YOSEMITE SLOUGH RESTORATION PROJECTPhase 1 Construction

Preconstruction Conditions

Historic Yosemite Slough

2010 Preconstruction Conditions

2010

Preconstruction Shoreline

Plant Elevation Surveys

Construction Documents

3D Topographic and Habitat Modeling

Preconstruction Shoreline

Mass Grading of Tidal Wetlands

Mass Grading of Tidal Wetlands

Soil Remediation

Soil Remediation

Fine Grading Tidal Wetland

Importing Bay Mud

Pulverizing and Spreading Bay Mud

Pulverizing and Spreading Bay Mud

Constructing a Snowy Plover Nesting Island

Preparing for the Breach

Preparing for the Breach

Preparing for the Breach During Low Tide

Breach During Low Tide

Breach During Low Tide

Breach During Low Tide

Breach During Low Tide

Breach During Low Tide

Daybreak After the Breach

First Incoming Tide

San Francisco Celebrates New Wetlands