Warwickshire County Council

Signal Design, Safety Audit &Installation Practice

Gafoor Din IEng FIHE – Principal EngineerMichelle Fillingham IEng FIHE – Traffic Signal Design Engineer

Warwickshire County Council

Format of talk

• Propose of traffic control and information systems• Design Specification & Installation Practice• What is Road Safety Audit and Safety Review• Design issues at traffic signal junctions• Design issues at pedestrian crossings• Installation Practice

2

Warwickshire County Council

• Code of Practice• The Geometric Layout of Signal Controlled

Junctions TD 50/04• Work Specifications• Layout Drawings• Dropped Kerbs & Tactile Surfaces• Ducting & Chambers

Signal DesignSpecification & Installation Practice

Warwickshire County Council

• Signal Poles & Lanterns• Detection• Cabling & Terminating• Questions

Signal DesignSpecification & Installation Practice

3

Warwickshire County Council

• Improving safety• Improve network management• Better travel and traveller information• Better public transport• More efficient freight transport• Reducing environmental impact

OBJECTIVES TOOLS

Local Transport Plan (LTP 3)DfT ITS Policy

Delivering Outcomes notImplementing Technology

Propose of traffic control and information systems

Warwickshire County Council

• Improving safety• Improved asset management• Better maintenance• Better network management

OBJECTIVES AUXILIARY EQUIPMENT

Design Manual for Road BridgesTraffic Advisory Leaflets

Delivering Sustainable Infrastructurenot just a Scheme

4

Warwickshire County Council

How do we get from here?

Warwickshire County Council

To Here?

5

Warwickshire County Council

Signal DesignSpecification & Installation Practice

The Code of Practice for Traffic Control &Information Systems TA84/06

Warwickshire County Council

TA 84/06 Volume 8, Section 1, Part 2.

CODE OF PRACTICE FOR TRAFFIC CONTROL AND INFORMATION SYSTEMS

6

Warwickshire County Council

Signal DesignSpecification & Installation Practice

The Geometric Layout of Signal-ControlledJunctions and Signalised Roundabouts

TD 50/04

Warwickshire County Council

https://www.gov.uk/government/publications/local-transport-notes

https://www.gov.uk/government/collections/traffic-advisory-leaflets

http://www.dft.gov.uk/ha/standards/dmrb/

7

Warwickshire County Council

• Visibility to a signal heads at a traffic signal junctionTD 50/04

Warwickshire County Council

Signal head positions

120m

Example for 40mph SSD is 120m

8

Warwickshire County Council

Warwickshire County Council

9

Warwickshire County Council

Warwickshire County Council

10

Warwickshire County Council

Warwickshire County Council

11

Warwickshire County Council

Warwickshire County Council

Signal DesignSpecification & Installation Practice

Work Specifications

12

Warwickshire County Council

Warwickshire County Council

13

Warwickshire County Council

Signal DesignSpecification & Installation Practice

Programming the Work

Warwickshire County Council

14

Warwickshire County Council

Signal DesignSpecification & Installation Practice

Layout Drawings

Warwickshire County Council

Standard Key

www.theihe.org - Traffic Signal Control course - Conference Aston Birmingham - 29th April to May 2nd 2013

15

Warwickshire County Council

Standard Key

www.theihe.org - Traffic Signal Control course - Conference Aston Birmingham - 29th April to May 2nd 2013

Warwickshire County Council

Type of Phases

www.theihe.org - Traffic Signal Control course - Conference Aston Birmingham - 29th April to May 2nd 2013

16

Warwickshire County Council

Type of Phases

www.theihe.org - Traffic Signal Control course - Conference Aston Birmingham - 29th April to May 2nd 2013

Warwickshire County Council

17

Warwickshire County Council

Warwickshire County Council

Typical 2 Stage control

18

Warwickshire County Council

Typical 3 Stage control

Warwickshire County Council

Typical 4 Stage control

19

Warwickshire County Council

Warwickshire County Council

Permitted stage changes

1 2

3

20

Warwickshire County Council

Dummy Phase

www.theihe.org - Traffic Signal Control course - Conference Aston Birmingham - 29th April to May 2nd 2013

Warwickshire County Council

21

Warwickshire County Council

Warwickshire County Council

22

Warwickshire County Council

Warwickshire County Council

Signal DesignSpecification & Installation Practice

Dropped Kerbs and Tactile Surfaces atPedestrian Crossing Points

23

Warwickshire County Council

Warwickshire County Council

24

Warwickshire County Council

Warwickshire County Council

25

Warwickshire County Council

The preferred gradientis 5% or 1:20

Warwickshire County Council

26

Warwickshire County Council

Warwickshire County Council

27

Warwickshire County Council

Warwickshire County Council

Signal DesignSpecification & Installation Practice

Fully Ducted System

28

Warwickshire County Council

Fully Ducted System

Warwickshire County Council

Topographic Survey

29

Warwickshire County Council

Warwickshire County Council

AGDElectricity

Controller

SupplyCable

AGD

BoxSign

5

4

6

1 32

Draw up as Schematic

30

Warwickshire County Council

Warwickshire County Council

Retention Socket

31

Warwickshire County Council

Warwickshire County Council

STAKKA Box

32

Warwickshire County Council

Warwickshire County Council

33

Warwickshire County Council

Warwickshire County Council

34

Warwickshire County Council

Warwickshire County Council

35

Warwickshire County Council

Warwickshire County Council

36

Warwickshire County Council

Warwickshire County Council

High Friction Surfacing (HFS) – TD 50/04 (DMRB 6.2.3)

HD 36/06 (DMRB 7.5.1) – Polished Stone Value (PSV)

37

Warwickshire County Council

Warwickshire County Council

38

Warwickshire County Council

Warwickshire County Council

39

Warwickshire County Council

The Manual of Contract Documents for Highway Works (MCHW)Volume 3 - Highway Construction Details

G Series

Warwickshire County Council

The Manual of Contract Documents for Highway Works (MCHW)Volume 3 - Highway Construction Details

G Series

40

Warwickshire County Council

The Manual of Contract Documents for Highway Works (MCHW)Volume 3 - Highway Construction Details

G Series

Warwickshire County Council

The Manual of Contract Documents for Highway Works (MCHW)Volume 3 - Highway Construction Details

G Series

41

Warwickshire County Council

Warwickshire County Council

42

Warwickshire County Council

Warwickshire County Council

43

Warwickshire County Council

Warwickshire County Council

44

Warwickshire County Council

Some Bad, Some Dangerous!

Signal DesignSpecification & Installation Practice

Warwickshire County Council

45

Warwickshire County Council

Warwickshire County Council

46

Warwickshire County Council

Warwickshire County Council

47

Warwickshire County Council

Warwickshire County Council

48

Warwickshire County Council

Warwickshire County Council

49

Warwickshire County Council

Warwickshire County Council

50

Warwickshire County Council

Warwickshire County Council

Safety Audit Definition

A formal procedure for the independent evaluation ofhighway schemes before implementation to identifypotential safety hazards which may affect road usersand to suggest measures to eliminate or mitigate thoseproblems

• An independent review of the design• Ensure that all safety related issues have been

addressed• Make recommendations

51

Warwickshire County Council

Safety Audit are carried out in four stages –HD 19/15 – DMRB Vol 5, Section 2, Part 2

• Stage 1 :- Completion of preliminary design(before publication of draft orders)

• Stage 2 :- Completion of detailed design(before invitation to tender)

• Stage 3 :- Completion of construction(before opening)

• Stage 4 :- Monitoring reports shall be prepared using12 months and 36 months of accident data

Warwickshire County Council

The Scope of the Audit :

• Aim to minimise accident frequency and severity• NOT a design standards or technical check!• Who can be hurt here and why?

52

Warwickshire County Council

Warwickshire County Council

Safety Review Definition

An independent review of the safety aspects of a systemcarried out after the preliminary design stage and againafter the detailed design stage.

These reviews runs in parallel with and may becombined with, the Stage 1 and Stage 2 Safety Auditsextended to cover the control and operational aspects ofthe proposed system.

53

Warwickshire County Council

Exact location of traffic signal equipmentController Specification FormMethod of controlTiming sheets for crossingsTraffic model (Oscady, LinSig, Transyt, Paramics)

Warwickshire County Council

54

Warwickshire County Council

Warwickshire County Council

55

Warwickshire County Council

TAL 1/06 – General Principles of Traffic Control by Lights Signalswww.gov.uk/government/collections/traffic-advisory-leaflets

Warwickshire County Council

56

Warwickshire County Council

TAL 5/05 – Pedestrian Facilities at Signal-Controlled Junctions

Warwickshire County Council

57

Warwickshire County Council

Warwickshire County Council

58

Warwickshire County Council

Traffic – TAL 1/06 (part 4 of 4)Pedestrians – TAL 5/05 (part 4 of 4)

E

B

A

Warwickshire County Council

A

E

0 1 2 3 4 5 6

3 2

Intergreen = 6 secs

Intergreen from Phase A to E

59

Warwickshire County Council

Pedestrian to Traffic

Pedestrian

Traffic

0 1 2 3 4 5 6 7 8 9 10

2

Intergreen = 10 secs

Warwickshire County Council

2 second blackout – Warwickshire

Pedestrian

Traffic

2

Intergreen = 8 secs

0 1 2 3 4 5 6 7 8

60

Warwickshire County Council

TR 2581A

Warwickshire County Council

Pedestrian to Traffic

Pedestrian

Traffic

8 7 6 5 4 3 2 1

2

Intergreen = 10 secs

61

Warwickshire County Council

4 seconds

7 seconds

7 seconds

33 seconds

Minimum cycle times

Cycle Time

Maximum cycle times

Warwickshire County Council

Signal head positions

• Close Associated Secondary

62

Warwickshire County Council

• Local alignment

Warwickshire County Council

Method of Control

• Manual• Fixed Time• VA (Vehicle Actuated)• CLF (Cableless Linking Facility)• UTC/SCOOT• MOVA

63

Warwickshire County Council

Detection TypeLTN 2/95

Warwickshire County Council

• When the 85% tile approach speeds exceeds65mph it is recommended that traffic signalsshould not be installed

• Right turns should be controlled separatelywhen the 85% tile approach speeds exceeds45mph

• Duplicate primary signals

TAL 2/03 – Signal-control at junctions onHigh-Speed Roads

64

Warwickshire County Council

Detection – MOVA loops

• Improve traffic flow• Distance calculated

for individual sites• Can also be used at

high speed locationsinstead of x, y z andspeed discrimination /assessment loops

• Increase intergreenby 1 sec

Warwickshire County Council

Detection – MOVA loops

65

Warwickshire County Council

Warwickshire County Council

66

Warwickshire County Council

Warwickshire County Council

67

Warwickshire County Council

Trixi Mirrors

Warwickshire County Council

LTN 1/95 – The Assessment of PedestrianCrossing

• Zebra crossings are only appropriate for roads wherethe 85% tile speeds is less than or equal to 35mph

• Signaled crossings are only appropriate for roadswhere the 85% tile speeds is less than or equal to50mph

68

Warwickshire County Council

Warwickshire County Council

Location of crossing – on major road near junction

• Should be located awayfrom conflict points atuncontrolled junctions

• ‘Safe’ distance willdepend on junctiongeometry

• Minimum of 20msuggested for signalcontrolled crossing

• Absolute minimum of 5mfor a zebra crossing

69

Warwickshire County Council

Warwickshire County Council

70

Warwickshire County Council

Warwickshire County Council

71

Warwickshire County Council

Warwickshire County Council

72

Warwickshire County Council

Minimum width stagger island = 2.8m min

Warwickshire County Council

Forward Demand P1 and P6

73

Warwickshire County Council

Lighting for crossings

• May need to improve/supplement the lighting• ILE Technical Report No. 12• BS5489-1 2003, Section 11, and BS EN 13201-

2 2003, Annex B.• Can drivers see pedestrians/cycles waiting to

cross• Consult a lighting engineer

Warwickshire County Council

74

Warwickshire County Council

Warwickshire County Council

Signal DesignSpecification & Installation Practice

Signal Poles & Lanterns

75

Warwickshire County Council

Traffic Signal Poles

Warwickshire County Council

76

Warwickshire County Council

Warwickshire County Council

www.theihe.org | TrafficSignal Control Course

2.1m

1.0m to1.01m

2.4m on Cycle Path

4.32m

77

Warwickshire County Council

Warwickshire County Council

78

Warwickshire County Council

Warwickshire County Council

79

Warwickshire County Council

Warwickshire County Council

80

Warwickshire County Council

Warwickshire County Council

81

Warwickshire County Council

Warwickshire County Council

82

Warwickshire County Council

Warwickshire County Council

83

Warwickshire County Council

Warwickshire County Council

Signal DesignSpecification & Installation Practice

Cabling & Terminating

84

Warwickshire County Council

Warwickshire County Council

85

Warwickshire County Council

Warwickshire County Council

86

Warwickshire County Council

Warwickshire County Council

87

Warwickshire County Council

Questions?

gafoordin@warwickshire.gov.ukmichelle.fillingham@bournemouth.gov.uk