PrimaUnoisaspecialistProjectPlanning,ProjectControls,ProgrammeGovernanceandForensicPlanningConsultancy.

WeprovideaspecialistservicetopublicandprivatesectorclientsintheUK.

OurconsultancyservicegivesclientstheflexibilitytorespondtochallengingworkdemandsonnewandexisDngprojectsandprovideaccesstospecialistskillswhereneededknowingPrimaUnoisabsolutelycommiEedtomeeDngclientsexpectaDons.

www.primauno.co.uk

www.primauno.co.uk

WeProvide;• TenderPlanning• ProjectPlanning• ProjectControls• EarnedValueAnalysis• CriDcalPathAnalysis• ForensicPlanningServices• ProgrammeAuditandInterrogaDon

•  ProbabilityofProgramme/ProjectSuccess

• AdHocPlanning• DisputeResoluDon•  ProgrammeExpertWitness• NEC3ContractTraining

www.primauno.co.uk

ForensicPlanning

WeprovideavarietyofForensicPlanningservicesrangingfromprogrammeaudit/interrogaDononbaseline,liveorcompletedprojects.

Wecandeterminetheprobabilityofsuccessofyourproject/projects,wecananalysetensofthousandsofacDviDesacrosssingleorseveralprojectsandcomparechangesoverDme.

Weprovideindependentreviews,reports,andauditsforcompaniesrequiringustoensurethedeliverabilityofbaselineprojects.

www.primauno.co.uk

Wecreatereportsonlogic,constraints,criDcalpath,float,delay,cost,riskandconDngency.SomeDmesunforeseeneventscanoccurwhichcannotpreventprojectsrunninglatebutgivingclientsvisibilityofareasofconcernandunachievabledatescanoTenbeinvaluable.

Wealsoprovideservicesonprojectrecovery,delayanalysisandextensionsofDmeanalysis.

Wecanpinpoint,evaluateandeliminateissues.Wevalidateprojectscheduleandreportnotjustontheissuesbuthowtoresolvethem.

www.primauno.co.uk

Wehavebeeninvolvedonsomehighprofileprojects.

Someexamplesare;•  London2012•  T5Heathrow•  TransportForLondon–CoolingtheTube•  TransportForLondon–EastLondonLineProject•  DubaiMeydanRacecourse

www.primauno.co.uk

London2012OlympicsPrimaUnoweretheschedulemanagerforSBH(structures,bridgesandhighways)project.SBHwasthelargestprojectforthe2012Olympicswithabudgetofover£700million.SBHinterfacedwitheveryotherprojectontheOlympicsitesuchastheStadium,Aquaparkandallthevenues&faciliDeswhichareneededtosupporttheLondon2012Olympics.Ithad11contractworkspackagestodelivertheOlympicInfrastructurewithabudgetofover£700million.

www.primauno.co.uk

TerminalFiveHeathrowPrimaUnoweretheplanningconsultants;ontheconstrucDonofTerminalFiveBaggageandT5AProject.HeathrowAirport’sTerminal5wasoneofthelargestinfrastructureandconstrucDonprojectsinEurope.Itcomprisedofacomplex16majorinterconnecDngprojectsand140subprojects.Thescopeincludedanewmainterminalbuilding,twosatellitebuildings(eachthesizeofHeathrowTerminal4)andanewcontroltower.ConstrucDonbeganinSeptember2002,withearthworksfortheconstrucDonofthebuildingsfoundaDon.Atpeaktherewerearound8,000peopleworkingontheconstrucDonsite,whilstoverthelifeoftheprojectover60,000peoplehavebeeninvolved.

www.primauno.co.uk

PrimaUnoactedasprogrammeexpertwitnessonadelayandterminaAonofcontractclaimforTheMeydanGroup.

TheMeydanRacecourseconsistsofthreemaincomponents:MeydanMarina,TheMeydan,andTheGrandstand,whichincludes2horse‐racingtracks,a60,000‐seatgrandstand,ahotel,restaurants,amuseum,andacarparkingfacility.ConstrucDonofa£7.5millionrealestatedevelopmentincluding:2tracks/60,000‐seatgrandstand/hotel/morethan10restaurants/museum/theatre/MeydanMarina(includingamarina,cafes,andrestaurants)/TheMeydan(includingahotel,aspa,andrestaurants)/10,000‐carparkingfacility

www.primauno.co.uk

Transport for London East London Line and Cooling the Tube Project

We assisted Transport for London (TfL) and Parsons Brinkerhoff plan and programme the £1 billion project. 3.5km of new or refurbished viaduct running north from Whitechapel to Dalston Junction.

We also worked on Cooling the Tube Project which was planning the works of various schemes to cool the London Underground Network in preparation for the London 2012 Olympics.