Procurement Plan-Goods Country/Organisation:Nigeria Lagos Metropolitan Area Transport Authority (LAMATA)

Project/Programme: Lagos Urban Transport Project (LUTP)

IDA Credit No.: 3721-0 UNI

Description*

List of Contracts

Component 4: Project Management & System

Monitoring

Norm Duration of Proc Steps

Supply and Installation of Air Quality Equipment in Eleven

Monitoring Stations on LAMATA BRT Corridors including

Training, Laboratory Analysis, Installation of one Control

Centre and one Ambient Control Centre and a back-up

Procurement of IT Stationery/Consumable (4 Lots, to be

procured a lot per quarter)

Design, Supply and Installation of BRT Signal from CMS-

Mile 12-Ikorodu Icluding Design ( Intelligent Transport

Systems) - Phase 1

IT Equipment Purchase Switches and Printers

Implementation of the Recommendation of the Technical

Due Diligence Report on BFS Operations

Component 2:Public Transport and Traffic Management

Procurement of Office Furniture ( Front office desks, Work

stations, Executive swivel chairs, Board room furniture set,

Janitor shelf etc…

NonAsciiFileName0.xls 1 of 754 11/21/2012 1:40 AM

Pub

lic D

iscl

osur

e A

utho

rized

Pub

lic D

iscl

osur

e A

utho

rized

Pub

lic D

iscl

osur

e A

utho

rized

Pub

lic D

iscl

osur

e A

utho

rized

Pub

lic D

iscl

osur

e A

utho

rized

Pub

lic D

iscl

osur

e A

utho

rized

Pub

lic D

iscl

osur

e A

utho

rized

Pub

lic D

iscl

osur

e A

utho

rized

Procurement Plan-Goods

Total Cost

Fill gray cells only!

NOTE: Line 30 -Procurement of IT

Equipment procurement proces has been

scheduled to commence in October to coicide

with resumption of staff to be recruited for the

construction of Mile 12 to Ikorodu BRT

scheme

Nn

Purchase and installation of Corel Draw and Video editing

software for external relation

Procurement of IT Equipment (Servers Laptops PC's and

UPS

Procurement of IT Stationery/Consumable (4 Lots, to be

procured a lot per quarter)

Procurement of Fire Proof Cabinet

Procurement of Operational Vehicles (One four Wheel and

10 Saloon Cars)

Procurement of Ofice Equipment (2HP Split Air

Conditioners (5, Water Dispenser, Refrigerators)

NonAsciiFileName0.xls 2 of 754 11/21/2012 1:40 AM

Procurement Plan-Goods Country/Organisation:Nigeria Lagos Metropolitan Area Transport Authority (LAMATA)

Project/Programme: Lagos Urban Transport Project (LUTP)

IDA Credit No.: 3721-0 UNI

Description*Package

Number

List of Contracts

1

1

Component 4: Project Management & System

Monitoring

1

1

1

1

Norm Duration of Proc Steps

Supply and Installation of Air Quality Equipment in Eleven

Monitoring Stations on LAMATA BRT Corridors including

Training, Laboratory Analysis, Installation of one Control

Centre and one Ambient Control Centre and a back-up

Procurement of IT Stationery/Consumable (4 Lots, to be

procured a lot per quarter)

Design, Supply and Installation of BRT Signal from CMS-

Mile 12-Ikorodu Icluding Design ( Intelligent Transport

Systems) - Phase 1

IT Equipment Purchase Switches and Printers

Implementation of the Recommendation of the Technical

Due Diligence Report on BFS Operations

Component 2:Public Transport and Traffic Management

Procurement of Office Furniture ( Front office desks, Work

stations, Executive swivel chairs, Board room furniture set,

Janitor shelf etc…

NonAsciiFileName0.xls 3 of 754 11/21/2012 1:40 AM

Procurement Plan-Goods

1

1

1

1

1

Total Cost

Fill gray cells only!

NOTE: Line 30 -Procurement of IT

Equipment procurement proces has been

scheduled to commence in October to coicide

with resumption of staff to be recruited for the

construction of Mile 12 to Ikorodu BRT

scheme

Nn

Purchase and installation of Corel Draw and Video editing

software for external relation

Procurement of IT Equipment (Servers Laptops PC's and

UPS

Procurement of IT Stationery/Consumable (4 Lots, to be

procured a lot per quarter)

Procurement of Fire Proof Cabinet

Procurement of Operational Vehicles (One four Wheel and

10 Saloon Cars)

Procurement of Ofice Equipment (2HP Split Air

Conditioners (5, Water Dispenser, Refrigerators)

NonAsciiFileName0.xls 4 of 754 11/21/2012 1:40 AM

Procurement Plan-Goods Country/Organisation:Nigeria Lagos Metropolitan Area Transport Authority (LAMATA)

Project/Programme: Lagos Urban Transport Project (LUTP)

IDA Credit No.: 3721-0 UNI

Description*

List of Contracts

Component 4: Project Management & System

Monitoring

Norm Duration of Proc Steps

Supply and Installation of Air Quality Equipment in Eleven

Monitoring Stations on LAMATA BRT Corridors including

Training, Laboratory Analysis, Installation of one Control

Centre and one Ambient Control Centre and a back-up

Procurement of IT Stationery/Consumable (4 Lots, to be

procured a lot per quarter)

Design, Supply and Installation of BRT Signal from CMS-

Mile 12-Ikorodu Icluding Design ( Intelligent Transport

Systems) - Phase 1

IT Equipment Purchase Switches and Printers

Implementation of the Recommendation of the Technical

Due Diligence Report on BFS Operations

Component 2:Public Transport and Traffic Management

Procurement of Office Furniture ( Front office desks, Work

stations, Executive swivel chairs, Board room furniture set,

Janitor shelf etc…

Country/Organisation:Nigeria Lagos Metropolitan Area Transport Authority (LAMATA)

Lot

Number

Lots 1

1

1

Lots 1

Lots 1

Lots 1 -4

BASIC DATA

Component 2:Public Transport and Traffic Management

NonAsciiFileName0.xls 5 of 754 11/21/2012 1:40 AM

Procurement Plan-Goods

Total Cost

Fill gray cells only!

NOTE: Line 30 -Procurement of IT

Equipment procurement proces has been

scheduled to commence in October to coicide

with resumption of staff to be recruited for the

construction of Mile 12 to Ikorodu BRT

scheme

Nn

Purchase and installation of Corel Draw and Video editing

software for external relation

Procurement of IT Equipment (Servers Laptops PC's and

UPS

Procurement of IT Stationery/Consumable (4 Lots, to be

procured a lot per quarter)

Procurement of Fire Proof Cabinet

Procurement of Operational Vehicles (One four Wheel and

10 Saloon Cars)

Procurement of Ofice Equipment (2HP Split Air

Conditioners (5, Water Dispenser, Refrigerators)

Lot 1

Lot 1

Lot 1

Lot 1

1

Nn

NonAsciiFileName0.xls 6 of 754 11/21/2012 1:40 AM

Procurement Plan-Goods Country/Organisation:Nigeria Lagos Metropolitan Area Transport Authority (LAMATA)

Project/Programme: Lagos Urban Transport Project (LUTP)

IDA Credit No.: 3721-0 UNI

Description*

List of Contracts

Component 4: Project Management & System

Monitoring

Norm Duration of Proc Steps

Supply and Installation of Air Quality Equipment in Eleven

Monitoring Stations on LAMATA BRT Corridors including

Training, Laboratory Analysis, Installation of one Control

Centre and one Ambient Control Centre and a back-up

Procurement of IT Stationery/Consumable (4 Lots, to be

procured a lot per quarter)

Design, Supply and Installation of BRT Signal from CMS-

Mile 12-Ikorodu Icluding Design ( Intelligent Transport

Systems) - Phase 1

IT Equipment Purchase Switches and Printers

Implementation of the Recommendation of the Technical

Due Diligence Report on BFS Operations

Component 2:Public Transport and Traffic Management

Procurement of Office Furniture ( Front office desks, Work

stations, Executive swivel chairs, Board room furniture set,

Janitor shelf etc…

Procurement Method

ICB

NCB

ICB

NCB

Shopping

Shopping

BASIC DATA

NonAsciiFileName0.xls 7 of 754 11/21/2012 1:40 AM

Procurement Plan-Goods

Total Cost

Fill gray cells only!

NOTE: Line 30 -Procurement of IT

Equipment procurement proces has been

scheduled to commence in October to coicide

with resumption of staff to be recruited for the

construction of Mile 12 to Ikorodu BRT

scheme

Nn

Purchase and installation of Corel Draw and Video editing

software for external relation

Procurement of IT Equipment (Servers Laptops PC's and

UPS

Procurement of IT Stationery/Consumable (4 Lots, to be

procured a lot per quarter)

Procurement of Fire Proof Cabinet

Procurement of Operational Vehicles (One four Wheel and

10 Saloon Cars)

Procurement of Ofice Equipment (2HP Split Air

Conditioners (5, Water Dispenser, Refrigerators)

Shopping

Shopping

Shopping

Shopping

NCB

NonAsciiFileName0.xls 8 of 754 11/21/2012 1:40 AM

Procurement Plan-Goods Country/Organisation:Nigeria Lagos Metropolitan Area Transport Authority (LAMATA)

Project/Programme: Lagos Urban Transport Project (LUTP)

IDA Credit No.: 3721-0 UNI

Description*

List of Contracts

Component 4: Project Management & System

Monitoring

Norm Duration of Proc Steps

Supply and Installation of Air Quality Equipment in Eleven

Monitoring Stations on LAMATA BRT Corridors including

Training, Laboratory Analysis, Installation of one Control

Centre and one Ambient Control Centre and a back-up

Procurement of IT Stationery/Consumable (4 Lots, to be

procured a lot per quarter)

Design, Supply and Installation of BRT Signal from CMS-

Mile 12-Ikorodu Icluding Design ( Intelligent Transport

Systems) - Phase 1

IT Equipment Purchase Switches and Printers

Implementation of the Recommendation of the Technical

Due Diligence Report on BFS Operations

Component 2:Public Transport and Traffic Management

Procurement of Office Furniture ( Front office desks, Work

stations, Executive swivel chairs, Board room furniture set,

Janitor shelf etc…

Pre-or Post

Qualification

If Prequalification

add 7-13 wks

Post Qualification

Post Qualification

Post Qualification

Post Qualification

Post Qualification

Post Qualification

BASIC DATA

NonAsciiFileName0.xls 9 of 754 11/21/2012 1:40 AM

Procurement Plan-Goods

Total Cost

Fill gray cells only!

NOTE: Line 30 -Procurement of IT

Equipment procurement proces has been

scheduled to commence in October to coicide

with resumption of staff to be recruited for the

construction of Mile 12 to Ikorodu BRT

scheme

Nn

Purchase and installation of Corel Draw and Video editing

software for external relation

Procurement of IT Equipment (Servers Laptops PC's and

UPS

Procurement of IT Stationery/Consumable (4 Lots, to be

procured a lot per quarter)

Procurement of Fire Proof Cabinet

Procurement of Operational Vehicles (One four Wheel and

10 Saloon Cars)

Procurement of Ofice Equipment (2HP Split Air

Conditioners (5, Water Dispenser, Refrigerators)

Post Qualification

Post Qualification

Post Qualification

Post Qualification

Post Qualification

NonAsciiFileName0.xls 10 of 754 11/21/2012 1:40 AM

Procurement Plan-Goods Country/Organisation:Nigeria Lagos Metropolitan Area Transport Authority (LAMATA)

Project/Programme: Lagos Urban Transport Project (LUTP)

IDA Credit No.: 3721-0 UNI

Description*

List of Contracts

Component 4: Project Management & System

Monitoring

Norm Duration of Proc Steps

Supply and Installation of Air Quality Equipment in Eleven

Monitoring Stations on LAMATA BRT Corridors including

Training, Laboratory Analysis, Installation of one Control

Centre and one Ambient Control Centre and a back-up

Procurement of IT Stationery/Consumable (4 Lots, to be

procured a lot per quarter)

Design, Supply and Installation of BRT Signal from CMS-

Mile 12-Ikorodu Icluding Design ( Intelligent Transport

Systems) - Phase 1

IT Equipment Purchase Switches and Printers

Implementation of the Recommendation of the Technical

Due Diligence Report on BFS Operations

Component 2:Public Transport and Traffic Management

Procurement of Office Furniture ( Front office desks, Work

stations, Executive swivel chairs, Board room furniture set,

Janitor shelf etc…

Prior or Post Review

Post Review

Post Review

Prior Review

Post Review

Post Review

Post Review

BASIC DATA

NonAsciiFileName0.xls 11 of 754 11/21/2012 1:40 AM

Procurement Plan-Goods

Total Cost

Fill gray cells only!

NOTE: Line 30 -Procurement of IT

Equipment procurement proces has been

scheduled to commence in October to coicide

with resumption of staff to be recruited for the

construction of Mile 12 to Ikorodu BRT

scheme

Nn

Purchase and installation of Corel Draw and Video editing

software for external relation

Procurement of IT Equipment (Servers Laptops PC's and

UPS

Procurement of IT Stationery/Consumable (4 Lots, to be

procured a lot per quarter)

Procurement of Fire Proof Cabinet

Procurement of Operational Vehicles (One four Wheel and

10 Saloon Cars)

Procurement of Ofice Equipment (2HP Split Air

Conditioners (5, Water Dispenser, Refrigerators)

Post Review

Post Review

Post Review

Post Review

Post Review

NonAsciiFileName0.xls 12 of 754 11/21/2012 1:40 AM

Procurement Plan-Goods Country/Organisation:Nigeria Lagos Metropolitan Area Transport Authority (LAMATA)

Project/Programme: Lagos Urban Transport Project (LUTP)

IDA Credit No.: 3721-0 UNI

Description*

List of Contracts

Component 4: Project Management & System

Monitoring

Norm Duration of Proc Steps

Supply and Installation of Air Quality Equipment in Eleven

Monitoring Stations on LAMATA BRT Corridors including

Training, Laboratory Analysis, Installation of one Control

Centre and one Ambient Control Centre and a back-up

Procurement of IT Stationery/Consumable (4 Lots, to be

procured a lot per quarter)

Design, Supply and Installation of BRT Signal from CMS-

Mile 12-Ikorodu Icluding Design ( Intelligent Transport

Systems) - Phase 1

IT Equipment Purchase Switches and Printers

Implementation of the Recommendation of the Technical

Due Diligence Report on BFS Operations

Component 2:Public Transport and Traffic Management

Procurement of Office Furniture ( Front office desks, Work

stations, Executive swivel chairs, Board room furniture set,

Janitor shelf etc…

Plan vs.

Actual

Plan

Actual

Plan

Actual

Plan

Actual

Plan

Plan

Actual

Plan

Actual

Plan

NonAsciiFileName0.xls 13 of 754 11/21/2012 1:40 AM

Procurement Plan-Goods

Total Cost

Fill gray cells only!

NOTE: Line 30 -Procurement of IT

Equipment procurement proces has been

scheduled to commence in October to coicide

with resumption of staff to be recruited for the

construction of Mile 12 to Ikorodu BRT

scheme

Nn

Purchase and installation of Corel Draw and Video editing

software for external relation

Procurement of IT Equipment (Servers Laptops PC's and

UPS

Procurement of IT Stationery/Consumable (4 Lots, to be

procured a lot per quarter)

Procurement of Fire Proof Cabinet

Procurement of Operational Vehicles (One four Wheel and

10 Saloon Cars)

Procurement of Ofice Equipment (2HP Split Air

Conditioners (5, Water Dispenser, Refrigerators)

Actual

Plan

Actual

Plan

Actual

Plan

Actual

Plan

Actual

Plan

Actual

NonAsciiFileName0.xls 14 of 754 11/21/2012 1:40 AM

Procurement Plan-Goods Country/Organisation:Nigeria Lagos Metropolitan Area Transport Authority (LAMATA)

Project/Programme: Lagos Urban Transport Project (LUTP)

IDA Credit No.: 3721-0 UNI

Description*

List of Contracts

Component 4: Project Management & System

Monitoring

Norm Duration of Proc Steps

Supply and Installation of Air Quality Equipment in Eleven

Monitoring Stations on LAMATA BRT Corridors including

Training, Laboratory Analysis, Installation of one Control

Centre and one Ambient Control Centre and a back-up

Procurement of IT Stationery/Consumable (4 Lots, to be

procured a lot per quarter)

Design, Supply and Installation of BRT Signal from CMS-

Mile 12-Ikorodu Icluding Design ( Intelligent Transport

Systems) - Phase 1

IT Equipment Purchase Switches and Printers

Implementation of the Recommendation of the Technical

Due Diligence Report on BFS Operations

Component 2:Public Transport and Traffic Management

Procurement of Office Furniture ( Front office desks, Work

stations, Executive swivel chairs, Board room furniture set,

Janitor shelf etc…

Prep & Submission

by Ex Agency

4 - 7 wks

17-Dec-12

N/A

2-May-12

N/A

N/A

N/A

Draft Bid Documents, including specs and

quantities, draft SPN

NonAsciiFileName0.xls 15 of 754 11/21/2012 1:40 AM

Procurement Plan-Goods

Total Cost

Fill gray cells only!

NOTE: Line 30 -Procurement of IT

Equipment procurement proces has been

scheduled to commence in October to coicide

with resumption of staff to be recruited for the

construction of Mile 12 to Ikorodu BRT

scheme

Nn

Purchase and installation of Corel Draw and Video editing

software for external relation

Procurement of IT Equipment (Servers Laptops PC's and

UPS

Procurement of IT Stationery/Consumable (4 Lots, to be

procured a lot per quarter)

Procurement of Fire Proof Cabinet

Procurement of Operational Vehicles (One four Wheel and

10 Saloon Cars)

Procurement of Ofice Equipment (2HP Split Air

Conditioners (5, Water Dispenser, Refrigerators)

N/A

N/A

N/A

N/A

N/A

NonAsciiFileName0.xls 16 of 754 11/21/2012 1:40 AM

Procurement Plan-Goods Country/Organisation:Nigeria Lagos Metropolitan Area Transport Authority (LAMATA)

Project/Programme: Lagos Urban Transport Project (LUTP)

IDA Credit No.: 3721-0 UNI

Description*

List of Contracts

Component 4: Project Management & System

Monitoring

Norm Duration of Proc Steps

Supply and Installation of Air Quality Equipment in Eleven

Monitoring Stations on LAMATA BRT Corridors including

Training, Laboratory Analysis, Installation of one Control

Centre and one Ambient Control Centre and a back-up

Procurement of IT Stationery/Consumable (4 Lots, to be

procured a lot per quarter)

Design, Supply and Installation of BRT Signal from CMS-

Mile 12-Ikorodu Icluding Design ( Intelligent Transport

Systems) - Phase 1

IT Equipment Purchase Switches and Printers

Implementation of the Recommendation of the Technical

Due Diligence Report on BFS Operations

Component 2:Public Transport and Traffic Management

Procurement of Office Furniture ( Front office desks, Work

stations, Executive swivel chairs, Board room furniture set,

Janitor shelf etc…

No-objection

Date

1 - 1.5 wks

31-Dec-12

N/A

16-May-12

N/A

N/A

N/A

Draft Bid Documents, including specs and

quantities, draft SPN

NonAsciiFileName0.xls 17 of 754 11/21/2012 1:40 AM

Procurement Plan-Goods

Total Cost

Fill gray cells only!

NOTE: Line 30 -Procurement of IT

Equipment procurement proces has been

scheduled to commence in October to coicide

with resumption of staff to be recruited for the

construction of Mile 12 to Ikorodu BRT

scheme

Nn

Purchase and installation of Corel Draw and Video editing

software for external relation

Procurement of IT Equipment (Servers Laptops PC's and

UPS

Procurement of IT Stationery/Consumable (4 Lots, to be

procured a lot per quarter)

Procurement of Fire Proof Cabinet

Procurement of Operational Vehicles (One four Wheel and

10 Saloon Cars)

Procurement of Ofice Equipment (2HP Split Air

Conditioners (5, Water Dispenser, Refrigerators)

N/A

N/A

N/A

N/A

N/A

NonAsciiFileName0.xls 18 of 754 11/21/2012 1:40 AM

Procurement Plan-Goods Country/Organisation:Nigeria Lagos Metropolitan Area Transport Authority (LAMATA)

Project/Programme: Lagos Urban Transport Project (LUTP)

IDA Credit No.: 3721-0 UNI

Description*

List of Contracts

Component 4: Project Management & System

Monitoring

Norm Duration of Proc Steps

Supply and Installation of Air Quality Equipment in Eleven

Monitoring Stations on LAMATA BRT Corridors including

Training, Laboratory Analysis, Installation of one Control

Centre and one Ambient Control Centre and a back-up

Procurement of IT Stationery/Consumable (4 Lots, to be

procured a lot per quarter)

Design, Supply and Installation of BRT Signal from CMS-

Mile 12-Ikorodu Icluding Design ( Intelligent Transport

Systems) - Phase 1

IT Equipment Purchase Switches and Printers

Implementation of the Recommendation of the Technical

Due Diligence Report on BFS Operations

Component 2:Public Transport and Traffic Management

Procurement of Office Furniture ( Front office desks, Work

stations, Executive swivel chairs, Board room furniture set,

Janitor shelf etc…

If Post-Review, No-objection Dates are not needed

Spec Proc Notice

Advert

On-line UNDB

Gateway

Nat Press

1.5 - 2 wks

4-Jan-13

2-Nov-12

20-May-12

29-Feb-12

N/A

N/A

NonAsciiFileName0.xls 19 of 754 11/21/2012 1:40 AM

Procurement Plan-Goods

Total Cost

Fill gray cells only!

NOTE: Line 30 -Procurement of IT

Equipment procurement proces has been

scheduled to commence in October to coicide

with resumption of staff to be recruited for the

construction of Mile 12 to Ikorodu BRT

scheme

Nn

Purchase and installation of Corel Draw and Video editing

software for external relation

Procurement of IT Equipment (Servers Laptops PC's and

UPS

Procurement of IT Stationery/Consumable (4 Lots, to be

procured a lot per quarter)

Procurement of Fire Proof Cabinet

Procurement of Operational Vehicles (One four Wheel and

10 Saloon Cars)

Procurement of Ofice Equipment (2HP Split Air

Conditioners (5, Water Dispenser, Refrigerators)

N/A

N/A

N/A

N/A

29-Feb-12

NonAsciiFileName0.xls 20 of 754 11/21/2012 1:40 AM

Procurement Plan-Goods Country/Organisation:Nigeria Lagos Metropolitan Area Transport Authority (LAMATA)

Project/Programme: Lagos Urban Transport Project (LUTP)

IDA Credit No.: 3721-0 UNI

Description*

List of Contracts

Component 4: Project Management & System

Monitoring

Norm Duration of Proc Steps

Supply and Installation of Air Quality Equipment in Eleven

Monitoring Stations on LAMATA BRT Corridors including

Training, Laboratory Analysis, Installation of one Control

Centre and one Ambient Control Centre and a back-up

Procurement of IT Stationery/Consumable (4 Lots, to be

procured a lot per quarter)

Design, Supply and Installation of BRT Signal from CMS-

Mile 12-Ikorodu Icluding Design ( Intelligent Transport

Systems) - Phase 1

IT Equipment Purchase Switches and Printers

Implementation of the Recommendation of the Technical

Due Diligence Report on BFS Operations

Component 2:Public Transport and Traffic Management

Procurement of Office Furniture ( Front office desks, Work

stations, Executive swivel chairs, Board room furniture set,

Janitor shelf etc…

If Post-Review, No-objection Dates are not needed

Bid Invitation Date

6 to

4-Jan-13

2-Nov-12

20-May-12

29-Feb-12

1-Mar-12

1-Mar-12

Bidding Period

NonAsciiFileName0.xls 21 of 754 11/21/2012 1:40 AM

Procurement Plan-Goods

Total Cost

Fill gray cells only!

NOTE: Line 30 -Procurement of IT

Equipment procurement proces has been

scheduled to commence in October to coicide

with resumption of staff to be recruited for the

construction of Mile 12 to Ikorodu BRT

scheme

Nn

Purchase and installation of Corel Draw and Video editing

software for external relation

Procurement of IT Equipment (Servers Laptops PC's and

UPS

Procurement of IT Stationery/Consumable (4 Lots, to be

procured a lot per quarter)

Procurement of Fire Proof Cabinet

Procurement of Operational Vehicles (One four Wheel and

10 Saloon Cars)

Procurement of Ofice Equipment (2HP Split Air

Conditioners (5, Water Dispenser, Refrigerators)

7-Mar-12

8-Oct-12

5-Mar-12

8-Mar-12

29-Feb-12

NonAsciiFileName0.xls 22 of 754 11/21/2012 1:40 AM

Procurement Plan-Goods Country/Organisation:Nigeria Lagos Metropolitan Area Transport Authority (LAMATA)

Project/Programme: Lagos Urban Transport Project (LUTP)

IDA Credit No.: 3721-0 UNI

Description*

List of Contracts

Component 4: Project Management & System

Monitoring

Norm Duration of Proc Steps

Supply and Installation of Air Quality Equipment in Eleven

Monitoring Stations on LAMATA BRT Corridors including

Training, Laboratory Analysis, Installation of one Control

Centre and one Ambient Control Centre and a back-up

Procurement of IT Stationery/Consumable (4 Lots, to be

procured a lot per quarter)

Design, Supply and Installation of BRT Signal from CMS-

Mile 12-Ikorodu Icluding Design ( Intelligent Transport

Systems) - Phase 1

IT Equipment Purchase Switches and Printers

Implementation of the Recommendation of the Technical

Due Diligence Report on BFS Operations

Component 2:Public Transport and Traffic Management

Procurement of Office Furniture ( Front office desks, Work

stations, Executive swivel chairs, Board room furniture set,

Janitor shelf etc…

Bid Closing-Opening

12 wks

18-Feb-13

3-Dec-12

19-Jun-12

30-Mar-12

15-Mar-12

15-Mar-12

Bidding Period

NonAsciiFileName0.xls 23 of 754 11/21/2012 1:40 AM

Procurement Plan-Goods

Total Cost

Fill gray cells only!

NOTE: Line 30 -Procurement of IT

Equipment procurement proces has been

scheduled to commence in October to coicide

with resumption of staff to be recruited for the

construction of Mile 12 to Ikorodu BRT

scheme

Nn

Purchase and installation of Corel Draw and Video editing

software for external relation

Procurement of IT Equipment (Servers Laptops PC's and

UPS

Procurement of IT Stationery/Consumable (4 Lots, to be

procured a lot per quarter)

Procurement of Fire Proof Cabinet

Procurement of Operational Vehicles (One four Wheel and

10 Saloon Cars)

Procurement of Ofice Equipment (2HP Split Air

Conditioners (5, Water Dispenser, Refrigerators)

21-Mar-12

22-Oct-12

19-Mar-12

22-Mar-12

30-Mar-12

NonAsciiFileName0.xls 24 of 754 11/21/2012 1:40 AM

Procurement Plan-Goods Country/Organisation:Nigeria Lagos Metropolitan Area Transport Authority (LAMATA)

Project/Programme: Lagos Urban Transport Project (LUTP)

IDA Credit No.: 3721-0 UNI

Description*

List of Contracts

Component 4: Project Management & System

Monitoring

Norm Duration of Proc Steps

Supply and Installation of Air Quality Equipment in Eleven

Monitoring Stations on LAMATA BRT Corridors including

Training, Laboratory Analysis, Installation of one Control

Centre and one Ambient Control Centre and a back-up

Procurement of IT Stationery/Consumable (4 Lots, to be

procured a lot per quarter)

Design, Supply and Installation of BRT Signal from CMS-

Mile 12-Ikorodu Icluding Design ( Intelligent Transport

Systems) - Phase 1

IT Equipment Purchase Switches and Printers

Implementation of the Recommendation of the Technical

Due Diligence Report on BFS Operations

Component 2:Public Transport and Traffic Management

Procurement of Office Furniture ( Front office desks, Work

stations, Executive swivel chairs, Board room furniture set,

Janitor shelf etc…

Submission

Bid Eval Rpt

1.5 - 3 wks

4-Mar-13

N/A

7-Jul-12

N/A

N/A

N/A

Bid Evaluation

NonAsciiFileName0.xls 25 of 754 11/21/2012 1:40 AM

Procurement Plan-Goods

Total Cost

Fill gray cells only!

NOTE: Line 30 -Procurement of IT

Equipment procurement proces has been

scheduled to commence in October to coicide

with resumption of staff to be recruited for the

construction of Mile 12 to Ikorodu BRT

scheme

Nn

Purchase and installation of Corel Draw and Video editing

software for external relation

Procurement of IT Equipment (Servers Laptops PC's and

UPS

Procurement of IT Stationery/Consumable (4 Lots, to be

procured a lot per quarter)

Procurement of Fire Proof Cabinet

Procurement of Operational Vehicles (One four Wheel and

10 Saloon Cars)

Procurement of Ofice Equipment (2HP Split Air

Conditioners (5, Water Dispenser, Refrigerators)

N/A

N/A

N/A

N/A

N/A

NonAsciiFileName0.xls 26 of 754 11/21/2012 1:40 AM

Procurement Plan-Goods Country/Organisation:Nigeria Lagos Metropolitan Area Transport Authority (LAMATA)

Project/Programme: Lagos Urban Transport Project (LUTP)

IDA Credit No.: 3721-0 UNI

Description*

List of Contracts

Component 4: Project Management & System

Monitoring

Norm Duration of Proc Steps

Supply and Installation of Air Quality Equipment in Eleven

Monitoring Stations on LAMATA BRT Corridors including

Training, Laboratory Analysis, Installation of one Control

Centre and one Ambient Control Centre and a back-up

Procurement of IT Stationery/Consumable (4 Lots, to be

procured a lot per quarter)

Design, Supply and Installation of BRT Signal from CMS-

Mile 12-Ikorodu Icluding Design ( Intelligent Transport

Systems) - Phase 1

IT Equipment Purchase Switches and Printers

Implementation of the Recommendation of the Technical

Due Diligence Report on BFS Operations

Component 2:Public Transport and Traffic Management

Procurement of Office Furniture ( Front office desks, Work

stations, Executive swivel chairs, Board room furniture set,

Janitor shelf etc…

No-objection

Date

1 - 1.5 wks

18-Mar-13

N/A

22-Jul-12

N/A

N/A

N/A

Bid Evaluation

NonAsciiFileName0.xls 27 of 754 11/21/2012 1:40 AM

Procurement Plan-Goods

Total Cost

Fill gray cells only!

NOTE: Line 30 -Procurement of IT

Equipment procurement proces has been

scheduled to commence in October to coicide

with resumption of staff to be recruited for the

construction of Mile 12 to Ikorodu BRT

scheme

Nn

Purchase and installation of Corel Draw and Video editing

software for external relation

Procurement of IT Equipment (Servers Laptops PC's and

UPS

Procurement of IT Stationery/Consumable (4 Lots, to be

procured a lot per quarter)

Procurement of Fire Proof Cabinet

Procurement of Operational Vehicles (One four Wheel and

10 Saloon Cars)

Procurement of Ofice Equipment (2HP Split Air

Conditioners (5, Water Dispenser, Refrigerators)

N/A

N/A

N/A

N/A

N/A

NonAsciiFileName0.xls 28 of 754 11/21/2012 1:40 AM

Procurement Plan-Goods Country/Organisation:Nigeria Lagos Metropolitan Area Transport Authority (LAMATA)

Project/Programme: Lagos Urban Transport Project (LUTP)

IDA Credit No.: 3721-0 UNI

Description*

List of Contracts

Component 4: Project Management & System

Monitoring

Norm Duration of Proc Steps

Supply and Installation of Air Quality Equipment in Eleven

Monitoring Stations on LAMATA BRT Corridors including

Training, Laboratory Analysis, Installation of one Control

Centre and one Ambient Control Centre and a back-up

Procurement of IT Stationery/Consumable (4 Lots, to be

procured a lot per quarter)

Design, Supply and Installation of BRT Signal from CMS-

Mile 12-Ikorodu Icluding Design ( Intelligent Transport

Systems) - Phase 1

IT Equipment Purchase Switches and Printers

Implementation of the Recommendation of the Technical

Due Diligence Report on BFS Operations

Component 2:Public Transport and Traffic Management

Procurement of Office Furniture ( Front office desks, Work

stations, Executive swivel chairs, Board room furniture set,

Janitor shelf etc…

Plan vs.

Actual

Plan

Actual

Plan

Actual

Plan

Actual

Plan

Plan

Actual

Plan

Actual

Plan

NonAsciiFileName0.xls 29 of 754 11/21/2012 1:40 AM

Procurement Plan-Goods

Total Cost

Fill gray cells only!

NOTE: Line 30 -Procurement of IT

Equipment procurement proces has been

scheduled to commence in October to coicide

with resumption of staff to be recruited for the

construction of Mile 12 to Ikorodu BRT

scheme

Nn

Purchase and installation of Corel Draw and Video editing

software for external relation

Procurement of IT Equipment (Servers Laptops PC's and

UPS

Procurement of IT Stationery/Consumable (4 Lots, to be

procured a lot per quarter)

Procurement of Fire Proof Cabinet

Procurement of Operational Vehicles (One four Wheel and

10 Saloon Cars)

Procurement of Ofice Equipment (2HP Split Air

Conditioners (5, Water Dispenser, Refrigerators)

Actual

Plan

Actual

Plan

Actual

Plan

Actual

Plan

Actual

Plan

Actual

NonAsciiFileName0.xls 30 of 754 11/21/2012 1:40 AM

Procurement Plan-Goods Country/Organisation:Nigeria Lagos Metropolitan Area Transport Authority (LAMATA)

Project/Programme: Lagos Urban Transport Project (LUTP)

IDA Credit No.: 3721-0 UNI

Description*

List of Contracts

Component 4: Project Management & System

Monitoring

Norm Duration of Proc Steps

Supply and Installation of Air Quality Equipment in Eleven

Monitoring Stations on LAMATA BRT Corridors including

Training, Laboratory Analysis, Installation of one Control

Centre and one Ambient Control Centre and a back-up

Procurement of IT Stationery/Consumable (4 Lots, to be

procured a lot per quarter)

Design, Supply and Installation of BRT Signal from CMS-

Mile 12-Ikorodu Icluding Design ( Intelligent Transport

Systems) - Phase 1

IT Equipment Purchase Switches and Printers

Implementation of the Recommendation of the Technical

Due Diligence Report on BFS Operations

Component 2:Public Transport and Traffic Management

Procurement of Office Furniture ( Front office desks, Work

stations, Executive swivel chairs, Board room furniture set,

Janitor shelf etc…

Date

Contract

Award

1 wk

25-Mar-13

24-Dec-12

29-Jul-12

20-Apr-12

22-Mar-12

22-Mar-12

NonAsciiFileName0.xls 31 of 754 11/21/2012 1:40 AM

Procurement Plan-Goods

Total Cost

Fill gray cells only!

NOTE: Line 30 -Procurement of IT

Equipment procurement proces has been

scheduled to commence in October to coicide

with resumption of staff to be recruited for the

construction of Mile 12 to Ikorodu BRT

scheme

Nn

Purchase and installation of Corel Draw and Video editing

software for external relation

Procurement of IT Equipment (Servers Laptops PC's and

UPS

Procurement of IT Stationery/Consumable (4 Lots, to be

procured a lot per quarter)

Procurement of Fire Proof Cabinet

Procurement of Operational Vehicles (One four Wheel and

10 Saloon Cars)

Procurement of Ofice Equipment (2HP Split Air

Conditioners (5, Water Dispenser, Refrigerators)

28-Mar-12

29-Oct-12

26-Mar-12

29-Mar-12

20-Apr-12

NonAsciiFileName0.xls 32 of 754 11/21/2012 1:40 AM

Procurement Plan-Goods Country/Organisation:Nigeria Lagos Metropolitan Area Transport Authority (LAMATA)

Project/Programme: Lagos Urban Transport Project (LUTP)

IDA Credit No.: 3721-0 UNI

Description*

List of Contracts

Component 4: Project Management & System

Monitoring

Norm Duration of Proc Steps

Supply and Installation of Air Quality Equipment in Eleven

Monitoring Stations on LAMATA BRT Corridors including

Training, Laboratory Analysis, Installation of one Control

Centre and one Ambient Control Centre and a back-up

Procurement of IT Stationery/Consumable (4 Lots, to be

procured a lot per quarter)

Design, Supply and Installation of BRT Signal from CMS-

Mile 12-Ikorodu Icluding Design ( Intelligent Transport

Systems) - Phase 1

IT Equipment Purchase Switches and Printers

Implementation of the Recommendation of the Technical

Due Diligence Report on BFS Operations

Component 2:Public Transport and Traffic Management

Procurement of Office Furniture ( Front office desks, Work

stations, Executive swivel chairs, Board room furniture set,

Janitor shelf etc…

Date

Contract

Advert

1-Apr-13

31-Dec-12

5-Aug-12

27-Apr-12

N/A

N/A

NonAsciiFileName0.xls 33 of 754 11/21/2012 1:40 AM

Procurement Plan-Goods

Total Cost

Fill gray cells only!

NOTE: Line 30 -Procurement of IT

Equipment procurement proces has been

scheduled to commence in October to coicide

with resumption of staff to be recruited for the

construction of Mile 12 to Ikorodu BRT

scheme

Nn

Purchase and installation of Corel Draw and Video editing

software for external relation

Procurement of IT Equipment (Servers Laptops PC's and

UPS

Procurement of IT Stationery/Consumable (4 Lots, to be

procured a lot per quarter)

Procurement of Fire Proof Cabinet

Procurement of Operational Vehicles (One four Wheel and

10 Saloon Cars)

Procurement of Ofice Equipment (2HP Split Air

Conditioners (5, Water Dispenser, Refrigerators)

N/A

N/A

N/A

N/A

27-Apr-12

NonAsciiFileName0.xls 34 of 754 11/21/2012 1:40 AM

Procurement Plan-Goods Country/Organisation:Nigeria Lagos Metropolitan Area Transport Authority (LAMATA)

Project/Programme: Lagos Urban Transport Project (LUTP)

IDA Credit No.: 3721-0 UNI

Description*

List of Contracts

Component 4: Project Management & System

Monitoring

Norm Duration of Proc Steps

Supply and Installation of Air Quality Equipment in Eleven

Monitoring Stations on LAMATA BRT Corridors including

Training, Laboratory Analysis, Installation of one Control

Centre and one Ambient Control Centre and a back-up

Procurement of IT Stationery/Consumable (4 Lots, to be

procured a lot per quarter)

Design, Supply and Installation of BRT Signal from CMS-

Mile 12-Ikorodu Icluding Design ( Intelligent Transport

Systems) - Phase 1

IT Equipment Purchase Switches and Printers

Implementation of the Recommendation of the Technical

Due Diligence Report on BFS Operations

Component 2:Public Transport and Traffic Management

Procurement of Office Furniture ( Front office desks, Work

stations, Executive swivel chairs, Board room furniture set,

Janitor shelf etc…

Date

Contract

Signature

1.5-3 wks

1-Apr-13

31-Dec-12

20-Aug-12

27-Apr-12

29-Mar-12

29-Mar-12

NonAsciiFileName0.xls 35 of 754 11/21/2012 1:40 AM

Procurement Plan-Goods

Total Cost

Fill gray cells only!

NOTE: Line 30 -Procurement of IT

Equipment procurement proces has been

scheduled to commence in October to coicide

with resumption of staff to be recruited for the

construction of Mile 12 to Ikorodu BRT

scheme

Nn

Purchase and installation of Corel Draw and Video editing

software for external relation

Procurement of IT Equipment (Servers Laptops PC's and

UPS

Procurement of IT Stationery/Consumable (4 Lots, to be

procured a lot per quarter)

Procurement of Fire Proof Cabinet

Procurement of Operational Vehicles (One four Wheel and

10 Saloon Cars)

Procurement of Ofice Equipment (2HP Split Air

Conditioners (5, Water Dispenser, Refrigerators)

4-Apr-12

5-Nov-12

2-Apr-12

5-Apr-12

27-Apr-12

NonAsciiFileName0.xls 36 of 754 11/21/2012 1:40 AM

Procurement Plan-Goods Country/Organisation:Nigeria Lagos Metropolitan Area Transport Authority (LAMATA)

Project/Programme: Lagos Urban Transport Project (LUTP)

IDA Credit No.: 3721-0 UNI

Description*

List of Contracts

Component 4: Project Management & System

Monitoring

Norm Duration of Proc Steps

Supply and Installation of Air Quality Equipment in Eleven

Monitoring Stations on LAMATA BRT Corridors including

Training, Laboratory Analysis, Installation of one Control

Centre and one Ambient Control Centre and a back-up

Procurement of IT Stationery/Consumable (4 Lots, to be

procured a lot per quarter)

Design, Supply and Installation of BRT Signal from CMS-

Mile 12-Ikorodu Icluding Design ( Intelligent Transport

Systems) - Phase 1

IT Equipment Purchase Switches and Printers

Implementation of the Recommendation of the Technical

Due Diligence Report on BFS Operations

Component 2:Public Transport and Traffic Management

Procurement of Office Furniture ( Front office desks, Work

stations, Executive swivel chairs, Board room furniture set,

Janitor shelf etc…

NonAsciiFileName0.xls 37 of 754 11/21/2012 1:40 AM

Procurement Plan-Goods

Total Cost

Fill gray cells only!

NOTE: Line 30 -Procurement of IT

Equipment procurement proces has been

scheduled to commence in October to coicide

with resumption of staff to be recruited for the

construction of Mile 12 to Ikorodu BRT

scheme

Nn

Purchase and installation of Corel Draw and Video editing

software for external relation

Procurement of IT Equipment (Servers Laptops PC's and

UPS

Procurement of IT Stationery/Consumable (4 Lots, to be

procured a lot per quarter)

Procurement of Fire Proof Cabinet

Procurement of Operational Vehicles (One four Wheel and

10 Saloon Cars)

Procurement of Ofice Equipment (2HP Split Air

Conditioners (5, Water Dispenser, Refrigerators)

NonAsciiFileName0.xls 38 of 754 11/21/2012 1:40 AM

Procurement Plan-Goods Country/Organisation:Nigeria Lagos Metropolitan Area Transport Authority (LAMATA)

Project/Programme: Lagos Urban Transport Project (LUTP)

IDA Credit No.: 3721-0 UNI

Description*

List of Contracts

Component 4: Project Management & System

Monitoring

Norm Duration of Proc Steps

Supply and Installation of Air Quality Equipment in Eleven

Monitoring Stations on LAMATA BRT Corridors including

Training, Laboratory Analysis, Installation of one Control

Centre and one Ambient Control Centre and a back-up

Procurement of IT Stationery/Consumable (4 Lots, to be

procured a lot per quarter)

Design, Supply and Installation of BRT Signal from CMS-

Mile 12-Ikorodu Icluding Design ( Intelligent Transport

Systems) - Phase 1

IT Equipment Purchase Switches and Printers

Implementation of the Recommendation of the Technical

Due Diligence Report on BFS Operations

Component 2:Public Transport and Traffic Management

Procurement of Office Furniture ( Front office desks, Work

stations, Executive swivel chairs, Board room furniture set,

Janitor shelf etc…

Contract Implementation

Opening

of

Let of Credit

8-Apr-13

N/A

N/A

N/A

N/A

N/A

NonAsciiFileName0.xls 39 of 754 11/21/2012 1:40 AM

Procurement Plan-Goods

Total Cost

Fill gray cells only!

NOTE: Line 30 -Procurement of IT

Equipment procurement proces has been

scheduled to commence in October to coicide

with resumption of staff to be recruited for the

construction of Mile 12 to Ikorodu BRT

scheme

Nn

Purchase and installation of Corel Draw and Video editing

software for external relation

Procurement of IT Equipment (Servers Laptops PC's and

UPS

Procurement of IT Stationery/Consumable (4 Lots, to be

procured a lot per quarter)

Procurement of Fire Proof Cabinet

Procurement of Operational Vehicles (One four Wheel and

10 Saloon Cars)

Procurement of Ofice Equipment (2HP Split Air

Conditioners (5, Water Dispenser, Refrigerators)

N/A

N/A

N/A

N/A

N/A

NonAsciiFileName0.xls 40 of 754 11/21/2012 1:40 AM

Procurement Plan-Goods Country/Organisation:Nigeria Lagos Metropolitan Area Transport Authority (LAMATA)

Project/Programme: Lagos Urban Transport Project (LUTP)

IDA Credit No.: 3721-0 UNI

Description*

List of Contracts

Component 4: Project Management & System

Monitoring

Norm Duration of Proc Steps

Supply and Installation of Air Quality Equipment in Eleven

Monitoring Stations on LAMATA BRT Corridors including

Training, Laboratory Analysis, Installation of one Control

Centre and one Ambient Control Centre and a back-up

Procurement of IT Stationery/Consumable (4 Lots, to be

procured a lot per quarter)

Design, Supply and Installation of BRT Signal from CMS-

Mile 12-Ikorodu Icluding Design ( Intelligent Transport

Systems) - Phase 1

IT Equipment Purchase Switches and Printers

Implementation of the Recommendation of the Technical

Due Diligence Report on BFS Operations

Component 2:Public Transport and Traffic Management

Procurement of Office Furniture ( Front office desks, Work

stations, Executive swivel chairs, Board room furniture set,

Janitor shelf etc…

Contract Implementation

Arrival

of

Goods

28-Sep-13

31-Mar-13

19-Jan-13

25-May-12

5-Apr-12

5-Apr-12

NonAsciiFileName0.xls 41 of 754 11/21/2012 1:40 AM

Procurement Plan-Goods

Total Cost

Fill gray cells only!

NOTE: Line 30 -Procurement of IT

Equipment procurement proces has been

scheduled to commence in October to coicide

with resumption of staff to be recruited for the

construction of Mile 12 to Ikorodu BRT

scheme

Nn

Purchase and installation of Corel Draw and Video editing

software for external relation

Procurement of IT Equipment (Servers Laptops PC's and

UPS

Procurement of IT Stationery/Consumable (4 Lots, to be

procured a lot per quarter)

Procurement of Fire Proof Cabinet

Procurement of Operational Vehicles (One four Wheel and

10 Saloon Cars)

Procurement of Ofice Equipment (2HP Split Air

Conditioners (5, Water Dispenser, Refrigerators)

11-Apr-12

12-Nov-12

9-Apr-12

12-Apr-12

25-May-12

NonAsciiFileName0.xls 42 of 754 11/21/2012 1:40 AM

Procurement Plan-Goods Country/Organisation:Nigeria Lagos Metropolitan Area Transport Authority (LAMATA)

Project/Programme: Lagos Urban Transport Project (LUTP)

IDA Credit No.: 3721-0 UNI

Description*

List of Contracts

Component 4: Project Management & System

Monitoring

Norm Duration of Proc Steps

Supply and Installation of Air Quality Equipment in Eleven

Monitoring Stations on LAMATA BRT Corridors including

Training, Laboratory Analysis, Installation of one Control

Centre and one Ambient Control Centre and a back-up

Procurement of IT Stationery/Consumable (4 Lots, to be

procured a lot per quarter)

Design, Supply and Installation of BRT Signal from CMS-

Mile 12-Ikorodu Icluding Design ( Intelligent Transport

Systems) - Phase 1

IT Equipment Purchase Switches and Printers

Implementation of the Recommendation of the Technical

Due Diligence Report on BFS Operations

Component 2:Public Transport and Traffic Management

Procurement of Office Furniture ( Front office desks, Work

stations, Executive swivel chairs, Board room furniture set,

Janitor shelf etc…

Contract Implementation

Inspection

Final

Acceptance

28-Sep-13

31-Mar-13

18-Feb-13

25-May-12

5-Apr-12

5-Apr-12

NonAsciiFileName0.xls 43 of 754 11/21/2012 1:40 AM

Procurement Plan-Goods

Total Cost

Fill gray cells only!

NOTE: Line 30 -Procurement of IT

Equipment procurement proces has been

scheduled to commence in October to coicide

with resumption of staff to be recruited for the

construction of Mile 12 to Ikorodu BRT

scheme

Nn

Purchase and installation of Corel Draw and Video editing

software for external relation

Procurement of IT Equipment (Servers Laptops PC's and

UPS

Procurement of IT Stationery/Consumable (4 Lots, to be

procured a lot per quarter)

Procurement of Fire Proof Cabinet

Procurement of Operational Vehicles (One four Wheel and

10 Saloon Cars)

Procurement of Ofice Equipment (2HP Split Air

Conditioners (5, Water Dispenser, Refrigerators)

11-Apr-12

12-Nov-12

9-Apr-12

12-Apr-12

25-May-12

NonAsciiFileName0.xls 44 of 754 11/21/2012 1:40 AM

Procurement Plan-Works Country/Organisation:Nigeria Lagos Metropolitan Area Transport Authority (LAMATA)

Project/Programme: Lagos Urban Transport Project (LUTP)

IDA Credit No.: 3721-0 UNI

Description*

Component 1:(Instititional Development)

List of Contracts

Component 2:Public Transport and Traffic Management

Construction of 8 No Bus Shelters including Platforms

Component 3: Improvement of Lagos State Metropolitan

Road Network

Norm Duration of Proc Steps

Construction of Bus Terminal at Mile 12

Construction of Footbridges at 7 locations along the project

corriddor

Construction of BRT Bus Depot at Ikorodu

Construction of Ikorodu and Agric Bus Terminals

Rehabilitation and Upgrading of Wempco Road Ogba

Construction of 7 No Bus Shelters including Platforms

NonAsciiFileName0.xls 45 of 754 11/21/2012 1:40 AM

Procurement Plan-Works

Total Cost

Fill gray cells only!

NonAsciiFileName0.xls 46 of 754 11/21/2012 1:40 AM

Procurement Plan-Works

NonAsciiFileName0.xls 47 of 754 11/21/2012 1:40 AM

Procurement Plan-Works

NonAsciiFileName0.xls 48 of 754 11/21/2012 1:40 AM

Procurement Plan-Works

NonAsciiFileName0.xls 49 of 754 11/21/2012 1:40 AM

Procurement Plan-Works

NonAsciiFileName0.xls 50 of 754 11/21/2012 1:40 AM

Procurement Plan-Works

NonAsciiFileName0.xls 51 of 754 11/21/2012 1:40 AM

Procurement Plan-Works

NonAsciiFileName0.xls 52 of 754 11/21/2012 1:40 AM

Procurement Plan-Works

NonAsciiFileName0.xls 53 of 754 11/21/2012 1:40 AM

Procurement Plan-Works

NonAsciiFileName0.xls 54 of 754 11/21/2012 1:40 AM

Procurement Plan-Works

NonAsciiFileName0.xls 55 of 754 11/21/2012 1:40 AM

Procurement Plan-Works

NonAsciiFileName0.xls 56 of 754 11/21/2012 1:40 AM

Procurement Plan-Works

NonAsciiFileName0.xls 57 of 754 11/21/2012 1:40 AM

Procurement Plan-Works

NonAsciiFileName0.xls 58 of 754 11/21/2012 1:40 AM

Procurement Plan-Works

NonAsciiFileName0.xls 59 of 754 11/21/2012 1:40 AM

Procurement Plan-Works

NonAsciiFileName0.xls 60 of 754 11/21/2012 1:40 AM

Procurement Plan-Works

NonAsciiFileName0.xls 61 of 754 11/21/2012 1:40 AM

Procurement Plan-Works

NonAsciiFileName0.xls 62 of 754 11/21/2012 1:40 AM

Procurement Plan-Works

NonAsciiFileName0.xls 63 of 754 11/21/2012 1:40 AM

Procurement Plan-Works

NonAsciiFileName0.xls 64 of 754 11/21/2012 1:40 AM

Procurement Plan-Works

NonAsciiFileName0.xls 65 of 754 11/21/2012 1:40 AM

Procurement Plan-Works

NonAsciiFileName0.xls 66 of 754 11/21/2012 1:40 AM

Procurement Plan-Works

NonAsciiFileName0.xls 67 of 754 11/21/2012 1:40 AM

Procurement Plan-Works Country/Organisation:Nigeria Lagos Metropolitan Area Transport Authority (LAMATA)

Project/Programme: Lagos Urban Transport Project (LUTP)

IDA Credit No.: 3721-0 UNI

Description*Package

Number

Component 1:(Instititional Development)

List of Contracts

Component 2:Public Transport and Traffic Management

1

1

2

Construction of 8 No Bus Shelters including Platforms 2

1

1

Component 3: Improvement of Lagos State Metropolitan

Road Network

1

Norm Duration of Proc Steps

Construction of Bus Terminal at Mile 12

Construction of Footbridges at 7 locations along the project

corriddor

Construction of BRT Bus Depot at Ikorodu

Construction of Ikorodu and Agric Bus Terminals

Rehabilitation and Upgrading of Wempco Road Ogba

Construction of 7 No Bus Shelters including Platforms

NonAsciiFileName0.xls 68 of 754 11/21/2012 1:40 AM

Procurement Plan-Works

Total Cost

Fill gray cells only!

NonAsciiFileName0.xls 69 of 754 11/21/2012 1:40 AM

Procurement Plan-Works

NonAsciiFileName0.xls 70 of 754 11/21/2012 1:40 AM

Procurement Plan-Works

NonAsciiFileName0.xls 71 of 754 11/21/2012 1:40 AM

Procurement Plan-Works

NonAsciiFileName0.xls 72 of 754 11/21/2012 1:40 AM

Procurement Plan-Works

NonAsciiFileName0.xls 73 of 754 11/21/2012 1:40 AM

Procurement Plan-Works

NonAsciiFileName0.xls 74 of 754 11/21/2012 1:40 AM

Procurement Plan-Works

NonAsciiFileName0.xls 75 of 754 11/21/2012 1:40 AM

Procurement Plan-Works

NonAsciiFileName0.xls 76 of 754 11/21/2012 1:40 AM

Procurement Plan-Works

NonAsciiFileName0.xls 77 of 754 11/21/2012 1:40 AM

Procurement Plan-Works

NonAsciiFileName0.xls 78 of 754 11/21/2012 1:40 AM

Procurement Plan-Works

NonAsciiFileName0.xls 79 of 754 11/21/2012 1:40 AM

Procurement Plan-Works

NonAsciiFileName0.xls 80 of 754 11/21/2012 1:40 AM

Procurement Plan-Works

NonAsciiFileName0.xls 81 of 754 11/21/2012 1:40 AM

Procurement Plan-Works

NonAsciiFileName0.xls 82 of 754 11/21/2012 1:40 AM

Procurement Plan-Works

NonAsciiFileName0.xls 83 of 754 11/21/2012 1:40 AM

Procurement Plan-Works

NonAsciiFileName0.xls 84 of 754 11/21/2012 1:40 AM

Procurement Plan-Works

NonAsciiFileName0.xls 85 of 754 11/21/2012 1:40 AM

Procurement Plan-Works

NonAsciiFileName0.xls 86 of 754 11/21/2012 1:40 AM

Procurement Plan-Works

NonAsciiFileName0.xls 87 of 754 11/21/2012 1:40 AM

Procurement Plan-Works

NonAsciiFileName0.xls 88 of 754 11/21/2012 1:40 AM

Procurement Plan-Works

NonAsciiFileName0.xls 89 of 754 11/21/2012 1:40 AM

Procurement Plan-Works

NonAsciiFileName0.xls 90 of 754 11/21/2012 1:40 AM

Procurement Plan-Works Country/Organisation:Nigeria Lagos Metropolitan Area Transport Authority (LAMATA)

Project/Programme: Lagos Urban Transport Project (LUTP)

IDA Credit No.: 3721-0 UNI

Description*

Component 1:(Instititional Development)

List of Contracts

Component 2:Public Transport and Traffic Management

Construction of 8 No Bus Shelters including Platforms

Component 3: Improvement of Lagos State Metropolitan

Road Network

Norm Duration of Proc Steps

Construction of Bus Terminal at Mile 12

Construction of Footbridges at 7 locations along the project

corriddor

Construction of BRT Bus Depot at Ikorodu

Construction of Ikorodu and Agric Bus Terminals

Rehabilitation and Upgrading of Wempco Road Ogba

Construction of 7 No Bus Shelters including Platforms

Country/Organisation:Nigeria Lagos Metropolitan Area Transport Authority (LAMATA)

Lot

Number

1

2

1

2

1

1

1

Basic Data

NonAsciiFileName0.xls 91 of 754 11/21/2012 1:40 AM

Procurement Plan-Works

Total Cost

Fill gray cells only!

NonAsciiFileName0.xls 92 of 754 11/21/2012 1:40 AM

Procurement Plan-Works

NonAsciiFileName0.xls 93 of 754 11/21/2012 1:40 AM

Procurement Plan-Works

NonAsciiFileName0.xls 94 of 754 11/21/2012 1:40 AM

Procurement Plan-Works

NonAsciiFileName0.xls 95 of 754 11/21/2012 1:40 AM

Procurement Plan-Works

NonAsciiFileName0.xls 96 of 754 11/21/2012 1:40 AM

Procurement Plan-Works

NonAsciiFileName0.xls 97 of 754 11/21/2012 1:40 AM

Procurement Plan-Works

NonAsciiFileName0.xls 98 of 754 11/21/2012 1:40 AM

Procurement Plan-Works

NonAsciiFileName0.xls 99 of 754 11/21/2012 1:40 AM

Procurement Plan-Works

NonAsciiFileName0.xls 100 of 754 11/21/2012 1:40 AM

Procurement Plan-Works

NonAsciiFileName0.xls 101 of 754 11/21/2012 1:40 AM

Procurement Plan-Works

NonAsciiFileName0.xls 102 of 754 11/21/2012 1:40 AM

Procurement Plan-Works

NonAsciiFileName0.xls 103 of 754 11/21/2012 1:40 AM

Procurement Plan-Works

NonAsciiFileName0.xls 104 of 754 11/21/2012 1:40 AM

Procurement Plan-Works

NonAsciiFileName0.xls 105 of 754 11/21/2012 1:40 AM

Procurement Plan-Works

NonAsciiFileName0.xls 106 of 754 11/21/2012 1:40 AM

Procurement Plan-Works

NonAsciiFileName0.xls 107 of 754 11/21/2012 1:40 AM

Procurement Plan-Works

NonAsciiFileName0.xls 108 of 754 11/21/2012 1:40 AM

Procurement Plan-Works

NonAsciiFileName0.xls 109 of 754 11/21/2012 1:40 AM

Procurement Plan-Works

NonAsciiFileName0.xls 110 of 754 11/21/2012 1:40 AM

Procurement Plan-Works

NonAsciiFileName0.xls 111 of 754 11/21/2012 1:40 AM

Procurement Plan-Works

NonAsciiFileName0.xls 112 of 754 11/21/2012 1:40 AM

Procurement Plan-Works

NonAsciiFileName0.xls 113 of 754 11/21/2012 1:40 AM

Procurement Plan-Works Country/Organisation:Nigeria Lagos Metropolitan Area Transport Authority (LAMATA)

Project/Programme: Lagos Urban Transport Project (LUTP)

IDA Credit No.: 3721-0 UNI

Description*

Component 1:(Instititional Development)

List of Contracts

Component 2:Public Transport and Traffic Management

Construction of 8 No Bus Shelters including Platforms

Component 3: Improvement of Lagos State Metropolitan

Road Network

Norm Duration of Proc Steps

Construction of Bus Terminal at Mile 12

Construction of Footbridges at 7 locations along the project

corriddor

Construction of BRT Bus Depot at Ikorodu

Construction of Ikorodu and Agric Bus Terminals

Rehabilitation and Upgrading of Wempco Road Ogba

Construction of 7 No Bus Shelters including Platforms

Country/Organisation:Nigeria Lagos Metropolitan Area Transport Authority (LAMATA)

Lumpsum or

Bill of

Quantities

BOQ

BOQ

BOQ

BOQ

BOQ

BOQ

BOQ

Basic Data

NonAsciiFileName0.xls 114 of 754 11/21/2012 1:40 AM

Procurement Plan-Works

Total Cost

Fill gray cells only!

NonAsciiFileName0.xls 115 of 754 11/21/2012 1:40 AM

Procurement Plan-Works

NonAsciiFileName0.xls 116 of 754 11/21/2012 1:40 AM

Procurement Plan-Works

NonAsciiFileName0.xls 117 of 754 11/21/2012 1:40 AM

Procurement Plan-Works

NonAsciiFileName0.xls 118 of 754 11/21/2012 1:40 AM

Procurement Plan-Works

NonAsciiFileName0.xls 119 of 754 11/21/2012 1:40 AM

Procurement Plan-Works

NonAsciiFileName0.xls 120 of 754 11/21/2012 1:40 AM

Procurement Plan-Works

NonAsciiFileName0.xls 121 of 754 11/21/2012 1:40 AM

Procurement Plan-Works

NonAsciiFileName0.xls 122 of 754 11/21/2012 1:40 AM

Procurement Plan-Works

NonAsciiFileName0.xls 123 of 754 11/21/2012 1:40 AM

Procurement Plan-Works

NonAsciiFileName0.xls 124 of 754 11/21/2012 1:40 AM

Procurement Plan-Works

NonAsciiFileName0.xls 125 of 754 11/21/2012 1:40 AM

Procurement Plan-Works

NonAsciiFileName0.xls 126 of 754 11/21/2012 1:40 AM

Procurement Plan-Works

NonAsciiFileName0.xls 127 of 754 11/21/2012 1:40 AM

Procurement Plan-Works

NonAsciiFileName0.xls 128 of 754 11/21/2012 1:40 AM

Procurement Plan-Works

NonAsciiFileName0.xls 129 of 754 11/21/2012 1:40 AM

Procurement Plan-Works

NonAsciiFileName0.xls 130 of 754 11/21/2012 1:40 AM

Procurement Plan-Works

NonAsciiFileName0.xls 131 of 754 11/21/2012 1:40 AM

Procurement Plan-Works

NonAsciiFileName0.xls 132 of 754 11/21/2012 1:40 AM

Procurement Plan-Works

NonAsciiFileName0.xls 133 of 754 11/21/2012 1:40 AM

Procurement Plan-Works

NonAsciiFileName0.xls 134 of 754 11/21/2012 1:40 AM

Procurement Plan-Works

NonAsciiFileName0.xls 135 of 754 11/21/2012 1:40 AM

Procurement Plan-Works

NonAsciiFileName0.xls 136 of 754 11/21/2012 1:40 AM

Procurement Plan-Works Country/Organisation:Nigeria Lagos Metropolitan Area Transport Authority (LAMATA)

Project/Programme: Lagos Urban Transport Project (LUTP)

IDA Credit No.: 3721-0 UNI

Description*

Component 1:(Instititional Development)

List of Contracts

Component 2:Public Transport and Traffic Management

Construction of 8 No Bus Shelters including Platforms

Component 3: Improvement of Lagos State Metropolitan

Road Network

Norm Duration of Proc Steps

Construction of Bus Terminal at Mile 12

Construction of Footbridges at 7 locations along the project

corriddor

Construction of BRT Bus Depot at Ikorodu

Construction of Ikorodu and Agric Bus Terminals

Rehabilitation and Upgrading of Wempco Road Ogba

Construction of 7 No Bus Shelters including Platforms

Procurement

Method

ICB

ICB

ICB

ICB

ICB

ICB

ICB

Basic Data

NonAsciiFileName0.xls 137 of 754 11/21/2012 1:40 AM

Procurement Plan-Works

Total Cost

Fill gray cells only!

NonAsciiFileName0.xls 138 of 754 11/21/2012 1:40 AM

Procurement Plan-Works

NonAsciiFileName0.xls 139 of 754 11/21/2012 1:40 AM

Procurement Plan-Works

NonAsciiFileName0.xls 140 of 754 11/21/2012 1:40 AM

Procurement Plan-Works

NonAsciiFileName0.xls 141 of 754 11/21/2012 1:40 AM

Procurement Plan-Works

NonAsciiFileName0.xls 142 of 754 11/21/2012 1:40 AM

Procurement Plan-Works

NonAsciiFileName0.xls 143 of 754 11/21/2012 1:40 AM

Procurement Plan-Works

NonAsciiFileName0.xls 144 of 754 11/21/2012 1:40 AM

Procurement Plan-Works

NonAsciiFileName0.xls 145 of 754 11/21/2012 1:40 AM

Procurement Plan-Works

NonAsciiFileName0.xls 146 of 754 11/21/2012 1:40 AM

Procurement Plan-Works

NonAsciiFileName0.xls 147 of 754 11/21/2012 1:40 AM

Procurement Plan-Works

NonAsciiFileName0.xls 148 of 754 11/21/2012 1:40 AM

Procurement Plan-Works

NonAsciiFileName0.xls 149 of 754 11/21/2012 1:40 AM

Procurement Plan-Works

NonAsciiFileName0.xls 150 of 754 11/21/2012 1:40 AM

Procurement Plan-Works

NonAsciiFileName0.xls 151 of 754 11/21/2012 1:40 AM

Procurement Plan-Works

NonAsciiFileName0.xls 152 of 754 11/21/2012 1:40 AM

Procurement Plan-Works

NonAsciiFileName0.xls 153 of 754 11/21/2012 1:40 AM

Procurement Plan-Works

NonAsciiFileName0.xls 154 of 754 11/21/2012 1:40 AM

Procurement Plan-Works

NonAsciiFileName0.xls 155 of 754 11/21/2012 1:40 AM

Procurement Plan-Works

NonAsciiFileName0.xls 156 of 754 11/21/2012 1:40 AM

Procurement Plan-Works

NonAsciiFileName0.xls 157 of 754 11/21/2012 1:40 AM

Procurement Plan-Works

NonAsciiFileName0.xls 158 of 754 11/21/2012 1:40 AM

Procurement Plan-Works

NonAsciiFileName0.xls 159 of 754 11/21/2012 1:40 AM

Procurement Plan-Works Country/Organisation:Nigeria Lagos Metropolitan Area Transport Authority (LAMATA)

Project/Programme: Lagos Urban Transport Project (LUTP)

IDA Credit No.: 3721-0 UNI

Description*

Component 1:(Instititional Development)

List of Contracts

Component 2:Public Transport and Traffic Management

Construction of 8 No Bus Shelters including Platforms

Component 3: Improvement of Lagos State Metropolitan

Road Network

Norm Duration of Proc Steps

Construction of Bus Terminal at Mile 12

Construction of Footbridges at 7 locations along the project

corriddor

Construction of BRT Bus Depot at Ikorodu

Construction of Ikorodu and Agric Bus Terminals

Rehabilitation and Upgrading of Wempco Road Ogba

Construction of 7 No Bus Shelters including Platforms

Pre-or Post

Qualification

If Prequalification

add 7-13 wks

Post Qualification

Post Qualification

Post Qualification

Post Qualification

Post Qualification

Post Qualification

Post Qualification

Basic Data

NonAsciiFileName0.xls 160 of 754 11/21/2012 1:40 AM

Procurement Plan-Works

Total Cost

Fill gray cells only!

NonAsciiFileName0.xls 161 of 754 11/21/2012 1:40 AM

Procurement Plan-Works

NonAsciiFileName0.xls 162 of 754 11/21/2012 1:40 AM

Procurement Plan-Works

NonAsciiFileName0.xls 163 of 754 11/21/2012 1:40 AM

Procurement Plan-Works

NonAsciiFileName0.xls 164 of 754 11/21/2012 1:40 AM

Procurement Plan-Works

NonAsciiFileName0.xls 165 of 754 11/21/2012 1:40 AM

Procurement Plan-Works

NonAsciiFileName0.xls 166 of 754 11/21/2012 1:40 AM

Procurement Plan-Works

NonAsciiFileName0.xls 167 of 754 11/21/2012 1:40 AM

Procurement Plan-Works

NonAsciiFileName0.xls 168 of 754 11/21/2012 1:40 AM

Procurement Plan-Works

NonAsciiFileName0.xls 169 of 754 11/21/2012 1:40 AM

Procurement Plan-Works

NonAsciiFileName0.xls 170 of 754 11/21/2012 1:40 AM

Procurement Plan-Works

NonAsciiFileName0.xls 171 of 754 11/21/2012 1:40 AM

Procurement Plan-Works

NonAsciiFileName0.xls 172 of 754 11/21/2012 1:40 AM

Procurement Plan-Works

NonAsciiFileName0.xls 173 of 754 11/21/2012 1:40 AM

Procurement Plan-Works

NonAsciiFileName0.xls 174 of 754 11/21/2012 1:40 AM

Procurement Plan-Works

NonAsciiFileName0.xls 175 of 754 11/21/2012 1:40 AM

Procurement Plan-Works

NonAsciiFileName0.xls 176 of 754 11/21/2012 1:40 AM

Procurement Plan-Works

NonAsciiFileName0.xls 177 of 754 11/21/2012 1:40 AM

Procurement Plan-Works

NonAsciiFileName0.xls 178 of 754 11/21/2012 1:40 AM

Procurement Plan-Works

NonAsciiFileName0.xls 179 of 754 11/21/2012 1:40 AM

Procurement Plan-Works

NonAsciiFileName0.xls 180 of 754 11/21/2012 1:40 AM

Procurement Plan-Works

NonAsciiFileName0.xls 181 of 754 11/21/2012 1:40 AM

Procurement Plan-Works

NonAsciiFileName0.xls 182 of 754 11/21/2012 1:40 AM

Procurement Plan-Works Country/Organisation:Nigeria Lagos Metropolitan Area Transport Authority (LAMATA)

Project/Programme: Lagos Urban Transport Project (LUTP)

IDA Credit No.: 3721-0 UNI

Description*

Component 1:(Instititional Development)

List of Contracts

Component 2:Public Transport and Traffic Management

Construction of 8 No Bus Shelters including Platforms

Component 3: Improvement of Lagos State Metropolitan

Road Network

Norm Duration of Proc Steps

Construction of Bus Terminal at Mile 12

Construction of Footbridges at 7 locations along the project

corriddor

Construction of BRT Bus Depot at Ikorodu

Construction of Ikorodu and Agric Bus Terminals

Rehabilitation and Upgrading of Wempco Road Ogba

Construction of 7 No Bus Shelters including Platforms

Prior or Post

Review

Prior Review

Post Review

Post Review

Post Review

Prior Review

Prior Review

Prior Review

Basic Data

NonAsciiFileName0.xls 183 of 754 11/21/2012 1:40 AM

Procurement Plan-Works

Total Cost

Fill gray cells only!

NonAsciiFileName0.xls 184 of 754 11/21/2012 1:40 AM

Procurement Plan-Works

NonAsciiFileName0.xls 185 of 754 11/21/2012 1:40 AM

Procurement Plan-Works

NonAsciiFileName0.xls 186 of 754 11/21/2012 1:40 AM

Procurement Plan-Works

NonAsciiFileName0.xls 187 of 754 11/21/2012 1:40 AM

Procurement Plan-Works

NonAsciiFileName0.xls 188 of 754 11/21/2012 1:40 AM

Procurement Plan-Works

NonAsciiFileName0.xls 189 of 754 11/21/2012 1:40 AM

Procurement Plan-Works

NonAsciiFileName0.xls 190 of 754 11/21/2012 1:40 AM

Procurement Plan-Works

NonAsciiFileName0.xls 191 of 754 11/21/2012 1:40 AM

Procurement Plan-Works

NonAsciiFileName0.xls 192 of 754 11/21/2012 1:40 AM

Procurement Plan-Works

NonAsciiFileName0.xls 193 of 754 11/21/2012 1:40 AM

Procurement Plan-Works

NonAsciiFileName0.xls 194 of 754 11/21/2012 1:40 AM

Procurement Plan-Works

NonAsciiFileName0.xls 195 of 754 11/21/2012 1:40 AM

Procurement Plan-Works

NonAsciiFileName0.xls 196 of 754 11/21/2012 1:40 AM

Procurement Plan-Works

NonAsciiFileName0.xls 197 of 754 11/21/2012 1:40 AM

Procurement Plan-Works

NonAsciiFileName0.xls 198 of 754 11/21/2012 1:40 AM

Procurement Plan-Works

NonAsciiFileName0.xls 199 of 754 11/21/2012 1:40 AM

Procurement Plan-Works

NonAsciiFileName0.xls 200 of 754 11/21/2012 1:40 AM

Procurement Plan-Works

NonAsciiFileName0.xls 201 of 754 11/21/2012 1:40 AM

Procurement Plan-Works

NonAsciiFileName0.xls 202 of 754 11/21/2012 1:40 AM

Procurement Plan-Works

NonAsciiFileName0.xls 203 of 754 11/21/2012 1:40 AM

Procurement Plan-Works

NonAsciiFileName0.xls 204 of 754 11/21/2012 1:40 AM

Procurement Plan-Works

NonAsciiFileName0.xls 205 of 754 11/21/2012 1:40 AM

Procurement Plan-Works Country/Organisation:Nigeria Lagos Metropolitan Area Transport Authority (LAMATA)

Project/Programme: Lagos Urban Transport Project (LUTP)

IDA Credit No.: 3721-0 UNI

Description*

Component 1:(Instititional Development)

List of Contracts

Component 2:Public Transport and Traffic Management

Construction of 8 No Bus Shelters including Platforms

Component 3: Improvement of Lagos State Metropolitan

Road Network

Norm Duration of Proc Steps

Construction of Bus Terminal at Mile 12

Construction of Footbridges at 7 locations along the project

corriddor

Construction of BRT Bus Depot at Ikorodu

Construction of Ikorodu and Agric Bus Terminals

Rehabilitation and Upgrading of Wempco Road Ogba

Construction of 7 No Bus Shelters including Platforms

Plan

vs.

Actual

Plan

Actual

Plan

Plan

Actual

Plan

Plan

Plan

Actual

Plan

Plan

NonAsciiFileName0.xls 206 of 754 11/21/2012 1:40 AM

Procurement Plan-Works

Total Cost

Fill gray cells only!

NonAsciiFileName0.xls 207 of 754 11/21/2012 1:40 AM

Procurement Plan-Works

NonAsciiFileName0.xls 208 of 754 11/21/2012 1:40 AM

Procurement Plan-Works

NonAsciiFileName0.xls 209 of 754 11/21/2012 1:40 AM

Procurement Plan-Works

NonAsciiFileName0.xls 210 of 754 11/21/2012 1:40 AM

Procurement Plan-Works

NonAsciiFileName0.xls 211 of 754 11/21/2012 1:40 AM

Procurement Plan-Works

NonAsciiFileName0.xls 212 of 754 11/21/2012 1:40 AM

Procurement Plan-Works

NonAsciiFileName0.xls 213 of 754 11/21/2012 1:40 AM

Procurement Plan-Works

NonAsciiFileName0.xls 214 of 754 11/21/2012 1:40 AM

Procurement Plan-Works

NonAsciiFileName0.xls 215 of 754 11/21/2012 1:40 AM

Procurement Plan-Works

NonAsciiFileName0.xls 216 of 754 11/21/2012 1:40 AM

Procurement Plan-Works

NonAsciiFileName0.xls 217 of 754 11/21/2012 1:40 AM

Procurement Plan-Works

NonAsciiFileName0.xls 218 of 754 11/21/2012 1:40 AM

Procurement Plan-Works

NonAsciiFileName0.xls 219 of 754 11/21/2012 1:40 AM

Procurement Plan-Works

NonAsciiFileName0.xls 220 of 754 11/21/2012 1:40 AM

Procurement Plan-Works

NonAsciiFileName0.xls 221 of 754 11/21/2012 1:40 AM

Procurement Plan-Works

NonAsciiFileName0.xls 222 of 754 11/21/2012 1:40 AM

Procurement Plan-Works

NonAsciiFileName0.xls 223 of 754 11/21/2012 1:40 AM

Procurement Plan-Works

NonAsciiFileName0.xls 224 of 754 11/21/2012 1:40 AM

Procurement Plan-Works

NonAsciiFileName0.xls 225 of 754 11/21/2012 1:40 AM

Procurement Plan-Works

NonAsciiFileName0.xls 226 of 754 11/21/2012 1:40 AM

Procurement Plan-Works

NonAsciiFileName0.xls 227 of 754 11/21/2012 1:40 AM

Procurement Plan-Works

NonAsciiFileName0.xls 228 of 754 11/21/2012 1:40 AM

Procurement Plan-Works Country/Organisation:Nigeria Lagos Metropolitan Area Transport Authority (LAMATA)

Project/Programme: Lagos Urban Transport Project (LUTP)

IDA Credit No.: 3721-0 UNI

Description*

Component 1:(Instititional Development)

List of Contracts

Component 2:Public Transport and Traffic Management

Construction of 8 No Bus Shelters including Platforms

Component 3: Improvement of Lagos State Metropolitan

Road Network

Norm Duration of Proc Steps

Construction of Bus Terminal at Mile 12

Construction of Footbridges at 7 locations along the project

corriddor

Construction of BRT Bus Depot at Ikorodu

Construction of Ikorodu and Agric Bus Terminals

Rehabilitation and Upgrading of Wempco Road Ogba

Construction of 7 No Bus Shelters including Platforms

Prep &

Submission

by Ex Agency

4 - 7 wks

30-Nov-12

30-Nov-12

30-Nov-12

30-Nov-12

25-Feb-13

25-Feb-13

17-Dec-12

Draft Bid Documents, including specs

and quantities, draft SPN

NonAsciiFileName0.xls 229 of 754 11/21/2012 1:40 AM

Procurement Plan-Works

Total Cost

Fill gray cells only!

NonAsciiFileName0.xls 230 of 754 11/21/2012 1:40 AM

Procurement Plan-Works

NonAsciiFileName0.xls 231 of 754 11/21/2012 1:40 AM

Procurement Plan-Works

NonAsciiFileName0.xls 232 of 754 11/21/2012 1:40 AM

Procurement Plan-Works

NonAsciiFileName0.xls 233 of 754 11/21/2012 1:40 AM

Procurement Plan-Works

NonAsciiFileName0.xls 234 of 754 11/21/2012 1:40 AM

Procurement Plan-Works

NonAsciiFileName0.xls 235 of 754 11/21/2012 1:40 AM

Procurement Plan-Works

NonAsciiFileName0.xls 236 of 754 11/21/2012 1:40 AM

Procurement Plan-Works

NonAsciiFileName0.xls 237 of 754 11/21/2012 1:40 AM

Procurement Plan-Works

NonAsciiFileName0.xls 238 of 754 11/21/2012 1:40 AM

Procurement Plan-Works

NonAsciiFileName0.xls 239 of 754 11/21/2012 1:40 AM

Procurement Plan-Works

NonAsciiFileName0.xls 240 of 754 11/21/2012 1:40 AM

Procurement Plan-Works

NonAsciiFileName0.xls 241 of 754 11/21/2012 1:40 AM

Procurement Plan-Works

NonAsciiFileName0.xls 242 of 754 11/21/2012 1:40 AM

Procurement Plan-Works

NonAsciiFileName0.xls 243 of 754 11/21/2012 1:40 AM

Procurement Plan-Works

NonAsciiFileName0.xls 244 of 754 11/21/2012 1:40 AM

Procurement Plan-Works

NonAsciiFileName0.xls 245 of 754 11/21/2012 1:40 AM

Procurement Plan-Works

NonAsciiFileName0.xls 246 of 754 11/21/2012 1:40 AM

Procurement Plan-Works

NonAsciiFileName0.xls 247 of 754 11/21/2012 1:40 AM

Procurement Plan-Works

NonAsciiFileName0.xls 248 of 754 11/21/2012 1:40 AM

Procurement Plan-Works

NonAsciiFileName0.xls 249 of 754 11/21/2012 1:40 AM

Procurement Plan-Works

NonAsciiFileName0.xls 250 of 754 11/21/2012 1:40 AM

Procurement Plan-Works

NonAsciiFileName0.xls 251 of 754 11/21/2012 1:40 AM

Procurement Plan-Works Country/Organisation:Nigeria Lagos Metropolitan Area Transport Authority (LAMATA)

Project/Programme: Lagos Urban Transport Project (LUTP)

IDA Credit No.: 3721-0 UNI

Description*

Component 1:(Instititional Development)

List of Contracts

Component 2:Public Transport and Traffic Management

Construction of 8 No Bus Shelters including Platforms

Component 3: Improvement of Lagos State Metropolitan

Road Network

Norm Duration of Proc Steps

Construction of Bus Terminal at Mile 12

Construction of Footbridges at 7 locations along the project

corriddor

Construction of BRT Bus Depot at Ikorodu

Construction of Ikorodu and Agric Bus Terminals

Rehabilitation and Upgrading of Wempco Road Ogba

Construction of 7 No Bus Shelters including Platforms

No-objection

Date

1 - 1.5 wks

14-Dec-12

14-Dec-12

14-Dec-12

14-Dec-12

11-Mar-13

11-Mar-13

31-Dec-12

Draft Bid Documents, including specs

and quantities, draft SPN

NonAsciiFileName0.xls 252 of 754 11/21/2012 1:40 AM

Procurement Plan-Works

Total Cost

Fill gray cells only!

NonAsciiFileName0.xls 253 of 754 11/21/2012 1:40 AM

Procurement Plan-Works

NonAsciiFileName0.xls 254 of 754 11/21/2012 1:40 AM

Procurement Plan-Works

NonAsciiFileName0.xls 255 of 754 11/21/2012 1:40 AM

Procurement Plan-Works

NonAsciiFileName0.xls 256 of 754 11/21/2012 1:40 AM

Procurement Plan-Works

NonAsciiFileName0.xls 257 of 754 11/21/2012 1:40 AM

Procurement Plan-Works

NonAsciiFileName0.xls 258 of 754 11/21/2012 1:40 AM

Procurement Plan-Works

NonAsciiFileName0.xls 259 of 754 11/21/2012 1:40 AM

Procurement Plan-Works

NonAsciiFileName0.xls 260 of 754 11/21/2012 1:40 AM

Procurement Plan-Works

NonAsciiFileName0.xls 261 of 754 11/21/2012 1:40 AM

Procurement Plan-Works

NonAsciiFileName0.xls 262 of 754 11/21/2012 1:40 AM

Procurement Plan-Works

NonAsciiFileName0.xls 263 of 754 11/21/2012 1:40 AM

Procurement Plan-Works

NonAsciiFileName0.xls 264 of 754 11/21/2012 1:40 AM

Procurement Plan-Works

NonAsciiFileName0.xls 265 of 754 11/21/2012 1:40 AM

Procurement Plan-Works

NonAsciiFileName0.xls 266 of 754 11/21/2012 1:40 AM

Procurement Plan-Works

NonAsciiFileName0.xls 267 of 754 11/21/2012 1:40 AM

Procurement Plan-Works

NonAsciiFileName0.xls 268 of 754 11/21/2012 1:40 AM

Procurement Plan-Works

NonAsciiFileName0.xls 269 of 754 11/21/2012 1:40 AM

Procurement Plan-Works

NonAsciiFileName0.xls 270 of 754 11/21/2012 1:40 AM

Procurement Plan-Works

NonAsciiFileName0.xls 271 of 754 11/21/2012 1:40 AM

Procurement Plan-Works

NonAsciiFileName0.xls 272 of 754 11/21/2012 1:40 AM

Procurement Plan-Works

NonAsciiFileName0.xls 273 of 754 11/21/2012 1:40 AM

Procurement Plan-Works

NonAsciiFileName0.xls 274 of 754 11/21/2012 1:40 AM

Procurement Plan-Works Country/Organisation:Nigeria Lagos Metropolitan Area Transport Authority (LAMATA)

Project/Programme: Lagos Urban Transport Project (LUTP)

IDA Credit No.: 3721-0 UNI

Description*

Component 1:(Instititional Development)

List of Contracts

Component 2:Public Transport and Traffic Management

Construction of 8 No Bus Shelters including Platforms

Component 3: Improvement of Lagos State Metropolitan

Road Network

Norm Duration of Proc Steps

Construction of Bus Terminal at Mile 12

Construction of Footbridges at 7 locations along the project

corriddor

Construction of BRT Bus Depot at Ikorodu

Construction of Ikorodu and Agric Bus Terminals

Rehabilitation and Upgrading of Wempco Road Ogba

Construction of 7 No Bus Shelters including Platforms

If Post-Review, No-objection Dates are not needed

Spec Proc Notice

Advert

On-line UNDB

Gateway

Nat Press

1.5 - 2 wks

18-Dec-12

18-Dec-12

18-Dec-12

18-Dec-12

16-Mar-13

15-Mar-13

5-Jan-13

NonAsciiFileName0.xls 275 of 754 11/21/2012 1:40 AM

Procurement Plan-Works

Total Cost

Fill gray cells only!

NonAsciiFileName0.xls 276 of 754 11/21/2012 1:40 AM

Procurement Plan-Works

NonAsciiFileName0.xls 277 of 754 11/21/2012 1:40 AM

Procurement Plan-Works

NonAsciiFileName0.xls 278 of 754 11/21/2012 1:40 AM

Procurement Plan-Works

NonAsciiFileName0.xls 279 of 754 11/21/2012 1:40 AM

Procurement Plan-Works

NonAsciiFileName0.xls 280 of 754 11/21/2012 1:40 AM

Procurement Plan-Works

NonAsciiFileName0.xls 281 of 754 11/21/2012 1:40 AM

Procurement Plan-Works

NonAsciiFileName0.xls 282 of 754 11/21/2012 1:40 AM

Procurement Plan-Works

NonAsciiFileName0.xls 283 of 754 11/21/2012 1:40 AM

Procurement Plan-Works

NonAsciiFileName0.xls 284 of 754 11/21/2012 1:40 AM

Procurement Plan-Works

NonAsciiFileName0.xls 285 of 754 11/21/2012 1:40 AM

Procurement Plan-Works

NonAsciiFileName0.xls 286 of 754 11/21/2012 1:40 AM

Procurement Plan-Works

NonAsciiFileName0.xls 287 of 754 11/21/2012 1:40 AM

Procurement Plan-Works

NonAsciiFileName0.xls 288 of 754 11/21/2012 1:40 AM

Procurement Plan-Works

NonAsciiFileName0.xls 289 of 754 11/21/2012 1:40 AM

Procurement Plan-Works

NonAsciiFileName0.xls 290 of 754 11/21/2012 1:40 AM

Procurement Plan-Works

NonAsciiFileName0.xls 291 of 754 11/21/2012 1:40 AM

Procurement Plan-Works

NonAsciiFileName0.xls 292 of 754 11/21/2012 1:40 AM

Procurement Plan-Works

NonAsciiFileName0.xls 293 of 754 11/21/2012 1:40 AM

Procurement Plan-Works

NonAsciiFileName0.xls 294 of 754 11/21/2012 1:40 AM

Procurement Plan-Works

NonAsciiFileName0.xls 295 of 754 11/21/2012 1:40 AM

Procurement Plan-Works

NonAsciiFileName0.xls 296 of 754 11/21/2012 1:40 AM

Procurement Plan-Works

NonAsciiFileName0.xls 297 of 754 11/21/2012 1:40 AM

Procurement Plan-Works Country/Organisation:Nigeria Lagos Metropolitan Area Transport Authority (LAMATA)

Project/Programme: Lagos Urban Transport Project (LUTP)

IDA Credit No.: 3721-0 UNI

Description*

Component 1:(Instititional Development)

List of Contracts

Component 2:Public Transport and Traffic Management

Construction of 8 No Bus Shelters including Platforms

Component 3: Improvement of Lagos State Metropolitan

Road Network

Norm Duration of Proc Steps

Construction of Bus Terminal at Mile 12

Construction of Footbridges at 7 locations along the project

corriddor

Construction of BRT Bus Depot at Ikorodu

Construction of Ikorodu and Agric Bus Terminals

Rehabilitation and Upgrading of Wempco Road Ogba

Construction of 7 No Bus Shelters including Platforms

If Post-Review, No-objection Dates are not needed

Bid Invitation

Date

1.5 - 2 wks

18-Dec-12

18-Dec-12

18-Dec-12

18-Dec-12

16-Mar-13

15-Mar-13

5-Jan-13

Bidding Period

NonAsciiFileName0.xls 298 of 754 11/21/2012 1:40 AM

Procurement Plan-Works

Total Cost

Fill gray cells only!

NonAsciiFileName0.xls 299 of 754 11/21/2012 1:40 AM

Procurement Plan-Works

NonAsciiFileName0.xls 300 of 754 11/21/2012 1:40 AM

Procurement Plan-Works

NonAsciiFileName0.xls 301 of 754 11/21/2012 1:40 AM

Procurement Plan-Works

NonAsciiFileName0.xls 302 of 754 11/21/2012 1:40 AM

Procurement Plan-Works

NonAsciiFileName0.xls 303 of 754 11/21/2012 1:40 AM

Procurement Plan-Works

NonAsciiFileName0.xls 304 of 754 11/21/2012 1:40 AM

Procurement Plan-Works

NonAsciiFileName0.xls 305 of 754 11/21/2012 1:40 AM

Procurement Plan-Works

NonAsciiFileName0.xls 306 of 754 11/21/2012 1:40 AM

Procurement Plan-Works

NonAsciiFileName0.xls 307 of 754 11/21/2012 1:40 AM

Procurement Plan-Works

NonAsciiFileName0.xls 308 of 754 11/21/2012 1:40 AM

Procurement Plan-Works

NonAsciiFileName0.xls 309 of 754 11/21/2012 1:40 AM

Procurement Plan-Works

NonAsciiFileName0.xls 310 of 754 11/21/2012 1:40 AM

Procurement Plan-Works

NonAsciiFileName0.xls 311 of 754 11/21/2012 1:40 AM

Procurement Plan-Works

NonAsciiFileName0.xls 312 of 754 11/21/2012 1:40 AM

Procurement Plan-Works

NonAsciiFileName0.xls 313 of 754 11/21/2012 1:40 AM

Procurement Plan-Works

NonAsciiFileName0.xls 314 of 754 11/21/2012 1:40 AM

Procurement Plan-Works

NonAsciiFileName0.xls 315 of 754 11/21/2012 1:40 AM

Procurement Plan-Works

NonAsciiFileName0.xls 316 of 754 11/21/2012 1:40 AM

Procurement Plan-Works

NonAsciiFileName0.xls 317 of 754 11/21/2012 1:40 AM

Procurement Plan-Works

NonAsciiFileName0.xls 318 of 754 11/21/2012 1:40 AM

Procurement Plan-Works

NonAsciiFileName0.xls 319 of 754 11/21/2012 1:40 AM

Procurement Plan-Works

NonAsciiFileName0.xls 320 of 754 11/21/2012 1:40 AM

Procurement Plan-Works Country/Organisation:Nigeria Lagos Metropolitan Area Transport Authority (LAMATA)

Project/Programme: Lagos Urban Transport Project (LUTP)

IDA Credit No.: 3721-0 UNI

Description*

Component 1:(Instititional Development)

List of Contracts

Component 2:Public Transport and Traffic Management

Construction of 8 No Bus Shelters including Platforms

Component 3: Improvement of Lagos State Metropolitan

Road Network

Norm Duration of Proc Steps

Construction of Bus Terminal at Mile 12

Construction of Footbridges at 7 locations along the project

corriddor

Construction of BRT Bus Depot at Ikorodu

Construction of Ikorodu and Agric Bus Terminals

Rehabilitation and Upgrading of Wempco Road Ogba

Construction of 7 No Bus Shelters including Platforms

Bid Closing-

Opening

6 to

31-Jan-13

31-Jan-13

31-Jan-13

31-Jan-13

28-Apr-13

7-May-13

6-Feb-13

Bidding Period

NonAsciiFileName0.xls 321 of 754 11/21/2012 1:40 AM

Procurement Plan-Works

Total Cost

Fill gray cells only!

NonAsciiFileName0.xls 322 of 754 11/21/2012 1:40 AM

Procurement Plan-Works

NonAsciiFileName0.xls 323 of 754 11/21/2012 1:40 AM

Procurement Plan-Works

NonAsciiFileName0.xls 324 of 754 11/21/2012 1:40 AM

Procurement Plan-Works

NonAsciiFileName0.xls 325 of 754 11/21/2012 1:40 AM

Procurement Plan-Works

NonAsciiFileName0.xls 326 of 754 11/21/2012 1:40 AM

Procurement Plan-Works

NonAsciiFileName0.xls 327 of 754 11/21/2012 1:40 AM

Procurement Plan-Works

NonAsciiFileName0.xls 328 of 754 11/21/2012 1:40 AM

Procurement Plan-Works

NonAsciiFileName0.xls 329 of 754 11/21/2012 1:40 AM

Procurement Plan-Works

NonAsciiFileName0.xls 330 of 754 11/21/2012 1:40 AM

Procurement Plan-Works

NonAsciiFileName0.xls 331 of 754 11/21/2012 1:40 AM

Procurement Plan-Works

NonAsciiFileName0.xls 332 of 754 11/21/2012 1:40 AM

Procurement Plan-Works

NonAsciiFileName0.xls 333 of 754 11/21/2012 1:40 AM

Procurement Plan-Works

NonAsciiFileName0.xls 334 of 754 11/21/2012 1:40 AM

Procurement Plan-Works

NonAsciiFileName0.xls 335 of 754 11/21/2012 1:40 AM

Procurement Plan-Works

NonAsciiFileName0.xls 336 of 754 11/21/2012 1:40 AM

Procurement Plan-Works

NonAsciiFileName0.xls 337 of 754 11/21/2012 1:40 AM

Procurement Plan-Works

NonAsciiFileName0.xls 338 of 754 11/21/2012 1:40 AM

Procurement Plan-Works

NonAsciiFileName0.xls 339 of 754 11/21/2012 1:40 AM

Procurement Plan-Works

NonAsciiFileName0.xls 340 of 754 11/21/2012 1:40 AM

Procurement Plan-Works

NonAsciiFileName0.xls 341 of 754 11/21/2012 1:40 AM

Procurement Plan-Works

NonAsciiFileName0.xls 342 of 754 11/21/2012 1:40 AM

Procurement Plan-Works

NonAsciiFileName0.xls 343 of 754 11/21/2012 1:40 AM

Procurement Plan-Works Country/Organisation:Nigeria Lagos Metropolitan Area Transport Authority (LAMATA)

Project/Programme: Lagos Urban Transport Project (LUTP)

IDA Credit No.: 3721-0 UNI

Description*

Component 1:(Instititional Development)

List of Contracts

Component 2:Public Transport and Traffic Management

Construction of 8 No Bus Shelters including Platforms

Component 3: Improvement of Lagos State Metropolitan

Road Network

Norm Duration of Proc Steps

Construction of Bus Terminal at Mile 12

Construction of Footbridges at 7 locations along the project

corriddor

Construction of BRT Bus Depot at Ikorodu

Construction of Ikorodu and Agric Bus Terminals

Rehabilitation and Upgrading of Wempco Road Ogba

Construction of 7 No Bus Shelters including Platforms

Submission

Bid Eval Rpt

12 wks

14-Feb-13

14-Feb-13

14-Feb-13

14-Feb-13

12-May-13

21-May-13

20-Feb-13

Bid Evaluation

NonAsciiFileName0.xls 344 of 754 11/21/2012 1:40 AM

Procurement Plan-Works

Total Cost

Fill gray cells only!

NonAsciiFileName0.xls 345 of 754 11/21/2012 1:40 AM

Procurement Plan-Works

NonAsciiFileName0.xls 346 of 754 11/21/2012 1:40 AM

Procurement Plan-Works

NonAsciiFileName0.xls 347 of 754 11/21/2012 1:40 AM

Procurement Plan-Works

NonAsciiFileName0.xls 348 of 754 11/21/2012 1:40 AM

Procurement Plan-Works

NonAsciiFileName0.xls 349 of 754 11/21/2012 1:40 AM

Procurement Plan-Works

NonAsciiFileName0.xls 350 of 754 11/21/2012 1:40 AM

Procurement Plan-Works

NonAsciiFileName0.xls 351 of 754 11/21/2012 1:40 AM

Procurement Plan-Works

NonAsciiFileName0.xls 352 of 754 11/21/2012 1:40 AM

Procurement Plan-Works

NonAsciiFileName0.xls 353 of 754 11/21/2012 1:40 AM

Procurement Plan-Works

NonAsciiFileName0.xls 354 of 754 11/21/2012 1:40 AM

Procurement Plan-Works

NonAsciiFileName0.xls 355 of 754 11/21/2012 1:40 AM

Procurement Plan-Works

NonAsciiFileName0.xls 356 of 754 11/21/2012 1:40 AM

Procurement Plan-Works

NonAsciiFileName0.xls 357 of 754 11/21/2012 1:40 AM

Procurement Plan-Works

NonAsciiFileName0.xls 358 of 754 11/21/2012 1:40 AM

Procurement Plan-Works

NonAsciiFileName0.xls 359 of 754 11/21/2012 1:40 AM

Procurement Plan-Works

NonAsciiFileName0.xls 360 of 754 11/21/2012 1:40 AM

Procurement Plan-Works

NonAsciiFileName0.xls 361 of 754 11/21/2012 1:40 AM

Procurement Plan-Works

NonAsciiFileName0.xls 362 of 754 11/21/2012 1:40 AM

Procurement Plan-Works

NonAsciiFileName0.xls 363 of 754 11/21/2012 1:40 AM

Procurement Plan-Works

NonAsciiFileName0.xls 364 of 754 11/21/2012 1:40 AM

Procurement Plan-Works

NonAsciiFileName0.xls 365 of 754 11/21/2012 1:40 AM

Procurement Plan-Works

NonAsciiFileName0.xls 366 of 754 11/21/2012 1:40 AM

Procurement Plan-Works Country/Organisation:Nigeria Lagos Metropolitan Area Transport Authority (LAMATA)

Project/Programme: Lagos Urban Transport Project (LUTP)

IDA Credit No.: 3721-0 UNI

Description*

Component 1:(Instititional Development)

List of Contracts

Component 2:Public Transport and Traffic Management

Construction of 8 No Bus Shelters including Platforms

Component 3: Improvement of Lagos State Metropolitan

Road Network

Norm Duration of Proc Steps

Construction of Bus Terminal at Mile 12

Construction of Footbridges at 7 locations along the project

corriddor

Construction of BRT Bus Depot at Ikorodu

Construction of Ikorodu and Agric Bus Terminals

Rehabilitation and Upgrading of Wempco Road Ogba

Construction of 7 No Bus Shelters including Platforms

No-objection

Date

1.5 - 3 wks

28-Feb-13

28-Feb-13

28-Feb-13

28-Feb-13

26-May-13

4-Jun-13

6-Mar-13

Bid Evaluation

NonAsciiFileName0.xls 367 of 754 11/21/2012 1:40 AM

Procurement Plan-Works

Total Cost

Fill gray cells only!

NonAsciiFileName0.xls 368 of 754 11/21/2012 1:40 AM

Procurement Plan-Works

NonAsciiFileName0.xls 369 of 754 11/21/2012 1:40 AM

Procurement Plan-Works

NonAsciiFileName0.xls 370 of 754 11/21/2012 1:40 AM

Procurement Plan-Works

NonAsciiFileName0.xls 371 of 754 11/21/2012 1:40 AM

Procurement Plan-Works

NonAsciiFileName0.xls 372 of 754 11/21/2012 1:40 AM

Procurement Plan-Works

NonAsciiFileName0.xls 373 of 754 11/21/2012 1:40 AM

Procurement Plan-Works

NonAsciiFileName0.xls 374 of 754 11/21/2012 1:40 AM

Procurement Plan-Works

NonAsciiFileName0.xls 375 of 754 11/21/2012 1:40 AM

Procurement Plan-Works

NonAsciiFileName0.xls 376 of 754 11/21/2012 1:40 AM

Procurement Plan-Works

NonAsciiFileName0.xls 377 of 754 11/21/2012 1:40 AM

Procurement Plan-Works

NonAsciiFileName0.xls 378 of 754 11/21/2012 1:40 AM

Procurement Plan-Works

NonAsciiFileName0.xls 379 of 754 11/21/2012 1:40 AM

Procurement Plan-Works

NonAsciiFileName0.xls 380 of 754 11/21/2012 1:40 AM

Procurement Plan-Works

NonAsciiFileName0.xls 381 of 754 11/21/2012 1:40 AM

Procurement Plan-Works

NonAsciiFileName0.xls 382 of 754 11/21/2012 1:40 AM

Procurement Plan-Works

NonAsciiFileName0.xls 383 of 754 11/21/2012 1:40 AM

Procurement Plan-Works

NonAsciiFileName0.xls 384 of 754 11/21/2012 1:40 AM

Procurement Plan-Works

NonAsciiFileName0.xls 385 of 754 11/21/2012 1:40 AM

Procurement Plan-Works

NonAsciiFileName0.xls 386 of 754 11/21/2012 1:40 AM

Procurement Plan-Works

NonAsciiFileName0.xls 387 of 754 11/21/2012 1:40 AM

Procurement Plan-Works

NonAsciiFileName0.xls 388 of 754 11/21/2012 1:40 AM

Procurement Plan-Works

NonAsciiFileName0.xls 389 of 754 11/21/2012 1:40 AM

Procurement Plan-Works Country/Organisation:Nigeria Lagos Metropolitan Area Transport Authority (LAMATA)

Project/Programme: Lagos Urban Transport Project (LUTP)

IDA Credit No.: 3721-0 UNI

Description*

Component 1:(Instititional Development)

List of Contracts

Component 2:Public Transport and Traffic Management

Construction of 8 No Bus Shelters including Platforms

Component 3: Improvement of Lagos State Metropolitan

Road Network

Norm Duration of Proc Steps

Construction of Bus Terminal at Mile 12

Construction of Footbridges at 7 locations along the project

corriddor

Construction of BRT Bus Depot at Ikorodu

Construction of Ikorodu and Agric Bus Terminals

Rehabilitation and Upgrading of Wempco Road Ogba

Construction of 7 No Bus Shelters including Platforms

Plan

vs.

Actual

Plan

Actual

Plan

Plan

Actual

Plan

Plan

Actual

Plan

Actual

Plan

Actual

Plan

NonAsciiFileName0.xls 390 of 754 11/21/2012 1:40 AM

Procurement Plan-Works

Total Cost

Fill gray cells only!

NonAsciiFileName0.xls 391 of 754 11/21/2012 1:40 AM

Procurement Plan-Works

NonAsciiFileName0.xls 392 of 754 11/21/2012 1:40 AM

Procurement Plan-Works

NonAsciiFileName0.xls 393 of 754 11/21/2012 1:40 AM

Procurement Plan-Works

NonAsciiFileName0.xls 394 of 754 11/21/2012 1:40 AM

Procurement Plan-Works

NonAsciiFileName0.xls 395 of 754 11/21/2012 1:40 AM

Procurement Plan-Works

NonAsciiFileName0.xls 396 of 754 11/21/2012 1:40 AM

Procurement Plan-Works

NonAsciiFileName0.xls 397 of 754 11/21/2012 1:40 AM

Procurement Plan-Works

NonAsciiFileName0.xls 398 of 754 11/21/2012 1:40 AM

Procurement Plan-Works

NonAsciiFileName0.xls 399 of 754 11/21/2012 1:40 AM

Procurement Plan-Works

NonAsciiFileName0.xls 400 of 754 11/21/2012 1:40 AM

Procurement Plan-Works

NonAsciiFileName0.xls 401 of 754 11/21/2012 1:40 AM

Procurement Plan-Works

NonAsciiFileName0.xls 402 of 754 11/21/2012 1:40 AM

Procurement Plan-Works

NonAsciiFileName0.xls 403 of 754 11/21/2012 1:40 AM

Procurement Plan-Works

NonAsciiFileName0.xls 404 of 754 11/21/2012 1:40 AM

Procurement Plan-Works

NonAsciiFileName0.xls 405 of 754 11/21/2012 1:40 AM

Procurement Plan-Works

NonAsciiFileName0.xls 406 of 754 11/21/2012 1:40 AM

Procurement Plan-Works

NonAsciiFileName0.xls 407 of 754 11/21/2012 1:40 AM

Procurement Plan-Works

NonAsciiFileName0.xls 408 of 754 11/21/2012 1:40 AM

Procurement Plan-Works

NonAsciiFileName0.xls 409 of 754 11/21/2012 1:40 AM

Procurement Plan-Works

NonAsciiFileName0.xls 410 of 754 11/21/2012 1:40 AM

Procurement Plan-Works

NonAsciiFileName0.xls 411 of 754 11/21/2012 1:40 AM

Procurement Plan-Works

NonAsciiFileName0.xls 412 of 754 11/21/2012 1:40 AM

Procurement Plan-Works Country/Organisation:Nigeria Lagos Metropolitan Area Transport Authority (LAMATA)

Project/Programme: Lagos Urban Transport Project (LUTP)

IDA Credit No.: 3721-0 UNI

Description*

Component 1:(Instititional Development)

List of Contracts

Component 2:Public Transport and Traffic Management

Construction of 8 No Bus Shelters including Platforms

Component 3: Improvement of Lagos State Metropolitan

Road Network

Norm Duration of Proc Steps

Construction of Bus Terminal at Mile 12

Construction of Footbridges at 7 locations along the project

corriddor

Construction of BRT Bus Depot at Ikorodu

Construction of Ikorodu and Agric Bus Terminals

Rehabilitation and Upgrading of Wempco Road Ogba

Construction of 7 No Bus Shelters including Platforms

Date

Contract

Award

1 wk

7-Mar-13

7-Mar-13

7-Mar-13

7-Mar-13

2-Jun-13

11-Jun-13

13-Mar-13

NonAsciiFileName0.xls 413 of 754 11/21/2012 1:40 AM

Procurement Plan-Works

Total Cost

Fill gray cells only!

NonAsciiFileName0.xls 414 of 754 11/21/2012 1:40 AM

Procurement Plan-Works

NonAsciiFileName0.xls 415 of 754 11/21/2012 1:40 AM

Procurement Plan-Works

NonAsciiFileName0.xls 416 of 754 11/21/2012 1:40 AM

Procurement Plan-Works

NonAsciiFileName0.xls 417 of 754 11/21/2012 1:40 AM

Procurement Plan-Works

NonAsciiFileName0.xls 418 of 754 11/21/2012 1:40 AM

Procurement Plan-Works

NonAsciiFileName0.xls 419 of 754 11/21/2012 1:40 AM

Procurement Plan-Works

NonAsciiFileName0.xls 420 of 754 11/21/2012 1:40 AM

Procurement Plan-Works

NonAsciiFileName0.xls 421 of 754 11/21/2012 1:40 AM

Procurement Plan-Works

NonAsciiFileName0.xls 422 of 754 11/21/2012 1:40 AM

Procurement Plan-Works

NonAsciiFileName0.xls 423 of 754 11/21/2012 1:40 AM

Procurement Plan-Works

NonAsciiFileName0.xls 424 of 754 11/21/2012 1:40 AM

Procurement Plan-Works

NonAsciiFileName0.xls 425 of 754 11/21/2012 1:40 AM

Procurement Plan-Works

NonAsciiFileName0.xls 426 of 754 11/21/2012 1:40 AM

Procurement Plan-Works

NonAsciiFileName0.xls 427 of 754 11/21/2012 1:40 AM

Procurement Plan-Works

NonAsciiFileName0.xls 428 of 754 11/21/2012 1:40 AM

Procurement Plan-Works

NonAsciiFileName0.xls 429 of 754 11/21/2012 1:40 AM

Procurement Plan-Works

NonAsciiFileName0.xls 430 of 754 11/21/2012 1:40 AM

Procurement Plan-Works

NonAsciiFileName0.xls 431 of 754 11/21/2012 1:40 AM

Procurement Plan-Works

NonAsciiFileName0.xls 432 of 754 11/21/2012 1:40 AM

Procurement Plan-Works

NonAsciiFileName0.xls 433 of 754 11/21/2012 1:40 AM

Procurement Plan-Works

NonAsciiFileName0.xls 434 of 754 11/21/2012 1:40 AM

Procurement Plan-Works

NonAsciiFileName0.xls 435 of 754 11/21/2012 1:40 AM

Procurement Plan-Works Country/Organisation:Nigeria Lagos Metropolitan Area Transport Authority (LAMATA)

Project/Programme: Lagos Urban Transport Project (LUTP)

IDA Credit No.: 3721-0 UNI

Description*

Component 1:(Instititional Development)

List of Contracts

Component 2:Public Transport and Traffic Management

Construction of 8 No Bus Shelters including Platforms

Component 3: Improvement of Lagos State Metropolitan

Road Network

Norm Duration of Proc Steps

Construction of Bus Terminal at Mile 12

Construction of Footbridges at 7 locations along the project

corriddor

Construction of BRT Bus Depot at Ikorodu

Construction of Ikorodu and Agric Bus Terminals

Rehabilitation and Upgrading of Wempco Road Ogba

Construction of 7 No Bus Shelters including Platforms

Date

Contract

Advert

14-Mar-13

14-Mar-13

14-Mar-13

14-Mar-13

9-Jun-13

18-Jun-13

20-Mar-13

NonAsciiFileName0.xls 436 of 754 11/21/2012 1:40 AM

Procurement Plan-Works

Total Cost

Fill gray cells only!

NonAsciiFileName0.xls 437 of 754 11/21/2012 1:40 AM

Procurement Plan-Works

NonAsciiFileName0.xls 438 of 754 11/21/2012 1:40 AM

Procurement Plan-Works

NonAsciiFileName0.xls 439 of 754 11/21/2012 1:40 AM

Procurement Plan-Works

NonAsciiFileName0.xls 440 of 754 11/21/2012 1:40 AM

Procurement Plan-Works

NonAsciiFileName0.xls 441 of 754 11/21/2012 1:40 AM

Procurement Plan-Works

NonAsciiFileName0.xls 442 of 754 11/21/2012 1:40 AM

Procurement Plan-Works

NonAsciiFileName0.xls 443 of 754 11/21/2012 1:40 AM

Procurement Plan-Works

NonAsciiFileName0.xls 444 of 754 11/21/2012 1:40 AM

Procurement Plan-Works

NonAsciiFileName0.xls 445 of 754 11/21/2012 1:40 AM

Procurement Plan-Works

NonAsciiFileName0.xls 446 of 754 11/21/2012 1:40 AM

Procurement Plan-Works

NonAsciiFileName0.xls 447 of 754 11/21/2012 1:40 AM

Procurement Plan-Works

NonAsciiFileName0.xls 448 of 754 11/21/2012 1:40 AM

Procurement Plan-Works

NonAsciiFileName0.xls 449 of 754 11/21/2012 1:40 AM

Procurement Plan-Works

NonAsciiFileName0.xls 450 of 754 11/21/2012 1:40 AM

Procurement Plan-Works

NonAsciiFileName0.xls 451 of 754 11/21/2012 1:40 AM

Procurement Plan-Works

NonAsciiFileName0.xls 452 of 754 11/21/2012 1:40 AM

Procurement Plan-Works

NonAsciiFileName0.xls 453 of 754 11/21/2012 1:40 AM

Procurement Plan-Works

NonAsciiFileName0.xls 454 of 754 11/21/2012 1:40 AM

Procurement Plan-Works

NonAsciiFileName0.xls 455 of 754 11/21/2012 1:40 AM

Procurement Plan-Works

NonAsciiFileName0.xls 456 of 754 11/21/2012 1:40 AM

Procurement Plan-Works

NonAsciiFileName0.xls 457 of 754 11/21/2012 1:40 AM

Procurement Plan-Works

NonAsciiFileName0.xls 458 of 754 11/21/2012 1:40 AM

Procurement Plan-Works Country/Organisation:Nigeria Lagos Metropolitan Area Transport Authority (LAMATA)

Project/Programme: Lagos Urban Transport Project (LUTP)

IDA Credit No.: 3721-0 UNI

Description*

Component 1:(Instititional Development)

List of Contracts

Component 2:Public Transport and Traffic Management

Construction of 8 No Bus Shelters including Platforms

Component 3: Improvement of Lagos State Metropolitan

Road Network

Norm Duration of Proc Steps

Construction of Bus Terminal at Mile 12

Construction of Footbridges at 7 locations along the project

corriddor

Construction of BRT Bus Depot at Ikorodu

Construction of Ikorodu and Agric Bus Terminals

Rehabilitation and Upgrading of Wempco Road Ogba

Construction of 7 No Bus Shelters including Platforms

Date

Contract

Signature

1.5-3 wks

14-Mar-13

14-Mar-13

14-Mar-13

14-Mar-13

9-Jun-13

18-Jun-13

20-Mar-13

NonAsciiFileName0.xls 459 of 754 11/21/2012 1:40 AM

Procurement Plan-Works

Total Cost

Fill gray cells only!

NonAsciiFileName0.xls 460 of 754 11/21/2012 1:40 AM

Procurement Plan-Works

NonAsciiFileName0.xls 461 of 754 11/21/2012 1:40 AM

Procurement Plan-Works

NonAsciiFileName0.xls 462 of 754 11/21/2012 1:40 AM

Procurement Plan-Works

NonAsciiFileName0.xls 463 of 754 11/21/2012 1:40 AM

Procurement Plan-Works

NonAsciiFileName0.xls 464 of 754 11/21/2012 1:40 AM

Procurement Plan-Works

NonAsciiFileName0.xls 465 of 754 11/21/2012 1:40 AM

Procurement Plan-Works

NonAsciiFileName0.xls 466 of 754 11/21/2012 1:40 AM

Procurement Plan-Works

NonAsciiFileName0.xls 467 of 754 11/21/2012 1:40 AM

Procurement Plan-Works

NonAsciiFileName0.xls 468 of 754 11/21/2012 1:40 AM

Procurement Plan-Works

NonAsciiFileName0.xls 469 of 754 11/21/2012 1:40 AM

Procurement Plan-Works

NonAsciiFileName0.xls 470 of 754 11/21/2012 1:40 AM

Procurement Plan-Works

NonAsciiFileName0.xls 471 of 754 11/21/2012 1:40 AM

Procurement Plan-Works

NonAsciiFileName0.xls 472 of 754 11/21/2012 1:40 AM

Procurement Plan-Works

NonAsciiFileName0.xls 473 of 754 11/21/2012 1:40 AM

Procurement Plan-Works

NonAsciiFileName0.xls 474 of 754 11/21/2012 1:40 AM

Procurement Plan-Works

NonAsciiFileName0.xls 475 of 754 11/21/2012 1:40 AM

Procurement Plan-Works

NonAsciiFileName0.xls 476 of 754 11/21/2012 1:40 AM

Procurement Plan-Works

NonAsciiFileName0.xls 477 of 754 11/21/2012 1:40 AM

Procurement Plan-Works

NonAsciiFileName0.xls 478 of 754 11/21/2012 1:40 AM

Procurement Plan-Works

NonAsciiFileName0.xls 479 of 754 11/21/2012 1:40 AM

Procurement Plan-Works

NonAsciiFileName0.xls 480 of 754 11/21/2012 1:40 AM

Procurement Plan-Works

NonAsciiFileName0.xls 481 of 754 11/21/2012 1:40 AM

Procurement Plan-Works Country/Organisation:Nigeria Lagos Metropolitan Area Transport Authority (LAMATA)

Project/Programme: Lagos Urban Transport Project (LUTP)

IDA Credit No.: 3721-0 UNI

Description*

Component 1:(Instititional Development)

List of Contracts

Component 2:Public Transport and Traffic Management

Construction of 8 No Bus Shelters including Platforms

Component 3: Improvement of Lagos State Metropolitan

Road Network

Norm Duration of Proc Steps

Construction of Bus Terminal at Mile 12

Construction of Footbridges at 7 locations along the project

corriddor

Construction of BRT Bus Depot at Ikorodu

Construction of Ikorodu and Agric Bus Terminals

Rehabilitation and Upgrading of Wempco Road Ogba

Construction of 7 No Bus Shelters including Platforms

NonAsciiFileName0.xls 482 of 754 11/21/2012 1:40 AM

Procurement Plan-Works

Total Cost

Fill gray cells only!

NonAsciiFileName0.xls 483 of 754 11/21/2012 1:40 AM

Procurement Plan-Works

NonAsciiFileName0.xls 484 of 754 11/21/2012 1:40 AM

Procurement Plan-Works

NonAsciiFileName0.xls 485 of 754 11/21/2012 1:40 AM

Procurement Plan-Works

NonAsciiFileName0.xls 486 of 754 11/21/2012 1:40 AM

Procurement Plan-Works

NonAsciiFileName0.xls 487 of 754 11/21/2012 1:40 AM

Procurement Plan-Works

NonAsciiFileName0.xls 488 of 754 11/21/2012 1:40 AM

Procurement Plan-Works

NonAsciiFileName0.xls 489 of 754 11/21/2012 1:40 AM

Procurement Plan-Works

NonAsciiFileName0.xls 490 of 754 11/21/2012 1:40 AM

Procurement Plan-Works

NonAsciiFileName0.xls 491 of 754 11/21/2012 1:40 AM

Procurement Plan-Works

NonAsciiFileName0.xls 492 of 754 11/21/2012 1:40 AM

Procurement Plan-Works

NonAsciiFileName0.xls 493 of 754 11/21/2012 1:40 AM

Procurement Plan-Works

NonAsciiFileName0.xls 494 of 754 11/21/2012 1:40 AM

Procurement Plan-Works

NonAsciiFileName0.xls 495 of 754 11/21/2012 1:40 AM

Procurement Plan-Works

NonAsciiFileName0.xls 496 of 754 11/21/2012 1:40 AM

Procurement Plan-Works

NonAsciiFileName0.xls 497 of 754 11/21/2012 1:40 AM

Procurement Plan-Works

NonAsciiFileName0.xls 498 of 754 11/21/2012 1:40 AM

Procurement Plan-Works

NonAsciiFileName0.xls 499 of 754 11/21/2012 1:40 AM

Procurement Plan-Works

NonAsciiFileName0.xls 500 of 754 11/21/2012 1:40 AM

Procurement Plan-Works

NonAsciiFileName0.xls 501 of 754 11/21/2012 1:40 AM

Procurement Plan-Works

NonAsciiFileName0.xls 502 of 754 11/21/2012 1:40 AM

Procurement Plan-Works

NonAsciiFileName0.xls 503 of 754 11/21/2012 1:40 AM

Procurement Plan-Works

NonAsciiFileName0.xls 504 of 754 11/21/2012 1:40 AM

Procurement Plan-Works Country/Organisation:Nigeria Lagos Metropolitan Area Transport Authority (LAMATA)

Project/Programme: Lagos Urban Transport Project (LUTP)

IDA Credit No.: 3721-0 UNI

Description*

Component 1:(Instititional Development)

List of Contracts

Component 2:Public Transport and Traffic Management

Construction of 8 No Bus Shelters including Platforms

Component 3: Improvement of Lagos State Metropolitan

Road Network

Norm Duration of Proc Steps

Construction of Bus Terminal at Mile 12

Construction of Footbridges at 7 locations along the project

corriddor

Construction of BRT Bus Depot at Ikorodu

Construction of Ikorodu and Agric Bus Terminals

Rehabilitation and Upgrading of Wempco Road Ogba

Construction of 7 No Bus Shelters including Platforms

Mobilization

Advance

Payment

28-Mar-13

28-Mar-13

28-Mar-13

28-Mar-13

23-Jun-13

2-Jul-13

3-Apr-13

Contract Implementation

NonAsciiFileName0.xls 505 of 754 11/21/2012 1:40 AM

Procurement Plan-Works

Total Cost

Fill gray cells only!

NonAsciiFileName0.xls 506 of 754 11/21/2012 1:40 AM

Procurement Plan-Works

NonAsciiFileName0.xls 507 of 754 11/21/2012 1:40 AM

Procurement Plan-Works

NonAsciiFileName0.xls 508 of 754 11/21/2012 1:40 AM

Procurement Plan-Works

NonAsciiFileName0.xls 509 of 754 11/21/2012 1:40 AM

Procurement Plan-Works

NonAsciiFileName0.xls 510 of 754 11/21/2012 1:40 AM

Procurement Plan-Works

NonAsciiFileName0.xls 511 of 754 11/21/2012 1:40 AM

Procurement Plan-Works

NonAsciiFileName0.xls 512 of 754 11/21/2012 1:40 AM

Procurement Plan-Works

NonAsciiFileName0.xls 513 of 754 11/21/2012 1:40 AM

Procurement Plan-Works

NonAsciiFileName0.xls 514 of 754 11/21/2012 1:40 AM

Procurement Plan-Works

NonAsciiFileName0.xls 515 of 754 11/21/2012 1:40 AM

Procurement Plan-Works

NonAsciiFileName0.xls 516 of 754 11/21/2012 1:40 AM

Procurement Plan-Works

NonAsciiFileName0.xls 517 of 754 11/21/2012 1:40 AM

Procurement Plan-Works

NonAsciiFileName0.xls 518 of 754 11/21/2012 1:40 AM

Procurement Plan-Works

NonAsciiFileName0.xls 519 of 754 11/21/2012 1:40 AM

Procurement Plan-Works

NonAsciiFileName0.xls 520 of 754 11/21/2012 1:40 AM

Procurement Plan-Works

NonAsciiFileName0.xls 521 of 754 11/21/2012 1:40 AM

Procurement Plan-Works

NonAsciiFileName0.xls 522 of 754 11/21/2012 1:40 AM

Procurement Plan-Works

NonAsciiFileName0.xls 523 of 754 11/21/2012 1:40 AM

Procurement Plan-Works

NonAsciiFileName0.xls 524 of 754 11/21/2012 1:40 AM

Procurement Plan-Works

NonAsciiFileName0.xls 525 of 754 11/21/2012 1:40 AM

Procurement Plan-Works

NonAsciiFileName0.xls 526 of 754 11/21/2012 1:40 AM

Procurement Plan-Works

NonAsciiFileName0.xls 527 of 754 11/21/2012 1:40 AM

Procurement Plan-Works Country/Organisation:Nigeria Lagos Metropolitan Area Transport Authority (LAMATA)

Project/Programme: Lagos Urban Transport Project (LUTP)

IDA Credit No.: 3721-0 UNI

Description*

Component 1:(Instititional Development)

List of Contracts

Component 2:Public Transport and Traffic Management

Construction of 8 No Bus Shelters including Platforms

Component 3: Improvement of Lagos State Metropolitan

Road Network

Norm Duration of Proc Steps

Construction of Bus Terminal at Mile 12

Construction of Footbridges at 7 locations along the project

corriddor

Construction of BRT Bus Depot at Ikorodu

Construction of Ikorodu and Agric Bus Terminals

Rehabilitation and Upgrading of Wempco Road Ogba

Construction of 7 No Bus Shelters including Platforms

Substantial

Completion

21-Jun-14

21-Jun-14

21-Jun-14

21-Jun-14

14-Apr-15

23-Apr-15

27-Jun-14

Contract Implementation

NonAsciiFileName0.xls 528 of 754 11/21/2012 1:40 AM

Procurement Plan-Works

Total Cost

Fill gray cells only!

NonAsciiFileName0.xls 529 of 754 11/21/2012 1:40 AM

Procurement Plan-Works

NonAsciiFileName0.xls 530 of 754 11/21/2012 1:40 AM

Procurement Plan-Works

NonAsciiFileName0.xls 531 of 754 11/21/2012 1:40 AM

Procurement Plan-Works

NonAsciiFileName0.xls 532 of 754 11/21/2012 1:40 AM

Procurement Plan-Works

NonAsciiFileName0.xls 533 of 754 11/21/2012 1:40 AM

Procurement Plan-Works

NonAsciiFileName0.xls 534 of 754 11/21/2012 1:40 AM

Procurement Plan-Works

NonAsciiFileName0.xls 535 of 754 11/21/2012 1:40 AM

Procurement Plan-Works

NonAsciiFileName0.xls 536 of 754 11/21/2012 1:40 AM

Procurement Plan-Works

NonAsciiFileName0.xls 537 of 754 11/21/2012 1:40 AM

Procurement Plan-Works

NonAsciiFileName0.xls 538 of 754 11/21/2012 1:40 AM

Procurement Plan-Works

NonAsciiFileName0.xls 539 of 754 11/21/2012 1:40 AM

Procurement Plan-Works

NonAsciiFileName0.xls 540 of 754 11/21/2012 1:40 AM

Procurement Plan-Works

NonAsciiFileName0.xls 541 of 754 11/21/2012 1:40 AM

Procurement Plan-Works

NonAsciiFileName0.xls 542 of 754 11/21/2012 1:40 AM

Procurement Plan-Works

NonAsciiFileName0.xls 543 of 754 11/21/2012 1:40 AM

Procurement Plan-Works

NonAsciiFileName0.xls 544 of 754 11/21/2012 1:40 AM

Procurement Plan-Works

NonAsciiFileName0.xls 545 of 754 11/21/2012 1:40 AM

Procurement Plan-Works

NonAsciiFileName0.xls 546 of 754 11/21/2012 1:40 AM

Procurement Plan-Works

NonAsciiFileName0.xls 547 of 754 11/21/2012 1:40 AM

Procurement Plan-Works

NonAsciiFileName0.xls 548 of 754 11/21/2012 1:40 AM

Procurement Plan-Works

NonAsciiFileName0.xls 549 of 754 11/21/2012 1:40 AM

Procurement Plan-Works

NonAsciiFileName0.xls 550 of 754 11/21/2012 1:40 AM

Procurement Plan-Works Country/Organisation:Nigeria Lagos Metropolitan Area Transport Authority (LAMATA)

Project/Programme: Lagos Urban Transport Project (LUTP)

IDA Credit No.: 3721-0 UNI

Description*

Component 1:(Instititional Development)

List of Contracts

Component 2:Public Transport and Traffic Management

Construction of 8 No Bus Shelters including Platforms

Component 3: Improvement of Lagos State Metropolitan

Road Network

Norm Duration of Proc Steps

Construction of Bus Terminal at Mile 12

Construction of Footbridges at 7 locations along the project

corriddor

Construction of BRT Bus Depot at Ikorodu

Construction of Ikorodu and Agric Bus Terminals

Rehabilitation and Upgrading of Wempco Road Ogba

Construction of 7 No Bus Shelters including Platforms

Final

Acceptance

19-Sep-14

19-Sep-14

19-Sep-14

19-Sep-14

13-Jun-15

22-Jun-15

25-Sep-14

Contract Implementation

NonAsciiFileName0.xls 551 of 754 11/21/2012 1:40 AM

Procurement Plan-Works

Total Cost

Fill gray cells only!

NonAsciiFileName0.xls 552 of 754 11/21/2012 1:40 AM

Procurement Plan-Works

NonAsciiFileName0.xls 553 of 754 11/21/2012 1:40 AM

Procurement Plan-Works

NonAsciiFileName0.xls 554 of 754 11/21/2012 1:40 AM

Procurement Plan-Works

NonAsciiFileName0.xls 555 of 754 11/21/2012 1:40 AM

Procurement Plan-Works

NonAsciiFileName0.xls 556 of 754 11/21/2012 1:40 AM

Procurement Plan-Works

NonAsciiFileName0.xls 557 of 754 11/21/2012 1:40 AM

Procurement Plan-Works

NonAsciiFileName0.xls 558 of 754 11/21/2012 1:40 AM

Procurement Plan-Works

NonAsciiFileName0.xls 559 of 754 11/21/2012 1:40 AM

Procurement Plan-Works

NonAsciiFileName0.xls 560 of 754 11/21/2012 1:40 AM

Procurement Plan-Works

NonAsciiFileName0.xls 561 of 754 11/21/2012 1:40 AM

Procurement Plan-Works

NonAsciiFileName0.xls 562 of 754 11/21/2012 1:40 AM

Procurement Plan-Works

NonAsciiFileName0.xls 563 of 754 11/21/2012 1:40 AM

Procurement Plan-Works

NonAsciiFileName0.xls 564 of 754 11/21/2012 1:40 AM

Procurement Plan-Works

NonAsciiFileName0.xls 565 of 754 11/21/2012 1:40 AM

Procurement Plan-Works

NonAsciiFileName0.xls 566 of 754 11/21/2012 1:40 AM

Procurement Plan-Works

NonAsciiFileName0.xls 567 of 754 11/21/2012 1:40 AM

Procurement Plan-Works

NonAsciiFileName0.xls 568 of 754 11/21/2012 1:40 AM

Procurement Plan-Works

NonAsciiFileName0.xls 569 of 754 11/21/2012 1:40 AM

Procurement Plan-Works

NonAsciiFileName0.xls 570 of 754 11/21/2012 1:40 AM

Procurement Plan-Works

NonAsciiFileName0.xls 571 of 754 11/21/2012 1:40 AM

Procurement Plan-Works

NonAsciiFileName0.xls 572 of 754 11/21/2012 1:40 AM

Procurement Plan-Works

NonAsciiFileName0.xls 573 of 754 11/21/2012 1:40 AM

Procurement Plan-Works Country/Organisation:Nigeria Lagos Metropolitan Area Transport Authority (LAMATA)

Project/Programme: Lagos Urban Transport Project (LUTP)

IDA Credit No.: 3721-0 UNI

Description*

Component 1:(Instititional Development)

List of Contracts

Component 2:Public Transport and Traffic Management

Construction of 8 No Bus Shelters including Platforms

Component 3: Improvement of Lagos State Metropolitan

Road Network

Norm Duration of Proc Steps

Construction of Bus Terminal at Mile 12

Construction of Footbridges at 7 locations along the project

corriddor

Construction of BRT Bus Depot at Ikorodu

Construction of Ikorodu and Agric Bus Terminals

Rehabilitation and Upgrading of Wempco Road Ogba

Construction of 7 No Bus Shelters including Platforms

Source of

Funds

IDA

IDA

IDA

IDA

IDA

AFD

IDA

NonAsciiFileName0.xls 574 of 754 11/21/2012 1:40 AM

Procurement Plan-Works

Total Cost

Fill gray cells only!

NonAsciiFileName0.xls 575 of 754 11/21/2012 1:40 AM

Procurement Plan-Works

NonAsciiFileName0.xls 576 of 754 11/21/2012 1:40 AM

Procurement Plan-Works

NonAsciiFileName0.xls 577 of 754 11/21/2012 1:40 AM

Procurement Plan-Works

NonAsciiFileName0.xls 578 of 754 11/21/2012 1:40 AM

Procurement Plan-Works

NonAsciiFileName0.xls 579 of 754 11/21/2012 1:40 AM

Procurement Plan-Works

NonAsciiFileName0.xls 580 of 754 11/21/2012 1:40 AM

Procurement Plan-Works

NonAsciiFileName0.xls 581 of 754 11/21/2012 1:40 AM

Procurement Plan-Works

NonAsciiFileName0.xls 582 of 754 11/21/2012 1:40 AM

Procurement Plan-Works

NonAsciiFileName0.xls 583 of 754 11/21/2012 1:40 AM

Procurement Plan-Works

NonAsciiFileName0.xls 584 of 754 11/21/2012 1:40 AM

Procurement Plan-Works

NonAsciiFileName0.xls 585 of 754 11/21/2012 1:40 AM

Procurement Plan-Works

NonAsciiFileName0.xls 586 of 754 11/21/2012 1:40 AM

Procurement Plan-Works

NonAsciiFileName0.xls 587 of 754 11/21/2012 1:40 AM

Procurement Plan-Works

NonAsciiFileName0.xls 588 of 754 11/21/2012 1:40 AM

Procurement Plan-Works

NonAsciiFileName0.xls 589 of 754 11/21/2012 1:40 AM

Procurement Plan-Works

NonAsciiFileName0.xls 590 of 754 11/21/2012 1:40 AM

Procurement Plan-Works

NonAsciiFileName0.xls 591 of 754 11/21/2012 1:40 AM

Procurement Plan-Works

NonAsciiFileName0.xls 592 of 754 11/21/2012 1:40 AM

Procurement Plan-Works

NonAsciiFileName0.xls 593 of 754 11/21/2012 1:40 AM

Procurement Plan-Works

NonAsciiFileName0.xls 594 of 754 11/21/2012 1:40 AM

Procurement Plan-Works

NonAsciiFileName0.xls 595 of 754 11/21/2012 1:40 AM

Procurement Plan-Works

NonAsciiFileName0.xls 596 of 754 11/21/2012 1:40 AM

Procurement Plan-Consultants 2 Country/Organisation:Nigeria Lagos Metropolitan Area Transport Authority (LAMATA)For Contracts under projects approved before the May 2002 Guidelines

Project/Programme: Lagos Urban Transport Project (LUTP)If Post-Review, No-objection Dates are not needed

IDA Credit No.: 3721-0 UNI

Description*Selection

Method

Norm Duration of Proc Steps

Component 1:(Instititional Development)

Training of Staff and Twining programme (To be

Implemented through global Training plan and

Twining arrangement for (January 2012 to Dec

2012)

CQS

QCBS

CQS

CQS

CQS

Component 2:Public Transport and Traffic Management

Consultancy Services for Carrying out the Pre and

Post Study for the Establishment of Transport

Planning Units in Lagos Island, Kosofe and

Ikorodu LGAs in Lagos State

Consultancy Services for Detailed Engineering

Design and Construction Supervision of BRT LITE

Upgrade from Mile 12 to CMS

Consultancy Services for Conceptual Design of

BRT LITE Upgrade from Mile 12 to CMS

Consultancy Services for Engineering Design and

Construction Supervision of BFS Infrastructure

Rehabilitation and Upgrading

Consultancy Services for conducting Technical due

diligence on BFS Buses (Environmental

Enhancement of BFS Operations: Due Diligence

Report) Including Supervision of the

Refurbishment of BFS Buses

NonAsciiFileName0.xls 597 of 754 11/21/2012 1:40 AM

Procurement Plan-Consultants 2 SS

QCBS

CQS

CQS

CQS

CQS

Component 3: Improvement of Lagos State

Metropolitan Road Network

QCBS

QCBS

CQS

CQS

QCBS

Component 4: Project Management & System Monitoring

CQS

CQS

Consultancy for Construction Supervision of Akin

Adesola and Wempco Roads

Consultancy Services for Design Upgrade and

Construction Supervision of BFS Bus Depot

Infrastructure

Consultancy Services for Website Redesign and

Hosting

Consultancy Services for IT Equipment

Maintenance

Consultancy Services for Events and Stakeholders

Management for BRT Services

Consultancy Services for Advertising and

Perception Management for BRT Extension (Mile

12 - Ikorodu)

Consultancy Services for Pavement Management

System Reconfiguration, Training and Data

Collection and Upload

Consultancy Services for the Documentation of the

Communication and Participation Efforts to Raise

Familiarity with BRT on Mile 12 to CMS Route

Consultancy to Conduct Stakeholder engagements

on other LAMATA projects (STMP, Road

rehabilitation/periodic maintenance etc)

Consultancy for Construction Supervision of

Adesina/Omilani/Airways Road Surulere

Consultancy for Construction Supervision of Apata

Lisabi Street Somolu

NonAsciiFileName0.xls 598 of 754 11/21/2012 1:40 AM

Procurement Plan-Consultants 2 CQS

SS

CQS

CQS

S/S

S/S

CQS

CQS

S/S

CQS

CQS

QCBS

Consultancy Services for Supply and installation

and Configuration of HDM4 Software for

LAMATA including Training

Consultancy Services for Provision, Installation

and Implementation of Knowledge Management

Software

Consultancy Services for Supply and installation

and configuratin of internet solution for LAMATA

(Share point)

Consultancy Services for the Provision of 1M

Internet Access

Consultancy Services for Oracle Support Licence

Consultancy Services for IT Equipment

Maintenance

Consultancy Services for EDMS Maintenance

Consultancy Services for Antivirus Support

Consultancy Services for Anti-Spam Support

Consultancy Services for Cloud Storage / Data

Backup

Consultancy Services for Arc GIS & Arc View

Upgrade and Licensing + HP Large format Plotter

Consultancy Services for Institutional, Technical

and Financial AuditNonAsciiFileName0.xls 599 of 754 11/21/2012 1:40 AM

Procurement Plan-Consultants 2

CQS

CQS

CQS

CQS

CQS

CQS

CQS

CQS

CQS

CQS

CQS

Consultancy Services for Conducting Resettlement

Policy Framework (RPF) for Akin Adesola &

Wempco Roads

Consultancy Services for Resettlement Action Plan

(RAP) Implementation for Mile 12 to Ikorodu BRT

scheme

Consultancy Services for Procurement Audit for 2

consecutive years

Consultancy Services for Assesment of Needs of

Disadvantaged Group in Accessing Public

Transport Services on Mile 12 to Ikorodu Town

BRT Corridor

Consultancy Services for Carrying out Socio-

Economic Baseline Survey of Transportation from

Mile 12 to Ikorodu

Consultancy Services for Institutional, Technical

and Financial Audit

Consultancy Services for Developing the core

public Transport Network in Kano -Rapid

Development of Shor-time Program Investment

Consultancy Services for Developing the core

public Transport Network in Kano -Rapid

Collection of Traffic and Transport Data

Consultancy Service for Inestigating the impact of

Motocycles and Three Wheelers Growth in Africa -

Case Study of Kano

Consultancy Services for Conducting

Environmental and Social Management Plan

(ESMP) for Akin Adesola and Wempco Roads

NonAsciiFileName0.xls 600 of 754 11/21/2012 1:40 AM

Procurement Plan-Consultants 2

NonAsciiFileName0.xls 601 of 754 11/21/2012 1:40 AM

Procurement Plan-Consultants 2 Country/Organisation:Nigeria Lagos Metropolitan Area Transport Authority (LAMATA)

Project/Programme: Lagos Urban Transport Project (LUTP)

IDA Credit No.: 3721-0 UNI

Description*

Norm Duration of Proc Steps

Component 1:(Instititional Development)

Training of Staff and Twining programme (To be

Implemented through global Training plan and

Twining arrangement for (January 2012 to Dec

2012)

Component 2:Public Transport and Traffic Management

Consultancy Services for Carrying out the Pre and

Post Study for the Establishment of Transport

Planning Units in Lagos Island, Kosofe and

Ikorodu LGAs in Lagos State

Consultancy Services for Detailed Engineering

Design and Construction Supervision of BRT LITE

Upgrade from Mile 12 to CMS

Consultancy Services for Conceptual Design of

BRT LITE Upgrade from Mile 12 to CMS

Consultancy Services for Engineering Design and

Construction Supervision of BFS Infrastructure

Rehabilitation and Upgrading

Consultancy Services for conducting Technical due

diligence on BFS Buses (Environmental

Enhancement of BFS Operations: Due Diligence

Report) Including Supervision of the

Refurbishment of BFS Buses

For Contracts under projects approved before the May 2002 Guidelines

If Post-Review, No-objection Dates are not needed

Contract

Type

Lumpsum

or

Time-Based

Lump Sum

Lump Sum/

Time Based

Lump Sum

Lump Sum

Lump Sum

Component 2:Public Transport and Traffic Management

NonAsciiFileName0.xls 602 of 754 11/21/2012 1:40 AM

Procurement Plan-Consultants 2

Component 3: Improvement of Lagos State

Metropolitan Road Network

Component 4: Project Management & System Monitoring

Consultancy for Construction Supervision of Akin

Adesola and Wempco Roads

Consultancy Services for Design Upgrade and

Construction Supervision of BFS Bus Depot

Infrastructure

Consultancy Services for Website Redesign and

Hosting

Consultancy Services for IT Equipment

Maintenance

Consultancy Services for Events and Stakeholders

Management for BRT Services

Consultancy Services for Advertising and

Perception Management for BRT Extension (Mile

12 - Ikorodu)

Consultancy Services for Pavement Management

System Reconfiguration, Training and Data

Collection and Upload

Consultancy Services for the Documentation of the

Communication and Participation Efforts to Raise

Familiarity with BRT on Mile 12 to CMS Route

Consultancy to Conduct Stakeholder engagements

on other LAMATA projects (STMP, Road

rehabilitation/periodic maintenance etc)

Consultancy for Construction Supervision of

Adesina/Omilani/Airways Road Surulere

Consultancy for Construction Supervision of Apata

Lisabi Street Somolu

Lump Sum/

Time Based

Lump Sum

Lump Sum

Lump Sum

Lump Sum

Lump Sum

Time Based

Time Based

Time Based

Time Based

Lump Sum

Lump Sum

Lump Sum

NonAsciiFileName0.xls 603 of 754 11/21/2012 1:40 AM

Procurement Plan-Consultants 2

Consultancy Services for Supply and installation

and Configuration of HDM4 Software for

LAMATA including Training

Consultancy Services for Provision, Installation

and Implementation of Knowledge Management

Software

Consultancy Services for Supply and installation

and configuratin of internet solution for LAMATA

(Share point)

Consultancy Services for the Provision of 1M

Internet Access

Consultancy Services for Oracle Support Licence

Consultancy Services for IT Equipment

Maintenance

Consultancy Services for EDMS Maintenance

Consultancy Services for Antivirus Support

Consultancy Services for Anti-Spam Support

Consultancy Services for Cloud Storage / Data

Backup

Consultancy Services for Arc GIS & Arc View

Upgrade and Licensing + HP Large format Plotter

Consultancy Services for Institutional, Technical

and Financial Audit

Lump Sum

Lump Sum

Lump Sum

Lump Sum

Lump Sum

Lump Sum

Lump Sum

Lump Sum

Lump Sum

Lump Sum

Lump Sum

Lump Sum

NonAsciiFileName0.xls 604 of 754 11/21/2012 1:40 AM

Procurement Plan-Consultants 2

Consultancy Services for Conducting Resettlement

Policy Framework (RPF) for Akin Adesola &

Wempco Roads

Consultancy Services for Resettlement Action Plan

(RAP) Implementation for Mile 12 to Ikorodu BRT

scheme

Consultancy Services for Procurement Audit for 2

consecutive years

Consultancy Services for Assesment of Needs of

Disadvantaged Group in Accessing Public

Transport Services on Mile 12 to Ikorodu Town

BRT Corridor

Consultancy Services for Carrying out Socio-

Economic Baseline Survey of Transportation from

Mile 12 to Ikorodu

Consultancy Services for Institutional, Technical

and Financial Audit

Consultancy Services for Developing the core

public Transport Network in Kano -Rapid

Development of Shor-time Program Investment

Consultancy Services for Developing the core

public Transport Network in Kano -Rapid

Collection of Traffic and Transport Data

Consultancy Service for Inestigating the impact of

Motocycles and Three Wheelers Growth in Africa -

Case Study of Kano

Consultancy Services for Conducting

Environmental and Social Management Plan

(ESMP) for Akin Adesola and Wempco Roads

Lump Sum

Lump Sum

Lump Sum

Lump Sum

Lump Sum

Lump Sum

Lump Sum

Lump Sum

Lump Sum

Lump Sum

Lump Sum

NonAsciiFileName0.xls 605 of 754 11/21/2012 1:40 AM

Procurement Plan-Consultants 2

NonAsciiFileName0.xls 606 of 754 11/21/2012 1:40 AM

Procurement Plan-Consultants 2 Country/Organisation:Nigeria Lagos Metropolitan Area Transport Authority (LAMATA)

Project/Programme: Lagos Urban Transport Project (LUTP)

IDA Credit No.: 3721-0 UNI

Description*

Norm Duration of Proc Steps

Component 1:(Instititional Development)

Training of Staff and Twining programme (To be

Implemented through global Training plan and

Twining arrangement for (January 2012 to Dec

2012)

Component 2:Public Transport and Traffic Management

Consultancy Services for Carrying out the Pre and

Post Study for the Establishment of Transport

Planning Units in Lagos Island, Kosofe and

Ikorodu LGAs in Lagos State

Consultancy Services for Detailed Engineering

Design and Construction Supervision of BRT LITE

Upgrade from Mile 12 to CMS

Consultancy Services for Conceptual Design of

BRT LITE Upgrade from Mile 12 to CMS

Consultancy Services for Engineering Design and

Construction Supervision of BFS Infrastructure

Rehabilitation and Upgrading

Consultancy Services for conducting Technical due

diligence on BFS Buses (Environmental

Enhancement of BFS Operations: Due Diligence

Report) Including Supervision of the

Refurbishment of BFS Buses

For Contracts under projects approved before the May 2002 Guidelines

If Post-Review, No-objection Dates are not needed

Prior/Post

Review

Plan vs.

Actual

Plan

Prior Review Plan

Post Review Plan

Actual

Prior Review Plan

Actual

Post Review Plan

Actual

Post Review Plan

Actual

Post Review Plan

Actual

NonAsciiFileName0.xls 607 of 754 11/21/2012 1:40 AM

Procurement Plan-Consultants 2

Component 3: Improvement of Lagos State

Metropolitan Road Network

Component 4: Project Management & System Monitoring

Consultancy for Construction Supervision of Akin

Adesola and Wempco Roads

Consultancy Services for Design Upgrade and

Construction Supervision of BFS Bus Depot

Infrastructure

Consultancy Services for Website Redesign and

Hosting

Consultancy Services for IT Equipment

Maintenance

Consultancy Services for Events and Stakeholders

Management for BRT Services

Consultancy Services for Advertising and

Perception Management for BRT Extension (Mile

12 - Ikorodu)

Consultancy Services for Pavement Management

System Reconfiguration, Training and Data

Collection and Upload

Consultancy Services for the Documentation of the

Communication and Participation Efforts to Raise

Familiarity with BRT on Mile 12 to CMS Route

Consultancy to Conduct Stakeholder engagements

on other LAMATA projects (STMP, Road

rehabilitation/periodic maintenance etc)

Consultancy for Construction Supervision of

Adesina/Omilani/Airways Road Surulere

Consultancy for Construction Supervision of Apata

Lisabi Street Somolu

Prior Review Plan

Actual

Prior Review Plan

Actual

Post Review Plan

Post Review Actual

Post Review Plan

Actual

Post Review Plan

Actual

Prior Review Plan

Prior Review

Post Review Plan

Actual

Post Review Plan

Actual

Prior Review Plan

Actual

Post Review Plan

Actual

Post Review Plan

NonAsciiFileName0.xls 608 of 754 11/21/2012 1:40 AM

Procurement Plan-Consultants 2

Consultancy Services for Supply and installation

and Configuration of HDM4 Software for

LAMATA including Training

Consultancy Services for Provision, Installation

and Implementation of Knowledge Management

Software

Consultancy Services for Supply and installation

and configuratin of internet solution for LAMATA

(Share point)

Consultancy Services for the Provision of 1M

Internet Access

Consultancy Services for Oracle Support Licence

Consultancy Services for IT Equipment

Maintenance

Consultancy Services for EDMS Maintenance

Consultancy Services for Antivirus Support

Consultancy Services for Anti-Spam Support

Consultancy Services for Cloud Storage / Data

Backup

Consultancy Services for Arc GIS & Arc View

Upgrade and Licensing + HP Large format Plotter

Consultancy Services for Institutional, Technical

and Financial Audit

Post Review Actual

Prior Review Plan

Actual

Post Review Plan

Actual

Post Review Plan

Actual

Prior Review Plan

Actual

Prior Review Plan

Actual

Post Review Plan

Actual

Post Review Plan

Actual

Prior Review Plan

Actual

Post Review Plan

Actual

Post Review Plan

Actual

Prior Review Plan

NonAsciiFileName0.xls 609 of 754 11/21/2012 1:40 AM

Procurement Plan-Consultants 2

Consultancy Services for Conducting Resettlement

Policy Framework (RPF) for Akin Adesola &

Wempco Roads

Consultancy Services for Resettlement Action Plan

(RAP) Implementation for Mile 12 to Ikorodu BRT

scheme

Consultancy Services for Procurement Audit for 2

consecutive years

Consultancy Services for Assesment of Needs of

Disadvantaged Group in Accessing Public

Transport Services on Mile 12 to Ikorodu Town

BRT Corridor

Consultancy Services for Carrying out Socio-

Economic Baseline Survey of Transportation from

Mile 12 to Ikorodu

Consultancy Services for Institutional, Technical

and Financial Audit

Consultancy Services for Developing the core

public Transport Network in Kano -Rapid

Development of Shor-time Program Investment

Consultancy Services for Developing the core

public Transport Network in Kano -Rapid

Collection of Traffic and Transport Data

Consultancy Service for Inestigating the impact of

Motocycles and Three Wheelers Growth in Africa -

Case Study of Kano

Consultancy Services for Conducting

Environmental and Social Management Plan

(ESMP) for Akin Adesola and Wempco Roads

Actual

Post Review Plan

Actual

Post Review Plan

Actual

Post Review Plan

Actual

Post Review Plan

Actual

Post Review Plan

Actual

Post Review Plan

Actual

Post Review Plan

Post Review Actual

Post Review Plan

Post Review Actual

Post Review Plan

Post Review Actual

NonAsciiFileName0.xls 610 of 754 11/21/2012 1:40 AM

Procurement Plan-Consultants 2

NonAsciiFileName0.xls 611 of 754 11/21/2012 1:40 AM

Procurement Plan-Consultants 2 Country/Organisation:Nigeria Lagos Metropolitan Area Transport Authority (LAMATA)

Project/Programme: Lagos Urban Transport Project (LUTP)

IDA Credit No.: 3721-0 UNI

Description*

Norm Duration of Proc Steps

Component 1:(Instititional Development)

Training of Staff and Twining programme (To be

Implemented through global Training plan and

Twining arrangement for (January 2012 to Dec

2012)

Component 2:Public Transport and Traffic Management

Consultancy Services for Carrying out the Pre and

Post Study for the Establishment of Transport

Planning Units in Lagos Island, Kosofe and

Ikorodu LGAs in Lagos State

Consultancy Services for Detailed Engineering

Design and Construction Supervision of BRT LITE

Upgrade from Mile 12 to CMS

Consultancy Services for Conceptual Design of

BRT LITE Upgrade from Mile 12 to CMS

Consultancy Services for Engineering Design and

Construction Supervision of BFS Infrastructure

Rehabilitation and Upgrading

Consultancy Services for conducting Technical due

diligence on BFS Buses (Environmental

Enhancement of BFS Operations: Due Diligence

Report) Including Supervision of the

Refurbishment of BFS Buses

For Contracts under projects approved before the May 2002 Guidelines

Prep &

Submission

by Ex Ag

3 - 6 wks

15-Mar-12

1-Nov-12

30-Jan-12

18-May-12

15-Nov-12

Preparation

Request for Proposals

NonAsciiFileName0.xls 612 of 754 11/21/2012 1:40 AM

Procurement Plan-Consultants 2

Component 3: Improvement of Lagos State

Metropolitan Road Network

Component 4: Project Management & System Monitoring

Consultancy for Construction Supervision of Akin

Adesola and Wempco Roads

Consultancy Services for Design Upgrade and

Construction Supervision of BFS Bus Depot

Infrastructure

Consultancy Services for Website Redesign and

Hosting

Consultancy Services for IT Equipment

Maintenance

Consultancy Services for Events and Stakeholders

Management for BRT Services

Consultancy Services for Advertising and

Perception Management for BRT Extension (Mile

12 - Ikorodu)

Consultancy Services for Pavement Management

System Reconfiguration, Training and Data

Collection and Upload

Consultancy Services for the Documentation of the

Communication and Participation Efforts to Raise

Familiarity with BRT on Mile 12 to CMS Route

Consultancy to Conduct Stakeholder engagements

on other LAMATA projects (STMP, Road

rehabilitation/periodic maintenance etc)

Consultancy for Construction Supervision of

Adesina/Omilani/Airways Road Surulere

Consultancy for Construction Supervision of Apata

Lisabi Street Somolu

2-Apr-12

6-Feb-12

8-Nov-11

11-Oct-11

2-Feb-12

2-Feb-12

3-Nov-11

3-Nov-11

6-Sep-12

6-Sep-12

2-Jul-12

2-Feb-12

6-Sep-11

NonAsciiFileName0.xls 613 of 754 11/21/2012 1:40 AM

Procurement Plan-Consultants 2

Consultancy Services for Supply and installation

and Configuration of HDM4 Software for

LAMATA including Training

Consultancy Services for Provision, Installation

and Implementation of Knowledge Management

Software

Consultancy Services for Supply and installation

and configuratin of internet solution for LAMATA

(Share point)

Consultancy Services for the Provision of 1M

Internet Access

Consultancy Services for Oracle Support Licence

Consultancy Services for IT Equipment

Maintenance

Consultancy Services for EDMS Maintenance

Consultancy Services for Antivirus Support

Consultancy Services for Anti-Spam Support

Consultancy Services for Cloud Storage / Data

Backup

Consultancy Services for Arc GIS & Arc View

Upgrade and Licensing + HP Large format Plotter

Consultancy Services for Institutional, Technical

and Financial Audit

1-Nov-11

13-Apr-12

5-Apr-12

23-Apr-12

20-Aug-12

27-Feb-12

27-Mar-12

23-Apr-12

2-Oct-12

25-Jul-12

25-Jun-12

1-Nov-12

NonAsciiFileName0.xls 614 of 754 11/21/2012 1:40 AM

Procurement Plan-Consultants 2

Consultancy Services for Conducting Resettlement

Policy Framework (RPF) for Akin Adesola &

Wempco Roads

Consultancy Services for Resettlement Action Plan

(RAP) Implementation for Mile 12 to Ikorodu BRT

scheme

Consultancy Services for Procurement Audit for 2

consecutive years

Consultancy Services for Assesment of Needs of

Disadvantaged Group in Accessing Public

Transport Services on Mile 12 to Ikorodu Town

BRT Corridor

Consultancy Services for Carrying out Socio-

Economic Baseline Survey of Transportation from

Mile 12 to Ikorodu

Consultancy Services for Institutional, Technical

and Financial Audit

Consultancy Services for Developing the core

public Transport Network in Kano -Rapid

Development of Shor-time Program Investment

Consultancy Services for Developing the core

public Transport Network in Kano -Rapid

Collection of Traffic and Transport Data

Consultancy Service for Inestigating the impact of

Motocycles and Three Wheelers Growth in Africa -

Case Study of Kano

Consultancy Services for Conducting

Environmental and Social Management Plan

(ESMP) for Akin Adesola and Wempco Roads

3-Feb-12

2-Feb-12

2-Feb-12

2-Feb-12

9-Apr-12

8-Feb-12

5-Jul-11

5-Jul-11

5-Jul-11

5-Jul-11

5-Jul-11

5-Jul-11

NonAsciiFileName0.xls 615 of 754 11/21/2012 1:40 AM

Procurement Plan-Consultants 2

NonAsciiFileName0.xls 616 of 754 11/21/2012 1:40 AM

Procurement Plan-Consultants 2 Country/Organisation:Nigeria Lagos Metropolitan Area Transport Authority (LAMATA)

Project/Programme: Lagos Urban Transport Project (LUTP)

IDA Credit No.: 3721-0 UNI

Description*

Norm Duration of Proc Steps

Component 1:(Instititional Development)

Training of Staff and Twining programme (To be

Implemented through global Training plan and

Twining arrangement for (January 2012 to Dec

2012)

Component 2:Public Transport and Traffic Management

Consultancy Services for Carrying out the Pre and

Post Study for the Establishment of Transport

Planning Units in Lagos Island, Kosofe and

Ikorodu LGAs in Lagos State

Consultancy Services for Detailed Engineering

Design and Construction Supervision of BRT LITE

Upgrade from Mile 12 to CMS

Consultancy Services for Conceptual Design of

BRT LITE Upgrade from Mile 12 to CMS

Consultancy Services for Engineering Design and

Construction Supervision of BFS Infrastructure

Rehabilitation and Upgrading

Consultancy Services for conducting Technical due

diligence on BFS Buses (Environmental

Enhancement of BFS Operations: Due Diligence

Report) Including Supervision of the

Refurbishment of BFS Buses

No-objection

Date

1 - 2 wks

22-Mar-12

15-Nov-12

2-Feb-12

25-May-12

29-Nov-12

Preparation

Request for Proposals

NonAsciiFileName0.xls 617 of 754 11/21/2012 1:40 AM

Procurement Plan-Consultants 2

Component 3: Improvement of Lagos State

Metropolitan Road Network

Component 4: Project Management & System Monitoring

Consultancy for Construction Supervision of Akin

Adesola and Wempco Roads

Consultancy Services for Design Upgrade and

Construction Supervision of BFS Bus Depot

Infrastructure

Consultancy Services for Website Redesign and

Hosting

Consultancy Services for IT Equipment

Maintenance

Consultancy Services for Events and Stakeholders

Management for BRT Services

Consultancy Services for Advertising and

Perception Management for BRT Extension (Mile

12 - Ikorodu)

Consultancy Services for Pavement Management

System Reconfiguration, Training and Data

Collection and Upload

Consultancy Services for the Documentation of the

Communication and Participation Efforts to Raise

Familiarity with BRT on Mile 12 to CMS Route

Consultancy to Conduct Stakeholder engagements

on other LAMATA projects (STMP, Road

rehabilitation/periodic maintenance etc)

Consultancy for Construction Supervision of

Adesina/Omilani/Airways Road Surulere

Consultancy for Construction Supervision of Apata

Lisabi Street Somolu

16-Apr-12

20-Feb-12

16-Nov-11

19-Oct-11

9-Feb-12

9-Feb-12

9-Nov-11

3-Nov-11

14-Sep-12

14-Sep-12

16-Jul-12

9-Feb-12

14-Sep-11

NonAsciiFileName0.xls 618 of 754 11/21/2012 1:40 AM

Procurement Plan-Consultants 2

Consultancy Services for Supply and installation

and Configuration of HDM4 Software for

LAMATA including Training

Consultancy Services for Provision, Installation

and Implementation of Knowledge Management

Software

Consultancy Services for Supply and installation

and configuratin of internet solution for LAMATA

(Share point)

Consultancy Services for the Provision of 1M

Internet Access

Consultancy Services for Oracle Support Licence

Consultancy Services for IT Equipment

Maintenance

Consultancy Services for EDMS Maintenance

Consultancy Services for Antivirus Support

Consultancy Services for Anti-Spam Support

Consultancy Services for Cloud Storage / Data

Backup

Consultancy Services for Arc GIS & Arc View

Upgrade and Licensing + HP Large format Plotter

Consultancy Services for Institutional, Technical

and Financial Audit

10-Nov-11

27-Apr-12

13-Apr-12

1-May-12

3-Sep-12

12-Mar-12

4-Apr-12

1-May-12

16-Oct-12

2-Aug-12

5-Jul-12

15-Nov-12

NonAsciiFileName0.xls 619 of 754 11/21/2012 1:40 AM

Procurement Plan-Consultants 2

Consultancy Services for Conducting Resettlement

Policy Framework (RPF) for Akin Adesola &

Wempco Roads

Consultancy Services for Resettlement Action Plan

(RAP) Implementation for Mile 12 to Ikorodu BRT

scheme

Consultancy Services for Procurement Audit for 2

consecutive years

Consultancy Services for Assesment of Needs of

Disadvantaged Group in Accessing Public

Transport Services on Mile 12 to Ikorodu Town

BRT Corridor

Consultancy Services for Carrying out Socio-

Economic Baseline Survey of Transportation from

Mile 12 to Ikorodu

Consultancy Services for Institutional, Technical

and Financial Audit

Consultancy Services for Developing the core

public Transport Network in Kano -Rapid

Development of Shor-time Program Investment

Consultancy Services for Developing the core

public Transport Network in Kano -Rapid

Collection of Traffic and Transport Data

Consultancy Service for Inestigating the impact of

Motocycles and Three Wheelers Growth in Africa -

Case Study of Kano

Consultancy Services for Conducting

Environmental and Social Management Plan

(ESMP) for Akin Adesola and Wempco Roads

10-Feb-12

9-Feb-12

9-Feb-12

9-Feb-12

16-Apr-12

15-Feb-12

13-Jul-11

13-Jul-11

13-Jul-11

13-Jul-11

13-Jul-11

13-Jul-11

NonAsciiFileName0.xls 620 of 754 11/21/2012 1:40 AM

Procurement Plan-Consultants 2

NonAsciiFileName0.xls 621 of 754 11/21/2012 1:40 AM

Procurement Plan-Consultants 2 Country/Organisation:Nigeria Lagos Metropolitan Area Transport Authority (LAMATA)

Project/Programme: Lagos Urban Transport Project (LUTP)

IDA Credit No.: 3721-0 UNI

Description*

Norm Duration of Proc Steps

Component 1:(Instititional Development)

Training of Staff and Twining programme (To be

Implemented through global Training plan and

Twining arrangement for (January 2012 to Dec

2012)

Component 2:Public Transport and Traffic Management

Consultancy Services for Carrying out the Pre and

Post Study for the Establishment of Transport

Planning Units in Lagos Island, Kosofe and

Ikorodu LGAs in Lagos State

Consultancy Services for Detailed Engineering

Design and Construction Supervision of BRT LITE

Upgrade from Mile 12 to CMS

Consultancy Services for Conceptual Design of

BRT LITE Upgrade from Mile 12 to CMS

Consultancy Services for Engineering Design and

Construction Supervision of BFS Infrastructure

Rehabilitation and Upgrading

Consultancy Services for conducting Technical due

diligence on BFS Buses (Environmental

Enhancement of BFS Operations: Due Diligence

Report) Including Supervision of the

Refurbishment of BFS Buses

On-line UNDB

Gateway

Nat Press

1 - 1.5 wks

5-Apr-12

19-Nov-12

3-Feb-12

29-May-12

06-Dec-12

Request for EOI

(where required)

NonAsciiFileName0.xls 622 of 754 11/21/2012 1:40 AM

Procurement Plan-Consultants 2

Component 3: Improvement of Lagos State

Metropolitan Road Network

Component 4: Project Management & System Monitoring

Consultancy for Construction Supervision of Akin

Adesola and Wempco Roads

Consultancy Services for Design Upgrade and

Construction Supervision of BFS Bus Depot

Infrastructure

Consultancy Services for Website Redesign and

Hosting

Consultancy Services for IT Equipment

Maintenance

Consultancy Services for Events and Stakeholders

Management for BRT Services

Consultancy Services for Advertising and

Perception Management for BRT Extension (Mile

12 - Ikorodu)

Consultancy Services for Pavement Management

System Reconfiguration, Training and Data

Collection and Upload

Consultancy Services for the Documentation of the

Communication and Participation Efforts to Raise

Familiarity with BRT on Mile 12 to CMS Route

Consultancy to Conduct Stakeholder engagements

on other LAMATA projects (STMP, Road

rehabilitation/periodic maintenance etc)

Consultancy for Construction Supervision of

Adesina/Omilani/Airways Road Surulere

Consultancy for Construction Supervision of Apata

Lisabi Street Somolu

N/A

27-Feb-12

18-Nov-11

21-Oct-11

13-Feb-12

13-Feb-12

11-Nov-11

8-Nov-11

18-Sep-12

18-Sep-12

20-Jul-12

13-Feb-12

16-Sep-11

NonAsciiFileName0.xls 623 of 754 11/21/2012 1:40 AM

Procurement Plan-Consultants 2

Consultancy Services for Supply and installation

and Configuration of HDM4 Software for

LAMATA including Training

Consultancy Services for Provision, Installation

and Implementation of Knowledge Management

Software

Consultancy Services for Supply and installation

and configuratin of internet solution for LAMATA

(Share point)

Consultancy Services for the Provision of 1M

Internet Access

Consultancy Services for Oracle Support Licence

Consultancy Services for IT Equipment

Maintenance

Consultancy Services for EDMS Maintenance

Consultancy Services for Antivirus Support

Consultancy Services for Anti-Spam Support

Consultancy Services for Cloud Storage / Data

Backup

Consultancy Services for Arc GIS & Arc View

Upgrade and Licensing + HP Large format Plotter

Consultancy Services for Institutional, Technical

and Financial Audit

15-Nov-11

N/A

17-Apr-12

3-May-12

N/A

N/A

6-Apr-12

3-May-12

N/A

6-Aug-12

9-Jul-12

22-Nov-12

NonAsciiFileName0.xls 624 of 754 11/21/2012 1:40 AM

Procurement Plan-Consultants 2

Consultancy Services for Conducting Resettlement

Policy Framework (RPF) for Akin Adesola &

Wempco Roads

Consultancy Services for Resettlement Action Plan

(RAP) Implementation for Mile 12 to Ikorodu BRT

scheme

Consultancy Services for Procurement Audit for 2

consecutive years

Consultancy Services for Assesment of Needs of

Disadvantaged Group in Accessing Public

Transport Services on Mile 12 to Ikorodu Town

BRT Corridor

Consultancy Services for Carrying out Socio-

Economic Baseline Survey of Transportation from

Mile 12 to Ikorodu

Consultancy Services for Institutional, Technical

and Financial Audit

Consultancy Services for Developing the core

public Transport Network in Kano -Rapid

Development of Shor-time Program Investment

Consultancy Services for Developing the core

public Transport Network in Kano -Rapid

Collection of Traffic and Transport Data

Consultancy Service for Inestigating the impact of

Motocycles and Three Wheelers Growth in Africa -

Case Study of Kano

Consultancy Services for Conducting

Environmental and Social Management Plan

(ESMP) for Akin Adesola and Wempco Roads

13-Feb-12

13-Feb-12

13-Feb-12

13-Feb-12

20-Apr-12

19-Feb-12

15-Jul-11

15-Jul-11

15-Jul-11

15-Jul-11

15-Jul-11

15-Jul-11

NonAsciiFileName0.xls 625 of 754 11/21/2012 1:40 AM

Procurement Plan-Consultants 2

NonAsciiFileName0.xls 626 of 754 11/21/2012 1:40 AM

Procurement Plan-Consultants 2 Country/Organisation:Nigeria Lagos Metropolitan Area Transport Authority (LAMATA)

Project/Programme: Lagos Urban Transport Project (LUTP)

IDA Credit No.: 3721-0 UNI

Description*

Norm Duration of Proc Steps

Component 1:(Instititional Development)

Training of Staff and Twining programme (To be

Implemented through global Training plan and

Twining arrangement for (January 2012 to Dec

2012)

Component 2:Public Transport and Traffic Management

Consultancy Services for Carrying out the Pre and

Post Study for the Establishment of Transport

Planning Units in Lagos Island, Kosofe and

Ikorodu LGAs in Lagos State

Consultancy Services for Detailed Engineering

Design and Construction Supervision of BRT LITE

Upgrade from Mile 12 to CMS

Consultancy Services for Conceptual Design of

BRT LITE Upgrade from Mile 12 to CMS

Consultancy Services for Engineering Design and

Construction Supervision of BFS Infrastructure

Rehabilitation and Upgrading

Consultancy Services for conducting Technical due

diligence on BFS Buses (Environmental

Enhancement of BFS Operations: Due Diligence

Report) Including Supervision of the

Refurbishment of BFS Buses

Lead-time

before shortlist

2 wks

19-Apr-12

3-Dec-12

17-Feb-12

12-Jun-12

20-Dec-12

Request for EOI

(where required)

NonAsciiFileName0.xls 627 of 754 11/21/2012 1:40 AM

Procurement Plan-Consultants 2

Component 3: Improvement of Lagos State

Metropolitan Road Network

Component 4: Project Management & System Monitoring

Consultancy for Construction Supervision of Akin

Adesola and Wempco Roads

Consultancy Services for Design Upgrade and

Construction Supervision of BFS Bus Depot

Infrastructure

Consultancy Services for Website Redesign and

Hosting

Consultancy Services for IT Equipment

Maintenance

Consultancy Services for Events and Stakeholders

Management for BRT Services

Consultancy Services for Advertising and

Perception Management for BRT Extension (Mile

12 - Ikorodu)

Consultancy Services for Pavement Management

System Reconfiguration, Training and Data

Collection and Upload

Consultancy Services for the Documentation of the

Communication and Participation Efforts to Raise

Familiarity with BRT on Mile 12 to CMS Route

Consultancy to Conduct Stakeholder engagements

on other LAMATA projects (STMP, Road

rehabilitation/periodic maintenance etc)

Consultancy for Construction Supervision of

Adesina/Omilani/Airways Road Surulere

Consultancy for Construction Supervision of Apata

Lisabi Street Somolu

N/A

12-Mar-12

2-Dec-11

4-Nov-11

27-Feb-12

27-Feb-12

25-Nov-11

23-Nov-11

2-Oct-12

2-Oct-12

3-Aug-12

27-Feb-12

30-Sep-11

NonAsciiFileName0.xls 628 of 754 11/21/2012 1:40 AM

Procurement Plan-Consultants 2

Consultancy Services for Supply and installation

and Configuration of HDM4 Software for

LAMATA including Training

Consultancy Services for Provision, Installation

and Implementation of Knowledge Management

Software

Consultancy Services for Supply and installation

and configuratin of internet solution for LAMATA

(Share point)

Consultancy Services for the Provision of 1M

Internet Access

Consultancy Services for Oracle Support Licence

Consultancy Services for IT Equipment

Maintenance

Consultancy Services for EDMS Maintenance

Consultancy Services for Antivirus Support

Consultancy Services for Anti-Spam Support

Consultancy Services for Cloud Storage / Data

Backup

Consultancy Services for Arc GIS & Arc View

Upgrade and Licensing + HP Large format Plotter

Consultancy Services for Institutional, Technical

and Financial Audit

29-Nov-11

N/A

1-May-12

17-May-12

N/A

N/A

20-Apr-12

17-May-12

N/A

20-Aug-12

23-Jul-12

6-Dec-12

NonAsciiFileName0.xls 629 of 754 11/21/2012 1:40 AM

Procurement Plan-Consultants 2

Consultancy Services for Conducting Resettlement

Policy Framework (RPF) for Akin Adesola &

Wempco Roads

Consultancy Services for Resettlement Action Plan

(RAP) Implementation for Mile 12 to Ikorodu BRT

scheme

Consultancy Services for Procurement Audit for 2

consecutive years

Consultancy Services for Assesment of Needs of

Disadvantaged Group in Accessing Public

Transport Services on Mile 12 to Ikorodu Town

BRT Corridor

Consultancy Services for Carrying out Socio-

Economic Baseline Survey of Transportation from

Mile 12 to Ikorodu

Consultancy Services for Institutional, Technical

and Financial Audit

Consultancy Services for Developing the core

public Transport Network in Kano -Rapid

Development of Shor-time Program Investment

Consultancy Services for Developing the core

public Transport Network in Kano -Rapid

Collection of Traffic and Transport Data

Consultancy Service for Inestigating the impact of

Motocycles and Three Wheelers Growth in Africa -

Case Study of Kano

Consultancy Services for Conducting

Environmental and Social Management Plan

(ESMP) for Akin Adesola and Wempco Roads

27-Feb-12

27-Feb-12

27-Feb-12

27-Feb-12

4-May-12

4-Mar-12

29-Jul-11

1-Aug-11

29-Jul-11

1-Aug-11

29-Jul-11

1-Aug-11

NonAsciiFileName0.xls 630 of 754 11/21/2012 1:40 AM

Procurement Plan-Consultants 2

NonAsciiFileName0.xls 631 of 754 11/21/2012 1:40 AM

Procurement Plan-Consultants 2 Country/Organisation:Nigeria Lagos Metropolitan Area Transport Authority (LAMATA)

Project/Programme: Lagos Urban Transport Project (LUTP)

IDA Credit No.: 3721-0 UNI

Description*

Norm Duration of Proc Steps

Component 1:(Instititional Development)

Training of Staff and Twining programme (To be

Implemented through global Training plan and

Twining arrangement for (January 2012 to Dec

2012)

Component 2:Public Transport and Traffic Management

Consultancy Services for Carrying out the Pre and

Post Study for the Establishment of Transport

Planning Units in Lagos Island, Kosofe and

Ikorodu LGAs in Lagos State

Consultancy Services for Detailed Engineering

Design and Construction Supervision of BRT LITE

Upgrade from Mile 12 to CMS

Consultancy Services for Conceptual Design of

BRT LITE Upgrade from Mile 12 to CMS

Consultancy Services for Engineering Design and

Construction Supervision of BFS Infrastructure

Rehabilitation and Upgrading

Consultancy Services for conducting Technical due

diligence on BFS Buses (Environmental

Enhancement of BFS Operations: Due Diligence

Report) Including Supervision of the

Refurbishment of BFS Buses

Submission

Date

N/A

17-Dec-12

N/A

N/A

N/A

Short

List

NonAsciiFileName0.xls 632 of 754 11/21/2012 1:40 AM

Procurement Plan-Consultants 2

Component 3: Improvement of Lagos State

Metropolitan Road Network

Component 4: Project Management & System Monitoring

Consultancy for Construction Supervision of Akin

Adesola and Wempco Roads

Consultancy Services for Design Upgrade and

Construction Supervision of BFS Bus Depot

Infrastructure

Consultancy Services for Website Redesign and

Hosting

Consultancy Services for IT Equipment

Maintenance

Consultancy Services for Events and Stakeholders

Management for BRT Services

Consultancy Services for Advertising and

Perception Management for BRT Extension (Mile

12 - Ikorodu)

Consultancy Services for Pavement Management

System Reconfiguration, Training and Data

Collection and Upload

Consultancy Services for the Documentation of the

Communication and Participation Efforts to Raise

Familiarity with BRT on Mile 12 to CMS Route

Consultancy to Conduct Stakeholder engagements

on other LAMATA projects (STMP, Road

rehabilitation/periodic maintenance etc)

Consultancy for Construction Supervision of

Adesina/Omilani/Airways Road Surulere

Consultancy for Construction Supervision of Apata

Lisabi Street Somolu

N/A

26-Mar-12

N/A

N/A

N/A

N/A

30-Jan-12

N/A

N/A

17-Aug-12

N/A

N/A

NonAsciiFileName0.xls 633 of 754 11/21/2012 1:40 AM

Procurement Plan-Consultants 2

Consultancy Services for Supply and installation

and Configuration of HDM4 Software for

LAMATA including Training

Consultancy Services for Provision, Installation

and Implementation of Knowledge Management

Software

Consultancy Services for Supply and installation

and configuratin of internet solution for LAMATA

(Share point)

Consultancy Services for the Provision of 1M

Internet Access

Consultancy Services for Oracle Support Licence

Consultancy Services for IT Equipment

Maintenance

Consultancy Services for EDMS Maintenance

Consultancy Services for Antivirus Support

Consultancy Services for Anti-Spam Support

Consultancy Services for Cloud Storage / Data

Backup

Consultancy Services for Arc GIS & Arc View

Upgrade and Licensing + HP Large format Plotter

Consultancy Services for Institutional, Technical

and Financial Audit

N/A

N/A

N/A

N/A

N/A

N/A

N/A

N/A

N/A

N/A

N/A

20-Dec-12

NonAsciiFileName0.xls 634 of 754 11/21/2012 1:40 AM

Procurement Plan-Consultants 2

Consultancy Services for Conducting Resettlement

Policy Framework (RPF) for Akin Adesola &

Wempco Roads

Consultancy Services for Resettlement Action Plan

(RAP) Implementation for Mile 12 to Ikorodu BRT

scheme

Consultancy Services for Procurement Audit for 2

consecutive years

Consultancy Services for Assesment of Needs of

Disadvantaged Group in Accessing Public

Transport Services on Mile 12 to Ikorodu Town

BRT Corridor

Consultancy Services for Carrying out Socio-

Economic Baseline Survey of Transportation from

Mile 12 to Ikorodu

Consultancy Services for Institutional, Technical

and Financial Audit

Consultancy Services for Developing the core

public Transport Network in Kano -Rapid

Development of Shor-time Program Investment

Consultancy Services for Developing the core

public Transport Network in Kano -Rapid

Collection of Traffic and Transport Data

Consultancy Service for Inestigating the impact of

Motocycles and Three Wheelers Growth in Africa -

Case Study of Kano

Consultancy Services for Conducting

Environmental and Social Management Plan

(ESMP) for Akin Adesola and Wempco Roads

N/A

N/A

N/A

N/A

N/A

N/A

N/A

N/A

N/A

N/A

N/A

N/A

NonAsciiFileName0.xls 635 of 754 11/21/2012 1:40 AM

Procurement Plan-Consultants 2

NonAsciiFileName0.xls 636 of 754 11/21/2012 1:40 AM

Procurement Plan-Consultants 2 Country/Organisation:Nigeria Lagos Metropolitan Area Transport Authority (LAMATA)

Project/Programme: Lagos Urban Transport Project (LUTP)

IDA Credit No.: 3721-0 UNI

Description*

Norm Duration of Proc Steps

Component 1:(Instititional Development)

Training of Staff and Twining programme (To be

Implemented through global Training plan and

Twining arrangement for (January 2012 to Dec

2012)

Component 2:Public Transport and Traffic Management

Consultancy Services for Carrying out the Pre and

Post Study for the Establishment of Transport

Planning Units in Lagos Island, Kosofe and

Ikorodu LGAs in Lagos State

Consultancy Services for Detailed Engineering

Design and Construction Supervision of BRT LITE

Upgrade from Mile 12 to CMS

Consultancy Services for Conceptual Design of

BRT LITE Upgrade from Mile 12 to CMS

Consultancy Services for Engineering Design and

Construction Supervision of BFS Infrastructure

Rehabilitation and Upgrading

Consultancy Services for conducting Technical due

diligence on BFS Buses (Environmental

Enhancement of BFS Operations: Due Diligence

Report) Including Supervision of the

Refurbishment of BFS Buses

No-objection

Date

Plan vs.

Actual

1 - 2 wks Plan

Plan

N/A Plan

Actual

31-Dec-12 Plan

Actual

N/A Plan

Actual

N/A Plan

Actual

N/A Plan

Actual

Short

List

NonAsciiFileName0.xls 637 of 754 11/21/2012 1:40 AM

Procurement Plan-Consultants 2

Component 3: Improvement of Lagos State

Metropolitan Road Network

Component 4: Project Management & System Monitoring

Consultancy for Construction Supervision of Akin

Adesola and Wempco Roads

Consultancy Services for Design Upgrade and

Construction Supervision of BFS Bus Depot

Infrastructure

Consultancy Services for Website Redesign and

Hosting

Consultancy Services for IT Equipment

Maintenance

Consultancy Services for Events and Stakeholders

Management for BRT Services

Consultancy Services for Advertising and

Perception Management for BRT Extension (Mile

12 - Ikorodu)

Consultancy Services for Pavement Management

System Reconfiguration, Training and Data

Collection and Upload

Consultancy Services for the Documentation of the

Communication and Participation Efforts to Raise

Familiarity with BRT on Mile 12 to CMS Route

Consultancy to Conduct Stakeholder engagements

on other LAMATA projects (STMP, Road

rehabilitation/periodic maintenance etc)

Consultancy for Construction Supervision of

Adesina/Omilani/Airways Road Surulere

Consultancy for Construction Supervision of Apata

Lisabi Street Somolu

N/A Plan

Actual

9-Apr-12 Plan

Actual

N/A Plan

N/A Actual

N/A Plan

Actual

N/A Plan

Actual

6-Feb-12 Plan

N/A Plan

Actual

N/A Plan

Actual

31-Aug-12 Plan

Actual

N/A Plan

Actual

N/A Plan

NonAsciiFileName0.xls 638 of 754 11/21/2012 1:40 AM

Procurement Plan-Consultants 2

Consultancy Services for Supply and installation

and Configuration of HDM4 Software for

LAMATA including Training

Consultancy Services for Provision, Installation

and Implementation of Knowledge Management

Software

Consultancy Services for Supply and installation

and configuratin of internet solution for LAMATA

(Share point)

Consultancy Services for the Provision of 1M

Internet Access

Consultancy Services for Oracle Support Licence

Consultancy Services for IT Equipment

Maintenance

Consultancy Services for EDMS Maintenance

Consultancy Services for Antivirus Support

Consultancy Services for Anti-Spam Support

Consultancy Services for Cloud Storage / Data

Backup

Consultancy Services for Arc GIS & Arc View

Upgrade and Licensing + HP Large format Plotter

Consultancy Services for Institutional, Technical

and Financial Audit

N/A Actual

N/A Plan

Actual

N/A Plan

Actual

N/A Plan

Actual

N/A Plan

Actual

N/A Plan

Actual

N/A Plan

Actual

N/A Plan

Actual

N/A Plan

Actual

N/A Plan

Actual

N/A Plan

Actual

3-Jan-13 Plan

NonAsciiFileName0.xls 639 of 754 11/21/2012 1:40 AM

Procurement Plan-Consultants 2

Consultancy Services for Conducting Resettlement

Policy Framework (RPF) for Akin Adesola &

Wempco Roads

Consultancy Services for Resettlement Action Plan

(RAP) Implementation for Mile 12 to Ikorodu BRT

scheme

Consultancy Services for Procurement Audit for 2

consecutive years

Consultancy Services for Assesment of Needs of

Disadvantaged Group in Accessing Public

Transport Services on Mile 12 to Ikorodu Town

BRT Corridor

Consultancy Services for Carrying out Socio-

Economic Baseline Survey of Transportation from

Mile 12 to Ikorodu

Consultancy Services for Institutional, Technical

and Financial Audit

Consultancy Services for Developing the core

public Transport Network in Kano -Rapid

Development of Shor-time Program Investment

Consultancy Services for Developing the core

public Transport Network in Kano -Rapid

Collection of Traffic and Transport Data

Consultancy Service for Inestigating the impact of

Motocycles and Three Wheelers Growth in Africa -

Case Study of Kano

Consultancy Services for Conducting

Environmental and Social Management Plan

(ESMP) for Akin Adesola and Wempco Roads

Actual

N/A Plan

Actual

N/A Plan

Actual

N/A Plan

Actual

N/A Plan

Actual

N/A Plan

Actual

N/A Plan

Actual

N/A Plan

N/A Actual

N/A Plan

N/A Actual

N/A Plan

N/A Actual

NonAsciiFileName0.xls 640 of 754 11/21/2012 1:40 AM

Procurement Plan-Consultants 2

NonAsciiFileName0.xls 641 of 754 11/21/2012 1:40 AM

Procurement Plan-Consultants 2 Country/Organisation:Nigeria Lagos Metropolitan Area Transport Authority (LAMATA)

Project/Programme: Lagos Urban Transport Project (LUTP)

IDA Credit No.: 3721-0 UNI

Description*

Norm Duration of Proc Steps

Component 1:(Instititional Development)

Training of Staff and Twining programme (To be

Implemented through global Training plan and

Twining arrangement for (January 2012 to Dec

2012)

Component 2:Public Transport and Traffic Management

Consultancy Services for Carrying out the Pre and

Post Study for the Establishment of Transport

Planning Units in Lagos Island, Kosofe and

Ikorodu LGAs in Lagos State

Consultancy Services for Detailed Engineering

Design and Construction Supervision of BRT LITE

Upgrade from Mile 12 to CMS

Consultancy Services for Conceptual Design of

BRT LITE Upgrade from Mile 12 to CMS

Consultancy Services for Engineering Design and

Construction Supervision of BFS Infrastructure

Rehabilitation and Upgrading

Consultancy Services for conducting Technical due

diligence on BFS Buses (Environmental

Enhancement of BFS Operations: Due Diligence

Report) Including Supervision of the

Refurbishment of BFS Buses

Invitation

Date

4 to

3-May-12

4-Jan-13

2-Mar-12

26-Jun-12

3-Jan-13

Consultant

Proposals

NonAsciiFileName0.xls 642 of 754 11/21/2012 1:40 AM

Procurement Plan-Consultants 2

Component 3: Improvement of Lagos State

Metropolitan Road Network

Component 4: Project Management & System Monitoring

Consultancy for Construction Supervision of Akin

Adesola and Wempco Roads

Consultancy Services for Design Upgrade and

Construction Supervision of BFS Bus Depot

Infrastructure

Consultancy Services for Website Redesign and

Hosting

Consultancy Services for IT Equipment

Maintenance

Consultancy Services for Events and Stakeholders

Management for BRT Services

Consultancy Services for Advertising and

Perception Management for BRT Extension (Mile

12 - Ikorodu)

Consultancy Services for Pavement Management

System Reconfiguration, Training and Data

Collection and Upload

Consultancy Services for the Documentation of the

Communication and Participation Efforts to Raise

Familiarity with BRT on Mile 12 to CMS Route

Consultancy to Conduct Stakeholder engagements

on other LAMATA projects (STMP, Road

rehabilitation/periodic maintenance etc)

Consultancy for Construction Supervision of

Adesina/Omilani/Airways Road Surulere

Consultancy for Construction Supervision of Apata

Lisabi Street Somolu

20-Apr-12

16-Apr-12

16-Dec-11

23-No-11

12-Mar-12

12-Mar-12

13-Feb-12

16-Oct-12

16-Oct-12

4-Sep-12

12-Mar-12

23-Jan-12

NonAsciiFileName0.xls 643 of 754 11/21/2012 1:40 AM

Procurement Plan-Consultants 2

Consultancy Services for Supply and installation

and Configuration of HDM4 Software for

LAMATA including Training

Consultancy Services for Provision, Installation

and Implementation of Knowledge Management

Software

Consultancy Services for Supply and installation

and configuratin of internet solution for LAMATA

(Share point)

Consultancy Services for the Provision of 1M

Internet Access

Consultancy Services for Oracle Support Licence

Consultancy Services for IT Equipment

Maintenance

Consultancy Services for EDMS Maintenance

Consultancy Services for Antivirus Support

Consultancy Services for Anti-Spam Support

Consultancy Services for Cloud Storage / Data

Backup

Consultancy Services for Arc GIS & Arc View

Upgrade and Licensing + HP Large format Plotter

Consultancy Services for Institutional, Technical

and Financial Audit

23-Jan-12

29-Apr-12

15-May-12

31-May-12

5-Sep-12

15-Mar-12

4-May-12

31-May-12

19-Oct-12

3-Sep-12

6-Aug-12

10-Jan-13

NonAsciiFileName0.xls 644 of 754 11/21/2012 1:40 AM

Procurement Plan-Consultants 2

Consultancy Services for Conducting Resettlement

Policy Framework (RPF) for Akin Adesola &

Wempco Roads

Consultancy Services for Resettlement Action Plan

(RAP) Implementation for Mile 12 to Ikorodu BRT

scheme

Consultancy Services for Procurement Audit for 2

consecutive years

Consultancy Services for Assesment of Needs of

Disadvantaged Group in Accessing Public

Transport Services on Mile 12 to Ikorodu Town

BRT Corridor

Consultancy Services for Carrying out Socio-

Economic Baseline Survey of Transportation from

Mile 12 to Ikorodu

Consultancy Services for Institutional, Technical

and Financial Audit

Consultancy Services for Developing the core

public Transport Network in Kano -Rapid

Development of Shor-time Program Investment

Consultancy Services for Developing the core

public Transport Network in Kano -Rapid

Collection of Traffic and Transport Data

Consultancy Service for Inestigating the impact of

Motocycles and Three Wheelers Growth in Africa -

Case Study of Kano

Consultancy Services for Conducting

Environmental and Social Management Plan

(ESMP) for Akin Adesola and Wempco Roads

12-Mar-12

12-Mar-12

12-Mar-12

12-Mar-12

18-May-12

18-Mar-12

16-Sep-11

19-Sep-11

16-Sep-11

19-Sep-11

16-Sep-11

19-Sep-11

NonAsciiFileName0.xls 645 of 754 11/21/2012 1:40 AM

Procurement Plan-Consultants 2

NonAsciiFileName0.xls 646 of 754 11/21/2012 1:40 AM

Procurement Plan-Consultants 2 Country/Organisation:Nigeria Lagos Metropolitan Area Transport Authority (LAMATA)

Project/Programme: Lagos Urban Transport Project (LUTP)

IDA Credit No.: 3721-0 UNI

Description*

Norm Duration of Proc Steps

Component 1:(Instititional Development)

Training of Staff and Twining programme (To be

Implemented through global Training plan and

Twining arrangement for (January 2012 to Dec

2012)

Component 2:Public Transport and Traffic Management

Consultancy Services for Carrying out the Pre and

Post Study for the Establishment of Transport

Planning Units in Lagos Island, Kosofe and

Ikorodu LGAs in Lagos State

Consultancy Services for Detailed Engineering

Design and Construction Supervision of BRT LITE

Upgrade from Mile 12 to CMS

Consultancy Services for Conceptual Design of

BRT LITE Upgrade from Mile 12 to CMS

Consultancy Services for Engineering Design and

Construction Supervision of BFS Infrastructure

Rehabilitation and Upgrading

Consultancy Services for conducting Technical due

diligence on BFS Buses (Environmental

Enhancement of BFS Operations: Due Diligence

Report) Including Supervision of the

Refurbishment of BFS Buses

Submission/

Opening

Date

12 wks

2-Jun-12

3-Feb-13

1-Apr-12

26-Jul-12

2-Feb-13

Consultant

Proposals

NonAsciiFileName0.xls 647 of 754 11/21/2012 1:40 AM

Procurement Plan-Consultants 2

Component 3: Improvement of Lagos State

Metropolitan Road Network

Component 4: Project Management & System Monitoring

Consultancy for Construction Supervision of Akin

Adesola and Wempco Roads

Consultancy Services for Design Upgrade and

Construction Supervision of BFS Bus Depot

Infrastructure

Consultancy Services for Website Redesign and

Hosting

Consultancy Services for IT Equipment

Maintenance

Consultancy Services for Events and Stakeholders

Management for BRT Services

Consultancy Services for Advertising and

Perception Management for BRT Extension (Mile

12 - Ikorodu)

Consultancy Services for Pavement Management

System Reconfiguration, Training and Data

Collection and Upload

Consultancy Services for the Documentation of the

Communication and Participation Efforts to Raise

Familiarity with BRT on Mile 12 to CMS Route

Consultancy to Conduct Stakeholder engagements

on other LAMATA projects (STMP, Road

rehabilitation/periodic maintenance etc)

Consultancy for Construction Supervision of

Adesina/Omilani/Airways Road Surulere

Consultancy for Construction Supervision of Apata

Lisabi Street Somolu

21-May-12

15-May-12

15-Jan-12

29-Dec-11

11-Apr-12

11-Apr-12

12-Mar-12

15-Nov-12

15-Nov-12

4-Oct-12

9-Apr-12

21-Feb-12

NonAsciiFileName0.xls 648 of 754 11/21/2012 1:40 AM

Procurement Plan-Consultants 2

Consultancy Services for Supply and installation

and Configuration of HDM4 Software for

LAMATA including Training

Consultancy Services for Provision, Installation

and Implementation of Knowledge Management

Software

Consultancy Services for Supply and installation

and configuratin of internet solution for LAMATA

(Share point)

Consultancy Services for the Provision of 1M

Internet Access

Consultancy Services for Oracle Support Licence

Consultancy Services for IT Equipment

Maintenance

Consultancy Services for EDMS Maintenance

Consultancy Services for Antivirus Support

Consultancy Services for Anti-Spam Support

Consultancy Services for Cloud Storage / Data

Backup

Consultancy Services for Arc GIS & Arc View

Upgrade and Licensing + HP Large format Plotter

Consultancy Services for Institutional, Technical

and Financial Audit

27-May-12

12-Jun-12

28-Jun-12

3-Oct-12

12-Apr-12

1-Jun-12

28-Jun-12

2-Nov-12

1-Oct-12

3-Sep-12

8-Feb-13

NonAsciiFileName0.xls 649 of 754 11/21/2012 1:40 AM

Procurement Plan-Consultants 2

Consultancy Services for Conducting Resettlement

Policy Framework (RPF) for Akin Adesola &

Wempco Roads

Consultancy Services for Resettlement Action Plan

(RAP) Implementation for Mile 12 to Ikorodu BRT

scheme

Consultancy Services for Procurement Audit for 2

consecutive years

Consultancy Services for Assesment of Needs of

Disadvantaged Group in Accessing Public

Transport Services on Mile 12 to Ikorodu Town

BRT Corridor

Consultancy Services for Carrying out Socio-

Economic Baseline Survey of Transportation from

Mile 12 to Ikorodu

Consultancy Services for Institutional, Technical

and Financial Audit

Consultancy Services for Developing the core

public Transport Network in Kano -Rapid

Development of Shor-time Program Investment

Consultancy Services for Developing the core

public Transport Network in Kano -Rapid

Collection of Traffic and Transport Data

Consultancy Service for Inestigating the impact of

Motocycles and Three Wheelers Growth in Africa -

Case Study of Kano

Consultancy Services for Conducting

Environmental and Social Management Plan

(ESMP) for Akin Adesola and Wempco Roads

9-Apr-12

9-Apr-12

9-Apr-12

9-Apr-12

17-Jun-12

17-Apr-12

16-Oct-11

21-Oct-11

16-Oct-11

21-Oct-11

16-Oct-11

21-Oct-11

NonAsciiFileName0.xls 650 of 754 11/21/2012 1:40 AM

Procurement Plan-Consultants 2

NonAsciiFileName0.xls 651 of 754 11/21/2012 1:40 AM

Procurement Plan-Consultants 2 Country/Organisation:Nigeria Lagos Metropolitan Area Transport Authority (LAMATA)

Project/Programme: Lagos Urban Transport Project (LUTP)

IDA Credit No.: 3721-0 UNI

Description*

Norm Duration of Proc Steps

Component 1:(Instititional Development)

Training of Staff and Twining programme (To be

Implemented through global Training plan and

Twining arrangement for (January 2012 to Dec

2012)

Component 2:Public Transport and Traffic Management

Consultancy Services for Carrying out the Pre and

Post Study for the Establishment of Transport

Planning Units in Lagos Island, Kosofe and

Ikorodu LGAs in Lagos State

Consultancy Services for Detailed Engineering

Design and Construction Supervision of BRT LITE

Upgrade from Mile 12 to CMS

Consultancy Services for Conceptual Design of

BRT LITE Upgrade from Mile 12 to CMS

Consultancy Services for Engineering Design and

Construction Supervision of BFS Infrastructure

Rehabilitation and Upgrading

Consultancy Services for conducting Technical due

diligence on BFS Buses (Environmental

Enhancement of BFS Operations: Due Diligence

Report) Including Supervision of the

Refurbishment of BFS Buses

Submission

Evaluation

Report (T)

2 - 3 wks

N/A

17-Feb-13

N/A

N/A

N/A

Proposal Evaluation and Negotiation for Projects after May 2002

Technical (T) & Financial (F) and Negotions (N)

NonAsciiFileName0.xls 652 of 754 11/21/2012 1:40 AM

Procurement Plan-Consultants 2

Component 3: Improvement of Lagos State

Metropolitan Road Network

Component 4: Project Management & System Monitoring

Consultancy for Construction Supervision of Akin

Adesola and Wempco Roads

Consultancy Services for Design Upgrade and

Construction Supervision of BFS Bus Depot

Infrastructure

Consultancy Services for Website Redesign and

Hosting

Consultancy Services for IT Equipment

Maintenance

Consultancy Services for Events and Stakeholders

Management for BRT Services

Consultancy Services for Advertising and

Perception Management for BRT Extension (Mile

12 - Ikorodu)

Consultancy Services for Pavement Management

System Reconfiguration, Training and Data

Collection and Upload

Consultancy Services for the Documentation of the

Communication and Participation Efforts to Raise

Familiarity with BRT on Mile 12 to CMS Route

Consultancy to Conduct Stakeholder engagements

on other LAMATA projects (STMP, Road

rehabilitation/periodic maintenance etc)

Consultancy for Construction Supervision of

Adesina/Omilani/Airways Road Surulere

Consultancy for Construction Supervision of Apata

Lisabi Street Somolu

N/A

29-May-12

N/A

N/A

N/A

N/A

30-Sep-11

N/A

N/A

18-Oct-12

N/A

N/A

NonAsciiFileName0.xls 653 of 754 11/21/2012 1:40 AM

Procurement Plan-Consultants 2

Consultancy Services for Supply and installation

and Configuration of HDM4 Software for

LAMATA including Training

Consultancy Services for Provision, Installation

and Implementation of Knowledge Management

Software

Consultancy Services for Supply and installation

and configuratin of internet solution for LAMATA

(Share point)

Consultancy Services for the Provision of 1M

Internet Access

Consultancy Services for Oracle Support Licence

Consultancy Services for IT Equipment

Maintenance

Consultancy Services for EDMS Maintenance

Consultancy Services for Antivirus Support

Consultancy Services for Anti-Spam Support

Consultancy Services for Cloud Storage / Data

Backup

Consultancy Services for Arc GIS & Arc View

Upgrade and Licensing + HP Large format Plotter

Consultancy Services for Institutional, Technical

and Financial Audit

N/A

N/A

N/A

N/A

N/A

N/A

N/A

N/A

N/A

N/A

22-Feb-13

NonAsciiFileName0.xls 654 of 754 11/21/2012 1:40 AM

Procurement Plan-Consultants 2

Consultancy Services for Conducting Resettlement

Policy Framework (RPF) for Akin Adesola &

Wempco Roads

Consultancy Services for Resettlement Action Plan

(RAP) Implementation for Mile 12 to Ikorodu BRT

scheme

Consultancy Services for Procurement Audit for 2

consecutive years

Consultancy Services for Assesment of Needs of

Disadvantaged Group in Accessing Public

Transport Services on Mile 12 to Ikorodu Town

BRT Corridor

Consultancy Services for Carrying out Socio-

Economic Baseline Survey of Transportation from

Mile 12 to Ikorodu

Consultancy Services for Institutional, Technical

and Financial Audit

Consultancy Services for Developing the core

public Transport Network in Kano -Rapid

Development of Shor-time Program Investment

Consultancy Services for Developing the core

public Transport Network in Kano -Rapid

Collection of Traffic and Transport Data

Consultancy Service for Inestigating the impact of

Motocycles and Three Wheelers Growth in Africa -

Case Study of Kano

Consultancy Services for Conducting

Environmental and Social Management Plan

(ESMP) for Akin Adesola and Wempco Roads

N/A

N/A

N/A

N/A

N/A

N/A

N/A

N/A

N/A

N/A

N/A

N/A

NonAsciiFileName0.xls 655 of 754 11/21/2012 1:40 AM

Procurement Plan-Consultants 2

NonAsciiFileName0.xls 656 of 754 11/21/2012 1:40 AM

Procurement Plan-Consultants 2 Country/Organisation:Nigeria Lagos Metropolitan Area Transport Authority (LAMATA)

Project/Programme: Lagos Urban Transport Project (LUTP)

IDA Credit No.: 3721-0 UNI

Description*

Norm Duration of Proc Steps

Component 1:(Instititional Development)

Training of Staff and Twining programme (To be

Implemented through global Training plan and

Twining arrangement for (January 2012 to Dec

2012)

Component 2:Public Transport and Traffic Management

Consultancy Services for Carrying out the Pre and

Post Study for the Establishment of Transport

Planning Units in Lagos Island, Kosofe and

Ikorodu LGAs in Lagos State

Consultancy Services for Detailed Engineering

Design and Construction Supervision of BRT LITE

Upgrade from Mile 12 to CMS

Consultancy Services for Conceptual Design of

BRT LITE Upgrade from Mile 12 to CMS

Consultancy Services for Engineering Design and

Construction Supervision of BFS Infrastructure

Rehabilitation and Upgrading

Consultancy Services for conducting Technical due

diligence on BFS Buses (Environmental

Enhancement of BFS Operations: Due Diligence

Report) Including Supervision of the

Refurbishment of BFS Buses

No-objection

Evaluation

Report (T)

0.5 - 2 wks

N/A

3-Mar-13

N/A

N/A

N/A

Proposal Evaluation and Negotiation for Projects after May 2002

Technical (T) & Financial (F) and Negotions (N)

NonAsciiFileName0.xls 657 of 754 11/21/2012 1:40 AM

Procurement Plan-Consultants 2

Component 3: Improvement of Lagos State

Metropolitan Road Network

Component 4: Project Management & System Monitoring

Consultancy for Construction Supervision of Akin

Adesola and Wempco Roads

Consultancy Services for Design Upgrade and

Construction Supervision of BFS Bus Depot

Infrastructure

Consultancy Services for Website Redesign and

Hosting

Consultancy Services for IT Equipment

Maintenance

Consultancy Services for Events and Stakeholders

Management for BRT Services

Consultancy Services for Advertising and

Perception Management for BRT Extension (Mile

12 - Ikorodu)

Consultancy Services for Pavement Management

System Reconfiguration, Training and Data

Collection and Upload

Consultancy Services for the Documentation of the

Communication and Participation Efforts to Raise

Familiarity with BRT on Mile 12 to CMS Route

Consultancy to Conduct Stakeholder engagements

on other LAMATA projects (STMP, Road

rehabilitation/periodic maintenance etc)

Consultancy for Construction Supervision of

Adesina/Omilani/Airways Road Surulere

Consultancy for Construction Supervision of Apata

Lisabi Street Somolu

N/A

12-Jun-12

N/A

N/A

N/A

N/A

14-Oct-11

N/A

N/A

1-Nov-12

N/A

N/A

NonAsciiFileName0.xls 658 of 754 11/21/2012 1:40 AM

Procurement Plan-Consultants 2

Consultancy Services for Supply and installation

and Configuration of HDM4 Software for

LAMATA including Training

Consultancy Services for Provision, Installation

and Implementation of Knowledge Management

Software

Consultancy Services for Supply and installation

and configuratin of internet solution for LAMATA

(Share point)

Consultancy Services for the Provision of 1M

Internet Access

Consultancy Services for Oracle Support Licence

Consultancy Services for IT Equipment

Maintenance

Consultancy Services for EDMS Maintenance

Consultancy Services for Antivirus Support

Consultancy Services for Anti-Spam Support

Consultancy Services for Cloud Storage / Data

Backup

Consultancy Services for Arc GIS & Arc View

Upgrade and Licensing + HP Large format Plotter

Consultancy Services for Institutional, Technical

and Financial Audit

N/A

N/A

N/A

N/A

N/A

N/A

N/A

N/A

N/A

N/A

8-Mar-13

NonAsciiFileName0.xls 659 of 754 11/21/2012 1:40 AM

Procurement Plan-Consultants 2

Consultancy Services for Conducting Resettlement

Policy Framework (RPF) for Akin Adesola &

Wempco Roads

Consultancy Services for Resettlement Action Plan

(RAP) Implementation for Mile 12 to Ikorodu BRT

scheme

Consultancy Services for Procurement Audit for 2

consecutive years

Consultancy Services for Assesment of Needs of

Disadvantaged Group in Accessing Public

Transport Services on Mile 12 to Ikorodu Town

BRT Corridor

Consultancy Services for Carrying out Socio-

Economic Baseline Survey of Transportation from

Mile 12 to Ikorodu

Consultancy Services for Institutional, Technical

and Financial Audit

Consultancy Services for Developing the core

public Transport Network in Kano -Rapid

Development of Shor-time Program Investment

Consultancy Services for Developing the core

public Transport Network in Kano -Rapid

Collection of Traffic and Transport Data

Consultancy Service for Inestigating the impact of

Motocycles and Three Wheelers Growth in Africa -

Case Study of Kano

Consultancy Services for Conducting

Environmental and Social Management Plan

(ESMP) for Akin Adesola and Wempco Roads

N/A

N/A

N/A

N/A

N/A

N/A

N/A

N/A

N/A

N/A

N/A

N/A

NonAsciiFileName0.xls 660 of 754 11/21/2012 1:40 AM

Procurement Plan-Consultants 2

NonAsciiFileName0.xls 661 of 754 11/21/2012 1:40 AM

Procurement Plan-Consultants 2 Country/Organisation:Nigeria Lagos Metropolitan Area Transport Authority (LAMATA)

Project/Programme: Lagos Urban Transport Project (LUTP)

IDA Credit No.: 3721-0 UNI

Description*

Norm Duration of Proc Steps

Component 1:(Instititional Development)

Training of Staff and Twining programme (To be

Implemented through global Training plan and

Twining arrangement for (January 2012 to Dec

2012)

Component 2:Public Transport and Traffic Management

Consultancy Services for Carrying out the Pre and

Post Study for the Establishment of Transport

Planning Units in Lagos Island, Kosofe and

Ikorodu LGAs in Lagos State

Consultancy Services for Detailed Engineering

Design and Construction Supervision of BRT LITE

Upgrade from Mile 12 to CMS

Consultancy Services for Conceptual Design of

BRT LITE Upgrade from Mile 12 to CMS

Consultancy Services for Engineering Design and

Construction Supervision of BFS Infrastructure

Rehabilitation and Upgrading

Consultancy Services for conducting Technical due

diligence on BFS Buses (Environmental

Enhancement of BFS Operations: Due Diligence

Report) Including Supervision of the

Refurbishment of BFS Buses

Opening Financial

Proposals

2 wks

N/A

17-Feb-13

N/A

N/A

N/A

Proposal Evaluation and Negotiation for Projects after May 2002

Technical (T) & Financial (F) and Negotions (N)

NonAsciiFileName0.xls 662 of 754 11/21/2012 1:40 AM

Procurement Plan-Consultants 2

Component 3: Improvement of Lagos State

Metropolitan Road Network

Component 4: Project Management & System Monitoring

Consultancy for Construction Supervision of Akin

Adesola and Wempco Roads

Consultancy Services for Design Upgrade and

Construction Supervision of BFS Bus Depot

Infrastructure

Consultancy Services for Website Redesign and

Hosting

Consultancy Services for IT Equipment

Maintenance

Consultancy Services for Events and Stakeholders

Management for BRT Services

Consultancy Services for Advertising and

Perception Management for BRT Extension (Mile

12 - Ikorodu)

Consultancy Services for Pavement Management

System Reconfiguration, Training and Data

Collection and Upload

Consultancy Services for the Documentation of the

Communication and Participation Efforts to Raise

Familiarity with BRT on Mile 12 to CMS Route

Consultancy to Conduct Stakeholder engagements

on other LAMATA projects (STMP, Road

rehabilitation/periodic maintenance etc)

Consultancy for Construction Supervision of

Adesina/Omilani/Airways Road Surulere

Consultancy for Construction Supervision of Apata

Lisabi Street Somolu

N/A

19-Jun-12

N/A

N/A

N/A

N/A

21-Oct-11

N/A

N/A

18-Oct-12

N/A

N/A

NonAsciiFileName0.xls 663 of 754 11/21/2012 1:40 AM

Procurement Plan-Consultants 2

Consultancy Services for Supply and installation

and Configuration of HDM4 Software for

LAMATA including Training

Consultancy Services for Provision, Installation

and Implementation of Knowledge Management

Software

Consultancy Services for Supply and installation

and configuratin of internet solution for LAMATA

(Share point)

Consultancy Services for the Provision of 1M

Internet Access

Consultancy Services for Oracle Support Licence

Consultancy Services for IT Equipment

Maintenance

Consultancy Services for EDMS Maintenance

Consultancy Services for Antivirus Support

Consultancy Services for Anti-Spam Support

Consultancy Services for Cloud Storage / Data

Backup

Consultancy Services for Arc GIS & Arc View

Upgrade and Licensing + HP Large format Plotter

Consultancy Services for Institutional, Technical

and Financial Audit

N/A

N/A

N/A

N/A

N/A

N/A

N/A

N/A

N/A

N/A

15-Mar-13

NonAsciiFileName0.xls 664 of 754 11/21/2012 1:40 AM

Procurement Plan-Consultants 2

Consultancy Services for Conducting Resettlement

Policy Framework (RPF) for Akin Adesola &

Wempco Roads

Consultancy Services for Resettlement Action Plan

(RAP) Implementation for Mile 12 to Ikorodu BRT

scheme

Consultancy Services for Procurement Audit for 2

consecutive years

Consultancy Services for Assesment of Needs of

Disadvantaged Group in Accessing Public

Transport Services on Mile 12 to Ikorodu Town

BRT Corridor

Consultancy Services for Carrying out Socio-

Economic Baseline Survey of Transportation from

Mile 12 to Ikorodu

Consultancy Services for Institutional, Technical

and Financial Audit

Consultancy Services for Developing the core

public Transport Network in Kano -Rapid

Development of Shor-time Program Investment

Consultancy Services for Developing the core

public Transport Network in Kano -Rapid

Collection of Traffic and Transport Data

Consultancy Service for Inestigating the impact of

Motocycles and Three Wheelers Growth in Africa -

Case Study of Kano

Consultancy Services for Conducting

Environmental and Social Management Plan

(ESMP) for Akin Adesola and Wempco Roads

N/A

N/A

N/A

N/A

N/A

N/A

N/A

N/A

N/A

N/A

N/A

N/A

NonAsciiFileName0.xls 665 of 754 11/21/2012 1:40 AM

Procurement Plan-Consultants 2

NonAsciiFileName0.xls 666 of 754 11/21/2012 1:40 AM

Procurement Plan-Consultants 2 Country/Organisation:Nigeria Lagos Metropolitan Area Transport Authority (LAMATA)

Project/Programme: Lagos Urban Transport Project (LUTP)

IDA Credit No.: 3721-0 UNI

Description*

Norm Duration of Proc Steps

Component 1:(Instititional Development)

Training of Staff and Twining programme (To be

Implemented through global Training plan and

Twining arrangement for (January 2012 to Dec

2012)

Component 2:Public Transport and Traffic Management

Consultancy Services for Carrying out the Pre and

Post Study for the Establishment of Transport

Planning Units in Lagos Island, Kosofe and

Ikorodu LGAs in Lagos State

Consultancy Services for Detailed Engineering

Design and Construction Supervision of BRT LITE

Upgrade from Mile 12 to CMS

Consultancy Services for Conceptual Design of

BRT LITE Upgrade from Mile 12 to CMS

Consultancy Services for Engineering Design and

Construction Supervision of BFS Infrastructure

Rehabilitation and Upgrading

Consultancy Services for conducting Technical due

diligence on BFS Buses (Environmental

Enhancement of BFS Operations: Due Diligence

Report) Including Supervision of the

Refurbishment of BFS Buses

Preparation

Eval Report

(T) (F)

1 - 2 wks

9-Jun-12

24-Feb-13

8-Apr-12

12-Aug-12

9-Feb-13

Proposal Evaluation and Negotiation for Projects after May 2002

Technical (T) & Financial (F) and Negotions (N)

NonAsciiFileName0.xls 667 of 754 11/21/2012 1:40 AM

Procurement Plan-Consultants 2

Component 3: Improvement of Lagos State

Metropolitan Road Network

Component 4: Project Management & System Monitoring

Consultancy for Construction Supervision of Akin

Adesola and Wempco Roads

Consultancy Services for Design Upgrade and

Construction Supervision of BFS Bus Depot

Infrastructure

Consultancy Services for Website Redesign and

Hosting

Consultancy Services for IT Equipment

Maintenance

Consultancy Services for Events and Stakeholders

Management for BRT Services

Consultancy Services for Advertising and

Perception Management for BRT Extension (Mile

12 - Ikorodu)

Consultancy Services for Pavement Management

System Reconfiguration, Training and Data

Collection and Upload

Consultancy Services for the Documentation of the

Communication and Participation Efforts to Raise

Familiarity with BRT on Mile 12 to CMS Route

Consultancy to Conduct Stakeholder engagements

on other LAMATA projects (STMP, Road

rehabilitation/periodic maintenance etc)

Consultancy for Construction Supervision of

Adesina/Omilani/Airways Road Surulere

Consultancy for Construction Supervision of Apata

Lisabi Street Somolu

4-Jun-12

26-Jun-12

22-Jan-12

6-Jan-12

18-Apr-12

18-Apr-12

28-Oct-11

22-Nov-12

22-Nov-12

25-Oct-12

16-Apr-12

28-Feb-12

NonAsciiFileName0.xls 668 of 754 11/21/2012 1:40 AM

Procurement Plan-Consultants 2

Consultancy Services for Supply and installation

and Configuration of HDM4 Software for

LAMATA including Training

Consultancy Services for Provision, Installation

and Implementation of Knowledge Management

Software

Consultancy Services for Supply and installation

and configuratin of internet solution for LAMATA

(Share point)

Consultancy Services for the Provision of 1M

Internet Access

Consultancy Services for Oracle Support Licence

Consultancy Services for IT Equipment

Maintenance

Consultancy Services for EDMS Maintenance

Consultancy Services for Antivirus Support

Consultancy Services for Anti-Spam Support

Consultancy Services for Cloud Storage / Data

Backup

Consultancy Services for Arc GIS & Arc View

Upgrade and Licensing + HP Large format Plotter

Consultancy Services for Institutional, Technical

and Financial Audit

3-Jun-12

19-Jun-12

5-Jul-12

10-Oct-12

19-Apr-12

8-Jun-12

5-Jul-12

9-Nov-12

8-Oct-12

10-Sep-12

22-Mar-13

NonAsciiFileName0.xls 669 of 754 11/21/2012 1:40 AM

Procurement Plan-Consultants 2

Consultancy Services for Conducting Resettlement

Policy Framework (RPF) for Akin Adesola &

Wempco Roads

Consultancy Services for Resettlement Action Plan

(RAP) Implementation for Mile 12 to Ikorodu BRT

scheme

Consultancy Services for Procurement Audit for 2

consecutive years

Consultancy Services for Assesment of Needs of

Disadvantaged Group in Accessing Public

Transport Services on Mile 12 to Ikorodu Town

BRT Corridor

Consultancy Services for Carrying out Socio-

Economic Baseline Survey of Transportation from

Mile 12 to Ikorodu

Consultancy Services for Institutional, Technical

and Financial Audit

Consultancy Services for Developing the core

public Transport Network in Kano -Rapid

Development of Shor-time Program Investment

Consultancy Services for Developing the core

public Transport Network in Kano -Rapid

Collection of Traffic and Transport Data

Consultancy Service for Inestigating the impact of

Motocycles and Three Wheelers Growth in Africa -

Case Study of Kano

Consultancy Services for Conducting

Environmental and Social Management Plan

(ESMP) for Akin Adesola and Wempco Roads

16-Apr-12

16-Apr-12

16-Apr-12

16-Apr-12

24-Jun-12

24-Apr-12

6-Nov-11

30-Nov-11

6-Nov-11

30-Nov-11

6-Nov-11

30-Nov-11

NonAsciiFileName0.xls 670 of 754 11/21/2012 1:40 AM

Procurement Plan-Consultants 2

NonAsciiFileName0.xls 671 of 754 11/21/2012 1:40 AM

Procurement Plan-Consultants 2 Country/Organisation:Nigeria Lagos Metropolitan Area Transport Authority (LAMATA)

Project/Programme: Lagos Urban Transport Project (LUTP)

IDA Credit No.: 3721-0 UNI

Description*

Norm Duration of Proc Steps

Component 1:(Instititional Development)

Training of Staff and Twining programme (To be

Implemented through global Training plan and

Twining arrangement for (January 2012 to Dec

2012)

Component 2:Public Transport and Traffic Management

Consultancy Services for Carrying out the Pre and

Post Study for the Establishment of Transport

Planning Units in Lagos Island, Kosofe and

Ikorodu LGAs in Lagos State

Consultancy Services for Detailed Engineering

Design and Construction Supervision of BRT LITE

Upgrade from Mile 12 to CMS

Consultancy Services for Conceptual Design of

BRT LITE Upgrade from Mile 12 to CMS

Consultancy Services for Engineering Design and

Construction Supervision of BFS Infrastructure

Rehabilitation and Upgrading

Consultancy Services for conducting Technical due

diligence on BFS Buses (Environmental

Enhancement of BFS Operations: Due Diligence

Report) Including Supervision of the

Refurbishment of BFS Buses

Negotiations (N)

2 wks

16-Jun-12

3-Mar-13

15-Apr-12

19-Aug-12

16-Feb-13

Proposal Evaluation and Negotiation for Projects after May 2002

Technical (T) & Financial (F) and Negotions (N)

NonAsciiFileName0.xls 672 of 754 11/21/2012 1:40 AM

Procurement Plan-Consultants 2

Component 3: Improvement of Lagos State

Metropolitan Road Network

Component 4: Project Management & System Monitoring

Consultancy for Construction Supervision of Akin

Adesola and Wempco Roads

Consultancy Services for Design Upgrade and

Construction Supervision of BFS Bus Depot

Infrastructure

Consultancy Services for Website Redesign and

Hosting

Consultancy Services for IT Equipment

Maintenance

Consultancy Services for Events and Stakeholders

Management for BRT Services

Consultancy Services for Advertising and

Perception Management for BRT Extension (Mile

12 - Ikorodu)

Consultancy Services for Pavement Management

System Reconfiguration, Training and Data

Collection and Upload

Consultancy Services for the Documentation of the

Communication and Participation Efforts to Raise

Familiarity with BRT on Mile 12 to CMS Route

Consultancy to Conduct Stakeholder engagements

on other LAMATA projects (STMP, Road

rehabilitation/periodic maintenance etc)

Consultancy for Construction Supervision of

Adesina/Omilani/Airways Road Surulere

Consultancy for Construction Supervision of Apata

Lisabi Street Somolu

18-Jun-12

10-Jul-12

31-Jan-12

25-Apr-12

25-Apr-12

4-Nov-11

29-Nov-12

29-Nov-12

1-Nov-12

23-Apr-12

6-Mar-12

NonAsciiFileName0.xls 673 of 754 11/21/2012 1:40 AM

Procurement Plan-Consultants 2

Consultancy Services for Supply and installation

and Configuration of HDM4 Software for

LAMATA including Training

Consultancy Services for Provision, Installation

and Implementation of Knowledge Management

Software

Consultancy Services for Supply and installation

and configuratin of internet solution for LAMATA

(Share point)

Consultancy Services for the Provision of 1M

Internet Access

Consultancy Services for Oracle Support Licence

Consultancy Services for IT Equipment

Maintenance

Consultancy Services for EDMS Maintenance

Consultancy Services for Antivirus Support

Consultancy Services for Anti-Spam Support

Consultancy Services for Cloud Storage / Data

Backup

Consultancy Services for Arc GIS & Arc View

Upgrade and Licensing + HP Large format Plotter

Consultancy Services for Institutional, Technical

and Financial Audit

10-Jun-12

26-Jun-12

12-Jul-12

17-Oct-12

26-Apr-12

15-Jun-12

12-Jul-12

16-Nov-12

15-Oct-12

17-Sep-12

5-Apr-13

NonAsciiFileName0.xls 674 of 754 11/21/2012 1:40 AM

Procurement Plan-Consultants 2

Consultancy Services for Conducting Resettlement

Policy Framework (RPF) for Akin Adesola &

Wempco Roads

Consultancy Services for Resettlement Action Plan

(RAP) Implementation for Mile 12 to Ikorodu BRT

scheme

Consultancy Services for Procurement Audit for 2

consecutive years

Consultancy Services for Assesment of Needs of

Disadvantaged Group in Accessing Public

Transport Services on Mile 12 to Ikorodu Town

BRT Corridor

Consultancy Services for Carrying out Socio-

Economic Baseline Survey of Transportation from

Mile 12 to Ikorodu

Consultancy Services for Institutional, Technical

and Financial Audit

Consultancy Services for Developing the core

public Transport Network in Kano -Rapid

Development of Shor-time Program Investment

Consultancy Services for Developing the core

public Transport Network in Kano -Rapid

Collection of Traffic and Transport Data

Consultancy Service for Inestigating the impact of

Motocycles and Three Wheelers Growth in Africa -

Case Study of Kano

Consultancy Services for Conducting

Environmental and Social Management Plan

(ESMP) for Akin Adesola and Wempco Roads

23-Apr-12

23-Apr-12

23-Apr-12

23-Apr-12

1-Jul-12

1-May-12

16-Feb-12

16-Feb-12

16-Feb-12

NonAsciiFileName0.xls 675 of 754 11/21/2012 1:40 AM

Procurement Plan-Consultants 2

NonAsciiFileName0.xls 676 of 754 11/21/2012 1:40 AM

Procurement Plan-Consultants 2 Country/Organisation:Nigeria Lagos Metropolitan Area Transport Authority (LAMATA)

Project/Programme: Lagos Urban Transport Project (LUTP)

IDA Credit No.: 3721-0 UNI

Description*

Norm Duration of Proc Steps

Component 1:(Instititional Development)

Training of Staff and Twining programme (To be

Implemented through global Training plan and

Twining arrangement for (January 2012 to Dec

2012)

Component 2:Public Transport and Traffic Management

Consultancy Services for Carrying out the Pre and

Post Study for the Establishment of Transport

Planning Units in Lagos Island, Kosofe and

Ikorodu LGAs in Lagos State

Consultancy Services for Detailed Engineering

Design and Construction Supervision of BRT LITE

Upgrade from Mile 12 to CMS

Consultancy Services for Conceptual Design of

BRT LITE Upgrade from Mile 12 to CMS

Consultancy Services for Engineering Design and

Construction Supervision of BFS Infrastructure

Rehabilitation and Upgrading

Consultancy Services for conducting Technical due

diligence on BFS Buses (Environmental

Enhancement of BFS Operations: Due Diligence

Report) Including Supervision of the

Refurbishment of BFS Buses

Plan vs.

Actual

Plan

Plan

Plan

Actual

Plan

Actual

Plan

Actual

Plan

Actual

Plan

Actual

NonAsciiFileName0.xls 677 of 754 11/21/2012 1:40 AM

Procurement Plan-Consultants 2

Component 3: Improvement of Lagos State

Metropolitan Road Network

Component 4: Project Management & System Monitoring

Consultancy for Construction Supervision of Akin

Adesola and Wempco Roads

Consultancy Services for Design Upgrade and

Construction Supervision of BFS Bus Depot

Infrastructure

Consultancy Services for Website Redesign and

Hosting

Consultancy Services for IT Equipment

Maintenance

Consultancy Services for Events and Stakeholders

Management for BRT Services

Consultancy Services for Advertising and

Perception Management for BRT Extension (Mile

12 - Ikorodu)

Consultancy Services for Pavement Management

System Reconfiguration, Training and Data

Collection and Upload

Consultancy Services for the Documentation of the

Communication and Participation Efforts to Raise

Familiarity with BRT on Mile 12 to CMS Route

Consultancy to Conduct Stakeholder engagements

on other LAMATA projects (STMP, Road

rehabilitation/periodic maintenance etc)

Consultancy for Construction Supervision of

Adesina/Omilani/Airways Road Surulere

Consultancy for Construction Supervision of Apata

Lisabi Street Somolu

Plan

Actual

Plan

Actual

Plan

Actual

Plan

Actual

Plan

Actual

Plan

Plan

Actual

Plan

Actual

Plan

Actual

Plan

Actual

Plan

NonAsciiFileName0.xls 678 of 754 11/21/2012 1:40 AM

Procurement Plan-Consultants 2

Consultancy Services for Supply and installation

and Configuration of HDM4 Software for

LAMATA including Training

Consultancy Services for Provision, Installation

and Implementation of Knowledge Management

Software

Consultancy Services for Supply and installation

and configuratin of internet solution for LAMATA

(Share point)

Consultancy Services for the Provision of 1M

Internet Access

Consultancy Services for Oracle Support Licence

Consultancy Services for IT Equipment

Maintenance

Consultancy Services for EDMS Maintenance

Consultancy Services for Antivirus Support

Consultancy Services for Anti-Spam Support

Consultancy Services for Cloud Storage / Data

Backup

Consultancy Services for Arc GIS & Arc View

Upgrade and Licensing + HP Large format Plotter

Consultancy Services for Institutional, Technical

and Financial Audit

Actual

Plan

Actual

Plan

Actual

Plan

Actual

Plan

Actual

Plan

Actual

Plan

Actual

Plan

Actual

Plan

Actual

Plan

Actual

Plan

Actual

Plan

NonAsciiFileName0.xls 679 of 754 11/21/2012 1:40 AM

Procurement Plan-Consultants 2

Consultancy Services for Conducting Resettlement

Policy Framework (RPF) for Akin Adesola &

Wempco Roads

Consultancy Services for Resettlement Action Plan

(RAP) Implementation for Mile 12 to Ikorodu BRT

scheme

Consultancy Services for Procurement Audit for 2

consecutive years

Consultancy Services for Assesment of Needs of

Disadvantaged Group in Accessing Public

Transport Services on Mile 12 to Ikorodu Town

BRT Corridor

Consultancy Services for Carrying out Socio-

Economic Baseline Survey of Transportation from

Mile 12 to Ikorodu

Consultancy Services for Institutional, Technical

and Financial Audit

Consultancy Services for Developing the core

public Transport Network in Kano -Rapid

Development of Shor-time Program Investment

Consultancy Services for Developing the core

public Transport Network in Kano -Rapid

Collection of Traffic and Transport Data

Consultancy Service for Inestigating the impact of

Motocycles and Three Wheelers Growth in Africa -

Case Study of Kano

Consultancy Services for Conducting

Environmental and Social Management Plan

(ESMP) for Akin Adesola and Wempco Roads

Actual

Plan

Actual

Plan

Actual

Plan

Actual

Plan

Actual

Plan

Actual

Plan

Actual

Plan

Actual

Plan

Actual

Plan

Actual

NonAsciiFileName0.xls 680 of 754 11/21/2012 1:40 AM

Procurement Plan-Consultants 2

NonAsciiFileName0.xls 681 of 754 11/21/2012 1:40 AM

Procurement Plan-Consultants 2 Country/Organisation:Nigeria Lagos Metropolitan Area Transport Authority (LAMATA)

Project/Programme: Lagos Urban Transport Project (LUTP)

IDA Credit No.: 3721-0 UNI

Description*

Norm Duration of Proc Steps

Component 1:(Instititional Development)

Training of Staff and Twining programme (To be

Implemented through global Training plan and

Twining arrangement for (January 2012 to Dec

2012)

Component 2:Public Transport and Traffic Management

Consultancy Services for Carrying out the Pre and

Post Study for the Establishment of Transport

Planning Units in Lagos Island, Kosofe and

Ikorodu LGAs in Lagos State

Consultancy Services for Detailed Engineering

Design and Construction Supervision of BRT LITE

Upgrade from Mile 12 to CMS

Consultancy Services for Conceptual Design of

BRT LITE Upgrade from Mile 12 to CMS

Consultancy Services for Engineering Design and

Construction Supervision of BFS Infrastructure

Rehabilitation and Upgrading

Consultancy Services for conducting Technical due

diligence on BFS Buses (Environmental

Enhancement of BFS Operations: Due Diligence

Report) Including Supervision of the

Refurbishment of BFS Buses

Submission Date

1 - 2 wks

N/A

17-Mar-13

N/A

N/A

N/A

Draft Contract

NonAsciiFileName0.xls 682 of 754 11/21/2012 1:40 AM

Procurement Plan-Consultants 2

Component 3: Improvement of Lagos State

Metropolitan Road Network

Component 4: Project Management & System Monitoring

Consultancy for Construction Supervision of Akin

Adesola and Wempco Roads

Consultancy Services for Design Upgrade and

Construction Supervision of BFS Bus Depot

Infrastructure

Consultancy Services for Website Redesign and

Hosting

Consultancy Services for IT Equipment

Maintenance

Consultancy Services for Events and Stakeholders

Management for BRT Services

Consultancy Services for Advertising and

Perception Management for BRT Extension (Mile

12 - Ikorodu)

Consultancy Services for Pavement Management

System Reconfiguration, Training and Data

Collection and Upload

Consultancy Services for the Documentation of the

Communication and Participation Efforts to Raise

Familiarity with BRT on Mile 12 to CMS Route

Consultancy to Conduct Stakeholder engagements

on other LAMATA projects (STMP, Road

rehabilitation/periodic maintenance etc)

Consultancy for Construction Supervision of

Adesina/Omilani/Airways Road Surulere

Consultancy for Construction Supervision of Apata

Lisabi Street Somolu

2-Jul-12

24-Jul-12

N/A

N/A

N/A

11-Nov-11

N/A

N/A

15-Nov-12

N/A

N/A

NonAsciiFileName0.xls 683 of 754 11/21/2012 1:40 AM

Procurement Plan-Consultants 2

Consultancy Services for Supply and installation

and Configuration of HDM4 Software for

LAMATA including Training

Consultancy Services for Provision, Installation

and Implementation of Knowledge Management

Software

Consultancy Services for Supply and installation

and configuratin of internet solution for LAMATA

(Share point)

Consultancy Services for the Provision of 1M

Internet Access

Consultancy Services for Oracle Support Licence

Consultancy Services for IT Equipment

Maintenance

Consultancy Services for EDMS Maintenance

Consultancy Services for Antivirus Support

Consultancy Services for Anti-Spam Support

Consultancy Services for Cloud Storage / Data

Backup

Consultancy Services for Arc GIS & Arc View

Upgrade and Licensing + HP Large format Plotter

Consultancy Services for Institutional, Technical

and Financial Audit

17-Jun-12

N/A

N/A

24-Oct-12

3-May-12

N/A

N/A

23-Nov-12

N/A

N/A

19-Apr-13

NonAsciiFileName0.xls 684 of 754 11/21/2012 1:40 AM

Procurement Plan-Consultants 2

Consultancy Services for Conducting Resettlement

Policy Framework (RPF) for Akin Adesola &

Wempco Roads

Consultancy Services for Resettlement Action Plan

(RAP) Implementation for Mile 12 to Ikorodu BRT

scheme

Consultancy Services for Procurement Audit for 2

consecutive years

Consultancy Services for Assesment of Needs of

Disadvantaged Group in Accessing Public

Transport Services on Mile 12 to Ikorodu Town

BRT Corridor

Consultancy Services for Carrying out Socio-

Economic Baseline Survey of Transportation from

Mile 12 to Ikorodu

Consultancy Services for Institutional, Technical

and Financial Audit

Consultancy Services for Developing the core

public Transport Network in Kano -Rapid

Development of Shor-time Program Investment

Consultancy Services for Developing the core

public Transport Network in Kano -Rapid

Collection of Traffic and Transport Data

Consultancy Service for Inestigating the impact of

Motocycles and Three Wheelers Growth in Africa -

Case Study of Kano

Consultancy Services for Conducting

Environmental and Social Management Plan

(ESMP) for Akin Adesola and Wempco Roads

N/A

N/A

N/A

N/A

N/A

N/A

N/A

N/A

N/A

NonAsciiFileName0.xls 685 of 754 11/21/2012 1:40 AM

Procurement Plan-Consultants 2

NonAsciiFileName0.xls 686 of 754 11/21/2012 1:40 AM

Procurement Plan-Consultants 2 Country/Organisation:Nigeria Lagos Metropolitan Area Transport Authority (LAMATA)

Project/Programme: Lagos Urban Transport Project (LUTP)

IDA Credit No.: 3721-0 UNI

Description*

Norm Duration of Proc Steps

Component 1:(Instititional Development)

Training of Staff and Twining programme (To be

Implemented through global Training plan and

Twining arrangement for (January 2012 to Dec

2012)

Component 2:Public Transport and Traffic Management

Consultancy Services for Carrying out the Pre and

Post Study for the Establishment of Transport

Planning Units in Lagos Island, Kosofe and

Ikorodu LGAs in Lagos State

Consultancy Services for Detailed Engineering

Design and Construction Supervision of BRT LITE

Upgrade from Mile 12 to CMS

Consultancy Services for Conceptual Design of

BRT LITE Upgrade from Mile 12 to CMS

Consultancy Services for Engineering Design and

Construction Supervision of BFS Infrastructure

Rehabilitation and Upgrading

Consultancy Services for conducting Technical due

diligence on BFS Buses (Environmental

Enhancement of BFS Operations: Due Diligence

Report) Including Supervision of the

Refurbishment of BFS Buses

No-objection Date

1 - 2 wks

N/A

29-Mar-13

N/A

N/A

N/A

Draft Contract

NonAsciiFileName0.xls 687 of 754 11/21/2012 1:40 AM

Procurement Plan-Consultants 2

Component 3: Improvement of Lagos State

Metropolitan Road Network

Component 4: Project Management & System Monitoring

Consultancy for Construction Supervision of Akin

Adesola and Wempco Roads

Consultancy Services for Design Upgrade and

Construction Supervision of BFS Bus Depot

Infrastructure

Consultancy Services for Website Redesign and

Hosting

Consultancy Services for IT Equipment

Maintenance

Consultancy Services for Events and Stakeholders

Management for BRT Services

Consultancy Services for Advertising and

Perception Management for BRT Extension (Mile

12 - Ikorodu)

Consultancy Services for Pavement Management

System Reconfiguration, Training and Data

Collection and Upload

Consultancy Services for the Documentation of the

Communication and Participation Efforts to Raise

Familiarity with BRT on Mile 12 to CMS Route

Consultancy to Conduct Stakeholder engagements

on other LAMATA projects (STMP, Road

rehabilitation/periodic maintenance etc)

Consultancy for Construction Supervision of

Adesina/Omilani/Airways Road Surulere

Consultancy for Construction Supervision of Apata

Lisabi Street Somolu

16-Jul-12

7-Aug-12

N/A

N/A

N/A

18-Nov-11

N/A

N/A

27-Nov-12

N/A

N/A

NonAsciiFileName0.xls 688 of 754 11/21/2012 1:40 AM

Procurement Plan-Consultants 2

Consultancy Services for Supply and installation

and Configuration of HDM4 Software for

LAMATA including Training

Consultancy Services for Provision, Installation

and Implementation of Knowledge Management

Software

Consultancy Services for Supply and installation

and configuratin of internet solution for LAMATA

(Share point)

Consultancy Services for the Provision of 1M

Internet Access

Consultancy Services for Oracle Support Licence

Consultancy Services for IT Equipment

Maintenance

Consultancy Services for EDMS Maintenance

Consultancy Services for Antivirus Support

Consultancy Services for Anti-Spam Support

Consultancy Services for Cloud Storage / Data

Backup

Consultancy Services for Arc GIS & Arc View

Upgrade and Licensing + HP Large format Plotter

Consultancy Services for Institutional, Technical

and Financial Audit

27-Jun-12

N/A

N/A

3-Nov-12

13-May-12

N/A

N/A

3-Dec-12

N/A

N/A

3-May-13

NonAsciiFileName0.xls 689 of 754 11/21/2012 1:40 AM

Procurement Plan-Consultants 2

Consultancy Services for Conducting Resettlement

Policy Framework (RPF) for Akin Adesola &

Wempco Roads

Consultancy Services for Resettlement Action Plan

(RAP) Implementation for Mile 12 to Ikorodu BRT

scheme

Consultancy Services for Procurement Audit for 2

consecutive years

Consultancy Services for Assesment of Needs of

Disadvantaged Group in Accessing Public

Transport Services on Mile 12 to Ikorodu Town

BRT Corridor

Consultancy Services for Carrying out Socio-

Economic Baseline Survey of Transportation from

Mile 12 to Ikorodu

Consultancy Services for Institutional, Technical

and Financial Audit

Consultancy Services for Developing the core

public Transport Network in Kano -Rapid

Development of Shor-time Program Investment

Consultancy Services for Developing the core

public Transport Network in Kano -Rapid

Collection of Traffic and Transport Data

Consultancy Service for Inestigating the impact of

Motocycles and Three Wheelers Growth in Africa -

Case Study of Kano

Consultancy Services for Conducting

Environmental and Social Management Plan

(ESMP) for Akin Adesola and Wempco Roads

N/A

N/A

N/A

N/A

N/A

N/A

N/A

N/A

N/A

NonAsciiFileName0.xls 690 of 754 11/21/2012 1:40 AM

Procurement Plan-Consultants 2

NonAsciiFileName0.xls 691 of 754 11/21/2012 1:40 AM

Procurement Plan-Consultants 2 Country/Organisation:Nigeria Lagos Metropolitan Area Transport Authority (LAMATA)

Project/Programme: Lagos Urban Transport Project (LUTP)

IDA Credit No.: 3721-0 UNI

Description*

Norm Duration of Proc Steps

Component 1:(Instititional Development)

Training of Staff and Twining programme (To be

Implemented through global Training plan and

Twining arrangement for (January 2012 to Dec

2012)

Component 2:Public Transport and Traffic Management

Consultancy Services for Carrying out the Pre and

Post Study for the Establishment of Transport

Planning Units in Lagos Island, Kosofe and

Ikorodu LGAs in Lagos State

Consultancy Services for Detailed Engineering

Design and Construction Supervision of BRT LITE

Upgrade from Mile 12 to CMS

Consultancy Services for Conceptual Design of

BRT LITE Upgrade from Mile 12 to CMS

Consultancy Services for Engineering Design and

Construction Supervision of BFS Infrastructure

Rehabilitation and Upgrading

Consultancy Services for conducting Technical due

diligence on BFS Buses (Environmental

Enhancement of BFS Operations: Due Diligence

Report) Including Supervision of the

Refurbishment of BFS Buses

Contract Award

1 wk

24-Jun-12

5-Apr-13

23-Apr-12

27-Aug-12

24-Feb-13

NonAsciiFileName0.xls 692 of 754 11/21/2012 1:40 AM

Procurement Plan-Consultants 2

Component 3: Improvement of Lagos State

Metropolitan Road Network

Component 4: Project Management & System Monitoring

Consultancy for Construction Supervision of Akin

Adesola and Wempco Roads

Consultancy Services for Design Upgrade and

Construction Supervision of BFS Bus Depot

Infrastructure

Consultancy Services for Website Redesign and

Hosting

Consultancy Services for IT Equipment

Maintenance

Consultancy Services for Events and Stakeholders

Management for BRT Services

Consultancy Services for Advertising and

Perception Management for BRT Extension (Mile

12 - Ikorodu)

Consultancy Services for Pavement Management

System Reconfiguration, Training and Data

Collection and Upload

Consultancy Services for the Documentation of the

Communication and Participation Efforts to Raise

Familiarity with BRT on Mile 12 to CMS Route

Consultancy to Conduct Stakeholder engagements

on other LAMATA projects (STMP, Road

rehabilitation/periodic maintenance etc)

Consultancy for Construction Supervision of

Adesina/Omilani/Airways Road Surulere

Consultancy for Construction Supervision of Apata

Lisabi Street Somolu

26-Jun-12

14-Aug-12

8-Feb-12

3-May-12

3-May-12

25-Nov-11

7-Dec-12

7-Dec-12

4-Dec-12

30-Apr-12

13-Mar-12

NonAsciiFileName0.xls 693 of 754 11/21/2012 1:40 AM

Procurement Plan-Consultants 2

Consultancy Services for Supply and installation

and Configuration of HDM4 Software for

LAMATA including Training

Consultancy Services for Provision, Installation

and Implementation of Knowledge Management

Software

Consultancy Services for Supply and installation

and configuratin of internet solution for LAMATA

(Share point)

Consultancy Services for the Provision of 1M

Internet Access

Consultancy Services for Oracle Support Licence

Consultancy Services for IT Equipment

Maintenance

Consultancy Services for EDMS Maintenance

Consultancy Services for Antivirus Support

Consultancy Services for Anti-Spam Support

Consultancy Services for Cloud Storage / Data

Backup

Consultancy Services for Arc GIS & Arc View

Upgrade and Licensing + HP Large format Plotter

Consultancy Services for Institutional, Technical

and Financial Audit

2-Jul-12

3-Jul-12

19-Jul-12

8-Nov-12

18-May-12

22-Jun-12

19-Jul-12

8-Dec-12

22-Oct-12

24-Sep-12

10-May-13

NonAsciiFileName0.xls 694 of 754 11/21/2012 1:40 AM

Procurement Plan-Consultants 2

Consultancy Services for Conducting Resettlement

Policy Framework (RPF) for Akin Adesola &

Wempco Roads

Consultancy Services for Resettlement Action Plan

(RAP) Implementation for Mile 12 to Ikorodu BRT

scheme

Consultancy Services for Procurement Audit for 2

consecutive years

Consultancy Services for Assesment of Needs of

Disadvantaged Group in Accessing Public

Transport Services on Mile 12 to Ikorodu Town

BRT Corridor

Consultancy Services for Carrying out Socio-

Economic Baseline Survey of Transportation from

Mile 12 to Ikorodu

Consultancy Services for Institutional, Technical

and Financial Audit

Consultancy Services for Developing the core

public Transport Network in Kano -Rapid

Development of Shor-time Program Investment

Consultancy Services for Developing the core

public Transport Network in Kano -Rapid

Collection of Traffic and Transport Data

Consultancy Service for Inestigating the impact of

Motocycles and Three Wheelers Growth in Africa -

Case Study of Kano

Consultancy Services for Conducting

Environmental and Social Management Plan

(ESMP) for Akin Adesola and Wempco Roads

30-Apr-12

30-Apr-12

30-Apr-12

30-Apr-12

9-Jul-12

9-May-12

23-Feb-12

23-Feb-12

23-Feb-12

NonAsciiFileName0.xls 695 of 754 11/21/2012 1:40 AM

Procurement Plan-Consultants 2

NonAsciiFileName0.xls 696 of 754 11/21/2012 1:40 AM

Procurement Plan-Consultants 2 Country/Organisation:Nigeria Lagos Metropolitan Area Transport Authority (LAMATA)

Project/Programme: Lagos Urban Transport Project (LUTP)

IDA Credit No.: 3721-0 UNI

Description*

Norm Duration of Proc Steps

Component 1:(Instititional Development)

Training of Staff and Twining programme (To be

Implemented through global Training plan and

Twining arrangement for (January 2012 to Dec

2012)

Component 2:Public Transport and Traffic Management

Consultancy Services for Carrying out the Pre and

Post Study for the Establishment of Transport

Planning Units in Lagos Island, Kosofe and

Ikorodu LGAs in Lagos State

Consultancy Services for Detailed Engineering

Design and Construction Supervision of BRT LITE

Upgrade from Mile 12 to CMS

Consultancy Services for Conceptual Design of

BRT LITE Upgrade from Mile 12 to CMS

Consultancy Services for Engineering Design and

Construction Supervision of BFS Infrastructure

Rehabilitation and Upgrading

Consultancy Services for conducting Technical due

diligence on BFS Buses (Environmental

Enhancement of BFS Operations: Due Diligence

Report) Including Supervision of the

Refurbishment of BFS Buses

Date

Contract

Advert

N/A

19-Apr-13

N/A

N/A

N/A

NonAsciiFileName0.xls 697 of 754 11/21/2012 1:40 AM

Procurement Plan-Consultants 2

Component 3: Improvement of Lagos State

Metropolitan Road Network

Component 4: Project Management & System Monitoring

Consultancy for Construction Supervision of Akin

Adesola and Wempco Roads

Consultancy Services for Design Upgrade and

Construction Supervision of BFS Bus Depot

Infrastructure

Consultancy Services for Website Redesign and

Hosting

Consultancy Services for IT Equipment

Maintenance

Consultancy Services for Events and Stakeholders

Management for BRT Services

Consultancy Services for Advertising and

Perception Management for BRT Extension (Mile

12 - Ikorodu)

Consultancy Services for Pavement Management

System Reconfiguration, Training and Data

Collection and Upload

Consultancy Services for the Documentation of the

Communication and Participation Efforts to Raise

Familiarity with BRT on Mile 12 to CMS Route

Consultancy to Conduct Stakeholder engagements

on other LAMATA projects (STMP, Road

rehabilitation/periodic maintenance etc)

Consultancy for Construction Supervision of

Adesina/Omilani/Airways Road Surulere

Consultancy for Construction Supervision of Apata

Lisabi Street Somolu

N/A

21-Aug-12

N/A

N/A

N/A

2-Dec-11

N/A

N/A

18-Dec-12

N/A

N/A

NonAsciiFileName0.xls 698 of 754 11/21/2012 1:40 AM

Procurement Plan-Consultants 2

Consultancy Services for Supply and installation

and Configuration of HDM4 Software for

LAMATA including Training

Consultancy Services for Provision, Installation

and Implementation of Knowledge Management

Software

Consultancy Services for Supply and installation

and configuratin of internet solution for LAMATA

(Share point)

Consultancy Services for the Provision of 1M

Internet Access

Consultancy Services for Oracle Support Licence

Consultancy Services for IT Equipment

Maintenance

Consultancy Services for EDMS Maintenance

Consultancy Services for Antivirus Support

Consultancy Services for Anti-Spam Support

Consultancy Services for Cloud Storage / Data

Backup

Consultancy Services for Arc GIS & Arc View

Upgrade and Licensing + HP Large format Plotter

Consultancy Services for Institutional, Technical

and Financial Audit

N/A

N/A

N/A

N/A

N/A

N/A

N/A

N/A

N/A

N/A

17-May-13

NonAsciiFileName0.xls 699 of 754 11/21/2012 1:40 AM

Procurement Plan-Consultants 2

Consultancy Services for Conducting Resettlement

Policy Framework (RPF) for Akin Adesola &

Wempco Roads

Consultancy Services for Resettlement Action Plan

(RAP) Implementation for Mile 12 to Ikorodu BRT

scheme

Consultancy Services for Procurement Audit for 2

consecutive years

Consultancy Services for Assesment of Needs of

Disadvantaged Group in Accessing Public

Transport Services on Mile 12 to Ikorodu Town

BRT Corridor

Consultancy Services for Carrying out Socio-

Economic Baseline Survey of Transportation from

Mile 12 to Ikorodu

Consultancy Services for Institutional, Technical

and Financial Audit

Consultancy Services for Developing the core

public Transport Network in Kano -Rapid

Development of Shor-time Program Investment

Consultancy Services for Developing the core

public Transport Network in Kano -Rapid

Collection of Traffic and Transport Data

Consultancy Service for Inestigating the impact of

Motocycles and Three Wheelers Growth in Africa -

Case Study of Kano

Consultancy Services for Conducting

Environmental and Social Management Plan

(ESMP) for Akin Adesola and Wempco Roads

N/A

N/A

N/A

N/A

N/A

N/A

N/A

N/A

N/A

NonAsciiFileName0.xls 700 of 754 11/21/2012 1:40 AM

Procurement Plan-Consultants 2

NonAsciiFileName0.xls 701 of 754 11/21/2012 1:40 AM

Procurement Plan-Consultants 2 Country/Organisation:Nigeria Lagos Metropolitan Area Transport Authority (LAMATA)

Project/Programme: Lagos Urban Transport Project (LUTP)

IDA Credit No.: 3721-0 UNI

Description*

Norm Duration of Proc Steps

Component 1:(Instititional Development)

Training of Staff and Twining programme (To be

Implemented through global Training plan and

Twining arrangement for (January 2012 to Dec

2012)

Component 2:Public Transport and Traffic Management

Consultancy Services for Carrying out the Pre and

Post Study for the Establishment of Transport

Planning Units in Lagos Island, Kosofe and

Ikorodu LGAs in Lagos State

Consultancy Services for Detailed Engineering

Design and Construction Supervision of BRT LITE

Upgrade from Mile 12 to CMS

Consultancy Services for Conceptual Design of

BRT LITE Upgrade from Mile 12 to CMS

Consultancy Services for Engineering Design and

Construction Supervision of BFS Infrastructure

Rehabilitation and Upgrading

Consultancy Services for conducting Technical due

diligence on BFS Buses (Environmental

Enhancement of BFS Operations: Due Diligence

Report) Including Supervision of the

Refurbishment of BFS Buses

Contract

Signature

1 - 3 wks

1-Jul-12

12-Apr-13

30-Apr-12

3-Sep-12

3-Mar-13

NonAsciiFileName0.xls 702 of 754 11/21/2012 1:40 AM

Procurement Plan-Consultants 2

Component 3: Improvement of Lagos State

Metropolitan Road Network

Component 4: Project Management & System Monitoring

Consultancy for Construction Supervision of Akin

Adesola and Wempco Roads

Consultancy Services for Design Upgrade and

Construction Supervision of BFS Bus Depot

Infrastructure

Consultancy Services for Website Redesign and

Hosting

Consultancy Services for IT Equipment

Maintenance

Consultancy Services for Events and Stakeholders

Management for BRT Services

Consultancy Services for Advertising and

Perception Management for BRT Extension (Mile

12 - Ikorodu)

Consultancy Services for Pavement Management

System Reconfiguration, Training and Data

Collection and Upload

Consultancy Services for the Documentation of the

Communication and Participation Efforts to Raise

Familiarity with BRT on Mile 12 to CMS Route

Consultancy to Conduct Stakeholder engagements

on other LAMATA projects (STMP, Road

rehabilitation/periodic maintenance etc)

Consultancy for Construction Supervision of

Adesina/Omilani/Airways Road Surulere

Consultancy for Construction Supervision of Apata

Lisabi Street Somolu

3-Jul-12

21-Aug-12

15-Feb-12

10-May-12

10-May-12

2-Dec-11

14-Dec-12

14-Dec-12

11-Dec-12

7-May-12

20-Mar-12

NonAsciiFileName0.xls 703 of 754 11/21/2012 1:40 AM

Procurement Plan-Consultants 2

Consultancy Services for Supply and installation

and Configuration of HDM4 Software for

LAMATA including Training

Consultancy Services for Provision, Installation

and Implementation of Knowledge Management

Software

Consultancy Services for Supply and installation

and configuratin of internet solution for LAMATA

(Share point)

Consultancy Services for the Provision of 1M

Internet Access

Consultancy Services for Oracle Support Licence

Consultancy Services for IT Equipment

Maintenance

Consultancy Services for EDMS Maintenance

Consultancy Services for Antivirus Support

Consultancy Services for Anti-Spam Support

Consultancy Services for Cloud Storage / Data

Backup

Consultancy Services for Arc GIS & Arc View

Upgrade and Licensing + HP Large format Plotter

Consultancy Services for Institutional, Technical

and Financial Audit

9-Jul-12

10-Jul-12

26-Jul-12

15-Nov-12

25-May-12

29-Jun-12

26-Jul-12

15-Dec-12

29-Oct-12

1-Oct-12

17-May-13

NonAsciiFileName0.xls 704 of 754 11/21/2012 1:40 AM

Procurement Plan-Consultants 2

Consultancy Services for Conducting Resettlement

Policy Framework (RPF) for Akin Adesola &

Wempco Roads

Consultancy Services for Resettlement Action Plan

(RAP) Implementation for Mile 12 to Ikorodu BRT

scheme

Consultancy Services for Procurement Audit for 2

consecutive years

Consultancy Services for Assesment of Needs of

Disadvantaged Group in Accessing Public

Transport Services on Mile 12 to Ikorodu Town

BRT Corridor

Consultancy Services for Carrying out Socio-

Economic Baseline Survey of Transportation from

Mile 12 to Ikorodu

Consultancy Services for Institutional, Technical

and Financial Audit

Consultancy Services for Developing the core

public Transport Network in Kano -Rapid

Development of Shor-time Program Investment

Consultancy Services for Developing the core

public Transport Network in Kano -Rapid

Collection of Traffic and Transport Data

Consultancy Service for Inestigating the impact of

Motocycles and Three Wheelers Growth in Africa -

Case Study of Kano

Consultancy Services for Conducting

Environmental and Social Management Plan

(ESMP) for Akin Adesola and Wempco Roads

7-May-12

7-May-12

7-May-12

7-May-12

16-Jul-12

16-May-12

1-Mar-12

1-Mar-12

1-Mar-12

NonAsciiFileName0.xls 705 of 754 11/21/2012 1:40 AM

Procurement Plan-Consultants 2

NonAsciiFileName0.xls 706 of 754 11/21/2012 1:40 AM

Procurement Plan-Consultants 2 Country/Organisation:Nigeria Lagos Metropolitan Area Transport Authority (LAMATA)

Project/Programme: Lagos Urban Transport Project (LUTP)

IDA Credit No.: 3721-0 UNI

Description*

Norm Duration of Proc Steps

Component 1:(Instititional Development)

Training of Staff and Twining programme (To be

Implemented through global Training plan and

Twining arrangement for (January 2012 to Dec

2012)

Component 2:Public Transport and Traffic Management

Consultancy Services for Carrying out the Pre and

Post Study for the Establishment of Transport

Planning Units in Lagos Island, Kosofe and

Ikorodu LGAs in Lagos State

Consultancy Services for Detailed Engineering

Design and Construction Supervision of BRT LITE

Upgrade from Mile 12 to CMS

Consultancy Services for Conceptual Design of

BRT LITE Upgrade from Mile 12 to CMS

Consultancy Services for Engineering Design and

Construction Supervision of BFS Infrastructure

Rehabilitation and Upgrading

Consultancy Services for conducting Technical due

diligence on BFS Buses (Environmental

Enhancement of BFS Operations: Due Diligence

Report) Including Supervision of the

Refurbishment of BFS Buses

Plan vs.

Actual

Plan

Plan

Plan

Actual

Plan

Actual

Plan

Actual

Plan

Actual

Plan

Actual

NonAsciiFileName0.xls 707 of 754 11/21/2012 1:40 AM

Procurement Plan-Consultants 2

Component 3: Improvement of Lagos State

Metropolitan Road Network

Component 4: Project Management & System Monitoring

Consultancy for Construction Supervision of Akin

Adesola and Wempco Roads

Consultancy Services for Design Upgrade and

Construction Supervision of BFS Bus Depot

Infrastructure

Consultancy Services for Website Redesign and

Hosting

Consultancy Services for IT Equipment

Maintenance

Consultancy Services for Events and Stakeholders

Management for BRT Services

Consultancy Services for Advertising and

Perception Management for BRT Extension (Mile

12 - Ikorodu)

Consultancy Services for Pavement Management

System Reconfiguration, Training and Data

Collection and Upload

Consultancy Services for the Documentation of the

Communication and Participation Efforts to Raise

Familiarity with BRT on Mile 12 to CMS Route

Consultancy to Conduct Stakeholder engagements

on other LAMATA projects (STMP, Road

rehabilitation/periodic maintenance etc)

Consultancy for Construction Supervision of

Adesina/Omilani/Airways Road Surulere

Consultancy for Construction Supervision of Apata

Lisabi Street Somolu

Plan

Actual

Plan

Actual

Plan

Actual

Plan

Actual

Plan

Actual

Plan

Plan

Actual

Plan

Actual

Plan

Actual

Plan

Actual

Plan

NonAsciiFileName0.xls 708 of 754 11/21/2012 1:40 AM

Procurement Plan-Consultants 2

Consultancy Services for Supply and installation

and Configuration of HDM4 Software for

LAMATA including Training

Consultancy Services for Provision, Installation

and Implementation of Knowledge Management

Software

Consultancy Services for Supply and installation

and configuratin of internet solution for LAMATA

(Share point)

Consultancy Services for the Provision of 1M

Internet Access

Consultancy Services for Oracle Support Licence

Consultancy Services for IT Equipment

Maintenance

Consultancy Services for EDMS Maintenance

Consultancy Services for Antivirus Support

Consultancy Services for Anti-Spam Support

Consultancy Services for Cloud Storage / Data

Backup

Consultancy Services for Arc GIS & Arc View

Upgrade and Licensing + HP Large format Plotter

Consultancy Services for Institutional, Technical

and Financial Audit

Actual

Plan

Actual

Plan

Actual

Plan

Actual

Plan

Actual

Plan

Actual

Plan

Actual

Plan

Actual

Plan

Actual

Plan

Actual

Plan

Actual

Plan

NonAsciiFileName0.xls 709 of 754 11/21/2012 1:40 AM

Procurement Plan-Consultants 2

Consultancy Services for Conducting Resettlement

Policy Framework (RPF) for Akin Adesola &

Wempco Roads

Consultancy Services for Resettlement Action Plan

(RAP) Implementation for Mile 12 to Ikorodu BRT

scheme

Consultancy Services for Procurement Audit for 2

consecutive years

Consultancy Services for Assesment of Needs of

Disadvantaged Group in Accessing Public

Transport Services on Mile 12 to Ikorodu Town

BRT Corridor

Consultancy Services for Carrying out Socio-

Economic Baseline Survey of Transportation from

Mile 12 to Ikorodu

Consultancy Services for Institutional, Technical

and Financial Audit

Consultancy Services for Developing the core

public Transport Network in Kano -Rapid

Development of Shor-time Program Investment

Consultancy Services for Developing the core

public Transport Network in Kano -Rapid

Collection of Traffic and Transport Data

Consultancy Service for Inestigating the impact of

Motocycles and Three Wheelers Growth in Africa -

Case Study of Kano

Consultancy Services for Conducting

Environmental and Social Management Plan

(ESMP) for Akin Adesola and Wempco Roads

Actual

Plan

Actual

Plan

Actual

Plan

Actual

Plan

Actual

Plan

Actual

Plan

Actual

Plan

Actual

Plan

Actual

Plan

Actual

NonAsciiFileName0.xls 710 of 754 11/21/2012 1:40 AM

Procurement Plan-Consultants 2

NonAsciiFileName0.xls 711 of 754 11/21/2012 1:40 AM

Procurement Plan-Consultants 2 Country/Organisation:Nigeria Lagos Metropolitan Area Transport Authority (LAMATA)

Project/Programme: Lagos Urban Transport Project (LUTP)

IDA Credit No.: 3721-0 UNI

Description*

Norm Duration of Proc Steps

Component 1:(Instititional Development)

Training of Staff and Twining programme (To be

Implemented through global Training plan and

Twining arrangement for (January 2012 to Dec

2012)

Component 2:Public Transport and Traffic Management

Consultancy Services for Carrying out the Pre and

Post Study for the Establishment of Transport

Planning Units in Lagos Island, Kosofe and

Ikorodu LGAs in Lagos State

Consultancy Services for Detailed Engineering

Design and Construction Supervision of BRT LITE

Upgrade from Mile 12 to CMS

Consultancy Services for Conceptual Design of

BRT LITE Upgrade from Mile 12 to CMS

Consultancy Services for Engineering Design and

Construction Supervision of BFS Infrastructure

Rehabilitation and Upgrading

Consultancy Services for conducting Technical due

diligence on BFS Buses (Environmental

Enhancement of BFS Operations: Due Diligence

Report) Including Supervision of the

Refurbishment of BFS Buses

Mobilization

Advance

Payment

15-Jul-12

26-Apr-13

14-May-12

17-Sep-12

17-Mar-13

Contract Implementation

NonAsciiFileName0.xls 712 of 754 11/21/2012 1:40 AM

Procurement Plan-Consultants 2

Component 3: Improvement of Lagos State

Metropolitan Road Network

Component 4: Project Management & System Monitoring

Consultancy for Construction Supervision of Akin

Adesola and Wempco Roads

Consultancy Services for Design Upgrade and

Construction Supervision of BFS Bus Depot

Infrastructure

Consultancy Services for Website Redesign and

Hosting

Consultancy Services for IT Equipment

Maintenance

Consultancy Services for Events and Stakeholders

Management for BRT Services

Consultancy Services for Advertising and

Perception Management for BRT Extension (Mile

12 - Ikorodu)

Consultancy Services for Pavement Management

System Reconfiguration, Training and Data

Collection and Upload

Consultancy Services for the Documentation of the

Communication and Participation Efforts to Raise

Familiarity with BRT on Mile 12 to CMS Route

Consultancy to Conduct Stakeholder engagements

on other LAMATA projects (STMP, Road

rehabilitation/periodic maintenance etc)

Consultancy for Construction Supervision of

Adesina/Omilani/Airways Road Surulere

Consultancy for Construction Supervision of Apata

Lisabi Street Somolu

17-Jul-12

4-Sep-12

29-Feb-12

24-May-12

24-May-12

16-Dec-11

28-Dec-12

28-Dec-12

25-Dec-12

21-May-12

3-Apr-12

NonAsciiFileName0.xls 713 of 754 11/21/2012 1:40 AM

Procurement Plan-Consultants 2

Consultancy Services for Supply and installation

and Configuration of HDM4 Software for

LAMATA including Training

Consultancy Services for Provision, Installation

and Implementation of Knowledge Management

Software

Consultancy Services for Supply and installation

and configuratin of internet solution for LAMATA

(Share point)

Consultancy Services for the Provision of 1M

Internet Access

Consultancy Services for Oracle Support Licence

Consultancy Services for IT Equipment

Maintenance

Consultancy Services for EDMS Maintenance

Consultancy Services for Antivirus Support

Consultancy Services for Anti-Spam Support

Consultancy Services for Cloud Storage / Data

Backup

Consultancy Services for Arc GIS & Arc View

Upgrade and Licensing + HP Large format Plotter

Consultancy Services for Institutional, Technical

and Financial Audit

23-Jul-12

24-Jul-12

9-Aug-12

29-Nov-12

8-Jun-12

13-Jul-12

9-Aug-12

29-Dec-12

12-Nov-12

15-Oct-12

31-May-13

NonAsciiFileName0.xls 714 of 754 11/21/2012 1:40 AM

Procurement Plan-Consultants 2

Consultancy Services for Conducting Resettlement

Policy Framework (RPF) for Akin Adesola &

Wempco Roads

Consultancy Services for Resettlement Action Plan

(RAP) Implementation for Mile 12 to Ikorodu BRT

scheme

Consultancy Services for Procurement Audit for 2

consecutive years

Consultancy Services for Assesment of Needs of

Disadvantaged Group in Accessing Public

Transport Services on Mile 12 to Ikorodu Town

BRT Corridor

Consultancy Services for Carrying out Socio-

Economic Baseline Survey of Transportation from

Mile 12 to Ikorodu

Consultancy Services for Institutional, Technical

and Financial Audit

Consultancy Services for Developing the core

public Transport Network in Kano -Rapid

Development of Shor-time Program Investment

Consultancy Services for Developing the core

public Transport Network in Kano -Rapid

Collection of Traffic and Transport Data

Consultancy Service for Inestigating the impact of

Motocycles and Three Wheelers Growth in Africa -

Case Study of Kano

Consultancy Services for Conducting

Environmental and Social Management Plan

(ESMP) for Akin Adesola and Wempco Roads

21-May-12

21-May-12

21-May-12

21-May-12

30-Jul-12

30-May-12

15-Mar-12

15-Mar-12

15-Mar-12

NonAsciiFileName0.xls 715 of 754 11/21/2012 1:40 AM

Procurement Plan-Consultants 2

NonAsciiFileName0.xls 716 of 754 11/21/2012 1:40 AM

Procurement Plan-Consultants 2 Country/Organisation:Nigeria Lagos Metropolitan Area Transport Authority (LAMATA)

Project/Programme: Lagos Urban Transport Project (LUTP)

IDA Credit No.: 3721-0 UNI

Description*

Norm Duration of Proc Steps

Component 1:(Instititional Development)

Training of Staff and Twining programme (To be

Implemented through global Training plan and

Twining arrangement for (January 2012 to Dec

2012)

Component 2:Public Transport and Traffic Management

Consultancy Services for Carrying out the Pre and

Post Study for the Establishment of Transport

Planning Units in Lagos Island, Kosofe and

Ikorodu LGAs in Lagos State

Consultancy Services for Detailed Engineering

Design and Construction Supervision of BRT LITE

Upgrade from Mile 12 to CMS

Consultancy Services for Conceptual Design of

BRT LITE Upgrade from Mile 12 to CMS

Consultancy Services for Engineering Design and

Construction Supervision of BFS Infrastructure

Rehabilitation and Upgrading

Consultancy Services for conducting Technical due

diligence on BFS Buses (Environmental

Enhancement of BFS Operations: Due Diligence

Report) Including Supervision of the

Refurbishment of BFS Buses

Draft

Report

13-Oct-12

23-Sep-13

12-Aug-12

14-Feb-13

15-Jun-13

Contract Implementation

NonAsciiFileName0.xls 717 of 754 11/21/2012 1:40 AM

Procurement Plan-Consultants 2

Component 3: Improvement of Lagos State

Metropolitan Road Network

Component 4: Project Management & System Monitoring

Consultancy for Construction Supervision of Akin

Adesola and Wempco Roads

Consultancy Services for Design Upgrade and

Construction Supervision of BFS Bus Depot

Infrastructure

Consultancy Services for Website Redesign and

Hosting

Consultancy Services for IT Equipment

Maintenance

Consultancy Services for Events and Stakeholders

Management for BRT Services

Consultancy Services for Advertising and

Perception Management for BRT Extension (Mile

12 - Ikorodu)

Consultancy Services for Pavement Management

System Reconfiguration, Training and Data

Collection and Upload

Consultancy Services for the Documentation of the

Communication and Participation Efforts to Raise

Familiarity with BRT on Mile 12 to CMS Route

Consultancy to Conduct Stakeholder engagements

on other LAMATA projects (STMP, Road

rehabilitation/periodic maintenance etc)

Consultancy for Construction Supervision of

Adesina/Omilani/Airways Road Surulere

Consultancy for Construction Supervision of Apata

Lisabi Street Somolu

15-Oct-12

1-Jul-13

25-Dec-12

22-Aug-12

20-Mar-13

11-Oct-12

24-Oct-13

24-Oct-13

21-Oct-13

17-Mar-13

28-Jan-13

NonAsciiFileName0.xls 718 of 754 11/21/2012 1:40 AM

Procurement Plan-Consultants 2

Consultancy Services for Supply and installation

and Configuration of HDM4 Software for

LAMATA including Training

Consultancy Services for Provision, Installation

and Implementation of Knowledge Management

Software

Consultancy Services for Supply and installation

and configuratin of internet solution for LAMATA

(Share point)

Consultancy Services for the Provision of 1M

Internet Access

Consultancy Services for Oracle Support Licence

Consultancy Services for IT Equipment

Maintenance

Consultancy Services for EDMS Maintenance

Consultancy Services for Antivirus Support

Consultancy Services for Anti-Spam Support

Consultancy Services for Cloud Storage / Data

Backup

Consultancy Services for Arc GIS & Arc View

Upgrade and Licensing + HP Large format Plotter

Consultancy Services for Institutional, Technical

and Financial Audit

19-May-13

20-May-13

5-Jun-13

25-Sep-13

4-Apr-13

11-Sep-12

8-Oct-12

25-Oct-13

11-Jan-13

14-Dec-12

27-Mar-14

NonAsciiFileName0.xls 719 of 754 11/21/2012 1:40 AM

Procurement Plan-Consultants 2

Consultancy Services for Conducting Resettlement

Policy Framework (RPF) for Akin Adesola &

Wempco Roads

Consultancy Services for Resettlement Action Plan

(RAP) Implementation for Mile 12 to Ikorodu BRT

scheme

Consultancy Services for Procurement Audit for 2

consecutive years

Consultancy Services for Assesment of Needs of

Disadvantaged Group in Accessing Public

Transport Services on Mile 12 to Ikorodu Town

BRT Corridor

Consultancy Services for Carrying out Socio-

Economic Baseline Survey of Transportation from

Mile 12 to Ikorodu

Consultancy Services for Institutional, Technical

and Financial Audit

Consultancy Services for Developing the core

public Transport Network in Kano -Rapid

Development of Shor-time Program Investment

Consultancy Services for Developing the core

public Transport Network in Kano -Rapid

Collection of Traffic and Transport Data

Consultancy Service for Inestigating the impact of

Motocycles and Three Wheelers Growth in Africa -

Case Study of Kano

Consultancy Services for Conducting

Environmental and Social Management Plan

(ESMP) for Akin Adesola and Wempco Roads

2-Dec-13

17-Mar-13

17-Mar-13

17-Mar-13

27-Dec-12

27-Oct-12

14-Apr-12

14-Apr-12

14-Apr-12

NonAsciiFileName0.xls 720 of 754 11/21/2012 1:40 AM

Procurement Plan-Consultants 2

NonAsciiFileName0.xls 721 of 754 11/21/2012 1:40 AM

Procurement Plan-Consultants 2 Country/Organisation:Nigeria Lagos Metropolitan Area Transport Authority (LAMATA)

Project/Programme: Lagos Urban Transport Project (LUTP)

IDA Credit No.: 3721-0 UNI

Description*

Norm Duration of Proc Steps

Component 1:(Instititional Development)

Training of Staff and Twining programme (To be

Implemented through global Training plan and

Twining arrangement for (January 2012 to Dec

2012)

Component 2:Public Transport and Traffic Management

Consultancy Services for Carrying out the Pre and

Post Study for the Establishment of Transport

Planning Units in Lagos Island, Kosofe and

Ikorodu LGAs in Lagos State

Consultancy Services for Detailed Engineering

Design and Construction Supervision of BRT LITE

Upgrade from Mile 12 to CMS

Consultancy Services for Conceptual Design of

BRT LITE Upgrade from Mile 12 to CMS

Consultancy Services for Engineering Design and

Construction Supervision of BFS Infrastructure

Rehabilitation and Upgrading

Consultancy Services for conducting Technical due

diligence on BFS Buses (Environmental

Enhancement of BFS Operations: Due Diligence

Report) Including Supervision of the

Refurbishment of BFS Buses

Final

Report

10-Jul-13

23-Oct-13

9-May-13

16-Mar-13

15-Jul-13

Contract Implementation

NonAsciiFileName0.xls 722 of 754 11/21/2012 1:40 AM

Procurement Plan-Consultants 2

Component 3: Improvement of Lagos State

Metropolitan Road Network

Component 4: Project Management & System Monitoring

Consultancy for Construction Supervision of Akin

Adesola and Wempco Roads

Consultancy Services for Design Upgrade and

Construction Supervision of BFS Bus Depot

Infrastructure

Consultancy Services for Website Redesign and

Hosting

Consultancy Services for IT Equipment

Maintenance

Consultancy Services for Events and Stakeholders

Management for BRT Services

Consultancy Services for Advertising and

Perception Management for BRT Extension (Mile

12 - Ikorodu)

Consultancy Services for Pavement Management

System Reconfiguration, Training and Data

Collection and Upload

Consultancy Services for the Documentation of the

Communication and Participation Efforts to Raise

Familiarity with BRT on Mile 12 to CMS Route

Consultancy to Conduct Stakeholder engagements

on other LAMATA projects (STMP, Road

rehabilitation/periodic maintenance etc)

Consultancy for Construction Supervision of

Adesina/Omilani/Airways Road Surulere

Consultancy for Construction Supervision of Apata

Lisabi Street Somolu

14-Nov-12

30-Aug-13

24-Feb-13

21-Sep-12

20-May-13

10-Dec-12

24-Dec-13

24-Dec-13

20-Dec-13

16-May-13

29-Mar-13

NonAsciiFileName0.xls 723 of 754 11/21/2012 1:40 AM

Procurement Plan-Consultants 2

Consultancy Services for Supply and installation

and Configuration of HDM4 Software for

LAMATA including Training

Consultancy Services for Provision, Installation

and Implementation of Knowledge Management

Software

Consultancy Services for Supply and installation

and configuratin of internet solution for LAMATA

(Share point)

Consultancy Services for the Provision of 1M

Internet Access

Consultancy Services for Oracle Support Licence

Consultancy Services for IT Equipment

Maintenance

Consultancy Services for EDMS Maintenance

Consultancy Services for Antivirus Support

Consultancy Services for Anti-Spam Support

Consultancy Services for Cloud Storage / Data

Backup

Consultancy Services for Arc GIS & Arc View

Upgrade and Licensing + HP Large format Plotter

Consultancy Services for Institutional, Technical

and Financial Audit

18-Jul-13

19-Jul-13

4-Aug-13

24-Nov-13

3-Jun-13

11-Oct-12

7-Nov-12

24-Dec-13

10-Feb-13

13-Jan-13

26-May-14

NonAsciiFileName0.xls 724 of 754 11/21/2012 1:40 AM

Procurement Plan-Consultants 2

Consultancy Services for Conducting Resettlement

Policy Framework (RPF) for Akin Adesola &

Wempco Roads

Consultancy Services for Resettlement Action Plan

(RAP) Implementation for Mile 12 to Ikorodu BRT

scheme

Consultancy Services for Procurement Audit for 2

consecutive years

Consultancy Services for Assesment of Needs of

Disadvantaged Group in Accessing Public

Transport Services on Mile 12 to Ikorodu Town

BRT Corridor

Consultancy Services for Carrying out Socio-

Economic Baseline Survey of Transportation from

Mile 12 to Ikorodu

Consultancy Services for Institutional, Technical

and Financial Audit

Consultancy Services for Developing the core

public Transport Network in Kano -Rapid

Development of Shor-time Program Investment

Consultancy Services for Developing the core

public Transport Network in Kano -Rapid

Collection of Traffic and Transport Data

Consultancy Service for Inestigating the impact of

Motocycles and Three Wheelers Growth in Africa -

Case Study of Kano

Consultancy Services for Conducting

Environmental and Social Management Plan

(ESMP) for Akin Adesola and Wempco Roads

31-Jan-14

17-May-13

17-May-13

17-May-13

26-Jan-13

26-Nov-12

14-May-12

14-May-12

14-May-12

NonAsciiFileName0.xls 725 of 754 11/21/2012 1:40 AM

Procurement Plan-Consultants 2

NonAsciiFileName0.xls 726 of 754 11/21/2012 1:40 AM

Procurement Plan-Approvals-Consultants 2

Initial Approval Update

Dates of Bank Approval of Procurement Plan

For Consultants 2

NonAsciiFileName0.xls 727 of 754 11/21/2012 1:40 AM

Item Description

Component 1:(Instititional Development)

1

2

3

4

5

6

7

8

9

10

Component 3: Improvement of Lagos State Metropolitan Road

Network11

12

13

14

Component 4: Project Management & System Monitoring

15

16

17

18 Consultancy Services for Anti-Spam Support

Consultancy Services for Conceptual Design of BRT LITE Upgrade

from Mile 12 to CMS

Consultancy Services for Detailed Engineering Design and

Construction Supervision of BRT LITE Upgrade from Mile 12 to CMS

Consultancy Services for Events and Stakeholders Management for

BRT Services

Consultancy Services for Advertising and Perception Management for

BRT Extension (Mile 12 - Ikorodu)

Consultancy Services for the Documentation of the Communication and

Participation Efforts to Raise Familiarity with BRT on Mile 12 to CMS

Consultancy to Conduct Stakeholder engagements on other LAMATA

projects (STMP, Road rehabilitation/periodic maintenance etc)

Consultancy Services for Carrying out the Pre and Post Study for the

Establishment of Transport Planning Units in Lagos Island, Kosofe and

Consultancy Services for Engineering Design and Construction

Supervision of BFS Infrastructure Rehabilitation and Upgrading

Consultancy Services for conducting Technical due diligence on BFS

Buses

Consultancy Services for Design Upgrade and Construction

Supervision of BFS Bus Depot Infrastructure

Consultancy Services for IT Equipment Maintenance

Consultancy for Construction Supervision of Akin Adesola and

Wempco Roads

Consultancy for Construction Supervision of Adesina/Omilani/Airways

Road Surulere

Consultancy Services for Cloud Storage / Data Backup

Consultancy for Construction Supervision of Apata Lisabi Street

Somolu

Consultancy Services for Pavement Management System

Reconfiguration, Training and Data Collection

Consultancy Services for Website Redesign and Hosting

19

20

22

23

24

25

25

25

26

27

28

29

30

31

32

Consultancy Services for Assesment of Needs of Disadvantaged Group

in Accessing Public Transport Services on Mile 12 to Ikorodu Town

Consultancy Services for Anti-Spam Support

Consultancy Services for Antivirus Support

Consultancy Services for Provision, Installation and Implementation of

Knowledge Management Software

Consultancy Services for Supply and installation and configuratin of

internet solution for LAMATA (Share point)

Consultancy Services for EDMS Maintenance

Consultancy Services for Institutional, Technical and Financial Audit

Consultancy Services for Procurement Audit for 2 consecutive years

Consultancy Services for Resettlement Action Plan (RAP)

Implementation for Mile 12 to Ikorodu BRT scheme

Consultancy Services for Conducting Environmental and Social

Management Framework (ESMF) for Akin Adesola and Wempco

Consultancy Services for Carrying out Socio-Economic Baseline

Survey of Transportation from Mile 12 to Ikorodu

Consultancy Services for Conducting Resettlement Policy Framwork

(RPF) for Akin Adesola & Wempco Roads

Arc GIS & Arc View Upgrade and Licensing + HP Large format

plotter

Consultancy Services for the Provision of 1M Internet Access

Oracle Support Licence

HDM4 Purchase, installation and training

Item

Description

Component 1:(Instititional Development)

1

Component 2:Public Transport and Traffic Management

2

3

4

5

6 Construction of 8 No Bus Shelters including Platforms

7

8

9

Component 3: Improvement of Lagos State Metropolitan Road Network

10

11

12

13

Post Review

Prior Review

PeriodicMaintenance Work on Apata Lisabi Street, Somolu

Construction of 7 No Bus Shelters including Platforms

Construction of BRT Bus Depot at Ikorodu

Construction of BRT infrastructure from Ajegunle to Majidun Bridge – (Rural

Area Roadworks, Bridges, TSM And Street Light, Chainage 14+350 to 18+333-

Rural Section)

Construction of BRT infrastructure from Majidun Bridge to Ikorodu

Roundabout – (Urban Area Roadworks, Bridges, TSM and Street Light -

Chainage 18+333 to 22+390-Urban Section 2)

Construction of LAMATA Corporate Headquarter Building

Construction of BRT infrastructure from Mile 12 to Ajegunle – (Urban Area

Roadworks, Bridges, TSM and Street Light) - Chainage 9+075 TO 14+350)

Construction of Bus Terminal at Mile 12

Construction of Ikorodu and Agric Bus Terminals

Rehabilitation and Upgrading of Akin Adesola Road

Rehabilitation and Upgrading of Wempco Road Ogba

Priodic Maintenance Work on Adesina/Omilani/Airways Roads

Item Description

Component 2:Public Transport and Traffic Management

1

3

Component 4: Project Management & System Monitoring

4

5

6

7

8

9

12

13

14

Supply and Installation of BRT Signal Control (Intelligent

Transport Systems -Mile 12 - CMS)

Procurement of Office Furniture ( Front office desks, Work

stations, Executive swivel chairs, Board room furniture set,

Janitor shelf etc…

IT Equipment Purchase Switches, Server, UPS, PC's, Laptops,

pritners and Other Spare Parts

Procurement of IT Stationery/Consumable (4 Lots, to be

procured a lot per quarter)

Purchase and installation of Corel Draw and Video editing

software for external relation

Procurement of Ofice Equipment (2HP Slit Air conditioners (5,

Water Dispenser, Refrigerators)

Procurement of Operational Vehicles

Implementation of the Recommendation of the Technical Due

Diligence Report on BFS Operations

Supply and Installation of Air Quality Equipment in Eleven

Monitoring Stations on LAMATA BRT Corridors including

Training, Laboratory Analysis, Installation of one Control Centre

and one Ambient Control Centre and a back-up

Procurement of Fire Proof Cabinet

Procurement of IT Equipment (Multi-function Colour Printer,

Black and White Lase Jet Printer-Auto Duplexing, Wndow