ACCA Survey Response Overview
96%
4%
Membership participation
ACCA members Non ACCA members
3% 4% 5% 6%
27%
Top participating countries
4
108 countries 1806 participants
Budgeting in a nutshell is the planning of company activity with the capability of controlling resources and analyzing results achieved during the course of the plan.
Survey Respondents’ Budget Responsibility
14% 20%
23% 24% 26%
47%
5
Less than a quarter of the respondents own the entire budget process. Which provides more room for complications, more revisions, more cycles and long decision cycles for budget approval for the rest of the survey respondents.
Core Accounting Systems In Use
573
366
113 58 53 40 30 26 23 21
504
6
A surprising number indicated that they only use Excel.
Budget Management
7
40% 37%
18% 16%
11%
4%
By division Centrally Regionally By location Globally Other
More than half indicated that they start their
budgeting season with a formal announcement, which
is consistent with a centralized approach
The Budgeting Process
5% 37%
43% 5% 2%
9%
1 year out
6 months out
3 months out
1 month out
Yearend
Other
8
80% start budgeting 3 – 6 months
before the end of the financial year
90% finalize budgets in less than 5 cycles
Top 3 Budgeting Methods
35.00%
32.00%
23.00%
IncrementalActivity basedZero based
9
Incremental budgets were in use by almost 40% of respondents and in theory take less time to approve because they generally require
approvals more on deltas than on the actual numbers which are often inherited from previous years.
The surprising budget method was zero based budgets - historically they have been particularly popular in the public sector as a whole whereas in the private sector they are often limited to administrative overhead activities
Challenges with the Process
10
90%
38% 29% 16% 9%
Key Tools Used • 32% reported actual-budget variances of >10% • 54% feel the budgeting frequency is just right • 21% have no plans to change budget frequency • Only 52% were happy with the status quo
Manageability Issues
Finance Disruption by Budgeting
Yes, 31%
No, 53%
Not sure, 16%
11
Over half of the respondents felt that the budgeting process was not disruptive to finance operations.
The fact that half were satisfied with their budgeting process is most likely due to the flexibility of Microsoft Excel and the simplicity of getting budgets compiled only once a year.
Frequency
Discoveries through analysis
12
What are the relationships between responses and the analysis of the discoveries reveled?
Dependence on MS Excel
• 90% of respondents use MS Excel as a key technology
• 49% of MS Excel users have no other tools yet are satisfied
• 41% use email in the process • Only 12% have workflow
13
Companies still depend heavily on Microsoft Excel for budgeting & planning Data collation and coordination remains a major challenge with the process Findings:
Budget Cycle Time
• 49% take 3+ months to complete • 86% with long cycles have a actual-
budget variance of > 5% • 57% have 3 or less budget cycle
iterations per budget
14
The majority of budgets take a long time to complete. Around half took longer than 3 months and a large portion of those with long budget cycles actually had variances of actual vs. budget greater than 5%
Budget iterations add time to the budget cycle and we determined that over half of the respondents have 3 or fewer budget cycle iterations. Even with a low number of iterations though, budgets seemed to take a long time to finalize.
Multi-participation
• 11% have >5 levels of approval • Banking & Public Sector dominate • 80% have <5 cycles of revision • 75% used a specialised tools • 39% find budgeting disruptive • 33% dissatisfied with the process
15
Budgets often have many levels of participation
Complexity results in business disruption even with tools and this can lead to significant dissatisfaction
Budget accuracy
• 27% indicated actual-budget variance of 10%+ • 25% felt this was improving • Variance issues with centrally managed budgets
– 59% identified indirect costs – 43% identified direct costs
• 50% felt the budget frequency was just right
16
Businesses have problems with budget inaccuracy
Data collation and commitment to the process were indicated as the greatest challenges Implementing rolling budgets seem for the most part to be absent from future plans
Budgeting more frequently
• 8% use rolling budgets • Banking, Healthcare, Media, Mining and
Professional Services dominate in this segment • 33% use formal tools in the process • Variances in actual-budget remain high
– >10% reported by 26% – 5-9% reported by 46%
17
Moving to more frequent and rolling budgets will improve budget accuracy
Using tools doesn’t seem to improve precision but it appears to make rebudgeting easier
Conclusions
• Rolling budgets remain rare • Excel spreadsheets remains a No.1 budgeting tool • Managing and collating data is a problem area • Formal budgeting tools are not commonplace • Even when used, budgeting tools don’t improve
accuracy
18
Workflow & control Process standardisation Participant/approver hierarchy Approval process transparency Hierarchical approval
The Winshuttle Advantage
19
Business process improvement Historical data extraction Data & procedure distribution Data collation ERP synchronization
Customer story
20
November 16, 2007
KP06 (Yearly forecast)
CO- controlling; updating cost elements
8 hours manually per cycle
30 mins to build 2 hours to setup for uploading Minutes to run
KP06 (Quarterly forecast)
CO-controlling; updating cost elements
4 hours manually per cycle
30 mins to build 1 hr to setup for uploading Minutes to run
• Founded 2002 • Total revenue of $233M • 600 employees • Maintain ~12,000km of
High Voltage power transmission lines and 280 substations in Alberta, Canada
Use Excel, SharePoint, Web, mobile, PDF for efficiency. Daily and periodic tasks completed more easily.
Systems of Engagement
Winshuttle’s Surround Strategy
21
Provide automation solutions while leveraging existing skills and infrastructure. Autonomy for business users and improved control by IT.
Ease your ERP data creation or changes. Increase ERP ROI and user satisfaction. Increase the quality and detail of audit records.
Systems of Record
ERP
System of Enablement
Winshuttle Value
22
Estimated value for one customer: Graphing actual transaction data against Winshuttle’s database (based on experience with nearly 2,000 customers) calculating the potential time and cost savings.
Winshuttle License & Maintenance Investment
Support Desk Savings
Productivity Savings
Annual Training Savings
Initial/Ongoing Development Savings
Deployment Savings
Year 1 Year 2 Year 3
$2,202,250
$2,487,190
$2,741,080
Annual Savings
Where to next?
23
Find out how Winshuttle can assist your: SAP Finance processes - visit winshuttle.com/finance SAP Master Data processes - visit winshuttle.com/masterdata
Find out more about the challenges that companies faced, decisions they made, and the benefits they realized by implementing Winshuttle: Read a case study on one of our customers.
Learn more about Winshuttle’s no-programming products and solutions: View or register for a webinar View a product demonstration Explore the Winshuttle TV YouTube channel Browse the Winshuttle Community site
For a quick reply contact info@winshuttle.com
24
Be a Winshuttle hero. Thank you.
info@winshuttle.com www.winshuttle.com