+ All Categories
Home > Documents >  · 5.3 Fortress Infinity Deck Board Specifications ... WPC may be produced from either virgin or...

 · 5.3 Fortress Infinity Deck Board Specifications ... WPC may be produced from either virgin or...

Date post: 09-Jul-2018
Category:
Upload: trinhminh
View: 214 times
Download: 0 times
Share this document with a friend
27
INFINITY TECHNICAL GUIDE www.FortressDeck.com
Transcript

INFINITY TECHNICAL GUIDEwww.FortressDeck.com

INFINITY TECHNICAL GUIDE

[email protected]/27 063016

CONTENTS

1. INFINITY CO-EXTRUDED COMPOSITE DECKING 1.1 An Introduction to Bamboo-Plastic Composite 1.2WhatisInfinityDeckingandWhatAretheBenefits? 1.3BenefitsofInfinityvs.Wood

2. TRANSPORTING FORTRESS INFINITY DECK BOARDS 2.1Stacking 2.2 On-Site

3 BASIC COMPONENTS OF A DECK 4 TOOLS & MATERIALS 4.1 Tools 4.2 Materials

5 JOIST SPACING 5.1JoistSpacingTable 5.2InstallingDeckBoardsAtAnAngle 5.3FortressInfinityDeckBoardSpecifications

6 GENERAL TIPS & BEST PRACTICES

7 BEFORE INSTALLATION: TIPS FOR PLANNING AHEAD

8 BEFORE INSTALLATION: SITE INSPECTION

9 PRE-INSTALLATION CHECKLIST

10. HULK HIDDEN CLIP & FASTENERS 10.1 HULK Screws & Hidden Clip 10.2 HULK Screws Table

11. INSTALLATION 11.1 Expansion Table 11.2 HULK Hidden Clip Installation 11.3LayingTheDeck

12. BEST PRACTICES: JOISTS

13. BEST PRACTICES: DECK BOARDS

14. BEST PRACTICES: FASCIA 14.1 Fascia Installation: Fasteners 14.2 Fascia Installation: Joint Connections

15. AFTER INSTALLATION

16. DON’TS

17. EXAMPLES OF DECKING INSTALLED INCORRECTLY

18. CLEAN & CARE GUIDE

3334

555

6

777

8888

9

10

10

11

111112

13131415-16

17

17

181819

19

19

20-23

24

INFINITY TECHNICAL GUIDE

[email protected]/27 063016

1. INFINITY CO-EXTRUDED COMPOSITE DECKING

1.1 An Introduction to Bamboo-Plastic Composite

Wood-PlasticComposites(WPC)arecompositematerialsmadeofwoodfiber/woodflourandthermoplastic(s).WPCareproducedbythoroughlymixinggroundwoodparticlesandheatedthermoplasticresin.WPCmaybeproducedfromeithervirginorrecycledthermoplasticsincludingHDPE,LDPE,PVC,PP,ABS,PS,andPLA.Themostcommonmethodofproductionistoextrudethematerialintothedesiredshape.Thesematerialscanbemoldedwithorwithoutsimulatedwoodgraindetails.ExtrudedWPCareformedintobothsolidandhollowprofiles.Injectionmoldingisalsoused.

WPCarestillfairlynewmaterialsinthemarket,relativetothelonghistoryofnaturalwoodasabuildingmaterial.WPCwerefirstintroducedintothedeckingmarketintheearly1990’s.WPCareoneofthefastestgrowingbuildingproductmaterials.

Bamboo-PlasticComposites(BPC)arearecentadvancementtothealreadysuccessfulintroductionofWPC.BPCareverysimilartoWPCwiththeprimarydifferencebeingtheintroductionofBambooasahigherperformingsubstitutetothatoftheoriginalwoodcomponent.EarlyWPCandevencurrentWPCdeckingproductshaveshowntostrugglewithmoistureabsorptionintothewoodfiberandcoreoftheproduct.Bambooisnaturallymoreresistanttomoistureabsorptionthanwoodandalsointroducesstrongerstructuralproperties.TheengineeringbehindBPChasshownsignificantimprovementinkeyperformancecharacteristicsforlongevityanddurability.

1.2 What is Infinity Decking and What Are the Benefits?

OveradecadeagoacompanynamedEva-Last®ofJohannesburg,SouthAfricadiscoveredtherewasaneedwithintheSouthAfricanmarketforamorerobustandsuperioroutdoorcompositeproduct.Theintroductionofwell-knownNorthAmericanmanufacturedcompositedeckinghadledtonumerousproductfailuresintheharshSouthAfricanenvironment.Throughextensiveresearchandstringenttestingmethodsinsomeofthemostunforgivingconditionsintheworld,Eva-Last®developedtheInfinityrangeofBambooPlastic Composite (BPC) products.

TheInfinityrangeofoutdoorBPCproductshasbecometheindustryleaderinEurope,theMiddleEastandthroughoutAfrica,provingperformanceinanenormousrangeofenvironmentalconditions.In2016,FortressDeckintroducedInfinitytotheNorthAmericanmarket,finallybringingtheglobally-proventechnologyofBPC’stotheUnitedStatesandCanada.

Infinityco-extrudeddeckproductsarebothultra-lowmaintenanceandenvironmentallyfriendly.InfinityBPCproductsaremadefrom55%sustainablebamboofiberand35%recycledplasticasthetwoprimarycomponents.Theuniquecombinationofbamboofibersandplasticminimizestheneedtoseal,stainorinotherwaystreatInfinitycompositeproducts.

AllInfinityprofilesarecreatedusingHigh-Density-Polyethylene-Plastics(HDPE).WherethisdiffersfromPolyvinylChloride(PVC)isthatPVChassomedisadvantages,amongthemlowthermalstabilityandhighbrittleness.ThoughPVCmayhaveaslightlylowerflamespreadindexwhencomparedtoHDPE,whenPVCburnsitreleaseshighlytoxichydrogen-chloride,henceitiscommonlyconsideredasoneofthemostenvironmentallydamagingthermoplastics.Attemperaturesabove158°F(70°C),PVC(ifnotstabilized),canstarttodegradeandreleasehydrogen-chloride.Furthermore,photodegradation(damagecausedtotheboardbysunlight)ofPVChasbeenknowntotakeplacenaturallyintheouterlayeroftheproductwhenexposedtotheelements.

Infinityiscurrentlyusedinover50countriesaroundtheworldwithglobaldemandandaccessexpandingexponentially.FortressDeckwillprovidetheUnitedStatesandCanadawithInfinityproductsforalltypesofapplications,fromresidentialbackyardentertainmentareas,tomassivecommercialdevelopments,mountainlodgesandhighlyspecializedoceanmarinas.TheapplicationandpossibilitiesofInfinityareendless.SomeofthebiggestandmostrecognizedbrandsintheworldalreadytrustInfinityforitssuperiorperformance,makingitoneofthemostrequesteddeckingproductsintheworld.

INFINITY TECHNICAL GUIDE

[email protected]/27 063016

DesignedandformulatedintheharshenvironmentsofSouthAfrica,Infinityissuperiorinqualityandperformanceandhasbecomeatrustedoutdoorbuildingproduct.TheprovenglobalperformanceallowsFortressDecktohaveanindustryleadingwarrantycoverageonallInfinityproducts.Infinityoffersthelatestininnovationanddesignandisasuperior,eco-friendly,hassle-freealternativetotraditionalwoodproducts,exotichardwoodsorwood-plasticcomposites.

1.3 Benefits of Infinity vs. Wood

●Ultra-lowmaintenance

●Environmentallyfriendly

●Mold&moistureresistant

●UVresistant

●Rot,warp,andcrackresistant

●Decreasesdeforestation

●Slipresistant

●Barefootfriendly

●Simpleinstallation

●Variouscolor&finishoptions

●Utilizesrecycledplastics

INFINITY TECHNICAL GUIDE

[email protected]/27 063016

2. TRANSPORTING FORTRESS INFINITY DECK BOARDS

2.1 Stacking

Thebestmethodofstackingisthepyramidmethodorbricklayersmethod.Byshiftingthelayersofboardshalfwayacrossaboard’slength,thechancesoftheboardsslidingapartarelowerandthereforesafer.

Thoughthepyramidmethodissaferforstoragepurposes,itisnotalwaysthemostpractical.Ifitisnecessarytostackboards,besurenottostackthemtoohigh.Makecertainthattheheightofthestackdoesnotexceedthewidthofthestack.

Whenstackingboardsfortransportation,pleasemakesurethattheboardsaresecure,andthatthereisanevendistributionofload.

2.2 On-site

EnsureInfinityDeckinghasacclimatedtotheenvironmentbeforeinstalling.Itisimportanttounderstandthatwheninstallingincolderweatherthatthecompositeboardswillexpandmorethanwheninstallinginhotterweatherandgappingshouldbeadjustedaccordingly.

Oncetheboardshavereachedthebuildingsite,ensurethattheyarestoredonlevelground.Itisrecommendedthattheboardsnotbestoreddirectlyonthegroundandthattheboardsarecovered.

Iftheboardsneedtobestoredforlongperiods,packtheboardsontopofpallets.

Pyramidmethodorbricklayersmethod Verticalstacking

INFINITY TECHNICAL GUIDE

[email protected]/27 063016

ThankyouforchoosingInfinityDecking.Youcanbeassuredthatyouareusingandinstallingaproductthatisoneofthemostdurable,highestperformingandlonglastinginitsclass.

Thisguidewasdevelopedtohelpinstallerslimitinstallationfaultsandworkmanship,increaseproductivityandcompleteinstallationsthatlastandconformtowarrantyspecifications.Throughsupport,trainingandthehandsonuseofthismanual,FortressDeckaimstogiveyouabetterunderstandingofInfinityDeckinganditscapabilities.Thisinturnwillgiveyouthetoolstoadviseclientswithconfidenceandgood,soundknowledge.

FortressDeckstrivestosetthestandardforcompositeinstallersinNorthAmerica.Weaimtolayoutgoodpracticeguidelinesforallinstallersandmanufacturersofcompositeproductssothattheindustrycanberecognizedasonethatdelivershigh-qualityproductsthroughhigh-qualityinstallations.

3. BASIC COMPONENTS OF A DECK

65

1. InfinityDeckBoard2. Infinity Fascia Board (12”)3.InfinityFascia/RiserBoard(8”)4.InfinityStairTreadBoard5. HULK Hidden Clip6. HULK Fasteners7.InfinityPostSleeve(5”)8.InfinityModernRails

Consultlocalbuildingcodefordeckframerequirements

12

3 4

7 8

8

7

INFINITY TECHNICAL GUIDE

[email protected]/27 063016

4. TOOLS & MATERIALS

4.1 Tools

InfinityDeckingrequirethesametoolsasthoseusedfortheinstallationoftraditionalwooddecks.InordertoproperlyinstallanInfinityDeckyouwillneedthefollowingtools:

4.2 Materials

InordertoproperlyinstallaFortressInfinityDeck,youwillneedthefollowingmaterials:

• InfinityDeckBoards• InfinityFasciaBoards• Clips• Clip Screws•SurfaceMountCompositeScrews•CarriageBolts

•LagScrews• Joists• Posts•Cement/Concrete•String/Line•MarkerBoards

•Gravel• Frame Screws• Truss Clips•Truss/JoistHangers• Hurricane Clips• HULK Screws

MITER SAWwithproperlysharpenedcarbidetipped

compositecuttingblades

CORDLESS DRILL(withclutchandscrewdriverHULK bits providedineverypackofHULK screws)

LEVELSSpiritlevel,laserlevelandpipelevels

CIRCULAR SAWwithproperlysharpenedcarbidetipped

compositecuttingblades

SQUARESCombinationsquares

setsquaresHAND TOOLS

MEASURING TAPE

SHOVELPEN AND PAPER

CHALK LINER

SAFETY EQUIPMENTAUGER

INFINITY TECHNICAL GUIDE

[email protected]/27 063016

5. JOIST SPACING

Pleaseconsultthechartbelowtoensuresufficientmaterialandproperspacingofsubstructurejoistsforyourdeckbeforebeginninginstallation.

5.1 Joist Spacing Table

5.2 Installing Deck Boards At An Angle

Installingdeckingatananglecanhelpdelineatedifferentareasofthedeck,andaddvarietytoyourdeckdesigns.

Wheninstallingdeckingatanangle,thedistancetheboardsmustspanincreasesbeyondtherecommendedlimit.Thesolutionissimple,however,byreducingthejoistspacing.

Astheangleofthedeckingbecomesmoreacute,thejoistspacingmustdecreasetoprovidepropersupport.Pleasereferto5.1JoistSpacingTableforcommondeckboardangles.

5.3 Fortress Infinity Deck Board Specifications

Pleasemakesureyourefertothetablebelowwheninstallingyourdeckboards

Fortress Infinity Deck Boards

NumberOfLfInASq.Ft

Board Dimensions

PlankWeightPerLf

2.1

2.1

7/8”x51/2”

7/8”x51/2”

2.59 lb

2.72 lb

Grooved

Square

90° 60° 45° 30°

JoistSpacingForGrooved&SquareBoards

AtAnAngle

16” 14” 12” 8”

INFINITY TECHNICAL GUIDE

[email protected]/27 063016

1.PleasefollowtheinstructionswheninstallingInfinityDecking,payingcloseattentiontogapping,spacingandfastenerrequirements.2.Beforebeginningconstruction,checkallareaslocalbuildingcodesandregulations.3.Infinityproductsrequireproperventilationanddrainagetoensurelongevity.Adequatedrainageisneededtopreventwaterfrompoolingunderthedeck.4.Themoreventilationprovidedunderneaththedeck,thebetter.Don’tclosethesidesandmakesureairmovesinalldirections.Thisallowsmoisturetoevaporate,ensuringyourdeckhasthelongestlifespanpossible.

5.Alwaysusesharpblades.6.Checkyourmitersaw,againstasteelsquareatthebeginningofeachday.7.Recommendthatyourclientnotletmulch,leafs,debris,pollenororganicmaterialbuildupontheirdeck.8.Adeckshouldbecleanedwithahighpressurehoseseasonallyandkeptfreeofdebris.Adeckthatcollectsmoredebriswillneedtobecleanedmorefrequently.Do not let debris accumulate between boards.9.Alwaysgivegoodandhonestadvicetoclients.Ifyouareunsureofanything,pleaserequestassistancefromFortressDeckorcontactaspecialistintherequiredfield.10.Besuretousecorrosion-resistantfastenersandconnectors.11.Avoidanydeckdesignsthatfacilitatethetrappingofmoisture.Untreatedandunsealedtimberframingthatiscontinuallyexposedtomoisturewilleventuallywarpand/orsplinter.12.Bracingisrecommendedforfree-standingdecksaswellaselevateddecksrequiringlongsupportcolumns.13.Ifyouarebuildingadeckthatisattachedtoyourhouse,makesuretheframingisstrongenoughtobeartheadditionalloadsthedeckwillprovide,includepeople,furniture,grill,toys,bikes,andotheritems.

6. GENERAL TIPS & BEST PRACTICES

INFINITY TECHNICAL GUIDE

[email protected]/27 063016

7. BEFORE INSTALLATION: TIPS FOR PLANNING AHEAD

Important! Please make sure that before you begin construction, you are aware of building requirements, codes and restrictions.

TheinstallationofanyFortressDeckproductisabiginvestmentandshouldbeviewedasaseriousbuildingproject.Installationplaysahugeroleinthelongevityandlifetimeoftheproductandwillhaveadirectinfluenceonperformanceaswellaswarranty.

Ifatanystageoftheinstallationyouneedadviceorassistance,pleasegetintouchwithFortressDeck.Weareheretohelpmakeeachandeverystepoftheinstallationprocessasuccess.

ItisimportantthatyouhaveasolidunderstandingoftheplanningandinstallationprocesstoguaranteethatInfinityproductsareinstalledcorrectly.Attentiontodetailandcarefulplanningarenecessarythroughouttheentireinstallationprocess.MakesureyoufamiliarizeyourselfwiththeInfinityTechnicalGuidebeforebeginningconstruction.WarrantyclaimswillbesubjecttocompliancewithspecificationsoutlinedintheInfinityTechnicalGuide.

Decide on which boards to use based on:

1.Yourclient’spersonalpreferencesandlifestyle2.Moistureanddrainageconditions3.Directsunlight(iftheprojectssiteisanareathatreceivesalotoflightyoumaywanttosuggestalightercolorthatwillabsorblessheat)4.Exposuretoexcessiveheatsourcesincludingreflectedsunlightfromlow-emissivity(Low-E)glass

Goodtimemanagementofyourbuildcanensureyousavemoneyandavoidthehassleandstressofarushedjob.Ifyoucan,startplanningmonthsinadvancetoavoidanysurprises.

KeepinmindthestandardlengthofInfinitymaterials.Iftheprojectallows,tryworkwithstandardsizesof12’,16’and20’piecesinordertokeepcostsdownandreducewaste.

WhencalculatingtheamountofInfinityproductyourequire,remembertotakewasteintoaccount.10%wasteisagoodaveragetoworkwithforasquaredecks,andround/curveddeckswillhaveapproximately15-20%waste.However,pleasekeepinmindthatyouwillstillneedtocalculatethisasitcanvarydependingontheshapeanddesignofthedeck.

Whenplanningadeck,consideritasanextensiontotheoutdoorlivingarearatherthanjustanoutdoorfloor.Deckscanincorporatecomfort,funandinterestingelements.Youmaywanttosuggestafirepit,grill,pergola,sittingarea,diningareaetc.toyourclient.There are no limits to what is possible.

Combinationsofcolors,particularlyonaborderaroundthedeckoronthefasciawillhighlightandaccentadeck.Experiment,exploreandtrysomethingthatwillgivetheprojectthatWOWfactor.

YoucouldsuggestaddinglightingsuchasFortressAccents,eitherleadingtoand/oronthedeck.Downlights,spotlights,stairlights,anythingispossible.Lightingaddslife,looksimpressiveandbringsawonderfulambiencetothedeck.

8. BEFORE INSTALLATION: SITE INSPECTION

Important! Please make sure that before you begin construction, you are aware of building requirements, codes and restrictions.

Inspectandassessthegroundand/orsurfacebelowyourprojectsitebeforeinstallingInfinity.Thisshouldbeadryflatarea.ForunevensurfacesallowforsubstructurealterationstocreateanevenbaseforInfinityDecking.Thegroundshouldbewellcompacted.

Ensurethebuildingsiteallowssufficientdeckventilationanddrainage.Fornon-sleepersystem,planaminimumof2”elevationspacebetweenthegroundandthebottomofyourlowestjoistorbeams.

Forsleepersystems,deckingmustbeelevatedaminimumof1¼”abovetheground.

INFINITY TECHNICAL GUIDE

[email protected]/27 063016

9. PRE-INSTALLATION CHECKLIST!

Bringanyissues,nomatterhowbigorsmall,toyourclient’sattention.Ifyoudonotdiscussissueswiththemtheymaynotbeawareofthem.Itisyourresponsibilitytoletthemknowwhatyouarenothappywithasaninstaller.

Note:Makesureyoudiscusswithyourclientwhetherornottheyhavehadorneedtohaveacivilengineerorarchitectcheckthesite,especiallyonnewbuildingsites,inordertoassesswhetherthegroundhasbeencompactedcorrectlyornotandissuitablefordeckingorlightconstruction.Haveitcheckedforvariouselementssuchasstormwaterdrainsetc.Checklocalbuildingcodestoensureallconformancewithrailingrequirements.

Wehighlyrecommendyouinsistonyourclientgettinganexpertintocheckthesitebeforeconstructionbegins.

Pleasenote:Therearemanywaystobuildandinstallsubstructuresanddecks.Forthepurposeofdemonstratinggoodpractices,proceduresandskills,wearegoingtouseasingletypeofmaterialinthisguide.Theseguidelinesarenotapplicabletoallapplications.Eachandeveryapplicationneedstobeassessedaccordinglybeforebeginninganyinstallation.BuildingcodesneedtobeadheredtoandallInfinityinstallationguidelinesneedtobefollowed.

Ifyouhaveanyquestionsatanystageofyourinstallation,pleasegetintouchwithFortressDeckregardingyourinquiries.

10. HULK HIDDEN CLIP & FASTENERSEva-Last®hasdevelopedarangeofcompleteanddurablespecializedsystemsthatworktogethertoensurethelongevityandstabilityofthedeck.

-Assessmentofthesiteandarea- Ground conditions-Soiltype-Drainage-Floodtest/drainage- Storm water drains

-Wheredoalltheguttersflowto?-Howistheroofpitched?-Hasthegroundbeencompacted?(Consultwithengineer)-Willthegroundwashawayorsubside?(Consultwithengineer)-Exposuretosunlight-Plants/treesnearthesitethatmayspillsaporresidueontothedeck

10.1 HULK ScrewsHULKscrewsweredevelopedusingstateofthearttechnologyandmanufacturingmethods.TheyworkinperfectsynergywithInfinityboardsandweredesignedtodojustthat.Forthebestperformanceandlongestlifespanofourproducts,werecommendedHULKscrewsareusedforallInfinityinstallations.

HULKscrewsareanextremelydurableandhardwearingchoiceforoutdoor,corrosion-risk,orlongtermapplications.HULKscrewsuseanadvancedbitlocksystemwhichmaximizestorquetransferandextendsthelifeofbitsandscrews.Italsoquickensassemblytime.

INFINITY TECHNICAL GUIDE

[email protected]/27 063016

500 units per box

-M4.2x40mmstainlesssteel,black,nanocoatedclipscrew,SS410KX-Z-tip-M4.2x40mmblack,nanocoatedclipscrew,Z-tip

500 units per box

-M4.2x40mmstainlesssteel,nanocoated clip screw-M4.2x40mmblack,nanocoatedclipscrew

*EveryHULKboxcontainsafasteningbit.

Z-Tipclipscrewsarespeciallydesignedforquickandeasyinstallationintosteelandgalvanizedsteelsystems.

Torpedoclipscrewsarespeciallydesignedforquickandeasyinstallation into wood.

Clip Screw For Wood

ClipScrewforSteel Fasteningbits

*Rememberitisgoodpracticetopre-drillwhensurfacemountingdeckboards.

HULKscrewscanbeusedfor:deckconstruction,outdoorfurnitureassembly,gardenapplications,cladding,outdoorframesandpergolas. Please refer to the table below for more information on HULK screws and how they should be used.

10.2 HULK Screws Table

Clip screw

Clip screw specifically designed for steel

applications

HULKZ-TipNanoBlack

Stainless Steel Screw

Clip screw used for wood applications

Clip screw

500HULK

Torpedo Tip Nano BlackStainless

Steel Screw

500

TYPE SCREW NOTES

CLI

P SC

REW

SURF

ACE

MO

UN

T SC

REW

FRAM

E SC

REW

HI S

TREN

GTH

CAR

BON

STE

EL

HC

TO(C

eram

ic T

reat

ed)

STAI

NLE

SSST

EEL

UN

ITS

PER

BOX

500 units per box

304stainlesssteel,coated

DesignedforInfinityGroovedBoardsaswellasmanyother

groovedboardsonthemarket.

Hidden Clip

Surface mount screw used for wood

applications

HULKTorpedoSurface

Mount Screw Surface mount screw

Note:EveryHULKboxcontainsafasteningbit.

C O M I N G S O O N

INFINITY TECHNICAL GUIDE

[email protected]/27 063016

11. INSTALLATIONImportant! Please make sure that before you begin construction, you consult building requirements, codes and restrictions regarding spacing and load requirements for rails. All supporting structures and framing must comply with applicable building codes. All local building codes will supercede any recommendations, measurements or techniques in the following installation instructions.

If you have any questions or uncertainties, please contact Fortress Deck before beginning installation.

●Makesureyoupre-drillslightlysmallerholesthanthescrewshaftdiameterfortrimscrewsandensureallscrewsaresecure,butnotovertightenedduringinstallation.Thiswillhelppreventpressurecracksandmushrooming.

●Infinityprofilescontainplasticandwillexpandandcontractmoresothanwood.Theexpansionandcontractionoftheseprofilesmustbeconsideredwheninstalling.Sufficientexpansiongapsmustbeleftatbuttjointsaswellaswheretheprofilesmeetfixedobjects.Considertemperaturesattimeofinstallationforcontraction/expansionpurposes.TherateofexpansionofInfinityprofilesiscalculatedat0.025”or1/40”perfoot(¼”-⅜”onbothsidesofa20’board)overa50°Fswingintemperature.

●EnsureInfinityhasacclimatedtotheenvironmentbeforeinstalling.Itisimportanttounderstandthatwheninstallingincolderweatherthatthecompositeboardswillexpandmorethanwheninstallinginhotterweatherandgappingshouldbeadjustedaccordingly.

●Avoidpre-cuttingInfinity boards,asnoteveryconstructionwallisstraightandcutallFortressInfinityproductsslowlyusingasharpfinetoothbladetoavoidchipping.

●Thefirstboardiskeyinthelayingprocess!Ifitisafixeddeck,placethefirstplankflushwiththerimjoist-makesureitissquareorparallelwiththeexistingstructureorwithyourframe.

●Makesureyourstartingprofileissquareontheframeandlaidperfectlystraight,asallsubsequentplankswillfollowitsline.Makesureofthisbymeasuringedgesanddiagonals.

●Surfacemounttheboardtotherimjoistwiththepreferredoverhang.Dependingonthedesign,youcanhaveabiggeroverhang,butrememberyoucannoteveroverhangbymorethan2”.Aesthetically,itoftenlooksbetterwhenyouoverhangabout¼”-½”overthefascia.

●HULKHiddenClipcanbeusedwhenyouendflushwiththeframeandthereisnooverhang.

●FortressInfinityPostSleevesandModernRailsaremanufacturedforon-centerpostspacingtoaccommodate6’and8’railsections.ModernRailsaredesignedinslightlylongerspanstoaccountforslightvariationinpostplacementandcutendsduringangledrailapplications.NOTE: IT IS IMPORTANT TO MEASURE POST SPACING PRIOR TO MAKING ANY CUTS.

11.1 Expansion Table20footboardwithexpansionof0.025(1/40”)perfoot)

20’boardexplanation=½”-¾”¼”-⅜”oneachside

¼”-⅜”gap ¼”-⅜”gap

INFINITY TECHNICAL GUIDE

[email protected]/27 063016

Middle BoardFirst Board Last Board

1¼” 1¼”

11.2 HULK Hidden Clip Installation

INFINITY TECHNICAL GUIDE

[email protected]/27 063016

●Layboardsperpendiculartojoistsoratapreferredangle.

●Pre-load clips with HULK screw.

●AttachsubsequentboardstojoistswithHulkHiddenClips.

●Tightenclip,donotovertightenasthismaydeformtheclip.(Impactdriverdrillrecommended)

●Movethenextprofileintopositionandtapintoplacewitharubbermallet,thensufficientlytightenclips.

●Continue to next board.

●Ifyouarepre-loadingclips,trytohavesomeoneassistyouinplacingtheclipsinpositiononeachboard.

●InstallacliponeveryjoistandfastenwithHULKscrews.Youcannotmissone!

●Pushthenextboardintoplace,donotforceorpushtoohard.Theclipswillkeepagapnaturallyifinstalledcorrectly.Ifyouovertighten,theclipwilldeformandincreasethegap.

●Wheninstallingwithascrew,don’tovertighteneither.

●Itisalwaysagoodideatouseacordlessdrillwithaclutch.Settheclutchrelativelylighttoensureyoudon’tovertighten.

●Installlast/endprofilewithsurfacemountscrewasseenin11.2HULKHiddenClipInstallation.Pleaseremembertoalwayspre-drillholestoavoidcrackingormushrooming.

●Surfacemountscrewsshouldbenocloserthan1¼”fromtheedgeoftheprofile.

●Installasecondsupportjoistasshownbelowforproperattachmentofthehiddenclip.Hiddenclipsshouldbeusedonbuttjoints.Oncethesupportjoistisinplace,theclipscanbesecurednexttooneanother.

●Don’t install closer than 1½”fromtheedge(cutedge).

●Buttjointsrequiredoublejoistsand2rowsofclips.Leaveaminimumof1¼”betweenbuttjointstoallowfordebristofallthrough.

Doublejoist&doubleclip

11.3 Installation: Laying The Deck

INFINITY TECHNICAL GUIDE

[email protected]/27 063016

11.3 Installation: Laying The Deck Cont.

●HulkHiddenclipsfiteasily,intotheboardgrooves,donotforcetheminthegroove(forexpansion&contractionreasons).

●Useaclipandscrewoneveryjoist.Boardsmustnotevershareclipsorjoist!Screwclipintojoist,ensuringthatthescrewgoesdownstraightandintothecenterofthejoist.

●Screwsmustgoinat90degreessoasnottodamagethenextboard.

●Atboardendsonthedeck’sedge,youcaninstallscrewsplacedperpendicularlyattherecommendeddistance,atminimumof1¼”fromtheedgeandaminimumof1½”fromboardendtopreventsplittingtheboard.

●Pre-drillingwithasharpdrillbitwillalwaysprovideoptimalresults.Pre-drillingisrecommendedtopreventcrackingandmushrooming.

●Drivefastenersperpendiculartothedecksurface.Anglingfastenerscanresultinmushroomingontheleadingedge.

●Allowaminimumof1¼”fromthesideoftheboardand1½”fromtheendoftheboardwheninstallingfacefasteners.Drivefastenersflushwiththedecksurface.Donotdrivefastenersdeeperthan⅛”belowthedecksurfaceforbestappearance.

●Do NOTuseFlat,Bugle,orTrimHeaddeckscrews,astheywilllikelyresultinmushrooming.

INFINITY TECHNICAL GUIDE

[email protected]/27 063016

11.4 Installation: Post

●FortressInfinityPostSleevesaremanufacturedtoworkwithtreated4”x4” post. (Actual dimention 3.5” x 3.5”)

●CONSULT LOCAL BUILDING CODES REGARDING PROPER POST INSTALLATION PRACTICES AND MINIMUM RAILING HEIGHTS IN YOUR AREA.

●CutFortressInfinityPostSleevestothedesiredheight.

●Slidepostsleevesovertreated4”x4”postsdowntothedeckingsurface.

●Postsshouldbesquareandplumbinbothdirections.

●Oncepostsleevesareinstalled,verifyspacingbetweenpostsbeforeprecedingtorailinginstallation.

11.5 Installation: Modern Rail Straight and Miter/Angle

●Measuretheopeningfrominsideofposttoinsideofpostanddeterminedesiredangleandlengths.(11.5A)

●TransfertheangleandmeasurementstotheInfinityModernRails,placetopandbottomrailssidebysidetoensureuniformspacingbetweenposts.Markrailsandcuttodesiredlengthandangle.(11.5B)

11.5A 11.B

INFINITY TECHNICAL GUIDE

[email protected]/27 063016

●Ifneeded,attachI-supportorcrushblocktothebottomofthebottomrail.Useonesupportatthecenterofa6’railsectionand2supportsat⅓and⅔ofan8’railsection.(11.5C)

11.5C

INFINITY TECHNICAL GUIDE

[email protected]/27 063016

11.6 Installation: Modern Rail Stair

●Buildingcodesareveryspecificontheallowableanglesandwidthsofopeningsbetweenpostsforstairapplications.Always consult your local building codes prior to installation.

●PostsshouldbeinstalledpriortoinstallingtheInfinityModernRails.

●PlacetheInfinityModernRailsonthestairsbetweenthetwoposts,spanningaminimumofthreestairstodeterminethedesiredangle.(11.6A)

●MarktheInfinityModernRailswiththecorrectdimensionsandcuttothedesiredlength.(11.6B)

●Note: Test the Infinity Modern Rails between posts for accuracy of fit prior to marketing the baluster positions.

●Oncerailshavebeencuttothedesiredlength,placetopandbottomrailssidebysideandmarkforaccuratebalusterplacement. NOTE: Baluster spacing must be less than 4”. (11.6C)

●Oncebalusterspacinghasbeenproperlymarked,pre-drillholesforfastenersusingabitslightlysmallerthanthefastenertoensure a secure connection.

11.6A 11.6B

11.6C

INFINITY TECHNICAL GUIDE

[email protected]/27 063016

11.8 Installation: Stair Tread

●Takemeasurementofthewidthofthestairs.

●CutStairTreadboardtothedesiredlengths.

●Useaminimumofthreefastenersateverystringer,nomorethan1½”fromtheedgeoftheboard.Seediagramaboveforfastenerspacing.

●StairTreadoverhangvariesfromstatetostate,Consultlocalbuildingcodesbeforeinstallation

●NOTE: It is important to pre-drill at a 90 degree angle to prevent mushrooming or cracking.

Stair Tread

8” Fascia/Riser

2” x 12” Stringers

12” Fascia

1½”minimum

1½”minimum

1½”minimum

(1.18” x 12.8”)

1½”fromboardedge

INFINITY TECHNICAL GUIDE

[email protected]/27 063016

●Rimjoists-markspacingandlayoutyourjoistswithrimjoistinmind.Forcomplexdesignsyoumayneedtocurvetherimjoist.

●Youwillalwaysneedperimeterjoists(rimjoists)forinstallingfascia.

●Alwaysremembertoleave1”-1¼”gapsbetweenthedoublejoiststoallowdebristofallthroughthegap.

12. BEST PRACTICES: JOISTS

13. BEST PRACTICES: DECK BOARDS

●Ifyouareworkingbetweensetlines,checkthattheyareparallel.Thiswillhelpwithwastageandhelpdisguiselinesthatarenotstraight.

●Useaoneortwoboardperimeteraroundadeckandthenlaytheboardsperpendicularlyinside.Makesurethereisanareaforwaterandleavestofallthrough.

●Thinkaboutallowingyourdeckboardstooverhang(max1”)asopposedtousingtrimaroundtheedgesofthedeckboards.

●Alwayscrossover.Usethelengthoftheprofilesinthedirectionoftheshortersideofthedeck.

●Buildinboxes.Buildingaborderoftwoprofiles(breakerboard)aroundeachprofilelengthareawillpreventprofilesimpactingeachother head to toe and will control expansion.

●Wheninstallingfascia,pre-drillholesthatareslightlybiggerthanthescrewsinthefasciaonlybutnottheframetoensureproperconnectiontothedeckstructure.

●Whensurfacemountingdeckboards,pre-drillholesthatareslightlysmallerthanthediameterofthescrewshaft

●Whensurfacemountingboards,fastentoeveryjoist.

Important! Always make sure you are working with the correct joist spacing for your profile. Please refer to 5.1 Joist Spacing Table for the correct spacings for your application.

INFINITY TECHNICAL GUIDE

[email protected]/27 063016

14. BEST PRACTICES: FASCIA

14.1 Fascia Installation: Fasteners

12” Fascia Board

8” Fascia Board

●Fasciaboardsshouldbescrewedtotheframe(endjoistorrimjoist)andnottothedeckingboards.

●8”Fascia:Usetwoscrewsfixedrigidlyevery12”alongtheprofile,andnomorethan1½”fromthestart/finishedge.

●12”Fascia:Usetwoscrewsfixedrigidlyevery16”alongtheprofile,andnomorethan1½”fromthestart/finishedge.

●Allowaventilationgapof1½”betweenthebottomofthefasciaboardandtheground.

●Fasciashouldsitunderneaththedeckboards.

●Itisrecommendedtooverhangthefasciatopreventimpactingthetrimunlessunlessthecorrectgapspacingistakenintoconsiderationtocompensateforcontractionandexpansion.

●Cutfasciaatanangleof30o - 45o atjoints(see14.2FasciaInstallation:JointConnections)

.

INFINITY TECHNICAL GUIDE

[email protected]/27 063016

14.2 Fascia Installation: Joint Connections

Cutangle30°-45°atjoints

15. AFTER INSTALLATION

●Disposeleftovercompositematerialperlocalregulations.

●Minorspillsandstainsonyourdeckcanbedealtwithbycleaning.

●PleasefamiliarizeyourselfwiththeInfinityCleaning&CareInstructionsavailableattheendofthisguideandseparately,insistyourclient does too.

Important! Do not sand Infinity Deck Boards

PleaseinsistthatyourclientunderstandInfinitycleaningandcareinstructions.Adeckshouldbecleanedwithahighpressurehoseseasonallyandkeptfreeofdebris.Adeckthatcollectsmoredebriswillneedtobecleanedmorefrequently.Do not let debris accumulate between boards.Foroptimumcleaningandlongevity,ahighpressurehoseshouldbeused. Use at pressures under 1500psiandatadistanceofatleast1¼”awayfromthesurfacewhenspraying.

16. DON’TS

-Donotspanoverabeam’sloadingcapacitywhenbuildingadeck,itisunsafe.-Donotrushajob.-Donotuseinferiorproducts.- Do not trap moisture.-Donoteverusecrackedboards.

FRONTVIEW

TOPVIEW

Cornerjoint(45°)

Continuousjoint

INFINITY TECHNICAL GUIDE

[email protected]/27 063016

17. EXAMPLES OF DECKING INSTALLED INCORRECTLY

Nodoublejoistandnodoubleclipatthebuttjoint. Countersinkistoodeepandtoobigforthesizeofthescrew.

Sloppingaway,eithertheearthhasdroppedortheframehasdropped.Thereisalsoinsufficientdrainage.

Screwsaretooclosetotheedgeoftheboard,minimumdistancefromthesideoftheboardshouldbe1¼”.

INFINITY TECHNICAL GUIDE

[email protected]/27 063016

Deckisnotslopingaway,thisdeckisslopingtothecenter. Deckisnotslopingcorrectly.Wateriscollectinginthecenteroftheboards.

Nodoublejoistandnodoubleclip. Missingpieceofdecking.Fascianotcutcorrectly.

INFINITY TECHNICAL GUIDE

[email protected]/27 063016

Unfinishedcuttingleft.Nobodycheckedthedeckaftercompletion.

Poorlyplannedinstallation.

Improperblocking.Nosupportunderthedecking. Treehasgrownmorethanallowablecutout.Leavesufficientgapsfortheplantsandtreestogrow.

INFINITY TECHNICAL GUIDE

[email protected]/27 063016

Therailingpostisonlysupportedbythedecking.Properblockingshouldbeinstalledtosupporttherailingpost.

Improperfasciainstallation.

Crackeddeckboardinstalled.Crackeddeckboardinstalled. Deckslopingaway,frameisgivingin.


Recommended