KEYNOTE

CONTINUATION SYMBOL

NUMBER OF SHEET WHERE DETAIL APPEARS

NUMBER OF DETAIL ON SHEET

REVISION NUMBER - SHOWN ON PLANS

GENERAL SYMBOLS

ROOM NAME AND NUMBER

POINT WHERE NEW CONNECTS TO EXISTING

ITEM TO BE DEMOLISHED

AREA NOT IN CONTRACT

1

-

---

* NOTE *ALL OF GENERAL NOTES ON THIS SHEET ARE TO BE APPLIED TO ALL OTHER DRAWINGS IN THIS SET.

THE SYMBOLS AND ABBREVIATIONS SHOWN ON THIS SHEET MAY OR MAY NOT BE USED IN THIS SET OF DRAWINGS.

FIRE PROTECTION SYMBOLS

Ø ROUNDABV ABOVEAC AIR CONDITIONINGAD AREA DRAINADD ADDENDUMAFF ABOVE FINISHED FLOORAFUE ANNUAL FUEL UTILIZATION EFFICIENCYALT ALTERNATEAP ACCESS PANELARCH ARCHITECT/ARCHITECTURALBFF BELOW FINISHED FLOORBLW BELOWBTU BRITISH THERMAL UNITSBTUH BRITISH THERMAL UNITS PER HOURCAP CAPACITYCB CATCH BASINCFM CUBIC FEET PER MINUTECLG CEILINGCO CLEAN OUTCW COLD WATERD DEGREEDB DRY BULBDIA DIAMETERDN DOWNDW DISTILLED WATEREA EACHEAT ENTERING AIR TEMPERATUREELEC ELECTRICALEQUIP EQUIPMENTEWC ELECTRIC WATER COOLEREWT ENTERING WATER TEMPERATUREE/A EXHAUST AIREXIST EXISTINGF DEGREES FAHRENHEITFCO FLOOR CLEAN OUTFD FLOOR DRAINFD FIRE DAMPERFDV FIRE DEPARTMENT VALVEFL FLOORFO FUEL OILFOV FUEL OIL VENTFOR FUEL OIL RETURNFOS FUEL OIL SUPPLYFPM FEET PER MINUTEFS FLOOR SINKFT FOOT/FEETFTR FIN TUBE RADIATIONGAL GALLONGC GENERAL CONTRACTORGPM GALLONS PER MINUTEGW GREASE WASTEHB HOSE BIBHP HORSE POWERHTG HEATINGHTR HEATERHW HOT WATERHYD HYDRANTID INDIRECTIN INCHINV INVERTLB POUNDLB/HR POUNDS PER HOURLAT LEAVING AIR TEMPERATURELP LOW PRESSURELPG LIQUEFIED PETROLEUM GAS

LVR LOUVERLWT LEAVING WATER TEMPERATUREM/A MIXED AIRMAX MAXIMUMMBH ONE THOUSAND BTU PER HOURMCF ONE THOUSAND CUBIC FEETMD MOTORIZED DAMPERMECH MECHANICALMFR MANUFACTURERMIN MINIMUMMISC MISCELLANEOUSMTR MOTORMU/A MAKE-UP/AIRNC NOISE CRITERIANC NORMALLY CLOSEDNIC NOT IN CONTRACTNO NUMBERNO NORMALLY OPENNTS NOT TO SCALEO OXYGENO/A OUTSIDE AIRORD OVERFLOW ROOF DRAINPD PRESSURE DROPPIV POST INDICATOR VALVEPLBG PLUMBINGPRESS PRESSUREPRV PRESSURE REDUCING VALVEPSI POUNDS PER SQUARE INCHPSIG POUNDS PER SQUARE INCH GAUGEPWR POWERR DUCT RISERR/A RETURN AIRRCP RADIANT CEILING PANELRD ROOF DRAINREC RECESSEDRED REDUCERRH RELATIVE HUMIDITYRL/A RELIEF AIRRM ROOMRPM REVOLUTIONS PER MINUTERW RAIN WATERSF SQUARE FOOTS/A SUPPLY AIRSAN SANITARYSF SQUARE FOOTSD SMOKE DAMPERSM SURFACE MOUNTSP STANDPIPESP STATIC PRESSURESTM STEAMT THERMOSTATTD TEMPERATURE DROPTDR TRENCH DRAINTEMP TEMPERATURETYP TYPICALUG UNDERGROUNDVAC VACUUMV VENTVAV VARIABLE AIR VOLUMEVENT VENTILATIONVTR VENT THROUGH ROOFW WASTEWB WET BULBWCO WALL CLEAN OUTWH WALL HYDRANT

ABBREVIATIONS

AC AIR CONDITIONING UNITACCU AIR COOLING CONDENSING UNITAHU AIR HANDLING UNITAS AIR SEPARATORB BOILERCH CHILLERCT COOLING TOWERCUH CABINET UNIT HEATERCHWP CHILLED WATER PUMPDBP DOMESTIC WATER BOOSTER PUMPDC DUCT MOUNTED COILDCP DOMESTIC WATER CIRCULATING PUMPEF EXHAUST FANEDC ELECTRIC DUCT COIL

ET EXPANSION TANKEWH ELECTRIC WATER HEATERFCU FAN COIL UNITFP FIRE PUMPGI GREASE INTERCEPTORGRV GRAVITY ROOF VENTILATORHWP HEATING WATER PUMPHRU HEAT RECOVERY UNITPRV POWER ROOF VENTILATORRE RETURN/EXHAUST FANRTU ROOFTOP UNITSP SUMP PUMPUH UNIT HEATERWH WATER HEATER

EQUIPMENT ABBREVIATIONS

VALVE ACCESSORY TAGS

BALANCING VALVE

SHUT-OFF VALVE

CHECK VALVE

3-WAY MIXING VALVE (TMV)

S

M MOTORIZED CONTROL VALVE

M 3-WAY MOTORIZED CONTROL VALVE

PRESSURE REDUCING VALVE (PRV)

REFRIGERANT SOLENOID VALVE

DOMESTIC WATER METER

BUTTERFLY VALVE

2"

4"

4"

PIPE RISE

PIPE DROP

PIPE TEE REDUCING 45 DEGREE TEE

45 DEGREE TEE

OBSTRUCTION FROM DUCTWORK 48" AND GREATER

FP-DOM-W

FP-W

FP-PA

FP-O

FP-D

FIRE PROTECTION OTHER

FIRE PROTECTION DRY

FIRE PROTECTION PRE-ACTION

FIRE PROTECTION WET

COMBINATION FIRE & DOMESTIC

48"x18" S/A

UPRIGHT SPRINKLER HEAD

PENDENT SPRINKLER HEAD

'D' REPRESENTS DRY SPRINKLER HEAD

CAP

PLUG

SIDEWALL SPRINKLER HEAD

EXTENDED COVERAGE SIDEWALL SPRINKLER HEAD

RECESSED SPRINKLER HEAD

CONCEALED SPRINKLER HEAD

VALVE ACCESSORY TAGS

BALANCING VALVE

SHUT-OFF VALVE

CHECK VALVE

3-WAY MIXING VALVE (TMV)

S

M MOTORIZED CONTROL VALVE

M 3-WAY MOTORIZED CONTROL VALVE

PRESSURE REDUCING VALVE (PRV)

REFRIGERANT SOLENOID VALVE

DOMESTIC WATER METER

BUTTERFLY VALVE

EXISTING PIPE TAG

PIPING BEING DEMOLISHED

ABOVE GROUND PIPING

PIPE SIZE TAG (DIAMETER)

BELOW GROUND PIPING

PIPE INVERT ELEVATION TAG

PIPE SLOPE TAG

(E)

2"

INVERT: -105' - 1"

1/8" / 12" SLOPE

Room

10

123456

E

D

C

B

A

E

D

C

B

A

123456

These Drawings and Specifications, and all copies thereof are and shall remain the property and

copyright of the Architect. They shall be used only with respect to this Project and are not to be used on any other Project or Work without prior written

permission from the Architect

UNIT C

UNIT A UNIT B

F001

Designed By: D.K. BENELL

Drawn By: C.M./J.W.

Checked By: D.B.

Date: 04.12.2021

Project #: 17-700-078-2

VERM

ILLI

ON

COUN

TY J

AIL

ADDI

TIO

N &

RENO

VATI

ON

1888

IN-6

3HI

LLSD

ALE,

IN 4

7854

GENERAL NOTES ANDABBREVIATIONS - FIREPROTECTION

100%

CD

Bid

Set

VERM

ILLI

ON

COUN

TY C

OM

MIS

SIO

NERS

FIRE PROTECTION GENERAL NOTESA EXISTING BUILDING: PROVIDE ALTERATIONS TO THE EXISTING FIRE PROTECTION SYSTEM AS REQUIRED TO

ACCOMMODATE THE NEW FLOOR PLAN AND NEW CEILING TYPES. PROVIDE A COMPLETE WET TYPE SYSTEMINCLUDING NEW MAINS, BRANCHES, HEADS, VALVES, AND ACCESSORIES AS REQUIRED. REUSE EXISTINGSYSTEM EQUIPMENT WHERE APPLICABLE. THE SYSTEM SHALL BE INSTALLED ACCORDING TOMANUFACTURER'S SPECIFICATIONS AND RECOMMENDATIONS AND AS PER REQUIREMENTS OF THE STATEBUILDING CODE, LOCAL FIRE DEPARTMENT, AND ALL FEDERAL, STATE, AND LOCAL AUTHORITIES, NFPA, ANDFACTORY MUTUAL.

B THE BUILDINGS COMPLETE OPERATIONAL FIRE PROTECTION SYSTEMS SHALL REMAIN IN PLACE. THISCONTRACTOR SHALL REPAIR ANY DAMAGE TO THIS SYSTEM CREATED BY THE REMOVAL OF ANY OTHERMECHANICAL SYSTEMS OR COMPONENTS.

C THIS CONTRACTOR SHALL COORDINATE PHASING OF SPRINKLER WORK WITH THE GENERAL CONTRACTORPRIOR TO STARTING WORK.

D PROVIDE A COMPLETE WET TYPE FIRE PROTECTION SYSTEM AS REQUIRED TO ACCOMMODATE THE FLOORPLAN AND CEILING TYPES INCLUDING MAINS, BRANCHES, HEADS, VALVES, AND ACCESSORIES AS REQUIRED.THE SYSTEM SHALL BE INSTALLED ACCORDING TO MANUFACTURER'S SPECIFICATIONS ANDRECOMMENDATIONS OF THE STATE BUILDING CODE, LOCAL FIRE DEPARTMENT, AND ALL FEDERAL, STATE,AND LOCAL AUTHORITIES, NFPA, AND FACTORY MUTUAL.

E THE SPRINKLER SYSTEM SHALL BE DESIGNED BASED UPON ACTUAL WATER FLOW TEST DATA OBTAINED ATOR NEAR THE JOB SITE.

F REFER TO REFLECTED CEILING PLANS FOR ADDITIONAL INFORMATION REGARDING SPRINKLER HEADLOCATION AND PIPE, UNLESS NOTED OTHERWISE.

G DIVISION 21 CONTRACTOR SHALL COORDINATE WITH THE ELECTRICAL CONTRACTOR FOR PROPERINSTALLATION OF THE FIRE PROTECTION SYSTEMS ALARM DEVICES INVOLVED WITH FIRE SPRINKLERSYSTEM.

H ALL SPRINKLER SYSTEM PIPING SHALL BE CONCEALED ABOVE THE SUSPENDED CEILING SYSTEM, UNLESSNOTED OTHERWISE. WRITTEN AUTHORIZATION SHALL BE OBTAINED FROM THE ARCHITECT PRIOR TOEXPOSING ANY PIPING IN ANY ROOM WHICH HAS A SUSPENDED CEILING.

J THIS CONTRACTOR SHALL PROVIDE ALL ADDITIONAL SPRINKLER HEADS AS REQUIRED TO ENSURE ANAPPROVED FIRE PROTECTION SYSTEM AT NO ADDITIONAL COST TO THE OWNER.

K AUXILIARY DRAINS SHALL BE EXPOSED WITH 1" DRAIN VALVES. WHEN 5 OR MORE GALLONS ARE TRAPPED,THIS CONTRACTOR SHALL PROVIDE FIXED PIPING TO AN ADEQUATELY SIZED RECEPTOR WHICH IS CAPABLEOF ACCEPTING THE FULL FLOW OF THE DRAIN. WHEN LESS THAN 5 GALLONS ARE TRAPPED, A HOSE BIBSHALL BE PROVIDED AT THE DRAIN VALVE.

L AUXILIARY DRAINS SHALL NOT BE LOCATED ABOVE PLASTER OR GYPSUM BOARD CEILING SYSTEMS. ONLY BYA SPECIFIC WRITTEN INSTRUCTION FROM THE ENGINEER WILL A VARIANCE BE PROVIDED.

M AN INSPECTOR'S TEST CONNECTION SHALL BE PROVIDED FOR EACH FIRE SPRINKLER ZONE. THISCONTRACTOR SHALL PROVIDE FIXED PIPING FROM THE TEST CONNECTION TO AN ADEQUATELY SIZEDRECEPTOR WHICH IS CAPABLE OF ACCEPTING THE FULL FLOW OF THE TEST. EXTERIOR DISCHARGE OF THETEST CONNECTION SHALL BE PERMITTED ONLY BY SPECIFIC WRITTEN INSTRUCTION FROM THE ENGINEER.

N SHOW ALL ROOM NUMBERS ON SHOP DRAWING PLANS.

P FLOW TEST DATA FROM #/#/# INDICATES THE FOLLOWING: STATIC PRESSURE # PSI. RESIDUAL PRESSURE: #PSI AT ## GPM. THE HYDRANTS TESTED ARE APPROXIMATELY ### FEET AWAY FROM THE CENTER OF THESITE LOCATED OFF THE ##" WATER MAIN IN ## STREET AT AN ELEVATION OF ### FEET ABOVE SEA LEVEL. SEECIVIL PLANS FOR HYDRANT LOCATION. THE CONTRACTOR SHALL PERFORM A FIRE FLOW TEST INACCORDANCE WITH NFPA 291 TO VERIFY THE FLOW TEST DATA GIVEN ABOVE. THE DATA GIVEN ABOVE SHALLBE THE BASIS OF DESIGN UNLESS THE AVAILABLE PRESSURE OR FLOW HAS DECREASED. NOTIFY OWNERSREPRESENTATIVE IF FLOW TEST DATA DIFFERS FROM THE DATA ABOVE. A FIRE PROTECTION ENGINEER ORAN ENGINEER EXPERIENCED IN WATER FLOW TESTING SHALL PERFORM OR WITNESS THE REQUIRED FLOWTESTING AND SIGN THE REPORT PRIOR TO THE FIRST SPRINKLER SYSTEM SUBMITTAL.

Q ROUTE SPRINKLER PIPING SUCH THAT IT DOES NOT RUN ABOVE ELECTRICAL PANELS, SWITCHGEAR, ORSIMILAR EQUIPMENT. SPRINKLER MAINS SHALL NOT RUN THROUGH ELECTRICAL OR COMMUNICATION ROOMS.SPRINKLER HEADS IN THESE ROOMS SHALL BE SERVED BY A DEDICATED BRANCH LINE FOR EACH ROOM.

R THIS DRAWING INDICATES A GENERAL PIPING ARRANGEMENT AND SUGGESTED SIZING ONLY. THISCONTRACTOR SHALL DETERMINE THE ACTUAL PIPE SIZING REQUIRED AND COORDINATE WORK WITH ALLOTHER TRADES TO AVOID CONFLICTS.

S THIS CONTRACTOR SHALL PREPARE HYDRAULIC CALCULATIONS BASED UPON THE CONFIGURATION OF THEACTUAL SYSTEM DESIGN AS SHOWN ON THIS CONTRACTOR'S SHOP DRAWINGS.

T SECURITY ELECTRONICS ROOM AND ELECTRICAL IT ROOM SHALL SHAL BE PROTECTED BY AN INERT-GASSYSTEM.

# Revision Date

Title SheetRevision

A

A

D

D

C

C

B

B

A.1

A.1

CELL

C106

CELL

C117

DAYROOM

C109

CELL

C113

CELL

C112

CELL

C111

CELL

C110

UTILITY

C108

DAYROOM

C119

CORRIDOR

C102

CORRIDOR

C101

SA

LL

YP

OR

T

C10

0

JAIL COMMANDER

C124

CONTROL ROOM

C126

?

?

STO.

C129

CL.

C091

CORR.

C128

RR

C127

DAYROOM

C131

CELL

C140

CELL

C147

PROGRAM

C153

CLO.

C152

CORRIDOR

C130

CORRIDOR

C125

RR

A104

JAIL LOBBY

A103

RR

A105

MATRON

A107

VIS.

A103B

JANITOR

B106

MECHANICAL

B107

WORK/FILE

A124

LOCKER

A119

LOCKER

A116

RR

A115

RR

A118

IT

A114A

MATT. STOR.

B103

SALLYPORT

B101

INTERVIEW

A112

INTERVIEW

A111

CHANGING

B109

?

?

UNIFORM

B108

PROPERTY STO.

B121

BOOKING

B122

SEG.

B120

SEG.

B119

BOOK-IN CORRIDOR

B115

GR

OU

P H

OL

DIN

G

B11

4

GROUP HOLDING

B113

?

?

BREATH.

B102

CO

RR

IDO

R

B10

5

JAIL LOBBY

A102

CELL

C144

CELL

C145

CELL

C146

CELL

C148

CELL

C149

CELL

C150

CELL

C151

CELL

C142

CELL

C141

CELL

C139

CELL

C138

CELL

C137

CELL

C136

CELL

C135

CELL

C134

CELL

C133

CELL

C132

CELL

C107

CELL

C105

CELL

C104

DAYROOM

C103

DAYROOM

C114

CELL

C115

CELL

C116

CELL

C118

CELL

C120

CELL

C121

CELL

C122

CELL

C123

TRUSTEES

B123

SEC/FILE

A123

WORKOUT

A122

?

?

BREAK ROOM

A120

STORAGE

A121

CORRIDOR

A110

SALLYPORT

A113

CORRIDOR

B104

SALLYPORT

090

ISO CELL

091

3

2

1

UNIT A UNIT B

UNIT A UNIT B

FIRE PROTECTION IN THISAREA TO BE REMOVED

F

F

H

H

K

K

123456

E

D

C

B

A

E

D

C

B

A

123456

These Drawings and Specifications, and all copies thereof are and shall remain the property and

copyright of the Architect. They shall be used only with respect to this Project and are not to be used on any other Project or Work without prior written

permission from the Architect

UNIT C

UNIT A UNIT B

F110

Designed By: D.K. BENELL

Drawn By: C.M./J.W.

Checked By: D.B.

Date: 04.12.2021

Project #: 17-700-078-2

VER

MIL

LIO

N C

OU

NTY

JAI

LAD

DIT

ION

& R

ENO

VATI

ON

1888

IN-6

3H

ILLS

DAL

E, IN

478

54

OVERALL FIRST FLOORDEMOLITION PLAN - FIREPROTECTION

100%

CD

Bid

Set

VER

MIL

LIO

N C

OU

NTY

CO

MM

ISSI

ON

ERS

1/16" = 1'-0"1

OVERALL FIRST FLOOR DEMOLITION PLAN - FIRE PROTECTION

PLAN NOTES# NOTE1 6" WATER/FIRE SERVICE.

2 4" BACKFLOW PREVENTOR.

3 WALL MOUNTED FIRE DEPARTMENT CONNECTION.

FIRE PROTECTION GENERAL NOTESA EXISTING BUILDING: PROVIDE ALTERATIONS TO THE EXISTING FIRE PROTECTION SYSTEM AS REQUIRED TO

ACCOMMODATE THE NEW FLOOR PLAN AND NEW CEILING TYPES. PROVIDE A COMPLETE WET TYPE SYSTEMINCLUDING NEW MAINS, BRANCHES, HEADS, VALVES, AND ACCESSORIES AS REQUIRED. REUSE EXISTINGSYSTEM EQUIPMENT WHERE APPLICABLE. THE SYSTEM SHALL BE INSTALLED ACCORDING TOMANUFACTURER'S SPECIFICATIONS AND RECOMMENDATIONS AND AS PER REQUIREMENTS OF THE STATEBUILDING CODE, LOCAL FIRE DEPARTMENT, AND ALL FEDERAL, STATE, AND LOCAL AUTHORITIES, NFPA, ANDFACTORY MUTUAL.

B THE BUILDINGS COMPLETE OPERATIONAL FIRE PROTECTION SYSTEMS SHALL REMAIN IN PLACE. THISCONTRACTOR SHALL REPAIR ANY DAMAGE TO THIS SYSTEM CREATED BY THE REMOVAL OF ANY OTHERMECHANICAL SYSTEMS OR COMPONENTS.

C THIS CONTRACTOR SHALL COORDINATE PHASING OF SPRINKLER WORK WITH THE GENERAL CONTRACTORPRIOR TO STARTING WORK.

D PROVIDE A COMPLETE WET TYPE FIRE PROTECTION SYSTEM AS REQUIRED TO ACCOMMODATE THE FLOORPLAN AND CEILING TYPES INCLUDING MAINS, BRANCHES, HEADS, VALVES, AND ACCESSORIES AS REQUIRED.THE SYSTEM SHALL BE INSTALLED ACCORDING TO MANUFACTURER'S SPECIFICATIONS ANDRECOMMENDATIONS OF THE STATE BUILDING CODE, LOCAL FIRE DEPARTMENT, AND ALL FEDERAL, STATE,AND LOCAL AUTHORITIES, NFPA, AND FACTORY MUTUAL.

E THE SPRINKLER SYSTEM SHALL BE DESIGNED BASED UPON ACTUAL WATER FLOW TEST DATA OBTAINED ATOR NEAR THE JOB SITE.

F REFER TO REFLECTED CEILING PLANS FOR ADDITIONAL INFORMATION REGARDING SPRINKLER HEADLOCATION AND PIPE, UNLESS NOTED OTHERWISE.

G DIVISION 21 CONTRACTOR SHALL COORDINATE WITH THE ELECTRICAL CONTRACTOR FOR PROPERINSTALLATION OF THE FIRE PROTECTION SYSTEMS ALARM DEVICES INVOLVED WITH FIRE SPRINKLERSYSTEM.

H ALL SPRINKLER SYSTEM PIPING SHALL BE CONCEALED ABOVE THE SUSPENDED CEILING SYSTEM, UNLESSNOTED OTHERWISE. WRITTEN AUTHORIZATION SHALL BE OBTAINED FROM THE ARCHITECT PRIOR TOEXPOSING ANY PIPING IN ANY ROOM WHICH HAS A SUSPENDED CEILING.

J THIS CONTRACTOR SHALL PROVIDE ALL ADDITIONAL SPRINKLER HEADS AS REQUIRED TO ENSURE ANAPPROVED FIRE PROTECTION SYSTEM AT NO ADDITIONAL COST TO THE OWNER.

K AUXILIARY DRAINS SHALL BE EXPOSED WITH 1" DRAIN VALVES. WHEN 5 OR MORE GALLONS ARE TRAPPED,THIS CONTRACTOR SHALL PROVIDE FIXED PIPING TO AN ADEQUATELY SIZED RECEPTOR WHICH IS CAPABLEOF ACCEPTING THE FULL FLOW OF THE DRAIN. WHEN LESS THAN 5 GALLONS ARE TRAPPED, A HOSE BIBSHALL BE PROVIDED AT THE DRAIN VALVE.

L AUXILIARY DRAINS SHALL NOT BE LOCATED ABOVE PLASTER OR GYPSUM BOARD CEILING SYSTEMS. ONLY BYA SPECIFIC WRITTEN INSTRUCTION FROM THE ENGINEER WILL A VARIANCE BE PROVIDED.

M AN INSPECTOR'S TEST CONNECTION SHALL BE PROVIDED FOR EACH FIRE SPRINKLER ZONE. THISCONTRACTOR SHALL PROVIDE FIXED PIPING FROM THE TEST CONNECTION TO AN ADEQUATELY SIZEDRECEPTOR WHICH IS CAPABLE OF ACCEPTING THE FULL FLOW OF THE TEST. EXTERIOR DISCHARGE OF THETEST CONNECTION SHALL BE PERMITTED ONLY BY SPECIFIC WRITTEN INSTRUCTION FROM THE ENGINEER.

N SHOW ALL ROOM NUMBERS ON SHOP DRAWING PLANS.

P FLOW TEST DATA FROM #/#/# INDICATES THE FOLLOWING: STATIC PRESSURE # PSI. RESIDUAL PRESSURE: #PSI AT ## GPM. THE HYDRANTS TESTED ARE APPROXIMATELY ### FEET AWAY FROM THE CENTER OF THESITE LOCATED OFF THE ##" WATER MAIN IN ## STREET AT AN ELEVATION OF ### FEET ABOVE SEA LEVEL. SEECIVIL PLANS FOR HYDRANT LOCATION. THE CONTRACTOR SHALL PERFORM A FIRE FLOW TEST INACCORDANCE WITH NFPA 291 TO VERIFY THE FLOW TEST DATA GIVEN ABOVE. THE DATA GIVEN ABOVE SHALLBE THE BASIS OF DESIGN UNLESS THE AVAILABLE PRESSURE OR FLOW HAS DECREASED. NOTIFY OWNERSREPRESENTATIVE IF FLOW TEST DATA DIFFERS FROM THE DATA ABOVE. A FIRE PROTECTION ENGINEER ORAN ENGINEER EXPERIENCED IN WATER FLOW TESTING SHALL PERFORM OR WITNESS THE REQUIRED FLOWTESTING AND SIGN THE REPORT PRIOR TO THE FIRST SPRINKLER SYSTEM SUBMITTAL.

Q ROUTE SPRINKLER PIPING SUCH THAT IT DOES NOT RUN ABOVE ELECTRICAL PANELS, SWITCHGEAR, ORSIMILAR EQUIPMENT. SPRINKLER MAINS SHALL NOT RUN THROUGH ELECTRICAL OR COMMUNICATION ROOMS.SPRINKLER HEADS IN THESE ROOMS SHALL BE SERVED BY A DEDICATED BRANCH LINE FOR EACH ROOM.

R THIS DRAWING INDICATES A GENERAL PIPING ARRANGEMENT AND SUGGESTED SIZING ONLY. THISCONTRACTOR SHALL DETERMINE THE ACTUAL PIPE SIZING REQUIRED AND COORDINATE WORK WITH ALLOTHER TRADES TO AVOID CONFLICTS.

S THIS CONTRACTOR SHALL PREPARE HYDRAULIC CALCULATIONS BASED UPON THE CONFIGURATION OF THEACTUAL SYSTEM DESIGN AS SHOWN ON THIS CONTRACTOR'S SHOP DRAWINGS.

T SECURITY ELECTRONICS ROOM AND ELECTRICAL IT ROOM SHALL SHAL BE PROTECTED BY AN INERT-GASSYSTEM.

# Revision Date

A

A

D

D

C

C

B

B

17 17

16 16

14 14

13 13

12 12

11 11

18 18

14.214.214.314.3

13.313.313.213.2

16.816.8

A.1

A.1

THIS AREA IS TO BE PROTECTED BY AN INERT-GAS SYSTEMSEE DETAIL 1/F800

THIS AREA IS TO BE PROTECTED BY AN INERT-GAS SYSTEM

NEW 4" FIRE LINE

NEW WALL MOUNTED FIRE DEPARTMENT CONNECTION (FDC)

CONNECT NEW 6" FIRE LINE TO EXISTING FIRE RISER.

CELL

C106

CELL

C117

DAYROOM

C109

CELL

C113

CELL

C112

CELL

C111

CELL

C110

UTILITY

C108

DAYROOM

C119

CORRIDOR

C102

CORRIDOR

C101

SA

LL

YP

OR

T

C10

0

JAIL COMMANDER

C124

CONTROL ROOM

C126

?

?

STO.

C129

CL.

C091

CORR.

C128

RR

C127

DAYROOM

C131

CELL

C140

CELL

C147

PROGRAM

C153

CLO.

C152

ISO

C156

PROGRAM

C165

CORRIDOR

C130

CORRIDOR

C125

RR

A104

JAIL LOBBY

A103

RR

A105

MATRON

A107

VIS.

A103B

JANITOR

B106

MECHANICAL

B107ADMIN.

A126

LOBBY

A127

RR

A128

STOR.

A144

DEPUTY

A147

DEPUTY

A146

DEPUTY

A145

CONFERENCE

A143

POLYGRAPH

A142

CHIEF DEPUTY

A141

WORK

A129

EVIDENCE

A134

STORAGE/JAN

A131

INTERVIEW

A132

CONFERENCE

A140

SHERIFF'S

A139

ADMIN. ASSIST

A138

DETECTIVE

A137

DETECTIVE

A136

SOFT INTER.

A135

CORRIDOR

A130

WORK/FILE

A124

LOCKER

A119

LOCKER

A116

RR

A115

RR

A118

IT

A114A

MATT. STOR.

B103

SALLYPORT

B101

INTERVIEW

A112

INTERVIEW

A111

CHANGING

B109

?

?

UNIFORM

B108

PROPERTY STO.

B121

BOOKING

B122

SEG.

B120

SEG.

B119

PADDED

B118

BOOK-IN CORRIDOR

B115

GR

OU

P H

OL

DIN

G

B11

4

GROUP HOLDING

B113

?

?

BREATH.

B102

STORAGE

C155

SALLYPORT

B100

CO

RR

IDO

R

B10

5

JAIL LOBBY

A102

?

?

WALK-IN FREEZER

B132

KITCHEN

B134

SALLYPORT

B129

CELL

C144

CELL

C145

CELL

C146

CELL

C148

CELL

C149

CELL

C150

CELL

C151

CELL

C142

CELL

C141

CELL

C139

CELL

C138

CELL

C137

CELL

C136

CELL

C135

CELL

C134

CELL

C133CELL

C132

CELL

C107

CELL

C105

CELL

C104

DAYROOM

C103

DAYROOM

C114

CELL

C115

CELL

C116

CELL

C118

CELL

C120

CELL

C121

CELL

C122

CELL

C123

NURSE'S OFFICE

C162

MEDICAL CORRIDOR

C154PADDED

C157

ISO

C159

EXAM ROOM

C160

STAFF RR

C161INMATE RR

C158

? ?

INMATE RR

B117PADDED

B116

TRUSTEES

B123

COOK'S OFFICE

B133

WALK-IN COOLER

B131

LA

UN

DR

Y S

TO

RA

GE

B12

7

LAUNDRY

B128

SEC/FILE

A123

WORKOUT

A122

?

?

TR

AN

SF

ER

VE

ST

IBU

LE

A13

3

BREAK ROOM

A120

STORAGE

A121

CORRIDOR

A110

SALLYPORT

A113

CORRIDOR

C163

MECHANICAL

C166

VESTIBULE

A100

CORRIDOR

A101

CORRIDOR

B104

?

?

SALLYPORT

C164

CORRIDOR

B130

SALLYPORT

090

ISO CELL

091

CORRIDOR

D101

MECHANICAL

D109

INMATE RR

D103

STORAGE

D107

ENCLOSED

RECREATION

D104

SALLYPORT

D106

SECURITY

D108

STAIR

D102

SECURED

CORRIDOR

D100

2 BED CELL

D111

CHASE

D109A

2 BED CELL

D112

2 BED ADA CELL

D113

2 BED CELL

D121

2 BED CELL

D122

2 BED ADA CELL

D123

DAYROOM

D110

DAYROOM

D120

DAYROOM

D130

DAYROOM

D140

DAYROOM

D150

2 BED ADA CELL

D154

2 BED CELL

D153

2 BED CELL

D152

2 BED CELL

D151

2 BED ADA CELL

D143

2 BED CELL

D142

2 BED CELL

D141

2 BED ADA CELL

D134

2 BED CELL

D133

2 BED CELL

D132

2 BED CELL

D131

CHASE

D109B

JANITOR

D101A

INSPECTOR'S TEST CONNECTION: SEE DETAIL 4/F800

INSPECTOR'S TEST CONNECTION: SEE DETAIL 4/F800

INSPECTOR'S TEST CONNECTION: SEE DETAIL 4/F800

4"

FP

-W

F

F

H

H

K

K

3"

3"

4"4"

4"

4"

4"

4" FIRE LINE UP

6"

A

A

D

D

C

C

B

B

17 17

16 16

14 14

13 13

12 12

11 11

18 18

14.214.214.314.3

13.313.313.213.2

16.816.8

A.1

A.1

MEZZ.

D230

MECHANICAL

D109

CHASE

D109A

CHASE

D109B

MEZZ.

D250

MEZZ.

D240

MEZZ.

D220

MEZZ.

D210

SPRINKLER ZONE RISERS:SEE DETAIL 6/F800

4"

123456

E

D

C

B

A

E

D

C

B

A

123456

These Drawings and Specifications, and all copies thereof are and shall remain the property and

copyright of the Architect. They shall be used only with respect to this Project and are not to be used on any other Project or Work without prior written

permission from the Architect

UNIT C

UNIT A UNIT B

F210

Designed By: D.K. BENELL

Drawn By: C.M./J.W.

Checked By: D.B.

Date: 04.12.2021

Project #: 17-700-078-2

VER

MIL

LIO

N C

OU

NTY

JAI

LAD

DIT

ION

& R

ENO

VATI

ON

1888

IN-6

3H

ILLS

DAL

E, IN

478

54

OVERALL FIRST ANDSECOND FLOOR PLANS -FIRE PROTECTION

100%

CD

Bid

Set

VER

MIL

LIO

N C

OU

NTY

CO

MM

ISSI

ON

ERS

0 16' 32'8'

1/16" = 1'-0"1

OVERALL FIRST FLOOR PLAN - FIRE PROTECTION

PLAN NOTES# NOTE

FIRE PROTECTION GENERAL NOTESA EXISTING BUILDING: PROVIDE ALTERATIONS TO THE EXISTING FIRE PROTECTION SYSTEM AS REQUIRED TO

ACCOMMODATE THE NEW FLOOR PLAN AND NEW CEILING TYPES. PROVIDE A COMPLETE WET TYPE SYSTEMINCLUDING NEW MAINS, BRANCHES, HEADS, VALVES, AND ACCESSORIES AS REQUIRED. REUSE EXISTINGSYSTEM EQUIPMENT WHERE APPLICABLE. THE SYSTEM SHALL BE INSTALLED ACCORDING TOMANUFACTURER'S SPECIFICATIONS AND RECOMMENDATIONS AND AS PER REQUIREMENTS OF THE STATEBUILDING CODE, LOCAL FIRE DEPARTMENT, AND ALL FEDERAL, STATE, AND LOCAL AUTHORITIES, NFPA, ANDFACTORY MUTUAL.

B THE BUILDINGS COMPLETE OPERATIONAL FIRE PROTECTION SYSTEMS SHALL REMAIN IN PLACE. THISCONTRACTOR SHALL REPAIR ANY DAMAGE TO THIS SYSTEM CREATED BY THE REMOVAL OF ANY OTHERMECHANICAL SYSTEMS OR COMPONENTS.

C THIS CONTRACTOR SHALL COORDINATE PHASING OF SPRINKLER WORK WITH THE GENERAL CONTRACTORPRIOR TO STARTING WORK.

D PROVIDE A COMPLETE WET TYPE FIRE PROTECTION SYSTEM AS REQUIRED TO ACCOMMODATE THE FLOORPLAN AND CEILING TYPES INCLUDING MAINS, BRANCHES, HEADS, VALVES, AND ACCESSORIES AS REQUIRED.THE SYSTEM SHALL BE INSTALLED ACCORDING TO MANUFACTURER'S SPECIFICATIONS ANDRECOMMENDATIONS OF THE STATE BUILDING CODE, LOCAL FIRE DEPARTMENT, AND ALL FEDERAL, STATE,AND LOCAL AUTHORITIES, NFPA, AND FACTORY MUTUAL.

E THE SPRINKLER SYSTEM SHALL BE DESIGNED BASED UPON ACTUAL WATER FLOW TEST DATA OBTAINED ATOR NEAR THE JOB SITE.

F REFER TO REFLECTED CEILING PLANS FOR ADDITIONAL INFORMATION REGARDING SPRINKLER HEADLOCATION AND PIPE, UNLESS NOTED OTHERWISE.

G DIVISION 21 CONTRACTOR SHALL COORDINATE WITH THE ELECTRICAL CONTRACTOR FOR PROPERINSTALLATION OF THE FIRE PROTECTION SYSTEMS ALARM DEVICES INVOLVED WITH FIRE SPRINKLERSYSTEM.

H ALL SPRINKLER SYSTEM PIPING SHALL BE CONCEALED ABOVE THE SUSPENDED CEILING SYSTEM, UNLESSNOTED OTHERWISE. WRITTEN AUTHORIZATION SHALL BE OBTAINED FROM THE ARCHITECT PRIOR TOEXPOSING ANY PIPING IN ANY ROOM WHICH HAS A SUSPENDED CEILING.

J THIS CONTRACTOR SHALL PROVIDE ALL ADDITIONAL SPRINKLER HEADS AS REQUIRED TO ENSURE ANAPPROVED FIRE PROTECTION SYSTEM AT NO ADDITIONAL COST TO THE OWNER.

K AUXILIARY DRAINS SHALL BE EXPOSED WITH 1" DRAIN VALVES. WHEN 5 OR MORE GALLONS ARE TRAPPED,THIS CONTRACTOR SHALL PROVIDE FIXED PIPING TO AN ADEQUATELY SIZED RECEPTOR WHICH IS CAPABLEOF ACCEPTING THE FULL FLOW OF THE DRAIN. WHEN LESS THAN 5 GALLONS ARE TRAPPED, A HOSE BIBSHALL BE PROVIDED AT THE DRAIN VALVE.

L AUXILIARY DRAINS SHALL NOT BE LOCATED ABOVE PLASTER OR GYPSUM BOARD CEILING SYSTEMS. ONLY BYA SPECIFIC WRITTEN INSTRUCTION FROM THE ENGINEER WILL A VARIANCE BE PROVIDED.

M AN INSPECTOR'S TEST CONNECTION SHALL BE PROVIDED FOR EACH FIRE SPRINKLER ZONE. THISCONTRACTOR SHALL PROVIDE FIXED PIPING FROM THE TEST CONNECTION TO AN ADEQUATELY SIZEDRECEPTOR WHICH IS CAPABLE OF ACCEPTING THE FULL FLOW OF THE TEST. EXTERIOR DISCHARGE OF THETEST CONNECTION SHALL BE PERMITTED ONLY BY SPECIFIC WRITTEN INSTRUCTION FROM THE ENGINEER.

N SHOW ALL ROOM NUMBERS ON SHOP DRAWING PLANS.

P FLOW TEST DATA FROM #/#/# INDICATES THE FOLLOWING: STATIC PRESSURE # PSI. RESIDUAL PRESSURE: #PSI AT ## GPM. THE HYDRANTS TESTED ARE APPROXIMATELY ### FEET AWAY FROM THE CENTER OF THESITE LOCATED OFF THE ##" WATER MAIN IN ## STREET AT AN ELEVATION OF ### FEET ABOVE SEA LEVEL. SEECIVIL PLANS FOR HYDRANT LOCATION. THE CONTRACTOR SHALL PERFORM A FIRE FLOW TEST INACCORDANCE WITH NFPA 291 TO VERIFY THE FLOW TEST DATA GIVEN ABOVE. THE DATA GIVEN ABOVE SHALLBE THE BASIS OF DESIGN UNLESS THE AVAILABLE PRESSURE OR FLOW HAS DECREASED. NOTIFY OWNERSREPRESENTATIVE IF FLOW TEST DATA DIFFERS FROM THE DATA ABOVE. A FIRE PROTECTION ENGINEER ORAN ENGINEER EXPERIENCED IN WATER FLOW TESTING SHALL PERFORM OR WITNESS THE REQUIRED FLOWTESTING AND SIGN THE REPORT PRIOR TO THE FIRST SPRINKLER SYSTEM SUBMITTAL.

Q ROUTE SPRINKLER PIPING SUCH THAT IT DOES NOT RUN ABOVE ELECTRICAL PANELS, SWITCHGEAR, ORSIMILAR EQUIPMENT. SPRINKLER MAINS SHALL NOT RUN THROUGH ELECTRICAL OR COMMUNICATION ROOMS.SPRINKLER HEADS IN THESE ROOMS SHALL BE SERVED BY A DEDICATED BRANCH LINE FOR EACH ROOM.

R THIS DRAWING INDICATES A GENERAL PIPING ARRANGEMENT AND SUGGESTED SIZING ONLY. THISCONTRACTOR SHALL DETERMINE THE ACTUAL PIPE SIZING REQUIRED AND COORDINATE WORK WITH ALLOTHER TRADES TO AVOID CONFLICTS.

S THIS CONTRACTOR SHALL PREPARE HYDRAULIC CALCULATIONS BASED UPON THE CONFIGURATION OF THEACTUAL SYSTEM DESIGN AS SHOWN ON THIS CONTRACTOR'S SHOP DRAWINGS.

T SECURITY ELECTRONICS ROOM AND ELECTRICAL IT ROOM SHALL SHAL BE PROTECTED BY AN INERT-GASSYSTEM.

1/16" = 1'-0"2

SECOND FLOOR REFLECTED CEILING PLAN - UNIT C - FIRE PROTECTION

0 16' 32'8'

# Revision Date

HFC- 125EXTINGUISHING

SYSTEM RELEASE

HFC- 125EXTINGUISHINGSYSTEM ABORTPUSH AND HOLD

F

I

R

E

F

I

R

E

NOTICEHFC-125 EX TINGUI S HI NG

SY STE M A LA RM

IF ACTIVE

EXI T ARE A IMME DIA TE LY

CAUTIONTHIS AREA IS PROTECTED BY A

HFC-125 EXTINGUISHING SYSTEM

DO NOT ENTER AREA DURING

OR AFTER DISCHARGE

KEEP DOOR CLOSED AT ALL TIMES

F

I

R

E

F

I

R

E

NOTICEHFC-125 EX TINGUI S HI NG

SY STE M A LA RM

IF ACTIVE

DO NOT E NTER ARE A

TYPICAL ELEVATION DETAIL

OF EXIT FORM ROOM

TYPICAL ELEVATION DETAIL

OF ENTRANCE TO ROOM

FLOOR

MANUAL

PULL STATION

BELL

ABORT SWITCH

(MUSHROOM BUTTON)

COORDINATE DEVICE

LOCATIONS WITH

ELECTRICAL WALL SWITCH

AND/OR ROOM THERMOSTAT

+48"

HORN / STROBE

STROBE

+80" OR 6"

BELOW CEILING,

(WHICHEVER IS

LOWER)

DOOR SHALL HAVE

WEATHER-STRIPPING

AROUND JAMS AND

LATCHING DEVICES

CONTROL

PANEL

+6' 0

"

LAY-IN CEILINGPHOTOELECTRIC

SMOKE

DETECTOR

PHOTOELECTRIC

SMOKE

DETECTOR

SUPPORT DISCHARGE

PIPING 10'-0" MAX

DISCHARGE

NOZZLE

(TYP.)POROUS BLOCK WALLS MUST

BE COMPLETELY SEALED

OPERATION OF FIRE SUPPRESSION SYSTEM

SMOKE DETECTION ACTIVATION

A. FIRST DETECTOR IN ALARM IN THE ROOM AREA.

1. ALARM BELL SOUNDS.

2. DAMPERS CLOSE.

B. SECOND DETECTOR IN ALARM IN THE ROOM AREA.

1. PRE-DISCHARGE HORN / STROBES SOUND &

FLASH.

2. TIME DELAY (30 SECONDS) IS STARTED

3. ABORT STATION CAN BE PUSHED AT THIS TIME TO

HALT DISCHARGE.

C. TIME DELAY (30 SECONDS) EXPIRES.

1. DISCHARGE HORNS SOUND AND STROBES FLASH.

2. CLEAN EXTINGUISHING AGENT WILL DISCHARGE

VIA THE NOZZLES.

MANUAL STATION ACTIVATION

D. MANUAL PULL STATION IS ACTIVATED.

1. BELLS SOUND AND STROBES FLASH.

2. DAMPERS CLOSE

3. CLEAN AGENT WILL DISCHARGE IMMEDIATELY VIA

THE NOZZLES.

LAY-IN CEILING

ACCESS

FLOOR

CLEAN AGENT TANKS

FLEX-HOSE

DISCHARGE

PIPING

PIPE CEILINGESCUTCHEON PLATE

SPRINKLER BRANCH PIPING

SPRINKLER BRANCH PIPING FROM CONTROLROOM RISER PIPING IS NORMALLY "DRY"

"WET" PIPE SYSTEM

TYPICAL PENDENT INSTITUTIONALTYCO "RAVEN" SPRINKLER FURNISHEDAND INSTALLED BY THE SPRINKLERCONTRACTOR.

SPRINKLER PIPING INSTALLED BYTHE CELL MANUFACTURER ATTHE FACTORY.

SPRINKLER PIPING INSTALLED BYTHE SPRINKLER CONTRACTOR.

TYPICAL PENDENT INSTITUTIONALTYCO "RAVEN" SPRINKLER FURNISHEDAND INSTALLED BY THE SPRINKLERCONTRACTOR

"UPRIGHT" SPRINKLER INSTALLED BYTHE SPRINKLER CONTRACTOR.

TYPICAL PENDENT INSTITUTIONALTYCO "RAVEN" SPRINKLER FURNISHEDAND INSTALLED BY THE SPRINKLERCONTRACTOR

( ZONE NO. 1 OR ZONE NO. 2 )

DAYROOM CEILING.

BULKHEAD CEILING

OPEN GRATING WALKWAY

CONTRACTOR MAY MAKE FINAL CONNECTIONTO CELL WITH BRAIDED FLEXIBLE HOSE.BRAIDED FLEXIBLE HOSE SHALL NOT EXCEED30" IN LENGTH AND SHALL BE DRAINABLE.

SPRINKLER PIPING DROPTO CELLS

1" DRAIN VALVE WITHPIPE CAP.

SPRINKLER PIPING DROPTO CELLS

ADJUSTABLE HUB

MULTI-PORT BRACKET

SELF TAPPING SCREWS

SPRINKLER HEAD

FLEXHEAD SPRINKLER DROP

CORRUGATED STAINLESS STEEL HOSEWITH STAINLESS STEEL BRAID AVAILABLEIN 2', 3',4',5' & 6' LENGTHS

METAL OR WOODENSTUD (OR APPROPRIATE

RIGID SURFACE)

SPRINKLER HEAD TYPES PER LOCATION.REFER TO SPECIFICATIONS FOR

TO SUITLENGTHPROVIDE

TO SUITLENGTHPROVIDE

40 PIPING, TYPICAL1" BLACK STEEL SCHEDULE

SUSPENDED CEILING

CHROME ESCUTCHEON PLATE

1" X 1/2" PIPE REDUCING COUPLING

SPRINKLER BRANCH PIPING

FIRE DEPARMENTCONNECTION

AUTOMATIC

10" ALARM BELL BY

BELL WIRING BY

6" REDUCED PRESSURE DETECTORBACKFLOW PREVENTER ASSEMBLYBY SPRINKLER CONTRACTOR

TAMPER

2" MAIN DRAIN

TEE CONNECTION

MAIN DRAIN VALVE

TEE CONNECTION

WATER PRESSURE GAUGE

FLOW SWITCH

OS&Y VALVE (TYP)

PRESSUREGAUGE

AIR GAPFITTING

FLOOR ANCHOREDSUPPORT

(TYP)

TEE CONNECTION

SWITCH

BALL DRIP

SPRINKLER CONTRACTOR

TO BEGIN HIS WORK AT

THIS POINT.

PLUMBING CONTRACTOR

TO FURNISH AND INSTALL

INCOMING SERVICE.

SPRINKLER CONTRACTOR

ELECTRICAL CONTRACTOR

CHECK VALVE W/

TO EXTERIOR

SEE CIVIL DRAWINGSFOR LOCATION

CAULK ALL

4"

6"

PIPING TO SPRINKLER SYSTEM

FLOORPENETRATIONS

MAIN DRAINTERMINATE EXTERIOR

OF BUILDING

TERMINATE OVERFLOOR DRAIN

TAMPERSWITCH

PIPING SYSYEM TO BE SIZED BY THEFIRE PROTECTION CONTRACTOR.

FLOOR

CEILING

ACCESS PANEL IN WALL

EXTERIOR WALL

A/S DRAIN LINE

A/S DRAIN LINE

PIPE SLEEVE

THREADED OUTLET1" 45° ELBOW

18" ABOVE GRADE

SECTION

NOTE:ACCESS PANEL WITH LABEL AUTOMATIC SPRINKLER DRAIN AND INSPECTOR TEST VALVE TO BE INSTALLED WHEN LOCATED IN A FINISHED AREA.

WATERFLOW SWITCH

TO AUTOMATIC SPRINKLER SYSTEM

INSPECTOR'S TEST VALVE

SECTIONAL DRAIN VALVE

TO DRAIN

1" SIGHT GLASS

RISER

1" UNION WITH ORIFICE DISK

INDICATING TYPE FLOOR CONTROL VALVE WITHSUPERVISORY SWITCH

FEED MAIN

ALARM WIRING BY

MAIN RISER DRAIN VALVE (TYP)

FLOW SWITCH

OS&Y VALVE (TYP)

PRESSUREGAUGE

FLOOR ANCHOREDSUPPORT(TYP)

SLEEVE PENETRATIONTHRU FLOOR.

ELECTRICAL CONTRACTOR

4"

FIRE LINE TO CELL AREA

FIRE ZONE# 1

FIRE ZONE# 2

4"

OS&Y VALVE (TYP. 0F 2)NORMALLY CLOSED

NORMALLY OPEN

NITROGEN SUPPLY TO RISER

FLOOR LINE

2" MAIN DRAINROUTE TOFIRST FLOOR DRAIN

NITROGENSUPPLY LINE

PRESSURE SWITCH TOSERVE NITROGEN SYSTEM

(TYP. 0F 2)

CONTROL ROOM A214

4"

CAP FOR

FUTURE

123456

E

D

C

B

A

E

D

C

B

A

123456

These Drawings and Specifications, and all copies thereof are and shall remain the property and

copyright of the Architect. They shall be used only with respect to this Project and are not to be used on any other Project or Work without prior written

permission from the Architect

UNIT C

UNIT A UNIT B

F800

Designed By: D.K. BENELL

Drawn By: C.M./J.W.

Checked By: D.B.

Date: 04.12.2021

Project #: 17-700-078-2

VERM

ILLI

ON

COUN

TY J

AIL

ADDI

TIO

N &

RENO

VATI

ON

1888

IN-6

3HI

LLSD

ALE,

IN 4

7854

FIRE PROTECTIONDETAILS & SCHEDULES

100%

CD

Bid

Set

VERM

ILLI

ON

COUN

TY C

OM

MIS

SIO

NERS

NOT TO SCALE4

INSPECTOR'S TEST STATION DETAIL

NOT TO SCALE1

CLEAN AGENT DETAIL

NOT TO SCALE2

CELL AREA SPRINKLER DETAIL

NOT TO SCALE3

SPRINKLER CONNECTION DETAIL

NOT TO SCALE5

SPRINKLER SYSTEM ZONE CONTROL

VALVE DETAILNOT TO SCALE

6JAIL ZONE RISERS DETAIL

FLOW TEST SCHEDULESTATIC

PRESSURE (PSI)

RESIDUALPRESSURE

(PSI)

FLOW RATE (GPM)

PITOTPRESSURE

(PSI)

NOTES:

1. DATE OF FLOW TEST: 2. DATA GIVEN BY LOCAL WATER COMPANY.

1/8" = 1'-0"7

SPRINKLER RISER DETAIL

# Revision Date