© Copyright Gross National Happiness Commission (2019)Published by: Gross National Happiness Commission, Royal Government of Bhutan.
ISBN: 978-99936-55-04-6
ISBN: 978-99936-55-05-3
Twelfth Five Year Plan Document (Volume III)
“Looking ahead, we have a new five-year plan, and a great number of responsibilities of national importance before us. We must work together in
order to build an extraordinary, strong, secure, and peaceful future for Bhutan.”
His Majesty The Druk Gyalpo 111th National Day, Samtse, 17th December, 2018
TWELVE FIVE YEAR PLAN_BINU_12.indd 3 5/24/2019 10:52:20 AM
“Looking ahead, we have a new five-year plan, and a great number of responsibilities of national importance before us. We must work together in
order to build an extraordinary, strong, secure, and peaceful future for Bhutan.”
His Majesty The Druk Gyalpo 111th National Day, Samtse, 17th December, 2018
TWELVE FIVE YEAR PLAN_BINU_12.indd 3 5/24/2019 10:52:20 AM
Twelfth Five Year Plan (2018-2023), Punakha Dzongkhag
-i-
2nd February, 2019
FOREWORD
� e 12th Five Year Plan (FYP) commences amid numerous auspicious occasions that hold special signi� cance for all Bhutanese. Our Nation celebrated the 12th year of glorious reign of His Majesty � e Druk Gyalpo and 111 years of the institution of Monarchy and nation building. � e nation continues to enjoy the blessings of Yabjey-Damba, His Majesty � e Fourth Druk Gyalpo. It witnessed the 22nd year of tireless service by His Holiness the 70th Je Khenpo for the wellbeing of the country and its people. � e Nation’s Son, His Royal Highness � e Gyalsey Jigme Namgyel Wangchuck continues to be a source of unbounded joy for all Bhutanese citizens. � e � ird Parliamentary election was successfully held with increased people’s participation in the electoral process. � at the Election Commission of Bhutan and Bhutan Broadcasting Service were conferred well-deserved high awards by His Majesty � e Druk Gyalpo re� ects their eminent role in the success of the elections.
In addition, Bhutan will be graduating from the list of Least Developed Countries (LDC) by 2023. Meeting the eligibility criteria for graduation is a testament of the hard work of the people of Bhutan with the support of key development partners. Even though Bhutan has ful� lled the two required indicators for graduation, the fact that we are yet to cross the threshold for economic vulnerability is a source of concern. It is a reminder of the work that remains to address the last mile challenge of development and ensure continued progress towards creating an inclusive and prosperous Gross National Happiness (GNH) state. � e 12th FYP will be Bhutan’s last � ve year plan as an LDC. At this critical stage in our development history, Bhutan looks to the continued support of all its development partners to implement the 12th FYP. It is also a call to all public servants, the private sector, civil society organisations and citizens to work together to achieve the noble aspirations of the 12th FYP and live up to the trust bestowed on each one of us by His Majesty � e Druk Gyalpo.
With the objective of Just, Harmonious and Sustainable Society through enhanced Decentralisation, the 12th FYP and its 17 national key result areas are drawn from the timeless vision and wisdom emanating from the Golden � rone. Re� ecting Bhutan’s status as an active member of the global
PRIME MINISTER
xii
TWELVE FIVE YEAR PLAN_BINU_12.indd 12 5/24/2019 10:52:21 AM
Twelfth Five Year Plan (2018-2023), Punakha Dzongkhag
-i-
2nd February, 2019
FOREWORD
� e 12th Five Year Plan (FYP) commences amid numerous auspicious occasions that hold special signi� cance for all Bhutanese. Our Nation celebrated the 12th year of glorious reign of His Majesty � e Druk Gyalpo and 111 years of the institution of Monarchy and nation building. � e nation continues to enjoy the blessings of Yabjey-Damba, His Majesty � e Fourth Druk Gyalpo. It witnessed the 22nd year of tireless service by His Holiness the 70th Je Khenpo for the wellbeing of the country and its people. � e Nation’s Son, His Royal Highness � e Gyalsey Jigme Namgyel Wangchuck continues to be a source of unbounded joy for all Bhutanese citizens. � e � ird Parliamentary election was successfully held with increased people’s participation in the electoral process. � at the Election Commission of Bhutan and Bhutan Broadcasting Service were conferred well-deserved high awards by His Majesty � e Druk Gyalpo re� ects their eminent role in the success of the elections.
In addition, Bhutan will be graduating from the list of Least Developed Countries (LDC) by 2023. Meeting the eligibility criteria for graduation is a testament of the hard work of the people of Bhutan with the support of key development partners. Even though Bhutan has ful� lled the two required indicators for graduation, the fact that we are yet to cross the threshold for economic vulnerability is a source of concern. It is a reminder of the work that remains to address the last mile challenge of development and ensure continued progress towards creating an inclusive and prosperous Gross National Happiness (GNH) state. � e 12th FYP will be Bhutan’s last � ve year plan as an LDC. At this critical stage in our development history, Bhutan looks to the continued support of all its development partners to implement the 12th FYP. It is also a call to all public servants, the private sector, civil society organisations and citizens to work together to achieve the noble aspirations of the 12th FYP and live up to the trust bestowed on each one of us by His Majesty � e Druk Gyalpo.
With the objective of Just, Harmonious and Sustainable Society through enhanced Decentralisation, the 12th FYP and its 17 national key result areas are drawn from the timeless vision and wisdom emanating from the Golden � rone. Re� ecting Bhutan’s status as an active member of the global
PRIME MINISTER
xii
TWELVE FIVE YEAR PLAN_BINU_12.indd 12 5/24/2019 10:52:21 AM
Twelfth Five Year Plan (2018-2023), Punakha Dzongkhag
-ii-
community, it also takes into consideration the Sustainable Development Goals and other regional and international commitments. � e Plan has been shaped by extensive consultations held over a period of two years with wide ranging groups of stakeholders. � e outcome is a 12th FYP that is a National Development Plan re� ecting the aspirations and concerns of the people of Bhutan. Pledges of elected Government as well as selected pledges of the other three political parties have been incorporated into the Plan following rigorous assessment. Lessons learnt from 11th FYP have also proved useful in changing how we plan and implement better.
� e 12th FYP formulation, execution and implementation are underpinned by the principles of coordination, consolidation and collaboration to achieve greater gains. True to the objective of enhancing decentralisation, resources have been doubled for LGs in the 12th FYP compared to 11th FYP resulting in an equal share of capital resources as the Central Agencies. � e Division of Responsibilities Framework has also been revised to provide greater decentralisation of roles, functions and authority to the local governments. Another new feature of the 12th FYP is the Government’s � agship programmes that aims to address issues of national priority. � e programme areas have been chosen to ensure that critical issues such as youth unemployment, water security and poverty reduction are addressed in a coherent manner within a � ve year period.
Unlike past plan periods, the 12th FYP period commences from 1st November, 2018 and will end on 31st October, 2023 in order to align with the Government’s tenure. Implementation will be rigorously monitored through the government performance management system to ensure that results are achieved. Progress will be reviewed during the annual and mid-term reviews to ensure that corrective measures and mid-course corrections are made in a timely manner.
� e 12th FYP is unprecedented both in size and scope and will demand utmost dedication on the part of the over 54,000 public servants across the country. It sets out an ambitious agenda and will be the biggest plan implemented thus far with an outlay of Nu. 310 billion, an increase of nearly 38 percent over the 11th FYP. An inclusive plan has been formulated, adequate resources mobilised with quali� ed public servants to implement the activities. All required causes and conditions are in place to ensure that what has been planned can be delivered. I take this opportunity to call upon all Bhutanese as well as our development partners, civil society organisations, political parties, private sector and other stakeholders to work together to build a strong, secure and peaceful future for our nation.
TASHI DELEK.
sector and other stakeholders to work together to build a strong, secure and peaceful future for our
(DR. LOTAY TSHERING)CHAIRPERSON OF THE GNH COMMISSION
xiii
TWELVE FIVE YEAR PLAN_BINU_12.indd 13 5/24/2019 10:52:21 AM
TABLE OF CONTENTS
1. Background ...................................................................................................................................92. Map of Dzongkhag ......................................................................................................................93. Dzongkhag at a Glance ............................................................................................................. 104. Key Strategies ............................................................................................................................. 135. Resource Allocation formula (RAF) for Dzongkhags and Gewogs ................................... 13
5.1. Dzongkhag- RAF criteria and weights ...................................................................... 135.2. Gewogs- RAF criteria and weights ............................................................................. 14
6. Rationale and expenditure objectives of capital grants allocation under each RAF criteria and sub-criteria for Bumthang Dzongkhag ........................................................................... 16
6.1. Dzongkhag .................................................................................................................... 166.2. Four Gewogs ................................................................................................................. 18
7. Resource Allocation (Capital Grants share) in the 12FYP for Dzongkhag and Gewogs 228. Local Government Key Result Areas (LGKRAs) at a Glance ............................................. 229. LGKRA 1: Gainful employment created and local economy enhanced (4 KPIs) ............ 24
9.1. Programme summary and strategies ......................................................................... 279.2. Programme Output Matrix ......................................................................................... 29
9.2.1. Dzongkhag ........................................................................................................ 29
10. LGKRA 2: Food and nutrition security enhanced (7 KPIs) ................................................ 32
10.1. Programme summary and strategy ............................................................................ 3510.2. Programme Output Matrix ......................................................................................... 37
10.2.1. Dzongkhag ........................................................................................................ 3710.2.2. Gewog ................................................................................................................ 42
11. LGKRA 3: Community health enhanced and water security ensured (13 KPIs) ............. 54
11.1. Programme summary and strategy ............................................................................ 5811.2. Programme Output Matrix ......................................................................................... 60
11.2.1 Dzongkhag ........................................................................................................ 6011.2.2. Gewogs .............................................................................................................. 63
Twelfth Five Year Plan (2018-2023), Punakha Dzongkhag
-ii-
community, it also takes into consideration the Sustainable Development Goals and other regional and international commitments. � e Plan has been shaped by extensive consultations held over a period of two years with wide ranging groups of stakeholders. � e outcome is a 12th FYP that is a National Development Plan re� ecting the aspirations and concerns of the people of Bhutan. Pledges of elected Government as well as selected pledges of the other three political parties have been incorporated into the Plan following rigorous assessment. Lessons learnt from 11th FYP have also proved useful in changing how we plan and implement better.
� e 12th FYP formulation, execution and implementation are underpinned by the principles of coordination, consolidation and collaboration to achieve greater gains. True to the objective of enhancing decentralisation, resources have been doubled for LGs in the 12th FYP compared to 11th FYP resulting in an equal share of capital resources as the Central Agencies. � e Division of Responsibilities Framework has also been revised to provide greater decentralisation of roles, functions and authority to the local governments. Another new feature of the 12th FYP is the Government’s � agship programmes that aims to address issues of national priority. � e programme areas have been chosen to ensure that critical issues such as youth unemployment, water security and poverty reduction are addressed in a coherent manner within a � ve year period.
Unlike past plan periods, the 12th FYP period commences from 1st November, 2018 and will end on 31st October, 2023 in order to align with the Government’s tenure. Implementation will be rigorously monitored through the government performance management system to ensure that results are achieved. Progress will be reviewed during the annual and mid-term reviews to ensure that corrective measures and mid-course corrections are made in a timely manner.
� e 12th FYP is unprecedented both in size and scope and will demand utmost dedication on the part of the over 54,000 public servants across the country. It sets out an ambitious agenda and will be the biggest plan implemented thus far with an outlay of Nu. 310 billion, an increase of nearly 38 percent over the 11th FYP. An inclusive plan has been formulated, adequate resources mobilised with quali� ed public servants to implement the activities. All required causes and conditions are in place to ensure that what has been planned can be delivered. I take this opportunity to call upon all Bhutanese as well as our development partners, civil society organisations, political parties, private sector and other stakeholders to work together to build a strong, secure and peaceful future for our nation.
TASHI DELEK.
sector and other stakeholders to work together to build a strong, secure and peaceful future for our
(DR. LOTAY TSHERING)CHAIRPERSON OF THE GNH COMMISSION
xiii
TWELVE FIVE YEAR PLAN_BINU_12.indd 13 5/24/2019 10:52:21 AM
12. LGKRA 4: Quality of education and skills improved (9 KPIs) ........................................... 68
11.1. Programme summary and strategy ............................................................................ 7111.2. Programme Output Matrix ......................................................................................... 73
11.2.1. Dzongkhag ........................................................................................................ 7311.2.2. Gewogs .............................................................................................................. 78
13. LGKRA 5: Culture and traditions preserved and promoted (5 KPIs) ............................... 83
13.1. Programme summary and strategy ............................................................................ 8513.2. Programme Output Matrix ......................................................................................... 86
13.2.1. Dzongkhag ........................................................................................................ 8613.2.2. Gewogs .............................................................................................................. 88
14. LGKRA 6: Livability, safety and sustainability of human settlements improved (10 KPIs) ................................................................................................................... 93
14.1. Programme Summary and strategy ........................................................................... 9614.2. Programme Output Matrix ......................................................................................... 98
14.2.1. Dzongkhag ........................................................................................................ 9814.2.2. Gewogs ............................................................................................................ 102
15. LGKRA 7: Transparent, effective and efficient public service delivery enhanced (5 KPIs) ................................................................................................................... 106
15.1. Programme summary and strategy .......................................................................... 10815.2. Programme Output Matrix ....................................................................................... 110
15.2.1. Dzongkhag ...................................................................................................... 11015.2.2. Gewogs ............................................................................................................ 113
16. LGKRA 8: Democracy and decentralization strengthened (4 KPIs) ............................... 118
16.1. Programme Summary and strategy ......................................................................... 12016.2. Programme Output Matrix ....................................................................................... 122
16.2.1. Dzongkhag ...................................................................................................... 122
17. LGKRA 9: Carbon neutral, climate and disaster resilient development enhanced (4 KPIs) ................................................................................................................... 123
17.1. Programme Summary and strategy ......................................................................... 12517.2. Programme Output Matrix ....................................................................................... 127
17.2.1. Dzongkhag ...................................................................................................... 127
18. LGKRA 10: Gender equality promoted, women and girls empowered (6 KPIs) ........... 129
18.1. Programme Summary and strategy ......................................................................... 13218.2. Programme Output Matrix ....................................................................................... 133
18.2.1. Dzongkhag ...................................................................................................... 13318.2.2. Gewogs ............................................................................................................ 135
19. LGKRA 11: Improved and sustained the livelihood of highlanders (3 KPIs) ................. 137
19.1. Programme summary and strategy .......................................................................... 13819.2. Dzongkhag Output Matrix ........................................................................................ 139
19.2.1. Dzongkhag ...................................................................................................... 13919.2.2. Gewogs ............................................................................................................ 140
20. Programme Monitoring and Evaluation Plan ..................................................................... 14221. Collaborating agencies and requirements ........................................................................... 14322. Common Minimum Infrastructure (CMI) and outlay ...................................................... 145
22.1. Dzongkhag CMI and outlay ...................................................................................... 14522.2. Dzongkhag Throm CMI and outlay ......................................................................... 14622.3. Gewog s CMI and outlay ........................................................................................... 146
23. Central Agencies’ activities for Dzongkhag ......................................................................... 146
-11-
Twelfth Five Year Plan (2018-2023), Bumthang Dzongkhag
1. BACKGROuND
BumthangDzongkhag lies in the central region of the country; it is bordered by China in the north, Lhuntse in the east, Zhemgang in the south and Trongsa in the west. It has an approximate area of 2,668 square kilometers with an ele-vation ranging from 2400 to 6000m above sea level. Bumthang has four Gewogs namely Chhoekhor, Chhumig, Tang and ura. All Gewogs and Chiwog are con-nected with motor able road.
Twelfth Five Year Plan (2018-2023), Bumthang Dzongkhag
-12-
2. MAP OF DZONGKhAG
-13-
Twelfth Five Year Plan (2018-2023), Bumthang Dzongkhag
3.
DZO
NG
Kh
AG
AT
A G
LAN
CE
Indi
cato
rs
Stat
usD
zong
khag
Chh
oekh
orC
hhum
igTa
ngU
raM
ean
Ann
ual h
ouse
hold
Inco
me
(Nu
‘000
) (G
Nh
Sur
vey
2015
)29
4,06
0
Po
vert
y Ra
te (P
AR
2017
)2.
1
Mul
tidim
ensio
nal P
over
ty In
dex
(MPI
201
7)3.
9
u
nem
ploy
men
t rat
e (P
hC
B 20
17)
1.6
GN
h In
dex
0.81
6
Po
pula
tion
17
820
3947
3195
2318
1724
Mal
e93
9620
4217
4811
6587
1Fe
mal
e84
2419
0514
4711
5385
3N
umbe
r of h
ouse
hold
s3,
770
2,25
070
943
237
9A
rea
(sq.
km
)2,
667,
71,
530
401.
152
0.0
265.
6Fo
rest
Cov
er (%
)52
.06
3379
.766
.781
.8RN
R C
ente
r (LE
C/A
EC)
41
11
1
Num
ber o
f Coo
pera
tives
2
20
00
Num
ber o
f Irr
igat
ion
sche
mes
33
10
220
2
Tota
l len
gths
of I
rrig
atio
n Sc
hem
es (k
m)
63.0
315
.13
6.30
44.6
03.
0
Tota
l len
gth
of E
lect
ric fe
ncin
g (k
m)
103.
316
49.9
238
.45
18.6
6631
.2
Num
ber o
f ele
ctric
fenc
ing
101
4424
1716
Num
ber o
f Far
m sh
op2
01
01
Num
ber o
f Bio
-gas
pla
nts
95
40
0To
tal n
umbe
r of p
ower
tille
r21
998
6144
16
Twelfth Five Year Plan (2018-2023), Bumthang Dzongkhag
-14-
Indi
cato
rs
Stat
usD
zong
khag
Chh
oekh
orC
hhum
igTa
ngU
raN
umbe
r of h
ospi
tal(s
)1
10
00
Num
ber o
f Bas
ic h
ealth
uni
ts
a) 0
a) 0
a) 0
a) 0
a) 0
a. G
rade
Ib)
5b)
2b)
1b)
1b)
1b.
Gra
de II
Num
ber o
f sub
-pos
t0
00
00
Num
ber o
f Out
Rea
ch C
linic
s12
32
43
Num
ber o
f Doc
tors
33
00
0
Num
ber o
f Dru
ngts
ho1
10
00
Num
ber o
f Sow
ai M
enpa
s4
21
01
Num
ber o
f nur
ses
1513
01
1N
umbe
r of h
ealth
Ass
istan
ts13
73
21
Num
ber o
f hou
seho
lds w
ith cl
ean
drin
king
wat
er su
pply
3135
1738
636
418
343
Num
ber o
f Rur
al W
ater
Sup
ply
Sche
mes
16
646
5544
21N
umbe
r of h
ouse
hold
s with
toile
ts/la
trin
es31
3517
3863
641
834
3N
et E
nrol
men
t Rat
e99
%10
0%10
0%99
%99
%N
umbe
r of E
CC
D C
entr
e9
32
31
Num
ber o
f Prim
ary
scho
ols
125
2 2
3N
umbe
r of L
ower
seco
ndar
y sc
hool
s2
1 1
0 0
Num
ber o
f Mid
dle
seco
ndar
y sc
hool
s0
0 0
0 0
Num
ber o
f hig
her s
econ
dary
scho
ols
21
1 0
0 N
umbe
r of c
entr
al sc
hool
s3
01
11
Num
ber n
on-fo
rmal
Edu
catio
n (N
FE) C
ente
rs13
6 3
40
Num
ber o
f NFE
Lea
rner
s10
241
1434
13N
umbe
r of N
FE in
stru
ctor
s 9
41
31
Num
ber o
f tea
cher
s26
712
367
4334
Stud
ent T
each
er R
atio
1:15
1:17
.61:
12.4
1:14
.51:
12.8
Num
ber o
f Chi
wog
s20
55
55
Num
ber o
f Vill
ages
97
42
25 2
710
Num
ber o
f fem
ale
DT
mem
bers
00
00
0N
umbe
r of f
emal
e G
T m
embe
rs4
02
02
Num
ber o
f hou
seho
lds e
lect
rified
3135
173
863
641
8 34
3 N
umbe
r of v
illag
es w
ith m
obile
cove
rage
9742
2527
10N
umbe
r of S
uspe
nsio
n Br
idge
s 13
45
40
Leng
th o
f GC
Roa
d (k
m)
27.8
70.
42 .2
5 2
70.
2N
umbe
r of F
arm
Roa
ds69
20
14
21
14
Tota
l len
gth
of fa
rm ro
ad (k
m)
182.
292
70.
015
39.
657
37.
635
.02
Tota
l num
ber o
f Lh
akha
ngs/
tem
ples
a. 1
1a.
1a.
8a.
2a.
0a.
gov
ernm
ent o
wne
d b.
42
b. C
omm
unity
c. 35
b.9
b.15
b.9
b.9
c. Pr
ivat
e
c.5
c.12
c.10
c.8
Num
ber o
f cho
rten
s35
012
186
102
41To
tal n
umbe
r of S
port
s fac
ilitie
s/gr
ound
a. In
door
spor
ts h
all
a.0
a.0
a.0
a.0
a.0
b. F
ootb
all
b.1
b.1
b.0
b.0
b.0
c. Ba
sket
ball
c.0c.
0c.
0c.
0c.
0d.
Bad
min
ton
d.0
d.0
d.0
d.0
d.0
e. O
ther
s (2
arch
ery
grou
nds)
e. 2
e. 1
e. 1
e. 0
e. 0
-15-
Twelfth Five Year Plan (2018-2023), Bumthang Dzongkhag
Indi
cato
rs
Stat
usD
zong
khag
Chh
oekh
orC
hhum
igTa
ngU
raN
umbe
r of h
ospi
tal(s
)1
10
00
Num
ber o
f Bas
ic h
ealth
uni
ts
a) 0
a) 0
a) 0
a) 0
a) 0
a. G
rade
Ib)
5b)
2b)
1b)
1b)
1b.
Gra
de II
Num
ber o
f sub
-pos
t0
00
00
Num
ber o
f Out
Rea
ch C
linic
s12
32
43
Num
ber o
f Doc
tors
33
00
0
Num
ber o
f Dru
ngts
ho1
10
00
Num
ber o
f Sow
ai M
enpa
s4
21
01
Num
ber o
f nur
ses
1513
01
1N
umbe
r of h
ealth
Ass
istan
ts13
73
21
Num
ber o
f hou
seho
lds w
ith cl
ean
drin
king
wat
er su
pply
3135
1738
636
418
343
Num
ber o
f Rur
al W
ater
Sup
ply
Sche
mes
16
646
5544
21N
umbe
r of h
ouse
hold
s with
toile
ts/la
trin
es31
3517
3863
641
834
3N
et E
nrol
men
t Rat
e99
%10
0%10
0%99
%99
%N
umbe
r of E
CC
D C
entr
e9
32
31
Num
ber o
f Prim
ary
scho
ols
125
2 2
3N
umbe
r of L
ower
seco
ndar
y sc
hool
s2
1 1
0 0
Num
ber o
f Mid
dle
seco
ndar
y sc
hool
s0
0 0
0 0
Num
ber o
f hig
her s
econ
dary
scho
ols
21
1 0
0 N
umbe
r of c
entr
al sc
hool
s3
01
11
Num
ber n
on-fo
rmal
Edu
catio
n (N
FE) C
ente
rs13
6 3
40
Num
ber o
f NFE
Lea
rner
s10
241
1434
13N
umbe
r of N
FE in
stru
ctor
s 9
41
31
Num
ber o
f tea
cher
s26
712
367
4334
Stud
ent T
each
er R
atio
1:15
1:17
.61:
12.4
1:14
.51:
12.8
Num
ber o
f Chi
wog
s20
55
55
Num
ber o
f Vill
ages
97
42
25 2
710
Num
ber o
f fem
ale
DT
mem
bers
00
00
0N
umbe
r of f
emal
e G
T m
embe
rs4
02
02
Num
ber o
f hou
seho
lds e
lect
rified
3135
173
863
641
8 34
3 N
umbe
r of v
illag
es w
ith m
obile
cove
rage
9742
2527
10N
umbe
r of S
uspe
nsio
n Br
idge
s 13
45
40
Leng
th o
f GC
Roa
d (k
m)
27.8
70.
42 .2
5 2
70.
2N
umbe
r of F
arm
Roa
ds69
20
14
21
14
Tota
l len
gth
of fa
rm ro
ad (k
m)
182.
292
70.
015
39.
657
37.
635
.02
Tota
l num
ber o
f Lh
akha
ngs/
tem
ples
a. 1
1a.
1a.
8a.
2a.
0a.
gov
ernm
ent o
wne
d b.
42
b. C
omm
unity
c. 35
b.9
b.15
b.9
b.9
c. Pr
ivat
e
c.5
c.12
c.10
c.8
Num
ber o
f cho
rten
s35
012
186
102
41To
tal n
umbe
r of S
port
s fac
ilitie
s/gr
ound
a. In
door
spor
ts h
all
a.0
a.0
a.0
a.0
a.0
b. F
ootb
all
b.1
b.1
b.0
b.0
b.0
c. Ba
sket
ball
c.0c.
0c.
0c.
0c.
0d.
Bad
min
ton
d.0
d.0
d.0
d.0
d.0
e. O
ther
s (2
arch
ery
grou
nds)
e. 2
e. 1
e. 1
e. 0
e. 0
Twelfth Five Year Plan (2018-2023), Bumthang Dzongkhag
-16-
4. KEY STRATEGIES
In the 12th FYP, key strategies are:
1. Enhance income and resilient capacities particularly of the poor and vul-nerable in eradicating poverty in all its forms;
2. Develop and improve critical infrastructures and ensure standard and quality;
3. Provide effective, efficient and user-friendly public services and amenities;4. Promote and strengthen entrepreneurship, enterprises and industries of all
types;5. Identify, build and strengthen critical hR capacity and skills and ensure
their effective and efficient management and utilization; 6. Initiate Public Private Partnership (PPP) arrangement and hire experts for
planning and implementation to offset lack of hR capacity and skills7. Increase contracting and outsourcing of works and services while ensuring
quality and value for money; 8. Increase dialogue and collaboration with private sector, community and
others in every value chain development of economy;9. Identify issues, opportunities and mitigating interventions related to
cross-cutting issues and themes such as gender, climate, environment, di-saster, poverty, population and vulnerable and disabled people, etc. during plan and strategy formulation.
10. Tap incentives and sectoral support available through various policies such as EDP, Fiscal Incentives Policy, CSMI Policy, etc. for local development and economic/business growth.
11. Ensure that the mandatory indicators related to corruption reduction namely, work, integrity and leadership culture index, corruption, transpar-ency and accountability index; and administrative sanction against pub-lic officials as KPIs in the Annual Performance Agreement, in addition to ensuring that measures to reduce corruption are strengthened and imple-mented.
-17-
Twelfth Five Year Plan (2018-2023), Bumthang Dzongkhag
5. RESOuRCE ALLOCATION FORMuLA (RAF) FOR DZONGKhAGS AND GEWOGS
5.1. Dzongkhag- RAF criteria and weights
Criteria & Weight Sub-Criteria & Weight Description/Indicator1) Economy (40%) CSI (20%) Inverse Number of production & manufacturing
Cottage & Small Industries (CSI) to resident population in the Dzongkhag (CSI Report, 2018)
People unemployed (10%) Number of people unemployed (persons age 15 years & above who during the ref-erence period are without work, currently available for work & seeking work) in the Dzongkhag (PhCB, 2017)
Employed in agriculture (10%)
Number of people employed in agricul-ture in the Dzongkhag (PhCB, 2017)
2) health (10%) Crude Death Rate (10%) Number of deaths in a year per 1000 pop-ulation the Dzongkhag (PhCB 2017)
3) Education (10%) Student’s performance (10%) Inverse
Pass percentage (40%) of students in class X in BCSE in the Dzongkhag (Pupil Performance Report, 2018, BCSEA)
4) GNh Index (15%)
GNh index (15%)Inverse
Level of happiness & general wellbeing of the population in the Dzongkhag (GNh Survey Report, 2015)
6) Culture (10%) Cultural participation (10%)Inverse
Average number of days of participation by people in socio-cultural activities in the Dzongkhag (GNh Survey Report, 2015)
7)Environment (15%)
Waste disposal and litter (10%)
Number of people affected by inadequate waste disposal sites & littering in the Dzongkhag (PhCB, 2017)
Wildlife damages (5%) Number of people affected by wildlife in the Dzongkhag (PhCB, 2017)
Twelfth Five Year Plan (2018-2023), Bumthang Dzongkhag
-18-
5.2. Gewogs- RAF criteria and weights
Criteria & Weight Sub-Criteria& Weight
Description/Indicator
1) Population (15%)
Resident Population (15%)
Number of resident population of the Gewog (PhCB, 2017)
2) GNh Index (10%)
GNh index (10%)Inverse
Level of happiness & general wellbeing of the population in the Gewog (GNh Survey Report, 2015)
3) Farming (15%) Kamzhing (5%) Area of Kamzhing (dry land) in acres owned by people in the Gewog (PhCB 2017)
Chuzhing (5%) Area of Chhuzhing (wetland) in acres owned by people in the Gewog (PhCB 2017)
Livestock (5%) Number of livestock (“Nor”) owned by people in the Gewog (PhCB 2017)
4) health (20%) u5MR (5%) Rate of u5 deaths in percentage in the last 12 months to total births in the last 12 months in the Gewog (PhCB 2017)
unreliable water supply (10%)
Number of households without access to reliable water (unavailability of water at least during the critical time 5AM-8AM, 11AM-2 PM and 5PM-9PM & not adequate for wash-ing/cooking) in the Gewog (PhCB 2017)
unhygienic sanitation (5%)
Number of households without access to im-proved sanitation facilities (households without pour flush, ventilated improved pit, pit latrine with slab & composting toilet) in the Gewog (PhCB 2017)
5) Education (5%) School aged children unschooled (6-14 years) (5%)
Number of school-age children (6-14) out of school in the Gewog (PhCB 2017)
6) Poverty (15%) Income Poverty (5%) Number of people below poverty line (< Nu 2195.95 per person per month) in the Gewog (BLSS 2012)
Average hhs Income (10%) Inverse
Mean per-capita household income (in Nu.) of the households in the Gewog (BLSS, 2012)
7) Transportation/Distance (20%)
Distance to road head (15%)
Number of household within walking distance of more than 30 minutes from the nearest road head in the Gewog (PhCB 2017)
Transportation cost index (5%)
Per unit cost per metric ton per kilometre (distance) of Dzongkhag headquarter from Phuentsholing (Administrative Data, RSTA)
-19-
Twelfth Five Year Plan (2018-2023), Bumthang Dzongkhag
6. RATIONALE AND EXPENDITuRE OBjECTIVES OF CAPITAL GRANTS ALLOCATION uNDER EACh RAF CRITERIA AND SuB-CRITERIA FOR BuMThANG DZONGKhAG
6.1. Dzongkhag
Criteria, weightage and allocation for DzongkhagSl. No. Criteria Weight (%) Amount (Nu. in Million)
1. Economy 40 147.1902. GNh index 15 96.4003. health 10 69.6804. Education 10 82.8705. Culture 10 77.1206. Environment 15 101.710
Figure 1: Allocation based on RAF Criteria and weightage for Dzongkhag
1. The first criteria of economy is measured by three sub-criteria: 1. Number of cottage and small Industry (CSI) engaged in production and manufac-turing to resident population, 2. Number of unemployed people, and 3. Number of people employed in the agriculture sector in the Dzongkhag.
Twelfth Five Year Plan (2018-2023), Bumthang Dzongkhag
-20-
The grant allocation under sub-criteria 1, 2 and 3 are Nu. 59.29 million,Nu. 51.45 million and is Nu. 36.45 million respectively. Resource allocation is made as inverse of per capita CSI, whereby more resource is allocated to Dzongkhags with less CSI (in production and manufacturing) per capita. So Dzongkhags receive higher resource allocation for higher number of unemployed people and people employed in agriculture in the Dzongkhag.
The grant is allocated to encourage and direct Dzongkhag to invest in pri-ority interventions to promote cottage, small and medium industries, par-ticularly in production and manufacturing. Focus will be on supporting CSI operations, building entrepreneurship and business skills, encourag-ing women participation, strengthening rural connectivity in transport and roads, enhancing product diversification and value addition, exploring new markets, and increasing sale of local products and exports to enhance local economy, rural and farm income and job creation, particularly for unemployed youth. Support will also be provided to build skills of farmers, make farming and farm employment attractive, intensify and maximise food production and variety from the limited arable land.
2. health (Crude death rate-CDR) and education (Students’ performance in class X) is the second and third criteria, for which grant allocation under the sub-criteria, CDR and students’ performance are Nu. 69.68 million and Nu. 82.87 million respectively. Resource allocation for education is made as inverse of students’ performance, whereby more resource is allocated to Dzongkhags with low students’ performance. For health, higher the CDR Dzongkhag receives more resources.
The grant is allocated to encourage and direct the Dzongkhag to invest in priority interventions to enhance and achieve quality health and education services. Focus will be on improving services’ quality, professional develop-ment of teachers, nurses and doctors, infrastructure and services, student’s performance, and life skills for enhanced learning outcomes, and prepar-ing students for jobs in future. Awareness and education, helpline services and other counselling support to reduce and prevent suicides, drugs and alcohol abuses, and joblessness will be carried out.
3. The fourth criteria of GNh Index reflects the level of happiness and gen-eral wellbeing of the population from the lens of nine domains in the Dz-ongkhag.
-21-
Twelfth Five Year Plan (2018-2023), Bumthang Dzongkhag
The grant allocation under GNh Index is Nu. 96.40 million. The inverse of GNh Index is used for resource allocation, whereby less happier Dz-ongkhags receive more resource.
The grant is allocated to encourage and direct Dzongkhag to invest in pri-ority interventions to enhance conducive conditions and provide holistic development support to improve well-being and happiness of the people. Focus will particularly be on less happier people such as women, rural res-idents, widowed, divorced or separated people, less educated, and farmers, and in improving psychological well-being (anger, frustration, and spiri-tuality), community vitality (belonging), and cultural diversity (Driglam-Namzha), which have suffered significant reduction in sufficiency in the Dzongkhag. Provision of 100% clean drinking water, steady water supply for sanitation and pourflush toilets to poorest households will also be a priority requiring attention.
4. Culture is the fifth criteria and the Dzongkhag receives, Nu.77.12 million as grant allocation under the only sub-criteria ‘number of days of participation in socio-cultural activities by the people in the Dzongkhag’. The inverse of culture criteria is used for resource allocation, whereby Dzongkhags with lesser number of days engaged in cultural participation by the people will receive more resource.
This is to encourage and direct the Dzongkhag to invest in priority in-terventions towards promoting culture and tradition. Emphasis is placed on preservation, documentation, awareness and promotion of intangible culture and heritage such as songs, dances, folk stories, local festivals, our unique identity, and social and family cohesion. Improvement in psycho-logical well-being (spirituality), community vitality (belonging), and cul-tural diversity (DriglamNamzha), which have suffered significant reduc-tion in sufficiency so far will also be given importance under this criteria. Volunteerism, participation in socio-environment, cultural activities and programmes will also be promoted.
5. Environment is the last criteria and measured by two sub-criteria: 1. Num-ber of people affected by waste disposal sites and litter, and 2. Number of people affected by wildlife damages. Dzongkhag receives Nu. 75.23 million and Nu. 26.49 million under sub-criteria, 1 and 2 respectively. under this Dzongkhags with more number of people affected by waste disposal sites, litter and wildlife damages receives more resource.
Twelfth Five Year Plan (2018-2023), Bumthang Dzongkhag
-22-
The grant is allocated to encourage and direct Dzongkhag to invest in pri-ority interventions to institute proper waste disposal and management system. In particular it will promote waste segregation, reduction, reus-ing, recycling, and make towns and settlements green, clean and beautiful through awareness and education. Proper green transportation facilities for reducing pollution will be promoted alongside management of human wildlife conflict and issues such as protecting and insuring farms and crops from wildlife damages through technologies and awareness creation.
6.2. Four Gewogs
Criteria, weightage and allocation for GewogsSl. No. Criteria Weight (%) RAF (Nu. in Million)1. Resident Population 15 58.5002. GNh Index 10 17.1203. Farming 15 50.7404. health 20 46.1505. Education 5 16.5506. Poverty 15 18.4207. Transportation cost/distance 20 20.170
Figure 2: Allocation based on RAF Criteria and weightage for Gewogs
-23-
Twelfth Five Year Plan (2018-2023), Bumthang Dzongkhag
1. The total grant allocation under resident population criteria for Gewogs is Nu. 58.50 million. Gewog s with larger size of resident population will receive more resource as it ensures best possible equal per capita resource allocation reflecting developmental issues and needs faced by the resident population.
The grant is allocated to encourage and direct Gewogs to invest in pri-ority interventions to develop and improve infrastructure and facilities of primary schools, outreach clinics and outposts, create rural employment, improve quality of public service delivery and other amenities for the com-munities, and make rural settlements and living attractive and livable in order to reduce gungtongs and rural-urban migration.
2. The total grant allocation under GNh Index criteria for Gewogs is Nu.17.12 million. The inverse of GNh Index is used for resource allocation, which means less happier Gewogs receive higher resource share.
The grant is allocated to encourage and direct Gewogs to invest in priority interventions to foster conditions conducive for holistic development and improvement of well-being and happiness through awareness, education and other support. Focus will be on people, particularly those less happier such as women, rural residents, widowed, divorced or separated people, less educated and farmers. Psychological well-being (anger, frustration, spirituality), community vitality (belonging), and cultural diversity (Dri-glamNamzha), which have suffered significant reduction in sufficiency so far in the Gewogs will also be a priority.
3. The total grant allocation under farming criteria are Nu. 27.72 million, Nu.5.56 million and Nu. 17.47million for sub-criteria, area of Kamzhing (dry land), area of Chhuzhing (wetland) and number of livestock (nor) owned by people in the Gewog , respectively. Gewogs with larger land-holdings, of kamzhing and chuzhing, and more number of livestock receive more resource.
Agriculture and farming practice is the mainstay of rural population, and a key contributor to food sufficiency, poverty reduction, income genera-tion, gross domestic product, better livelihood and a main source of rural employment. The grant is allocated to encourage and direct the Gewogs to invest in priority interventions to support farmers, intensify and maximize food production and variety from the limited arable land and livestock po-tential, and increase sale of agriculture and livestock produces.
Twelfth Five Year Plan (2018-2023), Bumthang Dzongkhag
-24-
4. health is the fourth criteria for resource allocation and is measured by three sub-criteria, 1. under 5 mortality rate; 2. Number of households without access to reliable water for drinking, washing and cooking; and 3. Number of households without access to improved sanitation facilities.
The total grant allocation under sub-criteria 1, 2 and 3 are Nu.4.42 million, Nu. 18.61 million, and Nu. 14.15 million respectively. higher the under 5 mortality rate, and higher the households without reliable water supply and improved sanitation facilities, greater the resource allocation to these Ge-wogs.
The grant is allocated to encourage and direct Gewogs to invest in pri-ority interventions to promote healthy communities and reduce poverty in order to maintain health outposts and outreach clinics, ensure effective delivery of services and attendance by health personnel, access to facili-ties for mother and child to address mortality and other issues, awareness and education to prevent and reduce deaths due to other factors such as suicides. Provision of 100 percent 24x7 safe drinking water in dwellings, proper drains and drainage systems in the villages, and sanitation facilities especially supporting the poorest households to at least have a pourflush toilet will also be priorities.
5. Education is the fifth criteria with a weight of 5% for resource allocation and is measured through the sub-criteria, 1. Number of school-age children (6-14) out of school in the Gewog and total grant allocation is Nu.18.42 million. More resource is allocated to Gewogs with larger number of out-of-school children.
Education empowers people and society, is instrumental in reducing and eradicating poverty and preparing people for jobs. The grant is allocated to encourage and direct the Gewogs to invest in priority interventions to en-hance and achieve education access and quality services for rural children and supporting out-of-school children to ensure their school attendance and completion.
6. Poverty is the sixth criteria for resource allocation and is measured by sub-criteria; 1. Number of people below poverty line (< Nu 2195.95 per person per month) in the Gewog and; 2. Mean per capita household in-come in the Gewog .
-25-
Twelfth Five Year Plan (2018-2023), Bumthang Dzongkhag
The grant allocation for sub-criteria 1 and 2 are Nu. 7.56 million and Nu. 17.56 million respectively. For sub-criteria 1, Gewogs with larger number of poor people will receive greater resource share. For sub-criteria 2, In-verse of mean per capita household income is used, Gewogs with low mean per capita household income receives more resource.
Poverty is a rural phenomenon and reducing or eradicating it at the earliest is key to increased income, rural prosperity and sustainable communities. The grant is allocated to encourage and direct Gewogs to invest in priori-ty interventions to support rural entrepreneurs and farmers on skills and knowledge, support creation and operation of rural enterprises, promote rural products, increase sale of rural products, and improve living stan-dards of the people.
7. Transportation cost/distance is the seventh and last criteria used for re-source allocation and is measured by two sub-criteria namely, 1. Distance to road head, and 2. Transportation cost index. The grant allocation under sub-criteria 1 and 2 are Nu. 5.62 million and Nu 14.55 million respectively. Greater the distance and higher the transportation cost for Gewogs, more resource is accordingly allocated.
The distance to road head and transportation cost index take into account geographical location, remoteness and spatial conditions of a Gewog or rural settlement, especially distance of Gewog households from the main supply hub of Phuentsholing, for raw materials and utilities needed for development. The criteria is used to compensate for huge investment re-quirements and administrative costs arising from high transportation costs associated with the aforementioned conditions and rising fuel costs, to de-liver raw materials and utilities for development and public services deliv-ery.
The grant is allocated to encourage and direct Gewogs to invest in priority interventions to improve/strengthen rural connectivity, particularly roads, bridges, footpaths and tracks, encourage private entities to provide public transport services in remote areas, and meet the additional costs of provid-ing quality rural infrastructures, facilities and services.
Twelfth Five Year Plan (2018-2023), Bumthang Dzongkhag
-26-
7. RESOuRCE ALLOCATION (CAPITAL GRANTS ShARE) IN ThE 12 FYP FOR DZONGKhAG AND GEWOGS
Sl. No Dzongkhag/Gewog
Capital Grant Allocation (Nu. in Million illion)Total
Formula (RAF) Based CMI
1 Dzongkhag 574.98 161.400 736.3832 Chhoekhor 87.370 19.800 107.1703 Chhumig 52.800 19.800 72.6004 Tang 49.650 19.800 69.4505 ura 37.440 19.800 57.240Total 802.240 240.600 1042.831
Note:
1. From the total RAF based grants allocation to the Dzongkhag, Nu. 10 Million per Year per Dzongkhag to be used as Dzongkhag Development Grant (DDG) under DDG Guideline.
2. All RAF based grants allocation to the Gewogs will be released as Annual Grant (AG) on a ‘Quarterly basis’ upon submission of the Budget utiliza-tion Plan (BuP) under AG Guideline.
-27-
Twelfth Five Year Plan (2018-2023), Bumthang Dzongkhag
8. LOCAL GOVERNMENT KEY RESuLT AREAS (LGKRAS) AT A GLANCE
1. LGKRA 1: Gainful employment created and local economy enhanced
2. LGKRA 2: Food and nutrition security enhanced
3. LGKRA 3: Community health enhanced and water security ensured
4. LGKRA 4: Quality of education & skills improved
5. LGKRA 5: Culture and traditions preserved and promoted
6. LGKRA 6: Livability, safety and sustainability of human settlements im-proved
7. LGKRA 7: Transparent, effective and efficient public service delivery enhanced
8. LGKRA 8: Democracy and decentralization strengthened
9. LGKRA 9: Carbon neutral, climate and disaster resilient development enhanced
10. LGKRA 10: Gender equality promoted, women and girls empowered
11. LGKRA 11: Livelihood of highlanders improved and sustained
Twelfth Five Year Plan (2018-2023), Bumthang Dzongkhag
-28-
9.
LGK
RA 1
:
Gai
nful
empl
oym
ent c
reat
ed a
nd lo
cal e
cono
my
enha
nced
(4 K
PIs)
NK
RA
KPI
Des
crip
tion
Uni
tBa
selin
eTa
rget
Dat
a so
urce
Col
lect
ion
met
hodo
logy
Rem
arks
1. M
acro
econ
omic
st
abili
ty e
nsur
ed
2. E
cono
mic
di
vers
ity a
nd
prod
uctiv
ity
enha
nced
3. P
over
ty e
radi
cate
d an
d in
equa
lity
redu
ced
10. G
ende
r equ
ality
pr
omot
ed a
nd
wom
en a
nd g
irls
empo
wer
ed11
. Pro
duct
ive
and
gain
ful e
mpl
oym
ent
crea
ted
CSM
Is e
stab
-lis
hed
(farm
)Th
is in
dica
tor m
easu
res c
reat
ion
of C
SMI s
uch
as a
gro-
base
d,
lives
tock
ent
erpr
ises a
nd
busin
esse
s. Th
e nu
mbe
r CSM
I to
be
crea
ted
to b
e di
stin
guish
ed
by C
SMI c
reat
ed 1
) sol
ely
by
Dzo
ngkh
ag’s
plan
inte
rven
tions
, 2)
thro
ugh
part
ners
hip
of
Dzo
ngkh
ag a
nd ce
ntra
l age
ncie
s an
d 3)
by
priv
ate
entit
ies w
ith
supp
ort/f
acili
tatio
n fr
om
Dzo
ngkh
ag.
No.
45 (2
016)
NT=
36
C=8
1A
dmin
istra
tive
Dat
a,
Dzo
ngkh
ag
Plan
ning
uni
t
Adm
inist
rativ
e re
cord
NT=
New
Tar
get
C=C
umul
ativ
ePo
tato
bas
ed
proc
essin
g pl
ant,
Mus
tard
oi
l pro
cess
ing
plan
t, Zi
m-s
eng
oil p
roce
ssin
g pl
ant,
Yout
h co
oper
ativ
e fa
rmin
g,
hone
y pr
oduc
ts
dive
rsifi
catio
n un
it,
com
mer
cial
dai
ry
farm
, com
mer
cial
po
ultr
y fa
rms(
2nos
), se
mi-c
omm
erci
al
(20n
os) B
ee fa
rmin
g (5
gou
rps)
Live
stoc
k da
iry
base
d pr
oduc
ts
proc
essin
g u
nit,
Live
stoc
k fe
eds
man
ufac
turin
g,C
old
stor
age
CSM
Is
esta
blish
ed
(non
-far
m)
This
indi
cato
r mea
sure
s cre
atio
n of
non
-far
m C
SMIs
rela
ted
to
man
ufac
turin
g an
d se
rvic
es li
ke
clot
hing
& te
xtile
s, ha
ndic
rafts
, fu
rnitu
re, m
iner
als,
hote
ls,
rest
aura
nt IT
& el
ectr
onic
re
pairs
, cob
bler
& sa
lon,
dry
cl
eani
ng, t
ouris
m, e
tc.)
The
num
ber C
SMI t
o be
crea
ted
to b
e di
stin
guish
ed b
y C
SMI
crea
ted
1) so
lely
by
Dzo
ngkh
ag’s
plan
inte
rven
tions
, 2) t
hrou
gh
part
ners
hip
of D
zong
khag
an
d ce
ntra
l age
ncie
s and
3) b
y pr
ivat
e en
titie
s with
supp
ort/
faci
litat
ion
from
Dzo
ngkh
ag.
No.
121(
2016
) N
T=10
C=1
31
Adm
inist
rativ
e D
ata,
D
zong
khag
Pl
anni
ng u
nit
Adm
inist
rativ
e re
cord
NT=
New
Tar
get
C=C
umul
ativ
eC
omm
unity
Bas
ed
Tour
ist S
ervi
ce/
tour
ists v
isitin
g C
entr
e, Bi
cycl
ing
hiri
ng u
nits
, A
mus
emen
t Par
k,
hor
se a
nd y
ak
ridin
g st
able
uni
t,
Was
te re
cycl
ing
unit,
Men
chus
, m
aint
enan
ce/
reha
bilit
atio
n gr
oup,
Tour
ist
arriv
als b
y be
d-ni
ghts
The
indi
cato
r mea
sure
s nig
ht
spen
t by
a to
urist
in th
e D
zong
khag
segr
egat
ed b
y do
mes
tic a
nd in
tern
atio
nal.
No.
28,9
42 (2
017)
C=3
4,45
3
NT=
5511
Bhut
an T
our-
ism M
onito
r, TC
B
Adm
inist
rativ
e re
cord
NT=
New
Tar
get
C=C
umul
ativ
e
jobs
crea
ted
(farm
and
no
n-fa
rm)
This
indi
cato
r mea
sure
s nu
mbe
r of p
aid
jobs
(far
m
and
non-
farm
) cre
ated
in th
e D
zong
khag
. A
pai
d jo
b is
defin
ed a
s a p
rofe
ssio
n or
a w
ork
earn
ing
cash
or p
aym
ent.
The
num
ber o
f pai
d jo
bs cr
eate
d to
be
dist
ingu
ished
by
jobs
cr
eate
d 1)
sole
ly b
y D
zong
khag
’s pl
an in
terv
entio
ns, 2
) thr
ough
pa
rtne
rshi
p of
Dzo
ngkh
ag
and
cent
ral a
genc
ies a
nd 3
) by
priv
ate
entit
ies w
ith su
ppor
t/fa
cilit
atio
n fr
om D
zong
khag
.
No.
106
(201
5-16
A
PA)
NT=
500
C
=606
A
dmin
istra
-tiv
e D
ata,
D
zong
khag
Pl
anni
ng u
nit
Adm
inist
rativ
e re
cord
100
num
ber o
f pa
id jo
bs to
be
crea
ted
annu
ally
1)
thro
ugh
part
ners
hip
of D
zong
khag
and
ce
ntra
l age
ncie
s an
d 2)
by
priv
ate
entit
ies w
ith su
ppor
t/fa
cilit
atio
n fr
om
Dzo
ngkh
ag.
-29-
Twelfth Five Year Plan (2018-2023), Bumthang Dzongkhag
9.
LGK
RA 1
:
Gai
nful
empl
oym
ent c
reat
ed a
nd lo
cal e
cono
my
enha
nced
(4 K
PIs)
NK
RA
KPI
Des
crip
tion
Uni
tBa
selin
eTa
rget
Dat
a so
urce
Col
lect
ion
met
hodo
logy
Rem
arks
1. M
acro
econ
omic
st
abili
ty e
nsur
ed
2. E
cono
mic
di
vers
ity a
nd
prod
uctiv
ity
enha
nced
3. P
over
ty e
radi
cate
d an
d in
equa
lity
redu
ced
10. G
ende
r equ
ality
pr
omot
ed a
nd
wom
en a
nd g
irls
empo
wer
ed11
. Pro
duct
ive
and
gain
ful e
mpl
oym
ent
crea
ted
CSM
Is e
stab
-lis
hed
(farm
)Th
is in
dica
tor m
easu
res c
reat
ion
of C
SMI s
uch
as a
gro-
base
d,
lives
tock
ent
erpr
ises a
nd
busin
esse
s. Th
e nu
mbe
r CSM
I to
be
crea
ted
to b
e di
stin
guish
ed
by C
SMI c
reat
ed 1
) sol
ely
by
Dzo
ngkh
ag’s
plan
inte
rven
tions
, 2)
thro
ugh
part
ners
hip
of
Dzo
ngkh
ag a
nd ce
ntra
l age
ncie
s an
d 3)
by
priv
ate
entit
ies w
ith
supp
ort/f
acili
tatio
n fr
om
Dzo
ngkh
ag.
No.
45 (2
016)
NT=
36
C=8
1A
dmin
istra
tive
Dat
a,
Dzo
ngkh
ag
Plan
ning
uni
t
Adm
inist
rativ
e re
cord
NT=
New
Tar
get
C=C
umul
ativ
ePo
tato
bas
ed
proc
essin
g pl
ant,
Mus
tard
oi
l pro
cess
ing
plan
t, Zi
m-s
eng
oil p
roce
ssin
g pl
ant,
Yout
h co
oper
ativ
e fa
rmin
g,
hone
y pr
oduc
ts
dive
rsifi
catio
n un
it,
com
mer
cial
dai
ry
farm
, com
mer
cial
po
ultr
y fa
rms(
2nos
), se
mi-c
omm
erci
al
(20n
os) B
ee fa
rmin
g (5
gou
rps)
Live
stoc
k da
iry
base
d pr
oduc
ts
proc
essin
g u
nit,
Live
stoc
k fe
eds
man
ufac
turin
g,C
old
stor
age
CSM
Is
esta
blish
ed
(non
-far
m)
This
indi
cato
r mea
sure
s cre
atio
n of
non
-far
m C
SMIs
rela
ted
to
man
ufac
turin
g an
d se
rvic
es li
ke
clot
hing
& te
xtile
s, ha
ndic
rafts
, fu
rnitu
re, m
iner
als,
hote
ls,
rest
aura
nt IT
& el
ectr
onic
re
pairs
, cob
bler
& sa
lon,
dry
cl
eani
ng, t
ouris
m, e
tc.)
The
num
ber C
SMI t
o be
crea
ted
to b
e di
stin
guish
ed b
y C
SMI
crea
ted
1) so
lely
by
Dzo
ngkh
ag’s
plan
inte
rven
tions
, 2) t
hrou
gh
part
ners
hip
of D
zong
khag
an
d ce
ntra
l age
ncie
s and
3) b
y pr
ivat
e en
titie
s with
supp
ort/
faci
litat
ion
from
Dzo
ngkh
ag.
No.
121(
2016
) N
T=10
C=1
31
Adm
inist
rativ
e D
ata,
D
zong
khag
Pl
anni
ng u
nit
Adm
inist
rativ
e re
cord
NT=
New
Tar
get
C=C
umul
ativ
eC
omm
unity
Bas
ed
Tour
ist S
ervi
ce/
tour
ists v
isitin
g C
entr
e, Bi
cycl
ing
hiri
ng u
nits
, A
mus
emen
t Par
k,
hor
se a
nd y
ak
ridin
g st
able
uni
t,
Was
te re
cycl
ing
unit,
Men
chus
, m
aint
enan
ce/
reha
bilit
atio
n gr
oup,
Tour
ist
arriv
als b
y be
d-ni
ghts
The
indi
cato
r mea
sure
s nig
ht
spen
t by
a to
urist
in th
e D
zong
khag
segr
egat
ed b
y do
mes
tic a
nd in
tern
atio
nal.
No.
28,9
42 (2
017)
C=3
4,45
3
NT=
5511
Bhut
an T
our-
ism M
onito
r, TC
B
Adm
inist
rativ
e re
cord
NT=
New
Tar
get
C=C
umul
ativ
e
jobs
crea
ted
(farm
and
no
n-fa
rm)
This
indi
cato
r mea
sure
s nu
mbe
r of p
aid
jobs
(far
m
and
non-
farm
) cre
ated
in th
e D
zong
khag
. A
pai
d jo
b is
defin
ed a
s a p
rofe
ssio
n or
a w
ork
earn
ing
cash
or p
aym
ent.
The
num
ber o
f pai
d jo
bs cr
eate
d to
be
dist
ingu
ished
by
jobs
cr
eate
d 1)
sole
ly b
y D
zong
khag
’s pl
an in
terv
entio
ns, 2
) thr
ough
pa
rtne
rshi
p of
Dzo
ngkh
ag
and
cent
ral a
genc
ies a
nd 3
) by
priv
ate
entit
ies w
ith su
ppor
t/fa
cilit
atio
n fr
om D
zong
khag
.
No.
106
(201
5-16
A
PA)
NT=
500
C
=606
A
dmin
istra
-tiv
e D
ata,
D
zong
khag
Pl
anni
ng u
nit
Adm
inist
rativ
e re
cord
100
num
ber o
f pa
id jo
bs to
be
crea
ted
annu
ally
1)
thro
ugh
part
ners
hip
of D
zong
khag
and
ce
ntra
l age
ncie
s an
d 2)
by
priv
ate
entit
ies w
ith su
ppor
t/fa
cilit
atio
n fr
om
Dzo
ngkh
ag.
Twelfth Five Year Plan (2018-2023), Bumthang Dzongkhag
-30-
9.1. Programme summaryand strategies
Programme Title: Economic development and job creation
Objective: To enhance local economy and create gainful employment
Collaborating Agencies: MoEA/MoLHR/MoAF/MoF/MoIC/TCB
Programmestrategies: The local economy is predominantly non-agrarian with tertiary sector domi-nance; the Dzongkhag has 121 non-farm CSIs which mostly caters to the tourism industry against 45 farm-based CSIs. In 2017, the Dzongkhag received a total of 11,321 tourists which translated into 28,942 bed nights (Bhutan Tourism Mon-itor, 2017). These statistics clearly indicates the scope for diversifying the eco-nomic base by supporting establishment of both farm and non-farm CSIs.
As per the Labour Force Survey (LFS), 2015 there were 427 people who were unemployed (245 Male and 182 Female). In order to address the issues of un-employment and improve the living standards, it is imperative to enhance local economy.
Given the issues, potential and opportunities of economic growth, job creation and income generation in the Dzongkhag, the Dzongkhag will develop a com-prehensive local economic growth and job creation strategy and plan for imple-mentation as follows;
1. Develop the Dzongkhag Local Economic Development Strategy (DLEDS) which will primarily focus on stimulating the economic growth and ex-amining and exploring investment areas. It will focus on an in-depth situational analysis of the economy, conducting feasibility studies of the potential growth sectors, production, branding and marketing plan, and implementation and monitoring plans;
2. Collaborate and facilitate building networks and linkages between hotels, institutions, businesses, industries and farmers etc. for setting pricing and marketing of local products.
-31-
Twelfth Five Year Plan (2018-2023), Bumthang Dzongkhag
3. Create and strengthen enabling infrastructures/facilities such as economic development/incubation centre, warehouse, improve transport connectiv-ity and marketing linkages.
4. In collaboration with MoAF and MoEA support will also target rural entre-preneurs and farmers who want to engage in and strengthen commercial-ization of agriculture farming and agri-business.
5. Explore possibilities of establishing small and medium industries based on livestock, agriculture and non-farm produce to enhance household income and generate employment.
6. Collaboration with communities and other relevant agencies will ac-celerate development of new products unique to the Dzongkhag, and upscale both farm and nonfarm products.
7. Focus more on Eco/cultural and community-based tourism, particu-larly in terms of community lodges, farm houses, camp sites, and other visiting centers to attract more and all-season tourists’ arrival. The Dz-ongkhag will collaborate and improve the existing infrastructure and invest to new tourism products where the benefits trickle down to the communities.
8. Build the capacity of youths to undertake the tasks through formation of youth groups/cooperatives.
9. Support will be provided to address job mismatch issues with focus on job retention success and enhancing worker’s capability and performance.
10. Establish Local Government Business Council to hold local business fo-rum to discuss issues, finding solutions and recommending way forward. Wherever central support is required the local business council will take the matter and issues with MoEA, MoLhR and other central agencies for solutions and recommendations to support local business clients, rural en-trepreneurs and enterprises.
11. Establish potato, honey and livestock dairy based processing plant/indus-try, and also oil processing unit for mustard, sunflower and Zim-seng. The Dzongkhag will also emphasize youth cooperative farming, Community Based Tourist Service Centre, Community Transport unit, Bicycling hir-ing units, Rafting unit, Amusement Park, Briquettes manufacturing for employment and income generation.
Twelfth Five Year Plan (2018-2023), Bumthang Dzongkhag
-32-
9.2.
Pr
ogra
mm
eOut
put M
atri
x
9.2.
1. D
zong
khag
Prog
ram
me o
utpu
t ind
icat
ors a
nd ta
rget
s O
utco
me
Out
put
Wei
ght
Out
put I
ndic
ator
Uni
tW
eigh
tBa
selin
e (B
ase
Year
) P
lan
Targ
et
Gai
nful
em
ploy
men
t cr
eate
d an
d lo
cal e
cono
my
enha
nced
Func
tiona
l an
d pr
oduc
tive
CSM
Is
esta
blish
ed
40N
umbe
r of C
SMIs
(far
m)
Num
ber
1245
(201
6)N
T=36
Num
ber o
f CSM
Is (n
on-
farm
)N
umbe
r5
121
NT=
10
Num
ber o
f new
/val
ue a
dded
pr
oduc
ts, g
oods
and
serv
ices
Num
ber
613
NT=
10
No.
of n
ew ru
ral
entr
epre
neur
s sup
port
ed a
nd
stre
ngth
ened
Num
ber
9N
A50
No.
of e
xist
ing
CSM
Is (f
arm
an
d no
n-fa
rm) s
uppo
rted
an
d st
reng
then
ed
Num
ber
816
6N
T=20
Ann
ual
inco
me
of
hous
ehol
ds
incr
ease
d
32In
com
e ge
nera
ted
from
the
sale
of a
gric
ultu
re p
rodu
cts
Nu.
(in
mill
ion)
814
3.23
015
7.55
3
Inco
me
gene
rate
d fr
om th
e sa
le o
f liv
esto
ck p
rodu
cts
Nu.
(in
mill
ion)
896
.53
(201
6)11
0
Inco
me
gene
rate
d fr
om sa
le
of n
on-f
arm
pro
duct
sN
u. (i
n m
illio
n)6
1580
.7 (2
016
RRC
O)
1739
Num
ber o
f tou
rist a
rriv
al b
y be
d ni
ghts
N
umbe
r5
28,9
42 (2
017)
34,4
53
No.
of t
ouris
m p
rodu
cts
deve
lope
dN
umbe
r5
NA
10
Gai
nful
jobs
cr
eate
d28
jobs
crea
ted
(farm
and
non
-fa
rm)
Num
ber
510
6 (2
015-
16 A
PA)
500
Num
ber o
f peo
ple
unem
ploy
ed b
y ge
nder
Num
ber
5M
ale=
245
F/m
ale=
182
(LFS
20
15)
0
Loca
l job
crea
tion
stra
tegy
an
d pl
an in
pla
ceD
ate
50
2018
-19
No.
of j
ob se
eker
s tra
ined
on
mar
ket r
elev
ant s
kills
Num
ber
80
500
No.
of r
ural
ent
repr
eneu
rs
trai
ned
on e
ntre
pren
eurs
hip
and
busin
ess s
kills
incl
udin
g tr
aini
ng o
f loc
al co
mm
unity
fr
eela
nce
guid
e
Num
ber
5N
A10
0
-33-
Twelfth Five Year Plan (2018-2023), Bumthang Dzongkhag
9.2.
Pr
ogra
mm
eOut
put M
atri
x
9.2.
1. D
zong
khag
Prog
ram
me o
utpu
t ind
icat
ors a
nd ta
rget
s O
utco
me
Out
put
Wei
ght
Out
put I
ndic
ator
Uni
tW
eigh
tBa
selin
e (B
ase
Year
) P
lan
Targ
et
Gai
nful
em
ploy
men
t cr
eate
d an
d lo
cal e
cono
my
enha
nced
Func
tiona
l an
d pr
oduc
tive
CSM
Is
esta
blish
ed
40N
umbe
r of C
SMIs
(far
m)
Num
ber
1245
(201
6)N
T=36
Num
ber o
f CSM
Is (n
on-
farm
)N
umbe
r5
121
NT=
10
Num
ber o
f new
/val
ue a
dded
pr
oduc
ts, g
oods
and
serv
ices
Num
ber
613
NT=
10
No.
of n
ew ru
ral
entr
epre
neur
s sup
port
ed a
nd
stre
ngth
ened
Num
ber
9N
A50
No.
of e
xist
ing
CSM
Is (f
arm
an
d no
n-fa
rm) s
uppo
rted
an
d st
reng
then
ed
Num
ber
816
6N
T=20
Ann
ual
inco
me
of
hous
ehol
ds
incr
ease
d
32In
com
e ge
nera
ted
from
the
sale
of a
gric
ultu
re p
rodu
cts
Nu.
(in
mill
ion)
814
3.23
015
7.55
3
Inco
me
gene
rate
d fr
om th
e sa
le o
f liv
esto
ck p
rodu
cts
Nu.
(in
mill
ion)
896
.53
(201
6)11
0
Inco
me
gene
rate
d fr
om sa
le
of n
on-f
arm
pro
duct
sN
u. (i
n m
illio
n)6
1580
.7 (2
016
RRC
O)
1739
Num
ber o
f tou
rist a
rriv
al b
y be
d ni
ghts
N
umbe
r5
28,9
42 (2
017)
34,4
53
No.
of t
ouris
m p
rodu
cts
deve
lope
dN
umbe
r5
NA
10
Gai
nful
jobs
cr
eate
d28
jobs
crea
ted
(farm
and
non
-fa
rm)
Num
ber
510
6 (2
015-
16 A
PA)
500
Num
ber o
f peo
ple
unem
ploy
ed b
y ge
nder
Num
ber
5M
ale=
245
F/m
ale=
182
(LFS
20
15)
0
Loca
l job
crea
tion
stra
tegy
an
d pl
an in
pla
ceD
ate
50
2018
-19
No.
of j
ob se
eker
s tra
ined
on
mar
ket r
elev
ant s
kills
Num
ber
80
500
No.
of r
ural
ent
repr
eneu
rs
trai
ned
on e
ntre
pren
eurs
hip
and
busin
ess s
kills
incl
udin
g tr
aini
ng o
f loc
al co
mm
unity
fr
eela
nce
guid
e
Num
ber
5N
A10
0
Twelfth Five Year Plan (2018-2023), Bumthang Dzongkhag
-34-
Pro
ject
ed A
nnua
l Tar
get
Sl.
No
KPI
Proj
ecte
d A
nnua
l Tar
get
FY
2018
-201
9FY
20
19-2
020
FY
2020
-202
1FY
20
21-2
022
FY
2022
-202
31
Num
ber o
f CSM
Is (f
arm
)5
810
103
2N
umbe
r of C
SMIs
(non
-far
m)
12
32
13
Num
ber o
f new
/val
ue a
dded
pro
duct
s, go
ods a
nd se
rvic
es1
33
21
4N
o. o
f new
rura
l ent
repr
eneu
rs su
ppor
ted
and
stre
ngth
ened
610
1212
105
No.
of e
xist
ing
CSM
Is (f
arm
and
non
-far
m) s
uppo
rted
and
st
reng
then
ed3
68
85
6In
com
e ge
nera
ted
from
the
sale
of a
gric
ultu
re p
rodu
cts
146.
0946
148.
9592
151.
8238
154.
6884
157.
553
7In
com
e ge
nera
ted
from
the
sale
of l
ives
tock
pro
duct
s98
.943
101.
356
103.
769
106.
183
110.
000
8In
com
e ge
nera
ted
from
sale
of n
on-f
arm
pro
duct
s16
1216
4416
7617
0717
399
Num
ber o
f tou
rist a
rriv
al b
y be
d ni
ghts
33
,141
33,4
6933
,797
34,1
2534
,453
10N
o. o
f tou
rism
pro
duct
s dev
elop
ed1
23
3 1
11jo
bs cr
eate
d (fa
rm &
non
-far
m)
4012
014
013
070
12N
umbe
r of p
eopl
e un
empl
oyed
by
gend
erM
=215
F=16
2M
=180
F=13
7M
=134
F=97
M=7
1F=
55M
=0F=
013
Loca
l job
Cre
atio
n st
rate
gy a
nd p
lan
in p
lace
2018
-19
impl
emen
tim
plem
ent
Impl
emen
tIm
plem
ent.
14N
o. o
f job
seek
ers t
rain
ed o
n m
arke
t rel
evan
t ski
lls10
010
015
010
050
15N
o. o
f rur
al e
ntre
pren
eurs
trai
ned
on e
ntre
pren
eurs
hip
and
busi-
ness
skill
s inc
ludi
ng tr
aini
ng o
f loc
al co
mm
unity
free
lanc
e gu
ide
2020
2020
20
-35-
Twelfth Five Year Plan (2018-2023), Bumthang Dzongkhag
Prog
ram
me A
ctiv
ity a
nd O
utla
y O
utpu
tA
ctiv
ityA
ctiv
ity L
ocat
ion
Indi
cativ
e Pl
an O
utla
y (N
u. in
Mill
ion
)R
emar
ks
1. F
unct
iona
l and
Pro
duct
ive
CSM
Is
esta
blish
ed2.
Gai
nful
jobs
crea
ted
3. A
nnua
l inc
ome
of h
ouse
hold
s in
crea
sed
Dev
elop
ent
repr
eneu
rshi
p, b
usin
ess
and
man
agem
ent c
apac
ity a
nd sk
ills
4 G
ewog
s37
.600
Prov
ision
of c
ritic
al e
quip
men
t and
ot
her i
nput
s for
ent
erpr
ises
4 G
ewog
s3.
000
Dev
elop
and
pro
mot
e pr
oduc
ts fo
r to
urism
dev
elop
men
t4
Gew
ogs
21.5
00
Twelfth Five Year Plan (2018-2023), Bumthang Dzongkhag
-36-
10.
LGK
RA 2
:
Food
and
nut
ritio
n se
curi
ty en
hanc
ed (7
KPI
s)
NK
RA
KPI
Des
crip
tion
Uni
tBa
selin
eTa
rget
Dat
a so
urce
Col
lect
ion
met
hodo
logy
Rem
arks
2. E
cono
mic
di
vers
ity a
nd
prod
uctiv
ity
enha
nced
3.
Pov
erty
er
adic
ated
and
in
equa
lity
redu
ced
8. F
ood
and
nutr
ition
secu
rity
ensu
red
10. G
ende
r eq
ualit
y pr
omot
ed
and
wom
en a
nd
girls
em
pow
ered
14
. hea
lthy
and
carin
g so
ciet
y en
hanc
ed
Milk
pr
oduc
tion
The
indi
cato
r mea
sure
s the
tota
l qu
antit
y of
milk
pro
duce
d by
the
last
yea
r of t
he p
lan
perio
d. Th
e en
d of
FYP
targ
et in
clud
es y
early
in
crem
ent o
f 15
MT
whi
ch a
lso
have
to b
e re
port
ed a
nnua
lly.
MT
2625
2700
Adm
inist
rativ
e D
ata,
D
zong
khag
Li
vest
ock
Sect
or
Ann
ual
hou
seho
ld
Surv
ey
Act
ual r
equi
rem
ent f
or
popu
latio
n of
16,
116
is 10
27M
T an
nual
ly,
how
ever
we
are
targ
etin
g hi
gher
pro
duct
ion
base
on
pro
duct
ion
capa
city
fo
r inc
ome
gene
ratio
n.
Egg
prod
uctio
n Th
e in
dica
tor m
easu
res t
he to
tal
quan
tity
of e
ggs p
rodu
ced
by th
e la
st y
ear o
f the
pla
n pe
riod.
The
end
of F
YP ta
rget
incl
udes
yea
rly
incr
emen
t of 0
.010
M w
hich
also
ha
ve to
be
repo
rted
ann
ually
.
No.
(in
Mill
ion)
1.00
0 (2
017-
18
APA
)
1.05
0A
dmin
istra
tive
Dat
a,
Dzo
ngkh
ag
Live
stoc
k Se
ctor
Ann
ual
hou
seho
ld
Surv
ey
Cur
rent
pro
duct
ion
(0.3
77m
illio
n) c
apac
ity
is fa
r bel
ow o
ur a
ctua
l re
quire
men
t of 2
.4m
eg
gs. h
owev
er, w
e tr
ying
to
incr
ease
pro
duct
ion
by 1
00 p
erce
nt o
ver t
he
base
line
desp
ite c
ultu
ral
draw
back
s
Cer
eal
Prod
uctio
nTh
is w
ill m
easu
re th
e to
tal
quan
tity
of ce
real
(Buc
kwhe
at,
Whe
at
Padd
y, Ba
rley)
pro
duce
d by
the
last
yea
r of t
he p
lan
perio
d. Th
e en
d of
FYP
targ
et in
clud
es y
early
in
crem
ent o
f 30.
48M
Tof t
he
annu
al p
rodu
ctio
n w
hich
also
ha
ve to
be
repo
rted
ann
ually
.
MT
1616
.617
69A
dmin
istra
tive
Dat
a,
Dzo
ngkh
ag
Agr
icul
ture
Se
ctor
Ann
ual
hou
seho
ld
Surv
ey
Buck
whe
at: B
=718
. 3
0T=
790.
00, W
heat
: B=
407.
00,
T=44
8.00
, Pa
ddy:
B=
238.
30, T
=253
.00
Barle
y : B
=253
.00,
T=
278.
00
Vege
tabl
e pr
oduc
tion
This
will
mea
sure
the
tota
l qu
antit
y of
veg
etab
le (C
abba
ge,
Bean
s, C
aulifl
ower
, Bro
ccol
i/G
reen
Veg
etab
le) p
rodu
ced
by
the
last
yea
r of t
he p
lan
perio
d.
The
end
of F
YP ta
rget
incl
udes
ye
arly
incr
emen
t of 6
0.42
M
illio
n of
the
annu
al p
rodu
ctio
n w
hich
also
hav
e to
be
repo
rted
an
nual
ly.
MT
999.
013
02.2
1A
dmin
istra
tive
Dat
a,
Dzo
ngkh
ag
Agr
icul
ture
Se
ctor
Ann
ual
hou
seho
ld
Surv
ey
Are
a un
der
orga
nic
agric
ultu
re
This
indi
cato
r mea
sure
s tot
al
area
und
er o
rgan
ic a
gric
ultu
re
with
out u
se o
f pes
ticid
es,
chem
ical
s, fe
rtili
zers
, gro
wth
ho
rmon
es, i
nste
ad u
sing
orga
nic
and
natu
ral m
anur
es.
Acr
es71
3N
T=10
0,
C=8
13A
dmin
istra
tive
Dat
a,
Dzo
ngkh
ag
Agr
icul
ture
Se
ctor
Ann
ual
hou
seho
ld
Surv
ey
hou
seho
lds
with
kitc
hen
gard
en
havi
ng
at le
ast 3
va
rietie
s of
vege
tabl
es
This
indi
cato
r mea
sure
s the
pe
rcen
tage
of h
ouse
hold
s gr
owin
g at
leas
t thr
ee v
arie
ties o
f ve
geta
ble
at a
ny p
oint
of t
he y
ear
excl
udin
g ch
illie
s.
%60
90A
dmin
istra
tive
Dat
a,
Dzo
ngkh
ag
Agr
icul
ture
Se
ctor
Ann
ual
hou
seho
ld
Surv
ey
Food
re
quire
men
t m
et fr
om
Scho
ol
Agr
icul
ture
Pr
ogra
mm
e (S
AP)
This
indi
cato
r mea
sure
s tot
al
prod
uctio
n of
veg
etab
les,
mea
t, eg
gs, m
ilk b
y sc
hool
s as
a p
erce
ntag
e to
tota
l foo
d re
quire
men
t for
scho
ol fe
edin
g fr
om S
AP
%20
30A
dmin
istra
tive
Dat
a,
Dzo
ngkh
ag
Agr
icul
ture
Se
ctor
Ann
ual
hou
seho
ld
Surv
ey
-37-
Twelfth Five Year Plan (2018-2023), Bumthang Dzongkhag
10.
LGK
RA 2
:
Food
and
nut
ritio
n se
curi
ty en
hanc
ed (7
KPI
s)
NK
RA
KPI
Des
crip
tion
Uni
tBa
selin
eTa
rget
Dat
a so
urce
Col
lect
ion
met
hodo
logy
Rem
arks
2. E
cono
mic
di
vers
ity a
nd
prod
uctiv
ity
enha
nced
3.
Pov
erty
er
adic
ated
and
in
equa
lity
redu
ced
8. F
ood
and
nutr
ition
secu
rity
ensu
red
10. G
ende
r eq
ualit
y pr
omot
ed
and
wom
en a
nd
girls
em
pow
ered
14
. hea
lthy
and
carin
g so
ciet
y en
hanc
ed
Milk
pr
oduc
tion
The
indi
cato
r mea
sure
s the
tota
l qu
antit
y of
milk
pro
duce
d by
the
last
yea
r of t
he p
lan
perio
d. Th
e en
d of
FYP
targ
et in
clud
es y
early
in
crem
ent o
f 15
MT
whi
ch a
lso
have
to b
e re
port
ed a
nnua
lly.
MT
2625
2700
Adm
inist
rativ
e D
ata,
D
zong
khag
Li
vest
ock
Sect
or
Ann
ual
hou
seho
ld
Surv
ey
Act
ual r
equi
rem
ent f
or
popu
latio
n of
16,
116
is 10
27M
T an
nual
ly,
how
ever
we
are
targ
etin
g hi
gher
pro
duct
ion
base
on
pro
duct
ion
capa
city
fo
r inc
ome
gene
ratio
n.
Egg
prod
uctio
n Th
e in
dica
tor m
easu
res t
he to
tal
quan
tity
of e
ggs p
rodu
ced
by th
e la
st y
ear o
f the
pla
n pe
riod.
The
end
of F
YP ta
rget
incl
udes
yea
rly
incr
emen
t of 0
.010
M w
hich
also
ha
ve to
be
repo
rted
ann
ually
.
No.
(in
Mill
ion)
1.00
0 (2
017-
18
APA
)
1.05
0A
dmin
istra
tive
Dat
a,
Dzo
ngkh
ag
Live
stoc
k Se
ctor
Ann
ual
hou
seho
ld
Surv
ey
Cur
rent
pro
duct
ion
(0.3
77m
illio
n) c
apac
ity
is fa
r bel
ow o
ur a
ctua
l re
quire
men
t of 2
.4m
eg
gs. h
owev
er, w
e tr
ying
to
incr
ease
pro
duct
ion
by 1
00 p
erce
nt o
ver t
he
base
line
desp
ite c
ultu
ral
draw
back
s
Cer
eal
Prod
uctio
nTh
is w
ill m
easu
re th
e to
tal
quan
tity
of ce
real
(Buc
kwhe
at,
Whe
at
Padd
y, Ba
rley)
pro
duce
d by
the
last
yea
r of t
he p
lan
perio
d. Th
e en
d of
FYP
targ
et in
clud
es y
early
in
crem
ent o
f 30.
48M
Tof t
he
annu
al p
rodu
ctio
n w
hich
also
ha
ve to
be
repo
rted
ann
ually
.
MT
1616
.617
69A
dmin
istra
tive
Dat
a,
Dzo
ngkh
ag
Agr
icul
ture
Se
ctor
Ann
ual
hou
seho
ld
Surv
ey
Buck
whe
at: B
=718
. 3
0T=
790.
00, W
heat
: B=
407.
00,
T=44
8.00
, Pa
ddy:
B=
238.
30, T
=253
.00
Barle
y : B
=253
.00,
T=
278.
00
Vege
tabl
e pr
oduc
tion
This
will
mea
sure
the
tota
l qu
antit
y of
veg
etab
le (C
abba
ge,
Bean
s, C
aulifl
ower
, Bro
ccol
i/G
reen
Veg
etab
le) p
rodu
ced
by
the
last
yea
r of t
he p
lan
perio
d.
The
end
of F
YP ta
rget
incl
udes
ye
arly
incr
emen
t of 6
0.42
M
illio
n of
the
annu
al p
rodu
ctio
n w
hich
also
hav
e to
be
repo
rted
an
nual
ly.
MT
999.
013
02.2
1A
dmin
istra
tive
Dat
a,
Dzo
ngkh
ag
Agr
icul
ture
Se
ctor
Ann
ual
hou
seho
ld
Surv
ey
Are
a un
der
orga
nic
agric
ultu
re
This
indi
cato
r mea
sure
s tot
al
area
und
er o
rgan
ic a
gric
ultu
re
with
out u
se o
f pes
ticid
es,
chem
ical
s, fe
rtili
zers
, gro
wth
ho
rmon
es, i
nste
ad u
sing
orga
nic
and
natu
ral m
anur
es.
Acr
es71
3N
T=10
0,
C=8
13A
dmin
istra
tive
Dat
a,
Dzo
ngkh
ag
Agr
icul
ture
Se
ctor
Ann
ual
hou
seho
ld
Surv
ey
hou
seho
lds
with
kitc
hen
gard
en
havi
ng
at le
ast 3
va
rietie
s of
vege
tabl
es
This
indi
cato
r mea
sure
s the
pe
rcen
tage
of h
ouse
hold
s gr
owin
g at
leas
t thr
ee v
arie
ties o
f ve
geta
ble
at a
ny p
oint
of t
he y
ear
excl
udin
g ch
illie
s.
%60
90A
dmin
istra
tive
Dat
a,
Dzo
ngkh
ag
Agr
icul
ture
Se
ctor
Ann
ual
hou
seho
ld
Surv
ey
Food
re
quire
men
t m
et fr
om
Scho
ol
Agr
icul
ture
Pr
ogra
mm
e (S
AP)
This
indi
cato
r mea
sure
s tot
al
prod
uctio
n of
veg
etab
les,
mea
t, eg
gs, m
ilk b
y sc
hool
s as
a p
erce
ntag
e to
tota
l foo
d re
quire
men
t for
scho
ol fe
edin
g fr
om S
AP
%20
30A
dmin
istra
tive
Dat
a,
Dzo
ngkh
ag
Agr
icul
ture
Se
ctor
Ann
ual
hou
seho
ld
Surv
ey
Twelfth Five Year Plan (2018-2023), Bumthang Dzongkhag
-38-
10.1. Programme summary and strategy
Programme Title: Food production and food sufficiency
Objective: To enhance food and nutrition security
Collaborating Agency/ies: MoAF/RNR-RDC/MoE/Moh
Program Strategies:As per the GNh Survey 2015, 80 percent of the population is engaged in ag-riculture, horticulture and livestock sector for livelihood. however, only 25 percent of the total income comes from these sectors. The Dzongkhag has a total of 4,068 acres of fallow land, although the GNh Survey, 2015 shows that the Dzongkhag has the highest landholdings of 539 acres.
As per the Dzongkhag agriculture statistics, around 3 percent of households were impacted by natural calamities such as hailstorm, pest and erratic rain-fall, which led to declining production.
In the 12th Five Year Plan, the Dzongkhag will focus on enhancing food and nutrition security through increasing of RNR productivity by farm mech-anization, value addition, use of improved technologies and high yielding and climate resilient crop varieties, establishing storage facilities and capacity building of farmers. This will help to reduce food crop insufficiency and reli-ance on imports.
The Dzongkhag will implement the following strategies:
1. Reclaim at least 1000 acres of fallow land into cultivable land and use for crop production;
2. Focus on farm mechanization through youth cooperative farming;
3. Implement differentiated program approaches towards subsistence and commercialization production;
4. Strengthen market information network and facilities;
-39-
Twelfth Five Year Plan (2018-2023), Bumthang Dzongkhag
5. Focus on product diversification and value addition;
6. Construct infrastructure including storage facilities, e-fencing and adopt high yielding and climate resilient crop varieties seeds and seed-lings;
7. Strengthen farmer’s groups and cooperatives;
8. Facilitate certification arrangements, identify markets and market linkages for organic products
9. Provide machinery support to ease labor shortage and also electric fencing support to mitigate human wildlife conflict and;
10. Focus and support increased intake of food variety and nutrition in schools and for children who are not in schools on the same. For that priority will be to diversify diet and grow different types of vegetables and fruits in the kitchen gardens or backyard farms in schools and at the household’s level. Demonstration for the selected households will be carried out and actu-al handholding technical support will be provided during establishment of kitchen gardens and backyard farms. Awareness and education will be provided to the parents on the importance of nutritional and varied food intake and requirements.
Twelfth Five Year Plan (2018-2023), Bumthang Dzongkhag
-40-
10.2
. Pro
gram
meO
utpu
t Mat
rix
10.2
.1. D
zong
khag
Prog
ram
me O
utpu
t ind
icat
ors a
nd ta
rget
sO
utco
me
Out
put
Wei
ght
Out
put I
ndic
ator
Uni
tW
eigh
tBa
selin
e (B
ase
Year
) P
lan
Targ
et
Food
and
nu
triti
on
secu
rity
enha
nced
Cer
eal
prod
uctio
n in
crea
sed
30Bu
ckw
heat
pro
duct
ion
MT
571
8.30
790.
00
Whe
at p
rodu
ctio
n M
T6
407.
0044
8.00
Padd
y pr
oduc
tion
MT
423
8.30
253.
00
Barle
y pr
oduc
tion
MT
525
0.00
278.
00Q
uino
a pr
oduc
tion
Kg
30
2000
.00
Prop
ortio
n of
pad
dy fi
eld
acce
ss to
ass
ured
irrig
atio
n w
ater
Acr
e3
8095
Are
a of
agr
icul
ture
land
left
fallo
w
Acr
e4
4068
3068
Cas
h cr
op
prod
uctio
n in
crea
sed
20M
usta
rd p
rodu
ctio
n M
T2
1015
Pota
to p
rodu
ctio
n M
T3
5492
.00
6390
.00
Mus
hroo
m p
rodu
ctio
n (O
yest
er)
MT
10.
000.
4Ve
geta
ble
Prod
uctio
n M
T5
1005
.00
1302
.21
Are
a un
der O
rgan
ic fa
rmin
g A
cre
271
381
3
Frui
ts a
nd n
uts p
rodu
ctio
n M
T2
103
149
Prop
ortio
n of
veg
etab
le re
quire
men
t met
from
SA
P fo
r sch
ool f
eedi
ng m
aint
aine
d/ in
crea
sed
Perc
ent
220
30
Perc
enta
ge o
f rur
al h
ouse
hold
s with
kitc
hen
gard
en
havi
ng at
leas
t 3 v
arie
ties o
f veg
etab
les
Perc
ent
360
90
Live
stoc
k pr
oduc
tion
incr
ease
d
20M
ilk p
rodu
ctio
n M
T5
2625
2700
Butte
r pro
duct
ion
MT
297
100
Che
ese
prod
uctio
n M
T2
205
225
Egg
prod
uctio
n N
o. (i
n M
illio
n)3
1.00
01.
050
hon
ey p
rodu
ctio
n M
T4
21.9
924
.20
Supp
ly o
f bre
edin
g bu
lls a
nd ra
ms
No
234
51Im
prov
ed P
astu
re av
aila
ble
Acr
e2
5484
.44
1500
Func
tiona
l RN
R in
fra-
stru
ctur
e de
velo
ped
30N
o. o
f RN
R in
fras
truc
ture
cons
truc
ted
No.
24
NT=
5
No.
of R
NR
infr
astr
uctu
re m
aint
aine
d/re
nova
ted
No
45
NT=
8Le
ngth
of e
lect
ric fe
ncin
g co
nstr
ucte
d K
m5
174.
2N
=500
Le
ngth
of i
rrig
atio
n ch
anne
l con
stru
cted
Km
220
N=4
.5N
o. o
f irr
igat
ion
chan
nel c
onst
ruct
ed
No.
315
N=5
Leng
th o
f irr
igat
ion
chan
nel r
enov
ated
Km
. 2
3.5
N=2
5.7
No.
of i
rrig
atio
n ch
anne
l ren
ovat
edN
o.2
5N
=21
No.
of F
R co
nstr
ucte
dN
o.6
69N
=34
Leng
th o
f FR
cons
truc
ted
Km
218
2.29
N=3
5.5
Leng
th o
f FR
reno
vate
dN
o2
108
N=6
8.4
-41-
Twelfth Five Year Plan (2018-2023), Bumthang Dzongkhag
10.2
. Pro
gram
meO
utpu
t Mat
rix
10.2
.1. D
zong
khag
Prog
ram
me O
utpu
t ind
icat
ors a
nd ta
rget
sO
utco
me
Out
put
Wei
ght
Out
put I
ndic
ator
Uni
tW
eigh
tBa
selin
e (B
ase
Year
) P
lan
Targ
et
Food
and
nu
triti
on
secu
rity
enha
nced
Cer
eal
prod
uctio
n in
crea
sed
30Bu
ckw
heat
pro
duct
ion
MT
571
8.30
790.
00
Whe
at p
rodu
ctio
n M
T6
407.
0044
8.00
Padd
y pr
oduc
tion
MT
423
8.30
253.
00
Barle
y pr
oduc
tion
MT
525
0.00
278.
00Q
uino
a pr
oduc
tion
Kg
30
2000
.00
Prop
ortio
n of
pad
dy fi
eld
acce
ss to
ass
ured
irrig
atio
n w
ater
Acr
e3
8095
Are
a of
agr
icul
ture
land
left
fallo
w
Acr
e4
4068
3068
Cas
h cr
op
prod
uctio
n in
crea
sed
20M
usta
rd p
rodu
ctio
n M
T2
1015
Pota
to p
rodu
ctio
n M
T3
5492
.00
6390
.00
Mus
hroo
m p
rodu
ctio
n (O
yest
er)
MT
10.
000.
4Ve
geta
ble
Prod
uctio
n M
T5
1005
.00
1302
.21
Are
a un
der O
rgan
ic fa
rmin
g A
cre
271
381
3
Frui
ts a
nd n
uts p
rodu
ctio
n M
T2
103
149
Prop
ortio
n of
veg
etab
le re
quire
men
t met
from
SA
P fo
r sch
ool f
eedi
ng m
aint
aine
d/ in
crea
sed
Perc
ent
220
30
Perc
enta
ge o
f rur
al h
ouse
hold
s with
kitc
hen
gard
en
havi
ng at
leas
t 3 v
arie
ties o
f veg
etab
les
Perc
ent
360
90
Live
stoc
k pr
oduc
tion
incr
ease
d
20M
ilk p
rodu
ctio
n M
T5
2625
2700
Butte
r pro
duct
ion
MT
297
100
Che
ese
prod
uctio
n M
T2
205
225
Egg
prod
uctio
n N
o. (i
n M
illio
n)3
1.00
01.
050
hon
ey p
rodu
ctio
n M
T4
21.9
924
.20
Supp
ly o
f bre
edin
g bu
lls a
nd ra
ms
No
234
51Im
prov
ed P
astu
re av
aila
ble
Acr
e2
5484
.44
1500
Func
tiona
l RN
R in
fra-
stru
ctur
e de
velo
ped
30N
o. o
f RN
R in
fras
truc
ture
cons
truc
ted
No.
24
NT=
5
No.
of R
NR
infr
astr
uctu
re m
aint
aine
d/re
nova
ted
No
45
NT=
8Le
ngth
of e
lect
ric fe
ncin
g co
nstr
ucte
d K
m5
174.
2N
=500
Le
ngth
of i
rrig
atio
n ch
anne
l con
stru
cted
Km
220
N=4
.5N
o. o
f irr
igat
ion
chan
nel c
onst
ruct
ed
No.
315
N=5
Leng
th o
f irr
igat
ion
chan
nel r
enov
ated
Km
. 2
3.5
N=2
5.7
No.
of i
rrig
atio
n ch
anne
l ren
ovat
edN
o.2
5N
=21
No.
of F
R co
nstr
ucte
dN
o.6
69N
=34
Leng
th o
f FR
cons
truc
ted
Km
218
2.29
N=3
5.5
Leng
th o
f FR
reno
vate
dN
o2
108
N=6
8.4
Twelfth Five Year Plan (2018-2023), Bumthang Dzongkhag
-42-
Proj
ecte
d An
nual
Tar
get
Sl.N
oIn
dica
tor
Proj
ecte
d A
nnua
l Tar
get
FY 201
8-20
19FY
20
19-2
020
FY
020-
2021
FY 2021
-202
2FY
20
22-2
023
1Bu
ck w
heat
pro
duct
ion
733.
0074
7.00
761.
0077
6.00
790.
002
Whe
at p
rodu
ctio
n 41
5.00
423.
0043
1.00
440.
0044
8.00
3Pa
ddy
prod
uctio
n 24
1.00
244.
0024
7.00
250.
0025
3.00
4Ba
rley
prod
uctio
n 25
8.00
263.
0026
8.00
273.
0027
8.00
5Pr
opor
tion
of p
addy
fiel
d ac
cess
to a
ssur
ed ir
rigat
ion
wat
er65
7080
9095
6A
rea
of a
gric
ultu
re la
nd le
ft fa
llow
38
6836
834
6832
6830
687
Mus
tard
pro
duct
ion
1112
1314
158
Pota
to p
rodu
ctio
n 56
72.0
058
51.0
060
31.0
062
10.0
063
90.0
09
Vege
tabl
e Pr
oduc
tion
1061
.80
1121
.90
1182
.01
1242
.11
1302
.21
10A
rea
unde
r Org
anic
farm
ing
720
760
800
810
813
11Fr
uits
and
nut
s pro
duct
ion
120
130
140
140
149
12Pr
opor
tion
of v
eget
able
requ
irem
ent m
et fr
om S
AP
for
scho
ol fe
edin
g m
aint
aine
d/ in
crea
sed
2022
2428
30
13Pe
rcen
tage
of r
ural
hou
seho
lds w
ith k
itche
n ga
rden
hav
ing
at le
ast 3
var
ietie
s of v
eget
able
s75
8085
9090
14M
ilk p
rodu
ctio
n 26
3826
5326
6926
8427
0015
Butte
r pro
duct
ion
9798
9899
100
16C
hees
e pr
oduc
tion
210
213
217
220
225
17Eg
g pr
oduc
tion
1.01
1.02
1.03
1.04
1.05
18h
oney
pro
duct
ion
22.2
022
.50
23.0
023
.50
24.2
019
Supp
ly o
f bre
edin
g bu
lls a
nd ra
ms
810
1215
6
20Im
prov
ed P
astu
re av
aila
ble
300
300
300
300
300
21N
o. o
f RN
R in
fras
truc
ture
cons
truc
ted
11
21
022
No.
of R
NR
infr
astr
uctu
re m
aint
aine
d/re
nova
ted
20
22
223
Leng
th o
f ele
ctric
fenc
ing
cons
truc
ted
2013
814
715
540
24Le
ngth
of i
rrig
atio
n ch
anne
l con
stru
cted
02
2.5
00
25N
o. o
f irr
igat
ion
chan
nel c
onst
ruct
ed
02
30
026
Leng
th o
f irr
igat
ion
chan
nel r
enov
ated
3
6.2
66
4.5
27N
o. o
f irr
igat
ion
chan
nel r
enov
ated
35
55
328
No.
of F
R co
nstr
ucte
d1
912
84
29Le
ngth
of F
R co
nstr
ucte
d2
913
74.
530
Leng
th o
f FR
reno
vate
d8
1518
1710
.431
Qui
noa
prod
uctio
n 41
6.00
812.
0012
08.0
016
04.0
020
00.0
032
Mus
hroo
m p
rodu
ctio
n (O
yest
er)
00
0.2
0.3
0.4
Prog
ram
me A
ctiv
ity a
nd O
utla
y O
utpu
tA
ctiv
ityA
ctiv
ity L
ocat
ion
Indi
cativ
e Pl
an O
utla
y (N
u. in
Mill
ion
)R
emar
ks
1.C
erea
l pro
duct
ion
incr
ease
d 2.
Cas
h cr
op p
rodu
ctio
n in
crea
sed
3.Li
vest
ock
prod
uctio
n in
crea
sed
4.Fu
nctio
nal R
NR
infr
astr
uctu
re d
evel
oped
Cap
acity
bui
ldin
g A
ll G
ewog
s2.
000
Inpu
t sup
plie
sA
ll G
ewog
s56
.950
Infr
astr
uctu
re D
evel
opm
ent
All
Gew
ogs
24.8
00
-43-
Twelfth Five Year Plan (2018-2023), Bumthang Dzongkhag
Proj
ecte
d An
nual
Tar
get
Sl.N
oIn
dica
tor
Proj
ecte
d A
nnua
l Tar
get
FY 201
8-20
19FY
20
19-2
020
FY
020-
2021
FY 2021
-202
2FY
20
22-2
023
1Bu
ck w
heat
pro
duct
ion
733.
0074
7.00
761.
0077
6.00
790.
002
Whe
at p
rodu
ctio
n 41
5.00
423.
0043
1.00
440.
0044
8.00
3Pa
ddy
prod
uctio
n 24
1.00
244.
0024
7.00
250.
0025
3.00
4Ba
rley
prod
uctio
n 25
8.00
263.
0026
8.00
273.
0027
8.00
5Pr
opor
tion
of p
addy
fiel
d ac
cess
to a
ssur
ed ir
rigat
ion
wat
er65
7080
9095
6A
rea
of a
gric
ultu
re la
nd le
ft fa
llow
38
6836
834
6832
6830
687
Mus
tard
pro
duct
ion
1112
1314
158
Pota
to p
rodu
ctio
n 56
72.0
058
51.0
060
31.0
062
10.0
063
90.0
09
Vege
tabl
e Pr
oduc
tion
1061
.80
1121
.90
1182
.01
1242
.11
1302
.21
10A
rea
unde
r Org
anic
farm
ing
720
760
800
810
813
11Fr
uits
and
nut
s pro
duct
ion
120
130
140
140
149
12Pr
opor
tion
of v
eget
able
requ
irem
ent m
et fr
om S
AP
for
scho
ol fe
edin
g m
aint
aine
d/ in
crea
sed
2022
2428
30
13Pe
rcen
tage
of r
ural
hou
seho
lds w
ith k
itche
n ga
rden
hav
ing
at le
ast 3
var
ietie
s of v
eget
able
s75
8085
9090
14M
ilk p
rodu
ctio
n 26
3826
5326
6926
8427
0015
Butte
r pro
duct
ion
9798
9899
100
16C
hees
e pr
oduc
tion
210
213
217
220
225
17Eg
g pr
oduc
tion
1.01
1.02
1.03
1.04
1.05
18h
oney
pro
duct
ion
22.2
022
.50
23.0
023
.50
24.2
019
Supp
ly o
f bre
edin
g bu
lls a
nd ra
ms
810
1215
6
20Im
prov
ed P
astu
re av
aila
ble
300
300
300
300
300
21N
o. o
f RN
R in
fras
truc
ture
cons
truc
ted
11
21
022
No.
of R
NR
infr
astr
uctu
re m
aint
aine
d/re
nova
ted
20
22
223
Leng
th o
f ele
ctric
fenc
ing
cons
truc
ted
2013
814
715
540
24Le
ngth
of i
rrig
atio
n ch
anne
l con
stru
cted
02
2.5
00
25N
o. o
f irr
igat
ion
chan
nel c
onst
ruct
ed
02
30
026
Leng
th o
f irr
igat
ion
chan
nel r
enov
ated
3
6.2
66
4.5
27N
o. o
f irr
igat
ion
chan
nel r
enov
ated
35
55
328
No.
of F
R co
nstr
ucte
d1
912
84
29Le
ngth
of F
R co
nstr
ucte
d2
913
74.
530
Leng
th o
f FR
reno
vate
d8
1518
1710
.431
Qui
noa
prod
uctio
n 41
6.00
812.
0012
08.0
016
04.0
020
00.0
032
Mus
hroo
m p
rodu
ctio
n (O
yest
er)
00
0.2
0.3
0.4
Prog
ram
me A
ctiv
ity a
nd O
utla
y O
utpu
tA
ctiv
ityA
ctiv
ity L
ocat
ion
Indi
cativ
e Pl
an O
utla
y (N
u. in
Mill
ion
)R
emar
ks
1.C
erea
l pro
duct
ion
incr
ease
d 2.
Cas
h cr
op p
rodu
ctio
n in
crea
sed
3.Li
vest
ock
prod
uctio
n in
crea
sed
4.Fu
nctio
nal R
NR
infr
astr
uctu
re d
evel
oped
Cap
acity
bui
ldin
g A
ll G
ewog
s2.
000
Inpu
t sup
plie
sA
ll G
ewog
s56
.950
Infr
astr
uctu
re D
evel
opm
ent
All
Gew
ogs
24.8
00
Twelfth Five Year Plan (2018-2023), Bumthang Dzongkhag
-44-
10.2
.2. G
ewog
Chh
oekh
or G
ewog
Prog
ram
me o
utpu
t ind
icat
ors a
nd ta
rget
s O
utco
me
Out
put
Wei
ght
Out
put I
ndic
ator
Uni
tW
eigh
tBa
selin
e (B
ase
Year
) P
lan
Targ
et
Food
and
N
utrit
ion
Secu
rity
enha
nced
Cer
eal c
rop
prod
uctio
n
incr
ease
d
23Bu
ck w
heat
pro
duct
ion
MT
514
3.66
158.
00W
heat
pro
duct
ion
MT
611
8.03
129.
92
Padd
y pr
oduc
tion
MT
518
8.26
199.
87Q
uino
a pr
oduc
tion
Kg
20
600.
00Ba
rley
prod
uctio
n M
T5
62.5
69.5
Cas
h cr
op
prod
uctio
n in
crea
sed
24M
usta
rd p
rodu
ctio
n M
T3
34.
5Po
tato
pro
duct
ion
MT
712
08.2
414
05.8
0Ve
geta
ble
Prod
uctio
n M
T9
442.
2062
5.06
Mus
hroo
m p
rodu
ctio
n (O
yest
er)
MT
20
0.1
Frui
ts a
nd n
uts
MT
343
.26
62.5
8Li
vest
ock
prod
uctio
n in
crea
sed
18M
ilk p
rodu
ctio
nM
T9
984
995
Egg
prod
uctio
nN
o. (i
n M
illio
n)5
0.14
90.
600
hon
ey p
rodu
ctio
n M
T4
20.3
821
.5
Func
tiona
l ag
ricul
ture
an
d liv
esto
ck
infr
astr
uctu
re
deve
lope
d
35Le
ngth
of I
rrig
atio
n ch
anne
l mai
ntai
ned
Km
2
3.5
NT=
15
No.
of i
rrig
atio
n ch
anne
l mai
ntai
ned
No.
65
NT=
8
Leng
th o
f far
m ro
ad co
nstr
ucte
dK
m
370
.02
NT=
7N
o. o
f far
m ro
ad co
nstr
ucte
dN
o.10
20N
T=5
Leng
th o
f far
m ro
ad m
aint
aine
dK
m3
13N
T=25
Leng
th o
f ele
ctric
fenc
ing
cons
truc
ted
Km
1157
.59
154.
5
-45-
Twelfth Five Year Plan (2018-2023), Bumthang Dzongkhag
10.2
.2. G
ewog
Chh
oekh
or G
ewog
Prog
ram
me o
utpu
t ind
icat
ors a
nd ta
rget
s O
utco
me
Out
put
Wei
ght
Out
put I
ndic
ator
Uni
tW
eigh
tBa
selin
e (B
ase
Year
) P
lan
Targ
et
Food
and
N
utrit
ion
Secu
rity
enha
nced
Cer
eal c
rop
prod
uctio
n
incr
ease
d
23Bu
ck w
heat
pro
duct
ion
MT
514
3.66
158.
00W
heat
pro
duct
ion
MT
611
8.03
129.
92
Padd
y pr
oduc
tion
MT
518
8.26
199.
87Q
uino
a pr
oduc
tion
Kg
20
600.
00Ba
rley
prod
uctio
n M
T5
62.5
69.5
Cas
h cr
op
prod
uctio
n in
crea
sed
24M
usta
rd p
rodu
ctio
n M
T3
34.
5Po
tato
pro
duct
ion
MT
712
08.2
414
05.8
0Ve
geta
ble
Prod
uctio
n M
T9
442.
2062
5.06
Mus
hroo
m p
rodu
ctio
n (O
yest
er)
MT
20
0.1
Frui
ts a
nd n
uts
MT
343
.26
62.5
8Li
vest
ock
prod
uctio
n in
crea
sed
18M
ilk p
rodu
ctio
nM
T9
984
995
Egg
prod
uctio
nN
o. (i
n M
illio
n)5
0.14
90.
600
hon
ey p
rodu
ctio
n M
T4
20.3
821
.5
Func
tiona
l ag
ricul
ture
an
d liv
esto
ck
infr
astr
uctu
re
deve
lope
d
35Le
ngth
of I
rrig
atio
n ch
anne
l mai
ntai
ned
Km
2
3.5
NT=
15
No.
of i
rrig
atio
n ch
anne
l mai
ntai
ned
No.
65
NT=
8
Leng
th o
f far
m ro
ad co
nstr
ucte
dK
m
370
.02
NT=
7N
o. o
f far
m ro
ad co
nstr
ucte
dN
o.10
20N
T=5
Leng
th o
f far
m ro
ad m
aint
aine
dK
m3
13N
T=25
Leng
th o
f ele
ctric
fenc
ing
cons
truc
ted
Km
1157
.59
154.
5
Twelfth Five Year Plan (2018-2023), Bumthang Dzongkhag
-46-
Proj
ecte
d An
nual
Tar
get
Sl.
No
Indi
cato
rPr
ojec
ted
Ann
ual T
arge
tFY
20
18-2
019
FY
2019
-202
0FY
20
20-2
021
FY
2021
-202
2FY
20
22-2
023
1Bu
ck w
heat
pro
duct
ion
146.
6014
9.40
152.
2015
5.20
158.
002
Whe
at p
rodu
ctio
n 12
0.35
122.
6712
4.99
127.
6012
9.92
3Pa
ddy
prod
uctio
n 19
0.39
192.
7619
5.13
197.
5019
9.87
4Ba
rley
prod
uctio
n 64
.50
65.7
567
.00
68.2
569
.50
5M
usta
rd p
rodu
ctio
n 3.
303.
603.
904.
204.
506
Pota
to p
rodu
ctio
n 12
47.8
412
87.2
213
26.8
213
66.2
014
05.8
07
Vege
tabl
e Pr
oduc
tion
509.
6653
8.51
567.
3659
6.21
625.
068
Frui
ts a
nd n
uts p
rodu
ctio
n 50
.454
.658
.858
.862
.58
9M
ilk p
rodu
ctio
n 98
698
899
099
299
510
Egg
prod
uctio
n 0.
599
0.60
00.
600
0.60
00.
600
11h
oney
pro
duct
ion
2121
2121
.521
.512
Leng
th o
f Irr
igat
ion
chan
nel m
aint
aine
d3
43
32
13N
o. o
f irr
igat
ion
chan
nel m
aint
aine
d 1
22
21
14Le
ngth
of f
arm
road
cons
truc
ted
22
30
015
No.
of f
arm
road
cons
truc
ted
12
20
016
Leng
th o
f far
m ro
ad m
aint
aine
d3
57
73
17Le
ngth
of e
lect
ric fe
ncin
g co
nstr
ucte
d 6.
1842
.64
45.4
47.9
12.4
18Q
uino
a pr
oduc
tion
124.
8024
3.60
362.
4048
1.20
600.
0019
Mus
hroo
m p
rodu
ctio
n (O
yest
er)
0.02
0.04
0.06
0.08
0.1
-47-
Twelfth Five Year Plan (2018-2023), Bumthang Dzongkhag
Prog
ram
me A
ctiv
ity a
nd O
utla
yO
utpu
tA
ctiv
ityA
ctiv
ity L
ocat
ion
Indi
cativ
e Pl
an O
utla
y (N
u. in
Mill
ion)
Rem
arks
1.C
erea
l cro
p pr
oduc
tion
incr
ease
d2.
Cas
h cr
op p
rodu
ctio
n in
crea
sed
3.Li
vest
ock
prod
uctio
n in
crea
sed
4.Fu
nctio
nal a
gric
ultu
re a
nd li
vest
ock
infr
astr
uctu
re d
evel
oped
Cap
acity
bui
ldin
g A
ll C
hiw
ogs
2.05
0
Infr
astr
uctu
re D
evel
opm
ent
All
Chi
wog
s32
.380
Inpu
t sup
ply
All
Chi
wog
s1.
110
Twelfth Five Year Plan (2018-2023), Bumthang Dzongkhag
-48-
Chh
umig
Gew
og
Prog
ram
me o
utpu
t ind
icat
ors a
nd ta
rget
s O
utco
me
Out
put
Wei
ght
Out
put I
ndic
ator
Uni
tW
eigh
tBa
selin
e (B
ase
Year
) P
lan
Targ
et
Food
and
N
utrit
ion
Secu
rity
enha
nced
Cer
eal c
rop
prod
uctio
n in
crea
sed
25Bu
ck w
heat
pro
duct
ion
MT
1114
3.66
158.
00W
heat
pro
duct
ion
MT
785
.47
94.0
8Q
uino
a pr
oduc
tion
Kg
20
600.
00Ba
rley
prod
uctio
n M
T8
57.5
63.9
4C
ash
crop
pr
oduc
tion
incr
ease
d
22M
usta
rd p
rodu
ctio
n M
T3
2.5
3.75
Pota
to p
rodu
ctio
n M
T7
1043
.48
1214
.10
Vege
tabl
e Pr
oduc
tion
MT
818
0.9
234.
4M
ushr
oom
pro
duct
ion
(Oye
ster
)M
T2
00.
1Fr
uits
and
nut
s pro
duct
ion
MT
224
.72
35.7
6Li
vest
ock
prod
uctio
n in
crea
sed
18M
ilk p
rodu
ctio
n M
T7
551
565
Egg
prod
uctio
n N
o. (i
n M
illio
n)5
0.05
00.
070
hon
ey p
rodu
ctio
n M
T6
0.8
1.50
Func
tiona
l ag
ricul
ture
an
d liv
esto
ck
infr
astr
uctu
re
deve
lope
d
35Le
ngth
of f
arm
road
cons
truc
ted
Km
339
.66
NT=
11.5
No.
of f
arm
road
cons
truc
ted
No.
914
NT=
14Le
ngth
of f
arm
road
mai
ntai
ned
Km
312
.8N
T=20
.4N
o. o
f far
m ro
ad m
aint
aine
dN
o.11
8N
T=17
Leng
th o
f ele
ctric
fenc
ing
cons
truc
ted
Km
1049
.596
.5
Proj
ecte
d An
nual
Tar
get
-49-
Twelfth Five Year Plan (2018-2023), Bumthang Dzongkhag
Sl.
No
Indi
cato
rPr
ojec
ted
Ann
ual T
arge
tFY 2
018-
2019
FY
2019
-202
0FY 2
020-
2021
FY
2021
-202
2FY 2
022-
2023
1Bu
ck w
heat
pro
duct
ion
146.
6014
9.40
152.
2015
5.20
158.
02
Whe
at p
rodu
ctio
n 87
.15
88.8
390
.51
92.4
094
.08
3Ba
rley
prod
uctio
n 59
.34
60.4
961
.64
62.7
963
.94
4M
usta
rd p
rodu
ctio
n 2.
753.
003.
253.
503.
755
Pota
to p
rodu
ctio
n 10
77.6
811
11.6
911
45.8
911
79.9
012
14.1
06
Vege
tabl
e Pr
oduc
tion
191.
1220
1.94
212.
7622
3.58
234.
407
Frui
ts a
nd n
uts p
rodu
ctio
n 28
.831
.233
.633
.635
.76
8M
ilk p
rodu
ctio
n 55
355
655
856
256
59
Egg
prod
uctio
n 0.
050
0.05
40.
063
0.06
50.
070
10h
oney
pro
duct
ion
0.8
0.9
0.9
0.9
1.5
11Le
ngth
of f
arm
road
cons
truc
ted
03
43
1.5
12N
o. o
f far
m ro
ad co
nstr
ucte
d0
35
42
13Le
ngth
of f
arm
road
mai
ntai
ned
35
55
2.4
14N
o. o
f far
m ro
ad m
aint
aine
d 2
44
52
15Le
ngth
of e
lect
ric fe
ncin
g co
nstr
ucte
d 3.
8626
.63
28.4
29.9
27.
7216
Qui
noa
prod
uctio
n 12
4.00
243.
6036
2.40
481.
2060
0.00
17M
ushr
oom
pro
duct
ion
(Oys
ter)
0.02
0.04
0.06
0.08
0.1
18
No.
of g
roup
form
ed
12
33
119
No.
of p
oly
hous
e su
pplie
d -
33
3-
20N
o. o
f flou
r mea
l set
supp
lied
--
22
-
Twelfth Five Year Plan (2018-2023), Bumthang Dzongkhag
-50-
Prog
ram
me A
ctiv
ity a
nd O
utla
y:O
utpu
tA
ctiv
ityA
ctiv
ity L
ocat
ion
Indi
cativ
e Pl
an O
utla
y (N
u. in
Mill
ion)
Rem
arks
1.C
erea
l cro
p pr
oduc
tion
incr
ease
d2.
Cas
h cr
op p
rodu
ctio
n in
crea
sed
3.Li
vest
ock
prod
uctio
n in
crea
sed
4.Fu
nctio
nal
agric
ultu
re a
nd l
ives
tock
in
fras
truc
ture
dev
elop
ed
Cap
acity
bui
ldin
g A
ll C
hiw
ogs
0.60
0In
fras
truc
ture
Dev
elop
men
tA
ll C
hiw
ogs
20.2
90In
put s
uppl
yA
ll C
hiw
ogs
7.49
0
Tang
Gew
og
Prog
ram
me o
utpu
t ind
icat
ors a
nd ta
rget
s O
utco
me
Out
put
Wei
ght
Out
put I
ndic
ator
Uni
tW
eigh
tBa
selin
e (B
ase
Year
) P
lan
Targ
et
Food
and
N
utrit
ion
Secu
rity
enha
nced
Cer
eal c
rop
prod
uctio
n in
crea
sed
20Bu
ck w
heat
pro
duct
ion
MT
524
4.22
268.
60
Whe
at p
rodu
ctio
n M
T5
89.5
498
.56
Padd
y pr
oduc
tion
MT
450
.04
53.1
3Q
uino
a pr
oduc
tion
Kg
20
400.
00Ba
rley
prod
uctio
n M
T4
57.5
063
.94
Cas
h cr
op
prod
uctio
n in
crea
sed
18M
usta
rd p
rodu
ctio
n M
T2
34.
5Po
tato
pro
duct
ion
MT
617
02.5
219
80.9
0Ve
geta
ble
Prod
uctio
n M
T6
102.
0026
0.44
Mus
hroo
m p
rodu
ctio
n (O
yste
r )M
T2
00.
1Fr
uits
and
nut
s pro
duct
ion
MT
224
.72
35.7
6
Live
stoc
k pr
oduc
tion
incr
ease
d
22M
ilk p
rodu
ctio
n M
T10
485
515
Egg
prod
uctio
n N
o. (i
n M
illio
n)6
0.14
90.
310
hon
ey p
rodu
ctio
n M
T6
0.15
00.
60Fu
nctio
nal
agric
ultu
re
and
lives
tock
in
fras
truc
ture
de
velo
ped
40Le
ngth
of I
rrig
atio
n ch
anne
l con
stru
cted
Km
244
.6N
T=4.
5N
o. o
f irr
igat
ion
chan
nel c
onst
ruct
edN
o.4
20N
T=5
Leng
th o
f Irr
igat
ion
chan
nel m
aint
aine
dK
m2
-10
.5N
o. o
f irr
igat
ion
chan
nel m
aint
aine
d N
o.6
-12
Leng
th o
f far
m ro
ad co
nstr
ucte
dK
m2
37.6
4N
o. o
f far
m ro
ad co
nstr
ucte
dN
o.7
215
Leng
th o
f far
m ro
ad m
aint
aine
dK
m2
22.8
13N
o. o
f far
m ro
ad m
aint
aine
d N
o.7
2812
Leng
th o
f ele
ctric
fenc
ing
cons
truc
ted
Km
829
.67
121.
5
-51-
Twelfth Five Year Plan (2018-2023), Bumthang Dzongkhag
Prog
ram
me A
ctiv
ity a
nd O
utla
y:O
utpu
tA
ctiv
ityA
ctiv
ity L
ocat
ion
Indi
cativ
e Pl
an O
utla
y (N
u. in
Mill
ion)
Rem
arks
1.C
erea
l cro
p pr
oduc
tion
incr
ease
d2.
Cas
h cr
op p
rodu
ctio
n in
crea
sed
3.Li
vest
ock
prod
uctio
n in
crea
sed
4.Fu
nctio
nal
agric
ultu
re a
nd l
ives
tock
in
fras
truc
ture
dev
elop
ed
Cap
acity
bui
ldin
g A
ll C
hiw
ogs
0.60
0In
fras
truc
ture
Dev
elop
men
tA
ll C
hiw
ogs
20.2
90In
put s
uppl
yA
ll C
hiw
ogs
7.49
0
Tang
Gew
og
Prog
ram
me o
utpu
t ind
icat
ors a
nd ta
rget
s O
utco
me
Out
put
Wei
ght
Out
put I
ndic
ator
Uni
tW
eigh
tBa
selin
e (B
ase
Year
) P
lan
Targ
et
Food
and
N
utrit
ion
Secu
rity
enha
nced
Cer
eal c
rop
prod
uctio
n in
crea
sed
20Bu
ck w
heat
pro
duct
ion
MT
524
4.22
268.
60
Whe
at p
rodu
ctio
n M
T5
89.5
498
.56
Padd
y pr
oduc
tion
MT
450
.04
53.1
3Q
uino
a pr
oduc
tion
Kg
20
400.
00Ba
rley
prod
uctio
n M
T4
57.5
063
.94
Cas
h cr
op
prod
uctio
n in
crea
sed
18M
usta
rd p
rodu
ctio
n M
T2
34.
5Po
tato
pro
duct
ion
MT
617
02.5
219
80.9
0Ve
geta
ble
Prod
uctio
n M
T6
102.
0026
0.44
Mus
hroo
m p
rodu
ctio
n (O
yste
r )M
T2
00.
1Fr
uits
and
nut
s pro
duct
ion
MT
224
.72
35.7
6
Live
stoc
k pr
oduc
tion
incr
ease
d
22M
ilk p
rodu
ctio
n M
T10
485
515
Egg
prod
uctio
n N
o. (i
n M
illio
n)6
0.14
90.
310
hon
ey p
rodu
ctio
n M
T6
0.15
00.
60Fu
nctio
nal
agric
ultu
re
and
lives
tock
in
fras
truc
ture
de
velo
ped
40Le
ngth
of I
rrig
atio
n ch
anne
l con
stru
cted
Km
244
.6N
T=4.
5N
o. o
f irr
igat
ion
chan
nel c
onst
ruct
edN
o.4
20N
T=5
Leng
th o
f Irr
igat
ion
chan
nel m
aint
aine
dK
m2
-10
.5N
o. o
f irr
igat
ion
chan
nel m
aint
aine
d N
o.6
-12
Leng
th o
f far
m ro
ad co
nstr
ucte
dK
m2
37.6
4N
o. o
f far
m ro
ad co
nstr
ucte
dN
o.7
215
Leng
th o
f far
m ro
ad m
aint
aine
dK
m2
22.8
13N
o. o
f far
m ro
ad m
aint
aine
d N
o.7
2812
Leng
th o
f ele
ctric
fenc
ing
cons
truc
ted
Km
829
.67
121.
5
Twelfth Five Year Plan (2018-2023), Bumthang Dzongkhag
-52-
Proj
ecte
d An
nual
Tar
get
Sl.
No
KPI
Proj
ecte
d A
nnua
l Tar
get
FY
2018
-201
9FY
20
19-2
020
FY
2020
-202
1FY
20
21-2
022
FY
2022
-202
31
Buck
whe
at p
rodu
ctio
n 24
9.22
253.
9825
8.74
263.
8426
8.60
2W
heat
pro
duct
ion
91.3
093
.06
94.8
296
.80
98.5
63
Padd
y pr
oduc
tion
50.6
151
.24
51.8
752
.50
53.1
34
Barle
y pr
oduc
tion
59.3
460
.49
61.6
462
.79
63.9
45
Mus
tard
pro
duct
ion
3.30
3.60
3.90
4.20
4.50
6Po
tato
pro
duct
ion
1758
.32
1813
.81
1869
.61
1925
.10
1980
.90
7Ve
geta
ble
Prod
uctio
n 21
2.36
224.
3823
6.40
248.
4226
0.44
8Fr
uits
and
nut
s pro
duct
ion
28.8
31.2
33.6
33.6
35.7
69
Milk
pro
duct
ion
491
497
503
509
515
10Eg
g pr
oduc
tion
0.31
00.
312
0.31
20.
312
0.31
111
hon
ey p
rodu
ctio
n 0.
200.
300.
550.
550.
6012
Leng
th o
f Irr
igat
ion
chan
nel c
onst
ruct
ed0
22.
50
013
No.
of i
rrig
atio
n ch
anne
l con
stru
cted
02
30
014
Leng
th o
f Irr
igat
ion
chan
nel m
aint
aine
d0
23
32.
515
No.
of i
rrig
atio
n ch
anne
l mai
ntai
ned
02
44
216
Leng
th o
f far
m ro
ad co
nstr
ucte
d0
12
10
17N
o. o
f far
m ro
ad co
nstr
ucte
d0
13
10
18Le
ngth
of f
arm
road
mai
ntai
ned
22
33
319
No.
of f
arm
road
mai
ntai
ned
22
33
220
Leng
th o
f ele
ctric
fenc
ing
cons
truc
ted
4.86
33.5
335
.737
.67
9.72
21Q
uino
a pr
oduc
tion
83.2
016
2.40
241.
6032
0.80
400.
0022
Mus
hroo
m p
rodu
ctio
n 0.
020.
040.
060.
080.
1
-53-
Twelfth Five Year Plan (2018-2023), Bumthang Dzongkhag
Prog
ram
me A
ctiv
ity a
nd O
utla
yO
utpu
tA
ctiv
ityA
ctiv
ity L
ocat
ion
Indi
cativ
e Pl
an O
utla
y (N
u. in
Mill
ion)
Rem
arks
1.C
erea
l cro
p pr
oduc
tion
incr
ease
d2.
Cas
h cr
op p
rodu
ctio
n in
crea
sed
3.Li
vest
ock
prod
uctio
n in
crea
sed
4.Fu
nctio
nal a
gric
ultu
re a
nd li
vest
ock
infr
astr
uctu
re d
evel
oped
Cap
acity
bui
ldin
g A
ll C
hiw
og2.
380
Infr
astr
uctu
re D
evel
opm
ent
All
Chi
wog
16.3
94 In
put s
uppl
yA
ll C
hiw
og5.
036
Twelfth Five Year Plan (2018-2023), Bumthang Dzongkhag
-54-
Ura
Gew
og
Prog
ram
me o
utpu
t ind
icat
ors a
nd ta
rget
s O
utco
me
Out
put
Wei
ght
Out
put I
ndic
ator
Uni
tW
eigh
tBa
selin
e (B
ase
Year
) P
lan
Targ
et
Food
and
N
utrit
ion
Secu
rity
enha
nced
Cer
eal c
rop
prod
uctio
n
incr
ease
d
23Bu
ck w
heat
pro
duct
ion
MT
818
6.76
205.
40W
heat
pro
duct
ion
MT
711
3.96
125.
44Q
uino
a pr
oduc
tion
Kg
20
400.
00Ba
rley
prod
uctio
n M
T6
72.5
80.6
2C
ash
crop
pr
oduc
tion
incr
ease
d
24M
usta
rd p
rodu
ctio
n M
T2
1.50
2.25
Pota
to p
rodu
ctio
n M
T10
1537
.76
1789
.20
Vege
tabl
e Pr
oduc
tion
MT
814
0.70
182.
31M
ushr
oom
pro
duct
ion
MT
20
0.1
Frui
ts a
nd n
uts p
rodu
ctio
n M
T2
10.3
14.9
Live
stoc
k pr
oduc
tion
incr
ease
d
18M
ilk p
rodu
ctio
n M
T12
605
625
Egg
prod
uctio
n N
o. (i
n M
illio
n)3
0.03
00.
070
hon
ey p
rodu
ctio
n M
T3
0.00
0.60
Func
tiona
l ag
ricul
ture
an
d liv
esto
ck
infr
astr
uctu
re
deve
lope
d
35Le
ngth
of I
rrig
atio
n ch
anne
l mai
ntai
ned
Km
2-
0.2
No.
of i
rrig
atio
n ch
anne
l mai
ntai
ned
No.
2-
1Le
ngth
of f
arm
road
cons
truc
ted
Km
335
.02
NT=
13N
o. o
f far
m ro
ad co
nstr
ucte
dN
o.7
14N
T=5
Leng
th o
f far
m ro
ad m
aint
aine
dK
m3
20.9
NT=
10N
o. o
f far
m ro
ad m
aint
aine
d N
o.8
11N
T=5
Leng
th o
f ele
ctric
fenc
ing
cons
truc
ted
Km
1037
.212
7.5
-55-
Twelfth Five Year Plan (2018-2023), Bumthang Dzongkhag
Proj
ecte
d An
nual
Tar
get
Sl.
No
KPI
Proj
ecte
d A
nnua
l Tar
get
FY
2018
-201
9FY 2
019-
2020
FY 202
0-20
21FY
20
21-2
022
FY
2022
-202
31
Buck
whe
at p
rodu
ctio
n 19
0.58
194.
2219
7.86
201.
7620
5.40
2W
heat
pro
duct
ion
116.
2011
8.44
120.
6812
3.20
125.
443
Barle
y pr
oduc
tion
74.8
276
.27
77.7
279
.17
80.6
24
Mus
tard
pro
duct
ion
1.65
1.80
1.95
2.10
2.25
5Po
tato
pro
duct
ion
1588
.16
1638
.28
1688
.68
1738
.80
1789
.20
6Ve
geta
ble
Prod
uctio
n 14
8.65
157.
0716
5.48
173.
9018
2.31
7Fr
uits
and
nut
s pro
duct
ion
1213
1414
14.9
8M
ilk p
rodu
ctio
n 60
861
261
862
162
59
Egg
prod
uctio
n 0.
050
0.05
40.
060
0.06
50.
070
10h
oney
pro
duct
ion
0.20
00.
300
0.55
00.
550
0.60
011
Leng
th o
f Irr
igat
ion
chan
nel m
aint
aine
d0
0.2
00
012
No.
of i
rrig
atio
n ch
anne
l mai
ntai
ned
01
00
013
Leng
th o
f far
m ro
ad co
nstr
ucte
d0
34
33
14N
o. o
f far
m ro
ad co
nstr
ucte
d0
12
11
15Le
ngth
of f
arm
road
mai
ntai
ned
33
22
16N
o. o
f far
m ro
ad m
aint
aine
d 2
11
117
Leng
th o
f ele
ctric
fenc
ing
cons
truc
ted
5.1
35.1
937
.539
.53
10.2
18Q
uino
a pr
oduc
tion
83.2
016
2.40
241.
6032
0.80
400.
0019
Mus
hroo
m p
rodu
ctio
n 0.
020.
040.
060.
080.
1
Twelfth Five Year Plan (2018-2023), Bumthang Dzongkhag
-56-
Prog
ram
me A
ctiv
ity a
nd O
utla
y O
utpu
tA
ctiv
ityA
ctiv
ity L
ocat
ion
Indi
cativ
e Pl
an O
utla
y (N
u. in
Mill
ion)
Rem
arks
1.C
erea
l cro
p pr
oduc
tion
incr
ease
d2.
Cas
h cr
op p
rodu
ctio
n in
crea
sed
3.Li
vest
ock
prod
uctio
n in
crea
sed
4.Fu
nctio
nal a
gric
ultu
re a
nd li
vest
ock
infr
astr
uctu
re d
evel
oped
Cap
acity
bui
ldin
g A
ll C
hiw
ogs
0.90
0In
fras
truc
ture
Dev
elop
men
tA
ll C
hiw
ogs
16.0
50
Inpu
t sup
ply
All
Chi
wog
s3.
280
-57-
Twelfth Five Year Plan (2018-2023), Bumthang Dzongkhag
11.
LGK
RA 3
:
Com
mun
ity h
ealth
enha
nced
and
wat
er se
curi
ty en
sure
d (1
3 K
PIs)
NK
RA
KPI
Des
crip
tion
Uni
tBa
selin
eTa
rget
Dat
a so
urce
Col
lect
ion
met
hodo
logy
Rem
arks
3. P
over
ty
erad
icat
ed
and
ineq
ualit
y re
duce
d 8.
Foo
d an
d N
utrit
ion
secu
rity
ensu
red
10.G
ende
r eq
ualit
y pr
omot
ed,
wom
en
and
girls
em
pow
ered
14
. hea
lthy
and
carin
g so
ciet
y en
hanc
ed17
. Sus
tain
able
w
ater
en
sure
d
Inci
denc
e of
Infa
nt
Mor
talit
yTh
is in
dica
tor m
easu
res t
he to
tal
num
ber o
f inf
ant d
eath
s (29
day
s-
1 ye
ar) d
urin
g th
e pl
an p
erio
d
No.
11(2
012-
2016
)<5
Adm
inist
rativ
e D
ata,
D
zong
khag
h
ealth
Sec
tor
Ann
ual
hou
seho
ld
Surv
ey
Inci
denc
e of
M
ater
nal M
orta
lity
This
indi
cato
r mea
sure
s the
tota
l nu
mbe
r of p
reve
ntab
le m
ater
nal
deat
hs d
urin
g th
e pl
an p
erio
d
No.
0 (2
012-
2016
)0
Adm
inist
rativ
e D
ata,
D
zong
khag
h
ealth
Sec
tor
Ann
ual
hou
seho
ld
Surv
ey
Inci
denc
e of
u
nder
-5 M
orta
lity
This
indi
cato
r mea
sure
s the
tota
l nu
mbe
r of i
nfan
t dea
ths (
1-5
year
s)
durin
g th
e pl
an p
erio
d
No.
3(20
12-2
016)
<3A
dmin
istra
tive
Dat
a,
Dzo
ngkh
ag
hea
lth S
ecto
r
Ann
ual
hou
seho
ld
Surv
ey
Num
ber o
f hea
lth
pers
onne
l by
type
This
indi
cato
r mea
sure
s the
nu
mbe
r of d
octo
rs, s
peci
alist
s an
d St
aff N
urse
/Clin
ical
Nur
ses
requ
ired
in th
e D
zong
khag
No.
Dr:
3
Nur
s:12
Opt
halm
ic
Nur
se: 0
Dr:1
Nur
s:2O
ptha
lmic
N
urse
:1
Adm
inist
rativ
e D
ata,
D
zong
khag
h
ealth
Sec
tor
Adm
inist
rativ
e re
cord
hou
seho
lds w
ith at
le
ast P
our fl
ush
(PF)
to
ilet
Perc
enta
ge o
f hou
seho
lds w
ithou
t im
prov
ed sa
nita
tion
faci
litie
s [po
ur
flush
toile
t]
%45
(Ah
hS-
2017
)10
0A
dmin
istra
tive
Dat
a,
Dzo
ngkh
ag
hea
lth S
ecto
r
Ann
ual
hou
seho
ld
Surv
ey
hou
seho
lds w
ith
acce
ss to
24*
7 sa
fe
drin
king
wat
er
supp
ly
This
indi
cato
r mea
sure
s num
ber o
f ho
useh
olds
with
acc
ess t
o 24
*7 sa
fe
drin
king
wat
er w
ithin
the
dwel
ling
% 1
00 (2
016)
10
0A
dmin
istra
tive
Dat
a,
Dzo
ngkh
ag
hea
lth S
ecto
r
Ann
ual
hou
seho
ld
Surv
ey
Impl
emen
t Nat
iona
l po
licy
and
stra
tegi
c fr
amew
ork
to
Redu
ce h
arm
ful u
se
of A
lcoh
ol (2
015-
2020
)
This
indi
cato
r mea
sure
s im
plem
enta
tion
of th
e Dzo
ngkh
ag’s
resp
onsib
ilitie
s man
date
d by
this
polic
y
%10
100
Adm
in d
ata,
D
zong
khag
h
ealth
Sec
tor
Adm
in re
cord
Twelfth Five Year Plan (2018-2023), Bumthang Dzongkhag
-58-
NK
RA
KPI
Des
crip
tion
Uni
tBa
selin
eTa
rget
Dat
a so
urce
Col
lect
ion
met
hodo
logy
Rem
arks
Impl
emen
t Nat
iona
l Su
icid
e Pr
even
tion
Act
ion
Plan
(20
15-
2018
)
This
indi
cato
r mea
sure
s im
plem
enta
tion
of th
e Dzo
ngkh
ag’s
resp
onsib
ilitie
s man
date
d by
this
Act
ion
Plan
%10
100
Adm
in d
ata,
D
zong
khag
h
ealth
Sec
tor
Adm
in re
cord
TB In
cide
nce
This
indi
cato
r mea
sure
s the
in
cide
nce
of T
uber
culo
sis in
the
Dzo
ngkh
ag
No.
83≤6
0A
dmin
istra
tive
Dat
a,
Dzo
ngkh
ag
hea
lth S
ecto
r
Adm
inist
rativ
e re
cord
STI i
ncid
ence
This
indi
cato
r mea
sure
s the
in
cide
nce
of S
TI in
the
Dzo
ngkh
agN
o.70
7≤5
31A
dmin
istra
tive
Dat
a,
Dzo
ngkh
ag
hea
lth S
ecto
r
Adm
inist
rativ
e re
cord
NC
D C
ases
This
indi
cato
r mea
sure
s NC
D c
ases
in
the
Dzo
ngkh
agN
o.16
63(2
012-
2016
)≤1
243
Adm
inist
rativ
e D
ata,
D
zong
khag
h
ealth
Sec
tor
Adm
inist
rativ
e re
cord
Peop
le co
vere
d un
der S
peci
al h
ealth
Se
rvic
es
This
indi
cato
r mea
sure
s the
% o
f pe
ople
>60
yrs o
f age
pro
vide
d w
ith
med
ical
scre
enin
g at
leas
t onc
e in
a
year
%85
>90
Adm
inist
rativ
e D
ata,
D
zong
khag
h
ealth
Sec
tor
Adm
inist
rativ
e re
cord
Initi
ativ
es to
pr
omot
e ad
equa
te,
heal
thy
and
bala
nce
diet
This
indi
cato
r mea
sure
s ini
tiativ
es
to p
rom
ote
heal
thy
and
bala
nced
di
et/ n
utrit
ion
for h
ealth
y po
pula
tion
% N
AN
T-5
C-5
Adm
inist
rativ
e D
ata,
D
zong
khag
h
ealth
Sec
tor
Ann
ual S
urve
y
-59-
Twelfth Five Year Plan (2018-2023), Bumthang Dzongkhag
11.1. Programme summary and strategy
Programme Title: Quality health enhancement and water security
Objective: To improve community health and water security
ollaborating Agency/ies: Moh/MoWhS/NEC/MoAF/NCWC/MohCA/RBP/MoE/MoEA
Programme Strategies: According to the Annual Dzongkhag health Survey 2016, 76 percent of the dz-ongkhag’s population resides within an hour’s distance from the nearest health facilities, 13 percent within 3 hours reach and 11 percent beyond three hours reach. This poses a challenge in provision of health services. Despite rigorous effort by the health officials, the dzongkhag still has a high incidence of infant mortality (13 cases) and u-5 cases (3) in the past five years.
The Dzongkhag also witnessed a alcohol related death of nine cases and 12 sui-cide deaths in 2016. As per the morbidity report 2016, 1,663 cases of NCD and 797 STI cases were reported. In the 12 FYP, Dzongkhag will focus on following strategies:
2. The Dzongkhag will continue to pursue existing programmes towards re-ducing incidences of infant mortality (IM), maternal mortality (MM), un-der-five mortality (u5M), as well as improving antenatal care and immuni-zation coverage.
3. To ensure 24X7 drinking water supply in all Gewogs, the Dzongkhag will carry out detailed study on identification of water sources, distribution and storage of water, and main causes behind drinking water shortage, in-cluding water budgeting and management plan. The Dzongkhag will seek technical backstopping support from relevant central ministries wherever required. Awareness programmes to educate communities on efficient and sustainable use of water will be undertaken by the Dzongkhags, besides formation and training of the community water-user groups. The water-us-er groups will conduct regular monitoring, undertake minor maintenance and promote water conservation and sustainable use.
Twelfth Five Year Plan (2018-2023), Bumthang Dzongkhag
-60-
4. To improve coverage and promote use of improved toilets, the Dzongkhag will work with the Gewog s to conduct advocacy on importance of sani-tation, and effect of pour-flush toilets on health issues among people. For the poorer households, wherever the dwelling structure will allow, the Dz-ongkhag will provide the pour-flush toilet designs and materials such as cement and toilet pot, etc. for construction of toilets by themselves. Eligi-bility of households will be done through an objective criteria, specifying type and quantify of materials to be supplied.
5. The Dzongkhag will prepare comprehensive mapping of doctors, special-ists, health assistants and nurses required for the various levels of health centers in the Dzongkhag, and pursue with Ministry of health (Moh) for their strategic deployment. Provision of a female health worker in every Bhu will also receive priority in order to encourage female population to avail health services.
6. Dzongkhag will address the issue of incidences of alcohol deaths through implementation of the National Policy and Strategic Framework to Reduce harmful use of Alcohol, particularly the responsibilities assigned to the Dzongkhags, such as formation of the Alcohol harm Reduction Commit-tee at Dzongkhag and Gewog levels. Accordingly, public education and awareness on alcohol policies and harmful use of alcohol will be taken up in collaboration with the community health workers and religious figures, targeting both sellers and consumers.
7. Dzongkhag will plan and implement the National Suicide Prevention Ac-tion Plan in order to prevent suicides, particularly responsibilities assigned to the Dzongkhag. The Dzongkhag’s Suicide Prevention Response Team (DSPRT), with technical support from relevant central agencies, will plan and implement suicide prevention awareness and interventions in the Dz-ongkhags and Gewog s, as well as identify causes driving people to commit suicide.
-61-
Twelfth Five Year Plan (2018-2023), Bumthang Dzongkhag
11.2
. Pro
gram
me
Out
put M
atri
x
11.2
.1.
Dzo
ngkh
ag
Prog
ram
me o
utpu
t ind
icat
ors a
nd ta
rget
s O
utco
me
Out
put
Wei
ght
Out
put I
ndic
ator
Uni
tW
eigh
tBa
selin
e (B
ase
Year
) P
lan
Targ
et
Com
mun
ity
heal
th
enha
nced
an
d w
ater
se
curit
y en
sure
d
Mat
erna
l C
hild
and
Re
prod
uctiv
e h
ealth
se
rvic
es
impr
oved
32Im
mun
izat
ion
cove
rage
%2
100
100
Inci
denc
e of
neo
nata
l and
Infa
nt M
orta
lity
No.
111
(201
2-20
16)
<5In
cide
nce
of M
ater
nal M
orta
lity
No.
10
0In
cide
nce
of u
nder
-5 M
orta
lity
No.
13
(201
2-20
16)
<3%
of I
nstit
utio
nal D
eliv
ery
%5
98 (A
PA 2
017)
100
Ant
enat
al C
heck
up
(AN
C)8
visi
t N
o.7
186
1000
% o
f u5
scre
ened
for d
evel
opm
enta
l del
ay
(disa
bilit
y)%
485
( To
t. 68
45)
90
No.
of h
ealth
wor
kers
trai
ned
mat
erna
l and
ch
ild h
ealth
No.
664
80
% o
f wom
en sc
reen
ed b
y pa
p sm
ear
%5
21 (
Tot.
822)
80D
iseas
e pr
even
tion,
tr
eatm
ent a
nd
man
agem
ent
serv
ices
im
prov
ed
35TB
inci
denc
esN
o.1.
583
(201
2-20
16)
≤60
STI
inci
denc
esN
o.1.
570
7 (2
012-
2016
)≤5
31In
cide
nce
of a
lcoh
ol d
eath
No.
1.5
9 (2
012-
2016
)<5
Inci
denc
e of
suic
ides
No.
1.5
12 (2
012-
2016
)<3
Inci
denc
e of
NC
D
No.
216
63 (2
012-
2016
)≤1
243
No.
of s
choo
ls an
d re
ligio
us in
stitu
tions
co
vere
d un
der a
nnua
l hea
lth ch
eck
upN
o.6
3131
No.
of a
ctiv
ities
cond
ucte
d by
CBS
S/M
STF
annu
ally
N
o.5
66
Twelfth Five Year Plan (2018-2023), Bumthang Dzongkhag
-62-
Out
com
eO
utpu
tW
eigh
tO
utpu
t Ind
icat
orU
nit
Wei
ght
Base
line
(Bas
e Ye
ar)
Pla
n Ta
rget
N
umbe
r of h
ealth
per
sonn
el b
y ty
peN
o.2
Dr:
3
Nur
s:12
Opt
halm
ic N
urse
: 0
Dr:1
Nur
s:2O
ptha
lmic
N
urse
:1Pe
ople
cove
red
unde
r Spe
cial
hea
lth S
ervi
ces
%4
85>9
0In
itiat
ives
to p
rom
ote
adeq
uate
, hea
lthy
and
bala
nce
diet
No.
2 N
AN
T-5
C-5
Im
plem
ent N
atio
nal p
olic
y an
d st
rate
gic
fram
ewor
k to
Red
uce
har
mfu
l use
of
Alc
ohol
(201
5-20
20)
%4
1010
0
Impl
emen
t Nat
iona
l Sui
cide
Pre
vent
ion
Act
ion
Plan
(20
15-2
018)
%4
1010
0
hea
lth
infr
astr
uctu
re
stre
ngth
ened
33h
ouse
hold
s with
at le
ast P
our fl
ush
(PF)
to
ilet
%6
4510
0
hou
seho
lds w
ith a
cces
s to
24*7
cle
an w
ater
su
pply
%
510
010
0
No.
of n
ew h
ealth
infr
astr
uctu
re co
nstr
ucte
dN
o.11
10 (2
013-
2017
)C
=18,
N=9
No.
of h
ealth
infr
astr
uctu
re re
nova
ted/
mai
ntai
ned
No.
810
(201
2-20
13)
C=2
0,
N=1
0N
o. o
f hea
lth ce
nter
s con
nect
ed w
ith in
tern
etN
o.3
2 (2
012-
2017
)C
=6, N
=4
-63-
Twelfth Five Year Plan (2018-2023), Bumthang Dzongkhag
Proj
ecte
d An
nual
Tar
get
Sl.
No
Indi
cato
rsPr
ojec
ted
Ann
ual T
arge
tFY
20
18-2
019
FY
2019
-202
0FY
20
20-2
021
FY 2021
-202
2FY
20
22-2
023
1Im
mun
izat
ion
cove
rage
100
100
100
100
100
2In
cide
nce
of n
eona
tal a
nd In
fant
Mor
talit
y<5
<5<5
<5≤5
3In
cide
nce
of M
ater
nal M
orta
lity
00
00
04
Inci
denc
e of
und
er-5
Mor
talit
y4
33
3≤3
5%
of I
nstit
utio
nal D
eliv
ery
9910
010
010
010
06
Ant
enat
al C
heck
up
(AN
C) 8
visi
t20
020
020
020
020
07
% o
f u5
scre
ened
for d
evel
opm
enta
l del
ay (d
isabi
lity)
8587
8889
908
No.
of h
ealth
wor
kers
trai
ned
mat
erna
l and
child
hea
lth15
2025
200
9%
of w
omen
scre
ened
by
pap
smea
r40
5060
7080
10TB
inci
denc
es80
7075
62≤6
011
STI i
ncid
ence
s67
163
559
956
3≤5
3112
Inci
denc
e of
alc
ohol
dea
th<5
<5<5
<5<5
13N
o. o
f sch
ools
and
relig
ious
inst
itutio
ns co
vere
d un
der a
nnua
l he
alth
chec
k up
≤31
≤31
≤31
≤31
≤31
14In
cide
nce
of su
icid
es<3
<3<3
<3<3
15In
cide
nce
of N
CD
15
7914
9514
1113
27≤1
243
16N
o. o
f act
iviti
es co
nduc
ted
by C
BSS/
MST
F an
nual
ly6
66
66
17N
umbe
r of h
ealth
per
sonn
el b
y ty
pe-
Dr:1
Nur
s:2O
ptha
lmic
N
urse
:1
--
-
18h
ouse
hold
s with
at le
ast P
our fl
ush
(PF)
toile
t 60
7080
9010
0
Twelfth Five Year Plan (2018-2023), Bumthang Dzongkhag
-64-
Sl.
No
Indi
cato
rsPr
ojec
ted
Ann
ual T
arge
tFY
20
18-2
019
FY
2019
-202
0FY
20
20-2
021
FY 2021
-202
2FY
20
22-2
023
19h
ouse
hold
s with
acc
ess t
o 24
*7 c
lean
wat
er su
pply
10
010
010
010
010
020
No.
of n
ew h
ealth
infr
astr
uctu
re co
nstr
ucte
d1
23
11
21N
o. o
f hea
lth in
fras
truc
ture
reno
vate
d/m
aint
aine
d2
22
22
22N
o. o
f hea
lth ce
nter
s con
nect
ed w
ith in
tern
et1
11
10
23Im
plem
ent N
atio
nal p
olic
y an
d st
rate
gic f
ram
ewor
k to
Red
uce
har
mfu
l use
of A
lcoh
ol (2
015-
2020
)20
3060
9010
0
24Im
plem
ent N
atio
nal S
uici
de P
reve
ntio
n A
ctio
n Pl
an (
2015
-201
8)20
3060
9010
025
Peop
le co
vere
d un
der S
peci
al h
ealth
Ser
vice
s85
8688
89>9
026
Initi
ativ
es to
pro
mot
e ad
equa
te, h
ealth
y an
d ba
lanc
e di
et1
11
11
Prog
ram
me A
ctiv
ity a
nd O
utla
y O
utpu
tA
ctiv
ityA
ctiv
ity L
ocat
ion
Indi
cativ
e Pl
an O
utla
y (N
u. in
Mill
ion)
Rem
arks
1.
Mat
erna
l Chi
ld a
nd R
epro
duct
ive
hea
lth se
rvic
es im
prov
ed2.
h
ealth
infr
astr
uctu
re st
reng
then
ed3.
D
iseas
e pr
even
tion,
trea
tmen
t and
m
anag
emen
t ser
vice
s im
prov
ed
Cap
acity
dev
elop
men
tA
ll G
ewog
s8.
700
Infr
astr
uctu
re D
evel
opm
ent
All
Gew
ogs
45.0
00Aw
aren
ess a
nd E
duca
tion
prog
ram
mes
All
Gew
ogs
5.80
0
-65-
Twelfth Five Year Plan (2018-2023), Bumthang Dzongkhag
11.2
.2.
Gew
ogs
Chh
oekh
or G
ewog
Prog
ram
me o
utpu
t ind
icat
ors a
nd ta
rget
s O
utco
me
Out
put
Wei
ght
Out
put I
ndic
ator
Uni
tW
eigh
tBa
selin
e (B
ase
Year
) P
lan
Targ
et
Com
mun
ity h
ealth
en
hanc
ed a
nd w
ater
se
curit
y en
sure
d
hea
lth
infr
astr
uctu
re
stre
ngth
ened
100
No.
RW
SS co
nstr
ucte
dN
o.25
673
No.
RW
SS re
nova
ted
No.
1522
5N
o. o
f hea
lth in
fras
truc
ture
reno
vate
dN
o.60
515
Proj
ecte
d An
nual
Tar
get
Sl.
No
Indi
cato
rsPr
ojec
ted
Ann
ual T
arge
t
FY
2018
-201
9FY 2
019-
2020
FY
2020
-202
1FY
20
21-2
022
FY
2022
-202
31
No.
RW
SS co
nstr
ucte
d1
11
2N
o. R
WSS
reno
vate
d1
11
23
No.
of h
ealth
infr
astr
uctu
re re
nova
ted
33
33
3
Prog
ram
me A
ctiv
ity a
nd O
utla
yO
utpu
tA
ctiv
ityA
ctiv
ity L
ocat
ion
Indi
cativ
e Pl
an O
utla
y (N
u. in
Mill
ion)
Rem
arks
hea
lth in
fras
truc
ture
stre
ngth
ened
Infr
astr
uctu
re D
evel
opm
ent
Chi
wog
s0.
25Pu
blic
awar
enes
s an
d ca
paci
ty
build
ing
Chi
wog
s6.
000
Twelfth Five Year Plan (2018-2023), Bumthang Dzongkhag
-66-
Chh
umig
Gew
og
Prog
ram
me o
utpu
t ind
icat
ors a
nd ta
rget
s O
utco
me
Out
put
Wei
ght
Out
put I
ndic
ator
Uni
tW
eigh
tBa
selin
e (B
ase
Year
) P
lan
Targ
et
Com
mun
ity
heal
th e
nhan
ced
and
wat
er
secu
rity
ensu
red
1. h
ealth
infr
astr
uctu
re
stre
ngth
ened
2. A
war
enes
s cre
ated
on
heal
th a
nd h
ygie
ne
100
No.
RW
SS co
nstr
ucte
dN
o.8
581
No.
RW
SS re
nova
ted
No.
3524
6N
o. o
f hea
lth in
fras
truc
ture
cons
truc
ted
No.
2567
3N
o. o
f hea
lth in
fras
truc
ture
reno
vate
dN
o.12
253
No.
of a
war
enes
s and
cap
acity
bui
ldin
gN
o20
NA
4
Proj
ecte
d An
nual
Tar
get
Sl.
No
Indi
cato
rsPr
ojec
ted
Ann
ual T
arge
tFY
20
18-2
019
FY
2019
-202
0FY
20
20-2
021
FY
2021
-202
2FY
20
22-2
023
1N
o. R
WSS
cons
truc
ted
01
00
02
No.
RW
SS re
nova
ted
11
21
13
No.
of h
ealth
infr
astr
uctu
re co
nstr
ucte
d1
11
4N
o. o
f hea
lth in
fras
truc
ture
reno
vate
d0
11
10
5N
o. o
f aw
aren
ess a
nd c
apac
ity b
uild
ing
11
11
Prog
ram
me A
ctiv
ity a
nd O
utla
yO
utpu
tA
ctiv
ityA
ctiv
ity L
ocat
ion
Indi
cativ
e Pl
an O
utla
y (N
u. in
Mill
ion)
Rem
arks
1.h
ealth
infr
astr
uctu
re st
reng
then
ed2.
Awar
enes
s cre
ated
on
heal
th a
nd h
ygie
neIn
fras
truc
ture
Dev
elop
men
tA
ll C
hiw
ogs
1.95
0Aw
aren
ess a
nd c
apac
ity b
uild
ing
All
Chi
wog
s0.
200
-67-
Twelfth Five Year Plan (2018-2023), Bumthang Dzongkhag
Tang
Gew
og
Prog
ram
me o
utpu
t ind
icat
ors a
nd ta
rget
s O
utco
me
Out
put
Wei
ght
Out
put I
ndic
ator
Uni
tW
eigh
tBa
selin
e (B
ase
Year
) P
lan
Targ
et
Com
mun
ity h
ealth
en
hanc
ed a
nd w
ater
se
curit
y en
sure
d
1. h
ealth
infr
astr
uctu
re
stre
ngth
ened
2. A
war
enes
s cre
ated
on
heal
th a
nd h
ygie
ne
100
No.
RW
SS co
nstr
ucte
dN
o.40
475
No.
RW
SS re
nova
ted
No.
307
9N
o. o
f aw
aren
ess &
cap
acity
bu
ildin
g pr
ogra
mN
o30
NA
9
Proj
ecte
d An
nual
Tar
get
Sl.
No
Indi
cato
rsPr
ojec
ted
Ann
ual T
arge
t
FY
2018
-201
9FY 2
019-
2020
FY
2020
-202
1FY
20
21-2
022
FY
2022
-202
31
No.
RW
SS co
nstr
ucte
d1
12
12
No.
RW
SS re
nova
ted
22
31
13
No.
of a
war
enes
s & c
apac
ity b
uild
ing
prog
ram
12
32
1
Prog
ram
me A
ctiv
ity a
nd O
utla
yO
utpu
tA
ctiv
ityA
ctiv
ity L
ocat
ion
Indi
cativ
e Pl
an O
utla
y (N
u. in
Mill
ion)
Rem
arks
1.h
ealth
infr
astr
uctu
re st
reng
then
ed2.
Awar
enes
s cre
ated
on
heal
th a
nd
hygi
ene
Infr
astr
uctu
re D
evel
opm
ent
All
Chi
wog
s3.
000
Awar
enes
s dev
elop
men
t & c
apac
ity
build
ing
prog
ram
All
Chi
wog
s1.
700
Twelfth Five Year Plan (2018-2023), Bumthang Dzongkhag
-68-
Ura
Gew
og
Prog
ram
me o
utpu
t ind
icat
ors a
nd ta
rget
s O
utco
me
Out
put
Wei
ght
Out
put I
ndic
ator
Uni
tW
eigh
tBa
selin
e (B
ase
Year
) P
lan
Targ
et
Com
mun
ity
heal
th
enha
nced
and
w
ater
secu
rity
ensu
red
1.h
ealth
infr
astr
uctu
re
stre
ngth
ened
2.Aw
aren
ess c
reat
ed
on h
ealth
and
hy
gien
e
100
No.
RW
SS co
nstr
ucte
dN
o.35
313
No.
RW
SS re
nova
ted
No.
2523
5N
o. o
f hea
lth in
fras
truc
ture
mai
ntai
ned
No.
153
2
No.
awar
enes
s and
cap
acity
bui
ldin
gN
o25
2N
T=9
Proj
ecte
d An
nual
Tar
get
Sl.
No
Indi
cato
rsPr
ojec
ted
Ann
ual T
arge
tFY 2
018-
2019
FY
2019
-202
0FY
20
20-2
021
FY 2021
-202
2FY
20
22-2
023
1N
o. R
WSS
cons
truc
ted
11
12
No.
RW
SS re
nova
ted
01
21
13
No.
of h
ealth
infr
astr
uctu
re re
nova
ted
11
4N
o. aw
aren
ess a
nd c
apac
ity b
uild
ing
12
32
1
Prog
ram
me A
ctiv
ity a
nd O
utla
yO
utpu
tA
ctiv
ityA
ctiv
ity L
ocat
ion
Indi
cativ
e Pl
an O
utla
y (N
u. in
Mill
ion)
Rem
arks
1. h
ealth
infr
astr
uctu
re st
reng
then
ed2.
Aw
aren
ess c
reat
ed o
n he
alth
and
hyg
iene
Infr
astr
uctu
re D
evel
opm
ent
All
Chi
wog
s2.
500
Cap
acity
and
awar
enes
s pro
gram
All
Chi
wog
s1.
000
-69-
Twelfth Five Year Plan (2018-2023), Bumthang Dzongkhag
12.
LGK
RA 4
: Q
ualit
y of
edu
catio
n an
d sk
ills i
mpr
oved
(9 K
PIs)
NK
RA
KPI
Des
crip
tion
Uni
tBa
selin
eTa
rget
Dat
a so
urce
Col
lect
ion
met
hodo
logy
Rem
arks
7. Q
ualit
y of
ed
ucat
ion
and
skill
s im
prov
ed
3. P
over
ty
erad
icat
ed
and
ineq
ualit
y re
duce
d
10.G
ende
r eq
ualit
y pr
omot
ed,
wom
en
and
girls
em
pow
ered
11. P
rodu
ctiv
e an
d ga
infu
l em
ploy
men
t cr
eate
d
Out
of S
choo
l Chi
ldre
n (in
clud
ing
spec
ial n
eeds
) (a
ged
6-14
yea
rs) b
y ge
nder
This
indi
cato
r mea
sure
s chi
ldre
n ag
ed 6
-14
incl
udin
g sp
ecia
l nee
ds
child
ren
not a
ttend
ing
scho
ol o
ut o
f to
tal r
esid
ent p
opul
atio
n
No.
00
Adm
inist
rativ
e D
ata,
Dzo
ngkh
ag
Educ
atio
n Se
ctor
Adm
inist
rativ
e Re
cord
Spec
ific s
ubje
ct te
ache
rs
This
indi
cato
r mea
sure
s num
ber o
f sp
ecifi
c sub
ject
teac
hers
requ
ired
in
STEM
, Eng
lish
and
Dzo
ngkh
a in
the
Dzo
ngkh
ag
No.
241
25 (G
en-
eral
:2, D
z-on
:16,
IT:1
, G
eo:4
, Eng
.Ed
n:1,
Sc:1
)
Adm
inist
rativ
e D
ata,
Dzo
ngkh
ag
Educ
atio
n Se
ctor
Adm
inist
rativ
e Re
cord
Scho
ols m
eetin
g cl
ass s
ize
targ
ets
The
indi
cato
r mea
sure
s num
ber
of sc
hool
s with
clas
s siz
e of
24
in
prim
ary
and
30 in
seco
ndar
y sc
hool
s
No.
Pry:
10
Sec :
02Pr
y: ≥
10
Sec:
≥02
Adm
inist
rativ
e D
ata,
Dzo
ngkh
ag
Educ
atio
n Se
ctor
Adm
inist
rativ
e Re
cord
Stud
ents
scor
ing
at le
ast
60%
eac
h in
Eng
lish,
D
zong
kha,
Mat
hs a
nd
Scie
nce
in C
lass
VI b
y ge
nder
The
indi
cato
r mea
sure
s the
pe
rcen
tage
of s
tude
nts w
ho sc
ore
at le
ast 6
0% o
r abo
ve in
Eng
lish,
D
zong
kha,
Mat
hs a
nd S
cien
ce
%60
62A
dmin
istra
tive
Dat
a, D
zong
khag
Ed
ucat
ion
Sect
or
Adm
inist
rativ
e Re
cord
Stud
ents
scor
ing
at le
ast
60%
in e
ach
STEM
subj
ect
incl
udin
g D
zong
kha
and
Engl
ish in
BC
SE (X
) by
gend
er
This
indi
cato
r mea
sure
s per
cent
age
of st
uden
ts sc
orin
g at
leas
t 60%
or
abov
e in
STE
M su
bjec
ts [S
cien
ce, I
T an
d M
athe
mat
ics]
, Dzo
ngkh
a an
d En
glish
in B
CSE
.
%M
: 37
F: 5
0
M:
60
F: 7
0
Ann
ual R
epor
t, BC
SEA
Ass
essm
ent
Repo
rt
Enro
lmen
t rat
e fo
r EC
CD
by
gen
der
The
indi
cato
r mea
sure
s the
pa
rtic
ipat
ion
of 3
-5 y
ears
old
ch
ildre
n in
EC
CD
out
of t
otal
re
siden
t 3-5
yea
rs o
lds.
%M
= 13
.1
F=
16.
1M
= 50
F=
50
Adm
inist
rativ
e D
ata,
Dzo
ngkh
ag
Educ
atio
n Se
ctor
Adm
inist
rativ
e Re
cord
Twelfth Five Year Plan (2018-2023), Bumthang Dzongkhag
-70-
NK
RA
KPI
Des
crip
tion
Uni
tBa
selin
eTa
rget
Dat
a so
urce
Col
lect
ion
met
hodo
logy
Rem
arks
NFE
com
plet
ion
rate
by
gend
erTh
e in
dica
tor m
easu
res c
ompl
etio
n ra
te o
f NFE
lear
ners
.%
BLC
: 80
PL
C: 8
9BL
C: 1
00
PLC
: 100
Adm
inist
rativ
e D
ata,
Dzo
ngkh
ag
Educ
atio
n Se
ctor
Adm
inist
rativ
e Re
cord
Scho
ols w
ith v
ocat
iona
l/co
-cur
ricul
ar cl
ubs
This
indi
cato
r mea
sure
s per
cent
age
of sc
hool
s with
voc
atio
nal c
lubs
su
ch a
s cul
tura
l, ag
ricul
ture
(SA
P),
hort
icul
ture
, art
s and
craft
s, lit
erar
y, de
moc
racy
, sci
ence
and
tech
nolo
gy,
culin
ary
etc
%31
.58
70A
dmin
istra
tive
Dat
a, D
zong
khag
Ed
ucat
ion
Sect
or
Adm
inist
rativ
e Re
cord
Peop
le co
vere
d un
der
Spec
ial E
duca
tion
Serv
ices
by
gen
der
This
indi
cato
r mea
sure
s num
ber
of h
ouse
hold
s with
par
ticul
ar
grou
p su
ch a
s chi
ldre
n an
d yo
uth
with
disa
bilit
ies r
ecei
ving
Spe
cial
Ed
ucat
ion
Serv
ices
No.
315
Adm
inist
rativ
e D
ata,
Dzo
ngkh
ag
Educ
atio
n Se
ctor
Adm
inist
rativ
e Re
cord
-71-
Twelfth Five Year Plan (2018-2023), Bumthang Dzongkhag
11.1. Programme summary and strategy
Programme Title: Quality education and skills enhancement
Objective: To improve quality of education and skills
Collaborating Agency/ies: MoE/BCSEA/MoLhR (Technical Training Institute)/ RCSC/RuB/REC
Programme Strategies:The Dzongkhag is endowed with good educational infrastructure and good teacher pupil ratio (1:15.3). The net primary enrolment rate is 100 percent, adult literacy is 50.29 percent and infant literacy is 20.7 percent (APA 2016). however, as per the GNh survey 2015, the Dzongkhag literacy rate at 50.29 percent is be-low the national average of 52.32 percent.
Although the Dzongkhag has made tremendous strides toward improving access and quality of education, the importance of pricing access and enhancing learn-ing outcome cannot be sidelined.
In order to improve learning outcomes, quality of education, develop behavioural and life skills, Dzongkhag will adopt the following strategies:
1. Prioritise and consolidate existing infrastructure and resources;
2. Prepare comprehensive mapping of teacher’s & staff requirement for schools with MoE and RCSC for strategic deployment and management;
3. Provide adequate computers and reliable internet connectivity;
4. Equip libraries with relevant books and online resource materials for refer-ences, self-learning and online education;
5. Provide life skills education and value education to manage real life com-plexities and challenges and bring behavioural changes in the students;
6. Strengthen vocational clubs in the schools and introduce optional subjects for technical and vocational education;
Twelfth Five Year Plan (2018-2023), Bumthang Dzongkhag
-72-
7. Regularly assess student’s strengths, weaknesses, performance and individ-ual student’s learning needs for feedback and all-round improvement espe-cially focusing on slow learners; borne
8. Strengthen parents and teachers’ collaboration to discuss and agree on some of the pertinent issues and wellbeing of the students;
9. Strengthen Professional Development programmes for teachers by prepar-ing PD plan for teachers in schools for execution, monitoring and review for enhancing teacher’s competency and each child’s development;
10. Develop incentives plan for teachers serving in remote areas and those teachers who have served in remote areas for longer years such as training packages and other non-monetary recognition like certificates and awards;
11. Implement WASh and Menstrual hygiene Management facilitates in schools by ensuring reliable and clean water supply, constructing toliets are per national standard (1 for every 25 girls and 1 for every 40 biys) in every secondary schools, supplying sanitary pads to girl students on a regular basis and proper sanitary pad disposal facilities; and
12. Promoting and preserving cultural values through value education, obser-vations of national occasions, school events, and community-based learn-ing.
-73-
Twelfth Five Year Plan (2018-2023), Bumthang Dzongkhag
11.2
. Pro
gram
me
Out
put M
atri
x
11.2
.1.
Dzo
ngkh
ag
Prog
ram
me o
utpu
t ind
icat
ors a
nd ta
rget
sO
utco
me
Out
put
Wei
ght
Out
put I
ndic
ator
Uni
tW
eigh
tBa
selin
e (B
ase
Year
)Pl
an T
arge
t
Qua
lity
of
educ
atio
n an
d sk
ills
impr
oved
Qua
lity
and
incl
usiv
e ed
ucat
ion
enha
nced
28O
ut o
f Sch
ool C
hild
ren
(incl
udin
g sp
ecia
l nee
ds) (
aged
6-1
4 ye
ars)
by
gen
der
No.
20
0
Scho
ols m
eetin
g cl
ass s
ize
targ
ets
No.
2Pr
y:10
Sec:0
2Pr
y: ≥
10Se
c: ≥0
2
Spec
ific s
ubje
ct te
ache
rs
No.
124
125
(Gen
-er
al:2
, Dz-
on:1
6,IT
:1,
Geo
:4, E
ng.
Edn:
1, S
c:1)
Stud
ents
scor
ing
60%
and
abo
ve in
Eng
lish,
Dzo
ngkh
a, M
aths
and
Sc
ienc
e in
Cla
ss V
I by
gend
er(r
epor
t ann
ually
)%
3M
:55
F: 6
3M
:60
F:70
Stud
ents
scor
ing
60%
and
abo
ve in
STE
M su
bjec
ts, D
zong
kha
and
Engl
ish in
BC
SE b
y ge
nder
(rep
ort a
nnua
lly)
%3
M:4
0F:
53M
:60
F:70
Enro
lmen
t rat
e fo
r EC
CD
by
gend
er%
3M
:13.
1F:
16.
1M
:50
F: 5
0
Lear
ning
out
com
e in
clas
s III
%2
7275
Lear
ning
out
com
e in
clas
s VI
%2
6270
Lear
ning
out
com
e in
clas
s X%
255
60
Lear
ning
out
com
e in
clas
s XII
%3
56.3
60
Scho
ols w
ith v
ocat
iona
l clu
bs%
431
.58
70
Peop
le co
vere
d un
der S
peci
al E
duca
tion
Serv
ices
by
gend
erN
o.1
315
Twelfth Five Year Plan (2018-2023), Bumthang Dzongkhag
-74-
Out
com
eO
utpu
tW
eigh
tO
utpu
t Ind
icat
orU
nit
Wei
ght
Base
line
(Bas
e Ye
ar)
Plan
Tar
get
Adu
lt lit
erac
y st
reng
then
ed
7A
dult
liter
acy
%
250
.29
80
NFE
com
plet
ion
rate
(Pos
t Lea
rnin
g C
ours
e &
Bas
ic L
earn
ing
Cou
rse)
%5
BLC
:80
PLC
:89
BLC
:100
PLC
:100
hea
lth a
nd
wel
lbei
ng o
f ch
ildre
n an
d yo
uth
enha
nced
21N
o. o
f sch
ools
with
idea
l stu
dent
com
pute
r rat
io (1
:30
for p
rimar
y an
d 1:
10 fo
r sec
onda
ry sc
hool
s)N
o.3
Pry
:0Se
c: 01
Pry:
12
Sec:
5
Scho
ols w
ith a
cces
s to
safe
ly m
anag
ed W
ASh
(Wat
er, S
anita
tion
and
hyg
iene
) fac
ilitie
sN
o.3
1818
Scho
ols w
ith n
atio
nal s
tand
ard
toile
t (1
toile
t for
eve
ry 2
5 gi
rls, 1
to
ilet f
or e
very
40
boys
) toi
let f
acili
ties
No.
317
18
Scho
ols w
ith sa
nita
ry p
ad d
ispos
al fa
cilit
ies
No.
36
6
Stud
ents
taki
ng p
art i
n ph
ysic
al a
nd sp
ort a
ctiv
ities
(120
min
utes
per
w
eek)
%5
7010
0
Yout
h ta
king
up
scou
ting
prog
ram
%4
3350
Teac
her
deve
lopm
ent
and
supp
ort
stre
ngth
ened
22%
of t
each
er av
ailin
g 40
hou
rs o
f PD
%4
6010
0
Teac
her’s
requ
irem
ent m
appi
ng a
nd a
ctio
n pl
an in
pla
ce a
nd
impl
emen
ted
%5
5010
0
Teac
her’s
ince
ntiv
es p
lan
in p
lace
and
impl
emen
ted
No.
503
06
Teac
hers
with
min
imum
of 1
8 ho
urs c
ontr
act t
each
ing
%3
4810
0
Teac
hers
supp
orte
d w
ith la
ptop
s %
20
100
Func
tiona
l sc
hool
in
fras
truc
ture
de
velo
ped
22N
o. o
f cen
tral
scho
ols e
xpan
ded
(infr
astr
uctu
re)
No.
203
04
No.
of s
choo
l inf
rast
ruct
ure
cons
truc
ted
No.
942
12
No.
of s
choo
l inf
rast
ruct
ure
reno
vate
dN
o.11
3118
-75-
Twelfth Five Year Plan (2018-2023), Bumthang Dzongkhag
Proj
ecte
d An
nual
Tar
get
Sl.
No
KPI
Proj
ecte
d A
nnua
l Tar
get
FY
2018
-201
9FY
20
19-2
020
FY
2020
-202
1FY
20
21-2
022
FY
2022
-202
31
Out
of S
choo
l Chi
ldre
n (in
clud
ing
spec
ial n
eeds
) (ag
ed 6
-14
year
s) b
y ge
nder
00
00
0
2Sc
hool
s mee
ting
clas
s siz
e ta
rget
sPr
y: ≤
10Se
c: ≤0
2Pr
y: ≤
10Se
c: ≤0
2Pr
y: ≤
10Se
c: ≤
02Pr
y: ≤
10Se
c: ≤
02Pr
y: ≤
10Se
c: ≤
023
Stud
ents
scor
ing
60%
and
abo
ve in
Eng
lish,
Dzo
ngkh
a, M
aths
an
d Sc
ienc
e in
Cla
ss V
I by
gend
er(r
epor
t ann
ually
)M
:55
F: 6
3M
: 58
F: 6
5M
: 60
F: 6
7M
:65
F:69
M:7
0F:
70
4St
uden
ts sc
orin
g 60
% a
nd a
bove
in S
TEM
subj
ects
, Dzo
ngkh
a an
d En
glish
in B
CSE
by
gend
erM
: 40
F: 5
3M
:45
F: 5
5M
:50
F:60
M:5
5F:
65
M: 6
0F:
70
5En
rolm
ent r
ate
for E
CC
D b
y ge
nder
M: 2
0F:
20
M: 2
5F:
25
M: 3
0F:
30
M: 4
0F:
40
M: 5
0F:
50
6Le
arni
ng o
utco
me
in cl
ass I
II72
.573
73.5
7475
7Le
arni
ng o
utco
me
in cl
ass V
I63
6567
6870
8Le
arni
ng o
utco
me
in cl
ass X
5657
5859
609
Lear
ning
out
com
e in
clas
s XII
56.5
57.5
58.5
59.5
6010
Scho
ols w
ith v
ocat
iona
l clu
bs35
4555
6570
11A
dult
liter
acy
50
.29
5565
7580
12N
FE co
mpl
etio
n ra
te (P
ost L
earn
ing
Cou
rse
& B
asic
Lea
rnin
g C
ours
e)BL
C 8
0PL
C 8
9BL
C 8
0PL
C 8
9BL
C 9
0PL
C 9
3BL
C 9
5PL
C 9
5 10
010
013
No.
of s
choo
ls w
ith id
eal s
tude
nt co
mpu
ter r
atio
(1:3
0 fo
r pri-
mar
y an
d 1:
10 fo
r sec
onda
ry sc
hool
s)Pr
y: 6
Sec:
2Pr
y: 6
Sec:
30
00
14Sc
hool
s with
acc
ess t
o sa
fely
man
aged
WA
Sh (W
ater
, San
itatio
n an
d h
ygie
ne) f
acili
ties
180
00
0
Twelfth Five Year Plan (2018-2023), Bumthang Dzongkhag
-76-
Sl.
No
KPI
Proj
ecte
d A
nnua
l Tar
get
FY
2018
-201
9FY
20
19-2
020
FY
2020
-202
1FY
20
21-2
022
FY
2022
-202
315
Scho
ols w
ith n
atio
nal s
tand
ard
toile
t (1
toile
t for
eve
ry 2
5 gi
rls,
1 to
ilet f
or e
very
40
boys
) toi
let f
acili
ties (
to b
e de
lede
t)0
010
00
16Sc
hool
s with
sani
tary
pad
disp
osal
faci
litie
s6
00
00
17St
uden
ts ta
king
par
t in
phys
ical
and
spor
t act
iviti
es (1
20 m
in-
utes
per
wee
k)80
100
00
0
18Yo
uth
taki
ng u
p sc
outin
g pr
ogra
m34
3740
4550
19%
of t
each
er av
ailin
g 40
hou
rs o
f PD
7010
010
010
010
020
Teac
hers
with
min
imum
of 1
8 ho
urs c
ontr
act t
each
ing
5065
7585
100
21Te
ache
r’s re
quire
men
t map
ping
and
act
ion
plan
in p
lace
and
im
plem
ente
d55
6075
8510
0
22Te
ache
r’s in
cent
ives
pla
n in
pla
ce a
nd im
plem
ente
d0
11
10
23Te
ache
rs su
ppor
ted
with
lapt
ops
040
6080
100
24N
o. o
f cen
tral
scho
ols e
xpan
ded
(infr
astr
uctu
re)
125
No.
of i
nfra
stru
ctur
e co
nstr
ucte
d7
3 (s
pill
over
) 2
326
No.
of i
nfra
stru
ctur
e re
nova
ted
15
65
227
Teac
her’s
requ
irem
ent m
appi
ng a
nd a
ctio
n pl
an in
pla
ce a
nd
impl
emen
ted
5560
7585
100
-77-
Twelfth Five Year Plan (2018-2023), Bumthang Dzongkhag
Prog
ram
me A
ctiv
ity a
nd O
utla
y:
Out
put
Act
ivity
Act
ivity
Lo
catio
nIn
dica
tive
Plan
Out
lay
(Nu.
in M
illio
n )
Rem
arks
1. Q
ualit
y an
d in
clus
ive
educ
atio
n en
hanc
ed
2.A
dult
liter
acy
stre
ngth
ened
3.h
ealth
and
w
ellb
eing
of c
hild
ren
and
yout
h en
hanc
ed
4.Te
ache
r dev
elop
men
t and
supp
ort s
tren
gthe
ned
5. F
unct
iona
l Cen
tral
scho
ol i
nfra
stru
ctur
e de
velo
ped
Trai
ning
and
Ski
lls d
evel
opm
ent
All
scho
ols
4.98
0In
fras
truc
ture
Dev
elop
men
tA
ll sc
hool
s98
.870
PD p
rogr
amm
esA
ll sc
hool
s7.
000
Voca
tiona
l Clu
bsSc
hool
s0.
200
11.2
.2.
Gew
ogs
Chh
oekh
or G
ewog
Prog
ram
me o
utpu
t ind
icat
ors a
nd ta
rget
s O
utco
me
Out
put
Wei
ght
Out
put I
ndic
ator
Uni
tW
eigh
tBa
selin
e (B
ase
Year
) P
lan
Targ
et
Qua
lity
of
educ
atio
n an
d sk
ills i
mpr
oved
Func
tiona
l edu
catio
n in
fras
truc
ture
de
velo
ped
100
No.
of E
CC
D in
fras
truc
ture
reno
vate
d N
o.10
02
No.
of N
FE ce
nter
est
ablis
hed
No.
35-
5
No.
of P
S re
nova
ted
No.
553
NT=
3
Twelfth Five Year Plan (2018-2023), Bumthang Dzongkhag
-78-
Proj
ecte
d An
nual
Tar
get
Sl.
No
KPI
Proj
ecte
d A
nnua
l Tar
get
FY
2018
-201
9FY
20
19-2
020
FY 2
020-
2021
FY
2021
-202
2FY
20
22-2
023
1N
o. o
f EC
CD
infr
astr
uctu
re re
nova
ted
11
00
02
No.
of N
FE ce
nter
est
ablis
hed
12
20
03
No.
of P
S re
nova
ted
11
1
Prog
ram
me A
ctiv
ity a
nd O
utla
yO
utpu
tA
ctiv
ityA
ctiv
ity L
ocat
ion
Indi
cativ
e Pl
an O
utla
y (N
u. in
Mill
ion)
Rem
arks
Func
tiona
l edu
catio
n in
fras
truc
ture
dev
elop
edIn
fras
truc
ture
Dev
elop
men
tC
hhoe
khor
toe,
Dhu
r, Za
ngth
erpo
3.55
0
Chh
umig
Gew
og
Prog
ram
me o
utpu
t ind
icat
ors a
nd ta
rget
s O
utco
me
Out
put
Wei
ght
Out
put I
ndic
ator
Uni
tW
eigh
tBa
selin
e (B
ase
Year
) P
lan
Targ
et
Qua
lity
of
educ
atio
n an
d sk
ills i
mpr
oved
Func
tiona
l edu
catio
n in
fras
truc
ture
de
velo
ped
100
No.
of s
choo
l inf
rast
ruct
ure
cons
truc
ted
No.
302
NT=
3N
o. o
f PS
reno
vate
dN
o.70
1N
T=3
-79-
Twelfth Five Year Plan (2018-2023), Bumthang Dzongkhag
Proj
ecte
d An
nual
Tar
get
Sl.
No
KPI
Proj
ecte
d A
nnua
l Tar
get
FY
2018
-201
9FY
20
19-2
020
FY
2020
-202
1FY
202
1-20
22FY
20
22-2
023
1N
o. o
f sch
ool i
nfra
stru
ctur
e co
nstr
ucte
d 0
11
10
2N
o. o
f PS
reno
vate
d0
11
10
Prog
ram
me A
ctiv
ity a
nd O
utla
yO
utpu
tA
ctiv
ityA
ctiv
ity L
ocat
ion
Indi
cativ
e Pl
an O
utla
y (N
u. in
Mill
ion)
Rem
arks
Func
tiona
l edu
catio
n in
fra-
stru
ctur
e de
velo
ped
Infr
astr
uctu
re D
evel
opm
ent
Cho
onph
el C
PS, Z
ungn
ey
ECC
D, &
PS
1.85
0G
ayts
a, Z
ungn
ey,
Chu
ngph
el
Tang
Gew
og
Prog
ram
me o
utpu
t ind
icat
ors a
nd ta
rget
s O
utco
me
Out
put
Wei
ght
Out
put I
ndic
ator
Uni
tW
eigh
tBa
selin
e (B
ase
Year
) P
lan
Targ
et
Qua
lity
of
educ
atio
n an
d sk
ills i
mpr
oved
Func
tiona
l edu
catio
n in
fras
truc
ture
de
velo
ped
100
No.
of i
nfra
stru
ctur
e fo
r EC
CD
impr
oved
N
o.45
24
No.
of P
S m
aint
aine
dN
o55
02
Twelfth Five Year Plan (2018-2023), Bumthang Dzongkhag
-80-
Proj
ecte
d An
nual
Tar
get
Sl.
No
KPI
Proj
ecte
d A
nnua
l Tar
get
FY
2018
-201
9FY
20
19-2
020
FY
2020
-202
1FY
20
21-2
022
FY
2022
-202
3
1N
o. o
f inf
rast
ruct
ure
for E
CC
D im
prov
ed1
12
02
No.
of P
S m
aint
aine
d1
1
Prog
ram
me A
ctiv
ity a
nd O
utla
yO
utpu
tA
ctiv
ityA
ctiv
ity L
ocat
ion
Indi
cativ
e Pl
an O
utla
y (N
u. in
Mill
ion)
Rem
arks
Func
tiona
l edu
catio
n in
fras
truc
ture
de
velo
ped
Infr
astr
uctu
re D
evel
opm
ent
Mits
ithan
g, B
epzu
r&K
idzo
m1.
450
Ura
Gew
og
Prog
ram
me o
utpu
t ind
icat
ors a
nd ta
rget
s O
utco
me
Out
put
Wei
ght
Out
put I
ndic
ator
Uni
tW
eigh
tBa
selin
e (B
ase
Year
) P
lan
Targ
et
Qua
lity
of
educ
atio
n an
d sk
ills i
mpr
oved
Func
tiona
l edu
catio
n in
fras
truc
ture
de
velo
ped
100
No.
of
infr
astr
uctu
re/fa
cilit
y im
prov
ed
No.
850
5N
o. o
f inf
rast
ruct
ure
reno
vate
d N
o.15
31
-81-
Twelfth Five Year Plan (2018-2023), Bumthang Dzongkhag
Proj
ecte
d An
nual
Tar
get
Sl.
No
KPI
Proj
ecte
d A
nnua
l Tar
get
FY
2018
-201
9FY
20
19-2
020
FY
2020
-202
1FY
20
21-2
022
FY
2022
-202
3
1N
o. o
f in
fras
truc
ture
/faci
lity
impr
oved
1
11
11
2N
o. o
f inf
rast
ruct
ure
reno
vate
d 1
00
0
Prog
ram
me A
ctiv
ity a
nd O
utla
y O
utpu
tA
ctiv
ityA
ctiv
ity L
ocat
ion
Indi
cativ
e Pl
an O
utla
y (N
u. in
Mill
ion)
Rem
arks
Func
tiona
l edu
catio
n in
fras
truc
ture
de
velo
ped
Infr
astr
uctu
re/fa
cilit
y D
evel
opm
ent
Tang
sibi,
Shin
gnye
r, EC
CD
s3.
160
Twelfth Five Year Plan (2018-2023), Bumthang Dzongkhag
-82-
13.
LGK
RA 5
: C
ultu
re a
nd tr
aditi
ons p
rese
rved
and
pro
mot
ed (5
KPI
s)
NK
RA
K
PI
Des
crip
tion
Uni
t Ba
selin
eTa
rget
D
ata
sour
ce
Col
lect
ion
met
hodo
logy
R
emar
ks
2. E
cono
mic
di
vers
ity a
nd
prod
uctiv
ity
enha
nced
4. C
ultu
re &
Tr
aditi
ons
pres
erve
d an
d pr
omot
ed11
. Pro
duct
ive
and
gain
ful
empl
oym
ent
crea
ted
15. L
ivab
ility
, sa
fety
and
su
stai
nabi
lity
of h
uman
se
ttlem
ents
im
prov
ed
Initi
ativ
es to
pr
omot
e tr
aditi
onal
so
ngs a
nd d
ance
s
This
indi
cato
r mea
sure
s ini
tiativ
es
to p
rom
oteZ
hung
dra
and
Boed
ra
Com
petit
ion
orga
nize
d by
D
zong
khag
or G
ewog
s exc
ludi
ng
com
petit
ion
in sc
hool
s
No.
05
Adm
inist
rativ
e D
ata,
Cul
ture
Se
ctor
Adm
inist
rativ
e re
cord
Act
iviti
es
unde
rtak
en
thro
ugh
com
mun
ity
volu
ntee
rs
(With
out c
ash
and
kind
)
This
indi
cato
r mea
sure
s num
ber
of a
ctiv
ities
take
n th
roug
h co
mm
unity
vol
unte
ers s
uch
as
clea
ning
cam
paig
ns, m
aint
enan
ce
of fa
rm ro
ads,
Lhak
hang
s, ch
orte
ns,
irrig
atio
n ch
anne
ls, sc
hool
s, et
c.
No.
4N
T=20
Adm
inist
rativ
e D
ata,
Cul
ture
Se
ctor
Adm
inist
rativ
e re
cord
1.
Cle
anin
g ca
mpa
ign
2.m
inor
mai
nten
ance
of
farm
road
s3.
min
or re
nova
tion
of
lhak
ahan
g&ch
orte
n4.
min
or re
nova
tion
of
irrig
atio
n ch
anne
l
Folk
stor
ies,
Ora
l hi
stor
ies,
loca
l so
ngs a
nd d
ance
s, lo
cal f
estiv
als,
loca
l di
alec
ts re
vive
d an
d do
cum
ente
d
This
indi
cato
r mea
sure
s num
ber
of fo
lk st
orie
s, O
ral h
istor
ies,
loca
l di
alec
ts a
nd lo
cal f
estiv
als r
eviv
ed
and
docu
men
ted
No.
8 (2
017)
NT=
22A
dmin
istra
tive
Dat
a, C
ultu
re
Sect
or
Adm
inist
rativ
e re
cord
Initi
ativ
es
to sa
fegu
ard
and
prom
ote
indi
geno
us g
ames
an
d sp
orts
The
indi
cato
r mea
sure
s the
num
ber
of cl
ubs,
prog
ram
s, ev
ents
etc
., in
itiat
ed a
nd co
nduc
ted
to p
rese
rve
and
prom
ote
indi
geno
us g
ames
and
sp
orts
No.
05 (a
nnua
l ev
ent)
Adm
inist
rativ
e D
ata,
Cul
ture
Se
ctor
Adm
inist
rativ
e re
cord
1
. Ann
ual i
ndig
enou
s sp
orts
com
petit
ion
(sok
-so
m, j
igdu
m, D
oeko
r, hu
r, tr
aditi
onal
bow
and
ar
cher
y)
Tang
ible
her
itage
m
aint
aine
d Th
is in
dica
tor m
easu
res n
umbe
r of
tang
ible
her
itage
mai
ntai
ned/
reno
vate
d
No.
19
11A
dmin
istra
tive
Dat
a, C
ultu
re
Sect
or
Adm
inist
rativ
e re
cord
-83-
Twelfth Five Year Plan (2018-2023), Bumthang Dzongkhag
13.1. Programme summary and strategy
Programme Title: Tradition and culture development
Objective: To promote and preserve culture and traditions of the Dzongkhag
Collaborating Agency/ies: MohCA/DDC/DratshangLhentshog/ CSOs
Programme Strategies: Bumthang is the spiritual heartland of the country. It is home to some of the most sacred religious heritage such as jampa Lhakhang, Tamzhing Lhakhang and Kurjey Lhakhang. It also hosts several important religious festivals in the coun-try which is a source of both cultural and economic participation, for instance it hosts around 26 local festivals.
As per the GNh survey 2015, the Dzongkhag was raked as the fifth lowest in terms of family relationship index with a score of 12.9 on the scale of 14. It is important for the Dzongkhag to upkeep both the tangible and intangible cultural heritage in view of its contribution in enhancing cultural participation.
In order to preserve and promote cultural heritage and participation, the Dz-ongkhag will implement the following strategies:
1. Preserve and promote both tangible and intangible culture through ren-ovation, research and documentation in consultation with the relevant agencies;
2. Publishing and archiving of research works for future reference;
3. Sensitize public through collaboration with local media;
4. Organize programs for cultural exchanges and storytelling within and out-side the Dzongkhag;
5. Dzongkhag will also promote DriglamNamzha through involvement of general public on mass community training and sensitization;
Twelfth Five Year Plan (2018-2023), Bumthang Dzongkhag
-84-
6. Promote community vitality through community awareness and capacity building;
7. Promote Dzongkha language through capacity building, maintaining language uniformity, compliance monitoring and official correspondences in Dzongkha language for most official correspondences; and
8. Conduct inter-Gewog competition on local festivals, songs, dances, in-digenous games and sport.
-85-
Twelfth Five Year Plan (2018-2023), Bumthang Dzongkhag
13.2
. Pro
gram
me
Out
put M
atri
x
13.2
.1. D
zong
khag
Prog
ram
me o
utpu
t ind
icat
ors a
nd ta
rget
s O
utco
me
Out
put
Wei
ght
Out
put I
ndic
ator
Uni
tW
eigh
tBa
selin
e (B
ase
Year
) P
lan
Targ
et
Cultu
re
and
Trad
ition
s pr
eser
ved
and
prom
oted
Inta
ngib
le
trad
ition
an
d c
ultu
re
pres
erve
d an
d pr
omot
ed
45In
itiat
ives
to p
rom
ote
trad
ition
al so
ngs a
nd
danc
esN
o.8
05
(ann
ual
com
petit
ion)
A
ctiv
ities
und
erta
ken
thro
ugh
com
mun
ity
volu
ntee
rs (W
ithou
t cas
h an
d ki
nd)
46
6N
T=20
Num
ber o
f Fol
k st
orie
s, O
ral h
istor
ies,
loca
l so
ngs a
nd d
ance
s, lo
cal f
estiv
als,
loca
l dia
lect
s re
vive
d an
d do
cum
ente
d
No.
128
22
Num
ber o
f ini
tiativ
es to
safe
guar
d an
d pr
omot
e in
dige
nous
gam
es a
nd sp
orts
No.
70
5(an
nual
co
mpe
titio
n)N
o. o
f ini
tiativ
es to
pro
mot
e N
atio
nal
Lang
uage
N
o.6
3C
=4(P
rogr
am
on la
ngua
ge sk
ill
deve
lopm
ent,
sign
boar
ds,
corr
espo
nden
ces,
uni
code
trai
ning
) N
o. o
f peo
ple
trai
ned
on D
rigla
mN
amzh
aN
o.6
250
11th
FY
PN
T=50
0 (a
nnua
lly
100h
eads
)Ta
ngib
le
Cultu
ral
herit
age
pres
erve
d an
d pr
omot
ed
55N
o. o
f new
relig
ious
infr
astr
uctu
re d
evel
oped
No.
3512
NT=
11C
=23
No.
of r
elig
ious
infr
astr
uctu
re re
nova
ted
No.
2519
NT=
11C
=30
Twelfth Five Year Plan (2018-2023), Bumthang Dzongkhag
-86-
Proj
ecte
d An
nual
Tar
get
Sl.
No
Indi
cato
rsPr
ojec
ted
Ann
ual T
arge
tFY
20
18-2
019
FY
2019
-202
0FY
20
20-2
021
FY
2021
-202
2FY
20
22-2
023
1In
itiat
ives
to p
rom
ote
trad
ition
al so
ngs a
nd d
ance
s1
11
11
2A
ctiv
ities
und
erta
ken
thro
ugh
com
mun
ity v
olun
teer
s (W
ithou
t ca
sh a
nd k
ind)
35
55
2
3N
umbe
r of F
olk
stor
ies,
Ora
l hist
orie
s, lo
cal s
ongs
and
dan
ces,
loca
l fes
tival
s, lo
cal d
iale
cts r
eviv
ed a
nd d
ocum
ente
d 4
55
44
4N
umbe
r of i
nitia
tives
to sa
fegu
ard
and
prom
ote
indi
geno
us g
ames
an
d sp
orts
11
11
1
5N
o. o
f ini
tiativ
es to
pro
mot
e N
atio
nal L
angu
age
11
11
6N
o. o
f peo
ple
trai
ned
on D
rigla
mN
amzh
a10
010
010
010
010
07
No.
of n
ew re
ligio
us in
fras
truc
ture
dev
elop
ed2
22
32
8N
o. o
f rel
igio
us in
fras
truc
ture
reno
vate
d2
22
32
Prog
ram
me A
ctiv
ity a
nd O
utla
yO
utpu
tA
ctiv
ityA
ctiv
ity L
ocat
ion
Indi
cativ
e Pl
an O
utla
y (N
u. in
Mill
ion)
Rem
arks
1.In
tang
ible
trad
ition
and
cul
ture
pr
eser
ved
and
prom
oted
2.Ta
ngib
le C
ultu
ral h
erita
ge p
rese
rved
an
d pr
omot
ed
Doc
umen
tatio
n an
d Pr
oduc
tion
Dzo
ngkh
ag a
nd G
ewog
2.80
0Tr
aini
ng a
nd S
kills
dev
elop
men
tD
zong
khag
and
Gew
og5.
660
Infr
astr
uctu
re D
evel
opm
ent
Dzo
ngkh
ag a
nd G
ewog
38.4
50
-87-
Twelfth Five Year Plan (2018-2023), Bumthang Dzongkhag
13.2
.2. G
ewog
s
Chh
oekh
or G
ewog
Prog
ram
me o
utpu
t ind
icat
ors a
nd ta
rget
s O
utco
me
Out
put
Wei
ght
Out
put I
ndic
ator
Uni
tW
eigh
tBa
selin
e (B
ase
Year
) P
lan
Targ
et
Cultu
re a
nd
Trad
ition
s pre
serv
ed
and
prom
oted
Tang
ible
Cul
tura
l he
ritag
e pr
eser
ved
and
prom
oted
100
No.
of n
ew re
ligio
us in
fras
truc
ture
de
velo
ped
No.
658
NT=
10
No.
of r
elig
ious
infr
astr
uctu
re re
nova
ted
No.
355
NT=
13
Proj
ecte
d An
nual
Tar
get
Sl.
No
Indi
cato
rsPr
ojec
ted
Ann
ual T
arge
tFY
20
18-2
019
FY
2019
-202
0FY
20
20-2
021
FY
2021
-202
2FY
20
22-2
023
1N
o. o
f new
relig
ious
infr
astr
uctu
re d
evel
oped
12
2 2
32
No.
of r
elig
ious
infr
astr
uctu
re re
nova
ted
23
33
2
Prog
ram
me A
ctiv
ity a
nd O
utla
y:O
utpu
tA
ctiv
ityA
ctiv
ity
Loca
tion
Indi
cativ
e Pl
an O
utla
y (N
u. in
Mill
ion)
Rem
arks
Tang
ible
Cul
tura
l her
itage
pre
serv
ed a
nd p
rom
oted
Infr
astr
uctu
re D
evel
opm
ent
Chi
wog
s12
.450
Twelfth Five Year Plan (2018-2023), Bumthang Dzongkhag
-88-
Chh
umig
Gew
og
Prog
ram
me o
utpu
t ind
icat
ors a
nd ta
rget
s O
utco
me
Out
put
Wei
ght
Out
put I
ndic
ator
Uni
tW
eigh
tBa
selin
e (B
ase
Year
) P
lan
Targ
et
Cultu
re a
nd
Trad
ition
s pre
serv
ed
and
prom
oted
Tang
ible
Cul
tura
l h
erita
ge p
rese
rved
an
d pr
omot
ed
100
No.
of n
ew re
ligio
us in
fras
truc
ture
de
velo
ped
No.
6511
NT=
21
No.
of r
elig
ious
infr
astr
uctu
re re
nova
ted
No.
354
NT=
9
Proj
ecte
d An
nual
Tar
get
Sl.
No
Indi
cato
rsPr
ojec
ted
Ann
ual T
arge
tFY
20
18-2
019
FY
2019
-202
0FY
20
20-2
021
FY
2021
-202
2FY
20
22-2
023
1N
o. o
f new
relig
ious
infr
astr
uctu
re d
evel
oped
34
55
42
No.
of r
elig
ious
infr
astr
uctu
re re
nova
ted
12
22
2
Prog
ram
me A
ctiv
ity a
nd O
utla
y O
utpu
tA
ctiv
ityA
ctiv
ity
Loca
tion
Indi
cativ
e Pl
an O
utla
y (N
u. in
Mill
ion)
Rem
arks
Tang
ible
Cul
tura
l her
itage
pre
serv
ed a
nd p
rom
oted
Infr
astr
uctu
re D
evel
opm
ent
Chi
wog
s9.
960
-89-
Twelfth Five Year Plan (2018-2023), Bumthang Dzongkhag
Tang
Gew
og
Prog
ram
me o
utpu
t ind
icat
ors a
nd ta
rget
s O
utco
me
Out
put
Wei
ght
Out
put I
ndic
ator
Uni
tW
eigh
tBa
selin
e (B
ase
Year
) P
lan
Targ
et
Cultu
re a
nd
Trad
ition
s pre
serv
ed
and
prom
oted
Tang
ible
Cul
tura
l h
erita
ge p
rese
rved
an
d pr
omot
ed
100
No.
of n
ew re
ligio
us in
fras
truc
ture
de
velo
ped
No.
550
10
No.
of r
elig
ious
infr
astr
uctu
re re
nova
ted
No.
452
NT=
8
Proj
ecte
d An
nual
Tar
get
Sl.
No
Indi
cato
rsPr
ojec
ted
Ann
ual T
arge
tFY
20
18-2
019
FY
2019
-202
0FY
20
20-2
021
FY
2021
-202
2FY
20
22-2
023
1N
o. o
f new
relig
ious
infr
astr
uctu
re d
evel
oped
12
22
32
No.
of r
elig
ious
infr
astr
uctu
re re
nova
ted
11
22
2
Prog
ram
me A
ctiv
ity a
nd O
utla
y:O
utpu
tA
ctiv
ityA
ctiv
ity
Loca
tion
Indi
cativ
e Pl
an O
utla
y (N
u. in
Mill
ion)
Rem
arks
Tang
ible
Cul
tura
l her
itage
pre
serv
ed a
nd p
rom
oted
Infr
astr
uctu
re D
evel
opm
ent
Chi
wog
s3.
240
Twelfth Five Year Plan (2018-2023), Bumthang Dzongkhag
-90-
Ura
Gew
og
Prog
ram
me o
utpu
t ind
icat
ors a
nd ta
rget
s O
utco
me
Out
put
Wei
ght
Out
put I
ndic
ator
Uni
tW
eigh
tBa
selin
e (B
ase
Year
) P
lan
Targ
et
Cultu
re a
nd
Trad
ition
s pre
serv
ed
and
prom
oted
Tang
ible
Cul
tura
l h
erita
ge p
rese
rved
an
d pr
omot
ed
100
No.
of n
ew re
ligio
us in
fras
truc
ture
de
velo
ped
No.
551
NT=
7
No.
of r
elig
ious
infr
astr
uctu
re re
nova
ted
No.
4511
NT=
7
Proj
ecte
d An
nual
Tar
get
Sl.
No
Indi
cato
rsPr
ojec
ted
Ann
ual T
arge
tFY
20
18-2
019
FY
2019
-202
0FY
20
20-2
021
FY
2021
-202
2FY
20
22-2
023
1N
o. o
f new
relig
ious
infr
astr
uctu
re d
evel
oped
11
12
22
No.
of r
elig
ious
infr
astr
uctu
re re
nova
ted
12
21
1
Prog
ram
me A
ctiv
ity a
nd O
utla
y:O
utpu
tA
ctiv
ityA
ctiv
ity
Loca
tion
Indi
cativ
e Pl
an O
utla
y (N
u. in
Mill
ion)
Rem
arks
Tang
ible
Cul
tura
l her
itage
pre
serv
ed a
nd p
rom
oted
Infr
astr
uctu
re D
evel
opm
ent
5 C
hiw
ogs
2.70
0
-91-
Twelfth Five Year Plan (2018-2023), Bumthang Dzongkhag
14.
LGK
RA 6
:
Liva
bilit
y, sa
fety
and
sust
aina
bilit
y of
hum
an se
ttle
men
ts im
prov
ed (1
0 K
PIs)
NK
RA
K
PI
Des
crip
tion
Uni
t Ba
selin
eTa
rget
D
ata
sour
ce
Col
lect
ion
met
hodo
logy
R
emar
ks
2. E
cono
mic
m
ic d
iver
sity
and
prod
uctiv
ity
enha
nced
3. P
over
ty
erad
icat
ed a
nd
ineq
ualit
y re
duce
d 9.
Infr
astr
uctu
re,
com
mun
icat
ion
and
publ
ic
serv
ices
impr
oved
10.G
ende
r eq
ualit
y pro
mot
ed,
wom
en a
nd g
irls
empo
wer
ed
15. L
ivab
ility
, sa
fety
and
su
stai
nabi
lity
of h
uman
se
ttlem
ents
im
prov
ed
17. S
usta
inab
le
wat
er e
nsur
ed
Solid
was
te d
is-po
sed
to la
ndfil
l Th
is in
dica
tor m
easu
res t
otal
am
ount
of w
aste
disp
osed
to
land
fill a
fter s
egre
gatio
n
MT/
day
4.2
NT=
<4.2
Adm
inist
rativ
e D
ata,
Dzo
ngkh
ag
Mun
icip
ality
Adm
inist
rativ
e re
cord
Was
te g
oing
to
land
fill
after
re
cycl
ing,
segr
egat
ion
Was
te re
cycl
edTh
is in
dica
tor m
easu
res a
mou
nt
of w
aste
recy
cled
esp
ecia
lly
plas
tics f
rom
tota
l was
te p
rodu
ced
in D
zong
khag
thro
ugh
use
of m
oder
n as
wel
l as n
atur
al/
envi
ronm
enta
l tec
hnol
ogy
and
met
hods
%N
AN
T =3
0A
dmin
istra
tive
Dat
a, D
zong
khag
M
unic
ipal
ity
Adm
inist
rativ
e re
cord
Rec
yclin
gSe
greg
atio
n at
so
urce
hou
seho
lds
conn
ecte
d to
inte
grat
ed
was
te/s
ewer
m
anag
emen
t in
fras
truc
ture
an
d co
llect
ion
syst
em in
D
zong
khag
Thro
m
This
indi
cato
r mea
sure
s pe
rcen
tage
of h
ouse
hold
s co
nnec
ted
to in
tegr
ated
was
te a
nd
sew
er m
anag
emen
t inf
rast
ruct
ure
in D
zong
khag
Thro
m. Th
is in
dica
tor w
ill a
lso m
easu
re
redu
ctio
n of
in n
os. o
f raw
sew
er
and
hous
ehol
d w
aste
wat
er g
oing
or
spill
ing
dire
ctly
into
the
river
, st
ream
s and
any
oth
er w
ater
bo
dies
%84
(201
6)C
=90
NT=
6A
dmin
istra
tive
Dat
a, D
zong
khag
M
unic
ipal
ity
Adm
inist
rativ
e re
cord
Vehi
cle
park
ing
deve
lope
d Th
is in
dica
tor m
easu
res t
he a
rea
of v
ehic
le p
arki
ng d
evel
oped
ag
ains
t ide
ntifi
ed a
rea
as p
er
appr
oved
LA
P
%0.
06
(201
6)N
T= 0
.1A
dmin
istra
tive
Dat
a, D
zong
khag
M
unic
ipal
ity
Adm
inist
rativ
e re
cord
Twelfth Five Year Plan (2018-2023), Bumthang Dzongkhag
-92-
NK
RA
K
PI
Des
crip
tion
Uni
t Ba
selin
eTa
rget
D
ata
sour
ce
Col
lect
ion
met
hodo
logy
R
emar
ks
Prop
er tr
affic/
sa
fety
sign
age
and
faci
litie
s on
the
road
This
indi
cato
r mea
sure
s zeb
ra
cros
sings
, tra
ffic s
igns
, spe
ed
brea
kers
etc
No.
17 (2
016)
C=6
7N
T=50
Adm
inist
rativ
e D
ata,
Dzo
ngkh
ag
Mun
icip
ality
Adm
inist
rativ
e re
cord
Leng
th o
f fo
otpa
th in
D
zong
khag
Thro
m
This
indi
cato
r mea
sure
s len
gth
of
road
side
and
off
stre
et fo
otpa
th
Km
4.5
(201
6)C
=14.
5N
T=10
Adm
inist
rativ
e D
ata,
Dzo
ngkh
ag
Mun
icip
ality
Adm
inist
rativ
e re
cord
Gen
der f
riend
ly
publ
ic to
ilets
in
Dzo
ngkh
agTh
rom
This
indi
cato
r mea
sure
s the
nu
mbe
r of g
ende
r frie
ndly
toile
ts
cons
truc
ted
No.
0 (2
016)
NT=
1 A
dmin
istra
tive
Dat
a, D
zong
khag
M
unic
ipal
ity
Adm
inist
rativ
e re
cord
Cha
mkh
ar
Leng
th o
f urb
an
road
in th
e ap
prov
ed L
APs
This
indi
cato
r mea
sure
s len
gth
of u
rban
road
mai
ntai
ned
or
cons
truc
ted
in th
e ap
prov
ed L
APs
Km
7
NT
=4.6
Adm
inist
rativ
e D
ata,
Dzo
ngkh
ag
Mun
icip
ality
Adm
inist
rativ
e re
cord
4 (C
ham
khar
, ja
likha
r,Dek
iling
)
Stre
et li
ght
cove
rage
in
Dzo
nkha
gThro
m
This
indi
cato
r mea
sure
s pe
rcen
tage
of a
rea
cove
red
by
stre
et li
ghts
aga
inst
tota
l are
a of
D
zonk
hagTh
rom
%65
(201
6)>9
0 A
dmin
istra
tive
Dat
a, D
zong
khag
-M
unic
ipal
ity
Adm
inist
rativ
e re
cord
Vill
ages
with
im
prov
ed ro
ads/
pr
oper
foot
path
, dr
aina
ge a
nd
exist
ing
alle
ys
This
indi
cato
r mea
sure
s per
-ce
ntag
e of
vill
ages
with
pro
per
foot
path
, dra
inag
e an
d pa
vem
ent
of a
lleys
usin
g st
ones
, con
cret
e, br
icks
, mud
etc
.
% 2
NT=
20
C=2
2
Adm
inist
rativ
e D
ata,
Dzo
ngkh
ag
Mun
icip
ality
Adm
inist
rativ
e re
cord
-93-
Twelfth Five Year Plan (2018-2023), Bumthang Dzongkhag
14.1. Programme Summary and strategy
Programme Title: human Settlement Development
Objective: To improve livability, safety and sustainability of human settlements
Collaborating Agency/ies: Gewogs/MoWHS/Business Community
Programme Strategies:Bumthang has a total population of 17,820 which is expected to increase as the economic opportunities in the Dzongkhag increase and more economic oppor-tunities are created.
Currently, the Dzongkhag does not have an efficient solid waste collection and sewer system, only 84 households in the dzongkhag thromis connected to the sewer network. Waste collection and disposal is a concern as not every Gewog has garbage collection truck service, which leads to littering and waste problem. In order to improve the safety and sustainability of human settlements, the dz-ongkhag will pursue the following strategies:
1. To address the drinking water issues, the existing water supply network will be improved and additional water treatment plant and reservoir will be constructed;
2. Procure additional compactor and cesspool to provide reliable waste col-lection services;
3. Improve urban infrastructure such as urban road, footpath, sewerage treat-ment plant, drainage system, common duct, bus terminal and parking will be constructed and improved;
4. Recreational facilities such as Children Park, Cycling Track, Multi Sport Complex, Playground, Community Centers will be developed to enhance community vitality and community bonding;
5. To enhance the security of the community, additional street light and CCTV shall be installed in the Thromde;
Twelfth Five Year Plan (2018-2023), Bumthang Dzongkhag
-94-
6. To prevent and mitigate unforeseen natural calamities such as flood, river protection wall shall be constructed;
7. The Thromde shall strive and make concerted effort to preserve and pro-mote the traditional architectural design for all time to come;
8. In addition to the existing three Local Area Plan (LAP), one LAP shall be prepared and finalized to prevent the haphazard development of the town;
9. The municipality will emphasize and implement Development Control Regulation guidelines;
10. Focus will be given to realize and ensure 24X7 clean drinking water avail-ability at the household level in both rural and urban areas;
11. Collaborate and work with relevant central agencies in environmentally friendly and disable friendly planning and implementation of urban and rural infrastructures
i. Scrutinize the drawings and designs and retrofit buildings, roads, drainage, footpaths, parking etc.
ii. Monitor implementation and regulate as per the approved drawing and designs of infrastructures.
12. Dzongkhag will also start collecting parking fee in core Chamakhar town area to decongest traffic and increase revenue for municipality.
-95-
Twelfth Five Year Plan (2018-2023), Bumthang Dzongkhag
14.2
. Pro
gram
me
Out
put M
atri
x
14.2
.1. D
zong
khag
Prog
ram
me o
utpu
t ind
icat
ors a
nd ta
rget
sO
utco
me
Out
put
Wei
ght
Out
put I
ndic
ator
Uni
tW
eigh
tBa
selin
e (B
ase
Year
) P
lan
Targ
et
Liva
bilit
y, sa
fety
and
su
stai
nabi
lity
of h
uman
se
ttlem
ents
im
prov
ed
Liva
ble
and
safe
hum
an
settl
emen
t am
eniti
es
prov
ided
100
Solid
was
te d
ispos
ed to
land
fill
MT/
da
y4
4.2
NT=
<4.2
Was
te re
cycl
ed%
5N
AN
T =3
0h
ouse
hold
s con
nect
ed to
inte
grat
ed w
aste
/se
wer
man
agem
ent i
nfra
stru
ctur
e an
d co
llect
ion
syst
em in
Dzo
ngkh
agTh
rom
%5
84(2
016)
C=9
0
NT=
6
Vill
ages
with
impr
oved
road
s/ p
rope
r foo
tpat
h,
drai
nage
and
exi
stin
g al
leys
No.
32
NT=
22
Freq
uenc
y of
was
te co
llect
ion
per w
eek
No.
55
6In
itiat
ive
to re
duce
use
of p
last
icN
o3
02
No.
of r
ecyc
ling
plan
t/uni
tN
o.3
01
urb
an w
ater
supp
ly
No.
82
1Se
wer
age
trea
tmen
t pla
nt
Km
80
1A
rea
of v
ehic
le p
arki
ng%
30.
06(2
016)
0.1
Are
a of
gre
en/p
ublic
spac
e w
ithin
mun
icip
al
area
%3
1020
Leng
th o
f foo
tpat
h al
ong
urba
n ro
adK
m5
4.5
(201
6)C
=14.
5N
T=10
Num
ber o
f pro
per t
raffi
c/sa
fety
sign
age
and
faci
litie
s on
the
road
No.
417
(201
6)C
=67
NT=
50
Twelfth Five Year Plan (2018-2023), Bumthang Dzongkhag
-96-
Out
com
eO
utpu
tW
eigh
tO
utpu
t Ind
icat
orU
nit
Wei
ght
Base
line
(Bas
e Ye
ar)
Pla
n Ta
rget
Gen
der f
riend
ly p
ublic
toile
ts in
Dz-
ongk
hagTh
rom
No.
10
(201
6)N
T=1
Leng
th o
f new
urb
an ro
ad co
nstr
ucte
dK
m9
74.
6 (C
ham
khar
, ja
likha
r, D
ekili
ng,
Leng
th o
f urb
an ro
ad m
aint
aine
d/ re
nova
ted/
impr
oved
Km
121.
55N
T=14
.5
Stre
et li
ght c
over
age
in D
zonk
hagTh
rom
%4
65>9
0N
umbe
r of s
tree
t lig
ht m
aint
aine
d/ re
nova
ted
No.
330
NT
=78
No.
of i
nitia
tives
to p
rom
ote
Smar
t city
No.
35
NT
=4Le
ngth
of d
rain
age
(oth
er th
an ro
ads)
in
rura
l ar
eas
Km
22.
31
Num
ber o
f tar
gete
d in
terv
entio
ns fo
r vul
nera
ble
grou
ps –
peo
ple
who
beg
& v
ulne
rabl
e ur
ban
dwel
lers
No.
20
1
No.
of i
nitia
tives
to re
duce
Indu
stria
l was
te,
e-w
aste
, effl
uenc
eN
o.3
NA
1(de
velo
p in
dust
rial
and
E-w
aste
m
gt. p
lan)
No.
of s
crap
dea
lers
supp
orte
dN
o.2
05
-97-
Twelfth Five Year Plan (2018-2023), Bumthang Dzongkhag
Proj
ecte
d An
nual
Tar
get
Sl.
No
KPI
Proj
ecte
d A
nnua
l Tar
get
FY
2018
-201
9FY
20
19-2
020
FY
2020
-202
1FY
20
21-2
022
FY
2022
-202
31
Solid
was
te d
ispos
ed to
land
fill
<4.2
<4.2
<4.2
<4.2
<4.2
2W
aste
recy
cled
510
1525
303
hou
seho
lds c
onne
cted
to in
tegr
ated
was
te/s
ewer
man
-ag
emen
t inf
rast
ruct
ure
and
colle
ctio
n sy
stem
in D
z-on
gkha
gThro
m
8485
8788
>90
4V
illag
es w
ith im
prov
ed ro
ads/
pro
per f
ootp
ath,
dra
inag
e an
d ex
istin
g al
leys
25
55
3
5Fr
eque
ncy
of w
aste
colle
ctio
n pe
r wee
k6
66
66
6In
itiat
ive
to re
duce
use
of p
last
ic1
17
No.
of r
ecyc
ling
plan
t/uni
t1
8N
ew u
rban
wat
er su
pply
19
Sew
erag
e tr
eatm
ent p
lant
1
10A
rea
of v
ehic
le p
arki
ng0.
060.
060.
080.
090.
111
Are
a of
gre
en/p
ublic
spac
e w
ithin
mun
icip
al a
rea
1010
1520
2012
Leng
th o
f foo
tpat
h al
ong
urba
n ro
ad0
33
31
13N
umbe
r of p
rope
r tra
ffic/
safe
ty si
gnag
e an
d fa
cilit
ies o
n th
e ro
ad20
2010
14G
ende
r frie
ndly
pub
lic to
ilets
in D
zong
khag
Thro
m1
15Le
ngth
of n
ew u
rban
road
cons
truc
ted
01
11.
61
16Le
ngth
of u
rban
road
mai
ntai
ned/
reno
vate
d/ im
prov
ed
04
44
2.5
17St
reet
ligh
t cov
erag
e in
Dzo
nkha
gThro
m a
nd
>90
>90
>90
>90
>90
18N
umbe
r of s
tree
t lig
ht m
aint
aine
d/re
nova
ted
1020
3010
8
Twelfth Five Year Plan (2018-2023), Bumthang Dzongkhag
-98-
Sl.
No
KPI
Proj
ecte
d A
nnua
l Tar
get
FY
2018
-201
9FY
20
19-2
020
FY
2020
-202
1FY
20
21-2
022
FY
2022
-202
319
No.
of i
nitia
tives
to p
rom
ote
Smar
t city
Onl
ine
wat
er
billi
ng
Publ
ic
tran
spor
tC
yclin
g Tr
ekO
nlin
e ac
com
mod
atio
n in
form
atio
n &
ot
hers
20Le
ngth
of d
rain
age
(oth
er th
an ro
ads)
in
rura
l are
as1
121
Num
ber o
f tar
gete
d in
terv
entio
ns fo
r vul
nera
ble
grou
ps –
pe
ople
who
beg
& v
ulne
rabl
e ur
ban
dwel
lers
1
22N
o. o
f ini
tiativ
es to
redu
ce In
dust
rial w
aste
, e-w
aste
, effl
uenc
e1
No.
of s
crap
dea
lers
supp
orte
d5
23 Prog
ram
me A
ctiv
ity a
nd O
utla
y:
Out
put
Act
ivity
Act
ivity
Lo
catio
nIn
dica
tive
Plan
Out
lay
(Nu.
in M
illio
n )
Rem
arks
Liva
ble
and
safe
hum
an se
ttlem
ent a
men
ities
pro
vide
d In
fras
truc
ture
Dev
elop
men
t3
LAPs
81.3
84
-99-
Twelfth Five Year Plan (2018-2023), Bumthang Dzongkhag
14.2
.2. G
ewog
s
Chh
oekh
or G
ewog
Prog
ram
me o
utpu
t ind
icat
ors a
nd ta
rget
s O
utco
me
Out
put
Wei
ght
Out
put I
ndic
ator
Uni
tW
eigh
tBa
selin
e (B
ase
Year
) P
lan
Targ
et
Liva
bilit
y, sa
fety
and
su
stai
nabi
lity
of h
uman
se
ttlem
ents
impr
oved
Func
tiona
l in
fras
truc
ture
in
pla
ce
100
No.
of i
nfra
stru
ctur
e co
nstr
ucte
dN
o.75
13N
T=14
No.
of i
nfra
stru
ctur
e m
aint
aine
dN
o.25
112
Proj
ecte
d An
nual
Tar
get
Sl.
No
KPI
Proj
ecte
d A
nnua
l Tar
get
FY
2018
-201
9FY
201
9-20
20FY
20
20-2
021
FY
2021
-202
2FY
20
22-2
023
1N
o. o
f inf
rast
ruct
ure
cons
truc
ted
23
33
32
No.
of i
nfra
stru
ctur
e m
aint
aine
d1
11
1
Prog
ram
me A
ctiv
ity a
nd O
utla
yO
utpu
tA
ctiv
ityA
ctiv
ity L
ocat
ion
Indi
cativ
e Pl
an O
utla
y (N
u. in
Mill
ion)
Rem
arks
Func
tiona
l inf
rast
ruct
ure
in p
lace
In
fras
truc
ture
Dev
elop
men
t5
Chi
wog
s12
.400
Twelfth Five Year Plan (2018-2023), Bumthang Dzongkhag
-100-
Chh
umig
Gew
og
Prog
ram
me o
utpu
t ind
icat
ors a
nd ta
rget
s O
utco
me
Out
put
Wei
ght
Out
put I
ndic
ator
Uni
tW
eigh
tBa
selin
e (B
ase
Year
) P
lan
Targ
et
Liva
bilit
y, sa
fety
and
sust
aina
bilit
y of
hu
man
settl
emen
ts im
prov
edFu
nctio
nal
infr
astr
uctu
re in
pla
ce10
0N
o. o
f inf
rast
ruct
ure
cons
truc
ted
No
100
5N
T=9
Proj
ecte
d An
nual
Tar
get
Sl.
No
KPI
Proj
ecte
d A
nnua
l Tar
get
FY
2018
-201
9FY
20
19-2
020
FY
2020
-202
1FY
20
21-2
022
FY
2022
-202
31
No.
of i
nfra
stru
ctur
e co
nstr
ucte
d1
22
22
Prog
ram
me A
ctiv
ity a
nd O
utla
yO
utpu
tA
ctiv
ityA
ctiv
ity L
ocat
ion
Indi
cativ
e Pl
an O
utla
y (N
u. in
Mill
ion)
Rem
arks
Func
tiona
l inf
rast
ruct
ure
in p
lace
In
fras
truc
ture
Dev
elop
men
t5
Chi
wog
s3.
650
-101-
Twelfth Five Year Plan (2018-2023), Bumthang Dzongkhag
Tang
Gew
og
Prog
ram
me o
utpu
t ind
icat
ors a
nd ta
rget
s O
utco
me
Out
put
Wei
ght
Out
put I
ndic
ator
Uni
tW
eigh
tBa
selin
e (B
ase
Year
) P
lan
Targ
et
Liva
bilit
y, sa
fety
and
sust
aina
bilit
y of
hum
an se
ttlem
ents
impr
oved
Func
tiona
l in
fras
truc
ture
in p
lace
100
No.
of i
nfra
stru
ctur
e co
nstr
ucte
dN
o10
04
NT=
10
Proj
ecte
d An
nual
Tar
get
Sl.N
oK
PIPr
ojec
ted
Ann
ual T
arge
t
FY
2018
-201
9FY
20
19-2
020
FY
2020
-202
1FY
20
21-2
022
FY
2022
-202
31
No.
of i
nfra
stru
ctur
e co
nstr
ucte
d2
22
22
Prog
ram
me A
ctiv
ity a
nd O
utla
yO
utpu
tA
ctiv
ityA
ctiv
ity L
ocat
ion
Indi
cativ
e Pl
an O
utla
y (N
u. in
Mill
ion)
Rem
arks
Func
tiona
l inf
rast
ruct
ure
in p
lace
In
fras
truc
ture
Dev
elop
men
t5
Chi
wog
s9.
450
Twelfth Five Year Plan (2018-2023), Bumthang Dzongkhag
-102-
Ura
Gew
og
Prog
ram
me o
utpu
t ind
icat
ors a
nd ta
rget
s O
utco
me
Out
put
Wei
ght
Out
put I
ndic
ator
Uni
tW
eigh
tBa
selin
e (B
ase
Year
) P
lan
Targ
et
Liva
bilit
y, sa
fety
and
sust
aina
bilit
y of
hum
an se
ttlem
ents
impr
oved
Func
tiona
l in
fras
truc
ture
in p
lace
100
No.
of i
nfra
stru
ctur
e co
nstr
ucte
dN
o10
07
NT=
3
Proj
ecte
d An
nual
Tar
get
Sl.N
oK
PIPr
ojec
ted
Ann
ual T
arge
tFY
20
18-2
019
FY 2
019-
2020
FY
2020
-202
1FY
20
21-2
022
FY
2022
-202
31
No.
of i
nfra
stru
ctur
e co
nstr
ucte
d1
11
Prog
ram
me A
ctiv
ity a
nd O
utla
yO
utpu
tA
ctiv
ityA
ctiv
ity L
ocat
ion
Indi
cativ
e Pl
an O
utla
y (N
u. in
Mill
ion)
Rem
arks
Func
tiona
l inf
rast
ruct
ure
in p
lace
In
fras
truc
ture
Dev
elop
men
t5
Chi
wog
s1.
700
-103-
Twelfth Five Year Plan (2018-2023), Bumthang Dzongkhag
15.
LGK
RA 7
:
Tran
spar
ent,
effec
tive
and
effici
ent p
ublic
serv
ice
deliv
ery
enha
nced
(5 K
PIs)
NK
RA
KPI
Des
crip
tion
Uni
tBa
selin
eTa
rget
Dat
a so
urce
Col
lect
ion
met
hodo
logy
Rem
arks
2. E
cono
mic
di
vers
ity a
nd
prod
uctiv
ity
enha
nced
9. In
fras
truc
ture
, co
mm
unic
atio
n an
d pu
blic
serv
ices
im
prov
ed13
. Dem
ocra
cy
&de
cent
raliz
atio
n st
reng
then
ed14
. Cor
rupt
ion
redu
ced
16. j
ustic
e se
rvic
es
and
inst
itutio
n st
reng
then
ed
Civ
il se
rvan
t po
sitio
ns n
ot fi
lled
This
indi
cato
r mea
sure
s nu
mbe
r of s
taff
posit
ions
ap
prov
ed b
ut n
ot fi
lled
on
an a
nnua
l bas
is. It
exc
lude
s do
ctor
s, nu
rses
and
te
ache
rs
No
40
Adm
inist
rativ
e D
ata,
Dzo
ngkh
ag
AFD
Adm
inist
rativ
e re
cord
Envi
ronm
ent
Offi
cer,
Inte
rnal
Au
dito
r PA
, Sto
re
assis
tant
Serv
ice
Del
iver
y St
anda
rds
with
SO
Ps fo
r D
zong
khag
pub
lic
serv
ice
deliv
ery
deve
lope
d an
d op
erat
iona
lized
This
indi
cato
r mea
sure
s th
e tim
elin
e by
whi
ch
Serv
ice
Del
iver
y St
anda
rds w
ith S
OPs
for
Dzo
ngkh
ag p
ublic
serv
ice
deliv
ery
deve
lope
d an
d op
erat
iona
lized
Dat
e0
2018
-19
Adm
inist
rativ
e D
ata,
Dzo
ngkh
ag
AFD
Adm
inist
rativ
e re
cord
Com
mon
ly
avai
led
serv
ices
de
liver
ed a
s per
TA
T
This
indi
cato
r mea
sure
s pe
rcen
tage
of c
omm
only
av
aile
d se
rvic
es d
eliv
ered
as
per
TAT
%N
A90
Adm
inist
rativ
e D
ata,
Dzo
ngkh
ag
AFD
Adm
inist
rativ
e re
cord
New
pub
lic
Infr
astr
uctu
re
with
disa
bled
fr
iend
ly fa
cilit
ies
This
indi
cato
r mea
sure
s nu
mbe
r of n
ew p
ublic
in
fras
truc
ture
s with
di
sabl
ed fr
iend
ly fa
cilit
ies
such
as r
amp,
SEN
Blo
cks,
sepa
rate
toile
t for
disa
bled
, pr
oper
foot
path
etc
.
No.
NA
4A
dmin
istra
tive
Dat
a, D
zong
khag
En
gine
erin
g Se
ctor
Adm
inist
rativ
e re
cord
Inco
rpor
ate
disa
bled
fr
iend
ly fe
atur
es
in co
mm
on
infr
astr
uctu
re in
4
big
proj
ects
as
exem
plar
y
Twelfth Five Year Plan (2018-2023), Bumthang Dzongkhag
-104-
15.1. Programme summary and strategy
Programme title: Transparent, effective and efficient public service delivery
Objective: To promote transparent, effective and efficient public services delivery
Collaborating Agency/ies: Gewog s/MoHCA, DLG
Programme Strategies: As per the GNh Survey 2015, in general, people’s perception on government’s performance has declined significantly in 2015, mainly in terms of reducing the gap between rich and poor (narrowing the gap), creating jobs and fighting cor-ruption.
Service Delivery Standards and Operating Procedures are not standardized across Gewog s and Dzongkhags for effective public service delivery and internet connectivity is an issue for most of the Community Centers (CCs). Furthermore, due to less awareness, there are not many people availing the services of CCs.
During the 12th FYP, focus needs to be on strengthening initiatives that will fur-ther enhance decentralization by taking efficient and effective public services de-livery closer to the people and reduce corruption and increasing responsibility and accountability in the local governments.
The Dzongkhag administration will:
1. Strengthen and build the capacity of the Community Centers (CCs) by consolidating services that are provided online with Service Delivery Stan-dards (SDS), Standard Operating Procedures (SOPs) and Turn Around Time (TAT). These CCs will be provided with adequate and reliable inter-net connections;
2. Conduct awareness and advocacy on the public services available online in the CCs and sectorial offices to the citizens and communities especially to women and farmers and provide hands on support to the service recipients to ensure that more people are availing the services, and build credibility of the services;
-105-
Twelfth Five Year Plan (2018-2023), Bumthang Dzongkhag
3. Continuous feedback from service recipients and citizens will be taken by engaging citizens, and undertake performance evaluation to innovate, im-prove and enhance performance and TATs of service providers and ser-vices;
4. use of technology such as smart phones and mobile apps will be explored, tapped and developed to deliver and share real time information and ser-vices such as getting directions on parking availability, waste disposal, road blocks and traffic diversion, city social/entertainment events and free wi-fi locations for transparent, efficient and effective service delivery;
5. Develop and operationalize SOPs and SDS for critical services like health and hospital services such as for patient admission, consultations, doctors visit, prescribing medicine etc to reduce waiting time for patients and for efficient service delivery;
6. Regularly update and share plan and financial information such as annu-al plan and budget achievements, agenda and resolution of Dzongkhag Tshogdu and Gewog Tshogdes, new bye-laws and national policies and area/settlement developmental plans for community engagement and feedback, sharing information etc;
7. Encourage and discuss with interested private operators to start bus ser-vices or any other public transport services using utility pick-ups or medi-um sized trucks within Gewog s and to other dzongkhags and back. In the dzongkhag throm after assessing the size of the throm area and its popu-lation growth, the dzongkhag will introduce a bus service and put in place proper transport system and information. Dzongkhag will also develop re-lated transport infrastructures and facilities such as bus terminal and bus stop.
Twelfth Five Year Plan (2018-2023), Bumthang Dzongkhag
-106-
15.2
. Pro
gram
me
Out
put M
atri
x
15.2
.1. D
zong
khag
Prog
ram
me o
utpu
t ind
icat
ors a
nd ta
rget
sO
utco
me
Out
put
Wei
ght
Out
put I
ndic
ator
Uni
tW
eigh
tBa
selin
e (B
ase
Year
)
Pla
n Ta
rget
Tran
spar
ent,
effec
tive
and
effici
ent p
ublic
se
rvic
e de
liver
y en
hanc
ed
Serv
ice
deliv
ery
impr
oved
30
Serv
ice
Del
iver
y St
anda
rds w
ith S
OPs
for D
zong
khag
dev
elop
edD
ate
70
2018
-19
Com
mon
ly av
aile
d se
rvic
es d
eliv
ered
as p
er T
AT%
6N
A>9
0
Civ
il se
rvan
t pos
ition
s not
fille
dN
o.2
40
New
pub
lic In
fras
truc
ture
with
disa
bled
frie
ndly
faci
litie
sN
o.4
04
Arc
hiva
l Sys
tem
For
Dzo
ngkh
ag d
evel
oped
Dat
e5
020
18-1
9
Cor
rupt
ion
redu
ced
20In
tegr
ity v
ettin
g fo
r man
ager
ial p
ositi
ons
%5
NA
Trac
k
Cor
rupt
ion,
tran
spar
ency
and
acc
ount
abili
ty in
dex
Scor
e6
NA
Trac
k
AD
per
form
ance
scor
e%
510
010
0
Wor
k an
d in
tegr
ity c
ultu
re in
dex
%4
NA
Trac
k
Func
tiona
l civ
il in
fras
truc
ture
de
velo
ped
50N
o. o
f new
civi
l inf
rast
ruct
ure
deve
lope
d N
o.24
8N
T=7(
Dzo
ngda
’s qu
arte
r, ro
ad
wid
enin
g, G
ate,
foot
path
aro
und
the
dzon
g, 2
C
Cs,
Disa
ster
Em
erge
ncy
oper
atio
n ce
nter
,
No.
of n
ew ci
vil i
nfra
stru
ctur
e m
aint
aine
dN
o.26
10N
=25
-107-
Twelfth Five Year Plan (2018-2023), Bumthang Dzongkhag
Proj
ecte
d An
nual
Tar
get
Sl.
No
KPI
Proj
ecte
d A
nnua
l Tar
get
FY
2018
-201
9FY
20
19-2
020
FY
2020
-202
1FY
20
21-2
022
FY
2022
-202
3
1Se
rvic
e D
eliv
ery
Stan
dard
s with
SO
Ps fo
r D
zong
khag
dev
elop
ed20
18-1
9Im
plem
enta
tion
Impl
emen
tatio
nIm
plem
enta
tion
Impl
emen
tatio
n
2C
omm
only
avai
led
serv
ices
del
iver
ed a
s per
TA
T80
>90
>90
>90
>90
4C
ivil
serv
ant p
ositi
ons n
ot fi
lled
32
06
New
pub
lic In
fras
truc
ture
with
disa
bled
fr
iend
ly fa
cilit
ies
01
11
1
7A
rchi
val S
yste
m fo
r Dzo
ngkh
ag d
evel
oped
2018
-19
Impl
emen
tatio
n Im
plem
enta
tion
Impl
emen
tatio
n Im
plem
enta
tion
8In
tegr
ity v
ettin
g fo
r man
ager
ial p
ositi
ons
Trac
kTr
ack
Trac
kTr
ack
Trac
k9
Wor
k an
d in
tegr
ity c
ultu
re in
dex
Trac
kTr
ack
Trac
kTr
ack
Trac
k10
Cor
rupt
ion,
tran
spar
ency
and
acc
ount
abili
ty
inde
xTr
ack
Trac
kTr
ack
Trac
kTr
ack
11N
o. o
f new
civi
l inf
rast
ruct
ure
deve
lope
d 0
23
212
No.
of n
ew ci
vil i
nfra
stru
ctur
e m
aint
aine
d5
55
55
13A
D p
erfo
rman
ce sc
ore
100
100
100
100
100
Prog
ram
me A
ctiv
ity a
nd O
utla
y O
utpu
tA
ctiv
ityA
ctiv
ity L
ocat
ion
Indi
cativ
e Pl
an O
utla
y (N
u. in
Mill
ion)
Rem
arks
1.
Serv
ice
Del
iver
y en
hanc
ed2.
C
orru
ptio
n re
duce
d3.
Fu
nctio
nal c
ivil
infr
astr
uctu
re
deve
lope
d
Infr
astr
uctu
re d
evel
opm
ent
Dzo
ngkh
ag a
nd G
ewog
68.3
50Tr
aini
ng a
nd S
kills
dev
elop
men
tD
zong
khag
and
Gew
og5.
500
Impr
ove
publ
ic se
rvic
esD
zong
khag
and
Gew
ogs
7.27
0
Twelfth Five Year Plan (2018-2023), Bumthang Dzongkhag
-108-
15.2
.2. G
ewog
s
Chh
oekh
or G
ewog
Prog
ram
me o
utpu
t ind
icat
ors a
nd ta
rget
s O
utco
me
Out
put
Wei
ght
Out
put I
ndic
ator
Uni
tW
eigh
tBa
selin
e (B
ase
Year
) P
lan
Targ
et
Tran
spar
ent,
effec
tive
and
effici
ent p
ublic
se
rvic
e de
liver
y en
hanc
ed
Func
tiona
l civ
il in
fras
truc
ture
de
velo
ped
100
No.
of n
ew ci
vil i
nfra
stru
ctur
e de
velo
ped
and
mai
ntai
ned
No.
552
NT=
7
No.
of c
apac
ity d
evel
opm
ent c
ondu
cted
No.
452
NT=
5
Proj
ecte
d An
nual
Tar
get
Sl.
No
KPI
Proj
ecte
d A
nnua
l Tar
get
FY
2018
-201
9FY
20
19-2
020
FY 2
020-
2021
FY
2021
-202
2FY
20
22-2
023
1N
o. o
f new
civi
l inf
rast
ruct
ure
deve
lope
d an
d m
aint
aine
d1
22
12
No.
of c
apac
ity d
evel
opm
ent c
ondu
cted
11
1
Prog
ram
me A
ctiv
ity a
nd O
utla
y:O
utpu
tA
ctiv
ityA
ctiv
ity L
ocat
ion
Indi
cativ
e Pl
an O
utla
y (N
u. in
Mill
ion)
Rem
arks
Func
tiona
l civ
il in
fras
truc
ture
dev
elop
edIn
fras
truc
ture
dev
elop
men
tC
hiw
ogs
7.28
0
-109-
Twelfth Five Year Plan (2018-2023), Bumthang Dzongkhag
Chh
umig
Gew
og
Prog
ram
me o
utpu
t ind
icat
ors a
nd ta
rget
s O
utco
me
Out
put
Wei
ght
Out
put I
ndic
ator
Uni
tW
eigh
tBa
selin
e (B
ase
Year
) P
lan
Targ
et
Tran
spar
ent,
effec
tive
and
effici
ent
publ
ic se
rvic
e de
liver
y en
hanc
ed
Func
tiona
l civ
il in
fras
truc
ture
de
velo
ped
100
No.
of n
ew ci
vil i
nfra
stru
ctur
e de
velo
ped
No.
607
NT=
6N
o. o
f new
civi
l inf
rast
ruct
ure
mai
ntai
ned
No.
404
NT=
3
Proj
ecte
d An
nual
Tar
get
Sl.
No
KPI
Proj
ecte
d A
nnua
l Tar
get
FY
2018
-201
9FY
20
19-2
020
FY
2020
-202
1FY
20
21-2
022
FY
2022
-202
31
No.
of n
ew ci
vil i
nfra
stru
ctur
e de
velo
ped
12
21
2N
o. o
f new
civi
l inf
rast
ruct
ure
mai
ntai
ned
11
1
Prog
ram
me A
ctiv
ity a
nd O
utla
y:
Out
put
Act
ivity
Act
ivity
Loc
atio
nIn
dica
tive
Plan
Out
lay
(Nu.
in M
illio
n)R
emar
ks
Func
tiona
l civ
il in
fras
truc
ture
de
velo
ped
Infr
astr
uctu
re d
evel
opm
ent
Gew
og3.
650
Trai
ning
and
Ski
lls d
evel
opm
ent/
awar
enes
sG
ewog
1.11
0Im
prov
e pu
blic
serv
ices
Gew
og1.
200
Twelfth Five Year Plan (2018-2023), Bumthang Dzongkhag
-110-
Tang
Gew
og
Prog
ram
me o
utpu
t ind
icat
ors a
nd ta
rget
s O
utco
me
Out
put
Wei
ght
Out
put I
ndic
ator
Uni
tW
eigh
tBa
selin
e (B
ase
Year
) P
lan
Targ
et
Tran
spar
ent,
effec
tive
and
effici
ent p
ublic
se
rvic
e de
liver
y en
hanc
ed
Func
tiona
l ci
vil
infr
astr
uctu
re
deve
lope
d
100
No.
of n
ew ci
vil i
nfra
stru
ctur
e de
velo
ped
No.
803
NT=
2N
o. o
f new
civi
l inf
rast
ruct
ure
mai
ntai
ned
No.
203
NT=
1
Proj
ecte
d An
nual
Tar
get
Sl.
No
KPI
Proj
ecte
d A
nnua
l Tar
get
FY 2
018-
2019
FY
2019
-202
0FY
20
20-2
021
FY
2021
-202
2FY
20
22-2
023
1N
o. o
f new
civi
l inf
rast
ruct
ure
deve
lope
d 0
01
01
2N
o. o
f new
civi
l inf
rast
ruct
ure
mai
ntai
ned
00
01
Prog
ram
me A
ctiv
ity a
nd O
utla
y:
Out
put
Act
ivity
Act
ivity
Loc
atio
nIn
dica
tive
Plan
Out
lay
(Nu.
in M
illio
n)R
emar
ks
Func
tiona
l civ
il in
fras
truc
ture
dev
elop
edIn
fras
truc
ture
dev
elop
men
tG
ewog
4.15
0
-111-
Twelfth Five Year Plan (2018-2023), Bumthang Dzongkhag
Ura
Gew
og
Prog
ram
me o
utpu
t ind
icat
ors a
nd ta
rget
s O
utco
me
Out
put
Wei
ght
Out
put I
ndic
ator
Uni
tW
eigh
tBa
selin
e (B
ase
Year
) P
lan
Targ
et
Tran
spar
ent,
effec
tive
and
effici
ent p
ublic
serv
ice
deliv
ery
enha
nced
Func
tiona
l civ
il in
fras
truc
ture
dev
elop
ed
100
No.
of n
ew ci
vil
infr
astr
uctu
re d
evel
oped
N
o.10
03
NT=
5
Proj
ecte
d An
nual
Tar
get
Sl.
No
KPI
Proj
ecte
d A
nnua
l Tar
get
FY
2018
-201
9FY
20
19-2
020
FY
2020
-202
1FY
20
21-2
022
FY
2022
-202
31
No.
of n
ew ci
vil i
nfra
stru
ctur
e de
velo
ped
01
12
1
Prog
ram
me A
ctiv
ity a
nd O
utla
y:
Out
put
Act
ivity
Act
ivity
Loc
atio
nIn
dica
tive
Plan
Out
lay
(Nu.
in M
illio
n)R
emar
ks
Func
tiona
l civ
il in
fras
truc
ture
dev
elop
edIn
fras
truc
ture
dev
elop
men
tG
ewog
1.00
0
Twelfth Five Year Plan (2018-2023), Bumthang Dzongkhag
-112-
16.
LGK
RA 8
:
Dem
ocra
cy a
nd d
ecen
tral
izat
ion
stre
ngth
ened
(4 K
PIs)
NK
RA
KPI
Des
crip
tion
Uni
tBa
selin
eTa
rget
Dat
a so
urce
Col
lect
ion
met
hodo
logy
Rem
arks
2. E
cono
mic
di
vers
ity a
nd
prod
uctiv
ity
enha
nced
10. G
ende
r eq
ualit
y pr
omot
ed,
wom
en a
nd g
irls
empo
wer
ed
12. C
orru
ptio
n re
duce
d
13. D
emoc
racy
an
d de
cent
raliz
atio
n st
reng
then
ed
16. j
ustic
e se
rvic
es a
nd
inst
itutio
n st
reng
then
ed
Zom
du
atte
ndan
ce b
y ge
nder
This
indi
cato
r mea
sure
s per
cent
age
of re
siden
t pe
ople
(vot
ing
age)
by
gend
er at
tend
ing
(ann
ually
) in
form
al m
eetin
gs co
nduc
ted
by
Gew
og/D
zong
khag
nam
ely
for 1
) Age
nda
setti
ng fo
r sub
miss
ion
to G
ewog
Tsho
gde,
Dzo
ngkh
agTs
hogd
u& P
arlia
men
t 2)
Con
sulta
tion
on p
lans
, bud
get &
ann
ual
perf
orm
ance
targ
ets f
or G
ewog
&D
zong
khag
&
Loca
l Are
a Pl
an 3
) Con
sulta
tion
on
Gew
og&
Dzo
ngkh
ag b
ye-la
ws &
nat
iona
l po
licie
s
%N
A>5
0 of
hh
s A
dmin
istra
-tiv
e D
ata,
G
ewog
Ad-
min
istra
tion
Adm
inist
rativ
e re
cord
Func
tiona
l loc
al
user
gro
ups,
self-
help
gro
ups,
loca
l co
mm
ittee
s and
co
oper
ativ
es
This
indi
cato
r mea
sure
s num
ber o
f gro
ups a
nd
com
mitt
ees s
uch
as fa
rm ro
ad u
ser g
roup
s, w
ater
use
r gro
ups,
irrig
atio
n, C
omm
unity
Fo
rest
ry, e
tc. a
nd d
isagg
rega
ted
by g
roup
s
No.
125
(201
5)
20A
dmin
istra
-tiv
e D
ata,
RN
R Se
ctor
Adm
inist
rativ
e re
cord
Grie
vanc
es
regi
ster
ed w
ith
Dzo
ngkh
ag a
nd
Gew
ogs r
esol
ved
This
indi
cato
r mea
sure
s per
cent
age
of
grie
vanc
es re
gist
ered
with
Dzo
ngkh
ag a
nd
Gew
ogs r
esol
ved
as p
er g
rieva
nce
redr
essa
l m
echa
nism
%0
>90
Adm
inist
ra-
tive
Dat
a,
Dzo
ngkh
ag
AFD
Adm
inist
rativ
e re
cord
Com
mun
ity
scor
e ca
rd to
ol
impl
emen
ted
This
indi
cato
r mea
sure
s num
ber o
f com
mun
ity
scor
e ca
rd to
ol im
plem
ente
d to
get
com
mun
ity
(use
r) sa
tisfa
ctio
n on
LG
’s se
rvic
e de
liver
y at
le
ast t
wic
e a
year
whi
ch a
sses
s the
qua
lity
of
publ
ic se
rvic
es su
ch a
s agr
icul
ture
, liv
esto
ck,
road
s, w
ater
and
sani
tatio
n, e
duca
tion,
etc
.
No.
05
Adm
inist
ra-
tive
Dat
a,
Dzo
ngkh
ag
AFD
Citi
zen’s
Rep
ort
Car
d
-113-
Twelfth Five Year Plan (2018-2023), Bumthang Dzongkhag
16.1. Programme Summary and strategy
Programme Title: Democracy and decentralization
Objective: To strengthen democracy and decentralization
Collaborating Agency/ies: Gewog s/MoHCA, DLG/ECB
Programme Strategies: The most recent local government elections were held in 2012. At the nation-al level, from the total of 2,185 candidates 1,104 representatives were elected at various levels. Of the 165 female candidates 76 were elected to office. however, female participants in any of the election from the Dzongkhag are very poor.
In terms of political participation, zomdusare male dominated political forum. In order to enable more gender balanced participation, strategies need to be devised to encourage more female participation.
Strengthening, sustaining and building a vibrant democracy is a major priority highlighted in many of the Royal addresses. Democracy, good governance and local economic development can be ensured and nurtured by upholding the law and through citizen’s active participation in local development management and decision making at the grassroots level
Given the issues and opportunities facing democracy and decentralization at the local level, Dzongkhag will:
1. Strengthen initiatives of the 11 FYP to further enhance understanding and implementation of decentralization by enhancing citizen’s engagement in decision-making processes, taking efficient and effective public service de-livery closer to the people, and increase ownership, responsibility and ac-countability at the local level especially by citizens and community of their own development;
2. Dzongkhag and Gewog s will also ensure faster and effective complaint/grievances redressal of developmental and social issues faced by the cit-izens and informing the citizens of the actions taken on their grievances submitted;
Twelfth Five Year Plan (2018-2023), Bumthang Dzongkhag
-114-
3. Support formation of more community users’ groups, committees and co-operatives similar to community monitoring and assessment committee (CMAC) currently being piloted in the dzongkhags to strengthen democ-racy, enhance citizen’s participation and engagement in planning, deci-sion-making and management of their own local development and eco-nomic growth;
4. Facilitate and support formation, capacity building and functioning of groups, cooperatives and committees as platforms for citizens to come to-gether, share ideas, mobilize common resources, take initiatives, monitor developmental works, give solutions, foster community cooperation and mutual support, and at the same time promote participation and demo-cratic actions in decision making and in achieving common outcomes and greater developmental goals.
-115-
Twelfth Five Year Plan (2018-2023), Bumthang Dzongkhag
16.2
. Pro
gram
me
Out
put M
atri
x
16.2
.1.
Dzo
ngkh
ag
Prog
ram
me o
utpu
t ind
icat
ors a
nd ta
rget
s O
utco
me
Out
put
Wei
ght
Out
put I
ndic
ator
Uni
tW
eigh
tBa
selin
e (B
ase
Year
) P
lan
Targ
et
Dem
ocra
cy a
nd
dece
ntra
lizat
ion
stre
ngth
ened
Cre
ate
enab
ling
envi
ronm
ent
100
Num
ber o
f zom
dues
/pub
lic fo
rum
%
100
50Zo
mdu
atte
ndan
ce b
y ge
nder
%4
NA
>50
of h
hs
Num
ber o
f fun
ctio
nal l
ocal
use
r gro
ups
No.
1012
5N
T=10
Grie
vanc
es re
gist
ered
with
Dzo
ngkh
ag a
nd
Gew
ogs r
esol
ved
%15
0>9
0
Com
mun
ity sc
ore
card
tool
impl
emen
ted
No.
120
8N
umbe
r of f
unct
iona
l loc
al co
mm
ittee
sN
o.16
2N
T=5
Num
ber o
f fun
ctio
nal l
ocal
coop
erat
ives
No.
152
NT=
2N
umbe
r of f
unct
iona
l loc
al fa
rmer
s gro
upN
o.18
21N
T=7
Twelfth Five Year Plan (2018-2023), Bumthang Dzongkhag
-116-
Proj
ecte
d An
nual
Tar
get
Sl.
No
Indi
cato
rsPr
ojec
ted
Ann
ual T
arge
tFY
20
18-2
019
FY
2019
-202
0FY
20
20-2
021
FY
2021
-202
2FY
20
22-2
023
1N
umbe
r of z
omdu
es/p
ublic
foru
m
1010
1010
102
Zom
du at
tend
ance
by
gend
er>5
0 of
hh
s>5
0 of
hh
s>5
0 of
hh
s>5
0 of
hh
s>5
0 of
hh
s3
Num
ber o
f fun
ctio
nal l
ocal
use
r gro
ups
22
22
24
Grie
vanc
es re
gist
ered
with
Dzo
ngkh
ag a
nd G
ewog
s res
olve
d>9
0>9
0>9
0>9
0>9
05
Com
mun
ity sc
ore
card
tool
impl
emen
ted
11
11
16
Num
ber o
f fun
ctio
nal l
ocal
com
mitt
ees
11
11
17
Num
ber o
f fun
ctio
nal l
ocal
coop
erat
ives
11
00
08
Num
ber o
f fun
ctio
nal l
ocal
farm
ers g
roup
11
22
1
Prog
ram
me A
ctiv
ity a
nd O
utla
yO
utpu
tA
ctiv
ityA
ctiv
ity L
ocat
ion
Indi
cativ
e Pl
an O
utla
y (N
u. in
Mill
ion)
Rem
arks
Cre
ate
enab
ling
envi
ronm
ent
Awar
enes
s and
Edu
catio
n pr
ogra
mm
esD
zong
khag
and
Gew
og4.
000
-117-
Twelfth Five Year Plan (2018-2023), Bumthang Dzongkhag
17.
LGK
RA 9
:
Car
bon
neut
ral,
clim
ate
and
disa
ster
resi
lient
dev
elop
men
t enh
ance
d (4
KPI
s)
NK
RA
KPI
Des
crip
tion
Uni
tBa
selin
eTa
rget
Dat
a so
urce
Col
lect
ion
met
hodo
logy
Rem
arks
5. h
ealth
y ec
osys
tem
se
rvic
es
mai
ntai
ned
6. C
arbo
n ne
utra
l, cl
imat
e an
d di
sast
er re
silie
nt
deve
lopm
ent
enha
nced
9.
Infr
astr
uctu
re,
com
mun
icat
ion
and
publ
ic
serv
ices
impr
oved
3.
Pov
erty
er
adic
ated
an
d in
equa
lity
redu
ced
14.h
ealth
y an
d ca
ring
soci
ety
enha
nced
hou
seho
lds
with
bio
gas
plan
ts
This
indi
cato
r mea
sure
s num
ber o
f ho
useh
olds
usin
g Bi
ogas
as a
n al
tern
ativ
e re
new
able
ene
rgy
No.
9 (2
016)
N=1
00A
dmin
istra
tive
Dat
a, L
ives
tock
Se
ctor
Adm
inist
rativ
e Re
cord
of
Live
stoc
k Se
ctor
Crit
ical
pub
lic
infr
astr
uctu
re
(sch
ools,
ho
spita
ls an
d ro
ads)
clim
ate/
disa
ster
pro
ofed
The
indi
cato
r mea
sure
s all
criti
cal p
ublic
in
fras
truc
ture
s (sc
hool
s, ho
spita
ls/Bh
us
and
road
s) a
re cl
imat
e an
d di
sast
er
proo
fed
by e
nsur
ing
all c
limat
e an
d di
sast
er re
silie
nt e
ngin
eerin
g co
mpo
nent
s, sa
fegu
ards
and
stan
dard
s, qu
ality
and
st
reng
th a
re in
clud
ed in
the
resp
ectiv
e dr
awin
gs a
nd d
esig
ns b
y D
zonk
hags
and
re
trofi
tted
No.
NA
4A
dmin
istra
tive
Dat
a,
Engi
neer
ing
Sect
or
Adm
inist
rativ
e re
cord
Prop
er st
orm
w
ater
dra
inag
e in
Thro
m
This
indi
cato
r mea
sure
s inc
iden
ces
of fl
oodi
ng a
nd w
ater
logg
ing
due
to
impr
oper
stor
m w
ater
dra
inag
e an
d ot
her
nece
ssar
y in
fras
truc
ture
Km
5.1
N=7
.2
Adm
inist
rativ
e D
ata,
D
zong
khag
M
unic
ipal
ity
Adm
inist
rativ
e re
cord
Leng
th o
f riv
er
prot
ectio
n w
orks
This
indi
cato
r mea
sure
s len
gth
of ri
ver
prot
ectio
n w
orks
car
ried
to re
duce
di
sast
ers d
urin
g m
onso
on
Km
131
Adm
inist
rativ
e D
ata,
En
gine
erin
g Se
ctor
Adm
inist
rativ
e re
cord
from
En
gine
erin
g Se
ctor
Twelfth Five Year Plan (2018-2023), Bumthang Dzongkhag
-118-
1.1. Programme Summary and strategy
Programme Title: Carbon neutral, climate and disaster resilient development
Objective: To strengthen Carbon neutral, climate and disaster resilient development
Collaborating Agency/ies:NEC/MoAF/MoEA/MoWhS
Programme Strategies:Bumthang is a highland Dzongkhag with cold climatic conditions which be-comes severe during the winter months. Most of the energy needs for cooking and heating purpose is met from the forest in the form of firewood.
As per the Agriculture Statistics 2016, around three percent of the households have experienced the impact of natural calamities such as hailstorm, erratic rain-fall and pest infection.
At the national level, as per GNh Survey, the percentage of rural people who feel ‘highly responsible’ for conserving our environment has drastically decreased from 82.4 percent to 78.7 percent
During the 12th FYP, the Dzongkhag will focus on the following strategies:
1. In order to reduce the carbon footprint and pressure on the forest, the Dz-ongkhag will facilitate and support installation of energy efficient cooking stoves and solar lights at the households’ level where the incidence of wood usage is high;
2. Energy efficiency will be promoted such as installing energy efficient street lights, replacing inefficient lights with efficient ones, tapping solar energy to power streetlights and water heating to save energy and costs and to re-duce emission of greenhouse gases;
3. use of bio-gas for cooking in rural areas will be supported and encouraged. In doing so, we will collaborate with Bhutan Biogas project and support construction and installation of bio-gas plants;
-119-
Twelfth Five Year Plan (2018-2023), Bumthang Dzongkhag
4. In order to enhance disaster resilience of the community and local econ-omy, will prioritize environment friendly development and construction, and particularly ensure climate proofing and adaptation quality of both new and existing critical infrastructures such as Gewog center roads, irri-gation channels, drainages, health and school infrastructures;
5. Dzongkhag will enhance engineering capacity as well as collaborate with relevant central agencies to improve technology and quality of climate proof and disaster resilient drawings, design and construction of related infrastructures. Future rainfall, snows and any extreme weather events will be considered and environmental governance enforced for planning, im-plementation and construction in collaboration with NEC and Meteorolo-gy Centre;
6. Dzongkhag contingency plan with robust disaster related mechanism for information sourcing and sharing will be developed and capacity built for disaster preparedness, response and rehabilitation and to effectively deal with Climate Change impacts;
7. Awareness, monitoring and enforcement will be carried out and strength-ened to ensure that disaster resilient and adaptation standards and quality is incorporated and adhered to in any development works and infrastruc-ture constructions by both private and government entities.
Twelfth Five Year Plan (2018-2023), Bumthang Dzongkhag
-120-
1.2.
Pr
ogra
mm
e O
utpu
t Mat
rix
1.2.
1. D
zong
khag
Prog
ram
me o
utpu
t ind
icat
ors a
nd ta
rget
s O
utco
me
Out
put
Wei
ght
Out
put I
ndic
ator
Uni
tW
eigh
tBa
selin
e (B
ase
Year
) P
lan
Targ
et
Car
bon
neut
ral,
clim
ate
and
disa
ster
re
silie
nt
deve
lopm
ent
enha
nced
Disa
ster
m
anag
emen
t an
d ad
aptiv
e ca
paci
ty
impr
oved
100
hou
seho
ld w
ith b
ioga
s pla
nts i
nsta
lled
No.
259
N=
100
Crit
ical
pub
lic in
fras
truc
ture
(sch
ools,
hos
pita
ls an
d ro
ads)
clim
ate/
disa
ster
pro
ofed
No.
9N
A4
No.
of d
isast
er p
roof
initi
ativ
es m
ains
trea
med
in a
ll co
nstr
uctio
ns
No.
7N
A5
Prop
er st
orm
wat
er d
rain
age
in D
zong
khag
Thro
mkm
155.
17.
2Le
ngth
of r
iver
pro
tect
ion
wor
ksK
m9
131
No.
of d
isast
er d
rills
& m
ock
carr
ied
out f
or p
ublic
&
stud
ents
as p
er d
isast
er m
anag
emen
t and
cont
inge
ncy
plan
No.
122
10
No.
of c
limat
e sm
art a
gric
ultu
re in
itiat
ives
No.
92
NT=
6N
o. o
f sus
tain
able
land
man
agem
ent i
nitia
tives
No.
71
NT=
2W
aste
man
agem
ent p
lans
for m
onas
tic in
stitu
tions
de
velo
ped
No.
60
12
Proj
ecte
d An
nual
Tar
get
-121-
Twelfth Five Year Plan (2018-2023), Bumthang Dzongkhag
Sl.
No
Indi
cato
rsPr
ojec
ted
Ann
ual T
arge
tFY
20
18-2
019
FY
2019
-202
0FY
20
20-2
021
FY
2021
-202
2FY
20
22-2
023
1h
ouse
hold
with
bio
gas p
lant
s ins
talle
d20
2020
2020
2C
ritic
al p
ublic
infr
astr
uctu
re (s
choo
ls, h
ospi
tals
and
road
s)
clim
ate/
disa
ster
pro
ofed
11
11
3N
o. o
f disa
ster
pro
of in
itiat
ives
mai
nstr
eam
ed in
all
cons
truc
tions
5
4Pr
oper
stor
m w
ater
dra
inag
e in
Dzo
ngkh
agTh
rom
-2
22
1.2
5Le
ngth
of r
iver
pro
tect
ion
wor
ks-
0.5
0.5
00
6N
o. o
f disa
ster
dril
ls &
moc
k ca
rrie
d ou
t for
pub
lic &
stud
ents
as
per d
isast
er m
anag
emen
t and
cont
inge
ncy
plan
22
22
2
7N
o. o
f clim
ate
smar
t agr
icul
ture
initi
ativ
es1
21
11
8N
o. o
f sus
tain
able
land
man
agem
ent i
nitia
tives
20
09
Was
te m
anag
emen
t pla
ns fo
r mon
astic
inst
itutio
ns d
evel
opm
ent
25
5
Prog
ram
me A
ctiv
ity a
nd O
utla
y O
utpu
tA
ctiv
ityA
ctiv
ity L
ocat
ion
Indi
cativ
e Pl
an O
utla
y (N
u. in
Mill
ion)
Rem
arks
Disa
ster
man
agem
ent a
nd a
dapt
ive
capa
city
impr
oved
Trai
ning
and
Ski
lls d
evel
opm
ent
All
Gew
ogs
3.05
0In
fras
truc
ture
dev
elop
men
t A
ll G
ewog
s26
.400
Impr
ove
supp
ort s
ervi
ces
All
Gew
ogs
1.37
0
Twelfth Five Year Plan (2018-2023), Bumthang Dzongkhag
-122-
17.2
.2 G
ewog
s
Chh
oekh
or G
ewog
Prog
ram
me
outp
ut in
dica
tors
and
targ
ets
Out
com
eO
utpu
tW
eigh
t O
utpu
t Ind
icat
orU
nit
Wei
ght
Base
line
(Bas
e Ye
ar)
Pla
n Ta
rget
C
arbo
n ne
utra
l, cl
imat
e an
d di
sast
er
resil
ient
dev
elop
men
t en
hanc
ed
Disa
ster
m
anag
emen
t an
d ad
aptiv
e ca
paci
ty
impr
oved
100
No.
of s
prin
g w
ater
sour
ce p
rote
cted
No.
356
N=
5
Acr
es o
f lan
d fo
r pa
ddy
culti
vatio
n at
upp
er
Cho
khor
dev
elop
edA
cres
300
5
Min
i fur
nitu
re h
ouse
gro
up m
embe
rs su
pplie
d w
ith e
quip
men
t and
skill
s dev
elop
edN
o.35
025
0
Proj
ecte
d A
nnua
l Tar
get
Sl.
No
Indi
cato
rsPr
ojec
ted
Ann
ual T
arge
tFY
20
18-2
019
FY
2019
-202
0FY
20
20-2
021
FY
2021
-202
2FY
20
22-2
023
1N
o. o
f spr
ing
wat
er so
urce
pro
tect
ed0
12
20
2A
cres
of l
and
for
padd
y cu
ltiva
tion
at u
pper
Cho
khor
dev
elop
ed0
12
20
3M
ini f
urni
ture
hou
se g
roup
mem
bers
supp
lied
with
equ
ipm
ent
and
skill
s dev
elop
ed50
5050
5050
-123-
Twelfth Five Year Plan (2018-2023), Bumthang Dzongkhag
Prog
ram
me
Act
ivity
and
Out
lay
Out
put
Act
ivity
Act
ivity
Lo
catio
nIn
dica
tive
Plan
Out
lay
(Nu.
in M
illio
n)R
emar
ks
Disa
ster
man
agem
ent a
nd a
dapt
ive
capa
city
impr
oved
Infr
astr
uctu
re d
evel
opm
ent
All
chew
ogs
1.90
0
Chh
umig
Gew
og
Prog
ram
me
outp
ut in
dica
tors
and
targ
ets
Out
com
eO
utpu
tW
eigh
t O
utpu
t Ind
icat
orU
nit
Wei
ght
Base
line
(Bas
e Ye
ar)
Pla
n Ta
rget
C
arbo
n ne
utra
l, cl
imat
e an
d di
sast
er re
silie
nt
deve
lopm
ent
enha
nced
Disa
ster
m
anag
emen
t an
d ad
aptiv
e ca
paci
ty
impr
oved
100
No.
of b
io-g
as in
stal
led
No.
354
N=
4N
o. o
f CM
F re
view
ed a
nd e
stab
lishe
dN
o.30
CF
7Re
view
2 &
1
new
N
o. o
f was
te co
llect
ion
shed
s ins
talle
d N
o.25
2N
=3Aw
aren
ess/
was
te m
anag
emen
t tra
inin
g co
nduc
ted
hh
s10
-N
=40
Proj
ecte
d A
nnua
l Tar
get
Sl.N
oIn
dica
tors
Proj
ecte
d A
nnua
l Tar
get
FY 2
018-
2019
FY 2
019-
2020
FY 2
020-
2021
FY 2
021-
2022
FY 2
022-
2023
1N
o. o
f bio
-gas
inst
alle
d0
11
20
2N
o. o
f CM
F re
view
ed a
nd e
stab
lishe
dRe
view
2Es
tabl
ish 1
new
3N
o. o
f was
te co
llect
ion
shed
s ins
talle
d 0
21
00
4Aw
aren
ess/
was
te m
anag
emen
t tr
aini
ng co
nduc
ted
040
00
0
Twelfth Five Year Plan (2018-2023), Bumthang Dzongkhag
-124-
Prog
ram
me
Act
ivity
and
Out
lay
Out
put
Act
ivity
Act
ivity
Lo
catio
nIn
dica
tive
Plan
Out
lay
(Nu.
in M
illio
n)R
emar
ks
Disa
ster
man
agem
ent a
nd a
dapt
ive
capa
city
impr
oved
Infr
astr
uctu
re d
evel
opm
ent
All
chew
ogs
0.85
0
Tang
Gew
og
Prog
ram
me
outp
ut in
dica
tors
and
targ
ets
Out
com
eO
utpu
tW
eigh
t O
utpu
t Ind
icat
orU
nit
Wei
ght
Base
line
(Bas
e Ye
ar)
Pla
n Ta
rget
C
arbo
n ne
utra
l, cl
imat
e an
d di
sast
er re
silie
nt
deve
lopm
ent
enha
nced
Disa
ster
m
anag
emen
t an
d ad
aptiv
e ca
paci
ty
impr
oved
100
No.
of C
MF
esta
blish
ed a
nd m
anag
edN
o.25
CF
8N
=1
Man
age=
1 N
o. o
f CSI
s est
ablis
hed
(han
dicr
aft &
saw
mill
)N
o.35
0N
=2N
o. o
f NW
FP g
roup
form
ed
No.
150
N=5
No.
of s
prin
g w
ater
sour
ce p
rote
cted
hh
s25
0N
=3
Proj
ecte
d A
nnua
l Tar
get
Sl.
No
Indi
cato
rsPr
ojec
ted
Ann
ual T
arge
tFY
201
8-20
19FY
201
9-20
20FY
202
0-20
21FY
202
1-20
22FY
202
2-20
231
No.
of C
MF
esta
blish
ed a
nd m
anag
ed0
01
10
2N
o. o
f CSI
s est
ablis
hed
(han
dicr
aft &
saw
mill
)1
13
No.
of N
WFP
gro
up fo
rmed
0
22
10
4N
o. o
f spr
ing
wat
er so
urce
pro
tect
ed0
12
00
-125-
Twelfth Five Year Plan (2018-2023), Bumthang Dzongkhag
Prog
ram
me
Act
ivity
and
Out
lay
Out
put
Act
ivity
Act
ivity
Lo
catio
nIn
dica
tive
Plan
Out
lay
(Nu.
in M
illio
n)R
emar
ks
Disa
ster
man
agem
ent a
nd a
dapt
ive
capa
city
impr
oved
Infr
astr
uctu
re d
evel
opm
ent
All
chew
ogs
2.85
0
Ura
Gew
og
Prog
ram
me
outp
ut in
dica
tors
and
targ
ets
Out
com
eO
utpu
tW
eigh
t O
utpu
t Ind
icat
orU
nit
Wei
ght
Base
line
(Bas
e Ye
ar)
Pla
n Ta
rget
C
arbo
n ne
utra
l, cl
imat
e an
d di
sast
er re
silie
nt
deve
lopm
ent
enha
nced
Disa
ster
m
anag
emen
t an
d ad
aptiv
e ca
paci
ty
impr
oved
100
No.
of f
ores
t fire
man
agem
ent c
ontr
ol in
pla
ceN
o.35
0N
=5
No.
of h
hs t
rain
ed o
n fo
rest
fire
man
agem
ent
No.
150
N=3
00N
o. o
f spr
ing
wat
er so
urce
pro
tect
edh
hs
351
N=7
No.
hh
s tra
ined
on
Non
Woo
d Fo
rest
Pro
duct
sh
hs
151
N=3
00
Twelfth Five Year Plan (2018-2023), Bumthang Dzongkhag
-126-
Proj
ecte
d A
nnua
l Tar
get
Sl.
No
Indi
cato
rsPr
ojec
ted
Ann
ual T
arge
tFY
201
8-20
19FY
201
9-20
20FY
202
0-20
21FY
202
1-20
22FY
202
2-20
231
No.
of f
ores
t fire
man
agem
ent c
ontr
ol in
pla
ce0
22
10
2N
o. o
f hh
s tra
ined
on
fore
st fi
re m
anag
emen
t 10
010
010
0
3N
o. o
f spr
ing
wat
er so
urce
pro
tect
ed1
22
11
4N
o. h
hs t
rain
ed o
n N
on W
ood
Fore
st P
rodu
cts
00
100
100
100
Prog
ram
me
Act
ivity
and
Out
lay
Out
put
Act
ivity
Act
ivity
Lo
catio
nIn
dica
tive
Plan
Out
lay
(Nu.
in M
illio
n)R
emar
ks
Disa
ster
man
agem
ent a
nd a
dapt
ive
capa
city
impr
oved
Infr
astr
uctu
re d
evel
opm
ent
All
chew
ogs
1.20
0
-127-
Twelfth Five Year Plan (2018-2023), Bumthang Dzongkhag
LG
KRA
10:
Gen
der e
qual
ity p
rom
oted
, wom
en a
nd g
irls
empo
wer
ed (6
KPI
s)
NK
RA
K
PI
Des
crip
tion
Uni
t Ba
selin
e (B
ase
year
)Ta
rget
D
ata
sour
ce
Col
lect
ion
met
hodo
logy
R
emar
ks
3. P
over
ty
erad
icat
ed a
nd
ineq
ualit
y re
duce
d10
. Gen
der
equa
lity
prom
oted
, w
omen
and
girl
s em
pow
ered
11
. Pro
duct
ive
and
gain
ful
empl
oym
ent
crea
ted
14. h
ealth
y an
d ca
ring
soci
ety
enha
nced
Non
-For
mal
Edu
catio
n (N
FE) l
earn
ers b
y ge
nder
This
indi
cato
r mea
sure
s per
cent
age
of
wom
en a
nd m
en N
FE le
arne
rs
%W
=74
M=
64
(201
6)
W=8
0M
=71
Adm
inist
rativ
e D
ata,
Edu
catio
n Se
ctor
Adm
inist
rativ
e re
cord
s
Wom
en re
pres
enta
tives
in
use
r gro
ups,
self-
help
gr
oups
, loc
al co
mm
ittee
s an
d co
oper
ativ
e
This
indi
cato
r mea
sure
s per
cent
age
of
wom
en re
pres
enta
tives
in u
ser g
roup
s, se
lf-he
lp g
roup
s, lo
cal c
omm
ittee
s and
co
oper
ativ
es
%39
.245
Adm
inist
rativ
e D
ata,
RN
R Se
ctor
Adm
inist
rativ
e re
cord
s
Gov
ernm
ent e
mpl
oyee
s w
ith a
cces
s to
func
tiona
l da
y ca
re cr
èche
s
This
indi
cato
r mea
sure
s pro
port
ion
of
Gov
ernm
ent e
mpl
oyee
s with
acc
ess t
o fu
nctio
nal d
ay c
are
crèc
hes
%N
A
10A
dmin
istra
tive
Dat
a,
Dzo
ngkh
ag
AFD
Adm
inist
rativ
e re
cord
s
Girl
s in
lead
ersh
ip
posit
ions
in sc
hool
sTh
is in
dica
tor m
easu
res n
umbe
r of
girls
in le
ader
ship
pos
ition
in e
xtra
-cu
rric
ular
club
s.
No.
166
200
Adm
inist
rativ
e D
ata,
Edu
catio
n Se
ctor
Adm
inist
rativ
e re
cord
s
Wom
en av
ailin
g sk
ills/
entr
epre
neur
ship
trai
ning
sTh
is in
dica
tor m
easu
res p
erce
ntag
e of
wom
en av
ailin
g sk
ills/
en
trep
rene
ursh
ip tr
aini
ngs f
or
prod
uctiv
e liv
elih
ood,
eco
nom
ic a
nd
inco
me
enha
ncem
ent
%N
A20
Adm
inist
rativ
e D
ata,
D
zong
khag
Pl
anni
ng u
nit
Adm
inist
rativ
e re
cord
s
Wom
en, m
en a
nd ch
ildre
n co
vere
d by
sens
itiza
tion/
awar
enes
s/ad
voca
cy o
n el
imin
atio
n of
Vio
lenc
e A
gain
st W
omen
, Vio
lenc
e A
gain
st M
en a
nd V
iole
nce
Aga
inst
Chi
ldre
n
This
indi
cato
r mea
sure
s per
cent
age
of w
omen
, men
and
child
ren
cove
red
by se
nsiti
zatio
n/aw
aren
ess/
advo
cacy
on
elim
inat
ion
of V
iole
nce
Aga
inst
Wom
en, V
iole
nce
Aga
inst
M
en a
nd V
iole
nce
Aga
inst
Chi
ldre
n di
sagg
rega
ted
by w
omen
, men
and
ch
ildre
n co
vere
d
%26
.380
Adm
inist
rativ
e D
ata,
D
zong
khag
A
FD
Adm
inist
rativ
e re
cord
s
Twelfth Five Year Plan (2018-2023), Bumthang Dzongkhag
-128-
1.1. Programme Summary and strategy
Programme Title: Gender equality promoted, women and girls empowerment
Objective: To promote gender equality and empower women and girls
Collaborating Agency/ies: NCWC/MoE
Programme Strategies:The GNh Survey 2015 shows that in Bhutan, women are less happy than men. however, it was also noted that women’s happiness level increased faster than men from 2010-2015. Disparity is largest in the education and good governance domains.
Women are poorly represented in decision-making positions both in the parlia-ment and civil service. Only 8.5 percent of women were elected in the National Assembly elections in 2008 and 2013. In 2012, women only accounted for 36 percent of the entire civil service workforce out of which only 6 percent held executive positions
unemployment rates have been higher among women than their male counter-parts for over a decade (F-3.1% and M-1.8%, LFS 2015 compared to F-4% and M-2.7%, LFS 2010). Employment opportunities for women have largely been in the agriculture sector, a sector where productivity and earnings are low.
Considering the importance placed on promoting gender equality and empow-ering women and girls, the Dzongkhag will focus on the following key strategies:
1. Create a policy environment within the Dzongkhag and Gewog for pro-gressing the gender agenda. Develop and strengthen linkages with central agencies such as the NCWC, Ministry of Finance and GNhC for policy directives and support on mainstreaming gender planning and budgeting in local plans;
2. The Dzongkhag will ensure gender sensitive and responsive interventions for women and girls in the domains of good governance, employment, ed-ucation and training, health, aging, mental health and disabilities, violence
-129-
Twelfth Five Year Plan (2018-2023), Bumthang Dzongkhag
against women and all gender prejudices and stereotypes. In doing so, the Dzongkhag will ensure that women are also included in the discussion and decision-making process affecting their choices and lives;
3. The Dzongkhag will furnish information on employment opportunities or any form of skills development training (entrepreneurships, leadership training, public speaking). The Dzongkhag will also promote ideas such as women cooperatives and self-help groups among women as a means of uplifting women out of poverty and easing their financial difficulties;
4. Promotion of modern technologies (labour saving) and economic assets to ease women’s work burden.
Twelfth Five Year Plan (2018-2023), Bumthang Dzongkhag
-130-
1.2.
Pr
ogra
mm
e O
utpu
t Mat
rix
1.2.
1. D
zong
khag
Prog
ram
me o
utpu
t ind
icat
ors a
nd ta
rget
sO
utco
me
Out
put
Wei
ght
Out
put I
ndic
ator
Uni
tW
eigh
tBa
selin
e (B
ase
Year
) P
lan
Targ
et
Gen
der
equa
lity
prom
oted
, w
omen
an
d gi
rls
empo
wer
ed
Mec
hani
sms
for
part
icip
atio
n of
wom
en/
child
ren
in d
ecisi
on
mak
ing
proc
ess
impr
oved
100
Non
-For
mal
Edu
catio
n (N
FE) l
earn
ers b
y ge
nder
%
9W
=74
M=
64 (2
016)
W=8
0M
=71
Wom
en re
pres
enta
tives
in u
ser g
roup
s, se
lf-he
lp g
roup
s, lo
cal c
omm
ittee
s and
coop
erat
ive
%8
39.2
45
Num
ber o
f girl
s in
lead
ersh
ip p
ositi
on in
scho
ols
No.
716
6C
T=20
0Fe
mal
e av
ailin
g sk
ills/
ent
repr
eneu
rshi
p tr
aini
ngs
%10
1220
Gov
ernm
ent e
mpl
oyee
s with
acc
ess t
o fu
nctio
nal d
ay c
are
crèc
hes
%9
010
Wom
en, m
en a
nd ch
ildre
n co
vere
d by
sens
itiza
tion/
aw
aren
ess p
rogr
ams o
n el
imin
atio
n of
VAW
, VA
M a
nd V
AC
No.
1226
.380
Type
of m
easu
res a
dopt
ed to
add
ress
issu
es o
f und
erag
e gi
rl’s &
stud
ent’s
pre
gnan
cyN
o.7
5(Aw
aren
ess,
coac
hing
, pa
rent
ing,
he
alth
talk
, ch
oesh
ey&
law
)
NT=
5
No
of aw
aren
ess a
nd se
nsiti
zatio
n pr
ogra
ms o
nge
nder
equ
ality
and
righ
t bas
ed ap
proa
chN
o.10
5N
T=5
No
of b
oard
ing
scho
ols w
ith g
irl fr
iend
ly fa
cilit
ies(
sepa
rate
to
ilets
, men
stru
al h
ygie
ne fa
cilit
y)N
o.8
5N
T=5
No
of ru
ral w
omen
ent
repr
eneu
rs cr
eate
d N
o.9
2N
T-2
No
of ru
ral w
omen
ent
repr
eneu
rs tr
aine
d &
supp
orte
dN
o.11
NA
300
-131-
Twelfth Five Year Plan (2018-2023), Bumthang Dzongkhag
Proj
ecte
d An
nual
Tar
get
Sl.
No
Indi
cato
rsPr
ojec
ted
Ann
ual T
arge
t
FY
2018
-201
9FY
20
19-2
020
FY
2020
-202
1FY 2
021-
2022
FY
2022
-202
3
1N
on-F
orm
al E
duca
tion
(NFE
) lea
rner
s by
gend
er
W=7
4M
=64
W=7
5M
=65
W=7
7M
=67
W=7
9M
=69
W=8
0M
=71
2W
omen
repr
esen
tativ
es in
use
r gro
ups,
self-
help
gro
ups,
loca
l co
mm
ittee
s and
coop
erat
ive
4041
4243
45
3N
umbe
r of g
irls i
n le
ader
ship
pos
ition
in sc
hool
s40
4040
4040
4Fe
mal
e av
ailin
g sk
ills/
ent
repr
eneu
rshi
p tr
aini
ngs
1214
1618
205
Gov
ernm
ent e
mpl
oyee
s with
acc
ess t
o fu
nctio
nal d
ay c
are
crèc
hes
35
710
6W
omen
, men
and
child
ren
cove
red
by se
nsiti
zatio
n/ aw
aren
ess
prog
ram
s on
elim
inat
ion
of V
AW, V
AM
and
VA
C30
4050
7080
7N
o of
boa
rdin
g sc
hool
s with
girl
frie
ndly
faci
litie
s(se
para
te to
ilets
, m
enst
rual
hyg
iene
faci
lity)
11
11
1
8N
umbe
r of
mea
sure
s ado
pted
to a
ddre
ss is
sues
of u
nder
age
girl’
s &
stud
ent’s
pre
gnan
cy5
55
5 5
9N
o of
rura
l wom
en e
ntre
pren
eurs
crea
ted
--
11
-10
No
of ru
ral w
omen
ent
repr
eneu
rs tr
aine
d &
supp
orte
d-
7580
100
4511
No
of aw
aren
ess a
nd s
ensit
izat
ion
prog
ram
s on
gend
er e
qual
ity
and
right
bas
ed ap
proa
ch1
11
11
Prog
ram
me A
ctiv
ity a
nd O
utla
y O
utpu
tA
ctiv
ityA
ctiv
ity
Loca
tion
Indi
cativ
e Pl
an O
utla
y (N
u. in
Mill
ion)
Rem
arks
Mec
hani
sms f
or p
artic
ipat
ion
of w
omen
/chi
ldre
n in
dec
ision
mak
ing
proc
ess i
mpr
oved
Awar
enes
s and
/edu
catio
n pr
ogra
ms
Gew
ogs
1.50
0In
fras
truc
ture
G
ewog
s8.
500
Twelfth Five Year Plan (2018-2023), Bumthang Dzongkhag
-132-
1.2.
2. G
ewog
s
Chh
oekh
or G
ewog
Prog
ram
me o
utpu
t ind
icat
ors a
nd ta
rget
s O
utco
me
Out
put
Wei
ght
Out
put
Indi
cato
rU
nit
Wei
ght
Base
line
(Bas
e Ye
ar)
Pla
n Ta
rget
G
ende
r equ
ality
pro
mot
ed,
wom
en a
nd g
irls e
mpo
wer
edM
echa
nism
s for
par
ticip
atio
n of
wom
en/c
hild
ren
in d
ecisi
on
mak
ing
proc
ess i
mpr
oved
100
No.
of s
uppo
rt
prov
ided
N
o.10
02
N=7
Proj
ecte
d An
nual
Tar
get
Sl.
No
KPI
Proj
ecte
d A
nnua
l Tar
get
FY
2018
-201
9FY
20
19-2
020
FY
2020
-202
1FY
20
21-2
022
FY
2022
-202
31
No.
of s
uppo
rt p
rovi
ded
12
21
1
Prog
ram
me A
ctiv
ity a
nd O
utla
y:
Out
put
Act
ivity
Act
ivity
Loc
atio
nIn
dica
tive
Plan
Out
lay
(Nu.
in M
illio
n)R
emar
ks
Mec
hani
sms f
or p
artic
ipat
ion
of w
omen
/chi
ldre
n in
dec
ision
mak
ing
proc
ess i
mpr
oved
No.
of s
uppo
rt p
rovi
ded
Chi
wog
s3.
950
-133-
Twelfth Five Year Plan (2018-2023), Bumthang Dzongkhag
18.
LGK
RA 1
1:
Impr
oved
and
sust
aine
d th
e liv
elih
ood
of h
ighl
ande
rs (3
KPI
s)
NK
RA
K
PI
Des
crip
tion
Uni
t Ba
selin
e (B
ase
year
) T
arge
t D
ata
sour
ce
Col
lect
ion
met
hodo
logy
R
emar
ks
3. P
over
ty
erad
icat
ed
and
ineq
ualit
y re
duce
d 8.
Foo
d an
d nu
triti
on se
curit
y en
sure
d17
. Sus
tain
able
W
ater
ens
ured
hou
seho
ld
with
Yak
sTh
is in
dica
tor m
easu
res t
he n
umbe
r of
dom
icile
d ho
useh
old
with
ya
k po
pula
tion
incr
ease
d in
the
Dzo
ngkh
ag
No.
45N
T=10
Adm
inist
rativ
e da
ta, D
zong
khag
Li
vest
ock
Sect
or
Adm
inist
rativ
e Re
cord
Add
ition
al o
f 50
yaks
hou
seho
ld
with
She
epTh
is in
dica
tor m
easu
res t
he n
umbe
r of
dom
icile
d ho
useh
old
with
sh
eep
popu
latio
n in
crea
sed
in th
e D
zong
khag
No.
45N
T=10
Adm
inist
rativ
e da
ta, D
zong
khag
Li
vest
ock
Sect
or
Adm
inist
rativ
e Re
cord
hig
hlan
d En
terp
rise
This
indi
cato
r mea
sure
s num
ber o
f h
ighl
and
Ente
rpris
eN
o.2
(201
5)C
= 7
NT=
4A
dmin
istra
tive
data
, Dzo
ngkh
ag
Live
stoc
k Se
ctor
Adm
inist
rativ
e Re
cord
reso
urce
cent
re,
ridin
g ya
ks, h
ome-
stay
pro
gram
s, ho
ney
prod
uctio
n, to
urism
en
trep
rene
ursh
ip
Twelfth Five Year Plan (2018-2023), Bumthang Dzongkhag
-134-
18.1. Programme summary and strategy
Program Title: Sustainable livelihoodof highlanders
Objective: To improve livelihood of highlanders
Collaborating Agency/ies: MoAF, GNhC, DoL, Nh-RDC
Program Strategies: highlanders play an important role in the upkeep of our nomadic culture and tradition and in ensuring security in the northern borders of our country. Given their importance, during the 12th FYP, special focus will be given to these com-munities to improve their livelihoods. In Bumthang, Tang Gewog with a popu-lation of 2278 is a highland community.
The Dzongkhag will implement the following strategies;
1. Develop capacity of livestock rearing households to diversify livestock products from Yak and Sheep and improve nomadic animal husbandry practices;
2. Support and enhance highland infrastructure and livestock input supplies in the form of rangeland development, fodder and pasture development and subsidy for development of herder’s camps;
3. Promote and establish highland enterprises through value chain develop-ment of highlander livestock products and eco-tourism products and man-agement;
4. Initiate alternative income generation avenues through mechanisms such as Payment for Ecosystem Services (PES); and
5. Initiate genetic improvement programmes to improve the highland live-stock resource base.
-135-
Twelfth Five Year Plan (2018-2023), Bumthang Dzongkhag
18.2
. Dzo
ngkh
ag O
utpu
t Mat
rix
18.2
.1. D
zong
khag
Prog
ram
me o
utpu
t ind
icat
ors a
nd ta
rget
s O
utco
me
Out
put
Wei
ght
Out
put I
ndic
ator
Uni
tW
eigh
tBa
selin
e (B
ase
year
) P
lan
Targ
et
Impr
oved
and
su
stai
ned
the
livel
ihoo
d of
hi
ghla
nder
s
hig
hlan
d liv
esto
ck fa
rmin
g an
d en
terp
rises
pr
omot
ed /
sust
aine
d
100
hou
seho
ld w
ith y
aks
No.
1545
NT=
10h
ouse
hold
with
shee
pN
o.15
45N
T=10
Num
ber o
f yak
sN
o.35
3658
NT=
50N
umbe
r of s
heep
pop
ulat
ion
incr
ease
dN
o.25
258
C=4
58N
=200
Num
ber o
f hig
hlan
d En
terp
rise
deve
lope
dN
o.10
2 (2
015)
C=
7 N
T=4
Proj
ecte
d An
nual
Tar
get
Sl.
No
KPI
Proj
ecte
d A
nnua
l Tar
get
FY 2
018-
201
9FY
20
19-2
020
FY
2020
-202
1FY
20
21-2
022
FY
2022
-202
31
hou
seho
ld w
ith y
aks
-2
33
22
hou
seho
ld w
ith sh
eep
-2
33
23
Num
ber o
f Yak
Pop
ulat
ion
mai
ntai
ned
1010
1010
104
Num
ber o
f she
ep p
opul
atio
n in
crea
sed
4040
4040
405
Num
ber o
f hig
hlan
d En
terp
rise
deve
lope
d1
11
1
Twelfth Five Year Plan (2018-2023), Bumthang Dzongkhag
-136-
Prog
ram
me A
ctiv
ity a
nd O
utla
y:
Out
put
Act
ivity
Act
ivity
Loc
atio
nIn
dica
tive
Plan
Out
lay
(Nu.
in M
illio
n)R
emar
ks
hig
hlan
d liv
esto
ck fa
rmin
g an
d en
terp
rises
pro
mot
ed /s
usta
ined
Infr
astr
uctu
re d
evel
opm
ent
Chh
oekh
or T
oed/
Chh
umig
1.5
00
Cap
acity
dev
elop
men
tC
hhoe
khor
Toe
d/C
hhum
ig 0
.500
Inpu
t sup
ply
Chh
oekh
or T
oed/
Chh
umig
5.30
0
18.2
.2.
Gew
ogs
Chh
oekh
or G
ewog
Prog
ram
me o
utpu
t ind
icat
ors a
nd ta
rget
s O
utco
me
Out
put
Wei
ght
Out
put I
ndic
ator
Uni
tW
eigh
tBa
selin
e (B
ase
Year
) P
lan
Targ
et
Impr
oved
and
sust
aine
d th
e liv
elih
ood
of h
ighl
ande
rs
hig
hlan
d liv
esto
ck fa
rmin
g an
d en
terp
rises
pro
mot
ed /s
usta
ined
10
0N
umbe
r of s
uppo
rt
serv
ices
pro
vide
dN
o.10
02
NT=
9
Proj
ecte
d An
nual
Tar
get
Sl.
No
KPI
Proj
ecte
d A
nnua
l Tar
get
FY
2018
-201
9FY
201
9-20
20FY
20
20-2
021
FY
2021
-202
2FY
20
22-2
023
1N
umbe
r of s
uppo
rt se
rvic
es p
rovi
ded
-2
33
1
Prog
ram
me A
ctiv
ity a
nd O
utla
y:
Out
put
Act
ivity
Act
ivity
Loc
atio
nIn
dica
tive
Plan
Out
lay
(Nu.
in M
illio
n)R
emar
ksh
ighl
and
lives
tock
farm
ing
and
ente
rpris
es p
rom
oted
/sus
tain
ed
Infr
astr
uctu
re a
nd
supp
ort s
ervi
ces
Chh
oekh
orto
ed6.
650
-137-
Twelfth Five Year Plan (2018-2023), Bumthang Dzongkhag
20. PROGRAMME MONITORING AND EVALuATION PLAN
Keeping in mind the importance of institutional efficiency and good governance, the 12th Five Year Plan shall be monitored using the Government Performance Management System (GPMS) with an objective to enhance accountability, transparency, and efficient utilization of resources. The Annual Performance Agreements (APA) will record understanding signed between the Prime Minister and the Dzongdag, and provide a summary of the most important objectives, actions and activities that the Dzongkhag expects to achieve in a financial year. It entails performance indicators and targets that will be reviewed quarterly, half-yearly and annually by the National Technical Committee (NTC) to mea-sure the degree of progress made in implementing the annual activities. This will ensure that any issues affecting the implementation and progress of the planned activities are identified and addressed in a timely manner.
Additionally, the 12th Plan will also be monitored using the Multi Year Rolling Budget System (MYRB) of Department of National Budget, and the Public Expenditure Management System (PEMS) of Department of Public Accounts, Ministry of Finance. Both these systems are integrated with the GPMS on planning, budgeting and expenditure information for planning and monitoring purposes.
The Gross National happiness Commission shall also conduct Quarterly and Mid-Term Review (MTR) of the 12th FYP. The results of the 12th FYP will be evaluated by GNhC at the end of the plan period. Evaluation of specific pro-grammes/projects can be also be undertaken by concerned agencies, local gov-ernments and GNhC as guided by the National Evaluation Policy.
The LGs shall also be responsible for monitoring the activities within the scope of their mandate. It shall be the responsibility of the Dzongkhag to undertake over-all monitoring of the activities within the respective Dzongkhag, and Gewogs
Twelfth Five Year Plan (2018-2023), Bumthang Dzongkhag
-138-
within its jurisdiction, and to compile and provide annual update on the related plan activities and KPIs. Dzongkhags will accordingly report the the implemen-tation status and progress to the GNhC.
The 12th FYP shall actively promote social accountability and therefore, encourage citizen monitoring of the development plans happening within their community, to ensure greater accountability and results of development programmes and in-terventions. The Dzongkhag will also form community user groups, and Com-munity Monitoring and Assessment Committees (CMAC) in a democratic man-ner to ensure citizen participation and engagement in planning, decision-making and management of local development and economic growth.
-139-
Twelfth Five Year Plan (2018-2023), Bumthang Dzongkhag
22.
CO
LLA
BORA
TIN
G A
GEN
CIE
S A
ND
REQ
uIR
EMEN
TS
KPI
whi
ch n
eed
stro
ng/
criti
cal c
entr
al su
ppor
tA
genc
ies
Spec
ific s
uppo
rt a
nd in
terv
entio
ns re
quir
ed fr
om ce
ntra
l age
ncie
s
CSM
Is e
stab
lishe
d (fa
rm/n
on-
farm
)M
oEA
, MoA
F, RM
Aa)
Sup
port
to st
art-
ups &
CSM
Is e
stab
lishm
ent i
n or
der t
o ex
pedi
te o
pera
tiona
lizat
ion
of in
dust
ries/
ent
erpr
ises
b) A
cces
s to
finan
ce
c) S
uppo
rt in
skill
s dev
elop
men
t on
entr
epre
neur
ship
, val
ue ch
ain
& su
pply
chai
nd)
Bra
ndin
g an
d M
arke
ting
of p
rodu
cts a
nd se
rvic
esjo
bs cr
eate
d (fa
rm/n
on-f
arm
)M
oEA
, MoL
hR
Acc
ess t
o fin
ance
, b) P
itchi
ng b
usin
ess i
deas
for s
ourc
ing
supp
ort,
c) S
uppo
rt in
spec
ific
trai
ning
for l
ocal
ent
repr
eneu
rs a
nd jo
b se
eker
s To
urist
arr
ival
by
bed
nigh
tsTC
BSu
ppor
t upg
rada
tion
of lo
cal h
otel
s thr
ough
pro
visio
n of
stan
dard
s, ce
rtifi
catio
n an
d fis
cal i
ncen
tives
, b) M
arke
ting
loca
l pro
duct
s and
des
tinat
ions
Agr
icul
ture
, liv
esto
ck &
fish
ery
prod
uctio
nM
oAF
Prod
uct b
rand
ing
and
mar
ketin
g, b
) Ide
ntifi
catio
n of
new
mar
kets
and
exp
ortin
g pr
oduc
ts to
nic
he m
arke
ts, c
) Pro
duct
div
ersifi
catio
n th
roug
h va
lue-
addi
tion
Are
a un
der o
rgan
ic a
gric
ultu
reM
oAF
Supp
ort t
o fa
rmer
s:a)
To
esta
blish
and
par
tner
with
bra
nds,
b) h
ow to
man
age
soil
nutr
ient
s & b
uild
oth
er
skill
s,c)
cert
ifica
tion
of fa
rms &
pro
duce
s, d)
iden
tify
cons
umer
dem
and
& m
arke
ts, e
) offe
r m
easu
res a
gain
st so
me
of th
e as
soci
ated
risk
sIn
cide
nces
of u
nder
-5, i
nfan
t &
mat
erna
l mor
talit
y M
oh, B
hSL
, RC
SC-s
uppo
rt to
a) t
rans
port
pat
ient
s to
hosp
itals
durin
g em
erge
ncie
s, b)
pro
vide
doc
tors
, nu
rses
& o
ther
hea
lth p
rofe
ssio
nals
as p
er ap
prov
ed st
affing
pat
tern
e.g1
doc
tor,
2 ge
nera
l nur
se a
nd 1
oph
thal
mic
nur
seIn
cide
nce
of d
rugs
, sub
stan
ce
abus
e, su
icid
es, a
lcoh
ol d
eath
sM
oh, D
RA &
RB
P-s
uppo
rt to
a) p
rovi
de h
elpl
ine
serv
ices
, b)p
rovi
de p
sych
othe
rapi
st &
trai
ned
coun
sello
rs (b
ased
on
hR-
need
)h
ouse
hold
s with
at le
ast P
our
Flus
h to
ilets
Moh
, MoW
hS
-sup
port
to p
rovi
de d
esig
n, te
chno
logy
& p
rodu
cts f
or e
co-f
riend
ly, p
ro-p
oor &
cost
eff
ectiv
e to
ilet
Twelfth Five Year Plan (2018-2023), Bumthang Dzongkhag
-140-
KPI
whi
ch n
eed
stro
ng/
criti
cal c
entr
al su
ppor
tA
genc
ies
Spec
ific s
uppo
rt a
nd in
terv
entio
ns re
quir
ed fr
om ce
ntra
l age
ncie
s
hou
seho
lds w
ith a
cces
s to
24*7
sa
fe d
rinki
ng w
ater
MoW
hS,
Moh
-sup
port
to p
rovi
de d
esig
n, te
chno
logy
& p
rodu
cts f
or sa
fe d
rinki
ng w
ater
a) S
tude
nts s
corin
g at
leas
t 60%
in
eac
h ST
EM su
bjec
t inc
lud-
ing
Dzo
ngkh
a an
d En
glish
in
BCSE
(X) b
y ge
nder
,
b) S
tude
nts s
corin
g at
leas
t 60%
ea
ch in
Eng
lish,
Dzo
ngkh
a,
Mat
hs a
nd S
cien
ce in
Cla
ss V
I by
gen
der
MoE
- pro
vide
subj
ect-
spec
ific t
each
ers a
s per
appr
oved
staffi
ng p
atte
rn
Loca
l son
gs, d
ance
s, fo
lk st
o-rie
s, lo
cal f
estiv
als a
nd h
erita
ge
revi
ved
and
docu
men
ted
Moh
CA
, M
oWh
S-s
uppo
rt to
a) p
rovi
de te
chni
cal s
uppo
rt to
rese
arch
, doc
umen
t & a
rchi
ve in
tang
ible
cu
lture
and
trad
ition
, and
hel
p of
cons
erva
tor f
or p
rese
rvin
g un
ique
her
itage
vill
ages
, ho
uses
& se
ttlem
ents
Was
te R
ecyc
led
& w
aste
dis-
posa
lN
EC, M
oWh
S-s
uppo
rt to
a) p
rovi
de id
eas &
tech
nolo
gy to
reco
ver w
aste
& v
alua
ble
raw
mat
eria
ls, b
) ho
w to
recy
cle,
c) h
ow to
man
age
resid
ual w
aste
, d) w
hat t
o do
& w
here
to se
ll pr
oduc
ts
of re
cycl
ed w
aste
, & e
) how
to co
nstr
uct e
nviro
nmen
t frie
ndly
& le
acha
te p
roof
disp
osal
sit
esC
omm
only
avai
led
serv
ices
de
liver
ed a
s per
TAT
PSG
RD, O
ffice
of
PM
&
Cab
inet
Supp
ort t
o sim
plify
and
enh
ance
serv
ice
deliv
ery
thro
ugh
onlin
e pl
atfo
rms,
and
trai
n pe
rson
nel m
anda
ted
to m
anag
e on
e w
indo
w se
rvic
es
Civ
il se
rvan
t pos
ition
not
fille
dRC
SC &
re
spec
tive
Cen
tral
agen
cies
Supp
ort t
o pr
ovid
e ci
vil s
erva
nts a
s per
the
appr
oved
staffi
ng p
atte
rn
Mob
ile N
etw
ork
cove
rage
MoI
CSu
ppor
t inf
rast
ruct
ure
deve
lopm
ent a
nd e
nsur
ing
conn
ectiv
ity o
f ser
vice
sa)
Zom
du at
tend
ance
by
gend
er,
b)G
rieva
nces
regi
ster
ed w
ith
Dzo
ngkh
ag a
nd G
ewog
s re
solv
ed
DLG
, Moh
CA
Supp
ort t
o a)
trai
n LG
s, an
d b)
pro
vide
ove
rsig
ht a
nd e
nfor
cem
ent o
f LG
Act
, rul
es
and
regu
latio
ns p
erio
dica
lly to
ens
urin
g pe
ople’
s par
ticip
atio
n in
dec
ision
-mak
ing
and
grie
vanc
es su
bmitt
ed, a
nd fo
llow
up
on th
e Zo
mdu
reso
lutio
ns in
term
s of a
ctio
ns &
im
plem
enta
tion
Com
mun
ity sc
ore
card
tool
im
plem
ente
dG
Nh
CSu
ppor
t to
a) tr
ain
plan
ning
offi
cers
, and
b) p
rovi
de o
vers
ight
and
mon
itorin
g of
C
omm
unity
scor
e ca
rd im
plem
enta
tion
& fo
llow
up
on im
prov
emen
t of L
Gs’
serv
ice
deliv
ery
as p
er th
e re
port
resu
lts
Crit
ical
pub
lic in
fras
truc
ture
(s
choo
ls, h
ospi
tals
and
road
s)
clim
ate/
disa
ster
pro
ofed
MoW
hS,
D
DM
(Moh
CA
)su
ppor
t to
a) tr
ain
engi
neer
s on
clim
ate/
disa
ster
pro
ofing
eng
inee
ring
& d
esig
ning
, b)
prov
ide
tech
nolo
gy &
pro
duct
s to
prom
ote
clim
ate/
proo
fed
infr
astr
uctu
res &
build
ings
/ho
uses
Wom
en e
ntre
pren
eurs
hip
skill
s de
velo
pmen
tM
oEA
, MoL
hR
Prov
ide
trai
ners
and
exp
ertis
e fo
r ent
repr
eneu
rshi
p tr
aini
ng, b
usin
ess i
dea
deve
lopm
ent,
acce
ss to
reso
urce
s (fin
ance
, lan
d an
d an
cilla
ry su
ppor
t) a
nd re
gula
tory
cl
eara
nces
in o
rder
to e
xped
ite o
pera
tiona
lizat
ion
of th
eir b
usin
ess e
nter
prise
s
-141-
Twelfth Five Year Plan (2018-2023), Bumthang Dzongkhag
KPI
whi
ch n
eed
stro
ng/
criti
cal c
entr
al su
ppor
tA
genc
ies
Spec
ific s
uppo
rt a
nd in
terv
entio
ns re
quir
ed fr
om ce
ntra
l age
ncie
s
hou
seho
lds w
ith a
cces
s to
24*7
sa
fe d
rinki
ng w
ater
MoW
hS,
Moh
-sup
port
to p
rovi
de d
esig
n, te
chno
logy
& p
rodu
cts f
or sa
fe d
rinki
ng w
ater
a) S
tude
nts s
corin
g at
leas
t 60%
in
eac
h ST
EM su
bjec
t inc
lud-
ing
Dzo
ngkh
a an
d En
glish
in
BCSE
(X) b
y ge
nder
,
b) S
tude
nts s
corin
g at
leas
t 60%
ea
ch in
Eng
lish,
Dzo
ngkh
a,
Mat
hs a
nd S
cien
ce in
Cla
ss V
I by
gen
der
MoE
- pro
vide
subj
ect-
spec
ific t
each
ers a
s per
appr
oved
staffi
ng p
atte
rn
Loca
l son
gs, d
ance
s, fo
lk st
o-rie
s, lo
cal f
estiv
als a
nd h
erita
ge
revi
ved
and
docu
men
ted
Moh
CA
, M
oWh
S-s
uppo
rt to
a) p
rovi
de te
chni
cal s
uppo
rt to
rese
arch
, doc
umen
t & a
rchi
ve in
tang
ible
cu
lture
and
trad
ition
, and
hel
p of
cons
erva
tor f
or p
rese
rvin
g un
ique
her
itage
vill
ages
, ho
uses
& se
ttlem
ents
Was
te R
ecyc
led
& w
aste
dis-
posa
lN
EC, M
oWh
S-s
uppo
rt to
a) p
rovi
de id
eas &
tech
nolo
gy to
reco
ver w
aste
& v
alua
ble
raw
mat
eria
ls, b
) ho
w to
recy
cle,
c) h
ow to
man
age
resid
ual w
aste
, d) w
hat t
o do
& w
here
to se
ll pr
oduc
ts
of re
cycl
ed w
aste
, & e
) how
to co
nstr
uct e
nviro
nmen
t frie
ndly
& le
acha
te p
roof
disp
osal
sit
esC
omm
only
avai
led
serv
ices
de
liver
ed a
s per
TAT
PSG
RD, O
ffice
of
PM
&
Cab
inet
Supp
ort t
o sim
plify
and
enh
ance
serv
ice
deliv
ery
thro
ugh
onlin
e pl
atfo
rms,
and
trai
n pe
rson
nel m
anda
ted
to m
anag
e on
e w
indo
w se
rvic
es
Civ
il se
rvan
t pos
ition
not
fille
dRC
SC &
re
spec
tive
Cen
tral
agen
cies
Supp
ort t
o pr
ovid
e ci
vil s
erva
nts a
s per
the
appr
oved
staffi
ng p
atte
rn
Mob
ile N
etw
ork
cove
rage
MoI
CSu
ppor
t inf
rast
ruct
ure
deve
lopm
ent a
nd e
nsur
ing
conn
ectiv
ity o
f ser
vice
sa)
Zom
du at
tend
ance
by
gend
er,
b)G
rieva
nces
regi
ster
ed w
ith
Dzo
ngkh
ag a
nd G
ewog
s re
solv
ed
DLG
, Moh
CA
Supp
ort t
o a)
trai
n LG
s, an
d b)
pro
vide
ove
rsig
ht a
nd e
nfor
cem
ent o
f LG
Act
, rul
es
and
regu
latio
ns p
erio
dica
lly to
ens
urin
g pe
ople’
s par
ticip
atio
n in
dec
ision
-mak
ing
and
grie
vanc
es su
bmitt
ed, a
nd fo
llow
up
on th
e Zo
mdu
reso
lutio
ns in
term
s of a
ctio
ns &
im
plem
enta
tion
Com
mun
ity sc
ore
card
tool
im
plem
ente
dG
Nh
CSu
ppor
t to
a) tr
ain
plan
ning
offi
cers
, and
b) p
rovi
de o
vers
ight
and
mon
itorin
g of
C
omm
unity
scor
e ca
rd im
plem
enta
tion
& fo
llow
up
on im
prov
emen
t of L
Gs’
serv
ice
deliv
ery
as p
er th
e re
port
resu
lts
Crit
ical
pub
lic in
fras
truc
ture
(s
choo
ls, h
ospi
tals
and
road
s)
clim
ate/
disa
ster
pro
ofed
MoW
hS,
D
DM
(Moh
CA
)su
ppor
t to
a) tr
ain
engi
neer
s on
clim
ate/
disa
ster
pro
ofing
eng
inee
ring
& d
esig
ning
, b)
prov
ide
tech
nolo
gy &
pro
duct
s to
prom
ote
clim
ate/
proo
fed
infr
astr
uctu
res &
build
ings
/ho
uses
Wom
en e
ntre
pren
eurs
hip
skill
s de
velo
pmen
tM
oEA
, MoL
hR
Prov
ide
trai
ners
and
exp
ertis
e fo
r ent
repr
eneu
rshi
p tr
aini
ng, b
usin
ess i
dea
deve
lopm
ent,
acce
ss to
reso
urce
s (fin
ance
, lan
d an
d an
cilla
ry su
ppor
t) a
nd re
gula
tory
cl
eara
nces
in o
rder
to e
xped
ite o
pera
tiona
lizat
ion
of th
eir b
usin
ess e
nter
prise
s
Twelfth Five Year Plan (2018-2023), Bumthang Dzongkhag
-142-
23. COMMON MINIMuM INFRASTRuCTuRE (CMI) AND OuTLAY
23.1. Dzongkhag CMI and outlaySl. No
Activity Unit cost(Nu. in Million)
Requirement Cost Remarks
1 Bus Terminal/Shed 10.00 1 10.00 Total 10.00
23.2. Dzongkhag Throm CMI and outlaySl. No Activity Unit cost
(Nu. in Million)Length/Volume Total Remarks
1 Internal urban Road 15 2 km 30 2 SW Drainage 24.2 1km 24.2 3 Street Light 0.03 40 Poles 1.2 4 Footpath 0.05 1000 m 50 5 Sewer 46 1 46 Total 151.4
23.3. Gewog s CMI and outlaySl. No.
Activity Unit cost (Nu in Million)
Requirement Amount ( Nu. In Million)
Remarks
1
Maintenance of farm road/improve soling
19.80 4 Gewogs 79.200 Nu 19.8 Million each for every Gewog
Total 79.200
Note: Specific activities under CMI of Dzongkhag and Gewogs shall be planned and budgeted under Dzongkhag administration, and shall be implemented by Dzongkhag administration
-143-
Twelfth Five Year Plan (2018-2023), Bumthang Dzongkhag
25. CENTRAL AGENCIES’ ACTIVITIES FOR DZONGKhAG
Sl. No.
Activity Plan Outlay(Nu. in Million)
Implementing Agency
Remarks
1 urban infrastructure development for Dekidling town
150.000 MoWhS
2 Construction of Chamkhar GektongZam(motor-able)
100.000 MoWhS
3 Expansion of Boedpailathang airport 150.000 MoIC4 Construction of Shingkhar Gorgan
Road300.000 Dratshang
Lhentshog5 Construction of dining hall at
Nimalung Dratshang3.000 Dratshang
Lhentshog6 Construction of toilet cum bath
house at Nimalung Dratshang2.000 Dratshang
Lhentshog7 Construction of debri at Choedrak
Goenpa1.500 Dratshang
Lhentshog8 Construction of Drasha at Chumey
Buli Dratshang5.000 Dratshang
Lhentshog9 Maintenance of Duthroe 1.000 Dratshang
Lhentshog
Twelfth Five Year Plan (2018-2023), Bumthang Dzongkhag
-144-