ISIT 351IT Project
Annual 2012
AUTUMN LECTURE 01Introduction & Administration
Some people you’ll meet
• Lecturer & Co-Ordinator: Dr Bob Brown
– eMail: bobbrown@uow.edu.au
– Office: 39.108 Phone: x3758
– Consultation:<subject to change>
• Monday 13:30-14:30
• Tuesday 08:30-10:30
– All other times by appointment ONLY
• Tutors: Andy & Bob & Dane(in alphabetical order)
ADMINSTUFF
3/2/2012
2
THIS IS YOUR
CAPSTONESUBJECT
This is your chance to
show us what you’ve learned
over the last few years
ADMINSTUFF
Subject Description
• This subject is a group project, conducted under the supervision
of an academic staff member(s).
• Staff members will propose real-world IT projects ranging from
the selection and implementation of IT to the development and
implementation of software systems.
• Involves: project planning, group coordination, seminars and
individual presentations, research of proposed application
domain, preparation of reports and, depending on the project,
various system development methodologies.
• Students will form teams, each of which will design, implement
and document a solution to one of the proposed projects.
• Teams will meet weekly with supervisors to discuss progress
and problems.
ADMINSTUFF
3/2/2012
3
Subject Objectives
• On successful completion of this subject, students
should be able to:
1. gather necessary information about
the domain of their problem
2. develop a project plan
for a small group working on an IT problem
3. execute that plan to produce
a viable solution to an IT problem
4. communicate effectively (both orally and in writing)
the results of their investigation
5. communicate effectively with
their team members
ADMINSTUFF
Provisional Enrolment
• Will be considered on a case-by-case basis
– I *may* be able to waive the pre-req
in some cases … NO GUARANTEES
• See your Degree Co-Ordinator & *fix* your workload/schedule before I can even consider anything else …
ADMINSTUFF
3/2/2012
4
Provisional Enrolment
>NOTE:
– As this is a CAPSTONE subject, I must assumethat you are TOTALLY familiar with the concepts from previous topics … (DFDs, UseCase etc)
– So it is up to YOU to keep up
• This will probably require a considerable amount of independent extra study.
ADMINSTUFF
Attendance Requirementsaccording to UOW regulations:
• It is the responsibility of students to attend all lectures, tutorials,
labs, seminars, practical work etc. for all of the subjects in which you
are enrolled.
• It should be noted that the amount of time spent on each 6 credit
point subject should be at least 12 hours per week,
including lectures, tutorials & labs etc.
• thats all lects & labs PLUS 8 hpw of your Facebook time
– Full Time student = FULL TIME JOB .. (3 subj = 36 hpw)
– Satisfactory attendance is deemed by the University, to be
attendance at approximately 80% of the allocated contact hours.
– To maximize learning outcomes, it is strongly recommended that
students attend all lectures.
– Failure to meet minimum attendance will result in a Technical Fail
ADMINSTUFF
3/2/2012
5
C
3/2/2012
6
Schwalbe, K.
(2010)
Information Technology
Project Management
(6th ed).
Cengage learning.
ADMINSTUFF
*OR*
Pinto, J.K
Project Managementachieving competitive
advantage
Pearson pub.
3/2/2012
7
ADMIN
STUFF
Week Proposed Topic Reading
1Intro: Assessment, approach
and IT project managementNo tutorial
2What is project management?
who is the project manager?Chapter 1 Textbook,Individual Reflective Report due
3 The IT Context in project management Chapter 2 Textbook
4 Why do so many IT projects fail Prepare questions for special Guest
5 Special Guest lectureChapter 3 TextbookMicrosoft Project Tutorial
6 The project management process in class quiz
7 SDLC - SAD - RE - BPM Student Project work
8 Methodologies, methods, techniques & tools Student Project work
9 Project Integration Management Chapter 4 Textbook
10 Project scope management - the WBS Chapter 5 Textbook
11 Project human resources management Chapter 9 Textbook
12 Group PresentationsStudent Project Report Part A dueProject presentations due
13 Review Preparation for Spring Semester
Tutorial Classes… no tutorial classes in week 1
ALSO PLEASE NOTE: there will be no tuts in week 8 due to the ANZAC Day Holiday … so tuts will run to week 13
• 1: Mon….17:30-19:30….3.122
• 2: Mon….17:30-19:30….3.123
• 3: Wed….08:30-10:30 ….3.123
• 4: Wed….15:30-17:30….3.123
ADMINSTUFF
3/2/2012
8
GROUPS
• YOU DO NOT CHOOSE YOUR TEAM !
– To emulate the real world workplace,
your group will be assigned to you
• And NO. You cannot “swap” for any reason.
– It will be a RANDOMN selection, with some
consideration to spreading skills etc.
• Formation
• Politics
• Meetings
• Conflict resolution
ADMINSTUFF
ASSESSMENT ITEM % OF FINAL MARKGROUP/
INDIVIDUALDUE DATE
AUTUMN SESSION
1. Tutorial participation &
individual reflective report 10% IndividualWeeks 2-12 AUTUMN SESSION
Due in tutorials
2. Project Report Part A: Group
incl Presentation 25% GroupWeek 12 AUTUMN SESSION
3. In class quiz 5 % IndividualWeek 6 AUTUMN SESSION
in tutorial Class
SPRING SESSION
5. Mini-Deliverables 15% IndividualSPRING SESSION:
eek 5, Week 6,
Week 8, Week 10
7. Project Report Part B: Group 25% Group Week 12 – SPRING SESSION
8. End of Spring Session Exam 20% Individual Exam Week – SPRING SESSION
3/2/2012
9
WebCT - eLearning
• This subject will make extensive use of eLearning
– Make sure you can log on (that’s your responsibility)
– Lecture notes will become available there (but DON’T contain sufficient information
for you to pass without attending class)
– Most assignments will be submitted through ‘drop-boxes’
– Your Group Work project may involve use of WebCT
discussion boards
appropriate (ie: professional) online conduct is required at
all times … it is a factor in your assignment marks
ADMINSTUFF
• This subject is in two distinct CHUNKS
– IS Design Proposal
– Project Management
ADMINSTUFF
3/2/2012
10
$3.1m Parliament House website a year late February 14, 2012 smh.com.au
• A "major breach" of Australia's Parliament House computer network partly contributed to a $600,000 cost blowout &12-month delay in constructing the newly designed parliament website which is due to launch to the public this Friday evening.
• Revealed in senate estimates yesterday, the total cost of the new aph.gov.au site, which was meant to go live February 2011, had so far come to about $3.1 million
• The cost blowout and delayed launch follows a botched IT upgrade deployed in December, which brought the parliament site down for 3 days, and attacks on the website by the loose-knit hacking collective Anonymous over Communications Minister Stephen Conroy's internet filtering policy.
• The new site - which people inside parliament have had access to since the middle of January this year - replaces the current one which has been in place for 12 years and will offer "significant new functionality“.
3/2/2012
11
Computer failure let parole violators commit murder: reportApril 19, 2011 smh.com.au
• Seven criminals who had breached their parole orders had committed murder while out of jail and were not identified as parole violators because
of a failing in Victoria Police's computer system.
• The seven had either been charged with other offences while on parole or
had acted in a way that have led their parole being cancelled if police had
known of their situation at the time.
• A failing in the police LEAP computer system meant they had been
allowed to commit murder when they should have been locked up.
• A secret police report revealed the murders could have been prevented if
police who dealt with the offenders over other matters had known they were
on parole.
• Detective Superintendent Gerry Ryan said the computer issue was in the
process of being resolved. ''It's currently in the process
of happening – these things take time unfortunately,‘’.
Technology failure misrouted hiker's 911 calls June 18, 2009 smh.com.au
• A lost hiker who was killed in a helicopter crash after her rescue last
week called 911 repeatedly, but was initially routed to non-emergency
lines lacking the technology to help locate her, authorities said.
• Megumi Yamamoto, a University of New Mexico graduate student
from Japan, dialed 911 after getting lost in the Sangre de Cristo
mountains when she and her boyfriend became separated. She and
State Police Sgt. Andy Tingwall were killed when the helicopter sent
to rescue her crashed in stormy weather the night of June 9.
• Santa Fe County Sheriff Greg Solano said that such misrouted calls
have not occurred in more than a year, after the installation of
technology that uses cell phone tower signals to narrow a person's
location to within a 2-square-mile area through triangulation.
3/2/2012
12
Reasons for Project Failure
• Incomplete or changing requirements
• Limited user involvement• Lack of executive support• Lack of technical support• Poor project planning• Unclear objectives• Lack of required resources
Its about PEOPLE
3/2/2012
13
Website or app: what should start-ups build first? February 8, 2012 smh.com.au
• Roamz founder, Jonathan Barouch says an app was an obvious
choice for his business. Apps are becoming so popular that some
start-ups are bypassing a website in favour of developing their own
smartphone tool.
• Barouch says “We're a location-based service that people access
with their phones, so it made sense for us to focus on the app. We
do have a basic website and we're working on a full-blown site, but
the easiest win for us initially was the app”.
• The advantage of building an app distributed through the Apple
store is the global reach this gives the business. “People all over the
world now use roamz – someone has just uploaded a shot of a lolly
shop in Santa Maria in the US.
• If we'd been a web-based business, achieving
this reach would have been much more difficult,”
Who are your stakeholders?
3/2/2012
14
Model client/users/stakeholders
• Draw stick figures?
• Guess?
• Ask them?
– Ask ‘em what?
• Do they even KNOW?
• If any mere algorithm could yield a perfect solution to multi-dimensional constraint-satisfaction problems …then …
– there’d be NO engineers, architects or designers• Just skilled workers (brick layers, plumbers,
programmers)
• you’re not here to become a “worker”, but hopefully, an employable & PROFESSIONAL decision maker– &, as responsible ethical professionals,
you must be able to live with your decisions!
3/2/2012
15
So what is this “DESIGN” stuff ?
– WHEN is it?
– WHY is it?
– WHO does it?
– WHAT do they do?
• I think it’s a series of TRADE-OFF’s
– to SATISFY all of a project’s NEEDS (requirements)
• AND
– a maximal subset of WANTS (options)
• WITHIN
– A bunch of given (& unexpected) Constraints
• Time (inc. speed)
• Money (up front; construction, operation, maintenance, depreciation)
• Materiel (equipment, saw materials, supplies)
• Personnel (stakeholders; users; staff; skills; training; wages etc)
• Legal (Legislation; Regulation; Standards; Copyright IP; TradeLaws etc)
• Technical … etc
3/2/2012
16
Predictive vs. Adaptive
• Predictive design
– Assumes the system is well understood
• development project can be planned & organised in
advance, then developed according to the plan
• Adaptive design
– Assumes that system requirements are
“not well understood”
• Some requirements may only emerge after some
preliminary development work
Toolbox vs Cookbook
• Toolbox
– A suite of techniques & tools
• Up to the “expert”
to use them the best way
– [BUT: how do you become an expert?]
• Cookbook
– Methods & techniques
are pre-defined &
prescribed by some
methodology
3/2/2012
17
Functional requirements vs. Non-Functional requirements
• Functional• “fundamental or essential”
• “describe what the product has to do, or what processing actions it is to take”
» (Atlantic Systems Guild 2007)
• Non-Functional• “Not what a software will do, but how it will do it”
» (Thayer 1990)
• “can be subjective [..] & relative..”» (Chung, Nixon, Yu & Mylopoulos 1999)
• “properties [..] such as performance & usability”
• “these requirements are as important as functional reqs for a project’s success”
» (Atlantic Systems Guild 2007)
METHOD … ?
• What are the first steps TOWARDS being able to make a design … ?
3/2/2012
18
*some* Methodologies
• Process Oriented STRADIS/YSM/JSD
• Blended SSADM/Merise/IE etc
• Object Oriented OOA/RUP etc
• Rapid development RAD/DSDM/XP/WISDM
• People Oriented ETHICS/KADS/CommonKADS
• Organization Oriented SSM/ISAC/PI/PRINCE etc
• Frameworks Multiview/SODA/CMM/Euromethod
• Activity Oriented ATSA/ATSA-OO
HOMEWORK
• Go learn about:
–COMPETENCY BASED TRAINING
• What is VETAB ?
• What in an RTO ?
–EXTRACTIVE INDUSTRIES
• Mining, Quarrying etc