Laguna Lake Development AuthorityLaguna Lake Development Authority

Laguna de Bay Institutional Strengthening andLaguna de Bay Institutional Strengthening andCommunity Participation (LISCOP) ProjectCommunity Participation (LISCOP) Project

 omponen

-

omponen-

Watershed Development

 

Watershed Development

.

ADB Water Learning WeekNov. 7, 2011

.

ADB Water Learning WeekNov. 7, 2011

8/3/2019 WLW Day 1: LISCOP Component 1 by J Siapno

http://slidepdf.com/reader/full/wlw-day-1-liscop-component-1-by-j-siapno 2/34

Envisioned to support the sustainable

Envisioned to support the sustainable

With co-financin su ort from theWith co-financin su ort from the

Netherlands GovernmentNetherlands Government

LISCOP :ISCOP :LISCOP :development initiative of LLDA

OF M 2004 A il 2011

LISCOP :development initiative of LLDA

OF M 2004 A il 2011F:May 2004 – April 2011

AF:July 2011 – June 2014

OF:May 2004 – April 2011

AF:July 2011 – June 2014

8/3/2019 WLW Day 1: LISCOP Component 1 by J Siapno

http://slidepdf.com/reader/full/wlw-day-1-liscop-component-1-by-j-siapno 3/34

COMPONENT 1: COMPONENT 1: Co-Managed Investments for Co-Managed Investments for 

Improve the environmental 

ualit in the re ion b 

Improve the environmental 

ualit in the re ion b engaging LGUs/stakeholders 

 

engaging LGUs/stakeholders 

 

environmental sub-projects. 

environmental sub-projects.

8/3/2019 WLW Day 1: LISCOP Component 1 by J Siapno

http://slidepdf.com/reader/full/wlw-day-1-liscop-component-1-by-j-siapno 4/34

COMPONENT 2: COMPONENT 2: Strengthening Institutions and Strengthening Institutions and 

Ensure that Laguna de Bay and 

its watershed are mana ed 

Ensure that Laguna de Bay and 

its watershed are mana ed effectively and in a sustainable effectively and in a sustainable 

capacity of institutions in capacity of institutions in 

..

8/3/2019 WLW Day 1: LISCOP Component 1 by J Siapno

http://slidepdf.com/reader/full/wlw-day-1-liscop-component-1-by-j-siapno 5/34

Mission No. 1Mission No. 1Situational Analysis

Harness and deepen

stakeholders’ participation in

Harness and deepen

stakeholders’ participation in

micro-watershed

environmental activities

micro-watershed

environmental activities

8/3/2019 WLW Day 1: LISCOP Component 1 by J Siapno

http://slidepdf.com/reader/full/wlw-day-1-liscop-component-1-by-j-siapno 6/34

Mission No. 2

Implement direct and

-

Implement direct and

-

watershed level

interventions that

watershed level

interventions thatwould contribute

towards improvement

would contribute

towards improvement

o e qua y o eLaguna de Bay and itso e qua y o eLaguna de Bay and its

8/3/2019 WLW Day 1: LISCOP Component 1 by J Siapno

http://slidepdf.com/reader/full/wlw-day-1-liscop-component-1-by-j-siapno 7/34

Mission No. 3

Strengthen LGU’s

self-governance and

Strengthen LGU’s

self-governance andreinforce inter-LGU

cooperation in the

reinforce inter-LGU

cooperation in the

environmentalmanagement of

 

environmentalmanagement of

 t e la et e la e

8/3/2019 WLW Day 1: LISCOP Component 1 by J Siapno

http://slidepdf.com/reader/full/wlw-day-1-liscop-component-1-by-j-siapno 8/34

The 33 SubThe 33 Sub--Projects in 21 municipalities generated from 15 out ofProjects in 21 municipalities generated from 15 out of

24 micro24 micro--watersheds through the LEAP processwatersheds through the LEAP process

The 33 SubThe 33 Sub--Projects in 21 municipalities generated from 15 out ofProjects in 21 municipalities generated from 15 out of

24 micro24 micro--watersheds through the LEAP processwatersheds through the LEAP process

= Covered subprojects= Covered subprojects

8/3/2019 WLW Day 1: LISCOP Component 1 by J Siapno

http://slidepdf.com/reader/full/wlw-day-1-liscop-component-1-by-j-siapno 9/34

Original FinancingOriginal Financing

8/3/2019 WLW Day 1: LISCOP Component 1 by J Siapno

http://slidepdf.com/reader/full/wlw-day-1-liscop-component-1-by-j-siapno 10/34

ACCOMPLISHMENTS

==

96% = Financial

 

96% = Financial

8/3/2019 WLW Day 1: LISCOP Component 1 by J Siapno

http://slidepdf.com/reader/full/wlw-day-1-liscop-component-1-by-j-siapno 11/34

-

30 out of 33 completed subprojects30 out of 33 completed subprojects

8/3/2019 WLW Day 1: LISCOP Component 1 by J Siapno

http://slidepdf.com/reader/full/wlw-day-1-liscop-component-1-by-j-siapno 12/34

55MRF

 MRF

EcologicalEnhancement

EcologicalEnhancement

3Flood

3Flood

 Rehabilitation

Of Old

Rehabilitation

Of Old2

WWTF2

WWTF

umps eumps e

1Sanitary1Sanitary

 Reforestation Reforestation

LandfillLandfill

Operat ional Sub-pro jec t s = 30

8/3/2019 WLW Day 1: LISCOP Component 1 by J Siapno

http://slidepdf.com/reader/full/wlw-day-1-liscop-component-1-by-j-siapno 13/34

8/3/2019 WLW Day 1: LISCOP Component 1 by J Siapno

http://slidepdf.com/reader/full/wlw-day-1-liscop-component-1-by-j-siapno 14/34

osure o umps es anupgrading of 23 out of the

-

osure o umps es anupgrading of 23 out of the

-

in the Laguna de Bay Basin

 

in the Laguna de Bay Basin

Decrease by 53.22% in

volume of solid wastes

Decrease by 53.22% in

volume of solid wastesumpe n o open areas,

waterways and the lakeumpe n o open areas,

waterways and the lake

of MRF in 17munici alities.of MRF in 17munici alities.

8/3/2019 WLW Day 1: LISCOP Component 1 by J Siapno

http://slidepdf.com/reader/full/wlw-day-1-liscop-component-1-by-j-siapno 15/34

The establishment and operation ofThe establishment and operation ofcomposting facilities in seventeen(17) municipalities have contributedto the reduction of methane

composting facilities in seventeen(17) municipalities have contributedto the reduction of methane

emissionsemissions

The Flood Control SPsin Baras, Tanay and Taytay,The Flood Control SPsin Baras, Tanay and Taytay,

,impact of flooding.,impact of flooding.

8/3/2019 WLW Day 1: LISCOP Component 1 by J Siapno

http://slidepdf.com/reader/full/wlw-day-1-liscop-component-1-by-j-siapno 16/34

The LISCOP Project has paved the way towardsestablishing LGUs’ own identities, therebyThe LISCOP Project has paved the way towardsestablishing LGUs’ own identities, thereby

its constituentsits constituents

8/3/2019 WLW Day 1: LISCOP Component 1 by J Siapno

http://slidepdf.com/reader/full/wlw-day-1-liscop-component-1-by-j-siapno 17/34

The establishment of various LGU sub-projectsThe establishment of various LGU sub-projects

communities including the marginalized sector.About 462 individuals were hired to providecommunities including the marginalized sector.About 462 individuals were hired to provide

services to the various sub-projects.services to the various sub-projects.

8/3/2019 WLW Day 1: LISCOP Component 1 by J Siapno

http://slidepdf.com/reader/full/wlw-day-1-liscop-component-1-by-j-siapno 18/34

The LGU-proponents have establishedThe LGU-proponents have established

laid the groundwork for further collaboration.laid the groundwork for further collaboration.

8/3/2019 WLW Day 1: LISCOP Component 1 by J Siapno

http://slidepdf.com/reader/full/wlw-day-1-liscop-component-1-by-j-siapno 19/34

Propelled LGUs to formulate ordinances inPropelled LGUs to formulate ordinances in

suppor o e e ec ve mp emen a on othe sub-projectsuppor o e e ec ve mp emen a on othe sub-project

8/3/2019 WLW Day 1: LISCOP Component 1 by J Siapno

http://slidepdf.com/reader/full/wlw-day-1-liscop-component-1-by-j-siapno 20/34

The LGUs as well as the LLDA have built upinstitutional capabilities on various aspects ofThe LGUs as well as the LLDA have built upinstitutional capabilities on various aspects of

pro ec prepara on, appra sa , mp emen a on anmanagementpro ec prepara on, appra sa , mp emen a on anmanagement

8/3/2019 WLW Day 1: LISCOP Component 1 by J Siapno

http://slidepdf.com/reader/full/wlw-day-1-liscop-component-1-by-j-siapno 21/34

Reorientation of function from being a regulatory to

collaborating with LGUs to address environmentalmanagement issues

8/3/2019 WLW Day 1: LISCOP Component 1 by J Siapno

http://slidepdf.com/reader/full/wlw-day-1-liscop-component-1-by-j-siapno 22/34

 

8/3/2019 WLW Day 1: LISCOP Component 1 by J Siapno

http://slidepdf.com/reader/full/wlw-day-1-liscop-component-1-by-j-siapno 23/34

Involvement o f  Involvement o f  

i s an essent ia li s an essent ia l

successsuccess

e ex s enc e o a pro ec

CHAMPION assures

e ex s enc e o a pro ec

CHAMPION assures

sus ta inab i l i t y

 

sus ta inab i l i t y

8/3/2019 WLW Day 1: LISCOP Component 1 by J Siapno

http://slidepdf.com/reader/full/wlw-day-1-liscop-component-1-by-j-siapno 24/34

 

Natural and man-made events canNatural and man-made events can

OrganizationalOrganizational

changechange

8/3/2019 WLW Day 1: LISCOP Component 1 by J Siapno

http://slidepdf.com/reader/full/wlw-day-1-liscop-component-1-by-j-siapno 25/34

Donor‘s fieldDonor‘s field

v

performance,

v

performance,

and issues 

and issues

8/3/2019 WLW Day 1: LISCOP Component 1 by J Siapno

http://slidepdf.com/reader/full/wlw-day-1-liscop-component-1-by-j-siapno 26/34

Project implementation requires flexibilityProject implementation requires flexibility

interactions among partners 

interactions among partners

8/3/2019 WLW Day 1: LISCOP Component 1 by J Siapno

http://slidepdf.com/reader/full/wlw-day-1-liscop-component-1-by-j-siapno 27/34

•Importance of building inter-agency cooperation

Interplay of diff sectors/organizations,etc

Adoption of appropriate mechanisms/strategies

8/3/2019 WLW Day 1: LISCOP Component 1 by J Siapno

http://slidepdf.com/reader/full/wlw-day-1-liscop-component-1-by-j-siapno 28/34

•Importance of establishing sense of ownership

Projects are supported if the stakeholder’s are consulted and fully understood the project

8/3/2019 WLW Day 1: LISCOP Component 1 by J Siapno

http://slidepdf.com/reader/full/wlw-day-1-liscop-component-1-by-j-siapno 29/34

ADDIT IONAL FINANCING

Pila Ecotourism SPPila Ecotourism SP

Anii : host tree for firefliesAnii : host tree for fireflies

endangeredendangered

8/3/2019 WLW Day 1: LISCOP Component 1 by J Siapno

http://slidepdf.com/reader/full/wlw-day-1-liscop-component-1-by-j-siapno 30/34

TARGET SPS

BASED ON PADYEAR 1

SUB-PROJECTS -

YEAR 1

SUB-PROJECTS -Augus t 2011 – J u ly2014

August 2011 – July 2012August 2011 – July 2012

s

12 MRFs

 

16 MRFs

7 FCs

8 Ecos

3 FCs

7 Ecos 2 SLs 3 SLs

1 Agro-Forestry1 River Rehabilitation

1 Rehabilitation of Old Dumpsite

1 Agro-Forestry1 River Rehabilitation

1 Rehabilitation of Old Dumpsite

3737 3838

8/3/2019 WLW Day 1: LISCOP Component 1 by J Siapno

http://slidepdf.com/reader/full/wlw-day-1-liscop-component-1-by-j-siapno 31/34

ADDITIONAL FINANCING

With FS/DAED and Bidding Documents:6Subprojects with total project cost of: Php 99 M

1.Paete Landfill n MRF Php 16.5 M

. .

3.Bay Flood Control 8.1 M

. .

5.Rodriguez Ecotourism 50.0M

. .

8/3/2019 WLW Day 1: LISCOP Component 1 by J Siapno

http://slidepdf.com/reader/full/wlw-day-1-liscop-component-1-by-j-siapno 32/34

Upc om ing Pro jec t s

with Letters of Intent (LoI) issued by partner LGUs )

 

Pagsanjan MRF  

Teresa Ecotourism

Lucban River Rehabilitation Nagcarlan Landfill

Angono Flood Control and Ecotourism

Pangil Agroforestry Sta Maria Material Recovery Facility

Liliw Waste Water Treatment Facility

8/3/2019 WLW Day 1: LISCOP Component 1 by J Siapno

http://slidepdf.com/reader/full/wlw-day-1-liscop-component-1-by-j-siapno 33/34

“The effectiveness of the sub-projects can be 

“The effectiveness of the sub-projects can be 

of the stakeholders which is hoped to increasethrou h time” ……………..

 of the stakeholders which is hoped to increasethrou h time” ……………..

Mayor Rodel dela Cruz

Teresa, Rizal

Mayor Rodel dela Cruz

Teresa, Rizal

8/3/2019 WLW Day 1: LISCOP Component 1 by J Siapno

http://slidepdf.com/reader/full/wlw-day-1-liscop-component-1-by-j-siapno 34/34

Laguna Lake Development AuthorityLaguna Lake Development Authority

 aguna e ay nst tut ona trengt en ng anCommunity Participation (LISCOP) Project

aguna e ay nst tut ona trengt en ng anCommunity Participation (LISCOP) Project

an ouan ouJocelyn Fabian-SiapnoLISCOP Component 1

Co-Management Investments for Watershed Management

Jocelyn Fabian-SiapnoLISCOP Component 1

Co-Management Investments for Watershed Management