EnCana Weyburn SystemCO2 Sequestration
© A
BB
- L
CC
Oil
& G
as S
CA
DA
- 2
Weyburn Background
© A
BB
- L
CC
Oil
& G
as S
CA
DA
- 3
Weyburn Project Background
• Field discovered in 1954• 360 million barrels produced with water injection
only
• CO2 will add 130 million barrels
• CO2 brought in through a 300 Km pipeline from a coal gasification plant in Beulah ND
• More than 700 wells in production• Current production 30,000 bbl/day• Expected production 40,000 bbl/day
© A
BB
- L
CC
Oil
& G
as S
CA
DA
- 4
Current project facts
• EnCana tripled the production since CO2 injection started 6 years ago
• 30,000 bbl/day reached 2 years ahead of schedule
• Since 2000, 8 million tones of CO2 have been pumped underground instead of being released into the atmosphere
• By the time the project wraps up 30 million tones will be sequestered, the equivalent of taken nearly 7 million cars off the road
• More than 30 years of production have been added to the Weyburn field
© A
BB
- L
CC
Oil
& G
as S
CA
DA
- 5
Miscible flood
• How it works– The miscible displacement process is more
than a simple pressure maintenance project in that it involves introduction of a gas (solvent) into the reservoir that will mix with and completely dissolve the reservoir oil.
– This allows the CO2-oil mixture to be swept to the producing well
– The flood consists of an intermittent injection of CO2 followed by water injection
© A
BB
- L
CC
Oil
& G
as S
CA
DA
- 6
Injection Procedure
© A
BB
- L
CC
Oil
& G
as S
CA
DA
- 7
Why SCADA Vantage
• Because it could handle:• Well monitoring and control • Processing Plant• CO2 Compression Plant• Tank Farm• CO2 Pipeline Monitoring• CO2 Nomination• Dynamometer Cards• Field ESD• Automatic Well Test• Miscible Flood
© A
BB
- L
CC
Oil
& G
as S
CA
DA
- 8
Weyburn System Overview
ABB SCADA Vantage is used throughout the field and facilities
© A
BB
- L
CC
Oil
& G
as S
CA
DA
- 9
Weyburn System Overview
• Water injection wells
• Major Bingham pump units
• Injection ESD
• Miscible Flood
© A
BB
- L
CC
Oil
& G
as S
CA
DA
- 1
0
Weyburn System Overview
• CO2 Injection Control
© A
BB
- L
CC
Oil
& G
as S
CA
DA
- 1
1
Dynacard Plot
• Plot multiple cards on screen (current and reference)
• View/change load limits, malfunction/ pump-off points the points
• Right-Click to upload/download/save data
© A
BB
- L
CC
Oil
& G
as S
CA
DA
- 1
2
CO2 Sequestration
© A
BB
- L
CC
Oil
& G
as S
CA
DA
- 1
3
Cost Breakdown in CO2 Sequestration
0%
20%
40%
60%
80%
100%
Perc
en
tag
e o
f co
st
sh
are
Cost:
Capture: $40-60/t CO2 avoided Pipeline: $0.02-0.06/t .km Transportation mileage: 300 km Storage: $5-10/t CO2
Break even: $20 bbl
© A
BB
- L
CC
Oil
& G
as S
CA
DA
- 1
4
Weyburn Background
© A
BB
- L
CC
Oil
& G
as S
CA
DA
- 1
5
IPPC – Carbon Capture & Storage Report
• Approved by IPCC in September 2005
• Published December 2005• Written by over 100 authors from
30 countries , all continents • Extensively reviewed by over 200
experts• Presented at UNFCCC COP-11/
Kyoto COP/MOP-1 in Montreal
© A
BB
- L
CC
Oil
& G
as S
CA
DA
- 1
6
Total SCADA Solution Provider