6th May 2009 8 June 2009

WelcomesYou

Chennai Container Volume Growth(TEU’s) : 1995 - 2013

1000000

1200000

1400000

160000020121.58

millionTEUs

Achieved1.2 million

markAchieved1 million

mark

20

200000

400000

600000

800000

1995 1996 1997 1998 1999 2000 2001 2002 2003 2004 2005 2006 2007 2008 2009 2010 2011 2012 2013

AFTER 2001

19 % GROWTH Y2Y

AFTER 2001

19 % GROWTH Y2Y

BEFORE 2001

9 % GROWTH Y2Y

BEFORE 2001

9 % GROWTH Y2Y

CCTSnapshots

CCTSnapshots

CCT- Overview

o India’s 1st containerterminal -1983

o Until 2001, the terminalwas run by theGovernment Port.

o 30 years BOT awarded toP&O Ports - 2001.

o In 2006, P&O Ports wasacquired by DP World

o India’s 1st containerterminal -1983

o Until 2001, the terminalwas run by theGovernment Port.

o 30 years BOT awarded toP&O Ports - 2001.

o In 2006, P&O Ports wasacquired by DP World

Quay side operations at Mundra International Container Terminal

Quay Length – 885 m

Quay Cranes : 8(5 Mono + 3 Twin)

Draft – 13.4 m

Quay Infrastructure:

Supply Driven Infrastructure

Quay Cranes : 8(5 Mono + 3 Twin)

RTGs – 22 ; ECH - 1

3960 Ground Slots

357 Reefer Points

Yard Infrastructure:

World Class Performance

World Class Performance 2500 moves within 18 hours.

“125 moves per hour on Vessel”

Global Benchmarks – Productivity

Indicators Global Best

Skilled OperatorsSkilled Operators Achieved 50 movesAchieved 50 moves

Import DwellImport DwellTimeTime 22 Hours22 HoursImport DwellImport DwellTimeTime 22 Hours22 Hours

Yard UtilizationYard Utilization 84000 TEUs per Hectare84000 TEUs per Hectare

ProductivityProductivity 31 moves per crane hour31 moves per crane hour

Indicators Before Now(2014)

Berth waitingtime 3 days 0

VesselTurnaround

time72 hours 19 hours

CCT – Productivity Indicators

VesselTurnaround

time19 hours

TrailerTurnaround

time

180minutes 60 minutes

Import DwellDays 7 Days 22 Hours

Gross CraneProductivity

10 movesper hour

31 moves perhour

Chennai Container Terminal - Prior 2001

SIN,PKG & TPP

Port Blair

Colombo

2014 - Connected to 60+ ports globally!

IFXIFX

Chennai Container Terminal - 2014

IMSIMSBOBKYCBOBKYC

10

CCGCCG IFXIFX

Vishrutha (25KM)

SICAL (23 KM)

Triway (16 KM)

ECCT & German Exp (18KM)

Kailash & SattvaLogistics (15 KM)GDL (12 KM)

ICBC & Sattva Hi-tech(11 KM)

Concor (12 KM)

Balmer Lawrie(14 KM)

DR Logistics (23 KM)

Chandra CFS (28 KM)

CWC Madhavaram (15 KM)

Maersk CFS (32 KM)

TRL (15 KM)

CALYX (23 KM)

ICBC & Sattva Hi-tech(11 KM)

Binny (10KM)

AS Shipping (21 KM)

Viking (17KM)

CWC Virugambakkam (25 KM)

CWC Royapuram (2 KM)

Balmer Lawrie(14 KM)

SANCO & ALLCARGO(7KM)

Continental (17 KM)

CWC Chromepet(26 KM)

Sun Global (32 KM)

Glovis (30 KM)

Indev (29 KM)

TRL (15 KM)

Awards and Recognitions2014 Best Container Terminal Operator conferred by EXIM India2014 Terminal of the Year 2014 – Health, Safety & Environment2013 EXIM Achievement Award by Tamil Chamber of Commerce2012 Sir Visvesvaraya Industrial Award by AIMO2012 Best Container Terminal Operator conferred by EXIM India2012 EXIM Achievement Award by Tamil Chamber of Commerce2011 Best Container Terminal Operator conferred by EXIM India2010 DP World Global award for Excellence in Safety and Environment2010 Lloyds List ME and ISC Award for Terminal Operator of the Year2010 National Safety Award – Vishwakarma Rashtriya Puraskar2010 National Safety Award – Vishwakarma Rashtriya Puraskar2010 Maritime Gateway awards for Terminal Operator of the Year2010 EXIM South East India Awards Terminal Operator of the Year2009 Best Container Terminal Operator conferred by EXIM India2008 Exim Achievement Award by Tamil Chamber of commerce2007 Best Customer Award from Hyundai Motors India Ltd

Global Standard Certification

o ISO 9001 : Quality Management

o ISO 14001 : Environmental Management

o OHSAS 18001 : Occupational Health & Safety

o ISO 27001 : Information Security

o ISO 28000 : Supply Chain Security Management

DP World Chennai is committed toQuality, Health, Safety & Environment.

“Green is Sacrosanct for a Sustainable Future”

o ISO 9001 : Quality Management

o ISO 14001 : Environmental Management

o OHSAS 18001 : Occupational Health & Safety

o ISO 27001 : Information Security

o ISO 28000 : Supply Chain Security Management

Safety Initiatives………

About 2500 drivers / cleanersMeet on May Day.

Contractors Rest Area Safety Sign Boards PA System

Drivers Rest Area Shuttle Bus for Pedestrians Safety Gate Roof Top Numbers

Cleaners Rest Area Yard Marshalling Drivers Awareness Objectives for Contractors

More Safety Initiatives………

Truckers Rest Area Concrete for Traffic Control Lashing Cage RTG Blind corner mirror

Environmental Changes Initiatives

o World Environment Day

o Reduced per TEU fuel consumption by 30%reduced exhaust emissions and saving 500,000litres

o Recycled treated sewage water for garden /plants watering.

o Hazardous bund and Spill Trailer

o World Environment Day

o Reduced per TEU fuel consumption by 30%reduced exhaust emissions and saving 500,000litres

o Recycled treated sewage water for garden /plants watering.

o Hazardous bund and Spill Trailer

More - Measures : Future Ready

Launching ofLaunching ofRTG basedRTG based -- WeighingWeighing of Containersof Containers

&&-- RFIDRFID Pilot ProjectPilot Project

ByByShriShri Nitin Gadkari Hon’ble Union Ministry of Shipping on 3Nitin Gadkari Hon’ble Union Ministry of Shipping on 3rdrd Nov 2014Nov 2014

IMO (International Maritime Organization )mandate’s compliance :

Ready for weighing of all containershandled by July 2016

Load Cell unit fixed on all 22RTGs

Certified by Weight & Measureswith tolerance +/- 0.5 tons

Improve Safety & Security

Prevent Revenue Loss toexchequer

- Weighing of Containers

IMO (International Maritime Organization )mandate’s compliance :

Ready for weighing of all containershandled by July 2016

Load Cell unit fixed on all 22RTGs

Certified by Weight & Measureswith tolerance +/- 0.5 tons

Improve Safety & Security

Prevent Revenue Loss toexchequer

Rubber Tyre Gantry Cranelifting a container from a trailer

RFID - Radio Frequency Identification

Container / Trailer Tracking

Only authenticated trailers allowed toenter/exit.

Tampering of data will be eliminated.

Efficient Gate transaction (documents)< 2 minutes / trailer

Multiple Reports arrival/departure oftrailers

Emails/SMS based alerts on entry/exitinto/from CFS/Port

Container / Trailer Tracking

Only authenticated trailers allowed toenter/exit.

Tampering of data will be eliminated.

Efficient Gate transaction (documents)< 2 minutes / trailer

Multiple Reports arrival/departure oftrailers

Emails/SMS based alerts on entry/exitinto/from CFS/Port

•• ee-- Form13Form13 : Web based forms allocation to VOA, COA,CHA and CFS to receive/deliver containers.

•• ee-- SSRSSR : Allow containers arriving after cut-off time.

•• ee-- CRMCRM : Used by all our external customers to log calls.

•• ee-- InvoiceInvoice: To View/download invoices by customers .

•• ee-- Web Access :Web Access :VOA, COA and CFS pre-advise containers.

•• ee--Container SearchContainer Search : On line Container Tracking.

• e- payment : to all Vendors

Web Enabled- Customer Service

•• ee-- Form13Form13 : Web based forms allocation to VOA, COA,CHA and CFS to receive/deliver containers.

•• ee-- SSRSSR : Allow containers arriving after cut-off time.

•• ee-- CRMCRM : Used by all our external customers to log calls.

•• ee-- InvoiceInvoice: To View/download invoices by customers .

•• ee-- Web Access :Web Access :VOA, COA and CFS pre-advise containers.

•• ee--Container SearchContainer Search : On line Container Tracking.

• e- payment : to all Vendors

Projects awaited for to benefit theExim trade at Chennai

EMRIP – Ennore Manali Road Improvement Project

Elevated Corridor Project

Chennai Ennore Port RoadConnectivity project (EMRIP)

Segment Length inKms

Details

Part -1 1.6 Km Port Entry Gate 1 toKasimedu N4 PoliceStation

Part - 2 6.0 Km Kasimedu N4 PoliceStation to ErnavoorJunction (Deferred dueto Resettlement &Rehabilitation of PAF)

Part - 3 5.6 Km MORR (Ernavoorjunction to MFLJunction)

Part -4 9.0 Km TPP Road (MFLjunction to NCTPS)

Part - 5 7.5 Km Northern segment ofInner Ring Road ( MFLJunction toMadhavaram Bridge)

Total stretch – 30 kmsProject Cost – INR 600 crores