+ All Categories
Home > Documents > © 2007 1 Laboratory Testing Of High-Pressure Coiled-Tubing Drilling System June 1, 2007 Dr. William...

© 2007 1 Laboratory Testing Of High-Pressure Coiled-Tubing Drilling System June 1, 2007 Dr. William...

Date post: 11-Jan-2016
Category:
Upload: barbara-thompson
View: 223 times
Download: 5 times
Share this document with a friend
49
© 2007 1 Laboratory Testing Of High-Pressure Coiled-Tubing Drilling System June 1, 2007 June 1, 2007 Dr. William C. Maurer Dr. William C. Maurer
Transcript
Page 1: © 2007 1 Laboratory Testing Of High-Pressure Coiled-Tubing Drilling System June 1, 2007 Dr. William C. Maurer.

© 2007 1

Laboratory Testing Of High-Pressure Coiled-Tubing Drilling System

Laboratory Testing Of High-Pressure Coiled-Tubing Drilling System

June 1, 2007June 1, 2007

Dr. William C. MaurerDr. William C. Maurer

Page 2: © 2007 1 Laboratory Testing Of High-Pressure Coiled-Tubing Drilling System June 1, 2007 Dr. William C. Maurer.

© 2007 2

High-Pressure Drilling

1970s & 1980s High Pressure 1970s & 1980s High Pressure Bits Drill 2 to 3 Time FasterBits Drill 2 to 3 Time Faster ExxonExxon ShellShell Gulf OilGulf Oil Flow DrillFlow Drill

Pressure - 10,000 to 15,000 psiPressure - 10,000 to 15,000 psi

Page 3: © 2007 1 Laboratory Testing Of High-Pressure Coiled-Tubing Drilling System June 1, 2007 Dr. William C. Maurer.

© 2007 3

Exxon Jet Exxon Jet BitBit

Page 4: © 2007 1 Laboratory Testing Of High-Pressure Coiled-Tubing Drilling System June 1, 2007 Dr. William C. Maurer.

© 2007 4

Exxon HP Field TestExxon HP Field Test

Page 5: © 2007 1 Laboratory Testing Of High-Pressure Coiled-Tubing Drilling System June 1, 2007 Dr. William C. Maurer.

© 2007 5

4 3/4” High Pressure Bit4 3/4” High Pressure Bit

Page 6: © 2007 1 Laboratory Testing Of High-Pressure Coiled-Tubing Drilling System June 1, 2007 Dr. William C. Maurer.

© 2007 6

8” High Pressure Bit8” High Pressure Bit

Page 7: © 2007 1 Laboratory Testing Of High-Pressure Coiled-Tubing Drilling System June 1, 2007 Dr. William C. Maurer.

© 2007 7

Grooves Cut by HP TestsGrooves Cut by HP Tests

Page 8: © 2007 1 Laboratory Testing Of High-Pressure Coiled-Tubing Drilling System June 1, 2007 Dr. William C. Maurer.

© 2007 8

High Pressure Problems

ConnectionsConnections

Joint LeaksJoint Leaks

WashoutsWashouts

High MaintenanceHigh Maintenance

PumpPump

RigRig

Page 9: © 2007 1 Laboratory Testing Of High-Pressure Coiled-Tubing Drilling System June 1, 2007 Dr. William C. Maurer.

© 2007 9

High Pressure Solutions

Coiled TubingCoiled Tubing No JointsNo Joints Eliminates WashoutsEliminates Washouts

Improved EquipmentImproved Equipment PumpsPumps RigsRigs MotorsMotors BitsBits

Page 10: © 2007 1 Laboratory Testing Of High-Pressure Coiled-Tubing Drilling System June 1, 2007 Dr. William C. Maurer.

© 2007 10

High Pressure Drilling High Pressure Drilling MechanismMechanism

BitBit

JetsJetsPDC CutterPDC Cutter

Rock LedgesRock Ledges

Page 11: © 2007 1 Laboratory Testing Of High-Pressure Coiled-Tubing Drilling System June 1, 2007 Dr. William C. Maurer.

© 2007 11

Critical Components

Coiled TubingCoiled Tubing Fatigue Life At High PressuresFatigue Life At High Pressures

CT RigCT Rig High Pressure ComponentsHigh Pressure Components

PDM MotorsPDM Motors Bearing And Motor LoadsBearing And Motor Loads

BitsBits Correct Nozzle PlacementCorrect Nozzle Placement

Page 12: © 2007 1 Laboratory Testing Of High-Pressure Coiled-Tubing Drilling System June 1, 2007 Dr. William C. Maurer.

© 2007 12

0

50

100

150

200

6,000 9,000 12,000

1.75"2.00"

CT Fatigue LifeCT Fatigue Life

Fat

igu

e L

ife

(tri

ps)

Internal Pressure (psi)

QT-1000

(based on MEI CTLIFE model)

Page 13: © 2007 1 Laboratory Testing Of High-Pressure Coiled-Tubing Drilling System June 1, 2007 Dr. William C. Maurer.

© 2007 13

Fatigue Test Machine

Hydraulic Actuator

Curved Bending Form

Pump

StraightBending Form

CT Sample

PressureController

Page 14: © 2007 1 Laboratory Testing Of High-Pressure Coiled-Tubing Drilling System June 1, 2007 Dr. William C. Maurer.

© 2007 14

Fatigue Life of 1-1/2” Coiled TubingFatigue Life of 1-1/2” Coiled Tubing(R. Stanley, 2000)

0

50

100

150

200

250

300

350

400

450

500

1000 2000 3000 4000 5000 6000 7000 8000 9000 10000 11000 12000 13000 14000

Internal Test Pressure (psi)

Fat

igu

e L

ife

(cyc

les)

Actual Cycles for QT-1200

Model Cycles for QT-1000

Model Cycles for QT-800

(0.156” Wall)

Page 15: © 2007 1 Laboratory Testing Of High-Pressure Coiled-Tubing Drilling System June 1, 2007 Dr. William C. Maurer.

© 2007 15

First Reel of QT 1200 CT

Page 16: © 2007 1 Laboratory Testing Of High-Pressure Coiled-Tubing Drilling System June 1, 2007 Dr. William C. Maurer.

© 2007 16

Fiberspar Composite CTFiberspar Composite CT

Production Tubing - Production Tubing - FS PTFS PT Line Pipe - Line Pipe - FS LPFS LP Coiled Tubing -Coiled Tubing -FS CTFS CT (for Well Servicing) (for Well Servicing)

Page 17: © 2007 1 Laboratory Testing Of High-Pressure Coiled-Tubing Drilling System June 1, 2007 Dr. William C. Maurer.

© 2007 17

Swivel Test Stand

Hydraulic MotorTransducer

Swivel

Page 18: © 2007 1 Laboratory Testing Of High-Pressure Coiled-Tubing Drilling System June 1, 2007 Dr. William C. Maurer.

© 2007 18

Hydra-Rig High Pressure SwivelTorque vs Pressure

0

50

100

150

200

250

300

350

400

450

500

0 2000 4000 6000 8000 10000 12000 14000

Pressure (PSI)

Torq

ue (

ft.

lbs)

Page 19: © 2007 1 Laboratory Testing Of High-Pressure Coiled-Tubing Drilling System June 1, 2007 Dr. William C. Maurer.

© 2007 19

High Pressure CT MotorHigh Pressure CT Motor

PDC Thrust Bearings

High PressureJet Bit

Filter

PDM Multilobe Rotor/Stator (3 1/8”)

2 3/8” CT

Solid TitaniumFlexshaft

Radial Bearings/Flow Restrictors

Solid Rotor

Page 20: © 2007 1 Laboratory Testing Of High-Pressure Coiled-Tubing Drilling System June 1, 2007 Dr. William C. Maurer.

© 2007 20

Thrust Load on BearingThrust Load on Bearing

10,000 PSI

34,000 lbForce

Seal

Housing

Thrust Bearing

Bit

Page 21: © 2007 1 Laboratory Testing Of High-Pressure Coiled-Tubing Drilling System June 1, 2007 Dr. William C. Maurer.

© 2007 21

Thrust BearingsThrust Bearings

Diamond Roller

Page 22: © 2007 1 Laboratory Testing Of High-Pressure Coiled-Tubing Drilling System June 1, 2007 Dr. William C. Maurer.

© 2007 22

Bearing Load ComparisonBearing Load Comparison

5600

16,800

0

5000

10000

15000

20000

Ball Bearing PDC Bearing

Load

Cap

acit

y

100 Hours @ 300 rpm

Page 23: © 2007 1 Laboratory Testing Of High-Pressure Coiled-Tubing Drilling System June 1, 2007 Dr. William C. Maurer.

© 2007 23

Damaged Ball Bearings

Page 24: © 2007 1 Laboratory Testing Of High-Pressure Coiled-Tubing Drilling System June 1, 2007 Dr. William C. Maurer.

© 2007 24

Page 25: © 2007 1 Laboratory Testing Of High-Pressure Coiled-Tubing Drilling System June 1, 2007 Dr. William C. Maurer.

© 2007 25

Labyrinth Seal

Outer Sleeve

Inner Sleeve

Page 26: © 2007 1 Laboratory Testing Of High-Pressure Coiled-Tubing Drilling System June 1, 2007 Dr. William C. Maurer.

© 2007 26

Motor Labyrinth LeakageMotor Labyrinth Leakage

8.1

12.1

0

2

4

6

8

10

12

14

16

0.004" 0.006"Leakage Clearance (w)

Flo

w R

ate

(g

pm

)

wFour 5” Labyrinths10,000 psi

Page 27: © 2007 1 Laboratory Testing Of High-Pressure Coiled-Tubing Drilling System June 1, 2007 Dr. William C. Maurer.

© 2007 27

Radial Bearing

Outer Sleeve

Inner Sleeve

Page 28: © 2007 1 Laboratory Testing Of High-Pressure Coiled-Tubing Drilling System June 1, 2007 Dr. William C. Maurer.

© 2007 35

Page 29: © 2007 1 Laboratory Testing Of High-Pressure Coiled-Tubing Drilling System June 1, 2007 Dr. William C. Maurer.

© 2007 36

10,000 psi

Page 30: © 2007 1 Laboratory Testing Of High-Pressure Coiled-Tubing Drilling System June 1, 2007 Dr. William C. Maurer.

© 2007 37

Page 31: © 2007 1 Laboratory Testing Of High-Pressure Coiled-Tubing Drilling System June 1, 2007 Dr. William C. Maurer.

© 2007 38

High Pressure Jet-Drilling Rates

1500

780

25568 110

120142

910(WOB=1000 lbs)

Jet

Dri

llin

g R

ate

(ft

/in

)

CreamLimestone

Limestone BluffDolomite

RedSandstone

Bit Weight = 2000 lbs = 10,000 psi = 1,000 psi

Page 32: © 2007 1 Laboratory Testing Of High-Pressure Coiled-Tubing Drilling System June 1, 2007 Dr. William C. Maurer.

© 2007 39

70

60

50

40

30

20

10

00 1000 2000 3000 4000

Austin Chalk

Mancos Shale

Colton Sandstone

Dri

llin

g R

ate

(Ft/H

r)

7-7/8 Tricone Bit30,000 Lbs WOB

60 Rpm

pp

bp

Differential Pressure (psi )

Differential Pressure and Drilling Rate(Moffit, 1991)

Page 33: © 2007 1 Laboratory Testing Of High-Pressure Coiled-Tubing Drilling System June 1, 2007 Dr. William C. Maurer.

© 2007 40

Cuttings Removal Screen

Borehole Pressure

DrillingFluid Input

ShaftSeal

Pressure Chamber Formation Pressure

RockRock

Choke

DRC Wellbore Simulator Drilling DRC Wellbore Simulator Drilling StandStand

Page 34: © 2007 1 Laboratory Testing Of High-Pressure Coiled-Tubing Drilling System June 1, 2007 Dr. William C. Maurer.

© 2007 41

Effect Of Wellbore Pressure

740

260

0

100

200

300

400

500

600

700

800

0 psi 2000 psi

Wellbore Pressure

RO

P (

ft/h

r)

(Conventional Drilling)

Texas Cream Limestone2000 lb Bit Weight

Wellbore Pressure = 0 psiJet Pressure = 300 psi

Page 35: © 2007 1 Laboratory Testing Of High-Pressure Coiled-Tubing Drilling System June 1, 2007 Dr. William C. Maurer.

© 2007 42

Effect Of Wellbore Pressure

1010920

0

200

400

600

800

1000

1200

1400

1600

1800

0 psi 2000 psi

Wellbore Pressure

RO

P (

ft/h

r)

Texas Cream Limestone2000 lb Bit Weight

(High Pressure Drilling)

Wellbore Pressure = 2000 psiJet Pressure = 9300 psi

Page 36: © 2007 1 Laboratory Testing Of High-Pressure Coiled-Tubing Drilling System June 1, 2007 Dr. William C. Maurer.

© 2007 43

Page 37: © 2007 1 Laboratory Testing Of High-Pressure Coiled-Tubing Drilling System June 1, 2007 Dr. William C. Maurer.

© 2007 44

Initial Bottom Hole Pattern

Page 38: © 2007 1 Laboratory Testing Of High-Pressure Coiled-Tubing Drilling System June 1, 2007 Dr. William C. Maurer.

© 2007 45

Modified Jet Bit

Page 39: © 2007 1 Laboratory Testing Of High-Pressure Coiled-Tubing Drilling System June 1, 2007 Dr. William C. Maurer.

© 2007 46

Final Bottom Hole PatternFinal Bottom Hole Pattern

Page 40: © 2007 1 Laboratory Testing Of High-Pressure Coiled-Tubing Drilling System June 1, 2007 Dr. William C. Maurer.

© 2007 47

Additional Applications

Page 41: © 2007 1 Laboratory Testing Of High-Pressure Coiled-Tubing Drilling System June 1, 2007 Dr. William C. Maurer.

© 2007 48

HighPressure Jets

Slots

FormationDamage

Jet SlottingStimulation

Page 42: © 2007 1 Laboratory Testing Of High-Pressure Coiled-Tubing Drilling System June 1, 2007 Dr. William C. Maurer.

© 2007 49

Jet Slots In Glacier Bluff Dolomite10,000 psi Jet Pressure

Slot

Page 43: © 2007 1 Laboratory Testing Of High-Pressure Coiled-Tubing Drilling System June 1, 2007 Dr. William C. Maurer.

© 2007 50C

em

en

tC

em

en

t

Drillpipe or Casing

HighPressure Jets

Drilling Cement

Page 44: © 2007 1 Laboratory Testing Of High-Pressure Coiled-Tubing Drilling System June 1, 2007 Dr. William C. Maurer.

© 2007 51

Tubing After Drilling Cement

Page 45: © 2007 1 Laboratory Testing Of High-Pressure Coiled-Tubing Drilling System June 1, 2007 Dr. William C. Maurer.

© 2007 52

Cement Drilling Rates

60

1420

0

200

400

600

800

1000

1200

1400

1600

Conventional High Pressure

Cem

ent D

rillin

g R

ate

s (f

t/hr)

Motor Motor

Page 46: © 2007 1 Laboratory Testing Of High-Pressure Coiled-Tubing Drilling System June 1, 2007 Dr. William C. Maurer.

© 2007 53

Cement Drill Cuttings (10,000 psi)

Page 47: © 2007 1 Laboratory Testing Of High-Pressure Coiled-Tubing Drilling System June 1, 2007 Dr. William C. Maurer.

© 2007 54

Acknowledgements

DOE (William DOE (William Gwilliam)Gwilliam)

Garry Collins Garry Collins (Marathon)(Marathon)

Mike Dearing Mike Dearing (Stewart & (Stewart & Stevenson)Stevenson)

John Martin John Martin (Quality (Quality Tubing)Tubing)

Mel Mel Hightower Hightower (ARCO)(ARCO)

Rod Stanley Rod Stanley (Quality (Quality Tubing)Tubing)

John John Misselbrook Misselbrook (BJ Services)(BJ Services)

Page 48: © 2007 1 Laboratory Testing Of High-Pressure Coiled-Tubing Drilling System June 1, 2007 Dr. William C. Maurer.

© 2007 55

Page 49: © 2007 1 Laboratory Testing Of High-Pressure Coiled-Tubing Drilling System June 1, 2007 Dr. William C. Maurer.

© 2007 56


Recommended