- A CASE STUDY
EVALUATION OF MODEL REPORTS
2
SOURCE OR PROJECT EMISSIONS
Emissions – Factors and Calculations
Determine Total Emissions: Is Project Subject To PSD Review ?
Determine Pollutants To Be Modeled
Modeling Protocol
Deviations – Whether Justified
Model, Preprocessor Version
3
SOURCE EMISSIONSEmission Emission Unit Emission Unit Hours Hours NOX NOX PM10 PM10
Unit Description Capacity Per Day Per Year Lb/Hr Ton/Yr Lb/Hr Ton/Yr
A01 GE CTG Turbine 1/HRSG 292 MW 24 8760 28.95 126.8 28.25 123.73
A03 GE CTG Turbine 2/HRSG 292 MW 24 8760 28.95 126.8 28.25 123.73
A05 GE CTG Turbine 3/HRSG 292 MW 24 8760 28.95 126.8 28.25 123.73
A07 GE CTG Turbine 4/HRSG 292 MW 24 8760 28.95 126.8 28.25 123.73
A09 Auxillary Boiler 44.1 MMBtu/hr 24 6000 5.2 15.6 0.4 1.2
A10 Auxillary Boiler 44.1 MMBtu/hr 24 6000 5.2 15.6 0.4 1.2
A12 Emergency Generator 600 KW 2 63 14.57 0.46 0.68 0.02
A13 Emergency Generator 600 KW 2 63 14.57 0.46 0.68 0.02
A14 Diesel fire pump 600 KW 2 100 8.53 0.43 0.61 0.03
A15 Diesel fire pump 600 KW 2 150 6.13 0.46 0.4 0.03
A16 Gas line preheater 9.8 MMBtu/hr 24 8760 1.17 5.14 0.09 0.39
171.17 545.35 116.26 497.81
4
SOURCE CHARACTERIZATION
Point, Area, and Volume SourcesHaul RoadsStock PilesRain CapsHorizontal StacksCross Reference – Emission Unit and Model ID
5
STACK DATAEmission Type UTM E UTM N Elevation Stack Ht Temp Velocity Diameter
Unit NAD 83 (m) NAD 83 (m) (m) (m) (K) (m/s) (m)
A01 Point 686302.995 4028527.001 679.1 51.82 363.15 20.18 5.486
A03 Point 686350.996 4028528.002 679.1 51.82 363.15 20.18 5.486
A05 Point 686399.997 4028528.003 679.1 51.82 363.15 20.18 5.486
A07 Point 686447.998 4028529.003 679.1 51.82 363.15 20.18 5.486
A09 Point 686504.999 4028530.004 683 11.28 483.15 13.72 0.814
A10 Point 686509.999 4028530.004 683 11.28 483.15 13.72 0.814
A12 Point 686368.796 4028552.002 679.1 4 758.71 32.22 0.305
A13 Point 686341.998 4028420.001 683 4 758.71 32.2235 0.3048
A14 Point 686441.001 4028975.996 684.6 4 758.71 32.2235 0.3048
A15 Point 686463.998 4028553.503 679.1 4 758.71 32.22 0.305
A16 Point 686550.002 4028358.003 683 7.3152 644.26 18.88656 0.6096
6
LOCATION
Sources, Buildings, Fence LinesCoordinate System, DatumGoogle Earth
7
SOURCE LAYOUT
VERIFY LOCATION
8
AS BUILT
9
10
11
RECEPTORS
Cartesian GridSpacing - Along Fence
- Away from Source
12
METEOROLOGY
RepresentativenessData CompletenessLand Characteristics – Albedo, Bowen Ratio,
Surface Roughness
13
TERRAIN
NED DataDomain Extents
14
BUILDING DOWNWASH
BPIP Prime ModelGEP Stack Height
15
CUMULATIVE ANALYSIS
Source/Project Impacts – Compare with Significance
LevelsRadius of ImpactList of Sources Included in Cumulative AnalysisNAAQS Inventory vs. PSD Increment InventoryBackground ConcentrationsComparison with NAAQS/Increment
OUTPUT FILE - 1
16
17
OUTPUT FILE - 2Edited for Clarity
18
OUTPUT FILE - 3Edited for Clarity
OUTPUT PLOT - 1
19
OUTPUT PLOT - 2
20