Page 1
[email protected] © 2006 Alan Sinclair
Page 1
Page 2
Page [email protected] © 2006 Alan Sinclair
Page 3
© 2006 Alan [email protected] Page 3
Page 4
© 2006 Alan [email protected] Page 4
Page 5
Fron
t
Rear Keyhole Frame
Keyhole Flatpattern
[email protected] © 2006 Alan Sinclair
Page 5
Page 6
Page 6© 2006 Alan Sinclair
[email protected]
Page 7
AA
A−A
[email protected] © 2006 Alan Sinclair
Page 7
Page 8
Fron
t
[email protected]
Page 8
© 2006 Alan Sinclair
Page 9
A
Front
B
[email protected] © 2006 Alan Sinclair
Page 9
Page 10
FrontA
B
Page 10
[email protected] © 2006 Alan Sinclair
Page 11
C
Front
D
[email protected] © 2006 Alan Sinclair
Page 11
Page 12
FrontC
D
© 2006 Alan [email protected] Page 12
Page 13
Extra material trim as needed.
© 2006 Alan [email protected]
GPage 13
H
Page 14
PF
Page 14
[email protected]
© 2006 Alan Sinclair
INNE
R SU
RFAC
E N
Page 15
[email protected] © 2006 Alan Sinclair
Page 15
J K
Page 16
M
[email protected] © 2006 Alan Sinclair
Page 16
ML
Page 17
INNE
R SU
RFAC
E
GE
© 2006 Alan [email protected]
H
Page 17
F
Page 18
Page 18
PN
Extra material trim as needed.
[email protected] © 2006 Alan Sinclair
Page 19
J K
© 2006 Alan [email protected] Page 19
Page 20
ML
Page 20© 2006 Alan Sinclair
[email protected]
Page 27
© 20
06 Alan Sinclair
[email protected]
The Cross Hatched area along the bottom is NOT part of the Finished Dome. It is only intended to keep the sections together during construction. It should be coverd by the Inner layer or removed before mounting the dome to the helmet.