Post on 13-Jan-2020
transcript
Document of
The World Bank
FOR OFFICIAL USE ONLY
Report No: PAD1905
INTERNATIONAL DEVELOPMENT ASSOCIATION
PROJECT APPRAISAL DOCUMENT
ON A
PROPOSED CREDIT
IN THE AMOUNT OF SDR106,600,000
(US$ 150.00 MILLION EQUIVALENT)
TO THE
UNITED REPUBLIC OF TANZANIA
FOR A
RESILIENT NATURAL RESOURCE MANAGEMENT FOR TOURISM AND GROWTH
PROJECT
September 7, 2017
Environment & Natural Resources Global Practice
Africa Region
This document has a restricted distribution and may be used by recipients only in the
performance of their official duties. Its contents may not otherwise be disclosed without
World Bank authorization.
Pub
lic D
iscl
osur
e A
utho
rized
Pub
lic D
iscl
osur
e A
utho
rized
Pub
lic D
iscl
osur
e A
utho
rized
Pub
lic D
iscl
osur
e A
utho
rized
CURRENCY EQUIVALENTS
(Exchange Rate Effective July 31, 2017)
Currency Unit = Tanzania Shillings (TZS)
TZS 1 = US$ 0.00045
US$ 1 = SDR 0.71
GOVERNMENT FISCAL YEAR
July 1 – June 30
Regional Vice President: Makhtar Diop
Country Director: Bella Bird
Senior Global Practice Director: Karin Kemper
Practice Manager: Magda Lovei
Task Team Leader: Daniel Mira-Salama
ABBREVIATIONS AND ACRONYMS
BOT Bank of Tanzania
EA Environmental Assessment
EIRR Economic Internal Rate of Return
ESIA Environmental and Social Impact Assessment
ESMF Environmental and Social Management Framework
ESMP Environmental and Social Management Plan
FM Financial Management
FFS Farmer Field School
GDP Gross Domestic Product
GoT Government of Tanzania
GRS Grievance Redress Service
IDA International Development Association
IBRD International Bank for Reconstruction and Development
IFMS Integrated Financial Management System
IFR Interim Financial Report
IRMPF Institutional Risk Management Policy Framework
IWRMDP Integrated Water Resource Management Development Plan
LGA Local Government Authority
MALF Ministry of Agriculture, Livestock, and Fisheries
METG Monitoring and Evaluation Technical Group
MINAPA Mikumi National Park
MNRT Ministry of Natural Resources and Tourism
MoFP Ministry of Finance and Planning
MoWI Ministry of Water and Irrigation
M&E Monitoring and Evaluation
NAO National Audit Office
NCCA Ngorongoro Conservation Area Authority
NCCS National Climate Change Strategy
NEEC National Economic Empowerment Council
NIRC National Irrigation Commission
NSSM National Sector Stakeholders Meeting
OGPFM Open Government and Public Financial Management
PA Protected Area
PCU Project Coordination Unit
PDO Project Development Objective
PEFA Public Expenditure and Financial Accountability
PO-RALG President’s Office Regional Administration and Local Government
PPIs Predictive Proxy Indicators
PS Permanent Secretary
RAP Resettlement Action Plan
REGROW Resilient Natural Resource Management for Tourism and Growth
project
RPF Resettlement Policy Framework
RUNAPA Ruaha National Park
RBWB Rufiji Basin Water Board
SCD Strategic Country Diagnostic
SDR Special Drawing Rights
SGR Selous Game Reserve
SoE Statement of Expenditures
SRI System for Rice Intensification
TANAPA Tanzania National Parks
TAWIRI Tanzania Wildlife Research Institute
TAWA Tanzania Wildlife Management Authority
TFS Tanzania Forest Services
ToR Terms of Reference
TTB Tanzania Tourist Board
TZS Tanzanian Shillings
UMNP Udzungwa Mountains National Park
US$ United States Dollar
VLUP Village Land Use Plans
VMG Vulnerable and Marginalized Groups
WMA Wildlife Management Area
WSDP Water Sector Development Program
TANZANIA
RESILIENT NATURAL RESOURCES MANAGEMENT FOR TOURISM AND
GROWTH (REGROW)
TABLE OF CONTENTS
Page
I. STRATEGIC CONTEXT .................................................................................................1
A. Country Context .............................................................................................................. 1
B. Sectoral and Institutional Context ................................................................................... 2
C. Higher Level Objectives to which the Project Contributes ............................................ 5
II. PROJECT DEVELOPMENT OBJECTIVE ..................................................................7
A. PDO................................................................................................................................. 7
B. Project Beneficiaries ....................................................................................................... 7
C. PDO Level Results Indicators ......................................................................................... 8
III. PROJECT DESCRIPTION ..............................................................................................8
A. Project Components ........................................................................................................ 8
B. Project Financing .......................................................................................................... 11
C. Lessons Learned and Reflected in Project Design ........................................................ 12
IV. IMPLEMENTATION .....................................................................................................13
A. Institutional and Implementation Arrangements .......................................................... 13
B. Results Monitoring and Evaluation .............................................................................. 14
C. Sustainability................................................................................................................. 15
V. KEY RISKS ......................................................................................................................16
A. Overall Risk Rating and Explanation of Key Risks...................................................... 16
VI. APPRAISAL SUMMARY ..............................................................................................18
A. Economic and Financial Analysis ................................................................................. 18
B. Technical ....................................................................................................................... 18
C. Financial Management .................................................................................................. 19
D. Procurement .................................................................................................................. 20
E. Social (including Safeguards) ....................................................................................... 21
F. Environment (including Safeguards) ............................................................................ 23
G. World Bank Grievance Redress .................................................................................... 25
ANNEX 1: RESULTS FRAMEWORK AND MONITORING ...............................................26
ANNEX 2: DETAILED PROJECT DESCRIPTION ...............................................................43
ANNEX 3: IMPLEMENTATION ARRANGEMENTS ..........................................................57
ANNEX 4: IMPLEMENTATION SUPPORT PLAN ..............................................................86
ANNEX 5: ECONOMIC AND FINANCIAL ANALYSIS ......................................................89
MAPS ...........................................................................................................................................92
i
.
PAD DATA SHEET
Tanzania
Tanzania: Resilient Natural Resource Management for Tourism and Growth (P150523)
PROJECT APPRAISAL DOCUMENT .
AFRICA
0000009270
Report No.: PAD1905 .
Basic Information
Project ID EA Category Team Leader(s)
P150523 B - Partial Assessment Daniel Mira-Salama
Lending Instrument Fragile and/or Capacity Constraints [ ]
Investment Project Financing Financial Intermediaries [ ]
Series of Projects [ ]
Project Implementation Start Date Project Implementation End Date
28-Sep-2017 28-Sep-2023
Expected Effectiveness Date Expected Closing Date
28-Dec-2017 28-Sep-2023
Joint IFC
No
Practice
Manager/Manager
Senior Global Practice
Director Country Director Regional Vice President
Magda Lovei Karin Erika Kemper Bella Bird Makhtar Diop .
Borrower: United Republic of Tanzania
Responsible Agency: Ministry of Natural Resources and Tourism
Contact: Major General Gaudence S.
Milanzi
Title: Permanent Secretary
Telephone No.: 00255-26-2321567 Email: ps@mnrt.go.tz .
Project Financing Data (in USD Million)
[ ] Loan [ ] IDA Grant [ ] Guarantee
[ X ] Credit [ ] Grant [ ] Other
Total Project Cost: 150.00 Total Bank Financing: 150.00
Financing Gap: 0.00 .
ii
Financing Source Amount
International Development Association (IDA) 150.00
Total 150.00 .
Expected Disbursements (in USD Million)
Fiscal
Year
2018 2019 2020 2021 2022 2023 2024 0000 0000 0000
Annual 1.00 15.00 25.00 35.00 35.00 30.00 9.00 0.00 0.00 0.00
Cumulati
ve
1.00 16.00 41.00 76.00 111.00 141.00 150.00
.
Institutional Data
Practice Area (Lead)
Environment & Natural Resources
Contributing Practice Areas
Agriculture, Trade & Competitiveness, Water
Proposed Development Objective(s)
The Project Development Objective (PDO) is to improve management of natural resources and tourism
assets in priority areas of Southern Tanzania and to increase access to alternative livelihood activities for
targeted communities. .
Components
Component Name Cost (USD Millions)
1. Strengthen management and improve infrastructure in
priority Protected Areas
97.00
2. Strengthen alternative livelihoods for targeted communities
in proximity to the priority Protected Areas
17.00
3. Strengthen landscape management and infrastructure
investments in and upstream of the Ruaha National Park
27.00
4. Project management, institutional strengthening, quality
assurance and control, and monitoring and evaluation
9.00
.
Systematic Operations Risk- Rating Tool (SORT)
Risk Category Rating
1. Political and Governance Substantial
2. Macroeconomic Moderate
3. Sector Strategies and Policies Substantial
4. Technical Design of Project or Program Moderate
5. Institutional Capacity for Implementation and Sustainability Substantial
6. Fiduciary Substantial
iii
7. Environment and Social Substantial
8. Stakeholders Moderate
9. Other
OVERALL Substantial .
Compliance
Policy
Does the project depart from the CAS in content or in other significant
respects?
Yes [ ] No [X]
.
Does the project require any waivers of Bank policies? Yes [ ] No [X]
Have these been approved by Bank management? Yes [ ] No [X]
Is approval for any policy waiver sought from the Board? Yes [ ] No [X]
Does the project meet the Regional criteria for readiness for implementation? Yes [X] No [ ] .
Safeguard Policies Triggered by the Project Yes No
Environmental Assessment OP/BP 4.01 X
Natural Habitats OP/BP 4.04 X
Forests OP/BP 4.36 X
Pest Management OP 4.09 X
Physical Cultural Resources OP/BP 4.11 X
Indigenous Peoples OP/BP 4.10 X
Involuntary Resettlement OP/BP 4.12 X
Safety of Dams OP/BP 4.37 X
Projects on International Waterways OP/BP 7.50 X
Projects in Disputed Areas OP/BP 7.60 X .
Legal Covenants
Name Recurrent Due Date Frequency
TANAPA appoints additional full-
time staff to its environmental and
social unit
28-Jun-2018
Description of Covenant
TANAPA shall appoint, no later than six (6) months after the Effective Date, or such other date
as may be agreed with the Association, additional full-time staff to its environmental and social
management unit, in adequate numbers and with qualifications and terms of reference
satisfactory to the Association, as further set forth in the PIM, as per section I.B.5 of the Project
Agreement .
Conditions
iv
Source Of Fund Name Type
IDA The Subsidiary Agreement has been executed on
behalf of the Recipient and TANAPA Effectiveness
Description of Condition
A Subsidiary Agreement needs to be executed on behalf of the Recipient and TANAPA, as per section
5.01 (a) of the Financing Agreement
Source Of Fund Name Type
IDA Project Agreement on behalf of the Association and
Project Implementing Entity Effectiveness
Description of Condition
The Project Agreement has been executed on behalf of the Association and the Project Implementing
Entity, as per section 5.01 (b) of the Financing Agreement
Source Of Fund Name Type
IDA Project Implementation Manual adopted by all
project entities Effectiveness
Description of Condition
The Recipient, TANAPA and the Project Implementing Partners, have each adopted the Project
Implementation Manual, acceptable to the Association, as per section 5.01 (c) of the Financing
Agreement .
Bank Staff
Name Role Title Specialization Unit
Daniel Mira-Salama Team Leader
(ADM
Responsible)
Senior
Environmental
Specialist
Environment and
natural resources
GEN01
Gisbert Joseph Kinyero Procurement
Specialist (ADM
Responsible)
Senior Procurement
Specialist Procurement GGO01
Wangwe Magige Mwita Procurement
Specialist
Consultant Procurement GGO01
Henry Amena Amuguni Financial
Management
Specialist
Sr Financial
Management
Specialist
Financial
management
GGO31
Alexandra C. Bezeredi Team Member Lead Social
Development
Specialist
Social safeguards GSU01
Anders Jensen Team Member Senior Monitoring
& Evaluation
Specialist
Monitoring and
evaluation
GENOS
Faustina Chande Team Member Program Assistant Team assistant AFCE1
v
Jane A. N. Kibbassa Environmental
Safeguards
Specialist
Senior
Environmental
Specialist
Environmental
safeguards
GEN01
Jean O Owino Team Member Finance Analyst Disbursements WFALA
Kristine Schwebach Social Safeguards
Specialist
Senior Social
Development
Specialist
Social safeguards GSU03
Sanjay Pahuja Team Member Lead Water
Resources
Specialist
Water resources
management
GWA03
Shaun Mann Team Member Senior Private
Sector Specialist Tourism
development
GTCCS
Veruschka Schmidt Team Member Environmental
Specialist Environmental
specialist
GEN01
Victor Bundi Mosoti Counsel Senior Counsel Lawyer LEGEN
Yesmeana N. Butler Team Member Program Assistant Team assistant GEN01
Extended Team
Name Title Office Phone Location
Erkan Ozcelik Economist 0039-3314884381 Rome
Jaap van de Pol Agriculture Officer 0039-0657054146 Rome
Joseph Sciortino Infrastructure Engineer 356-21-581382 Malta
Michael Carroll Lead Rural Development
Specialist Uruguay
.
Locations
Country First
Administrative
Division
Location Planned Actual Comments
.
Consultants (Will be disclosed in the Monthly Operational Summary)
Consultants Required? Consultants will be required
1
I. STRATEGIC CONTEXT
A. Country Context
1. The United Republic of Tanzania has had robust macroeconomic performance in the past 15
years, with Gross Domestic Product (GDP) growing annually at an average of 6.5 percent. GDP
per capita (current US$) increased from US$307 in 2000 to US$879 in 2016.1 Tanzania’s assets
provide unique economic opportunities compared to other African countries: as a coastal economy
bordering eight countries, six of which are completely or partially land-locked, it has a strong
advantage in terms of its location to be a regional hub; it is endowed with rich and diverse natural
resources, both renewable and non-renewable, providing the basis for current and future economic
development and people's livelihood; and it has enjoyed decades of socio-political stability.2
2. Despite strong economic performance, 12 million people live below the poverty line, especially
in rural areas. Tanzania hosts one of the largest poor populations in Africa. The poverty rate
declined from 34 percent in 2007 to 28 percent in 2012, while rural poverty declined from 39 percent
to 33 percent. However, with a rapidly growing country population (over 53 million in 2015,
projected to increase to 74 million by 2030), per capita gains will be limited.3
3. Tanzania's economy depends, to a significant degree, on its rich natural resources. The
tourism industry, largely biodiversity and wildlife-based, generated $4.8 billion in revenues in 2015,
or roughly 10 percent of GDP, and is the main contributor to foreign currency; agriculture consumes
around 89 percent of the country's water withdrawals, and accounts for 23 percent of GDP; 90
percent of the energy needs are satisfied by hydropower and wood fuels. Most of the population
lives in rural areas (around 70 percent), and depends on natural resources for their livelihoods in the
form of food, fuel, and fodder. In order to maintain economic growth and make it more inclusive,
strong management and stewardship of natural resources is paramount, given the interlinkages
between natural resources, livelihoods and poverty. The natural resource base and geography of
Southern Tanzania – the area of focus for this project – present a unique opportunity to contribute
to these goals in what is a largely neglected, yet high potential, part of the country.
4. The Government of Tanzania (GoT), in its Second Five Year Development Plan (FYDP II),4
has identified the tourism industry as a stable source of growth. Annual tourist numbers have more
than doubled from about 500,000 in 2000 to over 1,137,182 international visitors in 2015 – mostly
attracted by Tanzania’s unparalleled wildlife resources. The country has been very successful in
attracting higher expending tourists, resulting in the highest revenue/tourist ratio in Sub-Saharan
Africa (double, for example, that of Kenya). The sector generates the bulk of export revenues for
the country,5 represents a reliable and resilient source of revenue for the government, and provides
well-remunerated direct employment to over 400,000 people. According to the World Travel &
1 World Development Indicators (as of September 2017).
2 World Bank Group (2017). Tanzania Systematic Country Diagnostic.
3 World Bank Group (2015). Tanzania Economic Update – The Elephant in the Room: Unlocking the potential of the tourism industry
for Tanzanians. Dar es Salaam: Africa Region Macroeconomics and Fiscal Management.
4 Ministry of Finance and Planning (2016). National Five Year Development Plan 2016/17-2020/21: Nurturing Industrialization for
Economic Transformation and Human Development. Dar es Salaam: The United Republic of Tanzania.
5 World Trade Organization (2013) indicate that since 2008, the combined export revenues from travel and tourism have exceeded
those from the mining and energy sector.
2
Tourism Council, tourism’s total contribution to GDP in Tanzania between 2015 and 2025 is
expected to continue to grow at an average 6.6 percent per year.
5. Increased economic activity, population growth and climate change are exacerbating
competition for water resources, threatening ecosystem services. Demand for water is growing
faster than available supply, with conflicts over water resources becoming increasingly common –
Tanzania is on the path of becoming a water-scarce country by 2025. Climate change is
compounding these challenges, with changes in precipitation seasonality and variability. Land and
water, both of which are necessary enablers for a natural resources-based economy, are becoming
more scarce, impacting the development of sectors such as agriculture, tourism and power
production, jeopardizing the delivery of ecosystem services (such as water resources, soil
stabilization, timber, and others). Globally, progress has been made in planning for improved
catchment management, however, tested models for resolving such competing demands at the local
level do not exist in Tanzania. Part of the solution lies in more balanced spatial development, where
investments in ecosystem services and improved landscape management can be combined with
increased economic opportunities. The ambition driving the design and investments of the Resilient
Natural Resource Management for Tourism and Growth project (REGROW) is to create a viable
platform for growth that can better use natural endowments to transform Southern Tanzania.
B. Sectoral and Institutional Context
6. Tanzania's rich and diverse natural resources, especially wildlife, are the basis for tourism
development. About a third of the country’s total area is under protection, one of the world’s highest
ratios. Tanzania’s 16 national parks and 17 game reserves, in addition to three marine parks, 15
marine reserves, and multiple forest reserves, are host to world renowned biodiversity, wildlife, and
unique ecosystems, constituting a prime global tourism destination. The Ministry of Natural
Resources and Tourism (MNRT) including the Tanzania National Parks (TANAPA), the
Ngorongoro Conservation Area Authority (NCCA), and the recently created Tanzania Wildlife
Management Authority (TAWA), are responsible for the management of the country’s Protected
Areas (PAs) and tourism promotion. TANAPA and TAWA are partially funded through revenue
generated by the PAs, and tasked with their sustainable management.
7. The country’s most visited tourism destination - the “Northern Circuit” - is showing signs of
overstress and carrying capacity limitations. Tourism is heavily concentrated around Serengeti,
Ngorongoro, and Mount Kilimanjaro, where hotels and most tourist offerings are located. The most
visited PA in the North – Ngorongoro Conservation Area – receives over ten times the number of
tourists of the most visited PA in the South – Mikumi National Park (Table 1). Future expansion of
visitors in some of these key attractions may be at odds with the current low-volume high-value
national tourism approach.
8. The development of the “Southern Circuit” is the most feasible way the GoT can achieve its
ambition to double the number of tourist arrivals in the next decade. If the increase in visitors
continues to be focused in the North, it could undermine the successful strategy of promoting high
value tourism through the delivery of a unique wildlife experience. As highlighted in a recent World
Bank study,6 there is a need to diversify the tourism product without diminishing its revenue
potential, with model that does not compromise the natural asset base, key for attracting visitors.
6 World Bank Group (2015). Tanzania’s Tourism Futures: Harnessing Natural Assets. Washington D.C.
3
Table 1: Number of visitors in Protected Areas, 2015
Northern Circuit Protected Areas (2015 Visitor
Numbers – Resident / Non-Resident)
Southern Circuit Protected Areas (2015 Visitor
Numbers – Resident / Non-Resident)
Lake Manyara NP 62,287 92,341 Mikumi NP 35,311 17,117
Serengeti NP 204,998 167,988 Ruaha NP 7,403 11,558
Tarangire NP 55,585 116,590 Udzungwa NP 6.310 2,608
Ngorongoro Conservation Area 278,922 289,061 Selous GR 4,750 13,447
9. Southern Tanzania is the ideal location for tourism expansion and diversification. The
Southern Circuit includes several National Parks (i.e., the Katavi, Kitulo, Mahale, Udzungwa,
Mikumi and Ruaha National Parks), game reserves (Selous being the largest), two rift valley lakes
(Nyasa and Tanganyika), areas of cultural interest, and a gateway town, Iringa. A study
commissioned by the GoT highlighted that specifically the Mikumi National Park (MINAPA),
Ruaha National Park (RUNAPA), Udzungwa National Park (UMNP), and Selous Game Reserve
(SGR), have the highest, most immediate potential for boosting tourism in the South, increasing jobs
and strengthened local economic linkages.7 These four are large and unique: RUNAPA encompasses
20,226 km2, representing the largest National Park in East Africa. SGR is Africa’s largest Game
Reserve and a UNESCO World Heritage Site, and extends over 50,000 km2. MINAPA and UMNP
cover 3,230 km² and 1,990 km2, respectively. Combined, they cover over 75,446 km2 (for reference,
Switzerland covers 41,285 km²). These four areas have been selected as priority for the project, and
are hereafter referred to as priority PAs (see map at the end of the document).8
10. REGROW aims to position the Southern Circuit as a popular destination, turning tourism
into an engine of economic growth and job creation for the region and the nation. The Southern
Circuit could achieve, in the medium term, the levels of development and success witnessed in the
Northern Circuit. There is an opportunity to learn from the Northern Circuit, in terms of
infrastructure linkages, establishment of a “gateway” town (Arusha), attracting private investments
for tour operations and accommodation, branding and marketing, and creating effective local supply
chain linkages. A key lesson from the northern experience is the importance of bridging the gap
between conservation and sustained economic benefits for Tanzanians. Another lesson is that
supporting infrastructure between attractions (roads, airports, private sector investments, etc.),
which was implemented over time, was key to further develop the Northern Circuit. Through much
needed infrastructure, policy dialogue, strong community engagement and incentive-based
livelihood activities, REGROW sets the vision for poverty reduction through a conservation lens,
promoting local economic benefits from the expected increase in tourism.
11. There are challenges to sustainably develop the Southern Circuit to its full potential:
• Limited infrastructure inside the priority PAs coupled with environmental degradation. Poor
quality roads, limited wet-season access, and few entry gates are limiting factors to tourism
growth. In addition, the four priority PAs cover a vast area, and existing capacity to effectively
manage them is limited by human, logistical and financial constraints. Developing a viable
7 Dalberg Global Development Advisors and Solimar International (2015). A Strategy for Tourism Development in Southern
Tanzania. USAID Tanzania
8 For SGR, the project will be implemented in the photographic tourism area (Matambwe sector, as defined in SGR’s current General
Management Plan). While 90 percent of Selous allows for consumptive tourism (trophy hunting), 10 percent is being used for non-
consumptive tourism (photographic tourism). REGROW will focus on the photographic area, whereas other partners are investing in
the remainder.
4
Southern Circuit will therefore not only require significant investments in infrastructure to boost
the incipient tourism, but also strengthening the management of the priority PAs to significantly
increase conservation efforts and protection of wildlife.
• Insufficient linkages between tourism and development - tourism has the potential to deliver
more benefits and more jobs for the local economy. While the tourism sector has grown rapidly,
it has not created enough jobs for citizens: even around the most visited areas of the North,
poverty is prevalent, indicating that strong linkages with, and improved benefit-sharing
instruments for, local communities need to be reinforced. A World Bank study9 in Kenya showed
that the safari segment of tourism not only generates greater economic growth than any other
form of tourism, but also does more to address poverty problems and create rural economic
opportunities. Despite the establishment of Wildlife Management Areas (WMAs)10 and other
benefit-sharing programs by the GoT, community-based conservation remains weak. Sustainable
and successful tourism development would need to rely on stronger connections with local
economic activities11. This opportunity to build new financial relationships between investors –
public and private – and communities will be piloted by REGROW.
• Poor management of water resources upstream of the Ruaha National Park leading to water
scarcity inside RUNAPA. The expansion of formal and informal irrigation and associated
encroachment of the Usangu Plains upstream of RUNAPA, has denuded the watershed’s
ecosystem services, and reduced the once-perennial Great Ruaha River to a seasonal watercourse
(Box 1). These trade-offs, which can be considered as a sample of what might happen in other
basins in the medium-term (for example, Pangani or Kilombero), require integrated planning
and management across users at the watershed, landscape and ecosystem levels. REGROW will
deliver sound landscape and conservation practices upstream RUNAPA, to reduce impacts from
low river flow into the National Park and to ensure long-term productivity of the basin.
• Climate change impacts to Tanzania's natural resource-based growth. Tanzania is already
experiencing changes in its climate, and precipitation is increasingly unpredictable, with studies
showing a shift in the onset of the rainy season(s).12 Changes in timing and quantity of rainfall
are forecasted by models, and water security, which is already under threat from current climate
variability and social, economic and environmental change, is likely to be under greater threat.
These patterns will have multi-dimensional effects on the Tanzanian economy, affecting
agricultural productivity, energy use, water dynamics, and the wildlife upon which tourism
depends. Efforts to promote climate resilience in these key natural asset-based sectors will have
important longer-term effects on food security and livelihoods. As precipitation becomes more
erratic, and extreme events such as droughts become more intense, anthropogenic pressures on
9 World Bank Group (2017) Standing out from the herd – An economic assessment of tourism in Kenya. Washington D.C.
10 WMAs are areas of communal land set aside exclusively as habitat for wildlife by member villages. Following the principles of
community-based natural resource management, the key underlying assumption of the WMA concept is that providing local
communities with economic benefits and involving them in management will promote both long-term health of wildlife and habitat
and rural economic development. Communities will thus have a vested interest in the conservation of natural resources because they
benefit directly from them.
11 Successful tourism means that the industry: (i) is a source of inclusive and sustainable jobs and investments; (ii) can improve the
quality of life for local residents; and (iii) can ensure that the endowments that provide the asset base for tourism are sustained).
Perhaps like any industry, tourism is driven by a supply side delivery system where policies, strategies, institutions, infrastructures,
assets, and public, private and civil society actors all have a role to play at a national level as well as at the local destination level in
attracting sufficient demand to achieve success.
12 World Bank Group (2015). Financing Climate-Resilient Growth in Tanzania. Dar es Salaam: Environment and Natural Resources
Global Practice.
5
the priority PAs’ resources will only increase. There is thus an even greater need to implement
resilient livelihoods and concerted, multi-sectoral solutions that meet the needs of all users.
C. Higher Level Objectives to which the Project Contributes
12. The project directly contributes to the government’s objective to reduce poverty, by supporting
the National Five-Year Development Plan for the period 2016/17-2020/21. The project
complements the National Plan’s goal of increasing the benefits derived from tourism, by directly
supporting key interventions such as diversifying the tourism product, improving infrastructure,
providing training, and improving the enabling environment for the tourism sector. It also supports
the National Plan’s goal of strengthening natural resource management and conservation, promoting
the sustainable use of terrestrial ecosystems, and addressing climate change impacts.
13. The project is fully consistent with the Country Assistance Strategy for Tanzania (2012-16)13,
the recently published Systematic Country Diagnostic (SCD)14, and with the Country Partnership
Framework (under preparation and expected to go to Board in the second quarter of Fiscal Year
2018). The SCD specifically identifies the need to enhance sustainability of natural resources
through effective policy and institutional frameworks as a priority area. It also identifies the
economy’s dependence on natural resource-based sectors, and the growing risk of increasing
pressure on these as the country develops.
14. The Project is designed to contribute to the World Bank Group's corporate goals of ending
extreme poverty and promoting shared prosperity in a sustainable way. It recognizes the
importance of nature-based tourism as a key contributor to the GDP and job creation for rural
populations, who would, otherwise, have limited paths out of poverty, and which are among the
poorest and most vulnerable. The improved management of key natural assets, and the associated
increase in tourism brings well-known macro-economic benefits, spill-over benefits, and through
appropriate linkages with the local communities, also benefits at the household level.
15. The project specifically targets world-renowned global public goods, some of the most iconic
National Parks and Reserves in Tanzania, by improving the sustainability of pristine ecosystems.
13 Country Assistance Strategy for the United Republic of Tanzania for the period 2012-2016. May 9, 2011. Report No. 60269-TZ.
14 Tanzania Systematic Country Diagnostic, February 23, 2017. Report No. 110894-TZ.
Box 1: The Great Ruaha River Basin – a history of degradation
The Great Ruaha River sub-basin exemplifies the challenges that the GoT faces in its multi-sector planning and
investment strategies, due to the multiple, often conflicting water uses. The sub-basin is of national importance for
rice production, maintaining the Ihefu wetland and ecosystems of the Usangu Plains, meeting the ecological needs
of the RUNAPA, and feeding the Mtera/Kidatu dams (responsible for around 42 percent of the country’s total
installed hydropower). The river also supplies water to millions of people on its path to the Rufiji River and delta.
With the expansion of formal and informal irrigated agriculture and subsequent degradation of the Usangu wetland,
the watershed’s ecosystem services have been seriously threatened, reducing the once-perennial Great Ruaha River
to a seasonal watercourse. This situation is already impacting the sustainability of agriculture and irrigation
investments, reducing agricultural productivity, and creating wildlife casualties, leading to increased human-wildlife
conflict and undermining RUNAPA’s tourism potential. Impacts on power generation from, and operational lifetime
of, the two hydropower plants, are also to be expected, and there will be water supply challenges to downstream
populations. The different water use trade-offs (agriculture, ecological flows, human consumption, hydropower)
must be conciliated, and the sub-basin needs to be tackled in an integrated manner all along its course.
6
The project will directly support the National Strategy to Combat Poaching and Illegal Wildlife
Trade in the four priority PAs. In addition, the emphasis on landscape management in the Great
Ruaha River sub-basin is aimed at better managing fresh water resources of national importance (the
Rufiji basin, considered at the moment as one of the key basins in the country due to its social and
environmental importance).
16. The project is key in fighting climate change impacts through adaptation. It is aligned with the
National Climate Change Strategy (NCCS) and related sector action plans, and specifically
implements some of the actions underscored in the NCCS and derived from the recently developed
Integrated Water Resource Management Development Plan (IWRMDP) for the Rufiji basin, in
which climate change scenarios featured prominently. The project promotes climate change
adaptation in the agriculture and water sectors, by analyzing trade-offs between different uses and
implementing conciliating trade-offs between them. A more resilient Greater Ruaha sub-basin will
benefit farmers (with important implications for women), hydropower production, natural resources
and derived tourism, and will have an important long-term effect on food security and livelihoods.
17. Finally, the project has been designed in close coordination with the rest of the World Bank’s
portfolio in Tanzania, and the gains achieved by this approach will, more forcefully, contribute to
the goals of reducing poverty and sharing prosperity (see Box 2).
18. To better link the higher-level objectives of the project to the project’s results framework, each
of the relevant PDO and intermediate indicators has been linked to a cluster of predictive proxy
indicators (PPIs). These are specific types of proxy indicators that seek to provide information about
longer-term outcomes. The relevant clusters of PPIs are: (1) jobs; (2) household income; (3)
resilience; and (4) biodiversity in the Southern Circuit.
Box 2: A robust GoT - WB partnership in Southern Tanzania to complement REGROW’s goals
Realizing REGROW’s long-term vision to develop the Southern Circuit to its full potential will require interventions
beyond the project. The WB has current and planned investments to support the GoT in:
- Transport Infrastructure: The Tanzania Strategic Cities Project is developing municipal infrastructure in Iringa,
the gateway to the Southern Circuit. A planned transport program is assessing the potential to finance trunk roads
connecting Iringa, while the studies and designs for the regional network of airports have been completed, and are
also being considered. An irrigation and water resources management project for the Usangu plains, which would
improve water efficiency in the overall area upstream the Ihefu wetland, is currently being considered.
- Water and Agriculture: The recently closed Water Sector Development Program (WSDP) supported capacity
building of the Ministry of Water and Irrigation’s (MoWI) River Basin Organizations (RBOs), including
development of Integrated Water Resources Management and Development Plans (IWRMDPs) for the country’s
nine river basins. REGROW will implement priority actions of the IWRMDP for the Great Ruaha Sub-basin, in
collaboration with the Rufiji Basin Water Board (RBWB) and MoWI. The second phase of the WSDP, recently
approved, focuses on enabling environment, water governability, cross-sector coordination and stewardship,
therefore facilitating and streamlining REGROW interventions. The Southern Agricultural Growth Corridor of
Tanzania project focuses on strengthening agriculture value chains in the Sothern Agricultural Corridor, bringing
value added to produce and facilitating the area’s inclusion in the tourism supply chain.
- Business Environment and Skills: The Private Sector Competitiveness Project is financing a new Tourism National
Policy and Tourism Strategy for Tanzania. The Investment Climate Advisory Services Program focuses on
increasing competitiveness and unlocking investment and job potential in the tourism sector. This program will also
support REGROW in creating a conducive investment climate for southern Tanzania. REGROW also coordinates
with the Education and Skills for Productive Jobs program, which strengthens the institutional capacity of the skills
development system and promotes the expansion and quality of skills development opportunities in select economic
sectors, one of which is tourism.
7
II. PROJECT DEVELOPMENT OBJECTIVE
A. PDO
19. The Project Development Objective (PDO) is to improve management of natural resources and
tourism assets in priority areas of Southern Tanzania and to increase access to alternative
livelihood activities for targeted communities.
20. REGROW will: cover the infrastructure gap that currently exists inside the priority PAs, by
investing in new roads and upgrading the existing network, bridges, airstrips, entry gates, ranger
posts, visitor’s centers, and other key assets needed to promote tourism; implement an ambitious
marketing and branding campaign with the goal of increasing the total number of visitors to the
Southern Circuit, and turn Iringa into the gateway town for the Circuit; improve the country’s
capacity to conserve its wildlife as basis to attract tourists; promote conservation-friendly alternative
livelihoods in local communities to increase social inclusion, create jobs and tackle unsustainable
uses of natural resources; invest in the Great Ruaha River Sub-basin to mitigate impacts inside
RUNAPA caused by no-flow days, which currently affect the environmental and ecological services
that the river provides (ecological, agricultural, hydropower services amongst others); and it will
develop an innovative water resources management model, through efficiency gains, with the
potential to replicate in other key national basins.
B. Project Beneficiaries
21. Direct beneficiaries: (i) around 20,000 households located near the priority PAs through
increased economic benefits; (ii) around 20,000 farmers’ households located within the Great Ruaha
River sub basin, upstream of RUNAPA, through more efficient irrigation and production methods;
(iii) government agencies and officials working on water, agriculture and land management, wildlife,
tourism, and PA management in Southern Tanzania through capacity building; and (iv) tourism
operators and related businesses within and adjacent to the priority PAs through increased tourism
revenue. Within the framework of the project, emphasis will be placed on providing opportunities
for women and the youth.
22. Indirect beneficiaries of the project are the citizens of Tanzania, because REGROW provides
the foundation for the Southern Circuit to further develop and become a source of jobs and resilient
livelihoods. An increase in the tourism sector will generate economy-wide benefits (e.g., visa fees,
airport usage, taxes that stay at national/treasury level). It will also indirectly benefit global citizens
at large by conserving globally significant biodiversity. A number of agribusinesses and agro-
industries will benefit from increased tourism activity in the Southern Circuit. The lessons learned
and analytical outputs from the project will have spillover benefits across the PA management sector,
and the water resources management sector, with potential replicability in areas with similar
challenges in the country.
23. The project will mainstream gender-informed approaches in its design (Box 3), implementation
and monitoring of activities, by taking account of the different needs and opportunities for women,
men, and the youth, together with Vulnerable and Marginalized Groups (VMGs). Project activities,
particularly those targeted at communities living near the priority PAs, will be geared towards
female, youth, and VMG participation to the extent possible. In addition, project activities will
8
include mechanisms for effective citizen engagement through consultations, sensitizations, capacity
building, and partnerships.
C. PDO Level Results Indicators
24. The key PDO indicators are: (i) Area of the priority Protected Area (PA) with improved access
for basic management supported by the project; (ii) Total tourist visits to the priority PAs; (iii)
Households with access to alternative livelihood activities supported by the project; (iv) Land area
under sustainable landscape management practices; and (v) Share of beneficiaries with rating
‘Satisfied’ or above on project interventions (disaggregated by sex and age).
III. PROJECT DESCRIPTION
A. Project Components
25. Component 1 – Strengthen management and improve infrastructure in priority Protected
Areas (US$97 million). The objective of Component 1 is to improve the management and
sustainability of natural resources inside the four priority PAs in Southern Tanzania. This will be
achieved through infrastructure investments, policy and regulatory support, and capacity/skills
development grouped under three sub-components:
a) Sub-Component 1.1 – Improve PA infrastructure (US$70 million). Enhance accessibility
and basic infrastructure of the priority PAs to improve management and overall quality of
the tourism products. Key investments include: (i) earthworks - construction of new and
upgrade existing roads, trails, bridges and upgrading of existing airstrips to improve
connectivity and ability to patrol strategic locations; (ii) civil works - construction and
upgrading of ranger posts, tourist arrival amenities, entry/exit gates, visitor information
centers, youth hostels, and “bandas” for official and educational purposes, maintenance
workshops, and construction of research centers.
Box 3. Gender balance and youth engagement, key pillars for project success
The REGROW project recognizes the importance of engaging all segments of the local communities to achieve the
PDO. Although male adults represent the bulk of the farming population, females in general, female-headed
households in particular, and the landless youth play a significant role in the project areas and can greatly contribute
to tackling the existing challenges to the priority PAs. As such, REGROW will ensure that inclusive and equitable
development opportunities exist for females and youth to access project benefits. The project will proactively target
women and youth, by providing support and training for the development of tourism-related initiatives that would
generate off-farm income and employment.
The project will actively promote equal participation of men and women in the farmer field schools and will give
special preference to young/youth farmers (below the age of 30) to participate and benefit from this intensive
training program. Similar selection criteria will be applied by the project in providing extension support on
sustainable land and water management practices to farmer communities along the rivers flowing into the Usangu
plains. In the priority villages benefiting from support on improved livelihoods through tourism and wildlife
conservation, the project will also promote awareness and conservation-based initiatives, as well as scholarships,
internships and scout programs for young male and female graduates.
Implementation of all community-oriented activities to be supported by the project will be guided by a detailed
Subproject Manual, which would specify the beneficiary selection criteria and procedures, as well as the
mechanisms to ensure adequate gender balance and youth inclusion. In addition, the project’s M&E system and
results framework will have disaggregated indicators to reflect the targeting of female and youth beneficiaries.
9
b) Sub-Component 1.2 – Strengthen management capacity and infrastructure maintenance
of PAs (US$13 million). Activities include: (i) basic light and heavy equipment for road
works; (ii) infrastructure management tools and contingency plans; (iii) upgrading of
communications, monitoring and patrolling equipment;15 (iv) improve payment systems to
address delays entering PAs, and carry out sensitivity studies for entrance fees; (v) wildlife
related research initiatives to inform policy dialogue and integrated management; and (vi)
targeted training for PA staff on infrastructure management.
c) Sub-Component 1.3 – Strengthen “Destination Southern Tanzania” (US$14 million).
Identify and build linkages between the range of attractions – including the priority PAs – in
Southern Tanzania and increase recognition of Southern Tanzania as a destination. Activities
include: (i) an integrated tourism product development and marketing strategy for Southern
Tanzania that includes wildlife, forests, beach, cultural and historic products; (ii) implement
marketing and branding strategies for the priority PAs; (iii) build a destination marketing and
management office in Iringa to drive destination development; (iv) identify, assess
feasibility, and promote opportunities for private sector investment in and around the priority
PAs; and (v) scoping studies for Southern RUNAPA, Kitulo National Park, Katavi National
Park and other southern destinations for possible future investment.
26. Component 2 – Strengthen alternative livelihoods for targeted communities in proximity to
the priority Protected Areas (US$17 million). The overall objective of this component is to provide
access to improved economic opportunities to enhance livelihoods, reduce vulnerability to climate
shocks, and reduce pressure on natural resources and wildlife.
27. Recognizing that engagement in alternative livelihoods, per se, might not reduce anthropogenic
pressure on natural resources inside the priority PAs, the component will promote incentive-based
approaches, to influence behaviors and establish an enabling environment for change to take place.
28. The total population living around the boundaries of the priority PAs is estimated to be 300,000
inhabitants (based on the 2012 National Census). During preparation, an assessment of villages
adjacent to the priority PAs was conducted, and they were prioritized into 61 “hotspot villages”
(with an estimated total population of 204,000 inhabitants, or 34,000 households) that would be
eligible to receive assistance from the project. The methodology, names, population and location of
these villages, hereafter referred to as priority villages, are provided in Annex 2. The project may
expand its interventions to additional villages based on resources and identified impacts.
29. The implementation of this subcomponent would be led by the strengthened outreach units of
the respective priority PAs, operationally supported by service providers, under the overall
coordination of the PA management. The activities will be implemented in close coordination and
consultation with the National Economic Empowerment Council (NEEC). Sub-components are:
a) Sub-Component 2.1 – Improve the governance framework of conservation-related
community-based initiatives (US$2 million). The sub-component will, amongst others: (i)
strengthen the legal and institutional framework of TANAPA’s and TAWA’s benefit sharing
schemes; (ii) strengthen and/or develop the community outreach structures of TANAPA and
TAWA, through technical assistance, capacity building and equipment; and (iii) develop a
plan and/or strategy for development of cultural/historical tourism in the priority PAs.
15 Monitoring and patrolling equipment will not include weapons, firearms, or similar.
10
b) Sub-Component 2.2 – Enhance alternative community livelihoods by improving economic
opportunities and linking them with conservation of wildlife and landscapes (US$11
million). Through a demand-driven approach, the sub-component will support: (i) tourism-
related livelihoods, such as services and agricultural products to tourism operators, and
cultural tourism products; and (ii) natural resources-based livelihoods, such as conservation-
based crop and livestock production, human-wildlife conflict reduction, and participatory
forest management.
c) Sub-Component 2.3 – Skills development for local access to jobs in tourism and
conservation (US$4 million). The sub-component includes: (i) scholarships for community
members in tourism, wildlife, conservation, and facilitating access to vocational colleges;
(ii) sensitization and promotion of conservation activities at community level; (iii)
strengthening of eligible WMAs, through equipment and training, to increase their
effectiveness; (iv) targeted natural resources management and leadership training for local
government authorities around the priority PAs; and (v) support for the development or
improvement of Village Land Use Plans (VLUP) in the priority villages.
30. Component 3 – Strengthen landscape management and infrastructure investments in and
upstream of the Ruaha National Park (US$27 million). The component will focus on short-term
infrastructure measures for the restoration of dry season flows in the Great Ruaha River, which are
critical for continued and expanded tourism in RUNAPA. As a secondary focus, the component will
lay the ground towards mitigating future degradation of the RUNAPA resulting from climate change
impacts, excessive abstraction of water upstream of the Park, deteriorated water quality, and
increased sediment in inflowing rivers, through water controlling structures and water sources
protection. All activities follow the conclusions of the Rufiji Integrated Water Resources
Management and Development Plan.16 They are also fully aligned with the recommendations of the
GoT’s Task Force for the Great Ruaha River restoration. The sub-components are:
a) Sub-Component 3.1 – Assess and implement infrastructure measures to augment dry-
season flows to the RUNAPA (US$9 million). Key infrastructure investments such as low
weirs, enhancement of natural river pools, troughs or boreholes, inside RUNAPA and along
the Great Ruaha River, will be implemented to: (i) augment dry season flows to the river
through storage of wet season flows; and (ii) construct water supply sources, along the river
and tributaries, that ensure increased water availability during dry season.
b) Sub-Component 3.2 – Improve efficiency of irrigation systems (US$14 million). This sub-
component will focus on the extensive irrigation lands upstream of the Ihefu wetland,
promoting water savings through: (i) implementation of water-saving farming practices to
increase water availability for the Great Ruaha River through Farmer Field Schools; (ii)
irrigation infrastructure improvements in selected areas to demonstrate water-efficient
methods (water controlling structures, lining of canals and drainage); and (iii) revisiting
water use permits and assessing incentive mechanisms for controlling use of water or
increase of irrigation areas utilizing drainage water.
c) Sub-Component 3.3 – Catchment conservation activities in selected sub-basins (US$1.5
million). This would include: (i) surveying hotspots in the upper catchment areas where
climate variability and change, together with present and future human activities, comprise
16 Rufiji Basin IWRMD Plan for the Great Ruaha (2016). United Republic of Tanzania, Ministry of Water.
11
severe risks for water sources; (ii) integrated water and land-use plans, as mandated by GoT
regulations, to reduce the risks in these hotspots; and (iii) implementation of selected
watershed management activities such as river boundary protection and sustainable
agricultural land management practices.
d) Sub-Component 3.4 – Support the consensus-building process for land and water
management and climate change adaptation in the Usangu plains (US$2.5 million). Activities include: (i) facilitating cross-sectoral interaction and consultations at the district
level, including social and physical surveillance studies when needed, for water resources
management; and (ii) strengthening the monitoring and management capacity of Irrigation
Organizations and Water Users Associations, including operation and maintenance training.
31. Component 4 – Project management, institutional strengthening, quality assurance and
control, and monitoring and evaluation (US$9 million). This component will finance supplemental
support for project management, to ensure coordinated and timely execution of infrastructure and
other project activities. It includes project oversight and coordination; establishment and operation
of a Project Coordination Unit (PCU); fiduciary management, including external/internal audits and
accounting; quality control and assurance systems; environmental and social safeguards
management; development and implementation of a communications and stakeholder engagement
plan; and short-term training on project management. The component will also finance a monitoring
and evaluation (M&E) system, which will be implemented to capture data on physical and financial
progress, performance of implementing agencies and service providers, and the results achieved in
terms of outputs and outcomes. The M&E system includes a baseline study, perception surveys,
knowledge generation and exchange, annual networking among key project stakeholders (at local,
regional and national level, including active private sector involvement) and an impact evaluation.
B. Project Financing
32. The project will be financed through an IDA credit in the amount of Special Drawing Rights
SDR106,6 million (US$150 million equivalent), and will be implemented over 6 years (Table 2).
Table 2: Project Cost and Financing (million)
Project Components SDR US$
equivalent
Amount of
credit
allocated
(in US$)
% of
expenditures
financed
(inclusive of
taxes)
1. Strengthen management and improve infrastructure in
priority PAs 68.9 97.0 97.0 100
2. Strengthen alternative livelihoods for targeted
communities in proximity to the priority Protected Areas 12.1 17.0 17.0 100
3. Strengthen landscape management and infrastructure
investments in and upstream of the Ruaha National Park 19.2 27.0 27.0 100
4. Project management, institutional strengthening, quality
assurance and control, and monitoring and evaluation 6.4 9.0 9.0 100
Total Project Costs 106.6 150.0 150.0 100
12
33. The GoT will provide significant in-kind contribution to the implementation of the project,
through staffing of the project coordination unit, staffing of all implementing agencies, technical
staff, community outreach staff, priority PA staff, and many others.
C. Lessons Learned and Reflected in Project Design
34. The project design reflects lessons from analytical work, ongoing and completed operations, and
international good practice. It also considers conclusions and recommendations of sector and
thematic studies. Key lessons and how they have been incorporated into the design are:
a) Project management: The projects in the WB’s portfolio that have had unsatisfactory ratings
typically did not have sufficient project management resources and systems. Projects that
performed well had robust and professional systems in place supporting the PCUs – typically
with consulting resources to support fiduciary, safeguards, quality assurance and quality
control, and general project management. This is particularly relevant for agencies without
significant experience executing WB funded projects. For REGROW, resources are included
to ensure adequate support to the PCU.
b) Conciliating trade-offs between conservation and tourism: As highlighted in the World
Bank’s Tourism Portfolio Review,17 common challenges to overcome include inconsistent
and incomplete collection of tourism data, challenging business environments, insufficient
opportunities for skills development, and inefficient marketing and promotion. The project
addresses some of them directly, and is coordinating with other ongoing or future World
Bank projects in Tanzania to cover gaps (Box 2).
c) Community-based natural resource management: As highlighted by a recent World Bank
study on nature-based tourism in Tanzania,18 the integration of communities surrounding
PAs is fundamental to the success and sustainability of conservation-based tourism
initiatives. Existing benefit-sharing schemes in Tanzania were reviewed and compared with
international best practice. Project implementation will also strengthen TANAPA’s outreach
programs, and devote the entire Component 2 to promote community development activities.
d) Alignment with the country’s policies and programs and political stability is key for project
success. The project is fully aligned with Tanzania’s vision of tourism expansion as an engine
for development in the South. In particular, it has been designed in consultation with the
MNRT teams preparing a new National Tourism Policy and National Tourism Strategy,
ensuring that activities linked to the development of the already defined priority of the
“Southern Circuit” are specifically included in the National Tourism Policy.
17 Ebbe, K. (2010). Tourism Portfolio Review January 2005 – December 2009: Volume I Findings, Lessons Learned,
Recommendations. World Bank.
18 World Bank Group (2015). Tanzania’s Tourism Futures – Harnessing Natural Assets. Washington D.C. Environment and Natural
Resources Global Practice Policy Note
13
IV. IMPLEMENTATION
A. Institutional and Implementation Arrangements
35. The project is a multisector initiative, targeting protection of natural resources, tourism
product and market development, water resources management, livelihoods and poverty
alleviation. As such, a number of institutions have been involved during project preparation. The
REGROW project will be implemented through two main agencies - MNRT and TANAPA -, and
several implementing partners (TAWA, TAWIRI, TTB, TFS, NIRC, RBWB, MALF).19 TANAPA
will administer its own funds, whereas MNRT will administer both its own funds and funds for the
other implementing partners.
36. The implementation of the project will follow existing government structures within
ministries, agencies, regional secretariats and LGAs, and community institutions. The leading
implementing agencies will be MNRT and TANAPA. All activities taking place inside the priority
PAs will be implemented by TANAPA (for RUNAPA, MINAPA and UMNP) and TAWA (for
SGR). Tourism marketing and promotion will be led by TTB. Wildlife research will be conducted
by TAWIRI. NIRC will coordinate farmer field schools and irrigation improvements under
Component 3, with significant involvement from MALF, whereas RBWB will complement NIRC
with activities related to water allocation, and upstream management of catchment areas. TFS will
be involved whenever subprojects are implemented in forested areas.
37. A Project Steering Committee (PSC), with representatives from all institutions involved, will
meet at least bi-annually. It will be chaired by the Permanent Secretary (PS) of MNRT, and amongst
others comprise the PS from MoWI, Chief Executive Officers of TANAPA, TAWA, TFS, TAWIRI
and TTB, RBWB, NIRC, local government authorities and representatives from private sector. The
PSC will: (a) ensure strategic oversight of overall project implementation, (b) ensure coordination
and cooperation among all participating agencies; (c) endorse annual work plans and budgets for all
project-related activities, (d) provide overall guidance during project implementation and (e) endorse
financial, programmatic and monitoring reports to be presented to the World Bank and other national
stakeholders to ensure and promote transparency and accountability. A detailed description of the
PSC and its roles is presented in Annex 3.
38. A Project Coordination Unit (PCU), led by a project coordinator, has been formed to coordinate
all activities under REGROW. Located within MNRT, this PCU has coordination management,
oversight and reporting responsibilities for all components of the Project, and is fully staffed, as set
out in the Project Implementation Manual (PIM). It will ensure integration of the financial and
technical progress reports from each of the agencies being funded, and will carry out the overall
M&E for the Project. The PCU will have supplemental support, in areas of financial management,
procurement, monitoring and evaluation, quality assurance and control, project management, and
safeguards, financed by the project.
39. TANAPA has a delegated Technical Coordinator and a project implementation team within the
existing organizational structure. The specific members of the project implementation team are
defined in the PIM, including one procurement officer and one accountant. Other involved agencies
will need to have technical focal points according to their set of activities that are part of the project
19 TAWIRI: Tanzania Wildlife Research Institute; TTB: Tanzania Tourist Board; NIRC: National Irrigation Commission; RBWB:
Rufiji Basin Water Board; MALF: Ministry of Agriculture, Livestock and Fisheries; TFS: Tanzania Forest Services
14
(and other functions, as specified in the PIM). These will coordinate the day-to-day implementation
of project activities on the ground. Each entity is responsible for preparing annual work plans and
budgets to be submitted to the PCU for the preparation of the project annual work plan, to be
approved by the PSC and the World Bank.
40. Local government authorities will be consulted on project implementation as needed. Project
beneficiaries will also be involved in participatory monitoring, providing feedback on the quality of
services. There will be a special national stakeholders’ committee to ensure full engagement and
participation of Southern Circuit stakeholders, including private sector, development partners, civil
society and others.
B. Results Monitoring and Evaluation
41. The Monitoring and Evaluation (M&E) is supported under Component 4, to ensure
accountability of the use of project funds and progress towards effective management of natural
resources and tourism in priority areas of Southern Tanzania, and increased access to alternative
livelihood activities. Specifically, the M&E will provide the means to robustly analyze the relevant
data and information to: (i) monitor the project outcome indicators as reflected in the results
framework; and (ii) outline the flow of data and information from the project sites through the
various stakeholders.
42. All implementing agencies at different levels will participate in the process of data collection,
compilation, analysis and reporting of progress. These include MNRT, TANAPA, TAWA, TTB,
TFS, TAWIRI, MoWI, and MALF at national level, and RBWB, NIRC, and local governments at
regional and local levels.
43. The Project will form a Monitoring and Evaluation Technical Group (METG). The METG
will meet every two months during the first year of the project, and report to the PCU. It will be
chaired by the Director of the Planning and Policy Division of MNRT and will include the designated
technical focal points of the different entities participating in project implementation. Other technical
staff from entities involved in work plan activities will be invited to the committee on an ad hoc
basis. Its main role will include, among other activities: (a) analyzing project implementation from
a technical, financial and programmatic perspective; (b) coordinating data collection and reporting
arrangements at all levels; (c) preparing quarterly technical progress reports as well as bi-annual
reports to provide an overview of the status of achievements and the overall project performance to
the PCU; and (d) developing an ongoing plan for strengthening the project’s M&E function. For
more detail on the role and functions of the METG, see Annex 3.
44. The Project Coordination Unit (PCU) will finalize and endorse quarterly and annual reports of
each implementing agency and report to the World Bank (except for TANAPA, who will do this in
parallel for their own activities). The PCU and TANAPA are required to submit quarterly technical
progress reports within 45 days of the end of each fiscal year quarter, and annual reports.20
45. The Project will use two sets of indicators. The first set includes the PDO and intermediate
results indicators captured in the results framework and measuring progress during the
implementation towards the Project’s objectives. The framework includes five PDO indicators, with
one of these measuring satisfaction of target beneficiaries with project interventions. The satisfaction
20An outline of the quarterly technical progress report will be provided in the M&E section of the Project Implementation Manual.
15
indicator is disaggregated by sex and based on perception surveys that will focus on the interlinked
aspects of livelihoods, environmental protection, social inclusion and water resources management.
For all indicators in the results framework, the link to the higher-level objectives has been
established through the use of theory-based PPIs. The PPIs have been clustered in four groups: (1)
jobs; (2) household income; (3) resilience; and (4) biodiversity in the Southern Circuit. The second
set focuses on assessing the efficiency of the PCU and implementers in carrying out their core
functions.
46. The Project’s M&E will build, to the extent possible, on existing country systems, however, a
project management and monitoring platform to integrate the information coming from different
sources and levels, will be created. The Project will use existing data sources and tools that are in
use for PA management and wildlife monitoring, such as the GIS tracking tool of ranger patrols, and
camera traps for wildlife monitoring. The Project will also conduct field surveys to capture the
perception of satisfaction with project interventions as already highlighted above.
47. To identify M&E capacity needs, and to develop a capacity building plan, an assessment will
be carried out for all relevant agencies after project effectiveness. The assessment will focus on
capacity needs that the agency requires to carry out its responsibilities in M&E. Based on this
assessment, the PCU will prepare an M&E capacity building plan which will be integrated in the
overall Capacity Building plan of the project.
C. Sustainability
48. The project has been designed with the overarching objective of ensuring sustainability of
Southern Tanzania’s rich natural resources. The priority PAs cover, in total, a surface of over
75,446 km2 (almost twice the size of Switzerland), and some of the communities around them are in
remote areas, with poor connectivity with the rest of the country, and limited alternatives to moving
out of poverty. Arguably one of the few sources of sustainable revenues for these areas comes from
tourism. Through this project, and by strengthening the management of natural resources together
with promoting tourism development, the three main pillars of sustainability would be addressed:
environmental, social and financial.
49. Three Components address the environmental pillar: Component 1 will improve TANAPA’s and
TAWA’s capacity to manage the natural resources and wildlife; Component 2 will reduce
anthropogenic pressures on PA resources; and Component 3 will address the environmental
emergency caused by zero flow of the Great Ruaha River after the “Ngiriama” point during the dry
season.
50. The social pillar is squarely placed as a key element of the project through Component 2, in two
ways: by directly engaging communities to develop alternative livelihood schemes – both tourism
and non-tourism related; and by strengthening the ability of TANAPA/TAWA to implement their
ongoing community development and outreach programs.
51. Financial sustainability is being improved through increased tourism activity. Currently, the PAs
of the North are generating most of the revenue used by TANAPA to run their operations in all PAs.
By promoting the Southern Circuit and increasing the number of tourists visiting the priority PAs,
both TANAPA and TAWA will secure additional resources and contribute to the long-term
sustainability of the institutions.
16
52. The project is also directly addressing long-term sustainability in the specific case of the
RUNAPA, where extensive, inefficient agriculture and irrigation practices have drastically reduced
the dry season flow of the Great Ruaha River. The current situation, with long periods of zero river
flow of a once perennial river, is unsustainable, and is already causing major impacts downstream.
The project is promoting institutional strengthening in the area, direct engagement with farmers, and
land use planning, laying out the building blocks towards a more sustainable situation in the basin.
V. KEY RISKS
A. Overall Risk Rating and Explanation of Key Risks
53. The overall risk is rated substantial.
a) Political and Governance - Substantial. The government has intensified efforts to eradicate
corruption with promising results. However, the governance regime remains challenging and
could potentially negatively affect project activities, particularly with respect to fraud and
corruption. In addition, conflicting interests regarding the irrigation expansion in or around
National Parks, or wildlife crime, particularly poaching, impose additional risks. Efforts to
increase political support for private sector development and creation of an enabling
environment for the tourism sector are vital to avoid any impact to project implementation.
To mitigate these risks, REGROW will promote dialogue and consultations, transparency,
and peer to peer supervision of activities.
b) Macroeconomic - Moderate: Tanzania’s economic performance has recently shown some
signs of softening albeit real GDP growth remaining relatively high at 6-7 percent during the
past decade. During the last quarter of 2016, expansion of economic activities declined to
around 5.6 percent, coupled by high rates of non-performing loans and low level of growth
of credit to the private sector. The economy remains exposed to variations in commodity
prices on the international market, notably of food, fuel, and gold. Moreover, important risks
arise from fiscal policy including: (i) low levels of revenue collection while facing increased
public spending to address huge investments and human capital gaps; (ii) high level of
accumulated payment arrears for both central government and SoEs; and (iii) high levels of
debt service with increased non-concessional borrowing.
c) Sector Strategies and Policies - Substantial. Existing policies and strategies from sectors
such as agriculture, irrigation or mining may conflict with MNRT’s mandate to sustainably
manage natural resources and enforce PAs’ boundaries. The government’s intentions to turn
Tanzania into an industrialized country might pose additional stress on resources (e.g. mining
and dams around/inside SGR, road development, agricultural expansion) and their
announced aspiration to double the number of tourists might hurt the natural resources that
are the basis for tourism. The project will promote a multi-sectoral dialogue during its
implementation, and ensure that environmental concerns are represented in existing
coordinating mechanisms such as the National Water Board. The focus on tourism
diversification away from core attractions provides additional mitigation actions.
d) Technical Design of Project – Moderate. The project involves components across multiple
sectors and across the jurisdiction of multiple divisions and/or ministries. Particularly, the
implementation of Component 3, which aims to support the sustainable management of
watersheds where competing uses exist, is potentially complex, as it requires strong
17
collaboration across entities. Without strong support across the landscape, there is a risk of
limited impact on broader watershed management. To mitigate the risk, the Project design
has therefore been focused on a participatory process, active dialogue, and close coordination
of key stakeholders, which will be continued throughout project implementation.
e) Institutional Capacity for Implementation and Sustainability – Substantial. The envisaged
implementing agencies have different capacity levels in terms of procurement, FM, social
and environmental management, and monitoring and evaluation. The main implementing
agency, MNRT, with TANAPA and TAWA, does not have extensive experience in
implementing large projects, and will need strengthening in order to play a guiding,
coordinating, and supervising role as needed. Key mitigation actions will include: (i)
provision of technical assistance and capacity building; (ii) training of key staff; and (iii)
close monitoring of project implementation by the World Bank through continuous support.
f) Fiduciary – Substantial. The GoT has intensified efforts to fight fraud and corruption with
promising results. However, the continued risk with respect to fraud and corruption could
potentially affect fiduciary compliance with World Bank policies. The latest available Public
Financial Management Performance Report (September 2013) mentioned weak controls for
payroll and salaries, low compliance with procurement regulations, weak contract
management, weak internal auditing mechanisms, and poor record keeping as shortcomings.
The current administration is addressing the issues raised by the Report. A strong fiduciary
governance framework will need to be put in place and periodically be reviewed to enable
continuous strengthening. In addition to targeted training, the risk will be mitigated by the
project hiring procurement and FM advisors to support the fiduciary teams in their tasks.
g) Environment and Social – Substantial. Environment risks: The project involves activities
such as the development of infrastructure, to be implemented within priority PAs or irrigation
schemes, including Critical Natural Habitats. While these investments are intended to
improve the conservation and management of these areas, there is a possibility of unintended
and/or temporary negative impacts. An Environmental and Social Management Framework
(ESMF) has been developed to lay out the requirements to ensure sound safeguards
management of project investments. In parallel, all project-supported investments in Critical
Natural Habitats must be compatible with the management plan for that area.
Social risks: The project does not intend to acquire land or implement any activity that would
cause involuntary resettlement. However, in the unlikely event that GoT initiates activities
inside the priority PAs, or with communities engaged by the project, which will require
resettlement, the GoT has decided to follow international best practice through adopting the
use of the World Bank’s policy on Involuntary Resettlement (Annex 3, section 6). A
Resettlement Policy Framework (RPF) has been prepared as part of project preparation,
outlining guidelines, standards, and procedures to be followed. Finally, the promotion of
improved PA management under the project, could potentially restrict access to the priority
PAs resulting in marginal adverse impacts on livelihoods. To address this, a Process
Framework has been prepared which outlines measures to assist affected persons in their
efforts to improve, or at least maintain, their livelihoods, while also maintaining the
sustainability of the PAs. A Grievance Redress Mechanism has also been prepared, and it
will be utilized for any persons impacted by the project.
18
h) Stakeholders – Moderate. The multi-sector nature of the project requires strong
collaboration across a variety of ministries and agencies. Different mandates that cut across
the project scope, together with unclear roles and responsibilities as a result of weak
coordination, could undermine the success of project activities. Project implementation will
draw upon participatory processes, including through the creation of committees that
comprise representatives of key stakeholder groups.
VI. APPRAISAL SUMMARY
A. Economic and Financial Analysis
54. The main focus of the REGROW project is the sustainable management of the Tanzania’s natural
resource capital to catalyze wildlife-based tourism, while reducing rural poverty around PAs. The
cost benefit analysis clearly demonstrates a positive return on investment (Annex 5).
55. REGROW promotes investment in PA management, a core public sector service that is expected
to improve the protection of the country’s natural resources, which are considered public goods of
global and local importance. Their management has been underfunded, and would not be supported
through other sources of finance. The World Bank remains uniquely positioned to invest in this
sector, while bringing its convening power to address wider issues related to water augmentation,
local community development and tourism development to trigger and leverage much needed private
sector investment into the areas.
56. A cost-benefit analysis of the REGROW project was conducted to calculate the Economic
Internal Rate of Return EIRR, Net Present Values (NPV) and a Benefit-Cost Ratio (BCR). The
analysis focused on the expected economic benefits generated by the priority PAs which will receive
investment under the REGROW. The analysis centers on the expected benefit streams corresponding
to: i) revenue generated from nature-based tourism in the priority PAs; ii) income generated by local
communities in the vicinity of the priority PAs; and iii) water augmentation activities conducted in
collaboration with local farmers in the Great Ruaha sub-basin. The analysis returned a positive EIRR
of 17 percent (above the threshold of 10 percent), a NPV of US$62 million and a BCR of 1.6, over
a 20-year period. It should be noted that the profitability indicators are conservative as they do not
fully consider: (i) demand driven activities of local communities due to the nature of self-selection
during implementation; (ii) tourism demand above the rate of inflation due to any concerted effort
by a strategy of the project to this effect; (iii) the value of project impact on environmental services
as their value remains un-monetized, such as reduced human-wildlife conflict as a result of increased
protection and conservation stemming from improved infrastructure (e.g., ranger posts); and (iv) an
increase in visitor satisfaction.
B. Technical
57. The project’s design has been informed by several technical studies financed by a Project
Preparation Advance21 and a wealth of peer-reviewed reports and in-depth studies related to
21 “Development of Project implementation manual”; “Consultancy to conduct a curriculum development workshop and elaborate a
Farmer Field School program on on-farm water and crop management in the irrigation schemes on the Usangu Plains”; “Consultancy
to undertake a reconnaissance study of structural measures to augment dry season flows in Ruaha National Park”; “Consultancy on
19
natural resources management, tourism and poverty in Tanzania (mentioned elsewhere in this
document). The REGROW design is considered technically sound, as it incorporates all relevant
recommendations from the preparatory analytics, and provides the physical, financial and
institutional resources to achieve the PDO. It incorporates the recommendations of the World Bank’s
Tanzania Economic Update (“The Elephant in the Room: Unlocking the potential of the tourism
industry for Tanzanians”, 2015), which identifies tourism as a key sector of the economy and calls
for careful management of tourism-conservation tradeoffs, and diversification of the tourism product
towards the Southern Circuit. The message is further refined and detailed in the “Tanzania’s Tourism
Futures: Harnessing Natural Assets” (World Bank 2015). The 2015 “Strategy for Tourism
Development in Southern Tanzania”, commissioned by MNRT and carried out with USAID support
through an internationally renowned consulting firm, lays out the specific priorities, PAs to be
developed, type of tourism, and type of preliminary infrastructure needed. The study was delivered
by MNRT as an official input to the project design.
58. The inclusion of Component 2 into the project is especially important to highlight. The
Component was included after several studies revealed that some of the poorest communities in
Tanzania are located around PAs in the North. The Tourism Futures report noted that local
communities around PAs in Southern Tanzania do not benefit from the tourism products, for a
variety of reasons including lack of skills and capacity, and limited mechanisms that promote
interaction between communities and tourism stakeholders. The entire Component can thus be
considered as a proactive way to avoid past failures to address poverty through increased natural
resources conservation and nature-based tourism.
59. Project activities on water resources management in the Great Ruaha sub-basin under
Component 3 have been designed using advanced technologies and studies. These include reports
prepared by the European Space Agency showing land cover evolution in the past decades using
satellite images. The Component’s design has been carried out in close partnership with MoWI, and
includes the recommendations of the Integrated Water Resources Management Plan for the Rufiji
basin, by implementing several activities suggested therein.
60. In addition, all project-implemented activities will be based on careful designs, conducted by
selected firms, after quality and cost competition for contract awards. The selected firms have proven
experience and knowledge in the different topics, and, throughout the design phase, have engaged
in a proactive manner all relevant stakeholders, to ensure that views and expertise is incorporated
into final designs.
C. Financial Management
61. An assessment of the Financial Management (FM) arrangements of the key implementing
entities (MNRT and TANAPA), was conducted in August 2016 and updated in July 2017. The
objective of the assessment was to determine whether the implementing entities have acceptable FM
arrangements to implement the project. These include budgeting, accounting, internal controls,
funds flow, financial reporting, and auditing arrangements. The arrangements are considered
locally–based tourism product development and socio-economic assessment of communities adjacent to selected protected areas in
Southern Tanzania”; “Environmental and Social assessment including ESMF, RPF and PF”; “Consultancy to undertake a
reconnaissance survey of agricultural water management in the Usangu Flats”; “Consultancy to undertake an assessment of current
benefit-sharing models associated with natural resources and tourism and lessons learned from best practices”; and “Institutional
Assessment”.
20
acceptable if they (i) facilitate correct and complete recording of all transactions and balances
relating to the project; (ii) facilitate the preparation of regular, timely and reliable financial
statements; (iii) safeguard the project’s assets; and (iv) are subject to auditing arrangements
acceptable to the World Bank. The capacity assessment was conducted through discussions with
MNRT and TANAPA preparation teams, including finance, planning, and internal auditing units.
62. The assessment revealed that TANAPA and MNRT have adequate FM capacity to implement
the project in terms of financial systems and staffing, and both received unqualified (clean) audit
reports in the last two years. The overall FM risk for the Project is assessed as substantial since both
MNRT and TANAPA have no experience in implementing World Bank-financed projects. In
addition, project design is relatively complex since it involves other sub-implementing agencies, as
well as decentralized community driven activities under Component 2.
63. As risk mitigation measure, a financial management manual was prepared and agreed. The
manual outlines the specific FM procedures applicable to REGROW. In addition, training on FM,
disbursement, and procurement procedures has already started, and will continue to be provided on
a regular basis.
64. The conclusion of the FM Assessment is that adequate FM arrangements are in place at
MNRT and TANAPA, with the proposed actions and mitigating measures to strengthen the FM
arrangements, do meet the IDA’s minimum requirements under OP/BP 10. Both FM
arrangements are adequate to provide, with reasonable assurance, accurate and timely information
on the status of the project, as required by the World Bank.
65. The FM teams at MNRT and TANAPA will be responsible for the overall coordination and
consolidation of project financial statements, auditing, disbursement, and submission of quarterly
IFRs and monthly withdrawal applications to the World Bank. The National Audit will carry out the
annual external audit, and audits will be submitted to the World Bank within 6 months after the end
of the FY. Audit terms of reference were agreed upon during project preparation, as well as the flow
of funds to the project implementers.
66. The project will use the Statement of Expenditures (SoE) disbursement method and will submit
withdrawal application requests on a monthly basis. Two (2) US Dollar designated bank accounts
(DA’s) will be opened and maintained at the Bank of Tanzania (BOT), one for MNRT and the other
for TANAPA. Replenishment of the DA’s will be made on a monthly basis based on timely monthly
accountability of actual expenditures. Both MNRT and TANAPA will open Project Accounts (PA)
in local currency in the BOT to which funds from the respective DA will be transferred for payments.
D. Procurement
67. All procurement will be carried out in accordance with the World Bank Guidelines: Procurement
of Goods, Works and Non Consulting Services under IBRD Loans and IDA Credits and Grants by
World Bank Borrowers, dated January 2011, revised in July 2014; Guidelines: Selection and
Employment of Consultants under IBRD Loans and IDA Credits and Grants by World Bank
Borrowers, dated January 2011, revised in July 2014; Guidelines on Preventing and Combating
Fraud and Corruption in Projects Financed by IBRD Loans and IDA Credits and Grants, dated
October 15, 2006 and revised in January 2011 and as of July 1, 2016; and provisions stipulated in
the Financing Agreement. The various items under the different expenditure categories are described
in general below. For each contract to be financed by the credit, different procurement methods or
21
consultant selection methods, estimated costs, prior review requirements, and time frame would be
agreed upon between the Government and the World Bank in the Procurement Plan. The
Procurement Plan will be updated at least annually or as required to reflect the actual project
implementation needs and improvements in institutional capacity. The implementing entities, as
well as contractors, suppliers and consultants will observe the highest standard of ethics during
procurement and execution of contracts financed under this project. “Guidelines on Preventing and
Combating Fraud and Corruption in Projects Financed by IBRD Loans and IDA and Grants” dated
October 15, 2006 and revised in January 2011 and as of July 1, 2016, (the Anti-Corruption
Guidelines) shall apply to the project.
68. The Public Procurement Act, 2011 as amended through The Public Procurement (Amendment)
Act, 2016 will be applied for procurements below the defined thresholds involving National
Procurement Procedures. The Public Procurement Act, Act No. 7 of 2011 was reviewed by the
World Bank and found to be consistent with the World Bank Procurement Guidelines, except for
the provisions of Section 54 and 55 of the Act, which permits application of national preference in
bid evaluation under National Competitive Bidding (NCB). There should be no preference accorded
to domestic suppliers and contractors under NCB for goods and works. Furthermore, in accordance
with paragraph 1.16(e) of the Procurement Guidelines, each bidding document and contract financed
out of the proceeds of the credit shall provide that (a) the bidders, suppliers, contractors, and
subcontractors shall permit the World Bank, at its request, to inspect their accounts and records
relating to the bid submission and performance of the contract, and to have said accounts and records
audited by auditors appointed by the World Bank and (b) the deliberate and material violation by
the bidder, supplier, contractor, or subcontractor of such provision may amount to an obstructive
practice as defined in paragraph 1.16(a)(v) of the Procurement Guidelines.
69. The MNRT, TANAPA, TAWA, RBWB and NIRC will be responsible for procurement activities
and also carry out the oversight function in procurement and contract management for activities
under their respective components. Capacity assessments of the agencies to implement the project
procurement activities were carried out in August 2016, April 2017 and July 2017. The assessment
revealed that (a) MNRT, TAWA, NIRC and RBWB have inadequate space for procurement staff
offices and procurement records keeping; and (b) inadequate working facilities including computers,
printers, photocopiers and scanners. Furthermore, all agencies were noted to have inadequate staff
with knowledge and experience in procurement under World Bank procedures and in contract
management. Further strengthening of the MNRT PMU would also be required to enable the
ministry to provide the support that will be required by the other agencies.
70. The mitigation measures proposed to be implemented by the respective agencies include (a)
provision of more space for staff offices and for procurement records keeping; (b) provision of
working facilities including computers, printers, photocopiers and scanners; (c) recruitment of a
procurement expert to support the project for at least the initial two years; and (d) training of
procurement staff in procurement under the World Bank procedures and in contract management.
The overall unmitigated risk for the project with regards to procurement is High with the expectation
of reducing to Substantial after implementation of proposed mitigation measures.
E. Social (including Safeguards)
71. The project has been designed to have an overall positive social impact. By improving natural
resources management and increasing tourism revenues, the communities around the priority PAs
22
are expected to receive increased benefits, and take advantage of a sustainable and resilient source
of income. Moreover, Component 2 has been designed to improve the sharing of benefits, facilitating
the insertion of community members into tourism and non-tourism related economic activities, and
providing conservation-friendly alternative livelihoods. Additionally, Component 3 will provide
farmers with agricultural techniques by which to improve their livelihood while also improving
water management for Ruaha National Park. The successful achievement of the projects’
development objectives will lead to positive social development outcomes for the Southern Circuit
area, and are likely to create spill-over effects into other PAs and areas not targeted by the project
but close enough to benefit from increased tourism. Part of Component 3 activities will be carried
out in the upper catchment area of the Great Ruaha Sub-basin - the specific locations have not yet
been identified. During project implementation, due diligence in environmental and social screening
and assessment of potential areas will be conducted, and Environmental and Social Management
Plans will be prepared as areas are identified for project financing.
72. Increased management capacity of the priority PAs will result in better ability to curb illegal
wildlife poaching, which has been identified as a key deterrent of tourism, and increased capacity to
prevent degradation of resources. The four priority PAs, and their specific regulations on allowed
and non-allowed activities, have been in place for many years - in some cases, for several decades.
The REGROW project is not designed to enforce existing boundaries or introduce new restriction
of access to the PAs. However, through the construction of infrastructure such as additional ranger
posts and roads, and provision of equipment, the PA authorities will have better ability to detect
illegal uses of resources (illegal tree logging, waste dumping, illegal farming or grazing, etc). For
this reason, a Process Framework (PF) has been prepared, and will, in part, be applied as a
precautionary measure to the extent surveillance activities would marginally contribute to increasing
existing restrictions of access, with a focus on communities where illegal activities (in particular
poaching) are prevalent, which are the ones most likely to be affected.
73. Project activities include construction of tourism infrastructure including new, or upgrading of
existing roads, trails, and bridges as well as youth hostels and rest houses. It is expected that new
construction will occur within PA boundaries and therefore is unlikely to trigger the Involuntary
Resettlement Policy. Irrigation infrastructure is expected to happen on existing schemes, since
REGROW will work on efficiency, and not on new schemes. If, however, land acquisition is needed
under the project, the project will work with local district authorities and communities to identify
vacant state land for use to avoid negative impacts on individuals or households. A Resettlement
Policy Framework (RPF) has been prepared in the unlikely event where land acquisition is
unavoidable. The RPF establishes the guidelines, standards, and procedures to be followed in the
preparation of a Resettlement Action Plan (RAP) which will be implemented prior to project
activities affecting the identified assets.
74. The project area encompasses vulnerable groups. Determination of which groups in Tanzania
are recognized as vulnerable is being done on a project by project basis, and is done according to
the following criteria: those that may be below the food poverty line and lack access to basic social
services (including those that are geographically isolated), and are not integrated with society at
large and its institutions due to physical or social factors.
75. A rapid social assessment of vulnerable groups confirms that there are some vulnerable groups
in the project area, including women-headed households, the elderly, disabled, youth, children, and
persons with HIV/AIDs. The social assessment has also determined that there are no groups meeting
the criteria of OP 4.10 in the project area. The specific needs of vulnerable groups in the project will
23
be addressed through some of the project activities and mitigation measures in the Environmental
Management Plans and, where applicable, the Resettlement Action Plans
76. Based on the above, the social safeguards instruments prepared for this project include a PF, and
an RPF.
F. Environment (including Safeguards)
77. The project will support: (i) structural solutions to augment dry season flow of the Great Ruaha
River (at the “Ngiriama” control point) in the RUNAPA through storage of wet season flows, river
training, boreholes, ponds or enhancement of natural river pools and small surface reservoirs; (ii)
construction of irrigation infrastructure in selected irrigated areas to demonstrate water-efficient
irrigation; (iii) watershed management activities (demarcation of water sources, protection of
streams and others), and sustainable agricultural land management practices such as terracing on hill
slope farming; (iv) improving tourism infrastructure including: construction of new and upgrade
existing roads, trails, and bridges to improve connectivity; upgrading of existing airstrips;
construction of entry/exit gates and visitor information centers; construction of youth hostels and
rest houses; and other tourism infrastructure; (v) assistance to demand-driven productive initiatives
linking improved livelihoods with conservation of wildlife and landscapes. Given the nature of the
activities, their scale and the overall objective of the project of improving environmental
sustainability of the natural resources, the project is rated Environmental Risk Assessment Category
B. Appropriate mitigation measures will be undertaken to address potential environmental and social
impacts. The safeguard policies triggered for this project include: Environmental Assessment
(OP/BP 4.01); Natural Habitats (OP/BP 4.04); Forests (OP/BP 4.36); Pest Management (OP/BP
4.09); Physical Cultural Resources (OP/BP4.11) and Involuntary Resettlement (OP/BP 4.12). See
Table 3 for an overview.
78. Environmental safeguard instruments: All investments proposed for financing will need to
comply with environmental and social safeguard policies by undergoing the required level of
assessment prior to implementation. In addition, all investments inside the priority PAs were
identified as part of the existing General Management Plans of each PA, prepared with due
consideration to zoning, reduction of accumulated impacts and other considerations. Currently, the
total number, specific location and characteristics of proposed investments are still to be determined.
Therefore, specific impacts cannot be identified by appraisal and it is not possible to conduct a full
Environmental and Social Impact Assessment (ESIA) of the entire project. In this case, the
instrument of choice is an ESMF. The ESMF is an umbrella document, which details environmental
and social screening procedures for identifying, assessing, and mitigating potential environmental
and social impacts of project investments. The ESMF defines the adequate environmental and social
instruments to be applied for each investment. These instruments can range from an ESIA to a
simplified Environmental and Social Management Plan (ESMP). The ESMF, and all relevant
environmental and social assessment instruments must follow Tanzania's relevant environmental
regulations and World Bank's safeguard policies triggered for this project. The ESMF has been
publicly disclosed in country and in the World Bank InfoShop prior to appraisal.
79. The implementation of the REGROW project is expected to follow existing government
structures within the project-related ministries, agencies, regional secretariats and local government
authorities and community institutions. Thus, overall safeguard oversight and coordination will be
under MNRT's Environmental Management Unit, with close participation from TANAPA and
24
TAWA officials. MNRT will work closely with and provide oversight to implementing sectors and
agencies in accordance with World Bank Safeguard Policies and as per requirement of the
Environmental Management Act (2004).
Table 3: Safeguard Policies that apply to REGROW
Safeguards Policies Yes Reasons for Triggers and Proposed Mitigation Measures No
Environmental Assessment
(OP/BP 4.01)
x The project is envisioned to support investments of
infrastructure, including: structures to augment dry season
flow to Ruaha river; irrigation infrastructure improvement in
selected areas; catchment conservation activities and
community based activities. An ESMF has been prepared to
provide criteria and procedures for identifying, assessing,
and mitigating potential environmental and social impacts of
project investments.
Natural Habitats (OP/BP 4.04) x The project will support: watershed management activities in
the catchment of Great Ruaha River; and construction of
infrastructure and facilities in Ruaha National Park, Mikumi
National Park, Udzungwa National Park, and Selous Game
Reserve. Natural habitat issues will be addressed as part of
the ESIA and the ESMP for specific project investments.
Pest Management (OP 4.09) x The project is not expected to involve the purchase nor the
use of significant quantities of pesticides. However,
Component 3 includes activities to improve the efficiency of
agricultural practices and water conservation in the Great
Ruaha catchment, and will include support through farmer’s
field schools. In this regard, the project might involve or
inadvertently promote the use of pesticides during the
implementation of those activities. Therefore, the policy is
being triggered as a precaution, and specific instructions will
be included as part of the ESMF to promote best practices in
case of pesticide use or handling in the project area.
Physical Cultural Resources
(OP/BP 4.11)
x The project is not expected to affect or impact any physical
or cultural resource, or be conducted in the vicinity of them.
However, there will be some infrastructure works, and
therefore, as a precaution, investigations, rescue, and chance
finds Procedures Plan are being included in case they are
needed during implementation.
Indigenous Peoples (OP/BP
4.10)
There are no groups in the project area that meet the criteria
of OP 4.10.
x
Involuntary Resettlement
(OP/BP 4.12)
x Project activities related to construction are expected to
occur mainly within priority Protected Areas’ boundaries,
and therefore are unlikely to trigger the Involuntary
Resettlement Policy. If, however, land acquisition is needed,
the project will follow the provisions set out in the
Resettlement Policy Framework (RPF) in the preparation of
a Resettlement Action Plan which will be implemented prior
to project activities impacting the identified assets.
Forests (OP/BP 4.36) x Implementation of selected watershed management activities
may happen in forested areas, or may promote the
reforestation of some areas or planting of woodlots as
25
catchment protection measures for erosion control. The
ESIA and ESMP will provide the analysis of potential
impacts and define mitigation measures to address any such
adverse impacts.
Safety of Dams (OP/BP 4.37) x
Projects in Disputed Areas
(OP/BP 7.60)
x
Projects on International
Waterways (OP/BP 7.50)
x
G. World Bank Grievance Redress
80. Communities and individuals who believe that they are adversely affected by a World Bank
(WB) supported project may submit complaints to existing project-level grievance redress
mechanisms or the WB’s Grievance Redress Service (GRS). The GRS ensures that complaints
received are promptly reviewed in order to address project-related concerns. Project affected
communities and individuals may submit their complaint to the WB’s independent Inspection Panel
which determines whether harm occurred, or could occur, as a result of WB non-compliance with
its policies and procedures. Complaints may be submitted at any time after concerns have been
brought directly to the World Bank's attention, and Bank Management has been given an opportunity
to respond. For information on how to submit complaints to the World Bank’s corporate Grievance
Redress Service (GRS), please visit http://www.worldbank.org/GRS. For information on how to
submit complaints to the World Bank Inspection Panel, please visit www.inspectionpanel.org.
26
ANNEX 1: RESULTS FRAMEWORK AND MONITORING
TANZANIA: RESILIENT NATURAL RESOURCES MANAGEMENT FOR TOURISM AND GROWTH (REGROW) .
.
.
Project Development Objectives .
PDO Statement
The Project Development Objective (PDO) is to improve management of natural resources and tourism assets in priority areas of Southern Tanzania
and to increase access to alternative livelihood activities for targeted communities.
These results are at Project Level .
Project Development Objective Indicators
Cumulative Target Values
Indicator Name Baseline YR1 YR2 YR3 YR4 YR5 YR6 End Target
1. Area of the priority Protected
Area (PA) with improved access
for basic management
supported by the project
(Square kilometer(km2))
0.00 0.00 1966.00 2650.00 4090.00 5500.00 6850.00 6850.00
1.1 Selous Game Reserve
(Square kilometer(km2) - Sub-
Type: Breakdown)
0.00 0.00 616.00 850.00 1090.00 1300.00 1500.00 1500.00
1.2 Udzungwa National Park
(Square kilometer(km2) - Sub-
Type: Breakdown)
0.00 0.00 100.00 200.00 250.00 300.00 350.00 350.00
1.3 Mikumi National Park
(Square kilometer(km2) - Sub-
Type: Breakdown)
0.00 0.00 0.00 100.00 250.00 400.00 500.00 500.00
1.4 Ruaha National Park
(Square kilometer(km2) - Sub-
Type: Breakdown)
0.00 0.00 1250.00 1500.00 2500.00 3500.00 4500.00 4500.00
27
2. Total tourist visits to the
priority PAs
(Number) 98504.00 104500.00 117000.00 135000.00 135000.00
2.1 Mikumi National Park
(Number - Sub-Type: Breakdown) 52428.00 56000.00 63000.00 71000.00 71000.00
2.2 Ruaha National Park
(Number - Sub-Type: Breakdown) 18961.00 19500.00 22000.00 26000.00 26000.00
2.3 Selous Game Reserve
(Number - Sub-Type: Breakdown) 18197.00 19500.00 22000.00 26000.00 26000.00
2.4 Udzungwa National Park
(Number - Sub-Type: Breakdown) 8918.00 9500.00 10000.00 12000.00 12000.00
3. Households with access to
alternative livelihood activities
supported by the project
(Number)
0.00 0.00 1000.00 5000.00 8000.00 15000.00 20000.00 20000.00
3.1 NRM-based
(Number - Sub-Type: Breakdown) 0.00 0.00 700.00 4000.00 6000.00 11500.00 15000.00 15000.00
3.2 Tourism-based
(Number - Sub-Type: Breakdown) 0.00 0.00 300.00 1000.00 2000.00 3500.00 5000.00 5000.00
4. Land area under sustainable
landscape management
practices
(Hectare(Ha)) - (Corporate)
0.00 1000.00 3000.00 5000.00 8000.00 9000.00 10000.00 10000.00
5. Share of beneficiaries with
rating ‘Satisfied’ or above on
project interventions
(Percentage)
0.00 20.00 50.00 65.00 65.00
5.1 of which female
(Percentage - Sub-Type:
Breakdown)
0.00 20.00 50.00 65.00 65.00
5.2 of which youth 0.00 20.00 50.00 65.00 65.00
28
(Percentage - Sub-Type:
Breakdown) .
Intermediate Results Indicators
Cumulative Target Values
Indicator Name Baseline YR1 YR2 YR3 YR4 YR5 YR6 End Target
1.1 Access roads rehabilitated
inside priority Protected Areas
(Kilometers) 0.00 0.00 0.00 0.00 400.00 782.00 982.00 982.00
1.1.1 Selous Game Reserve
(Kilometers - Sub-Type:
Breakdown)
0.00 0.00 0.00 0.00 200.00 400.00 600.00 600.00
1.1.2 Ruaha National Park
(Kilometers - Sub-Type:
Breakdown)
0.00 0.00 0.00 0.00 100.00 189.00 189.00 189.00
1.1.3 Mikumi National Park
(Kilometers - Sub-Type:
Breakdown)
0.00 0.00 0.00 0.00 100.00 193.00 193.00 193.00
1.2 Airstrips rehabilitated in
selected project sites
(Number) 0.00 0.00 0.00 7.00 14.00 15.00 15.00 15.00
1.2.1 Selous Game Reserve
(Number - Sub-Type: Breakdown) 0.00 0.00 0.00 3.00 6.00 6.00 6.00 6.00
1.2.2 Ruaha National Park
(Number - Sub-Type: Breakdown) 0.00 0.00 0.00 3.00 7.00 8.00 8.00 8.00
1.2.3 Mikumi National Park
(Number - Sub-Type: Breakdown) 0.00 0.00 0.00 1.00 1.00 1.00 1.00 1.00
1.3 Ranger posts constructed
or/and upgraded in priority
Protected Areas
(Number)
0.00 0.00 0.00 11.00 15.00 15.00 15.00 15.00
29
1.3.1 Udzungwa National Park
(Number - Sub-Type: Breakdown) 0.00 0.00 0.00 1.00 1.00 1.00 1.00 1.00
1.3.2 Selous Game Reserve
(Number - Sub-Type: Breakdown) 0.00 0.00 0.00 4.00 5.00 5.00 5.00 5.00
1.3.3 Ruaha National Park
(Number - Sub-Type: Breakdown) 0.00 0.00 0.00 4.00 7.00 7.00 7.00 7.00
1.3.4 Mikumi National Park
(Number - Sub-Type: Breakdown) 0.00 0.00 0.00 2.00 2.00 2.00 2.00 2.00
1.4 Visitor information centers
constructed and operational in
priority Protected Areas
(Number)
0.00 0.00 0.00 2.00 4.00 5.00 5.00 5.00
1.4.1 Selous Game Reserve
(Number - Sub-Type: Breakdown) 0.00 0.00 0.00 1.00 2.00 3.00 3.00 3.00
1.4.2 Ruaha National Park
(Number - Sub-Type: Breakdown) 0.00 0.00 0.00 1.00 2.00 2.00 2.00 2.00
1.5 Wildlife census conducted in
priority Protected Areas
(Number) 0.00 4.00 8.00 12.00 12.00
1.5.1 Udzungwa
(Number - Sub-Type: Breakdown) 0.00 1.00 2.00 3.00 3.00
1.5.2 Selous Game Reserve
(Number - Sub-Type: Breakdown) 0.00 1.00 2.00 3.00 3.00
1.5.3 Ruaha National Park
(Number - Sub-Type: Breakdown) 0.00 1.00 2.00 3.00 3.00
1.5.4 Mikumi National Park
(Number - Sub-Type: Breakdown) 0.00 1.00 2.00 3.00 3.00
1.6 Product and Market
Development Strategy for
Southern Tanzania is developed
(Yes/No)
No No Yes Yes Yes Yes Yes Yes
30
1.7 Destination management
partnership for Southern
Tanzania operational
(Yes/No)
No No Yes Yes Yes Yes Yes Yes
2.1 Scholarships for vocational
training in nature conservation
and/or tourism hospitality
awarded (disaggregated by sex,
age (16-29))
(Number)
0.00 0.00 32.00 80.00 120.00 160.00 160.00 160.00
2.1.1 of which women
(Number - Sub-Type: Breakdown) 0.00 0.00 16.00 40.00 60.00 80.00 80.00 80.00
2.1.2 of which youth
(Number - Sub-Type: Breakdown) 0.00 0.00 20.00 60.00 80.00 120.00 120.00 120.00
2.2 Households trained by the
project in alternative livelihood
activities (disaggregated by sex,
age (16-29))
(Number)
0.00 0.00 3500.00 8000.00 15000.00 20000.00 20000.00 20000.00
2.2.1 of which youth
(Number - Sub-Type: Breakdown) 0.00 0.00 1750.00 4000.00 7500.00 10000.00 10000.00 10000.00
2.2.2 of which women
(Number - Sub-Type: Breakdown) 0.00 0.00 1750.00 4000.00 7500.00 10000.00 10000.00 10000.00
2.3 Households trained by the
project in reduction of human-
wildlife conflicts
(Number)
0.00 0.00 1000.00 3000.00 5000.00 6000.00 6000.00 6000.00
2.4 Communities using project-
promoted techniques to reduce
human-wildlife conflict
disaggregated by crop-
protection and livestock-
protection technique
0.00 0.00 800.00 2000.00 3600.00 4000.00 5000.00 5000.00
31
(Number)
2.4.1 Crop-protection technique
(Number - Sub-Type: Breakdown) 0.00 0.00 400.00 1000.00 1800.00 2000.00 2500.00 2500.00
2.4.2 Livestock-protection
technique
(Number - Sub-Type: Breakdown)
0.00 0.00 400.00 1000.00 1800.00 2000.00 2500.00 2500.00
3.1 Dry season water supply
sources constructed by the
project in Ruaha National Park
(Number)
0.00 0.00 0.00 1.00 2.00 4.00 4.00 4.00
3.2 Smallholder farmers trained
through Farm Field Schools
(FFS) on improved farming
(Number)
0.00 0.00 1500.00 5000.00 10000.00 15000.00 20000.00 20000.00
3.3 Smallholder agriculture
area benefiting from improved
irrigation infrastructure
(Hectare(Ha))
0.00 0.00 0.00 0.00 1000.00 2000.00 2200.00 2200.00
3.4 Operational water user
associations and irrigators
organizations strengthened
under the project
(Number)
0.00 0.00 1.00 4.00 8.00 12.00 16.00 16.00
.
32
Indicator Description .
Project Development Objective Indicators
Indicator Name Description (indicator definition etc.) Frequency Data Source /
Methodology
Responsibility for Data
Collection
Area of the priority
Protected Area (PA) with
improved access for basic
management supported by
the project
Cumulative targets. Improved access
means construction of roads and bridges,
and construction new/improved
infrastructure (ranger posts, entry gates) to
improve basic management of the areas.
The indicator captures both the
management of natural resources (wildlife
in particular) and tourism assets of the
PDO. The indicator relates to the PPIs
cluster on Biodiversity (improved basic
management will contribute to the
protection of biodiversity).
Annual Review of geospatial data
sets.
MNRT with support from
TANAPA/ TAWA
Selous Game Reserve Annual Review of geospatial data
sets.
MNRT with the support of
TAWA.
Udzungwa National Park Annual Review of geospatial data
sets.
MNRT with support from
TANAPA.
Mikumi National Park Annual Review of geospatial data
sets.
MNRT with support from
TANAPA
Ruaha National Park Annual Review of geospatial data
sets.
MNRT with support from
TANAPA
Total tourist visits to the
priority PAs
Annual targets. A tourist is a visitor to one
of the priority PAs paying entry fee to
enter any of the priority PAs. The baseline
and target values include resident and non-
resident visitors. This indicator captures
the tourism aspects of the PDO. Reference
to table 1 of the main body of the
document for baseline data. The indicator
Biennial Count of entry fees payed
(resident and non-resident)
TANAPA/TAWA
33
relates to the PPIs clusters on Jobs and
Household Income (increase in the
number of resident and especially non-
resident visitors will contribute
significantly to the employment in the
service sectors and also increase demand
for local produce and handicraft).
Mikumi National Park Biennial Count of entry fees payed
(resident and non-resident)
TANAPA
Ruaha National Park Biennial Count of entry fees payed
(resident and non-resident)
TANAPA
Selous Game Reserve Biennial Count of entry fees payed
(resident and non-resident)
TAWA
Udzungwa National Park Biennial Count of entry fees payed
(resident and non-resident)
TANAPA
Households with access to
alternative livelihood
activities supported by the
project
Cumulative targets
Number of households engaged in
alternative livelihood activities supported
by the project (NRM like supply of
produce and artisanal products for
increased tourism, or production of higher
value crops less water-demanding;
Tourism-based such as non-skilled and
skilled labor), either full time or part time.
The indicator captures the access to
alternative livelihood aspects of the PDO.
The indicator relates to the PPIs cluster on
Jobs, Household Income, Resilience and
Biodiversity (increased access to
alternative livelihoods will bring about a
behavior change away from destructive
practices in protected areas and contribute
to better protection of biodiversity. In
most cases, it will also contribute to an
Annual Field Survey TANAPA/TAWA
34
increase household income and jobs
through creation of alternative livelihood
strategies in NRM and livelihood
strategies related to the tourism sector.)
NRM-based Annual Field Survey TANAPA/TAWA
Tourism-based Annual Field survey TANAPA/TAWA
Land area under sustainable
landscape management
practices
Cumulative targets. Corporate results
indicator
Land area includes: specific farm land area
upstream of the Great Ruaha River;
sustainable landscape management
practices means the adoption of improved
land and water management practices
(techniques similar to System for Rice
Intensification (SRI), or areas with
improved operations and field-level
practices, or improved water control
through infrastructure).
The indicator captures the management of
natural resources (watersheds in
particular) of the PDO. The indicator
relates to the PPIs cluster on Resilience
(increased use of sustainable landscape
management practices will contribute
significantly to reduction in soil erosion
and soil degradation).
Annual Field Survey NIRC/RBWB
Share of beneficiaries with
rating ‘Satisfied’ or above
on project interventions
Biannual Targets.
Perception survey will focus on the
interlinked aspects of livelihoods,
environmental protection, social inclusion
and water resources management.
It captures demand-side social
accountability, citizen engagement, and
both natural resource managements and
Biennial Perception Survey PCU/M&E
35
tourism from the perspective of target
beneficiaries.
of which female Biennial Perception survey PCU/M&E
of which youth Biennial Perception survey PCU/M&E .
Intermediate Results Indicators
Indicator Name Description (indicator definition etc.) Frequency Data Source / Methodology Responsibility for Data
Collection
Access roads rehabilitated
inside priority Protected
Areas
Cumulative targets.
Access roads will be rehabilitated
including the construction of new (N)
roads as per the following:
a) 220
b) 1000 including 50 (N)
c) 989
The indicator links to PDO indicators #1
and #3 by strengthening the management
of the natural resources, and to #2 by
increasing access to tourist sites. The
indicator relates to the PPIs cluster on
Jobs, Household Income, Resilience and
Biodiversity (increased access to protected
areas will contribute to better protection of
biodiversity. In most cases, it will also
contribute to an increase household
income and jobs through creation of more
tourist sites and livelihood strategies
related to the tourism sector).
Annual Technical inspection upon
completion of works
TANAPA/TAWA
Selous Game Reserve Annual Technical inspection upon
completion of works
TAWA
Ruaha National Park Annual Technical inspection upon
completion of works
TANAPA
36
Mikumi National Park Annual Technical inspection upon
completion of works
TANAPA
Airstrips rehabilitated in
selected project sites
Cumulative targets.
Standard Airstrip is 1.2 km.
The indicator links to PDO indicators #1
and #2 by strengthening the management
of the natural resources and accessibility
to tourists. The indicator relates to the
PPIs cluster on Jobs, Household Income,
Resilience and Biodiversity (increased
access to protected areas will contribute to
better protection of biodiversity. In most
cases, it will also contribute to an increase
household income and jobs through
creation of more tourist sites and
livelihood strategies related to the tourism
sector.)
Annual Technical inspection upon
completion of works
TANAPA/TAWA
Selous Game Reserve Annual Technical inspection upon
completion of works
TAWA
Ruaha National Park Annual Technical inspection upon
completion of works
TANAPA
Mikumi National Park Annual Technical inspection upon
completion of works
TANAPA
Ranger posts constructed
or/and upgraded in priority
Protected Areas
Cumulative targets. New (N) ranger posts
will be constructed, and existing ones will
be upgraded (U). The indicator links to
PDO indicators 1 and 3 by strengthening
the management of the natural resources.
The indicator relates to the PPIs cluster on
Biodiversity (increasing the number of
ranger posts that function will contribute
to improving basic management that in
turn will contribute significantly
protection of biodiversity).
Annual Technical inspection upon
completion of works
TANAPA/TAWA
37
Udzungwa National Park Annual Technical inspection upon
completion of works
TANAPA
Selous Game Reserve Annual Technical inspection upon
completion of works
TAWA
Ruaha National Park Annual Technical inspection upon
completion of works
TANAPA/TAWA
Mikumi National Park Annual Technical inspection upon
completion of works
TANAPA/TAWA
Visitor information centers
constructed and operational
in priority Protected Areas
Cumulative targets.
Operational means visitor centers are
staffed, equipped, and in use. The
indicator links to PDO indicator #2 by
improving the tourism infrastructure. The
indicator relates to the PPIs clusters on
Jobs and Household Income (improving
visitor information centers will contribute
to an increase in the number of resident
and especially non-resident visitors will
contribute to the employment in the
service sectors and also increase demand
for local produce and handicraft).
Annual Technical inspection upon
completion of works
TANAPA/TAWA
Selous Game Reserve Annual Technical inspection upon
completion of works
TAWA
Ruaha National Park Annual Technical inspection upon
completion of works
TANAPA
Wildlife census conducted
in priority Protected Areas
Cumulative targets.
Censuses of elephants, rhinos, and big cat
populations. The indicator links to PDO
indicator #1 by strengthening the
management of the natural resources. The
indicator relates to the PPIs cluster on
Biodiversity (wildlife census is part of
improved planning which will contribute
Biennial Review of wildlife census
reports
TAWIRI
38
to improving basic management that in
turn will contribute significantly
protection of biodiversity).
Udzungwa Biennial Review of wildlife census
reports
TAWIRI
Selous Game Reserve Biennial Review of wildlife census
reports
TAWIRI
Ruaha National Park Biennial Review of wildlife census
reports
TAWIRI
Mikumi National Park Biennial Review of wildlife census
reports
TAWIRI
Product and Market
Development Strategy for
Southern Tanzania is
developed
Cumulative targets.
Product and Market Development
Strategy. The indicator links to PDO
indicator #2 by promoting tourism in
Southern Tanzania.
Annual Review of Product and
Market Development
Strategy
MNRT with support from
TTB
Destination management
partnership for Southern
Tanzania operational
Annual targets. The partnership will
include TTB, relevant private sector,
TAWA, TANAPA, NGOs, and
communities. Operational means regular
regional meetings to be held, annual work
plan developed and implemented,
promotion familiarization trips conducted
etc. The indicator links to PDO indicator
#2 by promoting tourism in Southern
Tanzania.
Annual Review of minutes of
meetings, work plan and
trip reports
TTB
Scholarships for vocational
training in nature
conservation and/or tourism
hospitality awarded
(disaggregated by sex, age
(16-29))
Cumulative targets. The indicator links to
PDO indicators 1, 3 and 5 by promoting
community-based natural resources
management, and improving livelihoods.
The indicator relates to the PPIs cluster on
Jobs, Household Income, Resilience and
Biodiversity (provision of training in
Annua Review of scholarship
award letters
MNRT/TANAPA/TAWA
39
alternative livelihoods will lead to
increased access to alternative livelihoods
that will bring about a behavior change
away from destructive practices in
protected areas and contribute to better
protection of biodiversity. In most cases, it
will also contribute to an increase
household income and jobs through
creation of alternative livelihood strategies
in NRM and livelihood strategies related
to the tourism sector.)
of which women Annual Review of scholarship
award letters
MNRT/TANAPA/TAWA
of which youth Annual Review of scholarship
award letters
MNRT/TANAPA/TAWA
Households trained by the
project in alternative
livelihood activities
(disaggregated by sex, age
(16-29))
Cumulative targets.
The indicator links to PDO indicators #3
and #5 by promoting community-based
natural resources management, and
improving livelihoods. The indicator
relates to the PPIs cluster on Jobs,
Household Income, Resilience and
Biodiversity (provision of training in
alternative livelihoods will lead to
increased access to alternative livelihoods
that will bring about a behavior change
away from destructive practices in
protected areas and contribute to better
protection of biodiversity. In most cases, it
will also contribute to an increase
household income and jobs through
creation of alternative livelihood strategies
in NRM and livelihood strategies related
to the tourism sector.)
Annual M&E system based on
service providers’ reports
MNRT/TANAPA/TAWA
40
of which youth Annual M&E system based on
service providers’ reports
MNRT/TANAPA/TAWA
of which women Annual M&E system based on
service providers’ reports
MNRT/TANAPA/TAWA
Households trained by the
project in reduction of
human-wildlife conflicts
Cumulative targets. The indicator links to
PDO indicators #3 and #5 by promoting
community-based natural resources
management, and reducing negative
impacts of human-wildlife conflict. The
indicator relates to the PPIs cluster on
Biodiversity (provision of training in
reduction of human-wildlife conflicts will
be part of improving basic management
that in turn will contribute to protection of
biodiversity).
Annual M&E system based on
service providers’ reports
MNRT/TANAPA/TAWA
Communities using project-
promoted techniques to
reduce human-wildlife
conflict disaggregated by
crop-protection and
livestock-protection
technique
Cumulative targets.
Community here means group of
households that jointly implement project
techniques
The indicator links to PDO indicators #3
and #5 by promoting community-based
natural resources management, and
reducing negative impacts of human-
wildlife conflict. The indicator relates to
the PPIs cluster on Biodiversity (provision
of assistance to reduce human-wildlife
conflicts will be part of improving basic
management that in turn will contribute to
protection of biodiversity).
Annual M&E system based on
service providers’ reports
Review of service
provider’s reports
MNRT/TANAPA/TAWA
Crop-protection technique Annual M&E system based on
service providers’ reports
MNRT/TANAPA/TAWA
Livestock-protection
technique
Annual M&E system based on
service providers’ reports
MNRT/TANAPA/TAWA
41
Dry season water supply
sources constructed by the
project in Ruaha National
Park
Cumulative targets.
Dry season water supply sources means
the design and construction of structural
measurements that are able to increase
water availability during the dry season in
RUNAPA. The indicator links to PDO
indicators #1, #2 and #4 by strengthening
the management of the natural resources.
The indicator relates to the PPIs cluster on
Resilience (increased use of sustainable
landscape management practices as dry
water supply will contribute significantly
to reduction in soil erosion and soil
degradation).
Annual Technical inspection upon
completion of works
TANAPA
Smallholder farmers trained
through Farm Field Schools
(FFS) on improved farming
Cumulative targets.
Improved farming means efficient water
use and management of irrigation
schemes. The indicator links to PDO
indicator #4 by promoting sustainable
landscape management practices. The
indicator relates to the PPIs cluster on
Resilience (training of farmers on
improved farming will increase the use of
sustainable landscape management
practices that in turn will contribute to
reduction in soil erosion and soil
degradation).
Annual Review of reports from FFS NIRC/RBWB
Smallholder agriculture
area benefiting from
improved irrigation
infrastructure
Cumulative targets. Improved means with
lining and intact structures. The indicator
links to PDO indicator 4 by promoting
sustainable landscape management
practices. The indicator relates to the PPIs
cluster on Resilience (improved irrigation
management is one of the sustainable
landscape management practices that will
Annual Technical inspection upon
completion of works
NIRC
42
contribute significantly to reduction in soil
erosion and soil degradation).
Operational water user
associations and irrigators
organizations strengthened
under the project
Cumulative targets. Strengthened means:
Operational and Maintenance in place, and
received training. The indicator links to
PDO indicators 1 and 4 by promoting
sustainable landscape management
practices. The indicator relates to the PPIs
cluster on Resilience (strengthening of the
respective institutions will contribute to an
increased use of sustainable landscape
management practices that will contribute
to reduction in soil erosion and soil
degradation).
Annual Review of training
providers’ report
RBWB/NIRC
43
ANNEX 2: DETAILED PROJECT DESCRIPTION
TANZANIA: RESILIENT NATURAL RESOURCE MANAGEMENT FOR TOURISM
AND GROWTH (REGROW) PROJECT
1. The project will be implemented through four distinctive components, which are described
below.
Component 1 – Strengthen management and improve infrastructure in priority Protected Areas
(US$97 million)
2. Background: Despite Tanzania’s endowment in unique natural assets, the tourism industry in
Southern Tanzania is relatively underdeveloped and attracts a low volume of visitors in
comparison to the North. A 2012 report22 showed that, while the country attracts more than a
million visitors a year, the South accounts for less than 10 percent of those visitors, and less than
1.5 percent of PA revenue. Recent figures shown in Table 1 prove that the situation has not
changed much. Southern Tanzania’s tourism products, including accommodation options and
activities, are fewer in number, limited in variety and have poor market penetration.
3. Challenges that specifically affect tourism in Southern Tanzania include the vast size and the
remoteness of the region, which together restrict access, and more significantly, the operating
environment for business is poor, poaching is rampant, and there has been little investment in
infrastructure or marketing of tourism in the south.
a) Southern Tanzania has
significant infrastructure
needs, requiring efficient
travel hubs, robust road
networks, and reliable
electricity to improve a
tourist’s experience and reduce the cost, both in terms of time and cost. The RUNAPA,
with its 20,226km2 area, is Tanzania’s largest national park. However, most tourists fly
directly into the park, with round trips from Dar es Salaam averaging US$600, as road
access is limited (see Table 4). The high cost of access has resulted in a primarily high-end
market for visitors, particularly those who appreciate and seek out remote wilderness.
Similarly, the Selous Game Reserve is one of Africa’s largest PAs, covering about 50,000
km2 and home to exceptional wildlife, however, accessibility is equally challenging.
b) Rampant poaching has caused a dramatic decline in the wildlife populations, especially
elephants and rhinos, whose numbers have dropped dramatically. For example, the Selous
Game Reserve’s elephant population fell by 66 per cent in just over four years, from around
39,000 in 2009 to 13,000 in 2013. In the Ruaha-Rungwa ecosystem, the population
declined by 37 per cent from around 32,000 to 20,000 over the same period. The cause of
such die-off is illegal harvesting, with poachers responsible for 60 to 90 percent of elephant
22 United Republic of Tanzania (2012). Tanzania Tourism Statistical Bulletin. Dar es Salaam, Ministry of Natural Resources and
Tourism
From/To Ruaha Selous Game Reserve
Dar es Salaam 625km (11 hours) 230km (6 hours)
Arusha 335km (5 hours) 1,000 (14 hours)
Selous Game Reserve 855km (17 hours) -
Table 4: Approximate Travel Distance by Road
44
deaths in Tanzania’s wildlife reserves. Addressing the wildlife poaching crisis is indeed at
the core of the challenge the tourism sector is facing in Tanzania.
4. Objective: The objective of Component 1 is to improve the management and sustainability of
natural resources inside the priority PAs in Southern Tanzania, and to build enabling infrastructure
for tourism development. This will be achieved through investments, policy and regulatory support
and capacity/skill development activities which are grouped under three sub-components:
5. Sub-Component 1.1 – Improve PA infrastructure (US$70 million). Enhance accessibility and
basic infrastructure of the priority PAs to improve management and overall quality of the tourism
products. Key investments include: (i) earthworks - construction of new and upgrade existing
roads, trails, bridges and upgrading of existing airstrips to improve connectivity and ability to
patrol strategic locations; (ii) civil works - construction and upgrading of ranger posts, tourist
arrival amenities, entry/exit gates, visitor information centers, youth hostels, and “bandas” for
official and educational purposes, maintenance workshops, and research centers.
6. This sub-component is entirely devoted to the implementation of key infrastructure inside the
four priority PAs, to facilitate accessibility, connectivity, and diversification of the tourism
product. It will follow the guidelines of the general management plans for each protected area. By
improving the road network, the areas that can be safely visited by tourists is expanded, therefore
increasing the potential total number of nights that tourists can stay in each PA. Some of the
infrastructure will also facilitate inter-connectivity between PAs, increase safety of air operations,
and enable TANAPA and TAWA to better manage the natural resources.
7. Sub-Component 1.2 – Strengthen management capacity and infrastructure maintenance of
PAs (US$13 million). Activities include: (i) basic light and heavy equipment for road works; (ii)
infrastructure management tools and contingency plans; (iii) upgrading of communications,
monitoring and patrolling equipment;23 (iv) improve payment systems to address delays entering
PAs, and carry out sensitivity studies for entrance fees; (v) wildlife related research initiatives to
inform policy dialogue and integrated management; and (vi) targeted training for PA staff on
infrastructure management.
8. Both TANAPA and TAWA carry out frequent maintenance of roads, airstrips and other
facilities inside the PAs. This is important, particularly due to the marked seasonality and intensity
of the rains. This sub-component will provide key equipment, preparation of maintenance plans,
and contingency plans (for fires, medical emergencies, and others), and training for operators so
that infrastructure can last longer and be operated in a safe environment. The sub-component will
also support TANAPA and TAWA with equipment to monitor the PA, especially targeted towards
illegal wildlife poaching. Resources are also available to design an effective payment system for
entrance to the PAs – delays with current systems are a frequent source of complains by visitors.
The project will also purchase the equipment, install, test and provide training for the new system.
Finally, it will conduct wildlife censuses and other targeted research, through the Tanzania
Wildlife Research Institute (TAWIRI), to monitor wildlife conservation outcomes.
9. Sub-Component 1.3 – Strengthen “Destination Southern Tanzania” (US$14 million).
Identify and build linkages between the range of attractions – including the priority PAs – in
Southern Tanzania and increase recognition of Southern Tanzania as a destination. Activities
include: (i) an integrated tourism product development and marketing strategy for Southern
23 Monitoring and patrolling equipment will not include weapons, firearms, or similar.
45
Tanzania that includes wildlife, forests, beach, cultural and historic products; (ii) implement
marketing and branding strategies for the priority PAs; (iii) build a destination marketing and
management office in Iringa to drive destination development; (iv) identify, assess feasibility, and
promote opportunities for private sector investment in and around the priority PAs; and (v) scoping
studies for Southern RUNAPA, Kitulo National Park, Katavi National Park and other southern
destinations for possible future investment.
10. The priority PAs in Southern Tanzania are part of a landscape that includes multiple potential
tourism attractions. Just as tourism has diversified beyond the core PA attractions (Serengeti,
Ngorongoro, Lake Manyara, Tarangire, and Kilimanjaro in northern Tanzania to include multiple
linkages to community-based and cultural tourism, agro-tourism, walking trails through forested
areas, bird-watching, handicrafts, beaches and marine based activities), the endowment base exists
in Southern Tanzania to attract investors and tourists who can transform the economy. 40 years
ago, Arusha was a small dusty town with just two government-owned hotels, today it is a thriving
tourism “gateway” town with over 100 different accommodation facilities. This vision of the
government, as described in the New National Tourism Policy is develop tourism in Tanzania
through a zonal approach, building around gateway towns such as Arusha in the north, Mwanza
covering the Lake region, and Iringa in Southern Tanzania. It is envisioned that these gateway
towns will provide centers for decentralized government services such as licensing, regulation and
standards, inspections, data collection, tourist and investor information provision, promotion and
marketing, tourism services training, regional tourism planning and broad stakeholder
coordination (including across different government agencies) – in essence “Destination
Management”. Global best practices for destination management usually involve a functioning and
integrated stakeholder partnership that is well coordinated and meets regularly to provide the
services and oversight outlined above.
11. This sub-component will support activities that identify and build linkages between the range
of attractions – including the priority PAs – in Southern Tanzania and increase recognition of
Southern Tanzania as a destination. It will also support the establishment of a Destination
Management Partnership based in Iringa that will, among other activities, support and oversee:
(i) The development of an integrated tourism product and market development strategy for
Southern Tanzania that includes wildlife, forests, beach, cultural and historic products:
Building on consultancies carried out during project preparation, this critical output will:
(a) conduct market research with foreign tour operators supplying Tanzania in at least the
top 10 source market countries in order to provide market context and potential for tourism
in Southern Tanzania, with a focus on the target protected areas, but also keeping the
perspective of the rest of Southern Tanzania as a destination; (b) identify – and to the extent
possible, quantify - specific domestic, regional, and international market segments that
have potential to grow from the existing, and potential future, tourism product base across
Southern Tanzania and in particular the four priority PAs; (c) building on the work already
completed during preparation, conduct an extensive tourism product inventory of Southern
Tanzania (qualified by two typologies – “market ready” and “not market ready”); (d) based
on the market analysis, conduct value chain analyses across 4-6 priority market segments
(e.g. cultural and community tourism itinerary), to identify gaps in the offering that is
currently in place in Southern Tanzania; (e) formulate, together with relevant stakeholders,
action plans and recommend interventions in each of the priority PAs that can strengthen
46
the value proposition for the priority market segments; (f) define integrated market
development strategies (print, digital and social media) for identified priority market
segments and relate these to action plans in each priority PA; (g) develop draft Terms of
Reference for the implementation of a 2-year action plan for Southern Tanzania but focused
on marketing and promotion strategies for each priority PA. The objective of this output is
to define a clear path for integrated product and market development. While this task will
be carried out by consultants, it will serve to build the Destination Management Partnership
as the involvement of these stakeholders will be a critical success factor of the emerging
strategy.
(ii) Implement marketing and branding strategies for the priority PAs; building from the work
above, activities here will focus on: (a) the development of brand concepts, content
collection and packages of collaterals and marketing and promotion materials for each of
the four priority PAs as well as the umbrella brand concept for Southern Tanzania; (b) the
development of targeted local and international media campaigns that facilitate
professional and commercial coverage of Southern Tanzania and build on the specific
interventions in the priority PAs to ensure national and global awareness of the emerging
Southern Tanzania destination; and (c) co-funding of tour operator and media relationship
building and joint promotions. This is envisioned as a two-part assignment to be evaluated
and modified at the mid-term of the project.
(iii) Supporting and developing capacity to drive destination development and management
activities will focus on: (a) providing office space and equipment in Iringa, transport and
technical assistance to facilitate the provision of key destination management services such
as licensing, regulation and standards, inspections, data collection, tourist and investor
information provision, promotion and marketing, tourism services training, regional
tourism planning and broad stakeholder coordination; and (b) technical support to design
appropriate data collection, management and information systems to both support project
M&E systems and data collection and analysis to inform planning and destination
management.
(iv) Identify, assess feasibility, and promote opportunities for private sector investment in and
around the priority PAs. Initially an investment identification study will be undertaken to
define a long list of investment opportunities that support the overall strategy of developing
a Southern Circuit. From this long list, investment readiness criteria will be applied to each
opportunity together with a priority ranking. The top 6-8 opportunities will be further
defined through land surveying, initial due diligence, local consultations, selecting and
drawing up an appropriate legal contracting document – lease, concession, etc. A small
prospectus around each one will be developed to present the offer to the market. In the case
of the WMA opportunities, there might have to be additional work to establish an
appropriate special purpose vehicle (SPV) to be an investment partner with the private
sector.
(v) Scoping studies for Southern RUNAPA, Kitulo National Park, Katavi National Park and
other southern destinations for possible future investment. It is envisioned that PAs beyond
the targeted ones in the project will require investment. These scooping studies are intended
47
to define investment gaps and market potential of other PAs in the Southern Tanzania
landscape.
Component 2 – Strengthen alternative livelihoods for targeted communities in proximity to the
priority Protected Areas (US$17 million)
12. Background: Despite the national economic importance and recent growth of tourism, at the
local level, communities in proximity to PAs are some of the poorest in the country. While in other
African countries (such as Namibia, Mozambique and parts of Kenya), tourism is providing an
important source of revenue and employment to local communities, Tanzania's current policies
aiming to promote local benefits from tourism, have not been as effective. Rather, local
populations, which are highly dependent on natural resources for food, fodder and fuel, generally
consider wildlife to be worth more dead than alive.
13. There is a need to strengthen linkages with the local economy and develop policies and
incentives to share benefits with the poorest, who often live close to tourist attractions. Recognizing that engagement in alternative livelihoods, per se, might not reduce anthropogenic
pressure on natural resources inside the priority PAs, the component will need to identify and
implement incentive-based approaches, to influence behaviors and establish an enabling
environment for change to happen. These incentives will necessarily link alternative livelihood
engagement with specific conservation outcomes and public good benefits to wildlife. Sustainable
tourism development will need to rely on a stronger connection with local economies through
training and job creation, supply chain development, and other forms of benefit sharing.
14. Community-based natural resource management will need to play an important role to better
conserve and manage the natural assets that are core to the benefits. Tanzania’s community-
based conservation model is anchored around Wildlife Management Areas (WMAs), areas of
communal land set aside as habitat for wildlife by member villages. The concept assumes that
providing local communities with economic benefits and involving them in management will
promote both long-term health of wildlife and habitat and rural economic development.24
However, while significant progress has been made over the past decade in terms of creating a
basic legal and institutional framework for WMAs, supporting communities to establish the basic
management structures and land use patterns required to form and oversee the WMAs, and
attracting support for this conservation model, major challenges, particularly economic and
governance-related, are hampering the full conservation potential, particularly in the Southern
Circuit, where tourism-related income is still limited. In addition, the government, through
TANAPA, supports communities adjacent to the PAs through (i) its Support for Community
Initiated Projects (SCIP), which extends financial support focusing on education, health,
transportation and water supply; and (ii) the TANAPA Income Generating Projects (TGIPs).
15. Reconciling biodiversity conservation, tourism and livelihood of the people is critical to
sustaining biodiversity (and their services) and promoting tourism in mega-biodiverse countries
like Tanzania. In most cases, areas set aside for conservation, spaces for tourism and land for
livelihood activities share the same landscapes. Therefore, successful interventions in tourism and
conservation require a clear understanding of the socio-economic characteristics of the
communities living adjacent to the priority PAs, and the right type of incentive-disincentive
mechanisms. For communities around the priority PAs, it is necessary to develop strategies that
24 Tanzania currently has 17 WMAs with additional 22 in various stages of development.
48
can better link these communities to tangible economic benefits that come from, or are related to,
the PAs. As such, there is a need to strengthen and reinforce the link communities have and the
benefits they gain from their affiliation with the PAs. This comes in the form of employment,
ownership in tourism or non-tourism businesses and enhanced agricultural activities that improve
their livelihoods and reduce their impact on wildlife and the landscape.
16. The overall objective of this component is to provide access to improved economic
opportunities within targeted communities living in the proximity of the priority PAs – the priority
villages- to enhance livelihoods, reduce vulnerability to climate shocks, and reduce pressure on
natural resources and wildlife.
17. By focusing on enhancing partnerships between priority PAs and communities, the project will
be anchored around improved policy and governance frameworks, productive initiatives linking
improved livelihoods with tourism, conservation of wildlife and landscapes, and a strong focus on
community and LGA education and training linked to the achievement of specific training goals.
18. The REGROW priority PAs cover a vast extension of land (RUNAPA encompasses 20,226
km2, SGR extends over 50,000 km2, MINAPA covers 3,230 km2 and UMNP covers 1,990 km2
combined, they cover over 75,000 km2 - for reference, Switzerland covers 41,285 km2). For this
reason, REGROW will not be able to tackle all communities surrounding the priority PAs, and
will need to prioritize in order to be effective (the total population living in villages located around
the priority PAs is estimated to be around 300,000 inhabitants - based on the 2012 National
Census), with the possibility of widening the scope in future operations. To do this prioritization,
during preparation the Government of Tanzania carried out an assessment of the villages in the
proximity of the priority PAs, and applied core selection criteria by which villages were prioritized
for project engagement. The assessment included meetings and field visits with districts and
villages adjacent to the four priority PAs.
19. The main selection criteria applied during the assessment included:
i. Villages whose inclusion in REGROW would help enhance landscape-scale biodiversity
conservation (ensure habitat/PAs connectivity and protection of buffer zones/dispersal areas
and wildlife migratory corridors). These are villages that have engaged and/or contributed land
in the management of Wildlife Management Areas, Village Land Forest Reserves, bee reserves,
situated along the wildlife migratory corridors and/or wildlife dispersal areas;
ii. Villages known as hotspots for illegal activities with the objective of both reducing illegal
use of PA resources (with a particular focus on illegal wildlife poaching), and mitigating any
ancillary impacts resulting from the curbing of such activities;
iii. High potential for engaging in conservation-friendly livelihood activities: All villages
surrounding the PAs have the potential for implementing conservation-friendly livelihood
activities. The inclusion/exclusion criterion for engagement in conservation-friendly activities
was guided by the word ‘high potential’. The inclusion of these villages in the REGROW
project would contribute to increased production, value addition, market linkages, and
diversification of livelihood activities (e.g. beekeeping due to availability of forested lands, fish
farming, poultry, horticultural activities, organic farming);
iv. Existence of tourist attractions and facilities: Existence of tourist local products (handicraft
products, traditional dances and tourist facilities such as campsites, lodges, etc.).
49
20. Additional secondary criteria considered:
i. Existence of village land use plans;
ii. Presence of financial institutions (Banks, SACCOS, Village Community Banks/
Conservation Community Banks (VICOBA)/COCOBA);
iii. Presence of the private sector in supporting tourism and non-tourism activities;
iv. Presence of infrastructure (railway, roads, etc.) to facilitate access;
v. Knowledge and skills in implementing tourism and non-tourism activities;
vi. Ongoing projects by other international and national organizations/donors (including
TANAPA/ TAWA);
vii. Number of beneficiaries: how many people are likely to benefit from the projects;
viii. Potential to participate in block interventions.
21. Using the above combination, the villages surrounding the REGROW priority PAs were
classified into three groups:
A: High Potential Villages: at least two core selection criteria and at least five other additional
criteria (combined); plus all villages, irrespective of their classification, identified as hotspots
for illegal activities inside the priority PAs;
B: Medium Potential Villages: at least one core selection criteria and at least three other
selection criteria (combined), plus the potential of a village to engage in implementation of
medium to large scale projects that targets a block and not individual villages (e.g. engagement
in semi-improved irrigation schemes)
C: Less Potential Villages: a village with no core selection criteria, and less than three additional
selection criteria (combined).
22. REGROW Component 2 activities will first focus on villages that were screened as High
Potential as described above. The project may expand its interventions to additional medium
potential villages based on resources and identified impacts. In total, 61 “hotspot villages” (with
an estimated total of 34,000 households) were classified as High Potential, and thus would be
eligible to receive technical and financial assistance from the project. The names, population and
location of these prioritized villages, referred to as priority villages, are provided in Table 5.
50
Table 5. Priority villages, eligible for support by the project
# Village Hab.
(2012)
# Village Hab.
(2012)
# Village Hab.
(2012)
SELOUS GAME RESERVE MIKUMI NATIONAL PARK RUAHA NATIONAL PARK
RUFIJI DISTRICT MVOMERO DISTRICT IRINGA RURAL DISTRICT 1 Kipo 1250 25 Doma 3388 46 Makuka 1667 2 Kipugira 1121 26 Maharaka 5254 47 Mboliboli 5023 3 Nyaminywili 2147 27 Mkata 552 48 Kinyika 2697 4 Mtanza-Msona 1651 28 Sewe Kipera 412 49 Itunundu 5113 5 Mwaseni/Mibuyu saba 1247 KILOSA DISTRICT 50 Kisanga N/A 6 Mloka 3493 29 Mikumi 14792 51 Malinzanga N/A
KILOMBERO DISTRICT 30 Ihombwe 2141 52 Mahuninga 2630
7 Msolwa station 8083 31 Kilangali 3364 53 Idodi 3550
8 Nyange 510 32 Tindinga 5041 54 Tungamalenga 3176
9 Magombera 947 MOROGORO RURAL 55 Isele 1823
10 Katurukila 2780 4 villages - in SGR 56 Mafuruto 2413
11 Kanyenja 1724 UDZUNGWA MOUNTAINS
NATIONAL PARK 57 Makifu 1701
12 Kikwawila 4300 KILOLO DISTRICT MBARALI DISTRICT
KISARAWE DISTRICT 33 Msosa 1955 58 Mapogoro 4613
13 Panga la Mwingireza 771 34 Ikula 1711 CHAMWINO DISTRICT
14 Kitongachole 348 35 Wotalisoli 1343 59 Ilangali 3364
15 Kisangire 380 36 Udekwa 2562 60 Manda 5488
16 Gwata 2132 KILOMBERO DISTRICT 61 Chinugulu 5216
17 Vikumburu 1215 37 Kiberege 10977
Total Priority Villages: 61
Total inhabitants: 205,211
18 Mtunani 373 38 Mang'ula B 5454
MOROGORO RURAL DISTRICT 39 Mwaya 10418
19
Kisaki station- shared with
Mikumi NP 4889 40 Msifuni 1477
20
Gomero- shared with
MINAPA 2760 41 Kidatu 7299
21
Kichangani shared with
MINAPA 1654 42 Mkamba 17207
22
Nyarutanga - shared with
Mikumi NP 4785 43 Kanolo 1135
23 Dakawa 2143 44 Mkula 1840
24 Magogoni 2000 45 Msolwa Ujamaa 5712
*Source: Modified from CARDNO “Provision of Consultancy Services on Locally–Based Tourism Product Development and
Socio-Economic Assessment of Communities Adjacent to Selected Protected Areas in Southern Tanzania“
23. The implementation of Component 2 would be led by the strengthened outreach units of the
respective priority PAs, operationally supported by service providers, under the overall
coordination of the PA management. The specific instruments, procedures and responsibilities for
the delivery of technical and financial support to beneficiaries would be included in a Subproject
Field Manual, which will need to be prepared by MNRT and approved by the World Bank before
the onset of activities. The ToR for the preparation of the Manual will be jointly developed, with
active participation of TANAPA and TAWA. Specific sub-components are:
24. Sub-Component 2.1 – Improve the governance framework of conservation-related
community-based initiatives (US$2 million). The sub-component will, amongst others: (i)
strengthen the legal and institutional framework of TANAPA’s and TAWA’s benefit sharing
schemes; (ii) strengthen and/or develop the community outreach structures of TANAPA and
TAWA, through technical assistance, capacity building and equipment; and (iii) develop a plan
and/or strategy for development of cultural/historical tourism in the priority PAs.
25. Sub-Component 2.2 – Enhance alternative community livelihoods by improving economic
opportunities and linking them with conservation of wildlife and landscapes (US$11 million).
51
Through a demand-driven approach, the sub-component will support: (i) tourism-related
livelihoods, such as services and agricultural products to tourism operators, and cultural tourism
products; and (ii) natural resources-based livelihoods, such as conservation-based crop and
livestock production, human-wildlife conflict reduction, and participatory forest management.
26. Sub-Component 2.3 – Skills development for local access to jobs in tourism and conservation
(US$4 million). The sub-component will focus on targeted skills development and training to
facilitate access to tourism jobs, and to create new or strengthen existing mechanisms for improved
natural resources management. The sub-component includes: (i) scholarships for community
members in tourism, wildlife, conservation, and facilitating access to vocational colleges (e.g.,
wildlife and tourism related skills); (ii) sensitization and promotion of conservation activities at
community level, including education sessions, village game scout programs, joint community
patrolling, and others; (iii) strengthening of eligible WMAs, through equipment and targeted
training, targeted towards increasing their wildlife management effectiveness; (iv) targeted natural
resources management training for local government authorities around the priority PAs; and (v)
support the development or improvement of Village Land Use Plans (VLUP) in the priority
villages.
Component 3 – Strengthen landscape management and infrastructure investments in and
upstream of the Ruaha National Park (US$27 million)
27. Background: The Great Ruaha River, flowing through the Ruaha National Park (RUNAPA)
in Southern Tanzania, has seen a decreasing trend of water flows during the last decades and a
growing number of days during the dry season with zero flows. Drying of the Great Ruaha River
threatens the ecological values of RUNAPA and the tourism activities, most of which are
geographically located along the river. An accelerated development of the irrigation areas and
human activities in the Usangu plains, which comprise part of the catchment areas for Great Ruaha
River, has been shown to be the cause of the decreasing flows.
28. The Great Ruaha River sources its water from the highlands in the south-western part of
Tanzania, specifically, the Kipengere mountains. The area is fairly natural, with relatively few
water outtakes for human activities compared to the total river flows. Hydrologically, these areas
are mostly vegetated and have deep soils, which make these rivers perennial, i.e. they carry river
runoff even in the dry season. The rivers from the Kipengere Mountains flow into the Usangu
plains, before entering the Ihefu wetland. The Usangu plains, which in their natural state are
seasonally flooded, have seen a large expansion of irrigation. The Ihefu wetland is also fed by the
Ndembera River from the east, which similarly to the southern rivers, has perennial flows that
partly is utilized by irrigation. The Ihefu wetland is inundated year around although the area
fluctuates much between dry and wet seasons because of its flat topography. At the wetland’s
outlet, a natural geological formation at N’giriama functions as a weir damming the wetland. This
natural weir is the start of the Great Ruaha River.
29. A combination of perennial inflows and the storage created by the Ihefu wetland, in their
natural state, provide an unusually (for the region) high dry season flow in the Great Ruaha River.
This flow is utilized by the wildlife in the RUNAPA, which migrates to the river during the dry
season. The rivers flowing in from the western and north-western catchment areas into the park to
join the Great Ruaha River are distinctly different than the southern and eastern catchment areas,
with much less rainfall and ephemeral sand rivers which are completely dry for much part of the
year. These sand rivers require sustained rainfall to have river runoff, since the sand layers are first
52
filled up. These rivers thus do not deliver any significant flows during the first months of the rainy
season when rainfall is more erratic. As a consequence, the wildlife of RUNAPA is totally
dependent on the river flows in the main Great Ruaha River during a large part of the year.
30. After having passed the RUNAPA, the Great Ruaha River flows into the manmade Mtera
reservoir, which was built in the 1980s. The reservoir functions as the regulation storage for the
Mtera and Kidatu hydropower plants. These two power plants provide a large part of the electricity
in Tanzania: currently, thermal generation represents 63 percent of the total installed capacity,
while hydro plants contribute 37 percent25 - of which the Mtera-Kidatu system represent 42 percent
of installed capacity. Moreover, the Mtera-Kidatu system is crucial for power grid control. By
hydropower’s unique ability to start and stop power production within seconds, these two plants
are crucial to avoid failure in the national transmission system that will cause power interruptions.
31. Since 1980s the total irrigation area, mainly for wet season rice cultivation, in the Usangu
plains and in the Ndembera River catchment has increased to more than 100,000 ha. This has
resulted in an annual outtake of water for irrigation of almost 50 percent of the natural inflows.
Although partly the reduction of inflows into the Usangu plains and the Ihefu wetland has reduced
natural evaporation losses, this has resulted in significantly reduced annual average flow in the
Great Ruaha River in the RUNAPA) and into the hydropower plants at Mtera and Kidatu.
32. This reduced inflow to Ihefu during the wet season due to rice irrigation has shrunk the
wetland, which is now considerably smaller in its inundated area during the wet season than it used
to be. Moreover, because of the characteristics of the natural weir at N’giriama, this has caused the
water levels during the dry season in Ihefu wetland to drop below the silt level of the geological
formation with zero inflows to the Great Ruaha River for a period of up to 3-4 months every year.
Though the artificial water outtake for rice irrigation occurs during the wet season, the natural
characteristics of the Ihefu wetland create a water deficit during the end of the dry season and the
early parts of the rainy season (normally September to January). During this period the inflow
from the western tributaries in the RUNAPA is essentially zero, which means that the Great Ruaha
River in the national park is completely absent of flows. The once perennial river has become
ephemeral. The river, by its topography, includes a number of pools that remain with water but
which slowly dry up. Massive short local rainfall during the onset of the rainy season may
temporarily fill up these pools. Because of natural variability in rainfall between years, the period
of no water in the river thus varies considerably from year to year. However, the trend in number
of zero flows is clear and recent model exercises indicate that this trend can be explained by the
increased water outtake by rice irrigation. Zero flows at Ngiriama do occur also during some years
in natural conditions. However, the frequency is significantly increased because of the expanded
irrigation.
33. Recent analytical studies have shown that a combination of measures, each acceptable from a
social, environmental and economic perspective, is likely to be the best way forward. The
combination of water efficiency improvements in upstream catchments, modest reduction of
irrigation areas, improved productivity through agriculture management, and structural measures
in RUNAPA to enhance dry season flows, will significantly reduce the number of days of zero
flows and will result in limited impact on agricultural production.
25 As per information disclosed by Tanzania Electric Supply Company Limited (TANESCO)
53
34. Acknowledging that improving land and water management in the Usangu plains and the upper
catchments feeding into Ihefu wetland and the Great Ruaha River is a long process that will only
show results in improved quantity and quality of flows in the long-term, the priority of Component
3 is to implement structural solutions in RUNAPA to improve water availability during the dry
season. A secondary priority is to initiate a process to improve land and water management
upstream of the RUNAPA through piloting cross-sectoral coordination, efficient farming and
irrigation procedures and conservation of upland water sources, to demonstrate the benefits and
methods for subsequent up scaling. To address these objectives, Component 3 is sub-divided in
four subcomponents.
35. Sub-Component 3.1 - Assess and implement infrastructure measures to augment dry-season
flows to the RUNAPA (US$9 million). The objective of this sub-component is to increase water
availability during the dry season in RUNAPA on a relative short term basis. Based on the results
of the reconnaissance study of structural measures to augment dry season flows in RUNAPA,
conducted during the Project design as a consultancy financed under the PPA,26 the Project will
finance the design and construction of a number of selected structural measures to restore natural
flows and increase water availability during the dry season. The selection of structural measures
is based on feasibility to construct, efficiency to augment dry season water deficits, capital costs,
operating costs (O&M), and environmental impacts to have as little effects on the ecology of the
RUNAPA. The first structural measures the project will support are, for example, structural
measures on the natural weir at Ngiriama to control outflow from the Ihefu wetland, boreholes and
ponds or enhancement of natural river pools. After having completed the final designs and cost
estimates of the first batch of structural measurements, based on the remaining funds available and
experiences obtained, the project will be able to support the design and construction of a number
of additional structural measurements to further restore natural flows and increase water
availability during the dry season in RUNAPA.
36. As these structural measures will be implemented within the park, TANAPA will be the
responsible organization for implementing these activities. Based on a preliminary expected
number of different types of structural measures a total budget of 9 million dollars has been
allocated for the design and construction of these measures.
37. Sub-Component 3.2 – Improve efficiency of irrigation systems (US$14 million). The
objective of this sub-component is to demonstrate improved irrigation and on-farm water
management efficiency and water savings in a selected number of irrigation schemes with a total
irrigated area of 10,000 ha that could result in increased water inflow to the Ihefu wetland as result
of reduced intake of irrigation water or increase of drainage water channeled back to the river.
Based on the results of the reconnaissance survey of agricultural water management in the Usangu
Flats, the irrigation schemes for demonstrating improved irrigation efficiency and water savings
will be selected.27 Examples of possible improved irrigation and on-farm water management
efficiency practices are, among other, improved field leveling, upgrading/ construction and
operation of proper field intakes and drainage infrastructures to better control water levels in the
field, proper maintenance of irrigation and drainage canals and promotion of the System Rice
Intensification (SRI). To assist farmers in the targeted irrigation schemes in adapting irrigation
26 See final report of the Reconnaissance Study of Structural Measures to Augment Dry Season Flows in Ruaha National Park,
Southern Tanzania prepared by WREM International.
27 Initiated during the Project design as a consultancy financed under the PPA. First results of the reconnaissance study are expected
to become available after project approval.
54
efficiency and water savings practices in their present cultivation practices the project will support
three activities. For the first two activities under sub-component 3.2 the National Irrigation
Commission (NIRC) of the Ministry of Water and Irrigation (MoWI) will be the responsible
organization. For the last activity under sub-component 3.2 the RBWB will be the responsible
organization.
38. The core activity of sub-component 3.2 is the development and implementation of an intensive
Farmer Field School (FFS) program.28 Main objective of the FFS program is to raise awareness
and knowledge of farming and water management methods to increase crop yields and reduce
water use. Based on the results of the consultancy "to conduct a curriculum development workshop
and elaborate a FFS program on on-farm water and crop management in the irrigation schemes on
the Usangu Plains" a detailed FFS program has been developed. Through NIRC the project will
contract a service provider to train more than 200 lead farmers selected from the targeted Water
Users Associations and Irrigators Organizations (WUA/IO) as FFS facilitators and 65 responsible
extension officers in mentoring/technically backstopping the FFS facilitators. These FFS
facilitators will be supported to initiate and facilitate every cropping season with one FFS on water
use efficiency with a group of on average 25 farmers, situated alone one irrigation canal. During
the FFS participating farmers will meet every week on one of their fields and discuss and practice
together all needed water, soil, pest and crop management practices to grow a good rice crop and
to experiment with alternative/improved practices, as for example improved land leveling and SRI.
As a group, depending for water from the same irrigation canal, the FFSs will also discuss related
canal, field intake and drainage operations and maintenance issues. Although the main objective
of the FFS program is to improve water use efficiency, as an incentive the FFSs will also be
focused on improving crop yields and farm income. The FFS program is targeting to provide
extension support to a total of 20,000 farmers (800 FFSs with 25 farmers each).
39. In addition to the FFSs, each FFS group will be requested to prepare a proposal for project
support to improve their current irrigation and drainage infrastructure. This could include, among
others; field intakes, field leveling, lining of secondary canals, and drainage. Based on their
proposed plans to improve their irrigation and drainage infrastructure to improve water use
efficiency and their willingness to contribute labor, the project will contribute to the design,
building materials and hiring of equipment up to a maximum of US$300 per hectare irrigated. To
facilitate this process, the project has prepared a manual spelling out the procedures, formats for
proposals/plans, farmers’ contributions, etc. In addition to these farmer-driven improvements, the
project will also support structural improvements on the main river intakes, primary canal, division
structures and construction/improvements of main drainage canal systems.
40. The project will also support the Rufiji Basin Water Board in revisiting water permits and
assessing incentive mechanisms for controlling excessive use of water or increasing of irrigation
areas utilizing drainage water. At the moment, Irrigation Organizations (IOs) have to pay water
28 Farmer Field Schools (FFS) bring together a group of farmers to engage in a process of hands-on, field-based learning over a
season/production cycle. This basic learning cycle, a FFS, is a time-bound activity, with a beginning and an end. For crop-based
FFS, activities will cover ‘seed to seed.” The emphasis of the basic learning cycle is to strengthen farmers’ skills and knowledge
for critical analysis and to test and validate new practices to make informed decisions on field management. The new practices are
often based on information generated by research, and are science-based. The learning process in the FFS reinforces understanding
of complex ecological relations in the field. The basic learning cycle also aims at enhancing group cohesion of participants to better
work as a group and to prepare for follow-up action once the FFS finishes. Through group dynamics exercises and discussions,
FFS helps create a basic understanding of how groups function. The FFS also includes activities that encourage participants in
critical analysis and evaluation, and planning for further action once the FFS basic learning cycle is completed.
55
fees based on area irrigated. Calculations of the needed flow of water at the intake are still based
on the needed irrigation water during the peak water demand stages of growing rice. During other
stages the crop needs less or even no irrigation water. With improved irrigation scheduling and
phased cultivation of rice, the average water use per second per hectare can easily be reduced.
Unfortunately, most of the irrigation intakes do not have water control mechanisms to measure or
regulate water inflow into the irrigation canals. Even some of the informal irrigation schemes,
which are officially registered and pay water fees, do not have mechanisms to close the intakes.
41. Sub-Component 3.3 – Catchment conservation activities in selected rivers (US$1.5 million). Siltation of the rivers feeding into the Usangu Flats is a growing problem. Filling up of the natural
river beds results in more shallow rivers with a reduced storage capacity and water flow. This
leads, in some cases, to rivers never reaching the wetlands. Another impact of the reduced water
flow is increased evaporation loses. RBWB will be the responsible organization for implementing
the activities under sub-component 3.3.
42. The project will support a survey of all the areas in the upper catchment where present and
future human activities pose severe risks for water sources and river banks. Based on the outcome
of the survey the project will select a few rivers for further support, with the target of reducing
siltation of the rivers and erosion of slopes. After identification of areas and issues, a number of
watershed management activities such as terracing, slope stabilization, river boundary protection
and sustainable agricultural land management practices will be implemented.
43. Sub-Component 3.4 – Support the consensus-building process for land and water
management and climate change adaptation in the Usangu plains (US$2.5 million). For long-
term solutions for the different, but related, land and water issues in and upstream of the park, there
is need for joint discussions and planning among all the important actors and stakeholders
(TANAPA, LGA, MoWI, MALF, WUAs, IOs, private sector, livestock keepers, amongst others).
Currently, there is little coordination between all these different actors and stakeholders.
44. The project will support active facilitation of cross-sectoral interaction and consultation at
district level and, if needed, at higher levels. In close consultation with the authorities of the
relevant districts the project will support district level meetings with all concerned actors and
stakeholders to discuss land and water management issues in the Usangu plains. This cross-sectoral
interaction and process will be facilitated by the RBWB.
45. It is expected that during the joint discussions of the land and water management issues in the
Usangu plains the need to conduct additional social and physical surveillance studies to provide
the factual basis for informed decisions will be identified. To be able to address this need the
project will allocate some budget to conduct these studies.
46. The authorities and involved ministries can only supervise and provide technical support, but
the actual daily management of the irrigation schemes is the responsibility of the respective
Irrigation Organizations and Water Users Associations. To improve daily management of the
irrigation schemes in the USANGU plains the project, through MoWI, will organize training
support to strengthen the monitoring and management capacity of Irrigation Organizations and
Water Users Associations.
47. Component 4 – Project management, institutional strengthening, quality assurance and
control, and monitoring and evaluation (US$9 million). This component will finance
supplemental support for project management, to ensure coordinated and timely execution of
56
infrastructure and other project activities. It includes project oversight and coordination;
establishment and operation of a Project Coordination Unit (PCU); fiduciary management,
including external/internal audits and accounting; quality control and assurance systems;
environmental and social safeguards management; development and implementation of a
communications and stakeholder engagement plan; and short-term training on project
management. The component will also finance a monitoring and evaluation (M&E) system, which
will be implemented to capture data on physical and financial progress, performance of
implementing agencies and service providers, and the results achieved in terms of outputs and
outcomes. The M&E system includes a baseline study, perception surveys, knowledge generation
and exchange, annual networking among key project stakeholders (at local, regional and national
level, including active involvement from the private sector) and an impact evaluation.
57
ANNEX 3: IMPLEMENTATION ARRANGEMENTS
1. The implementation of the project will follow existing government structures and procedures,
and will be carried out through the relevant ministries, agencies, regional secretariats, local
government authorities, and community institutions. Implementation will involve three levels: (i)
national, (ii) regional, zonal and district /local government level, and (iii) ward and village level,
with the main focus being on the priority PAs and LGAs.
2. The main organizing principle for field implementation will be the priority PAs, and their
surroundings, as all major activities are aimed at developing and securing the natural assets in
these PAs. This includes developing tourism and sustaining the interest of the local population in
conservation.
3. The detailed organizational structure and the overall implementation arrangements at the
different levels will be part of the Project Implementation Manual. The following sections contain
specific information on the project’s implementation arrangements.
1. NATIONAL LEVEL INSTITUTIONAL ARRANGEMENTS
4. The Project Steering Committee (PSC) is the main implementation oversight organ of the
project, and is coordinated by MNRT. It comprises the Permanent Secretaries or highest authorities
of MNRT, MoWI, PO-RALG, and MALF; Directors of the implementing government agencies
and institutions (TANAPA, TAWA, TTB, TFS, TAWIRI, NIRC, RBWB), private sector
representatives, and non-state actor representatives. As it is difficult to have many meetings with
such inclusive representation, the PSC will have an executive committee consisting of three
members, which can be consulted flexibly and make decisions if required. The full PSC will meet
twice a year, whereas the executive committee will meet at least quarterly.
5. The PSC will be the highest-level governing body of the project and will provide strategic
leadership and governance oversight. It will have the delegated authority from national
stakeholders to make decisions that are in line with the objectives, approach and scope of the
project as set out in the Project Appraisal Document (PAD) and described in the PIM.
6. The PSC is expected to make key policy decisions, guide the implementing entities and
responsible parties in the execution of the project, and ensure effective and strategic oversight
through receiving regular reports and reviewing the results of project evaluations that will take
place during its life cycle. It will also be tasked with ensuring good governance. The PSC can ask
for additional participation coming from the private sector, multi-bilateral agencies and notable
citizens, however, these participants will have a voice but no vote.
7. The Project Coordinator will act as the technical secretary of the PSC, prepare briefing papers
and progress reports, and provide all the necessary information and evidence needed to make
informed decisions.
8. The PSC members will be chosen based on their ability to provide strategic leadership. The
PSC will:
a) Provide advice to the National Sector Stakeholders Meeting (NSSM) with regard to
implementing the project (see next paragraph for details on the NSSM);
58
b) Provide policy guidance and guidance on the overall direction of the project together with
general oversight;
c) Coordinate the participating ministries and agencies and stakeholders;
d) Ensure smooth implementation support from all actors involved;
e) Approve the annual work plan and budget ensuring that resources are deployed to their
most efficient use. If necessary, the PSC will advise the World Bank about potential
changes to allocations to individual interventions that would help to make the project more
effective in delivering its intended outcome and impacts;
f) Discuss and approve suggestions on adaptations and learning in the project made by the
Project Coordination Unit (PCU);
g) Review and approve the recommendations for implementation of interventions;
h) Review periodic monitoring and evaluation reports and advise the PCU accordingly;
i) Monitor the implementation of the Project ensuring that any strategic changes are
undertaken in a timely manner so that the project achieves its goals; and
j) Ensure that the Project is coordinated with other relevant Government of Tanzania, donor
and private sector interventions.
9. The governance procedures of the PSC will include the following:
a) The quorum for the PSC will be achieved by simple majority;
b) Members must be committed and must ensure continuity in participation in all meetings.
Changes in individual participations will be penalized by affecting future participation of
that particular institution to the PSC. The PSC will aim to achieve consensus on decisions
made. In the event this proves impossible, decisions may be made by a simple majority
vote amongst participating members. In the event of a tie, the Chairperson will have an
additional casting vote;
c) The PSC is expected to meet biannually and members will need to devote some additional
time reviewing project documentation;
d) The PSC secretary (project coordinator) will carry out the following tasks:
o Invite members for meetings;
o Circulate relevant material to members in advance for preparation for each meeting;
o Draft agendas for agreement with the Chairperson; and
o Keep minutes and recording of decisions made.
e) The authority of the PSC will be final on all operational matters.
10. The National Sector Stakeholders Meeting (NSSM) will be an inclusive stakeholder forum,
which provides broad oversight and policy guidance for the implementation of the project. It would
be coordinated by MNRT and meet annually. It involves the ministers and permanent secretaries
of the participating sector ministries, regional authority secretaries from participating regions,
directors and senior government officers, development partners, selected LGAs from project
related subject matters, agencies, private sector representatives, non-state actors, and other project
related stakeholders.
11. The Project Coordination Unit (PCU) at the national level is the main management organ of
the whole project across components and levels of implementation. The responsibilities of this
59
‘implementation unit’ are project planning, coordination, implementation, monitoring and
reporting, specifically:
a) Coordinating the preparation and development of the regular work plans and budgets;
b) Facilitating implementation progress across levels and between institutions;
c) Monitoring project progress and quality of implementation, and distilling and documenting
lessons for improvement;
d) Preparing monthly, quarterly and annual reports;
e) Ensuring transparent information and report sharing and soliciting and providing of
effective feedback from and to the implementation entities;
f) Ensuring effective communication internally within the project teams and externally with
the project stakeholders;
g) Preparing project guidelines, manuals, briefs and publications for awareness and publicity;
h) Coordinating capacity development in the project;
i) Coaching the project implementation teams at PA and LGA level for continuous
performance improvement (e.g., team development, organizational development, learning
from and conceptualization of project experiences, injecting ideas and possible solutions
to be tried out for problems arising); and
j) Ensuring smooth day to day running of project activities.
12. The PCU will have a secretariat and be a permanent body with employed staff. It will consist
of the project coordinator/director, an M&E specialist, who will serve as the deputy project
coordinator, a communication specialist, a knowledge management specialist, procurement
specialist, a FM specialist, environmental and social safeguards specialist, and admin staff. The
staff of the PCU should be selected to ensure the highest possible competence and performance.
In addition, the PCU will competitively recruit, for the first two years of the project, a Procurement
Advisor and an FM Advisor with experience in multilateral donor-funded projects.
13. Priority PA-level Implementation Teams: The main project areas are the four priority PAs
and their surroundings, which cut across regions and LGAs. Therefore, each PA will have an
implementation team which will implement, together with the relevant LGAs in their area, the
project activities of the respective components (e.g., Ruaha National Park implementation team
will implement Components 1, 2 and 3 in and around the RUNAPA), the Selous Game Reserve
implementation team will implement Component 1 and 2 in and around the Selous Game Reserve).
Close collaboration will need to be ensured with the PCU.
14. The main responsibilities of the PA-level implementation teams will be:
a) Plan and implement the project activities for their PA-related area in close collaboration
with the PCU;
b) Develop, enter into agreement, and sign performance contracts/compacts with
stakeholders;
c) Monitor and assure quality implementation to achieve the overall project objectives;
d) Review activities, develop monthly work plans and develop coherence across the
stakeholders, including service providers, through regular meetings;
60
e) Learn lessons from successes and failures of project implementation, document them and
continuously suggest and implement improvements and alternative ways of overcoming
bottlenecks;
f) Follow up on performance contracts and compacts of all actors;
g) Prepare project implementation progress reports;
h) Follow up and supervise the contracted service providers and assure quality of
implementation;
i) Administrate project resources allocated for each PA and procure service providers;
j) Ensure LGAs, beneficiaries and other actors comply with laws and regulations related to
the implementation of project; and
k) Ensure excellent communication with local communities and CBOs and manage conflicts.
2. FINANCIAL MANAGEMENT
15. A Financial Management (FM) assessment was undertaken to evaluate the adequacy of the
project arrangements in accordance with the World Bank’s minimum requirements in OP/BP
10.00. The assessment covered MNRT and TANAPA, and complied with the Financial
Management Manual for World Bank-Financed Investment Operations that became effective on
March 1, 2010, as well as with the Africa Financial Management Assessment and Risk Rating
Principles. The overall FM was assessed to be adequate, and risk rating was assessed as
substantial.
16. Country Public Financial Management: The Public Expenditure and Financial
Accountability (PEFA) Assessment for Mainland Tanzania issued on September 2013 revealed
that Tanzania has continued to make progress in PFM reforms in key areas such as planning and
budget, accounting and reporting, external and internal auditing, Integrated Financial Management
System (IFMS) as well as procurement through Public Financial Management Reform Program
(PFMRP) funded by the GoT and Development Partners, including the World Bank. The GoT has
continued to improve debt management, cash management, budget preparation and execution, and
has strengthened the National Audit Office (NAO) and Oversight bodies.
17. According to the PEFA report, apart from the ongoing PFM reforms, challenges remain
including weak internal controls particularly on non-salary expenditures, fiscal risk to the budget
posed by public entities, unreliable cash forecasting, multiple budget reallocations, execution of
the budget through a monthly cash rationing system, ineffective commitment control and little
effort by the executive to follow-up on closure of audit recommendations included in CAG reports.
18. Recently, corruption and collusion have been highlighted as a significant risk in the majority
of the sectors in Tanzania. The risks particularly relate to procurement. In addition, weaknesses in
internal control and financial monitoring and oversight, combined with capacity weaknesses,
increase the inherent risk of miss-use of funds for approved purposes.
19. As one of the mitigation measures, the World Bank is supporting the GoT under the Open
Government Partnership (OGP) initiative and through an Open Government and Public Financial
Management (OGPFM) Development Policy Operation. The OGPFM is a three-year development
policy operation that seeks to support the Government to establish open data to increase access
61
and use of service delivery information as well as to improve budget credibility and execution
through better cash management, public investment management and procurement.
20. Risk Assessment and Mitigation: The inherent risk to the project from the financial
environment is assessed as substantial before mitigation and moderate after mitigation. The project
specific FM control risk, taking into account the risk mitigation measures that are to be
implemented for the project, is assessed as moderate.
Risk Risk
Rating
Brief Explanation Risk Mitigation Measures
Incorporated into Project
Design
Condition of
Negotiation,
Board or
Effectiveness
(Y/N)
Residual
Risk
Rating
Inherent
Risk
Country Level S Takes into account
overall country
governance environment,
corruption concerns in
major sectors.
Issues are being addressed
at country level through the
country’s governance
action plan, strengthening
of the public FM system
supported by the (i) World
Bank through Open
Government and Public
Financial Management
(OGPFM) Development
Policy Operation. (ii) other
Development partners
through Public Financial
Management Reform
Program (PFMRP)
N S
Entity level: S MNRT and TANAPA
are well established and
have adequate capacity
to manage World Bank
funded projects.
However, have no
experience in
implementing World
Bank project.
Training for project staff on
World Bank financial and
disbursement procedures
and guidelines has started,
and will continue
throughout implementation.
N M
Project level: S Project design relatively
complex since it
involves other agencies
under umbrella of
TANAPA and MNRT
Clearly defined activities
and funds flow and
accountability and
reporting will be documents
in the project
implementation manual
N S
Overall
Inherent
Risk
S S
Control
Risk
Budgeting M Budget system deemed
adequate for the purpose
of the project
Detailed project budgets
and cost table to be
prepared and agreed.
Regular reporting including
variance analysis will be
N M
62
Risk Risk
Rating
Brief Explanation Risk Mitigation Measures
Incorporated into Project
Design
Condition of
Negotiation,
Board or
Effectiveness
(Y/N)
Residual
Risk
Rating
done on quarterly basis
through IFRs
Funds Flow S Funds will flow from the
IDA to the designated
accounts maintained at
BOT and to project
accounts in BOT under
TANAPA and MNRT.
Risk of delays due to
numerous sub-
implementing agencies
Clearly defined activities
and funds flow mechanism
have been agreed upon.
Each implementing entity
will open a dollar
designated account. Proper
coordination through PCU.
Hire of FM advisor to
provide TA.
N S
Staffing M Both TANAPA and
MNRT have in place
adequate staff in
accounting and internal
audit units who have
appropriate experience
and qualifications.
Both MNRT and TANAPA
have allocated qualified
accountants to handle
project financial affairs.
Hire of FM advisor to
further enhance capacity
N M
Accounting
Policy &
Procedures
S There are adequate
accounting policy and
procedures including
computerized accounting
system. However,
multiple sub-
implementers may put
strain on accounting
capacity
Hire of FM advisor to
enhance FM capacity
N S
Internal
Controls
S The internal control
arrangements at both
TANAPA and MNRT
are deemed satisfactory.
However, additional risk
for Component 2 for
livelihood activities
A financial management
manual, applicable to
REGROW, has been
developed
Hire of service providers
N S
Internal
Audit
M Internal audit function is
well established with
adequate and
experienced staff both at
MNRT and TANAPA.
Project funds will be
subjected to normal
internal audit review of
the implementing
entities.
N M
External
Audit
M Audit reporting
arrangements deemed
adequate.
Annual Financial Audit of
the project’s financial
statements will be carried
by independent auditors the
National Audit Office.
N M
63
Risk Risk
Rating
Brief Explanation Risk Mitigation Measures
Incorporated into Project
Design
Condition of
Negotiation,
Board or
Effectiveness
(Y/N)
Residual
Risk
Rating
Reporting,
Monitoring
&
Information
Systems
M Adequate capacity in
TANAPA and MNRT
for financial reporting.
However, risk of delays
in financial reports from
multiple decentralized
sub-implementers
Regular capacity building
training
Hire of FM advisor
N M
Overall
Control
Risk
M M
Overall FM
Risk
S M
H= High; S= Substantial; M= Moderate; L= Low.
21. FM Implementation Arrangements: Project implementation will be fully integrated into the
respective institutional FM systems. MNRT and TANAPA will have overall fiduciary
responsibility over the project financial matters relevant to the project components that they are
implementing. The Chief Accountant (MNRT) and Director of Finance (TANAPA) will be
responsible for the overall coordination and consolidation of project financial statements, auditing,
disbursement, and submission of quarterly IFRs and monthly withdrawal applications to the World
Bank. The budget for the project will be included in TANAPA’s and MNRT’s overall budgets,
and will be approved by the Parliament.
22. The specific FM arrangements are as follows:
a) Staffing at MNRT and TANAPA: Both entities have financial functions that are
adequately staffed with experienced staff in accounting and reporting. Few are Certified
Public Accountant (CPAs), or have MBAs, and the majority have post graduates and first
degrees in accounting and finance. These are assessed as having the capacity to undertake
the project. MNRT and TANAPA have designated financial officers to handle project
accounting and reporting. These officers have adequate qualifications and relevant
experiences to fulfill fiduciary requirements consistent with IDA requirements. Since both
implementing entities lack experience in managing IDA funded projects, training for
project staff on World Bank FM and disbursement procedures and guidelines is being
provided on a regular basis.
b) Budgeting: The budgeting for IDA funds will be done as part of TANAPA and MNRT’s
annual budgeting process, which is deemed adequate. Detailed cost tables have been
prepared and approved by the World Bank, and they provide the basis for the annual work
plans. These plans will be prepared by project implementing units. These work plans will
be submitted to TANAPA and MNRT for consolidation. The consolidated work plans will
be approved by MNRT and TANAPA Board and then submitted to the World Bank for no
objection. Project budgeting will follow GoT policies and procedures.
c) Accounting: The current accounting systems in use at TANAPA and MNRT are adequate.
d) Internal Controls: The internal control arrangements at both TANAPA and MNRT are
deemed satisfactory. The approval and authorization controls over payments are considered
64
sufficient. Each implementing entity will be responsible for ensuring that an adequate
internal control framework and internal controls are in place and operating during the
project implementation. Additional fiduciary controls will be required for the decentralized
livelihood activities under Component 2. The additional procedures have been captured as
part of the financial manual, which will be revised from time to time as needs arise.
23. The FM anti-corruption measures will incorporate the following actions to address the high
inherent risks of the project and to strengthen the project specific risks:
a) Project implementation arrangements - combine a mix of centralized responsibility and
decentralized implementation arrangements to support effective, efficient and accountable
execution of contract management and monitoring of project outcomes.
• Clearly delineated roles and responsibilities for project FM personnel included in
the PIM.
• Project processes and procedures documented in the PIM, which should be
reviewed annually.
b) Building strong FM teams as part of the project team with effective tools: FM staff must
be selected based on skills and expertise, provided with further training and supported by
highly qualified experts.
• Training in FM and reporting, including World Bank FM requirements.
c) Integration of financial monitoring within the results orientated M&E framework: the
financial reports will form part of the project progress and results reporting to support
effective tracking of progress and early identification of issues for resolution.
• Project Steering Committee will monitor and sign off on the project M&E indictors
which will include appropriate and relevant FM indicators.
d) Enhanced disclosure and transparency: public dissemination of project related information
including financial information and the annual financial statements and audit reports of the
project.
• Through the MNRT and TANAPA websites, the following will be made publicly
available: all annual audit reports and audit management letters prepared in
accordance with the financing agreements for the project, and all formal responses
and follow actions. The disclosure of the audit reports must be completed within 30
days after receipt of the reports by the project management.
e) Complaints handling Mechanisms: the complaints handling system will include processes
for acting on all project complaints (including those related to FM and assets) in a
professional and timely manner with integrity.
24. Audit Committee: The audit committee is in place and meets on a quarterly basis to review
implementation of audit issues (internal and external audit). However, the government is reviewing
the set of these management oversight committees under the ongoing PFM reform initiatives with
a view to enhancing their effectiveness.
25. Institutional Risk Management Policy Framework (IRMPF): The GoT has issued a treasury
circular, which makes it mandatory for all public institutions in Tanzania to develop and implement
a Risk Management Framework. The exercise is spearheaded by the office of Internal Auditor
General of the Ministry of Finance and Planning (MoFP). IRMPF is being rolled out as part of the
ongoing PFM reforms.
65
26. Internal Audit: There is an effective internal audit function within the MNRT and TANAPA.
As part of normal functions these units will carry out regular internal audit reviews for all project
financial affairs. The review indicated that the units have adequate qualified and experienced
internal auditors with a well-developed auditing manual following risk based approach.
3. DISBURSEMENTS
Funds Flow and Disbursement Arrangements
27. Disbursement Methods: These are defined in the disbursement letter (DL) and include
reimbursement, advance, direct payment and special commitment.
28. Reporting on Eligible Expenditures Paid from the Designated Accounts: Withdrawal
applications reporting eligible expenditures paid from the designated account will be submitted
monthly.
29. Designated Accounts: It is proposed that 2 designated accounts in BOT details as follows:
a) Designated Account A: Account holder is MNRT.
b) Designated Account B: Account holder is TANAPA.
30. Project Accounts: Each implementing agency (MNRT and TANAPA) will open a local
account in BOT to receive funds from US Dollar Designated Account for the activities carried
with payments in local currency.
31. Sub-project bank accounts: There are no sub-project implementers under TANAPA hence
all in-country eligible project payments will be made from the main project account. However,
MNRT has several sub-implementers including TAWA, TAWIRI, TTB, TFS, RBWB, NIRC and
MALF. Each of these will open a sub-project bank account in a commercial bank acceptable to
IDA from which eligible project payments will be made.
32. Accounting for funds by sub-implementers: Each sub-implementer will submit an annual
work-plan to MNRT for approval. The sub-implementers will receive advance from MNRT
equivalent to 6 months forecast. They will be expected to submit financial reports at regular
intervals of not more than 3 months on the basis of which they will be replenished.
66
Funds Flow Chart
4. FINANCIAL REPORTING AND MONITORING
33. Quarterly Interim Financial Reports (IFRs) will be prepared by MNRT and TANAPA for
monitoring of financial performance. The format of the IFR has been agreed with the implementing
agencies.
34. MNRT and TANAPA will be required to submit unaudited IFRs to the World Bank within 45
days of the end of each quarter. The IFRs will cover all project activities, including counterpart
funding. The format of the IFR has been agreed with the implementing agencies.
35. Annual Project Financial Statements: Each implementing agency will prepare annual
financial statements covering the portion of the project components and activities for which they
are responsible, i.e. there will be annual financial statements from MNRT and TANAPA, and the
financial statements must be prepared on IPSAS / a modified cash basis in accordance with
international and national accounting standards.
36. The Project Financial Statements will consist of:
IDA (Credit/Grant)
Designated Account in
BOT (US$)- MNRT
Project Operations
Account BOT (TZS)
Payments for works, goods, consultancies, operating costs etc.
including those related to other sub-implementers.
Project Operations
Account BOT (TZS)
Designated Account in
BOT (US$)- TANAPA
Sub Project Accounts-Commercial
bank (TZS)- TAWA, TAWIRI, TTB,
TFS, MALF, RBWB, NIRC
67
a) A Statement of Sources and Uses of Funds / Cash Receipts and Payments which recognizes
all cash receipts, cash payments and cash balances controlled by the entity; and separately
identify payments by third parties on behalf of the entity.
b) The Accounting Policies Adopted and Explanatory Notes. The explanatory notes should
be presented in a systematic manner with items on the Statement of Cash Receipts and
Payments being cross referenced to any related information in the notes. Examples of this
information include a summary of fixed assets by category of assets, and a schedule of
credit / grant withdrawals, listing individual withdrawal applications; and
c) A Management Assertion that World Bank funds have been expended in accordance with
the intended purposes as specified in the relevant World Bank legal agreement.
37. The annual financial statements are required to be audited and submitted to the World Bank
within 6 months of the end of each financial year.
38. Audit Arrangements: The Project annual financial statements will be audited in accordance
with international auditing standards by National Audit Office (NAO). The audited financial
statements and audit reports will be submitted to the World Bank within six months of the end of
each financial year, and the date of closing of the project.
39. For each set of financial statements, the auditor would express a single audit opinion covering
the Project Accounts, the use of SoEs and the Designated Accounts. In addition, a management
letter addressing any internal control weaknesses of the implementing agencies will also be
provided by the auditor together with the audit reports.
40. The annual financial statements and audit reports will be made publicly available through the
MNRT and TANAPA web-site.
Audit Report Due Date
MNRT: Project Specific Financial Statements
Management Letter
31 December
TANAPA:
Project Specific Financial Statements
Management Letter
31 December
41. Supervision Plan: As the FM risk is assessed as substantial, supervision of project FM will be
performed at least twice a year. The supervision will review the project’s FM system, including
but not limited to operation of Designated Account, SoEs, internal controls, reporting and follow
up of audit findings and mission findings. The FM supervision will be conducted by Bank’s FM
specialists.
68
FM Action Plan
Action Responsibility Completed (Yes
/ No) Personnel
Confirm the appointment and qualifications of the finance
staff responsible for the project, acceptable to IDA
TANAPA and
MNRT Yes
Financial Manual and Training
Prepare a FM manual for the project (annex to the Project
Implementation Manual), which sets out in detail the
structure, procedures, reporting and coordination between
different levels of project in financial management aspects
Training on IDA regulation, requirement on financial
management and disbursements
TANAPA and
MNRT
Yes
Started, ongoing
Sub-Project Grant Manual
Develop specific provisions inside the FM manual for sub-
projects under Component 2
TANAPA and
MNRT
Yes
5. PROCUREMENT
42. All procurement will be carried out in accordance with the World Bank Guidelines:
Procurement of Goods, Works, and Non-Consulting Services under IBRD Loans and IDA Credits
and Grants by World Bank Borrowers, dated January 2011, revised in July 2014; Guidelines:
Selection and Employment of Consultants under IBRD Loans and IDA Credits and Grants by
World Bank Borrowers, dated January 2011, revised in July 2014; and provisions stipulated in the
Financing Agreement. The various items under the different expenditure categories are described
in general below. For each contract to be financed by the credit, different procurement methods or
consultant selection methods, estimated costs, prior review requirements, and time frame would
be agreed upon between the Government and the World Bank in the Procurement Plan. The
Procurement Plan will be updated at least annually or as required to reflect the actual project
implementation needs and improvements in institutional capacity. The implementing entities, as
well as contractors, suppliers and consultants will observe the highest standard of ethics during
procurement and execution of contracts financed under this project. "Guidelines on Preventing and
Combating Fraud and Corruption in Projects Financed by IBRD Loans and IDA and Grants" dated
October 15, 2006 and revised in January 2011 and as of July 1, 2016 (the Anti-Corruption
Guidelines) shall apply to the project.
43. The Public Procurement Act, 2011 as amended through The Public Procurement (Amendment)
Act, 2016 will be applied for procurements below the defined thresholds involving National
Procurement Procedures. The Public Procurement Act, Act No. 7 of 2011 was reviewed by the
World Bank and found to be consistent with the World Bank Procurement Guidelines, except for
the provisions of Clause 54 and 55 of the Act, which permits application of national preference in
bid evaluation under National Competitive Bidding (NCB). There should be no preference
accorded to domestic suppliers and contractors under NCB for goods and works. Furthermore, in
accordance with paragraph 1.16(e) of the Procurement Guidelines, each bidding document and
contract financed out of the proceeds of the credit shall provide that (a) the bidders, suppliers,
contractors, and subcontractors shall permit the World Bank, at its request, to inspect their accounts
69
and records relating to the bid submission and performance of the contract, and to have said
accounts and records audited by auditors appointed by the World Bank and (b) the deliberate and
material violation by the bidder, supplier, contractor, or subcontractor of such provision may
amount to an obstructive practice as defined in paragraph 1.16(a)(v) of the Procurement
Guidelines.
44. Procurement of Civil and Building Works. Civil works and building works to be procured
under this project will include: (i) construction of new and upgrade existing roads, trails, and
bridges to improve connectivity; (ii) upgrading of existing airstrips including airstrips that are
serving the PA management to transport supplies and connect remote locations;; (iii) construction
of entry/exit gates and visitor information centers; (iv) construction of youth hostels and rest
houses; (v) other tourism infrastructure, solid drifts and box culverts to connect the PA
management headquarters with ranger posts, airstrips, and other strategic locations; (vi)
construction and upgrading of ranger posts; (vii) construction of garages/workshops for vehicle
maintenance; (vii) construction of research centers to strengthen monitoring efforts. (viii)
construction of irrigation infrastructure in selected irrigation areas to demonstrate water-efficient
irrigation (water controlling, lining of canals and drainage)
45. Procurement of Goods. Goods to be procured under this project are for: (i) services and
agricultural products to tourism operators; (ii) developing cultural tourism products; (iii)
promoting low-environmental impact micro-enterprises; (iv) conservation-based production and
participatory forest management; and (v) fish farming, poultry, and livestock management.
Procurement will be done under ICB or NCB procedures using the World Bank's Standard Bidding
Documents for all ICB and National Standard Bidding Documents agreed with or satisfactory to
the World Bank. Small value goods may be procured under shopping procedures. Direct
contracting may be used where necessary if agreed in the procurement plan in accordance with the
provisions of paragraph 3.7 to 3.8 of the Procurement Guidelines.
46. Selection and Employment of Consultants. Consultancy services would include those for
studies including: (i) conducting social and physical surveillance studies to provide factual basis
for informed decisions; (ii) facilitating cross-sectoral interaction and consultations at the district
level for water resources management; (iii) strengthening the monitoring and management
capacity of Irrigation Organizations and Water Users Associations, (iv) supervision of
infrastructure works, technical assistance; (v) marketing and product development strategy; and
others. The default selection method will be Quality and Cost Based Selection (QCBS) method
whenever possible. Contracts estimated to cost less than US$300,000 equivalent per contract may
be contracted through Consultant Qualification Selection (CQS) method. The following additional
methods may be used where appropriate: Quality Based Selection, Selection under a Fixed Budget
(FBS), and Least-Cost Selection (LCS).
47. Short lists of consultants for services estimated to cost less than the equivalent of US$ 300,000
per contract may be composed entirely of national consultants in accordance with the provisions
of paragraph 2.7 of the Consultant Guidelines. However, if foreign firms express interest, they will
not be excluded from consideration.
48. Single Source Selection may be employed with prior approval of the World Bank and will be
in accordance with paragraphs 3.8 to 3.11 of the Consultant Guidelines. All services of Individual
Consultants (IC) will be procured as per the provisions of paragraphs 5.1 to 5.6 of the Guidelines.
70
49. Operating Costs. Operating costs shall consist of operations and maintenance costs for
vehicles, office supplies, communication charges, utility charges, per diem and travels costs, office
rental, training costs, workshops and seminar and associated costs, among others. Operating costs
will not include salaries of civil servants.
50. Training and Workshops. Training and workshops will be based on a capacity needs
assessment. Detailed training plans and workshop activities will be developed during project
implementation, and included in the project annual plan and budget for World Bank's review and
approval. This will cover among others: (i) scholarships for community members in tourism,
wildlife, conservation, and facilitating access to vocational colleges (e.g., wildlife and tourism
related skills); (ii) sensitization and promotion of conservation activities at community level,
including education sessions, Community Conservation Award Schemes, village game scout
programs, joint community patrolling, study tours, and others; (iii) strengthening of eligible
WMAs, through equipment and targeted training, targeted towards increasing their wildlife
management effectiveness; and (iv) project management and fiduciary training.
51. Procurement Risk Assessment. The MNRT, TANAPA, TAWA, RBWB and NIRC will be
responsible for implementation of the project. Each agency will be responsible for the
implementation of procurement activities under its sub-projects, carrying out the oversight
functions in procurement and contract management. Procurement activities will be carried out by
the respective Procurement Management Units (PMUs) of the agencies.
52. A capacity assessment of the agencies to be responsible for implementation of the project
procurement activities was carried out in August 2016 for TANAPA, in April 2017 for MNRT and
TAWA, and in July 2017 for NIRC and RBWB. The assessment reviewed the organizational
structure for implementing the project, functions, staffing skills and experiences, adequacy for
implementing the project, and the interaction between the project staff responsible for procurement
activities and the relevant government agencies. The assessment revealed that (a) MNRT, TAWA,
NIRC and RBWB have inadequate space for procurement staff offices and procurement records
keeping; and (b) inadequate working facilities including computers, printers, photocopiers and
scanners. Furthermore, all agencies were noted to have inadequate staff with knowledge and
experience in procurement under World Bank procedures and in contract management. Further
strengthening of the MNRT PMU would also be required to enable the ministry to provide the
support that will be required by the other agencies.
53. The overall unmitigated project risk for procurement is High which after mitigation will reduce
to Substantial. The proposed mitigation measures are summarized in the table below:
S/No Risk Mitigation Measure Responsible Agency
1. Inadequate space for office and
keeping of procurement records
Provide more space for office and
procurement records keeping
MNRT/ TAWA/
NIRC/RBWB
2. Inadequate office facilities Provide working facilities such as computers,
printers, photocopiers and scanners;
MNRT/TANAPA/
TAWA/RBWB
3. Inadequate staff with
knowledge and experience in
procurement under World Bank
procedures
Recruit a Procurement Advisor to support the
project during the initial two years of project
implementation
MNRT
Train procurement staff in procurement
under World Bank procedures and in
contract management
MNRT/TANAPA/T
AWA/NIRC/RBWB
71
54. Prior-Review Thresholds. The Procurement Plan shall set forth for those contracts which shall be
subject to the World Bank’s Prior Review. All other contracts shall be subject to Post Review by the
World Bank. A summary of prior-review and procurement method thresholds for the project are
indicated in the table below.
Thresholds for Prior Review, Procurement Approaches and Methods A. Goods, Works and Non-Consulting Services
Category Prior Review
(US$ millions)
Procurement Approaches and Methods (US$ millions)
Open International Open
National
Request for
Quotation
(RfQ)
Works ≥ 5 ≥ 15.0 < 15 ≤ 0.2
Goods, IT, and non-consulting
services ≥ 1.5 ≥ 5 < 5 ≤ 0.1
B. Consulting Services
Category Prior Review (US$
millions)
Short List of National Consultants (US$ million)
Consulting Services Engineering and
Construction Supervision
Consultants (Firms) ≥ 0.5 ≤ 0.3 ≤ 0.3
Individual Consultants ≥ 0.2 NA. NA.
Notes: (i) Terms of Reference: Terms of Reference for all contracts shall be cleared by the World Bank, regardless
of whether the assignment is for prior or post review; and (ii) Advertisement: All ICB contracts for goods, works
and non-consultancy services and for consultancy service for contracts estimated to cost US$300,000 equivalent
and above per contract shall be advertised in UNDB online in addition to advertising in National News Paper(s) of
wide circulation and/or Regional News Paper(s).
55. Record Keeping. The implementing entities will be responsible for records keeping and filing
of procurement records for ease of retrieval of procurement information. In this respect, each
contract shall have its own file and should contain all documents on the procurement process.
56. Monitoring. Monitoring and evaluation of procurement performance will be carried out
through World Bank Supervision and post procurement review missions.
57. Procurement Plan. The borrower has developed a Procurement Plan for the first 18 months of
the project implementation which provides the basis for the procurement methods. The
Procurement Plan was agreed between the borrower and the World Bank during negotiations. It
will be available in the project’s database and on the World Bank’s external website. The
Procurement Plan will be updated in agreement with the Project Team annually or as required to
reflect the actual project implementation needs and improvements in the institutional capacity.
58. Frequency of procurement Supervision: In addition to the prior review supervision to be
carried out from the World Bank offices, the capacity assessment of the implementing entities
72
recommends one supervision mission every six months to visit the field to carry out post review
of procurement actions.
6. SOCIAL AND ENVIRONMENT (INCLUDING SAFEGUARDS)
6.1 SOCIAL (INCLUDING SAFEGUARDS)
59. The REGROW project has been designed to have an overall positive social impact. By
improving natural resources management and increasing tourism revenues, the communities
around the priority PAs are expected to receive increased benefits, and take advantage of a
sustainable and resilient source of income. Moreover, the entire Component 2 has been designed
to improve the sharing of benefits, facilitating the insertion of community members into tourism
and non-tourism related economic activities, and providing conservation-friendly alternative
livelihoods. Additionally, Component 3 will provide farmers with improved agricultural
techniques by which to improve their livelihood while also improving water management for
RUNAPA. The successful achievement of the projects’ development objectives will lead to
positive social development outcomes for the Sothern Circuit area, and are likely to create spill-
over effects into other PAs and areas not targeted by the project but close enough to benefit from
increased tourism.
60. The four priority PAs, and their specific regulations on allowed and non-allowed activities,
have been in place for many years - in some cases, for several decades. The REGROW project is
not designed to enforce existing boundaries or introduce new restriction of access to the PAs.
However, through the construction of infrastructure such as additional ranger posts and roads, and
provision of equipment, the PA authorities will have better ability to detect illegal uses of resources
(illegal tree logging, waste dumping, illegal farming or grazing, etc.). For this reason, a Process
Framework (PF) has been prepared, and will, in part, be applied as a precautionary measure to the
extent surveillance activities would marginally contribute to increasing existing restrictions of
access, with a focus on communities where illegal activities (in particular poaching) are prevalent,
which are the ones most likely to be affected. The PF also details the participatory process by
which stakeholders are involved and receive benefits from the project. The framework identifies
measures to be used in an effort to improve livelihoods of priority villages living near the priority
PAs while also maintaining the sustainability of the PAs. The PF also identifies arrangements for
implementing and monitoring the process by which priority villages benefit. The methodology for
selection of the priority villages, together with other specifics, are provided in Annex 2, under the
detailed description of Component 2.
61. Project activities include construction of tourism infrastructure such as roads, trails, and
bridges as well as youth hostels and rest houses. It is expected that new construction will occur
within PA boundaries and therefore, is unlikely to trigger the Involuntary Resettlement Policy. If,
however, land acquisition is needed the project will work with local district authorities and
communities to identify vacant state land for use to avoid negatively impacting individuals or
households. A Resettlement Policy Framework (RPF) has been prepared in the unlikely event
where land acquisition is unavoidable. The RPF establishes the guidelines, standards, and
procedures to be followed in the preparation of a Resettlement Action Plan which will be
implemented prior to project activities impacting the identified assets.
73
62. The project area encompasses vulnerable groups. Determination of which groups in Tanzania
are recognized as vulnerable is being done on a project by project basis, and is done according to
the following criteria: those that may be below the food poverty line and lack access to basic social
services (including those that are geographically isolated), and are not integrated with society at
large and its institutions due to physical or social factors.
63. A rapid social assessment of vulnerable groups confirms that there are some vulnerable groups
in the project area, including women-headed households, the elderly, disabled, youth, children,
and persons with HIV/AIDs. The social assessment has also determined that there are no groups
meeting the criteria of OP 4.10 in the project area. The specific needs of vulnerable groups in the
project will be addressed through some of the project activities and mitigation measures in the
Environmental Management Plans and, where applicable, the Resettlement Action Plans.
64. Social Safeguards Instruments: A Resettlement Policy Framework was prepared for the
project which establishes the standards and procedures to be followed if it is determined the project
will need to acquire land for project activities. As the project might marginally increase restriction
to the priority PAs, the aforementioned Process Framework was prepared. The two safeguards
documents were publicly disclosed in-country, at national, regional, and district level, including
relevant local governments, as well as in the World Bank’s InfoShop, prior to project appraisal.
65. Ruaha National Park Extension Legacy: In 2006, the GoT began the process of protecting
critical habitat which entailed increasing the area of RUNAPA. With the newly formed boundaries,
several households found themselves within RUNAPA. As a result, the GoT began relocating
households as the laws of Tanzania do not allow for people to live within national parks. The
compensation and relocation process began in 2008. People were provided with cash compensation
as well as an option of moving to land that had been identified for relocation. Many households
chose to move to various locations throughout Tanzania based on individual household decisions.
66. During the compensation process in 2008, nearly 2000 complaints were received by GoT
claiming that the compensation did not cover lost assets. Due to the number of complaints, the
GoT suspended all resettlement activities to address grievances. Of the complaints received, 971
were determined by GoT to be valid complaints which required additional compensation. The GoT
calculated the amount needed to top up outstanding compensation. The top-up amount used the
2008 valuation amounts with an additional amount based on interest rates that would have been
accrued between 2008 to 2016. The funds were released to TANAPA in August 2016 which was
then provided to the Mbarali District, from where it will finally be disbursed to households through
deposits into bank accounts which can also be utilized through mobile banking.
67. As the redrawn boundaries that were enacted in 2008 tended to cut through existing
communities and villages, the total number of households remaining within the newly established
RUNAPA are unknown. A GoT Task Force – not related or supported by REGROW - will conduct
a rapid assessment to identify households within the park. From this information, a
recommendation will be made to the GoT as to whether or not park boundaries should be redrawn
to allow households to remain in their current location. The GoT will assess these
recommendations to determine what actions must be undertaken. If it is determined, however, that
TANAPA must protect critical habitat where people currently reside, the government may choose
to resettle selected households.
68. The REGROW project will not fund or cause activities which may cause household relocation.
However, in order to minimize likely negative impacts and maximize overall positive ones, while
74
at the same time reducing the likelihood of future complaints, the GoT, in addition to Tanzanian
policies, decided to follow international best practice by following the World Bank’s policy on
Involuntary Resettlement by applying the Resettlement Policy Framework, which establishes the
guidelines and standards to be followed if it is determined there is land acquisition and/or
relocation of households. The World Bank REGROW project will provide technical assistance
with review and comment of Resettlement Action Plans during the life of the project.
69. Preparation and consultation: To ensure communities are better able to benefit from PA
activities, a Stakeholders Consultation and Disclosure Plan has been prepared. This plan includes
awareness raising seminars to present the Environmental and Social Framework, Resettlement
Policy Framework, and Social Framework, preparation of briefs on issues raised and agreed
actions, and regular dissemination of information. The plan also ensures that stakeholders have
access to information. All consultation events will be well documented including minutes of these
meetings of information provided and concerns raised by stakeholders and impacted persons.
6.2 ENVIRONMENT (INCLUDING SAFEGUARDS)
70. The project is designed to improve the conservation and management of natural resources in
Tanzania, through key interventions such as diversifying the tourism product towards the Southern
Circuit, improving basic infrastructure inside PAs, providing training, and improving the enabling
environment for the tourism sector. The project activities support the government’s efforts in
strengthening natural resource management, and promote conservation, sustainable river
management, protecting, restoring, and promoting the sustainable use of terrestrial ecosystems,
halting biodiversity loss, and addressing climate change. The project also contributes to the
government’s response to the poaching crisis by supporting efforts outlined in the National
Strategy to Combat Poaching and Illegal Wildlife Trade, and is targeted at improving rural
livelihoods through enhanced community-based management of natural resources.
71. Given the nature of activities, the overall positive environmental impact expected, and the size
and type of investments being considered, the project is rated Environmental Risk Assessment
Category B. Appropriate mitigation measures will be undertaken to address potential
environmental and social impacts. The safeguard policies triggered for this project include:
Environmental Assessment (OP/BP 4.01); Natural Habitats (OP/BP 4.04); Forests (OP/BP 4.36);
Pest Management (OP/BP 4.09); Physical Cultural Resources (OP/BP 4.11), and Involuntary
Resettlement (OP/BP 4.12).
72. All investments proposed for financing will need to comply with environmental and social
safeguard policies by undergoing required level of assessment prior to implementation. Moreover,
and to reduce accumulation of impacts, project interventions inside the priority PAs will happen
following the General Management Plans of the PAs. Currently, the total number, specific location
and characteristics of proposed investments are still to be determined. Therefore, specific impacts
cannot be identified and it is thus not possible to conduct a full Environmental and Social Impact
Assessment of the entire project. For the REGROW case, thus, the instrument of choice has been
an Environmental and Social Management Framework (ESMF). The ESMF is an umbrella
document, applicable to all project activities. Its main objective is to establish environmental and
social screening procedures for identifying, assessing, and mitigating potential environmental and
social impacts of projects investments. The ESMF defines the adequate environmental and social
instruments to be applied for each investment. These instruments can range from an Environmental
75
and Social Impact Assessment (ESIA) to a simplified Environmental and Social Management Plan
(ESMP). In addition, the ESMF establishes the principles and procedures to undertake
consultations and to implement grievance mechanisms, as required; a monitoring and evaluation
system; and a reporting system. It also establishes institutional responsibilities (implementation,
supervision, monitoring and evaluation, and reporting) on environmental and social management
along the lifetime of any project activities (design, construction and operation). Overall, the ESMF
for REGROW facilitates the assessment of impacts, the identification of measures and plans to
reduce, mitigate and/or offset adverse impacts and enhance positive impacts, as well as the
provisions for estimating and budgeting the costs of such measures. The ESMF, and all relevant
environmental and social assessment instruments that it contains, follow Tanzania’s relevant
environmental regulations and World Bank’s safeguard policies triggered for this project.
73. Regarding infrastructure activities inside the priority PAs, and as mentioned earlier, each PA
has a General Management Plan (GMP) in place, which, through a comprehensive approach,
guides the day-to-day management of the areas in view of ecosystem and tourism management,
park operations, and community outreach. The tourism strategies under the GMPs aim at
enhancing visitor access and use, while at the same time minimizing disturbance to key habitats
and wildlife populations. Ongoing tourist activities are, for example, regulated based on high, low,
and wilderness zones, to minimize negative impacts, and environmental impacts of tourism
facilities are monitored and regulated. For new tourism products, the GMP provides clear measures
to mitigate any negative impacts. The REGROW design follows the recommendations of the
GMPs, which through the above described measures, regulate and mitigate cumulative, indirect,
and induced impacts from increased tourist arrivals and infrastructure interventions. In addition,
environmental assessments for the project will not be carried out for individual, isolated pieces of
infrastructure, but rather on infrastructure systems (for example, the road network inside each PA).
As such, the impact assessment will be able to provide insights on the consequences of the entire
investment.
74. Environmental safeguard Instruments: An ESMF has been prepared by GoT. It provides
criteria and procedures for screening project investments, and guides the preparation of site-
specific safeguards instruments. The ESMF facilitates the assessment of impacts and the
identification of measures, and lays out the principles for plans to reduce, mitigate and/or offset
adverse impacts and enhance positive impacts, as well as the provisions for estimating and
budgeting the costs of such measures. REGROW’s ESMF is an umbrella document, applicable to
all project activities, and it establishes environmental and social screening procedures for
identifying, assessing, and mitigating potential environmental and social impacts of REGROW
activities. In addition, the ESMF establishes the principles and procedures to undertake
consultations and to implement grievance mechanisms, as required; a monitoring and evaluation
system; and a reporting system. It also details the institutional responsibilities (implementation,
supervision, monitoring and evaluation, and reporting) on environmental and social management
along the lifetime of any project activities (design, construction and operation). The ESMF was
publicly disclosed both in-country and in the World Bank’s InfoShop, prior to the appraisal of the
project.
75. Capacity to manage environmental and social safeguards. Overall safeguard oversight and
coordination will be under MNRT. Additional coordination for safeguards will be carried out with
close participation from TANAPA, TAWA, NIRC, RBWB, TFS and TAWIRI officials. During
project implementation, respective sector and agency Environmental Management Units will be
76
responsible for compliance with environmental and social safeguard policies. Implementing
entities will ensure application, monitoring and reporting on the implementation of safeguard
instruments. Although a few of the key project implementers such as TANAPA, have established
arrangements for managing environmental and social issues, it will be important to enhance
capacity of all levels of the project to implement environmental and social safeguard instruments,
and the project will provide space to do so. In order to implement the ESMF and RPF adequately,
each implementing entity will designate or hire personnel responsible for environment and social
management oversight according to their level of skills and experience and how they relate with
the local or decentralized agencies. Specific safeguards capacity needs, recommended training and
required budget will be outlined in the ESMF.
76. Safeguard Policies Triggered
a) World Bank Operational Policies (OP) and World Bank Procedures (BP) Environmental
Assessment (EA) – (OP 4.01) require environmental assessment of projects that are
considered to have potential adverse impacts upon the environment. Environmental
assessment aims at improving decision making and minimizing negative impacts, while
maximizing positive ones, to ensure that project options under consideration are sound and
sustainable, and that potentially affected people have been properly consulted. Under the
EA policy, the Borrower is required to undertake environmental screening of each
proposed project to determine the appropriate extent and type of EA. The environmental
screening process, included in the ESMF, applies to all subprojects to be funded by
REGROW. The screening provides clear criteria and guidance to decide, for each sub-
project, the level of EA that is required. According to the type, location, sensitivity, scale
of the subproject and nature and magnitude of its potential environmental impacts, the
following type of EA will be required:
• Subprojects needing full ESIA. These are subprojects that may have diverse and
significant environmental impacts.
• Subprojects needing a limited ESIA. These subprojects may have specific
environmental impacts, which need to be understood and dealt with.
• Subprojects likely to have minimal or no adverse environmental impacts. For
most of these subprojects, a (simplified) ESMP will be sufficient.
For any investment that will require a full ESIA, the environmental assessment (including
social and socio-economic aspects) itself will follow a number of steps, including impact
assessment - based on screening and scoping exercise; analysis of alternatives - to enhance
the design of a subproject, including do nothing alternative; predictions – to provide
information on the potential implication of the proposed subproject; evaluation of
significance – to determine the predicted or measured change in an environment and social
attribute; identify mitigation measures – to reduce adverse environmental and social
impacts; and public consultations – with project-affected groups, local stakeholders, civil
society, and NGOs during screening, scoping and preparation of Terms of Reference (ToR)
and ESIA report. The EA package (including Environmental Management Plan (ESMP)
and Monitoring Plan (MP)) will be prepared in accordance with the environmental policy,
legislations, and regulations of Tanzania, plus the World Bank’s safeguard policies. The
ESIAs will finally be publicly disclosed in country and at the World Bank’s InfoShop.
77
It will be mandatory for each subproject proposal to include its assigned level of
environmental assessment (full ESIA, limited ESIA, (simplified) ESMP). For subprojects
requiring a full or limited ESIA, the proposal shall include the ESIA report and proof of its
approval by the respective National Environmental Authority and the World Bank. For less
contentious subprojects that do not require the preparation of a separate ESIA, the
completed environmental and social checklist will be attached to the subproject proposal.
Since the total number, specific location and characteristics of proposed investments to be
financed by REGROW are still to be fully determined (with most of them related to small
infrastructure inside Protected Areas, and natural resources management interventions in
the Great Ruaha watershed), the appropriate instrument is the ESMF. The ESMF will allow
the implementing agencies to identify, assess and mitigate potential negative
environmental and social impacts of subprojects, and to ensure that proper mitigation
measures, and monitoring plan are in place, and are an integral part of the subproject cost.
b) Natural Habitats (OP 4.04): This policy aims at the conservation of natural habitats, like
other measures that protect and enhance the environment. The policy is essential for long
term sustainable development. The World Bank therefore supports the protection,
maintenance, and rehabilitation of natural habitats. Natural Habitats are land and water
areas where the ecosystems’ biological communities are formed largely by native plant and
animal species, and human activity has not essentially modified the area’s primary
ecological functions. The policy recognizes the important role of biological, social,
economic, and existence value of natural habitats, including natural arid and semi-arid
lands, mangrove swamps, coastal marshes, and other wetlands; estuaries, sea grass beds,
coral reefs, freshwater lakes and rivers. For REGROW, the Natural Habitats policy is
triggered because some of the investments proposed under the project will occur inside
Protected Areas, and they may have potential impacts that need to be understood and
managed. By triggering the policy, it is required that any activities that will have any
(temporary) adverse impact on ecosystems are successfully mitigated, so that the balance
of the ecosystems are maintained or enhanced. Specific measures to enhance ecosystem
functions must include provision for monitoring and evaluation to provide feedback on
conservation outcomes and to provide guidance for developing or refining appropriate
corrective actions. The specific requirements under this policy have been included as part
of the overall ESMF that applies to the entire project.
c) Pest Management (OP 4.09): The project is not expected to involve the purchase nor the
use of significant quantities of pesticides. However, Component 3 includes activities to
improve the efficiency of agricultural practices and water conservation in the Great Ruaha
sub basin, and will include support through farmer’s field schools. In this regard, the project
might involve or inadvertently promote the use of pesticides during its implementation.
Therefore, the policy is being triggered as a precaution, and specific instructions are
included as part of the ESMF to promote best practices in case of pesticide use or handling
in the project area. This includes applicable good practice procedures for pesticide use and
storage, and prohibit use of pesticides excluded under OP 4.09.
d) Physical Cultural Resources (OP 4.11). The project is not expected to be carried out in or
around any known physical or cultural resources. However, specific procedures for chance
findings, which might occur during implementation, have been defined in the ESMF.
78
e) Involuntary Resettlement (OP 4.12): This policy aims to ensure that projects avoid
negatively impacting economic and social standards of individuals and households. The
policy recognizes that unmitigated impacts may contribute to (a) severe economic, social
and environmental risks; (b) weakening of production systems, community institutions,
social networks, kin groups, and cultural identity; (c) impoverishment if productive assets
or income sources are lost; or (d) people are relocated to areas where productive skills may
be less applicable. This policy provides safeguards to address and mitigate impoverishment
risks. Although the policy promotes avoiding resettlement, where it is not feasible to avoid
resettlement, then measures must be taken to enable impacted persons to share in project
benefits, be meaningfully consulted, and provided opportunity to participate in planning
and implementation of resettlement program. The policy is triggered when a project causes
either (a) involuntary taking of land, (b) loss of income sources or means of livelihood,
whether or not the affected person(s) must move, or (c) involuntary restriction of access to
legally designated PAs. To address impacts, the borrower is expected to prepare a
resettlement action plan when impact area is known, or resettlement policy framework,
when location of impact area is unknown at the time of project preparation (which was
REGROW’s case), to address involuntary land acquisition and a process framework, when
location of impact area is unknown at the time of project preparation. An RPF has been
prepared to address involuntary land acquisition, and a PF has also been prepared to
mitigate marginal increase in restricted access to PAs.
f) Forests (OP 4.36): This policy aims to reduce deforestation, enhance the environmental
contribution of forested areas, promote afforestation, reduce poverty, and encourage
economic development. The policy recognizes the role forests play in poverty alleviation,
economic development, and for providing local as well as global environmental services.
The policy applies to the World Bank-financed investment projects that have or may have
impacts on the health and quality of forests, projects that affect the rights and welfare of
people and their level of dependence upon or interaction with forests and projects that aim
to bring about changes in the management, protection, or utilization of natural forests or
plantations, whether they are publicly, privately, or communally owned. For the specific
case of REGROW, no activity is expected to generate any negative impact on forests,
whereas positive results are expected to be achieved, through increased conservation,
improved management of the Great Ruaha sub-basin, and the overall landscape approach
promoted by Component 3. The safeguard is being triggered as some of the catchment
management activities may involve planting of trees to stabilize slopes as well as reduce
erosion rate and siltation to the river. Other activities might involve reforestation of parts
of the catchment targeted towards water conservation.
7. MONITORING & EVALUATION
7.1. MONITORING & EVALUATION GUIDING PRINCIPLES
77. Monitoring & Evaluation (M&E) is essential for a results-based approach to program
management. Aside from being a key component of project design, M&E is incorporated into all
facets of the project cycle, from initiation through to completion. The M&E system will enable the
management team to clearly demonstrate to the key stakeholders whether the project is achieving
the stated goal, outcomes, and outputs in accordance with the targeted timeframe.
79
78. The M&E should provide the means to robustly analyze the relevant data and information to:
a) Monitor the project outcome indicators as reflected in the results framework.
b) Outline the flow of data and information from the project sites through the various
stakeholders, both for the use of the general public and to inform decision-making.
7.2. M&E ARRANGEMENTS
79. The project’s M&E will build, to the extent possible, on existing country systems to minimize
the need for a parallel M&E framework. All implementing agencies at different levels, including
MNRT, TANAPA, TAWA, MoWI and MALF at national level, and PO-RALG at regional and
local levels, will participate in the process of data collection, compilation, analysis and reporting
of progress. The organizational scheme with respect to M&E is shown below.
Proposed M&E Organizational Arrangements, Data and Reporting Flows
PCU
M&E Unit of the PCU
M&E Units of MNRT, TANAPA,
TAWA, MoWI, MALF
PA Implementation
Teams
National Level
Regional and local levels
Analyse, endorse information and reports for the stakeholders
Collect and consolidate information
Prepare reports
Collect informationRoutine monitoring
Prepare progress reports
Collect informationRoutine monitoring
Prepare progress reports
The World BankProject Steering
Committee
M&E Technical Working Group
80. The Project will form a Monitoring and Evaluation (M&E) Technical Group (METG). It
will be chaired by the Director of the Planning and Policy Division of MNRT and will include the
designated technical M&E focal points of the different entities participating in project
implementation. Representatives from other entities involved in work plan activities will be invited
to the committee on an ad hoc basis.
81. The METG will ensure implementing entities are aligned with strategies and ‘best practice’ in
view of developing effective systems to monitor and evaluate the project. It brings together a group
80
of individuals from the different implementing institutions who are well versed in M&E as well as
the programmatic needs and implications to advise on, and advocate for an improved M&E
function.
82. Its main roles will include, among other activities:
a) Supporting coordination/harmonization of M&E activities (data collection, analysis,
dissemination) among implementing institutions;
b) Identifying and prioritizing critical action steps for country, regional and local M&E work
to assure that action is taken by the relevant group(s) to achieve quality M&E in a timely
fashion;
c) Providing technical assistance and strategic information to the PCU to support the overall
M&E function;
d) Identifying and recommending strategies for addressing the needs for capacity building in
M&E at all levels;
e) Analyzing project implementation from a technical, financial and programmatic
perspective;
f) Promoting the use of results-based systems at country level to enable good monitoring and
to strengthen M&E frameworks;
g) Developing and maintaining consensus around M&E strategies across partners and
institutions;
h) Developing and providing technical guidance on selection and definition of indicators the
coordination of data collection and reporting arrangements at all levels;
i) Where gaps and new ways of analyses are identified, identifying the means through which
this new information can be obtained and utilized;
j) Finalizing and submitting monthly M&E reports to the PCU and other corresponding
authorities; and
k) Developing a plan for strengthening the project’s M&E function.
83. The METG, will meet every two months during the first year of the project. As the project
progresses, the METG will meet on a quarterly basis. Extraordinary meetings will be held
depending on specific needs.
84. The METG reports to the PCU and, during the first year of the project, is required to produce
monthly M&E reports which consolidate and summarize findings from M&E focal points at all
levels. In addition, the reports will summarize lessons learned and actionable recommendations to
close implementation gaps. Additional details on the functioning of the METG will be described
in the PIM.
85. The Project Coordination Unit (PCU) endorses quarterly and annual reports of each
implementing agency and report to the World Bank (exception for TANAPA, who will do this in
parallel for their own activities). The PCU and TANAPA are required to submit quarterly technical
progress reports within 45 days of the end of each fiscal year quarter. In addition, the PCU will
submit an annual progress report to provide an overview of the status of achievement of each
performance indicator at impact, outcome and output level and summarize the results of related
monitoring and impact studies. The performance targets are not expected to change every quarter,
81
but the progress of performance will be summarized and any challenges that may affect the
achievement of project targets will be highlighted in each quarterly report.
86. These reports will include the following table of contents:
a) Context data including the quarter/year and geographical area corresponding to the
reported data;
b) Introduction;
c) An executive summary;
d) A summary of progress in work-plan implementation, including a review of any challenges
encountered;
e) Summary of expenditures relative to project disbursement targets;
f) Summary of results being achieved, including a copy of the Results Framework (RF) listing
performance targets and accomplishment as well as two additional columns showing
performance as a percentage and the absolute variation with respect to the target (expressed
as the difference between the target and the actual performance);
g) A list of lessons learned; and
h) Recommendations and action plans with deadlines and staff in charge of implementing
them.
87. The M&E officer will participate in the joint implementation support missions, which are
targeted at assessing project implementation progress every six months. Reference surveys and
data collection will include: (i) baseline, mid-term and end-of-project surveys; (ii) the use of data
from secondary sources; and (iii) other ad hoc surveys and analyses.
88. The M&E officers of MNRT, TANAPA, TAWA, MoWI, MALF, TAWIRI, TAWA, TTB,
RBWB, and NIRC will have the responsibility for overall M&E of the project with the support of
the PCU. The Technical Coordinators / Focal Points and/or the M&E officers will collect and
process information necessary for tracking project outcomes and outputs. More specifically, their
role is to:
a) Provide technical support including institutionalization of M&E processes within the
implementing agencies and coordinate performance management system;
b) Organize annual data collection to monitor results for the Project and prepare periodic
performance / progress reports to be transmitted to PCU for endorsement;
c) Organize national and regional M&E workshops;
d) Undertake the baseline survey to collect data for key performance indicators for surveys at
mid-term and project end;
e) Prepare an Implementation Completion Report (ICR) for the Project at the end of project;
and
f) Oversee implementation of impact studies implemented and monitor performance of the
implementing agency; and compile, analyze and prepare progress reports and submit to
PCU for subsequent finalization and transmission of periodic Project’s performance
summaries.
89. All this information and arrangements will be compiled in the project’s monitoring and
evaluation plan, (to be developed, implemented and followed up on by the PCU Coordinator, PCU
82
M&E Officer, Technical Coordinators and Technical Focal Points), which will contain the
following sections:
a) Indicator Definitions and Measurement;
b) Routine Data Collection;
c) Data Management;
d) Program Review, Evaluation, and Surveys;
e) Data Quality Assurance Mechanisms and Related Supportive Supervision;
f) M&E Coordination;
g) Capacity Building;
h) M&E Costed Work Plan & budget; and
i) Information Products, dissemination and use.
7.3. M&E INDICATORS
90. The project will use two sets of indicators with different scopes: the indicators included in the
results framework, which are aimed at measuring project progress against specific baseline and
target values at different levels of the results chain; and indicators not captured in the results
framework, designed to measure the performance of the implementation unit. For all indicators in
the results framework, the link to the higher level objectives has been established through the use
of theory-based PPIs. The PPIs have been clustered in four groups: (1) jobs; (2) household income;
(3) resilience; and (4) biodiversity. The objective of the second set of indicators is to assess the
efficiency of the PCU and implementers in carrying out their core functions.
Indicators to measure the performance of the PIU (not limited to)
Indicator
Unit of
measurement Baseline Target Frequency
Percentage of key PIU positions filled in a
timely manner Percentage 0 100% Annual
Number of ToR submitted for no objection in
accordance with the PIP Number 0 100% Quarterly
Percentage of planned IFRs completed and
submitted on time
Percentage 0 100%
According to IFR
frequency
Percentage of procurement processes by
category started on time
Percentage 0 90% Quarterly
Percentage of quarterly financial execution Percentage 0 100% Quarterly
Percentage of quarterly programmatic
execution (executed activities divided by
planned activities for a specific period)
Percentage 0 100% Quarterly
91. The results framework indicators are detailed in Annex 1.
7.4. M&E System
92. While the project’s M&E system will build, to the extent possible, on existing country systems
to minimize the need for parallel M&E framework, it is anticipated that a project management and
monitoring platform will be needed to integrate the information coming from different sources and
levels, while using the results chain as its backbone to generate adequate reports.
83
93. Thus, the PCU should consider the acquisition of the afore-mentioned platform to capture data
on physical and financial progress, the performance of implementing agencies and service
providers, and the achievements of outcomes and impact vis-à-vis the project development
objectives and to guarantee that the following management functions can be carried out.
7.5. M&E Activities
94. The set of M&E activities to be carried out during the life span of the project is summarized in
the following illustration.
M&E activities
95. Capacity Needs Assessment and Capacity Building Plan of M&E Stakeholders. The M&E
capacity needs assessment will be carried out for all relevant agencies. The assessment will focus
on specific capacity that the agency requires to carry out its responsibilities in M&E. Based on this
assessment, the PCU will prepare an M&E capacity building plan which will be integrated in the
overall Capacity Building plan of the project.
96. This activity should be complemented with adequate training in the use of the developed M&E
system, which will build on existing capacities of the country but will also require a comprehensive
system to integrate data from different sources. This training, which would not only involve M&E
staff but also that of other areas like finance, procurement and management would focus on the
following:
M&E activities
Capacity needs assessment and capacity building
plan
M&E Start-up Workshops at National and
Regional Level
Joint implementation support missions
Baseline survey
Beneficiary satisfaction
survey
Midterm review
Final impact evaluation
Implementation completion and results report
84
a) Analysis of the M&E requirements included in the Project Appraisal Document, the M&E
Plan and the PIM;
b) Preparing the strategy to achieve Results Framework’s targets;
c) Case Studies and Exercises using the M&E platform; and
d) Practical exercises using real project data to determine variations with respect to the
achievement of targets or with respect to baselines.
97. M&E Start-up Workshops at National and Regional Level. For project M&E to start up and
progress effectively, it is vital that the key stakeholders become acquainted with the project Results
Framework, outcomes, outputs and their measurement. They must gain a shared understanding of
the work, the implementation strategy, management and their respective roles and responsibilities.
This will be done through national and regional dedicated workshops.
98. Joint Implementation Support Missions. The project will undertake regular joint
implementation support missions and reviews. These reviews will be facilitated and coordinated
by the PCU. The review teams will encompass government representatives and all implementing
entities. Field visits will be part of the joint implementation support missions.
99. A Baseline Survey will be undertaken during the first year of project implementation, to
establish benchmarks against which the outcomes and impact on the beneficiaries will be assessed.
Information will be collected for the indicators specified in the RF and M&E plan. Baseline
surveys will be carried out by an independent consultant/firm, under the responsibility of the M&E
Unit.
100. Beneficiary Satisfaction Surveys. Beneficiary satisfaction surveys on perceived
improvement in economic opportunities will be carried out as part of the midterm (year 3) and at
the end of project (early year 6). The methodology of the qualitative monitoring of beneficiary
groups will be primarily developed from participatory M&E techniques, such as Community Score
Card or/and other types of participatory survey methods such as focused group interviews.
101. Mid-Term Review. A mid-term Review of the project will be undertaken after 24 months
of operation by the implementing agencies and World Bank. The main purpose of this review will
be to: (i) determine whether satisfactory progress is being made towards meeting the PDO; (ii)
evaluate the outcomes of the project on the beneficiaries; (iii) assess the project design and the
efficiency of implementation arrangements; (iv) draw lessons from implementation; and (v)
introduce necessary changes to improve implementation progress towards the achievement of the
PDO and intermediate results. Further to a more detailed analysis of information collected and
stored in the project database, the mid-term review process may include the commissioning of
specific studies by external consultants.
102. Final Impact Evaluation. To assess the impact of the project, a final impact evaluation
will be conducted after Year 6 of the project.
103. Implementation Completion and Results Report (ICR). The Government will prepare and
submit the World Bank an ICR prior to the Projects’ closing date and the World Bank will prepare
its own ICR within six months after the closing date.
85
7.6. M&E Work Plan and Timeline
The M&E Work Plan for M&E activities will be updated at least twice; first, at the beginning of implementation during the national
M&E Start-up Workshop, and by year 3 during the MTR Workshop to stay relevant to the M&E needs of the project. The detailed
timeline is provided below.
M&E Activities PY1 PY2 PY3 PY4 PY5 PY6
M&E Start-up Workshops
Baseline studies
Training in Results Based M&E
METG meetings
Quarterly progress monitoring reports
Annual Progress Monitoring Reports
MTR Survey
MTR Workshop
MTR Progress Report
Beneficiary / Satisfaction Surveys
Design Impact Evaluation (IE)
Conduct Impact Evaluation
ICR Stakeholder workshop/ ICR Report
PY= Project Year
86
ANNEX 4: IMPLEMENTATION SUPPORT PLAN
TANZANIA: RESILIENT NATURAL RESOURCE MANAGEMENT FOR TOURISM
AND GROWTH (REGROW) PROJECT
Strategy and Approach for Implementation Support
1. The strategy and approach for implementation support will focus on mitigating the risks
identified at various levels, and include formal supervision, including field visits to the areas where
project activities will be carried out, and ad-hoc support through technical discussions and visits29.
Implementation Support Plan
2. Implementation support will primarily focus on assessing progress towards achieving the PDO
and overall implementation progress, and effectively responding to issues and challenges as they
arise. Specifically, the implementation support strategy will include: (i) semi-annual
implementation support missions to be conducted in coordination with other development partners;
(ii) a mid-term review that will include a comprehensive assessment of the progress achieved after
three years of project implementation, and serve as a platform for addressing any issues associated
with the project design including identification of needed adjustments; (iii) a project impact
assessment; and (iv) implementation completion, where an independent assessment of the project
will be undertaken to draw lessons to inform future or similar operations. The strategy, as
articulated above, will include a concerted plan of technical, fiduciary, and safeguards support
needed to ensure due diligence over the course of project implementation.
3. Technical support. At the technical level, the World Bank team will assemble the appropriate
technical skills mix and experience needed to support implementation of this complex and large
operation.
4. Fiduciary support. Given the substantial fiduciary risk rating, FM reviews will be regularly
conducted by the World Bank’s FM and procurement specialist to ensure that fiduciary capacity
and systems remain adequate during project implementation in accordance with the World Bank’s
fiduciary requirements. World Bank will require that quarterly IFRs be submitted to the World
Bank together with annual external audit reports for review. The government’s internal control,
oversight, and reporting systems will be reviewed periodically, including through annual,
unannounced project-site visits. Required actions that result from audit reviews, external audit
reports, management letters, internal audits, and other reports, will be followed-up on. Fiduciary
capacity building will be conducted on a regular basis, with additional training to be carried out
during project implementation as needed.
5. Environmental and social safeguards support: The World Bank’s safeguards team will
consist of social and environmental specialists who will guide the project team in applying the
agreed safeguard instruments and reviewing compliance during implementation support missions.
29 This annex reflects the World Bank’s anticipated support to the REGROW project.
87
Focus of project implementation support
Time Focus Skills Needed Resource
Estimate
First
twelve
months
• Project effectiveness and
implementation start-up
• Establishment of the PCU
• Safeguards instruments
application/compliance
• M&E system in place
• Fiduciary advisors recruited
• Fiduciary training provided
• Sub-project implementation
manual developed
• Water Resources
Management Specialist
• Agronomist
• Infrastructure Specialist
• Private Sector Specialist
• Community Development
Specialist
• Social Safeguards Specialist
• Environmental Safeguards
Specialist
• Procurement Specialist
• Financial Management
Specialist
• Monitoring and Evaluation
Specialist
• Legal Counsel
• Disbursement Officer
US$150K –
200K (est.)
12-48
months • Implementation of planned
activities
• Monitoring and reporting
against targets
• Implementation support
missions conducted
• Mid-term review conducted
(in year 3)
• First impact assessment
conducted
Same as above US$150K –
200K/year
(est.)
49-72
months • Implementation of planned
activities
• Monitoring and reporting
against targets
• Implementation support
missions conducted
• Second impact assessment
conducted
• Project completion and ICR
preparation
Same as above US$150K –
200K/year
(est.)
88
Skills Mix Required
Skills Needed Number of Staff Weeks Number of Trips
Water Resources Management
Specialist
10 4
Agronomist 10 4
Infrastructure Specialist 10 4
Private Sector Specialist 6 4
Community Development
Specialist
6 4
Social Safeguards Specialist 10 3
Environmental Safeguards
Specialist
5 4
Procurement Specialist 10 4
Financial Management Specialist 10 4
Monitoring and Evaluation
Specialist
5 4
Legal Counsel 2 --
Disbursement Officer 2 --
89
ANNEX 5: ECONOMIC AND FINANCIAL ANALYSIS
TANZANIA: RESILIENT NATURAL RESOURCE MANAGEMENT FOR TOURISM
AND GROWTH (REGROW) PROJECT
1. A cost-benefit analysis of the REGROW project was conducted to calculate the economic
internal rate of return (EIRR), the net present values (NPV), benefit-cost ratio (BCR) and switching
values. It predominately focuses on the economic benefits generated by the priority PAs that will
receive support from REGROW. The analysis centers on the benefit streams expected from
REGROW that correspond to: i) revenue generated from nature-based tourism in the PAs, ii)
income generated by local communities in the vicinity of the PAs and iii) water efficiency activities
conducted in collaboration with local farmers.
2. REGROW promotes investment in protected areas management - a core public sector service-
resulting in public goods of global and local importance that have remained underfunded and
which would not be generated through other sources of finance. The World Bank remains uniquely
positioned to invest in the sectors relevant to the project, including sustainable use of natural
resources, while bringing its convening power to address wider issues related to water
augmentation, local community development and tourism development to trigger and leverage
much needed private sector investment into the areas.
3. The analysis returned a positive EIRR of 17 percent (above the threshold of 10 percent), a
NPV of US$62 million, switching values for benefit and cost of -61 percent and 38 percent,
respectively and a BCR of 1.6, over a 20-year period. It should be noted that the profitability
indicators are conservative as they do not fully consider: i) an increase in spending per tourist, just
an increase in tourist numbers and income; ii) a highly discounted Tanzanian Shilling (TZS)
against the US$; iii) demand driven activities of local communities due to the nature of self-
selection during implementation; iv) tourism demand above the rate of inflation driven by a
specific - yet to be developed - marketing strategy of the project; v) the value of project impact on
environmental services as their value remains un-monetized, such as reduced human wildlife
conflict (HWC) as a result of increased protection and conservation stemming from improved
infrastructure (e.g., ranger posts); and vi) an increase in visitor satisfaction.
NPV values and EIRR
NPVs @ 10%
Project benefit stream 165,925,548
Project cost stream 103,319,996
Project net incremental benefits 62,605,553
EIRR 17%
Switching values Appraisal
valueSwitching value % change
Incremental benefits 165,925,548 103,319,996 -38%
Incremental costs 103,319,996 165,925,548 61%
BCR 1.61
90
4. Sensitivity analysis suggests that the probability of a negative return is likely to occur 4
percent of the times that such a project is run. This likelihood is considered low and within an
acceptable level of risk. The switching values that determine the point at which the project would
achieve a negative return are robust with incremental benefits needing to decline by 38 percent
and for incremental costs to increase by 61 percent, for the project to reach such a point. The BCR
is above the all-important threshold of 1 at 1.61. The project remains positive up to a discount
period of 15-years and above. Over a 20-year period, the project’s net benefit is three times the
cost of the initial investment cost.
5. For the purpose of this analysis a financial discount rate of 12 percent was used for the
calculation of the financial IRR and NPV values, and to reflect the opportunity cost of capital,
given that: i) the 7-year Tanzanian Government bond yield was, according to the World Bank,
10.08 percent as of June 2016; and ii) the interest rate spread (that is the margin that banks charge)
averaged just under 7 percent over the past five years. In the economic budgets a social discount
rate of 10 percent was determined by using (i) the Tanzania 7-year Treasury Bond Interest Rate
(June 2016) to reflect the cost of sovereign debt, and as a guide; (ii) the Ramsey formula, where
economic growth for Tanzania over the past 10 years averaged 6.69 percent between 2002-2016,
and an additional figure to factor in the risk of operating in remote rural and poverty prone areas
for the marginal utility of consumption by using a factor less than 1.5.
6. The modeling mirrors the activities of the project where possible and for this reason it is
centered on the Mikumi, Ruaha and Udzungwa National Parks and the Selous Game Reserve.
Figures on the number of tourist visitors, tourist income, staffing and personnel costs, investment
and operating costs were collected from both TANAPA and TAWA to present the most accurate
information available, based on figures for the past available three years. Sales figures were
increased at a fluctuating rate – between 0-35 percent p.a. to reflect an uneasy operating
environment from one year to the next.
7. The exchange rate for converting TZS to US$ was calculated using the average discount
rate of two intervals - the past 5 years and 10 years - to arrive at an average of 6.61 percent p.a.
This discount rate is conservative since alternative forecast methods noted a discount rate of
between 3-4.5 percent p.a.
8. Funding levels for each of the project components is distributed (within the project) to
reflect the spatial needs of the natural resources of the priority PAs. The Selous Game Reserve
alone is, for instance, larger than Switzerland.30 The three main components of project
implementation include: Component 1 investments in park infrastructure buildings for the priority
PAs that include: i) around 90 different structures and facilities, including entry and exit gates with
visitors' information centers, ranger posts, student hostels, cottage bandas, rest houses and guides
lodging - inside the priority PAs; ii) improved roads stretching over 500 km along all four priority
PAs; and iii) new or improved (lengthened/all-weather ready) airstrips, as well as light and heavy
equipment for road maintenance (component total is US$97 million). Component 2 includes
investments in local communities in proximity to the priority PAs (total US$17 million), yet given
the demand-driven and self-selection nature by the local community members, no actual modeling
was completed for the interventions at this stage. Component 3 involves water efficiency activities
30 Although the project will invest in only the northern sector, called Matambwe.
91
along the Great Ruaha River among 20,000 rice growers (total budget US$27 million). The
average size of farms is estimated at 0.5 ha, covering an area of 10,000 ha within the project area.
The adoption rate in year 10 is 60 percent, when aggregated. Again this is intended to remain
within a conservative set of calculations for the project. All project costs, including project
management under Component 4 were factored into the calculations at the project cost level and
not individually at each park level. Disaggregation of investments among the PAs was not final at
the time of the assessment. This method also ensures all costs are captured only once and not
double counted at both park and project level analysis.
Profitability indicators at PA level
9. The revenue at PAs fluctuates from year to year without the project and not all revenue
streams are fully explored, including concessions, flexible ticketing and marketing of various
segments of the tourist market. A concerted strategy to address certain shortcomings in operations
and a more strategic approach might see some quick gains and longer term planning, such as
automated ticketing, online purchasing and multi-entry ticketing options. A marketing campaign
and clear destination management will produce further strengthening of the PAs’ ability to
leverage its strengths in favor of sustained growth.
10. Rice production is the main model for agricultural production and acts as a proxy measure
for realizing the benefits of water efficiency around the Great Ruaha River, where it is the major
cash crop. While the conversion factors for rice were calculated, the rice is not for export and
touches on only a small percentage of farmers in the area (circa 5-10 percent of cultivated land or
10,000 hectares or 20,000 farmers, using a 60 percent adoption rate by rice farmers participating
in the project). The economic NPV for rice per hectare was calculated at US$856 with a discount
rate of 10 percent while the return on family labor was US$97 per hectare.
Priority Protected Areas (PAs) NPV (USD) FIRR
Mikumi National Park 14,843,941 48%
Ruaha Natioanl Park 49,487,594 65%
Udzundwa National Park 3,719,202 149%
Selous Game Reserve 29,227,878 68%
92
MAPS
93