Post on 16-Jul-2015
transcript
Rt. 105 – Zone 2
Rt. 242 – Zone 5
Rt. 118 – Zone 9
Rt. 15 – Zone 14
Rt. 17 – Zone 20
Rt. 125 – Zone 21
Rt. 73 – Zone 25
Rt. 4 – Zone 27
Rt. 103 – Zone 30
Rt. 11 – Zone 35
Rt. 9 – Zone 37
State/Federal Highways
Priority Zones
Conserved Lands
Green Mountain Range
Climate Change Safeguards Program
Critical Paths — Making Roadways Permeable for Wildlife NWF’s Northeast Regional Center is working to safeguard wildlife and improve public safety on our roads in partnership with state and federal agencies, municipalities, citizens, and other conservation organizations. The Critical Paths Project is studying road crossings throughout the region and working with transportation officials to devise practical solutions to minimize habitat fragmentation, create wildlife corridors, and help wildlife survive climate change.
National Wildlife Federation Northeast Regional Center • www.nwf.org/northeast • 149 State St., Montpelier, VT • (802) 229-0650
Zone 9 Zone 10
Zone 11 Rte. 118
N
State/Federal Highways
Priority Zones
Conserved Lands
Green Mountain Range
The Critical Paths Project has identified 11 priority zones out of the 38 wildlife crossings along the spine of Vermont’s Green Mountains. The inset map above shows three zones that were monitored along Route 118, and highlights the detailed physical characteristics of the priority zone between Belvidere and Eden.
Critical Path Partners: Vermont Natural Resources Council, the Vermont Department of Fish & Wildlife, the Vermont Agency of Transportation, and the U.S Forest Service, Green Mountain and Finger Lakes National Forest. Funding was made possible in part by a grant award made by the Wildlife Conservation Society through its Wildlife Action Opportunities Fund to assist implementation of several priority actions of Vermont’s Wildlife Action Plan. Support to establish the Wildlife Action Opportunities Fund was provided by the Doris Duke Charitable Foundation. Additional funding was provided by the Wallace Global Fund, the Summerlee Foundation, the Ward M. and Mariam C. Canaday Educational and Charitable Trust, and Jane’s Trust.
0 5 1