht fo ytiniciv eht ni .ecnailppa
GNINRAW
.ecnailppa roodni na sa deifitrec si relioB etacol ro sroodtuo reliob llatsni ton oD ot desopxe eb lliw ti erehw serutarepmet gnizeerf
”9
”9 ”42
Page 10
USE ONLY THE ULC LISTED BOILER COMPONENTS AND UL/CSA LISTED OIL OR GAS BURNER COMPONENTS SUPPLIED WITH THE VEGA B10 BOILER SYSTEM.
Please refer to figures below for Barometric Damper location for either oil or gas
4. Installation of Boiler Trim Components
* See detail on page 19
BIAS
Heat Wise
BAROMETRIC DAMPERWITH MANUAL RESETSPILL SWITCHALTERNATIVE
DAMPER LOCATION
BIASI B10
POWER GASBURNER
GAS COCK
DRIP LEG
UNIONGAS TRAIN
Trim Kit Components 1 - Honeywell L4006A or 7248U
aquastat 1 – Combo pressure/temp gauge 1 – ¾” X 3” Nipple 1 – 30 PSI pressure relief valve 1 – ¾” Boiler drain 1 – Cera-fiber Pad for floor of
combustion chamber
1– ¼” X ½” Bushing 2 – ¾” Plugs 1 – ¾” 90° Elbow 1 – Immersion well 1- Double acting barometric
damper with manual reset spill switch (Gas systems only)
11 egaP
denethgit eb tsum eguag ehT ruoy ton dna hcnerw a gnisudnah
.tnoC stnenopmoC mirT relioB fo noitallatsnI .4
Page 12
vide
Canadian
The make-up water line must be piped into the boiler and be fitted with a backflow preventer and a pressure-reducing valve to reduce line pressure to 10 to 15 psi.
NOTE Do not use automotive types of antifreeze
(ethylene glycol).
5. Piping the Boiler
31 egaP
gnitneV ekatnI .6
A on the next page.) erugiF eeS(
italitnev dna noitsubmoc rof ria lla fI iw emoc ot si no gnidliub eht niht
submoc rof ria eht lla fI eht edistuo morf emoc ot si noitalitnev dna noitgnidliub
Page 14
c.) Boiler located in a room under negative pressure: If the boiler is to be installed within a home where the operation of exhaust fans, attic fans, kitchen ventilation systems, clothes dryers or fireplaces may create severe negative vent pressures causing unsatisfactory combustion and venting, special provisions should be made for additional make-up air to supply the other air requirements. If building is of tight construction, combustion air requirements may not be met and combustion air ducts from outside may be necessary. Please refer to NFPA No. 31. Tight Construction (as defined by ANSI Z223.1):
1. Walls and ceilings exposed to the outside atmosphere have a continuous water vapor retarder with a rating of 1 perm or less with openings sealed with gaskets, etc..
2. Weather-stripping has been added on open able windows and doors, and…
3. Caulking or sealants are applied to areas such as joints around windows and door frames, between sole plates and floors, between wall-ceiling joints, between wall panels, at penetrations for plumbing, electrical, and gas lines, and in other openings.
If the building is of tight construction, air openings must be provided from the outside, with appropriate sizing depending on amount of BTU/H as shown in pictures. The boiler room must never be under a negative pressure, even if the appliance is installed as direct vent. Always provide air openings sized not only to the dimensions required for the firing rate of all appliances, but also to handle the air movement rate of the exhaust fans or air movers using air from the building or boiler room.
6. Intake Venting Cont.
Figure A.
51 egaP
gnitneV tsuahxE .7
gnitneV tsuahxE nommoC 1.7
Page 16
3.Insofar as practical, close all building doors and windows and all doors between the space in which the appliance remaining connected to the common venting system is located and other spaces of the building . Turn on any appliance not connected to the common vent system. Turn on all exhaust fans except for summer exhaust fans. Close the fireplace damper if applicable.
4.Place in operation the appliance being inspected. Follow the lighting instructions. Adjust thermostat so appliance will operate continuously.
5.Test for spillage at the barometric damper opening after 5 minutes of main burner operation. Use the flame of a match or candle, or smoke from a cigarette, cigar or pipe.
6.After it has been determined that each appliance remaining connected to the common venting system properly vents when tested as outlined above, return the doors, windows, exhaust fans, fireplace dampers and any other gas-burning appliance to their previous condition of use.
7.Any improper operation of the common venting system should be corrected so the installation conforms with the National fuel Gas Code, ANSI Z223.1 and/or CAN/CGA B149, Installation Codes. When resizing any portion of the common venting system, the common venting system should be resized to approach the minimum size as determined using the appropriate tables in Part 11 of the National Fuel Gas Code, ANSI Z223.1, and/or CAN/CGA B149, Installation Codes.
7.1 Common Exhaust Venting Cont.
For boilers connected to gas vents or chimneys, vent installations shall be in accordance with part 7, Venting of Equipment, of the National Fuel Gas Code, ANSI Z223.1 or Section 7, Venting Systems and Air Supply for Appliances, of the CAN/CGA B149, Installation Codes, or applicable provisions of the local building codes. Vent connectors serving appliances vented by natural draft shall not be connected into any portion of mechanical draft systems operating under positive pressure.
7.2 Gas Venting
Page 17
Good, reliable operation with a minimum of service, starts with attention to the small details:
Oil: 1. Setting the nozzle position and electrodes "by the book" using the
manufacturer's gauges. 2. Installing a quality micron filter at the burner. 3. Making careful/tight flare connections, without couplings, on oil suction
line. 4. Checking fuel pump pressure. 5. Checking draft at the breeching to insure it is adequate to overcome flue
gas resistance. (-.02 to –.04 in. w.c.) 6. Setting the air band properly with well maintained instruments. A good
target is 11% to 12.5% of (CO2) or 6.5% to 3.8% of (O2). To ensure proper burner setup, gauges should be used to check things such as the pump pressure, CO2 levels, etc…
Gas: 1. Checking the electrode, orifice size, and flame rod settings against
manufacturer’s specs to insure proper operation. 2. Installing properly sized gas piping according to BTU input required and
length of gas line run. 3. Making sure there is proper manifold pressure before and after the
gas valve using a calibrated manometer. 4. Checking draft at the breeching to insure it is adequate to overcome flue
gas resistance. (-.02 to –.04 in. w.c.) 5. Setting the air band properly with well maintained instruments. A good
target is 9.5% to 10.5% of (CO2) or 5% to 2.5% of (O2) for natural gas, or 10.0% to 12.0% of (CO2) or 5% to 2.5% of (O2) for LP gas.
8. Burner Setup
CUT INSULATION IN BLASTTUBE OPENING TO 4.25" TO ACCEPT CARLIN BLASTTUBE.
81 egaP
rub lio na gnisu sreliob rof ylno si egap sihT ,desu gnieb si renrub sag a fI .renreporp eht rof 91 egap ot refer esaelp .senil sag dna renrub eht fo putes
RERUTCAFUNAM RENRUB nilraC
PH 1-ZE ledoM relioB 4-B 5-B 6-B CLU yb detsil ton era srenrub dethgilhgih ehT
tnempiuqe isaiB no dellatsni eb ton yam dna adanaC ni
ledoM renruB *PH-1-ZE *PH-1-ZE *PH-1-ZE etaR gniriF 08.0 00.1 52.1
htpeD noitresnI "0.3 "0.3 "0.3 & elzzoN yramirP 07 X 56.0 06 X 58.0 06 X 00.1
nrettaP yarpS diloS wolloH diloS elzzoN yradnoceS 07 X 56. 07 X 58. 06 X 00.1
nrettaP yarpS & SS ro A SS ro A SS ro A erusserP pmuP ISP 051 ISP 051 ISP 051
gnitteS daeH 56.0-6.0 1-58.0 1-58.0 gnitteS xoB riA 56.0 58.0 59.0
RERUTCAFUNAM RENRUB esiW taeH
reenoiP ledoM relioB 3-B 4-B 5-B 6-B 7-B 8-B 9-B ledoM renruB VF 1-P (1) AK 1-P AK 1-P AK 2-P AK2-P AK2-P AK2-P
etaR gniriF 55.0 09.0 00.1 52.1 05.1 8.1 1.2 elzzoN 08 X 04.0 07 X 56.0 07 X 58.0 08 X 00.1 08 X 52.1 08 X 5.1 07 X 57.1
nrettaP yarpS diloS diloS diloS imeS wolloH wolloH wolloH diloS erusserP pmuP 091 091 041 551 541 541 041
gnitteS daeH 1 1 1 57.3 6 57.01 52.41 gnitteS riA 0 5.9 5.61 6 11 6 11
dedeeN naF mm-021 )1
RERUTCAFUNAM RENRUB olleiR seireS 04-F
ledoM relioB 3-B 4-B 5-B 6-B 7-B 8-B 9-B ledoM renruB 3-F 3-F 5-F 5-F 5-F 01-F 01-F
etaR gniriF 55.0 08.0 00.1 52.1 05.1 08.1 01.2 htpeD noitresnI "0.3 "0.3 "0.3 "0.3 "0.3 "0.3 "0.3
elzzoN 08 X 05.0 08 X 56.0 06 X 58.0 06 X 00.1 06 X 52.1 06 X 05.1 06 X 57.1 nrettaP yarpS W W W W W B B
erusserP pmuP ISP 541 ISP 541 ISP 541 ISP 541 ISP 541 ISP 541 ISP 541 rotalubruT 1 2 2 3 4 2 3
etaG riA 7.2-2 5.4-5.3 4.3.-8.2 5-3 6-5.4 4.3-8.2 1.4-3
puteS renruB liO 1.8
desu eb ton yam srenrub esehT :etoN - * adanaC ni tnempiuqE isaiB no
XN ,051-IIFA7-B6-B5-B4-BledoM relioB 6-B5-B4-B3-B
011-CEN*303-CEN*303-CEN*203-CEN*103-CENledoM renruB *3011-CEN*1011-CEN*1011-CEN*25.152.118.0etaR gniriF 02.100.109.055.0
"57.2"57.2"57.2"57.2htpeD noitresnI "00.6"00.6"00.6"05.3elzzoN 6.006 X 05.006 X 01.106 X 00.106 X 58.006 X 56.0 06 X 09.006 X 57.006 X 5
diloSdilosdiloswollohnrettaP yarpS Wdilosdiloswolloh081isp 581isp 061isp 041isp 061erusserP pmuP isp 081isp 081isp 081isp
tols 9tols 9tols 6tols 6epyT daeH BL09XNBL09XNBL09XNCL07XN3noitisoP daeH 57.357.257.0654 57.3
ttekceB :RERUTCAFUNAM RENRUB
81 egaP
eht otni gnimoc si sag hcum woh enimreted oT eht ,yltcerroc retem sag eht tes ot ro ,renrub
.desu eb nac alumrof gniwollof
enimreted ot desu eb nac thgir eht ot trahc ehT rep emit eht nopu gnidneped etar wolf eht
ezis eht dna noitulover .laid retem sag eht fo
tF 3 .ver reP .ces(/0063[ = rh/ )retem sag fo eziS(*])
laiD reteM saG fo eziS )tooF cibuC(
5.0 1 2 02 09 081 063 52 27 441 882 03 06 021 042 53 15 301 602 04 54 09 081 54 04 08 061 05 63 27 441 55 33 56 131 06 03 06 021
rep sdnoceS noituloveR
ub sag a gnisu sreliob rof ylno si egap sihT ,desu gnieb si renrub lio na fI .renrht rof 81 egap ot refer esaelp .renrub eht fo putes reporp e
olleiR saG larutaN enaporP
ledoM relioB ledoM renruB tupnI )HBM(
.serP .naM ).C.W(
daeH gnitteS
riA etaG
.serP .naM ).C.W(
daeH gnitteS
riA etaG
4-B 002R 011 ”60.1 2.2 1 ”23.1 2 1
5-B 002R 041 ”02.1 8.2 2 ”67.1 7.2 2
6-B 002R 571 ”64.1 8.2 3 ”43.2 9.2 3
7-B 004R 702 ”22.1 2 0 ”84.1 2 0
8-B 004R 842 ”62.1 3.2 1 ”46.1 3.2 1
taeH esiW
saG larutaN enaporP
relioB ledoM
renruB ledoM
tupnI )HBM(
.serP .naM ).C.W(
daeH gnitteS
riA etaG
.naM .serP ).C.W(
daeH gnitteS
riA etaG
4-B A2-US 511 ”5.3 21 3 ”3.2 21 3
5-B A2-US 041 ”2.3 51 3.8 ”8.1 51 57.7
6-B A2-US 571 ”5.3 01 5.31 ”3.2 01 5.31
7-B A2-US 512 ”3.3 3 51 ”0.2 3 51
8-B 3-US 272 ”7.1 1 52.3 ”3.1 1 52.3
3-B A2-US 08 ”5.3 81 desolc ”0.2 22 desolc
9-B 3-US 803 ”3.2 1 57.6 ”7.1 2 5.6
ecifirO
61/3
23/7
23/9
46/12
46/72
ecifiro oN
ecifiro oN
ecifirO
61/3
23/7
23/9
46/12
46/72
ecifiro oN
ecifiro oN
puteS renruB saG 2.8
su eb ton yam srenrub esehT :etoN* adanaC ni tnempiuqe isaiB no de
erutaretil srerutcafunam renrub tlusnoC :etoN .slortnoc dna margaid dlofinam sag rof
91 egaP
Page 20
Gas supply piping is to be sized and installed properly in order to provide a
supply of gas sufficient to meet the maximum demand without undue loss of pressure between the meter and the boiler. Consult with the National Fuel Gas Code ANSI Z223.1 for proper sizing of gas piping for various lengths and diameters.
Locate a drop pipe adjacent to, but not in front of the boiler. Locate a tee in the drop pipe at the same elevation as the gas inlet connection to the boiler. Extend the drop line with a nipple towards the floor and cap to form a sediment trap. Install a shut off valve before the tee with sediment trap and a union after the tee before the combination gas valve.
When installing the boiler, make sure a pipe compound resistant to the action of liquefied petroleum is used. Check piping for leaks. Always check leaks with a water and soap solution. DO NOT USE A FLAME FOR CHECKING GAS LEAKS
The boiler and its individual shut-off valve must be disconnected from the gas supply piping during any pressure testing of that piping at test pressures in excess of 1/2 psi.
To check for gas leaks, use a gas detec-tor or apply a soap solution to the joints. DO NOT USE AN OPEN FLAME!
Direction of flow
Manual Shutoff Valve Height of shutoff valve above ground level to conform to local codes, if any. Note: Massachusetts state code requires gas shutoff to be a tee handled gas cock.
Pressure Gauge Port (1/8” NPT plugged)
1” X 1” X 3/4” Tee Male Union 3/4” NPT
Burner Gas Train
Pipe Cap
3” M
INIM
UM
9. Gas Line Piping
INSTALLATION OF SEDIMENT TRAP AND BURNER SUPPLY
Page 21
NOTE: All piping, boiler controls, gauges and valves should be installed before the jacket is assembled on the boiler. Below is an explosion view of the boiler and jacket assembly to clarify these boiler jacket assembly instructions. Insert the separate (loose) piece of insulation on top of boiler with the foil side facing in so the entire top, bottom and sides of boiler are covered. Place tubular jacket spacers (#35 & #36 on exploded view of boiler) on the upper and lower draw rod extensions at the front(long spacers) and rear(short spacers) of the boiler. Place the rear insulated jacket panel (#26) at the back of the boiler, also by slipping over the slotted cut-outs. Position side jacket panels (#38 & #25) by slipping the slotted cut-outs over the boiler draw rods. Place the lower front jacket panel (#28) in place and secure with self-tapping screws provided. Fasten the washers and hex nuts to the ends of the tie-rods to hold the jacket in place. Set the top panel (#27) in place and secure with two screws in the back of the panel. With the jacket firmly secured, place front panel (#37) in position on the tabs on the side panels and press firmly to snap spring connectors in place. NOTE: Do not attach any electrical wiring or electrical conduit or boiler piping to the top panel (#27).
Boiler Jacket Assembly: 25 RH Side Jacket Panel 26 Rear Jacket Panel * 27 Top Jacket Panel 28 Lower Front Jacket Panel 29 Top & Side Insulation 30 Front Panel Pin Clips 31 Self Tapping Screws (Qty 2) 32 Jacket Mounting Nut (Qty 8) 33 Jacket Mounting Washer (Qty8) 34 Front Panel Mounting Pins 35 Long Jacket Spacer (Qty 4) 36 Short Jacket Spacer (Qty 4) 37 Front Jacket Panel * 38 LH Side Jacket Panel * Supplied with attached insulation
10. Boiler Jacket Assembly
Note: For replacement parts, contact your local Biasi Wholesaler.
25
26
2736
39
38
3137
29
28
3534
33
32
30
22 egaP
gniriW .11
If you received a Honeywell 7248U with your Biasi boiler, you will need to make the changes shown above, and described below to the wiring diagrams. 1. Run wire 1 to the L1 terminal on the 7248U instead of running wire 1 to the 4006A. 2. Run wire 2 to the L2 terminal on the 7248U instead of connecting to wire 4. 3. Run wire 4 to the B2 terminal on the 7248U instead of connecting to wire 2. 4. Run wire 5 to the B1 terminal on the 7248U instead of connecting to the isolated end
switch. 5. Lastly, run low voltage wiring from the TT terminals on the 7248U to the isolated end
switch.
7248U WIRING PROCEDURE
4006A WIRING
7248U WIRING
11. Wiring
Page 23
NO
TE
: All w
iring must be done in accordance w
ith applicable state, local and national codes.
Use only copper conductors.
LINE HONEYWELL7248U
BLACK
WHITE
BROWN
YELLOW
RED
RIE
LL
O O
IL B
UR
NE
R, C
S HE
AT
MA
NA
GE
R, 7248U
CO
NT
RO
L W
IRIN
G
11. Oil Burner Wiring
Page 24
Page 25
62 egaP
NO
TE: A
ll w
iring
mus
t be
done
in a
ccor
danc
e w
ith a
pplic
able
stat
e, lo
cal a
nd n
atio
nal c
odes
.
Use
onl
y co
pper
con
duct
ors.
CA
RL
IN O
IL B
UR
NE
R, S
R50
1, C
ON
TR
OL
WIR
ING
WIT
H D
HW
PR
IOR
ITY
Page 27
NO
TE
: All w
iring must be done in accordance w
ith applicable state, local and national codes.
Use only copper conductors.
82 egaP
Not
e 2:
All
wir
ing
mus
t be
done
in a
ccor
danc
e w
ith a
pplic
able
sta
te, l
ocal
and
nat
iona
l cod
es.
Use
onl
y co
pper
con
duct
ors.
smargaiD saG 2.11
92 egaP
NO
TE
: All w
iring must be done in accordance w
ith applicable state, local and national codes.
Use only copper conductors.
03 egaP
13 egaP
gninoissimmoC .21
ecnanetniaM .31
NOITUAC
ecitoN
23 egaP
__________.oN laireS _________________.oN ledoM relioB
:rellatsnI :resahcruP lanigirO
______________________ _________________________
______________________ _________________________
______________________ _________________________
-------rerutcafunaM renruB epyT ---- nruB liO fo -------------re
--------------.oN ledoM renruB --------------.oN laireS renruB
-------rerutcafunaM elzzoN elzzoN ------ ------------elgnA yarpS
------------ .H.P.G epyT -------- ------------- ----------
:stseT ecnamrofreP renruB
RUTAREPMET KCATS SSORG ------ E --------------
A( ERUTAREPMET MOOR ------ )TNEIBM -------------
UTAREPMET KCATS TEN ---------- ER -----------
----------------- 2OC
----------------2O
GNIDAER EKOMS ------ ----------
ICIFFE NOITSUBMOC -------------YCNE ---------
STNEMMOC
setoN rellatsnI .41
33 egaP
ECNAILPPA EHT PU TRATS OT
uoy fI !POTS ,sag llems
ETON
ECNAILPPA SAG FFO NRUT OT
noitamrofnI renwoemoH .51
Page 34
Page 35
Page 36
FIRST YEAR-WARRANTY FOR B10 SERIES RESIDENTIAL HOT WATER BOILERS: QHT warrants that its cast-iron boiler and casing are free from defects in material and workmanship for one year from the date of installation. If the boiler is found to be defective within this period, QHT will replace the boiler block or casing. LIFETIME WARRANTY-WARRANTY FOR THE CAST IRON BOILER BLOCKS OF THE B10 SERIES RESIDENTIAL BOILERS: Biasi warrants that the cast-iron sections and nipples of the BIASI B10 boilers are free from defects in material and workmanship for the lifetime of the original single family home installation. If the B10 boiler block is then found to be defective, QHT and Biasi will replace the original cast iron boiler block. These warranties are subject to the condition that a heating contractor whose principal occupation is the sale and installation of heating equipment must have installed the boiler. PARTS, WHICH ARE COVERED, consists of all materials supplied by Biasi, identified by QHT's part numbers in its literature. Other parts supplied in the casing, trim kit or in the burner pack carry their own warranty and each manufacturer has responsibility for its own products. NOTE: ANY PART, WHICH IS REPLACED UNDER WARRANTY, CARRIES ONLY THE UNEXPIRED PORTION OF THE ORIGINAL WARRANTY. OWNER RESPONSIBILITIES: 1. Provide for proper installation, which includes pressure relief
and pressure reducing valves and high limit safety controls on closed systems.
2. Provide qualified periodic service to prolong proper operation and service.
3. Insure that boiler is installed with approved burner and that installation conforms to all codes and ordinances.
4. This warranty does not apply to boilers, which are subject to misuse, abuse, neglect, alteration, accident, excessive temperature, excessive pressure, or corrosive water or atmosphere.
5. Owner will be responsible for return of faulty components to
Portsmouth, NH, freight pre-paid. QHT and Biasi will not be responsible for: 1. Components that are part of the heating system, but
were not manufactured by Biasi or QHT as part of the boiler. 2. The workmanship of the installers of VEGA B-10 boilers.
Furthermore, this warranty does not assume any liability for unsatisfactory performance caused by improper installation.
3. Any costs for labor to remove or replace the faulty component. 4. Improper burner application or adjustments, control settings,
care or maintenance. 5. Any damage associated with corrosion or leakage due to the
use of "non-barrier", plastic pipe in the heating system. *THIS WARRANTY DOES NOT EXTEND TO ANYONE EXCEPT THE FIRST PURCHASER AT RETAIL AND ONLY WHEN THE BOILER IS IN THE ORIGINAL INSTALLATION SITE. *IMPLIED WARRANTIES OF FITNESS FOR A PARTICULAR PURPOSE AND MERCHANTABILITY SHALL BE LIMITED TO THE DURATION OF THE EXPRESSED WARRANTY. BIASI AND QHT EXPRESSLY DISCLAIM AND EXCLUDE ANY LIABILITY FOR CONSEQUENTIAL OR INCIDENTAL DAMAGES FOR BREACH OF ANY EXPRESSED OR IMPLIED WARRANTY. THIS WARRANTY GIVES YOU SPECIFIC LEGAL RIGHTS, AND YOU MAY HAVE OTHER RIGHTS THAT VARY FROM STATE TO STATE. For prompt warranty service, notify the installer, who, in turn, will notify the distributor from whom he purchased the boiler. If this does not result in corrective action, contact Biasi through Quincy Hydronic Technologies (Address Below) with details in support of the warranty claim. All claims must be processed through proper trade channels. Contact with Biasi directly is not recommended for rapid claim settlement.
Quincy Hydronic Technologies, 80 Rochester Ave. Suite #12
Portsmouth, NH, 03801 Tel. (603) 334-6400
Item
Warrantyfor BIASI - B10 Residential Cast-Iron Water Boilers
NAME
STREET
CITY STATE ZIP
BOILER SERIAL NO. DATE OF INSTALL
NAME OF INSTALL CO.
STREET
CITY STATE ZIP
B10 BOILER SIZE (EX. 4 SECTION)
SILVER RATINGS LABEL SERIAL #
HOW DID YOU HEAR ABOUT BIASI?
DEALER/INSTALLER WEBSITE FRIEND/NEIGHBOR
OTHER
PLACE STAMP HERE
BIASI BOILER WARRANTY REGISTRATION IMPORTANT., Registration required. To gain complete warranty
protection, fill in and mail this card immediately.
QHT Inc. 80 Rochester Ave.
Suite #12 Portsmouth, NH 03801
TEA
R O
N T
HIS
LIN
E
#: B10/C-REV.G