WG3 – General information on work progress. R. Vuillermet. PP0 area connection. Common reference and mechanical connection between type 1 services and flex. Flex connectors on discontinuous boards Type 1 connectors on a single board. Flex in PP0 area. Type 1 services in PP0 area. - PowerPoint PPT Presentation

transcript

1

WG3 – General information on work progress

R. Vuillermet

12/04/2011

2

PP0 area connection

12/04/2011

Common reference and mechanical connection between type 1 services and flex

Flex connectors on discontinuous boardsType 1 connectors on a single board

3

Flex in PP0 area

12/04/2011

4

Type 1 services in PP0 area

12/04/2011

5

VI Beam Pipe Geometry

Component Radial thick[mm]

Outer Diameter [mm]

Alu foil 0.100 55.680Kapton tape 0.120 55.480Aerogel 4.000 55.240Kapton tape 0.120 47.240Heaters 0.200 47.000Beam Pipe 0.800 46.600Beam Pipe ID 45.000

Mark Gallilee

12/04/2011

Use to be 3 mm in

the TDR !

6

Construction of the scale one mock-up in building 180

12/04/2011

Week #15 – Survey of the rail system – installation of the central tower of concrete blockWeek#16 – Installation of the minivans – installation of access stairs – installation of hand rails – Installation of central plate on the towerWeek#17 – Installation of Bridge and scaffolding – installation of ITF – Survey and adjustment