Post on 18-Nov-2014
description
transcript
Well Come to GHCL Sutrapada
A Presentation byHARDWARE & NETWORK CELL IT Department
•What is Virtualization?Virtualization is Nothing But Creating Virtual Version of
Something, in Computer Terms it can be OS, Storage Device, Network Resources.
Virtualization
Goal Of Virtualization
• Goal of Virtualization is to centralize administrative task while improving scalability and overall Hardware Utilization. Many operating system can be run on single high end server.
• An Enterprise can better manage the updates and rapid changes to OS and applications without disturbing the users.
• Ultimately virtualization dramatically improves the efficiency and Availability of System resources in enterprise.
Hardware Virtualization
• Hardware Virtualization or Platform Virtualization means creation of virtual machine that act like real computer. For Example Computer Running Microsoft Windows 7 May Host The virtual machine look likes a ubuntu.
-Host Machine-Guest Machine
Types Of Hardware Virtualization
• Full Virtualization :- Almost complete simulation of the actual hardware to allow software, which typically consists of a guest operating system, to run unmodified
• Partial Virtualization :- Some but not all of the target environment is Simulated. Some guest programs, may need modifications to run in This virtual environment.
• Para Virtualization :- Hardware environment is not simulated; however, The guest programs are executed in their own isolated domains, as if they are Running on a separate system. Guest programs need to be specifically modified To run in this environment.
Creating Monitoring And Maintenance Of Virtual Machines
• Prepare the requirement of virtual machine Environment like how many user will connect To the VM, How Many Applications will run on The VM. As per requirement decide how much Resources required for VM Like No. of Virtual processor, RAM and NIC etc.
• Now Create the VM in hypervisor and install The OS and All Other Application users want run.• Keep Monitoring The VM And See How Much Load it takes and if needed Change the resources It uses.
Snapshotting of VM
• Snapshot is a state of virtual machine at an exact time. Snapshots are taken by giving an order to do so at a given time and can revert on demand.
• Snapshot is extremely rapid backup technique.
• Snapshot can be moved to another machine With its own hypervisor
Teleporation
• When the VM is temporarily stopped, Snapshotted, then it can be moved to other server and resumed on new host, this process is known as Teleportation (or migration).
• If you take snapshot regularly then Teleportation process become very fast And uninterrupted to the users.
FailOver
• Failover allows VM to continue operations if the host fails, in such failover case failover VM continues its operation from last known coherent state, rather then current state.
Challenges
• First challenge with virtualization is the complexities of licensing.
• Virtualized desktop is depend on centralized Server, storage and network. Which puts user vulnerable to server and Network outage or capacity limit.
Desktop Virtualization
• Desktop virtualization is the concept of separating the logical desktop from the physical machine
• Desktop virtualization is more advance state of hardware Virtualization.
• Rather than interacting with host computer directly via Keyboard and mouse and monitor, user uses another Computer or mobile device to interact with the server.
• Thin Clients in desktop virtualization are simple and much Cheaper solution which are designed to connect through The network
Virtualization in GHCL SodaAshDivision
APP
OS
APP
OS
APP
OS
Virtual Servers
Ncomp1 Domain Oracle
APP
OS
APP
OS
APP
OS
Virtual Servers
NCOMP2 AV Retro Backup
APP
OS
APP
OS
APP
OS
APP
OS
Virtual ServersProxy 1 Proxy 2 WSUS Veeam Backup
Physical Server1IBM 3650M4
Physical Server2IBM 3650M4
Physical Server3IBM 3650M4
13 Users 70 Users301 Users 160 Users 13 Users300 Users 300 Users10 Users 60 Users
Netgear 3220 NAS
Win 2k8 Win 2k3Win 2k8 Win 2k8 Win 2k8Win 2k8Win 2k8 Win 2k3Win 2k3 Win 2k8
Win 2012 R2Win 2012 R2
Win 2012 R2
Resource Planning Of Host Server1Resource Availabe VM Description Resources Assign Resource Remained
16 Procesor, 72 GB RAM, 8 NIC Card
Ncomputing For MS App.
16 Virtual Processor
4 Virtual Processor, 12 GB RAM, 2 NIC Card
32 GB RAM
1 NIC Card
Domain Server
2 Virtual Processor
8 Gb RAM
1 NIC Card
Oracle Server
2 Virtual Processor
8 Gb RAM
1 NIC Card
FailOver Of AV
2 Virtual Processor
6 GB RAM
1 NIC Card
FailOver Of Reliance Proxy
4 Virtual Processor
6 GB RAM
1 NIC Card
Resource Planning Of Host Server2Resource Availabe VM Description Resources Assign Resource Remained
16 Procesor, 72 GB RAM, 8 NIC Card
Ncomputing For Open Source App.
16 Virtual Processor
1 Virtual Processor, 4 GB RAM, 1 NIC Card
32 GB RAM
1 NIC Card
Antivirus Server
2 Virtual Processor
8 Gb RAM
1 NIC Card
RestroSpect Backup Server
2 Virtual Processor
8 Gb RAM
1 NIC Card
FailOver Of Domain Server
2 Virtual Processor
6 Gb RAM
1 NIC Card
FailOver Of NC1
8 Virtual Processor
16 GB RAM
1 NIC Card
FailOver Of BSNL Proxy
1 Virtual Processor
2 Gb RAM
1 NIC Card
Resource Planning Of Host Server3Resource Availabe VM Description Resources Assign Resource Remained
16 Procesor, 72 GB RAM, 8 NIC Card
Veeam Backup
4 Virtual Procesor
8 Virtual Processor, 2 GB RAM, 1 NIC Card
4 GB RAM
1 NIC Card
Windows Server Update Service
2 Virtual Processor
4 GB RAM
1 NIC Card
Reliance Proxy Server
2 Virtual Processor
4 GB RAM
1 NIC Card
BSNL Proxy Server
2 Virtual Processor
4 GB RAM
1 NIC Card
Test Server
2 Virtual Processor
4 GB RAM
1 NIC Card
FaiOver Of Domain Server
2 Virtual Processor
6 GB RAM
1 NIC Card
FailOver Of NC2
8 Virtual Processor
32 GB RAM
1 NIC Card
FailOver Of Antivirus
Shared NIC With Domain
6 GB RAM
1 NIC Card
FailOver Of BackUP Server
2 Virtual Processor
6 GB RAM
Shared NIC With AV
INTERNAL LAYOUT OF GIGABIT ETHERNET/ FAST ETHERNET NETWORK,NODES AND RELATED PERIPHERALS
AT GHCL LTD. PLANT SUTRAPADA, JUNAGADH, GUJRAT.
Index
• Introduction• GHCL Existing Network Setup• Existing Network Diagram• Network Resources Usage of Switches• Network Devices And Load On Them• Business Benefit• On Going CCTV Project Fiber Layout
Introduction
GHCL Ltd – Sutrapada Facility is having a state of the art Network infrastructure in place. To Support the Business with almost 99.999% uptime. IT Team conducts The audit of the existing set up to study the gap Addressing the below mentioned parameters to the HOD.
• Redundancy • Network Scalability
GHCL Existing Network Setup
• Existing network is based on the industry standard practice of design i.e. core – distribution & edge / access layer.
• Redundancy has been built at the core layer by deploying the HSRP Configuration on existing layer – 3 switches.
• Redundancy has been built at the link as well as path at almost all the locations.
GHCL Plant Logical Network
Admin
Disp Godown
HRDPlant Office
Material W/B Securit
y
VRA
Soda Ash W.B
Inst W.S
Safety
Rbc
LabMech worksh
op
New rmh
Bricket plan
Rmh con
UCR
LCR
CCR
Stores
Existing Network Diagram
Network Resources Usage of SwitchesVLAN AREA SWITCHS RESOURCES USAGES Normal Hours Peak Hours
VLAN 1 IT ADMIN CORE SWITCHS CPU / Ternary content-addressable memory Utilization 13% 16%
VALN 2 DISP GODOWN DDISTRUBUTION SWITCHS CPU / Ternary content-addressable memory Utilization 13% 16%
VALN 3 PLANT OFFICE DDISTRUBUTION SWITCHS CPU / Ternary content-addressable memory Utilization 13% 16%
VALN 4 HRD DDISTRUBUTION SWITCHS CPU / Ternary content-addressable memory Utilization 13% 16%
VALN 5 ADMIN BULDING DDISTRUBUTION SWITCHS CPU / Ternary content-addressable memory Utilization 13% 16%
Network Devices And Load On ThemNO MODEL NO LOCATION VLAN ID Connected Users
1 SGE2000 DISP GODOWN VLAN 2 9
2 SGE2000 DISP GODOWN 2 VLAN 2
3 SRW2024 MATERIAL WEB BRIGE VLAN 2 4
4 SRW2024 MATERIAL GATE SECURITY VLAN 2 4
5 SRW2024 VRA VLAN 2 2
6 SRW2024 SODA S WEB BRIGE VLAN 2 3
7 SGE2000 INU. W/s VLAN 2 6
8 SRW2024 500 SECTION VLAN 2 4
9 SGE2000 HRD VLAN 4 33
10 SRW2024 STORE VLAN 4 15
11 SGE2000 Plant Office Vlan 3 52
12 SGE2000 LAB Vlan 3 7
13 SGE2000 CCR Vlan 3 7
14 SGE2000 LCR Vlan 3 9
15 SGE2000 UCR Vlan 3 12
16 SRW2024 RMH Control Room Vlan 3 5
17 SRW2024 Mech Workshop Vlan 3 1
18 SRW2024 New RMH Vlan 3 1
19 SGE2000 ADMIN Switch=1 VLAN 1 24
20 SGE2000 ADMIN Switch=2 VLAN 1 28
21 SGE2000 ADMIN Switch=3 VLAN 5 52
22 SG300 ADMIN Switch=4 VLAN 1 26
23 SRW2024 Bricket Plant VLAN 3 1
Total Users 305
Business Benefit
• Switch level Redundancy Core & Distribution • Network management easy.• increase network reliability and uptime.• Allows the IT Admin to work remotely.
Main Gate Security CSO Office
Time Office / HRD
Soda GodownSoda Gate Security
Labour Gate
VRA
Material Weight Bridge
Material Gate Security Office
Lime Stone RAMP 1
Lime Stone RAMP 2
RBC Godown
IT Server Room
Steel Yard Nr. Civil Office
Steel Yard Nr. Sea Water Area (Standalone) UTP Cable
Fiber optic
GHCL Sutrapada CCTV Project Fiber Layout
Total 33 IP CCTV Cameras Connected
Through 12 POE Switches
Thank youA Presentation by
HARDWARE & NETWORK CELL IT Department