Welcome S.H. 177 in Braman. SH 177 Over East Branch of Dry Creek. Kay County, Oklahoma March 04,...

Post on 27-Mar-2015

214 views 0 download

Tags:

transcript

WelcomeS.H. 177 in Braman

SH 177SH 177Over East Branch of Dry Over East Branch of Dry

Creek.Creek.Kay County, OklahomaKay County, Oklahoma

March 04, 2010March 04, 2010

Public Information MeetingPublic Information Meeting

The purpose of this meeting is The purpose of this meeting is to inform the public about the to inform the public about the

Departments plan to Departments plan to reconstruct the SH 177 Bridge reconstruct the SH 177 Bridge

over the East Branch of Dry over the East Branch of Dry Creek in Bramen, OK.Creek in Bramen, OK.

NOTE:NOTE:

The Bridge over the East The Bridge over the East Branch of Dry Creek was built Branch of Dry Creek was built

in 1927.in 1927.

Why this project is needed:Why this project is needed:

Even with continued Even with continued maintenance, over time the maintenance, over time the

bridge has become load bridge has become load posted and has deteriorated posted and has deteriorated

to a point of structural to a point of structural deficiency and needs to be deficiency and needs to be

replaced.replaced.

Why this project is needed:Why this project is needed:

What work is being done?What work is being done?

SH 177 over Dry Creek:SH 177 over Dry Creek:

SH 177 over Dry Creek O’Flow:SH 177 over Dry Creek O’Flow:

SH 177 over Dry Creek O’Flow:SH 177 over Dry Creek O’Flow:

SH 177 over Unnamed Creek:SH 177 over Unnamed Creek:

SH 177 over E. Branch Dry SH 177 over E. Branch Dry Creek:Creek:

SH 177 over E. Branch Dry SH 177 over E. Branch Dry Creek:Creek:

SH 177 over E. Branch Dry SH 177 over E. Branch Dry Creek:Creek:

SH 177 over E. Branch Dry SH 177 over E. Branch Dry Creek:Creek:

SH 177 over E. Branch Dry SH 177 over E. Branch Dry Creek:Creek:

SH 177 over E. Branch Dry SH 177 over E. Branch Dry Creek:Creek:

What will it all look like?What will it all look like?

What will it all look like?What will it all look like?

What will it all look like?What will it all look like?

Will there be a Detour?Will there be a Detour?

YESYES

Where will it take me?Where will it take me?

When will ODOT start work?When will ODOT start work?

Start Construction March/April 2010Start Construction March/April 2010

Contract is for 100 DaysContract is for 100 Days

This project will have a $3750 a day This project will have a $3750 a day incentive/disincentiveincentive/disincentive

Estimated Project Cost = $1.370 Estimated Project Cost = $1.370 MillionMillion

Questions?Questions?

Thank you for Thank you for your your

participationparticipation