PEOPLE CHANGE PLACESA revitalization proposal for Lota, Chile 2011

Payam ShalchianRichelle Sibolboro

Miki SeltzerSebastian Whyte

Jamie Black Robert Giusti Graeme Kondruss Lauren Miles Apostolo Zeno

2

WELCOME TO LOTA

3

HARMONY WITH NATURE

4

A FISHING VILLAGE

5

A MINING TOWN

6

AN UNBALANCED ENVIRONMENT

7

BALANCE OF NATURE & URBAN ENVIRONMENT

11

CITY SYSTEMS

8

CITY SYSTEMS

9

CITY SYSTEMS

10

CITY SYSTEMS

12

LOTA

TORONTO

CANADA & CHILE

13

WHY WE CARE

Earthquake consequences 2010

14

PARTNERSHIPS

15

PARTNERSHIPS

16

PARTNERSHIPS

17

IWB & LOTA

The team at Lota’s Fuerte 2010

18

WE EXPERIENCED LOTA‘S NATURE

La Feria 2010

Chivilingo 2010

Fuerte 2010

19

WE EXPERIENCED LOTA’S CULTURE

Teatro Lota 2010

Lota Alto - Housing 2010Ex-Hospital - Miner’s Dance 2010

20

WE EXPERIENCED LOTA’S ECONOMY

La Feria Libre 2010

Muelle Lota 2010

Lota Bajo - Pedestrian street 2010

21

WE MET LOTA’S PEOPLE

Soccer Culture 2010

IwB student with soliders 2010

Presentations at Ex-hospital 2010

22

WE LISTENED

IwB students interviewing local business’ 2010

Presentations at Ex-hospital 2010

IwB students interviewing local residents 2010

23

WE CONSIDERED YOUR WANTS & NEEDS

Mining Culture 2010

Temporary Housing 2010

Feria Libre 2010

24

YOUR NATURAL ENVIRONMENT OPPORTUNITIES

Parque Lota 2010 Entrace to Lota 2010

Lota Stairs 2010

25

YOUR BUSINESS OPPORTUNITIES

Enacar 2010

Feria Libre 2010

Caleta artesanal 2010

26

YOUR INSTITUTIONAL OPPORTUNITIES

Pabellon 83 2010

Fourth graders Seventh-day Adventist elementary school 2010

Municipal workers 2010

27

PEOPLE CHANGE PLACES

Lota has Endless Opportunities

28

PEOPLE CHANGE PLACES

Create Awareness and Mobilize

29

PEOPLE CHANGE PLACES

Realize the Potential

30

PEOPLE CHANGE PLACES

Community Action Creates Opportunities

31

PEOPLE CHANGE PLACES

Through Education, More Developments Happen

32

PEOPLE CHANGE PLACES

Training & Learning

33

PEOPLE CHANGE PLACES

Health & Wellness

34

PEOPLE CHANGE PLACES

New Skills & Development

35

PEOPLE CHANGE PLACES

New Partnerships & Institutions

36

PEOPLE CHANGE PLACES

Diversity & Resilience

37

LOTA TODAY

38

TRANSPORTATION ROUTES

LOTALota 2010 Regional Map 2010

CORONEL

CONCEPCION

39

TRANSPORTATION ROUTES

Lota 2010 Lota 2010

40

BEACHES

Playa Blanca 2010

41

TOURIST SITES

Chiflon del Diablo 2010

42

INDUSTRIAL SITES

Enacar 2010

43

INSTITUTIONS

San Matias Apostol 2010

44

RESIDENTIAL NEIGHBOURHOODS

Residential housing 2010

45

TEMPORARY HOUSING

Temporary housing 2010

46

URBAN & NATURE RINGS

Lota 2010

47

URBAN & NATURAL RINGS: FLOOD ZONES

48

INSPIRATIONS

ENACAR, Lota 2010 Evergreen Brickworks, Toronto 2010

49

INSPIRATIONS

Lota 2010 Fogo Islands, Canada 2010

50

INSPIRATIONS

Lota 2010 Candy Chang, NY 2010

51

INSPIRATIONS

Lota 2010 Elemental, Temuco 2001

52

PEOPLE CHANGE PLACES

53

THE VISION

A Resilient City

54

STRATEGIC OBJECTIVES

INCREASED CONNECTIVITYENHANCED PUBLIC SPACESHOUSING SOLUTIONSINSTITUTIONAL RESTORATIONECONOMIC PROSPERITYCOMMUNITY EMPOWERMENT

55

STRATEGIC OBJECTIVES

INCREASED CONNECTIVITYENHANCED PUBLIC SPACESHOUSING SOLUTIONSINSTITUTIONAL RESTORATIONECONOMIC PROSPERITYCOMMUNITY EMPOWERMENT

56

TRANSPORTATION

1. TRAIN STATION2. BICICLOTA3. BARCALOTA

1

2

2

22

2

2

2

2

2

3

3

3

3

3

3

3

3

57

NEW BIOTREN ROUTE

58

TRAIN STATION

Existing train station 2010

59

TRAIN STATION

60

MARKET

HOTEL

BICICLOTA

TRAIN STATION

61

BICICLOTA

Existing infrastructure 2010

62

BICICLOTA

63

BARCALOTA

Existing fising pier 2010

64

BARCALOTA

65

TRANSPORTATION ROUTES

66

TRAIN STATION200 Initial jobs created$76,475,000 CAN Initial capital investment$37,000,000,000 CLP Initial capital investment

BICICLOTA90 Initial jobs created$470,000 CAN Initial capital investment$ 227,000,000 CLP Initial capital investment

BARCALOTA30 Initial jobs created$5,000 CAN /Station, initial capital investment$ 2,500,000 CLP Initial capital investment

TRANSPORTATION +

67

STRATEGIC OBJECTIVES

INCREASED CONNECTIVITYENHANCED PUBLIC SPACESHOUSING SOLUTIONSINSTITUTIONAL RESTORATIONECONOMIC PROSPERITYCOMMUNITY EMPOWERMENT

68

1. NATURE RING STANDARDS2. CAMINO VERDE3. PLAYA BLANCA4. ALTO PARK5. FUERTE DE LOTA

ENHANCED PUBLIC SPACES

Nature Ring

3

24

5

69

NATURE RING STANDARDS

Lamppost & banner

CUST

OM

MAD

ECO

MM

ERCI

ALLY

PRO

DU

CED

Wayfinding Signage Canopy Trash can

Picnic table Kiosk Canopy Bench Playground

Kit of parts

70

NATURE RING STANDARDS

Existing train line 2010

71

CAMINO VERDE

72

PLAYA BLANCA

Playa Blanca 2010

73

PLAYA BLANCA OCEAN WALK

Mixed Use Housing

74

MUNICIPALIDAD DE LOTA 2010

ALTO PARK

Exisiting green space 2010

75

ALTO PARK

76

FUERTE DE LOTA

Exisiting Fuerte de Lota 2010

77

FUERTE DE LOTA

78

FUERTE DE LOTA

79

1. URBAN RING STANDARDS2. ENTRANCE TO LOTA3. TEATRO LOTA4. SAN MATIAS APOSTOL5. PLAZA DE ARMAS

ENHANCED PUBLIC SPACES

2

3

4

5

Urban Ring

80

URBAN RING STANDARDS

Lamppost & banner

CUST

OM

MA

DE

COM

MER

CIA

LLY

PRO

DU

CED

Wayfinding Signage

Benches

Trash can

KioskBench

Vehicularsignage

Intersection lamppost &

banner

Intersection mural

ON

E O

F A

KIN

D

Kit of parts

81

URBAN RING STANDARDS

Existing streetscape 2010

82

URBAN RING STANDARDS

83

ENTRANCE TO LOTA

Exisiting Entrance 2010

84

ENTRANCE TO LOTA

85

PLAZA DE ARMAS

Existing Plaza de Armas 2010

86

PLAZA DE ARMAS

87

PLAZA DE ARMAS

88

STRATEGIC OBJECTIVES

INCREASED CONNECTIVITYENHANCED PUBLIC SPACESHOUSING SOLUTIONSINSTITUTIONAL RESTORATIONECONOMIC PROSPERITYCOMMUNITY EMPOWERMENT

89

1. COSTA VILLA2. CASCADA3. VALLE VERDE4. CASA FERIA5. CASA FLEXIBLE

HOUSING SOLUTIONS

1

23

4

5

90

COSTA VILLA

Caleta Pueblo Hundido 2010

91

COSTA VILLA

92

Ground floor plan 200 M2

Second floor plan75 M2

COSTA VILLA

OPTION A OPTION B

Ground floor plan200 M2

Second floor plan75 M2

93

15 UNITS$61,000 CAN/UNIT, INITIAL COST$29,500,000 CLP /UNIT, INITIAL COST

TOTAL COST FOR DEVELOPMENT$900,000 CAN INITIAL COST$441,000,000 CLP INITIAL COST

COSTA VILLA NEIGHBOURHOOD

94

CASCADA

Playa Conchilla 2010

95

CASCADA

96

CASCADA

Ground floor plan122 M2

Second floor plan122 M2

OPTION A OPTION B

Ground floor plan122 M2

Second floor plan122 M2

97

CASCADA SITE PLAN

77 UNITS$20,000 CAN/UNIT, INITIAL COST9,500,000 CLP /UNIT, INITIAL COST

TOTAL COST OF DEVELOPMENT$1,500,000 CAN INITIAL COST750,000,000 CLP INITIAL COST

Phase 1 - 46% of Site Developed

98

CASCADA SITE PLAN

58 UNITS$20,000 CAN/UNIT, INITIAL COST9,500,000 CLP /UNIT, INITIAL COST

TOTAL COST OF DEVELOPMENT$1,200,000 CAN INITIAL COST600,000,000 CLP INITIAL COST

Phase 2 - Additional 36% of Site Developed

99

30 UNITS$20,000 CAN/UNIT, INITIAL COST9,500,000 CLP /UNIT, INITIAL COST

TOTAL COST OF DEVELOPMENT$650,000 CAN INITIAL COST310,000,000 CLP INITIAL COST

CASCADA SITE PLAN

Phase 3 - Additional 18% of Site Developed

100

VALLE VERDE

Existing temporary housing 2010

101

VALLE VERDE

102

CAMINO VERDE

103

VALLE VERDE

Ground floor plan40 M2

Second floor plan40 M2

STANDARD EXPANDED

Ground floor plan65 M2

Second floor plan65 M2

104

12 UNITS$18,000 CAN/UNIT, INITIAL COST$8,500,000 CLP /UNIT, INITIAL COST

TOTAL COST OF DEVELOPMENT$210,000 CAN INITIAL COST$100,000,000 CLP INITIAL COST

VALLE VERDE NEIGHBOURHOOD

Phase 1 - 50% of Site Developed

105

12 UNITS$18,000 CAN/UNIT, INITIAL COST$8,500,000 CLP /UNIT, INITIAL COST

TOTAL COST OF DEVELOPMENT$210,000 CAN INITIAL COST$100,000,000 CLP INITIAL COST

VALLE VERDE

Phase 2 - Additional 50% of Site Developed

106

CASA FERIA

Feria Libre 2010

107

CASA FERIA

108

CASA FERIA

Ground floor plan - Market stalls125 M2

Second floor plan - dormitory125 M2

OPTION A - Mixed use OPTION B - Commercial

Ground floor plan - Market stalls125 M2

Second floor plan - restaurant60 M2

109

26 UNITS$115,000 CAN/UNIT, INITIAL COST55,500,000 CLP /UNIT, INITIAL COST

TOTAL COST OF DEVELOPMENT$3,000,000 CAN INITIAL COST1,500,000,000 CLP INITIAL COST

CASA FERIA

Phase 1 - 60% of Site Developed

110

18 UNITS$115,000 CAN/UNIT, INITIAL COST55,500,000 CLP /UNIT, INITIAL COST

TOTAL COST OF DEVELOPMENT$2,000,000 CAN INITIAL COST1,005,000,000 CLP INITIAL COST

VALLE VERDE

Phase 2 - Additional 40% of Site Developed

111

CASA FLEXIBLE

Colcura 2010

112

CASA FLEXIBLE

112

CASA FLEXIBLE

Floor plan75 M2

OPTION A - 4 Bedrooms, 2 Entrances

Floor plan75 M2

OPTION B - 3 Bedrooms, 2 Entrances

Floor plan75 M2

OPTION C - 3 Bedrooms, 1 Entrance

114

979 UNITS$28,000 CAN/UNIT, INITIAL COST$13,000,000 CLP /UNIT, INITIAL COST

TOTAL COST OF DEVELOPMENT$27,000,000 CAN INITIAL COST$13,000,000,000 CLP INITIAL COST

CASA FLEXIBLE

115

20% OF POPULATION IN NEED OF PERMANENT HOUSING

1,760 Total housing units proposed(4 People on average per unit)

70% OF HOUSING NEEDS ADRESSED

HOUSING STRATEGY

Students/live-work units3% Of housing solutions

Tourist units10% Of housing solutions

Social units25% Of housing solutions

Tourist/live-work units10% Of housing solutions

Family units60% Of housing solutions

116

STRATEGIC OBJECTIVES

INCREASED CONNECTIVITYENHANCED PUBLIC SPACESHOUSING SOLUTIONSINSTITUTIONAL RESTORATIONECONOMIC PROSPERITYCOMMUNITY EMPOWERMENT

117

INSTITUTIONAL RESTORATION

1. ENACAR 2. TEATRO LOTA3. SAN MATIAS APOSTOL CHURCH4. STADIUM

1

3

2

4

118

ENACAR

Enacar 2010

118

ENACAR

119

TEATRO LOTA

Teatro Lota 2010

120

TEATRO LOTA

121

SAN MATIAS APOSTOL CHURCH

San Matias Apostol 2010

123

SAN MATIAS APOSTOL CHURCH

124

SAN MATIAS APOSTOL CHURCH

125

STADIUM

Existing soccer field 2010

126

STADIUM

127

STADIUM

128

TEATRO LOTA$80,000 CAN Initial capital investment$39,000,000 CLP Initial capital investment

SAN MATIAS APOSTOL CHURCH$151,000 CAN Initial capital investment$73,000,000 CLP Initial capital investment

STADIUM450 Initial jobs created$5,500,000 CAN Initial capital investment$2,500,000,000 CLP Initial capital investment

INSTITUTIONS +

129

STRATEGIC OBJECTIVES

INCREASED CONNECTIVITYENHANCED PUBLIC SPACESHOUSING SOLUTIONSINSTITUTIONAL RESTORATIONECONOMIC PROSPERITYCOMMUNITY EMPOWERMENT

130

ECONOMIC PROSPERITY

1. LOS LADRILLOS RESTAURANT2. FERIA LIBRE3. HOTEL SONETO4. UNION BUILDING CONVERSION 1

342

131

LOS LADRILLOS RESTAURANT

Muelle Lota 2010

132

LOS LADRILLOS RESTAURANT

133

FERIA LIBRE

Feria Libre 2010

134

FERIA LIBRE

135

FERIA LIBRE

136

HOTEL SONETO

Existing lot 2010

137

HOTEL SONETO

138

CENTRE FOR SOCIAL INNOVATION

Existing Miner’s Union 2010

139

CENTRE FOR SOCIAL INNOVATION

140

TRAIN STATION TO PLAZA DE ARMAS

141

LOS LADRILLOS RESTAURANT100 Initial jobs created$3,500,000 CAN Initial capital investment$1,800,000,000 CLPInitial capital investment

FERIA LIBRE$93,000 CAN Initial capital investment$45,000,000 CLP Initial capital investment

HOTEL SONETO230 Initial jobs created$7,000,000 CAN Initial capital investment$3,400,000,000 CLP Initial capital investment

ECONOMIC PROSPERITY +

UNION BUILDING CONVERSION200 Initial jobs created$1,600,000 CAN Initial capital investment$800,000,000 CLP Initial capital investment

142

INCREASED CONNECTIVITYENHANCED PUBLIC SPACESHOUSING SOLUTIONSINSTITUTIONAL RESTORATIONECONOMIC PROSPERITYCOMMUNITY EMPOWERMENT

STRATEGIC OBJECTIVES

143

COMMUNITY EMPOWERMENT

1. LOTA VERDE2. BUSINESS IMPROVEMENT ASSOCIATION (BIA)3. HOUSING PROGRAMS4. SPORTS LEADERSHIP

144

LOTA VERDE

Community gardening programCommunity cleanup festival

Intersection mural

145

BUSINESS IMPROVEMENT ASSOCIATION

146

HOUSING PROGRAMS

Ministry Of Housing & Urban Development

147

SPORTS LEADERSHIP PROGRAM

148

REVITALIZATION PLAN IMPLEMENTATION

BUSINESS OWNERS

SPORTS ORGANIZATIONS

PABELLON 83

NEIGHBORHOOD LEADERS

BIA

Sports Leadership Program

Lota Verde

MINVU Subsidies

Business DistrictCleanup

Improve Business AreaInfrastructure

Restaurant(Los Lardrillos)

New Housing andMarket Stalls (Casa Feria)

Boutique Hotel(Hotel Soneto)Entrepreneurial

Water Taxi (Barcalota)

Miner’s UnionBuilding

Soccer FieldsCleanup

Bicycle Sharing(Biciclota)

Teatro Lota

New Stadium SchwaggerReturn

Plaza de Armas

Entrance

Camino Verde

Social Housing(Valle Verde)

New Housing Development(Casa Flexibles)

Enhance Parks

Enhancing PublicInfrastructure

Expansion of the Church

Extension ofBiotren and New Station

NeighborhoodCleanup

Voluntourism Housing(Cascada)

Water Front HousingDevelopment (Costa Villa)

TODAY 2012 2017 2022 2027

149

CITY SYSTEMS - LOTA AS A RESILIENT CITY

150

MASTER PLAN

151

YO SOY LOTA

www.peoplechangeplaces.com

Community members 2010