WWSWWS Report of the World Wide Study J. Brau June 4, 2008 Dubna ILCSC Meeting.

Post on 17-Jan-2016

213 views 1 download

Tags:

transcript

WWS

Report of the

World Wide Study

J. Brau

June 4, 2008

Dubna ILCSC Meeting

WWS Report, ILCSC, Dubna, 6/4/08 2 WW

S

Report of the World Wide Study

• LoI Team Workshops• Cooperation with CLIC efforts• ECFA08 Workshop next week• LCWS08 in Chicago - November• Reacting to Funding Crises in UK & US• P5 Report• Role of WWS in RD era

WWS Report, ILCSC, Dubna, 6/4/08 3 WW

S

14-16 January 2008

ILD Workshop

DESY, Zeuthen

WWS Report, ILCSC, Dubna, 6/4/08 4 WW

S

• Kickoff of merger LDC+GLD

120 participants

14-16 January 2008

ILD Workshop

DESY, Zeuthen

http://ilcagenda.linearcollider.org/conferenceDisplay.py?confId=2389

WWS Report, ILCSC, Dubna, 6/4/08 5 WW

S

• Successful advances in preparing for LoI and technical design effort

~ 65 participants

14-16 April 2008

SiD Workshop

RAL, Abingdon

WWS Report, ILCSC, Dubna, 6/4/08 6 WW

S

WWS and CLIC• Discussion on cooperation between ILC and

CLIC detector groups– February meeting at CERN– Participation and talk at SiD Workshop - April– Participation and talk at ECFA08 next week

• 3 LoI groups have chosen contacts to CLIC• WWS tools valuable to CLIC studies• CERN engineering to support LoIs• Studies on higher energy helpful to ILC

groups

WWS Report, ILCSC, Dubna, 6/4/08 7 WW

S

ECFA Workshop, Warsaw• > 170 registrants• Opening session includes

– Barry on “Path Forward” and “Critical Points of Contact Between GDE and P&D”

– Rolf on a “European Vision”– Sakue on the “New Organization”

• First meeting of IDAG– Plenary presentations by LoI groups– Closed discussions with each group

• Detector Performance– Including CLIC

• LHC-ILC Strategy to be discussed in plenary

WWS Report, ILCSC, Dubna, 6/4/08 8 WW

S

LCWS2008

• Conveners being nominated, to be recruited soon

WWS Report, ILCSC, Dubna, 6/4/08 9 WW

S

Funding Challenges in US and UK

• UK – recovery for detector effort more difficult than for

machine– go generic - connect to CLIC work

• US– Uncertainty in DOE/NSF response to P5

• HEPAP approved P5 recommendation of more funding for detector R&D• both DOE and NSF are considering the report

– Generic aspects of detector R&D important– Engineering support for LoIs currently restricted – LoI process requires strong lab (Fermilab/SLAC)

participation - uncertain, difficult in current climate

WWS Report, ILCSC, Dubna, 6/4/08 10 WW

S

P5 Report• The panel recommends for the near future a broad accelerator

and detector R&D program for lepton colliders that includes continued R&D on ILC at roughly the proposed FY2009 level in support of the international effort. This will ensure a significant role for the US even if the ILC is built overseas. The panel also recommends R&D for alternative accelerator technologies, to permit an informed choice when the lepton collider energy is established.

• The panel also recommends an R&D program for detector technologies to support a major US role in preparing for physics at a lepton collider.

Approved by HEPAP, May 29, 2008

WWS Report, ILCSC, Dubna, 6/4/08 11 WW

S

Role of WWS in RD Era

• Many WWS activities are being transferred to RD– eg. Roadmap planning, MDI studies, Detector R&D

coordination, etc.– WWS co-chairs are serving as initial RD regional

contacts

• WWS is the community (like user group)• WWS should

– Cooperate with RD– Organize workshops

• WWS is evolving into new role

WWS Report, ILCSC, Dubna, 6/4/08 12 WW

S

Conclusion

• LoI groups are hard at work developing integrated detector designs in support of the GDE machine design effort– Demonstrate realistic detector performance– Address machine detector interface issues

• Uncertainty regarding long term impact of funding cuts in UK and US