Post on 05-Dec-2014
description
transcript
1
Reg/Snr Architect PM/DM with over 25 years of experienceof designing, coordinating, overseeing the construction and generally the creation of AEC projects, of varied types and sizes, globally;
Zolna Murray
What?
MSc
2
Architect MSc (graduate followinga construction technician qualification)(studying and learning in Europe)
1982 - 1989
31990 - 1993
Architect MSc (graduate)(early work in design and construction management)
41992 - 2009
Architect MSc (registered in 2000)(living and working in New Zealand)
(own Business)
5
Design, coordination, contract administration, overseeing
construction
Residential work(small to mediumScale)
6
Design, coordination, contract administration,
overseeing construction
Residential work(new houses x 3)
7Residential work(medium/large scale)
Design, coordination, contract administration, overseeing construction
8Commercial work(medium/large scale)
Design, coordination, contract administration, overseeing construction
9
One of the significant number of clients with returning commissions
10Architect MSc
(contractedTo other s first,Set up own busFrom 2004)
Documentation, coordination, Detailed design,
Construction support
11
Documentation, coordination, Modeling, Detail design,
Construction support
Commercial / industrial work(medium/large scale)
12
Documentation, coordination, Modeling, Detail design,
Commercial / industrial / fit-out and interior work (medium/large scale)
13
Long term construction support through DM/coordination, shop drawings
and logisticsCommercial / industrial / fit-out and interior work (medium/large scale)
142010 moved to GCC
14
15
DM/PM support,Auditing consultants’ documents,
strategic planning
Numerous Mixed-use Developments (all large scale)
16
33 x
DM/PM/BIM support,Auditing consultants’ documents,
strategic planning
Institutional development (large scale)
New York University in Abu Dhabi UAE
17
The UAE Pavilion of EXPO 2010 Was disassembled and relocated to Saadiyat Island, Abu Dhabi.
DM/PM/BIM support,Auditing consultants’ documents,
strategic planning
Cultural developments
UAE Pavilion, relocation to Abu Dhabi, UAE
18
DM/PM/BIM support,Auditing consultants’ documents,
strategic planning
Mixed use developments (all large scale)
Saadiyat IslandApartments and Villas
19
DM/PM/BIM support,Auditing consultants’ documents,
strategic planning
Entertainment development (large scale)
Yas, WaterworldAbu Dhabi, UAE
20Full design and documentation
For DB proposal
Airport ExtensionAbu Dhabi, UAE
21
DM/PM/BIM support for bids,Auditing consultants’ documents,
strategic planning
Mixed use, cultural, civil and institutional developments (all large scale)
Midfield Airport Terminal Qatar Rail – New Metro lines (x2)
World Island - Development
BIDDING STAGE
22
DM/PM/BIM support for bids,Auditing consultants’ documents,
strategic planning
Mixed use, cultural, civil and institutional developments (medium to large scale)
ADCO Shah - Development
Royal Palaces
BIDDING STAGE
23
DM/PM/BIM support for bids,Auditing consultants’ documents,
strategic planning
Healthcare developments (all large scale)
Al Ain Hospital
Security Hospital
BIDDING STAGE
24
DM/PM/BIM support for bids,Auditing consultants’ documents,
strategic planning
Dubai Tower (Doha), various Hotels(all large scale)
BIDDING STAGE
25
DM/PM/BIM support for construction
Auditing consultants’ documents, Shop drawings
ADIB Headquarters, Abu Dhabi
CONSTRUCTION STAGE
26
DM/PM/BIM support for construction
Auditing consultants’ documents, Shop drawings
Mafraq Hospital, Abu Dhabi
CONSTRUCTION STAGE
27
DM/PM/BIM support for construction
Auditing consultants’ documents, Shop drawings
ADCO developmentQusahwira
CONSTRUCTION STAGE
28
DM/PM/BIM support for construction
Auditing consultants’ documents, strategic planning;
Habtoor PalaceDubai
CONSTRUCTION STAGE
29
DM/PM/BIM for claim support Auditing consultants’ documents,
Claims and Shop drawings
Al Bustan developmentAbu Dhabi
POSTCONSTRUCTION STAGE (CLAIMS)
30
DM/PM/BIM for claim support Auditing consultants’ documents,
Claims and Shop drawings
Al Bustan developmentAbu Dhabi
POSTCONSTRUCTION STAGE (CLAIMS)