+ All Categories
Home > Documents > 奥奇乐 充气跳床EN 14960测试报告hopsaland.com/.../06/european-Union-certificates2.pdf ·...

奥奇乐 充气跳床EN 14960测试报告hopsaland.com/.../06/european-Union-certificates2.pdf ·...

Date post: 24-Aug-2020
Category:
Upload: others
View: 1 times
Download: 0 times
Share this document with a friend
24
The results shown in this test report refer only to the sample(s) tested unless otherwise stated and the sample(s) are retained for 30 days only. The document is issued by ENC, this document cannot be reproduced except in full with our prior written permission. The document is available on request and the brief information for its validation can be assessable and confirmed at http://www.enc-lab.com. East Notice Certification 1/F, Haohui Commercial Building, Zhuji Street, Tel:+86-020-2331 4234 Fax:+86-020-8256 8534 Dongpu Town, Tianhe District, Guangzhou City E-mail: enc@ enc-lab.com Http:// www.enc-lab.com TEST REPORT EN 14960:2013 For Inflatable bouncers Model: AQL-F001, AQL-B002, AQL-F002, AQL-B005, AQL-l02, AQL-l05 Brand Name: AQL Report No.: ENC150810GZ48E1 Date of Issue: Aug. 14, 2015 Prepared For hopsaland.com , s.r.o. Centrum, 91/47, dubnica nad váhom 01841 slovakia Prepared By East Notice Certification Service Co., Ltd. 1/F, Haohui Commercial Building, Zhuji Street, Dongpu Town, Tianhe District, Guangzhou City, China TEL: +86-20-2331 4234 FAX: +86-20-8256 8534
Transcript

The results shown in this test report refer only to the sample(s) tested unless otherwise stated and the sample(s) are retained for 30 days only. The document isissued by ENC, this document cannot be reproduced except in full with our prior written permission. The document is available on request and the briefinformation for its validation can be assessable and confirmed at http://www.enc-lab.com.

East Notice Certification1/F, Haohui Commercial Building, Zhuji Street, Tel:+86-020-2331 4234 Fax:+86-020-8256 8534

Dongpu Town, Tianhe District, Guangzhou City E-mail: enc@ enc-lab.com Http:// www.enc-lab.com

TEST REPORTEN 14960:2013

For

Inflatable bouncers

Model: AQL-F001, AQL-B002, AQL-F002, AQL-B005, AQL-l02, AQL-l05

Brand Name: AQL

Report No.: ENC150810GZ48E1

Date of Issue: Aug. 14, 2015

Prepared For

hopsaland.com , s.r.o.

Centrum, 91/47, dubnica nad váhom 01841 slovakia

Prepared By

East Notice Certification Service Co., Ltd.

1/F, Haohui Commercial Building, Zhuji Street, Dongpu Town, Tianhe District,

Guangzhou City, China

TEL: +86-20-2331 4234

FAX: +86-20-8256 8534

The results shown in this test report refer only to the sample(s) tested unless otherwise stated and the sample(s) are retained for 30 days only. The document isissued by ENC, this document cannot be reproduced except in full with our prior written permission. The document is available on request and the briefinformation for its validation can be assessable and confirmed at http://www.enc-lab.com.

East Notice Certification1/F, Haohui Commercial Building, Zhuji Street, Tel:+86-020-2331 4234 Fax:+86-020-8256 8534

Dongpu Town, Tianhe District, Guangzhou City E-mail: enc@ enc-lab.com Http:// www.enc-lab.com

Report No.: ENC150810GZ48E1Page 1 of 23

TEST REPORTEN 14960:2013

Inflatable play equipment — Safety requirements and test methods

Report reference No. ............................... : ENC150810GZ48E1

Tested by ................................................. : Samliu

Review by (+ Signature). ......................... : Yemig ____________________________

Approved by (+ signature) ....................... : Rayzhou ____________________________

Date of issue ............................................: Aug. 14, 2015

Contents .................................................. : Total 23 pages

Testing laboratory

Name ....................................................... : East Notice Certification Service Co., Ltd.

Address ................................................... : 1/F, Haohui Commercial Building, Zhuji Street, Dongpu Town,Tianhe District, Guangzhou City, China

Testing location ....................................... : Same as above

Application

Name.........................................................: hopsaland.com , s.r.o.

Address ....................................................: Centrum, 91/47, dubnica nad váhom 01841 slovakia

Manufacturer

Name.........................................................: Xia men Aoqile Inflatable Products CO.,LTD

Address.....................................................: Unit 2, 9FL., Xiangyu Bldg., Xiamen Area of China (Fujian) PilotFree Trade Zone

Test specification

Standard ................................................. : EN 14960:2013

Test procedure ..................................... : CCA

Procedure deviation ................................ : N/A

Non-standard test method ...................... : N/A

Test Report Form/blank test report

Test Report Form No. .............................. : ENC14960-A13

TRF originator. ........................................ : ENC

Test item

Description .............................................. : Inflatable bouncers

Brand name ............................................. : AQL

Model...................................................... : AQL-F001, AQL-B002, AQL-F002, AQL-B005, AQL-l02, AQL-l05

Specification ............................................ : Inflatable Material: PVC

The results shown in this test report refer only to the sample(s) tested unless otherwise stated and the sample(s) are retained for 30 days only. The document isissued by ENC, this document cannot be reproduced except in full with our prior written permission. The document is available on request and the briefinformation for its validation can be assessable and confirmed at http://www.enc-lab.com.

East Notice Certification1/F, Haohui Commercial Building, Zhuji Street, Tel:+86-020-2331 4234 Fax:+86-020-8256 8534

Dongpu Town, Tianhe District, Guangzhou City E-mail: enc@ enc-lab.com Http:// www.enc-lab.com

Report No.: ENC150810GZ48E1Page 2 of 23

Test case verdicts

Test case does not apply to the test object…….: N(/A)

Test item does meet the requirement ………….: P(ass)

Test item does not meet the requirement………: F(ail)

Testing

Date of receipt of test item ……..……………….: Aug. 4, 2015

Date(s) of performance of test ………………….: Aug. 4, 2015-- Aug. 14, 2015

General remarks

This test report shall not be reproduced except in full without the written approval of the testing laboratory.

The test results presented in this report relate only to the item tested.

"(see remark #)" refers to a remark appended to the report.

"(see appended table)" refers to a table appended to the report.

Throughout this report a comma is used as the decimal separator.

When determining the test result, measurement uncertainty has been considered.

Note:

This report shall not be altered, increase and deleted.

The results relate only to the items tested.

This report shall not be published as advertisement without the approval of ENC.

This report shall not be copied partly without the written approval of ENC.

Should any objections to the test reports occurred, should submit it to the Company within ten days since theissuing of the report, Fail to accept.

Special description:

All tests are basic on model AQL-F001.

Difference description: All models have same materials, except for the difference appearance

Test Conditions: Ambient temperature: 25±3 , Relative humidity: 55±20%RH℃ .

Summary of testing

All tests were found satisfactory in accordance with Toys Directive 2009/48/EC - EN 14960:2013: Inflatableplay equipment — Safety requirements and test methods

Marking on the appliance:

Inflatable bouncers

Model: AQL-F001

Year of the manufacture:2015

Maximum working pressure:0.1bar, Maximum numberof users: 2 user for each m

2, Weight of each user:

Min.30Kg, Max.90Kg. The standard: EN 14960:2013

Xia men Aoqile Inflatable Products CO.,LTD

The results shown in this test report refer only to the sample(s) tested unless otherwise stated and the sample(s) are retained for 30 days only. The document isissued by ENC, this document cannot be reproduced except in full with our prior written permission. The document is available on request and the briefinformation for its validation can be assessable and confirmed at http://www.enc-lab.com.

East Notice Certification1/F, Haohui Commercial Building, Zhuji Street, Tel:+86-020-2331 4234 Fax:+86-020-8256 8534

Dongpu Town, Tianhe District, Guangzhou City E-mail: enc@ enc-lab.com Http:// www.enc-lab.com

Report No.: ENC150810GZ48E1Page 3 of 23

EN 14960:2013

Clause Requirement - Test Result Verdict

4 Safety requirements --

4.1 Materials --

4.1.1 Fabrics PVC --

Fabrics shall be flame retardant. P

Fabrics, and joins in fabrics, shall be of adequate tearand tensile strength for the weight of the intended userand have sufficient air retention to enable theinflatable, when pressurized to the level specified inthe operations manual, to resume its shape afterdistortion under load.

P

Fabrics of: --

a) minimum tear strength 350 N (test method AnnexE);

>350N P

b) minimum tensile strength 1 850 N (EN ISO 1421); >1850N P

c) and minimum coating adhesion 100 N (EN ISO2411);

>100N P

shall be used in those structural parts of the inflatablewhere force or stress is applied by the user.

P

4.1.2 Thread --

Threads shall be non-rotting yarn and at least 88 Ntensile strength. Stitching shall be lock-stitch. Thelength of individual stitches shall be a minimum of 3mm and a maximum of 8 mm.

N

4.1.3 Netting --

Retention netting is commonly used to define theplaying area, to contain the users and to retain items ofmobile play equipment such as balls. Retention nettingshall not significantly impair visibility. Retention nettingshall be strong enough to contain the largest/heaviestuser for whom the inflatable is designed.

N

In order to prevent users from climbing retentionnetting the mesh size, where the netting is more than 1m vertical height and accessible to the user, shall be30 mm or less to exclude users’ feet.

N

Where netting is used for roofs and is accessible to theuser, the mesh size shall be small enough to preventthe 8 mm finger rod from passing through (see Figure2).

N

The results shown in this test report refer only to the sample(s) tested unless otherwise stated and the sample(s) are retained for 30 days only. The document isissued by ENC, this document cannot be reproduced except in full with our prior written permission. The document is available on request and the briefinformation for its validation can be assessable and confirmed at http://www.enc-lab.com.

East Notice Certification1/F, Haohui Commercial Building, Zhuji Street, Tel:+86-020-2331 4234 Fax:+86-020-8256 8534

Dongpu Town, Tianhe District, Guangzhou City E-mail: enc@ enc-lab.com Http:// www.enc-lab.com

Report No.: ENC150810GZ48E1Page 4 of 23

EN 14960:2013

Clause Requirement - Test Result Verdict

Clamber netting (commonly laid on slopes to form footand hand holds) shall be securely fixed to preventlifting by the user. The rope from which it is made shallbe at least 12 mm in diameter and shall be securelyknotted. Strand ends shall be treated to preventfraying. Care shall be taken when heat sealing so asnot to form hard or sharp edges.

N

4.1.4 Ropes --

Ropes shall be fixed at both ends and the totalamplitude of swing shall not exceed 20 % of thedistance between the fixing points.

N

The rope diameter shall be between 18 mm and 45mm.

N

Fibre ropes (textile type) shall conform to EN ISO 9554or EN ISO 2307. Alternatively, the manufacturer shallsupply a works certificate stating the material used andthe safe working load. Monofilament plastics ropesshall not be used.

N

4.1.5 Zips --

Zips shall withstand air pressures and tensiongenerated within the structure. Zips used for entrancesand exits shall be reliable, easy to use, able to openfrom both sides and shall allow access and egress byadults. Zips used for deflation purposes shall have thepuller hidden from view (e.g. by a flap or pocket).

N

4.1.6 Dangerous substances and decorative finishes --

Dangerous substances shall not be used for inflatableplay equipment in such a way that they can causeadverse health affects to the user. Paints and otherdecorative finishes shall comply with EN 71-3.

P

4.2 Design --

4.2.1 Anchorage --

The inflatable shall be provided with an anchorageand/or ballast system and any necessary accessoriesenabling the inflatable to be securely fixed to theground. Each inflatable shall have at least sixanchorage points.

P

The number of anchorage points shall be calculated inaccordance with Annex A. They shall be distributedaround the perimeter of the inflatable (see also 4.2.3).The maximum wind-speed in which inflatables shall beused outdoors is 38 km/h (Force 5 on the BeaufortScale), see Annex B.

P

The results shown in this test report refer only to the sample(s) tested unless otherwise stated and the sample(s) are retained for 30 days only. The document isissued by ENC, this document cannot be reproduced except in full with our prior written permission. The document is available on request and the briefinformation for its validation can be assessable and confirmed at http://www.enc-lab.com.

East Notice Certification1/F, Haohui Commercial Building, Zhuji Street, Tel:+86-020-2331 4234 Fax:+86-020-8256 8534

Dongpu Town, Tianhe District, Guangzhou City E-mail: enc@ enc-lab.com Http:// www.enc-lab.com

Report No.: ENC150810GZ48E1Page 5 of 23

EN 14960:2013

Clause Requirement - Test Result Verdict

When used outdoors, the inflatable shall be secured tothe ground, preferably with ground stakes where theground is suitable. Each anchorage point on theinflatable and all of the components of the anchorageand/or ballast system e.g. ropes, webbings, metalattachments, stakes, weights, shall withstand a forceof 1 600 N. The direction of the exerted force shall beat an angle to the ground of 30 ° to 45 °. Groundstakes shall incline away from the direction of theexerted force. The tops of ground stakes shall berounded. The system shall expose no more than 25mm of the stake above ground level (see Figure 3).

P

On hard standing where ground stakes cannot beused, the inflatable shall be secured to the ground byequally effective method e.g. attaching each of theanchorage points to fittings already in the ground, or tosandbags or other weights, if these are capable ofsupporting the 1 600 N load. If the inflatable is securedto a vehicle or other movable machinery, such vehiclesor machinery shall be immobilized and be under thecontrol of an operator.

P

4.2.2 Structural Integrity --

The minimum air pressure inside the structural parts ofthe inflatable shall be 1 kPa (100 mm water gauge).Inflated chambers that are entered by the user are notconsidered to be structural parts of the inflatable e.g.enclosed dome type inflatables. Pressure in theplaying area of soft mountains shall be no greater than0,25 kPa (25 mm water gauge), but shall maintain apressure sufficient to prevent grounding. Pressure inthe surrounding safety apron of soft mountains shall beat least 1 kPa (100 mm water gauge), see Figure 4.

>1kpa P

The depth of the trough on the surface of any platformshall be a maximum of 33 % of the width of theadjacent panel, measured when inflated, see Figure 5.

P

Containing walls shall be vertical (90 ± 5) °. Towersthat support containing walls shall be on the sameplane. Containing walls and towers shall be strongenough to contain the largest and/or heaviest user forwhom the inflatable is designed.

P

Playing areas, surrounding safety aprons, steps and/orramps shall support the weight of the largest and/orheaviest user for whom the inflatable is designed,without grounding. See Annex C for the test method.

P

4.2.3 Access/egress --

The results shown in this test report refer only to the sample(s) tested unless otherwise stated and the sample(s) are retained for 30 days only. The document isissued by ENC, this document cannot be reproduced except in full with our prior written permission. The document is available on request and the briefinformation for its validation can be assessable and confirmed at http://www.enc-lab.com.

East Notice Certification1/F, Haohui Commercial Building, Zhuji Street, Tel:+86-020-2331 4234 Fax:+86-020-8256 8534

Dongpu Town, Tianhe District, Guangzhou City E-mail: enc@ enc-lab.com Http:// www.enc-lab.com

Report No.: ENC150810GZ48E1Page 6 of 23

EN 14960:2013

Clause Requirement - Test Result Verdict

A step or ramp shall be wide enough to cover theentire access/egress aperture with overlap, accordingto Figure 6.

N

A step or ramp shall have a tread depth of a minimumof 1,5 times the height of the adjacent playing areaplatform to which it is attached (see Figure 6).

N

The playing area of soft mountains shall be completelysurrounded by an inflated safety apron. This safetyapron shall have a minimum tread depth of 1,6 m or0,5 times the height of the playing area measured fromthe ground when inflated and in the unloadedcondition, whichever is greater.

N

In the event of air supply failure, the deflation time shallbe sufficient to allow users of the inflatable to beevacuated safely.

N

Inflatables shall be designed to ensure that adults areable to gain access in order to assist users.

N

On any open side the free height of fall shall be nogreater than 630 mm from the ground in the unloadedcondition.

N

On any open side, the extent of the impact area shallbe at least 1,2 m. The surface in the impact area shallmeet the requirements for impact attenuation so thatthe critical fall height of the surfacing, according to EN1177, is at least 630 mm.

N

Anchorage points in impact areas shall be avoided ifpossible but, where necessary, anchorage points shallbe connected to the bottom perimeter edge or seam ofthe inflatable and shall extend as short a distance aspracticable from the inflatable (see Figure 8).

N

Totally enclosed inflatables shall have signs indicatingexits, which shall be visible in all circumstances. Whendesigned for more than 15 users, there shall be morethan one exit, and users shall never be more than 5 mfrom an exit.

N

4.2.4 Blowers --

Blowers shall be protected to a minimum of IP23B asdefined in EN 60529, except that the 8 mm finger rod,as illustrated in Figure 2, shall be used instead of thejointed 12 mm test finger.

N

The blower shall be positioned at least 1,2 m from awalled side and 2,5 m from an open side. Theconnection tube shall be long enough to allow this.

N

The results shown in this test report refer only to the sample(s) tested unless otherwise stated and the sample(s) are retained for 30 days only. The document isissued by ENC, this document cannot be reproduced except in full with our prior written permission. The document is available on request and the briefinformation for its validation can be assessable and confirmed at http://www.enc-lab.com.

East Notice Certification1/F, Haohui Commercial Building, Zhuji Street, Tel:+86-020-2331 4234 Fax:+86-020-8256 8534

Dongpu Town, Tianhe District, Guangzhou City E-mail: enc@ enc-lab.com Http:// www.enc-lab.com

Report No.: ENC150810GZ48E1Page 7 of 23

EN 14960:2013

Clause Requirement - Test Result Verdict

If a blower is sited inside the inflatable structure, it shallbe at least 2,5 m from the playing area, safety apron,step and/or ramp.

N

The blower, including cabling and controls, shall not bereadily accessible to the public.

N

4.2.5 Entrapment --

4.2.5.1 Entrapment of the head and neck N

Inflatables shall be constructed so that any openingsdo not create head and neck entrapment hazards byeither head first or feet first passage.

N

a) completely bound openings through which a usercan slide head first or feet first;

N

b) partially bound or v-shaped openings; N

c) shearing or moving openings. N

When tested in accordance with D.2, if accessiblecompletely bound openings, with a lower edge morethan 600 mm above the standing surface, allowpassage of the small probe, the large probe shall alsobe able to pass through (see Figure D.1).

N

Partially bound and V-shaped openings with anentrance at 600 mm or more above a platform shall beconstructed so that either:

N

a) opening is not accessible when tested inaccordance with D.3, or

N

b) if accessible, when tested in accordance with D.3: N

- template apex contacts the base of the openingduring the test (see Figure D.4.a) or

N

- template contacts the sides of the opening at a heightof less than 600 mm above the standing surface (seeFigure D.4.b)

N

The test probes shall be applied with a force of 222 N. N

Non-rigid parts (for example ropes) shall not overlap if,by doing so, they create openings that do not conformto the requirements for completely bound openings

N

4.2.5.2 Clothing entrapment --

Inflatables shall be constructed so that hazardoussituations including:

N

The results shown in this test report refer only to the sample(s) tested unless otherwise stated and the sample(s) are retained for 30 days only. The document isissued by ENC, this document cannot be reproduced except in full with our prior written permission. The document is available on request and the briefinformation for its validation can be assessable and confirmed at http://www.enc-lab.com.

East Notice Certification1/F, Haohui Commercial Building, Zhuji Street, Tel:+86-020-2331 4234 Fax:+86-020-8256 8534

Dongpu Town, Tianhe District, Guangzhou City E-mail: enc@ enc-lab.com Http:// www.enc-lab.com

Report No.: ENC150810GZ48E1Page 8 of 23

EN 14960:2013

Clause Requirement - Test Result Verdict

a) gaps or V-shaped openings in which a part ofclothing can become trapped while or immediatelybefore the user is undergoing a forced movement;

N

b) protusions in which clothing entrapment can occur; N

Slides shall be constructed so that openings locatedwithin the free space (see Figure 9) do not trap thetoggle when tested in accordance with D.4.

N

Free space is defined as a series of cylindrical spacesthat represent the user, originating from andperpendicular to the bearing surface along the forcedpath of the user.

N

4.2.5.3 Fingers entrapment --

Inflatables shall be constructed so that there are nohazardous gaps in which fingers can be trapped whilethe rest of the body is moving or continuing in motioninvoluntarily, e.g. sliding, swinging, falling.

N

Openings within the free space, where the user issubjected to forced movement, and holes which havea lower edge more than 1,2 m above the platformwhen tested in accordance with Annex D (D.5), shallconform to one of the following requirements:

N

a) 8 mm finger rod (see Figure 2), when applied with aforce of 30 N, shall not pass through the minimumcross section of the opening and, the profile of theopening shall be such that the rod cannot be locked inany position when set in motion as given in Figure D,7;or

N

b) if the 8 mm finger rod passes through the opening,the 25 mm finger rod (see Figure 10), when appliedwith a force of 30 N shall also pass though the openingprovided that the opening does not permit access toanother finger entrapment site.

N

4.2.5.4 Body entrapment --

Adjacent inflated surfaces shall be more than 120 mmapart if the aperture formed is more than 200 mm deep(see Figure 11).

N

a) position of the wall to tower attachment at A formsan entrapment point. The position of the wall to towerattachment at B does not form an entrapment point.

N

b) large slide fixed at B forms an entrapment point. Theball fixed at A does not form an entrapment point.

N

Inflatable tunnels: N

The results shown in this test report refer only to the sample(s) tested unless otherwise stated and the sample(s) are retained for 30 days only. The document isissued by ENC, this document cannot be reproduced except in full with our prior written permission. The document is available on request and the briefinformation for its validation can be assessable and confirmed at http://www.enc-lab.com.

East Notice Certification1/F, Haohui Commercial Building, Zhuji Street, Tel:+86-020-2331 4234 Fax:+86-020-8256 8534

Dongpu Town, Tianhe District, Guangzhou City E-mail: enc@ enc-lab.com Http:// www.enc-lab.com

Report No.: ENC150810GZ48E1Page 9 of 23

EN 14960:2013

Clause Requirement - Test Result Verdict

An inflatable tunnel of 75 cm length or less shall, forthe purposes of this standard, be regarded as asqueeze.

N

A tunnel of between 75 cm and 2,0 m length shall be ofat least 50 cm internal diameter.

N

A tunnel of more than 2,0 m length shall be of at least75 cm internal diameter.

N

Inflatable squeeze: N

A squeeze shall not be longer than 75 cm. N

The diameter of the initial opening shall be at least 40cm.

N

The smallest aperture of the squeeze shall allow thelarge head probe to pass through with the applicationof a force of 222 N.

N

The entire length of the inner squeeze panel shall becapable of being expanded to at least 40 cm diameter.

N

4.2.6 Hard objects, sharp angles and edges --

There shall be no hard and/or sharp angles or edges inany part of the inflatable accessible to the users (e.g.outside seams with a raw edge, square inflatedcorners, sharp-pointed cones).

P

Users shall not be able to come into contact with anyhard object placed inside or adjacent to the inflatedstructure while it is in use or during accidentaldeflation.

P

Any hard object positioned over the playing area andsupported by air pressure, shall have an additionalindependent support system.

P

4.2.7 Electrical installations --

Electrical installations shall conform to applicablenational standards/regulations.

N

Controls of electrical installations shall not be readilyaccessible to the public.

N

Electrical cables shall be secured away from users andthe public.

N

4.2.8 Siting --

The inflatable shall be sited well away from possiblehazards such as overhead powerlines or otherobstacles with hazardous projections (e.g. fencesand/or trees).

P

The results shown in this test report refer only to the sample(s) tested unless otherwise stated and the sample(s) are retained for 30 days only. The document isissued by ENC, this document cannot be reproduced except in full with our prior written permission. The document is available on request and the briefinformation for its validation can be assessable and confirmed at http://www.enc-lab.com.

East Notice Certification1/F, Haohui Commercial Building, Zhuji Street, Tel:+86-020-2331 4234 Fax:+86-020-8256 8534

Dongpu Town, Tianhe District, Guangzhou City E-mail: enc@ enc-lab.com Http:// www.enc-lab.com

Report No.: ENC150810GZ48E1Page 10 of 23

EN 14960:2013

Clause Requirement - Test Result Verdict

The inflatable shall not be erected on a site with morethan a 5 % slope in any direction.

P

The site shall be cleared of debris and/or sharp objectson, or embedded in, the surface.

P

If, for crowd-control purposes, a perimeter fence isused, it shall be at least 1,8 m from walled sides and atleast 3,5 m from open sides. A gateway shall be 1,0 mwide

P

4.2.9 Containment --

Containing wall height shall be measured from thesurface of the platform to the top of the wall, at 90° tothe platform.

P

Walls for containing users, known as outside walls, arerequired where the platform height is greater than 60cm.

P

Inflatables with a platform height between 0,6 m and3,0 m shall have a containing wall height equal to atleast the height of the user. Containing walls of 1,8 mheight are sufficient for users of any height.

P

Inflatables with a platform height between 3,0 m and6,0 m shall have a containing wall height at least 1,25times the height of the user, or the platform area shallbe permanently roofed to contain the user.

P

Inflatables with a platform height over 6,0 m shall havecontaining walls and a permanent roof fitted (seeFigure14).

< 6 m N

The minimum internal height of such containing wallsand permanent roof, measured from the surface of theplatform to the under-side of the roof, shall be at least75 cm.

> 75 cm P

4.2.10 Wall heights on slopes --

Containing wall heights on slopes shall be measuredfrom the surface of the slope to the top of the wall, at90° to the slope.

P

The height of the containing walls on the slope of aslide or climbing ramp of more than a 30° inclinationshall be, for the first metre at the top, at least the heightof the user and for the remainder, at least 50 % of theheight of the user (see Figure 15).

> 50% P

The results shown in this test report refer only to the sample(s) tested unless otherwise stated and the sample(s) are retained for 30 days only. The document isissued by ENC, this document cannot be reproduced except in full with our prior written permission. The document is available on request and the briefinformation for its validation can be assessable and confirmed at http://www.enc-lab.com.

East Notice Certification1/F, Haohui Commercial Building, Zhuji Street, Tel:+86-020-2331 4234 Fax:+86-020-8256 8534

Dongpu Town, Tianhe District, Guangzhou City E-mail: enc@ enc-lab.com Http:// www.enc-lab.com

Report No.: ENC150810GZ48E1Page 11 of 23

EN 14960:2013

Clause Requirement - Test Result Verdict

P

On a slope or climbing ramp over 6,0 m high,containing walls and a permanent roof shall be fitted.The minimum internal height of such containing wallsand roof, measured from the surface of the slope to theunderside of the roof, shall be 75 cm.

N

4.2.11 Run-out --

All slides shall include a run-out section at the bottomwhich shall have an average inclination of not morethan 10°.

< 10° P

The length of the run-out section, measured from theend of the radius or angle at the bottom of the slidingsection, shall be related to the height of the highestplatform of the slide, measured from the ground.

P

When a stop-wall is fitted at the end of the run-outsection, 50 cm shall be added to the length of therun-out. The height of a stop-wall shall be at least userheight. The height of the containing walls on the sidesof a runout section, if fitted, shall be at least 50 % ofthe user height.

P

4.2.12 Ventilation --

Play spaces shall be well ventilated. P

The results shown in this test report refer only to the sample(s) tested unless otherwise stated and the sample(s) are retained for 30 days only. The document isissued by ENC, this document cannot be reproduced except in full with our prior written permission. The document is available on request and the briefinformation for its validation can be assessable and confirmed at http://www.enc-lab.com.

East Notice Certification1/F, Haohui Commercial Building, Zhuji Street, Tel:+86-020-2331 4234 Fax:+86-020-8256 8534

Dongpu Town, Tianhe District, Guangzhou City E-mail: enc@ enc-lab.com Http:// www.enc-lab.com

Report No.: ENC150810GZ48E1Page 12 of 23

EN 14960:2013

Clause Requirement - Test Result Verdict

4.3 Number of users --

To determine the maximum safe number of usersallowed to play on an inflatable at one time, thedesigner shall consider all circumstances which mightaffect the safe number.

P

These include: --

a) height of user; P

b) size of the playing area; P

c) type of activity e.g. bouncing, sliding; P

d) inflated shapes mounted on the playing area; P

e) access and egress. P

This list is not exhaustive. P

4.4 Supervision --

An inflatable shall not be used without supervision. P

When an inflatable is unattended, it shall be deflatedand the power source disabled.

P

The controller shall determine the number andsuitability of supervisory personnel required to operatethe inflatable safely by considering matters such as themaximum number of users marked on the inflatable,the age of the users, the environment in which theinflatable is being used and the information providedby the manufacturer/supplier. Supervisory personnelconsists of one operator and as many attendants asdetermined by the controller. Supervisory personnelshall be easily recognized.

P

6 Information to be provided by the supplier/manufacturer --

6.1 General product information --

The supplier/manufacturer shall provide information inthe appropriate language(s) of the country in which theequipment is to be installed and used. The informationshall:

See user's manual P

a) be printed legibly and in a simple form; P

b) be conveyed using illustrations wherever possible; P

c) include, at least, details of installation, operation,inspection and maintenance.

P

6.2 Pre-information --

The results shown in this test report refer only to the sample(s) tested unless otherwise stated and the sample(s) are retained for 30 days only. The document isissued by ENC, this document cannot be reproduced except in full with our prior written permission. The document is available on request and the briefinformation for its validation can be assessable and confirmed at http://www.enc-lab.com.

East Notice Certification1/F, Haohui Commercial Building, Zhuji Street, Tel:+86-020-2331 4234 Fax:+86-020-8256 8534

Dongpu Town, Tianhe District, Guangzhou City E-mail: enc@ enc-lab.com Http:// www.enc-lab.com

Report No.: ENC150810GZ48E1Page 13 of 23

EN 14960:2013

Clause Requirement - Test Result Verdict

The supplier/manufacturer shall provide informationconcerning the safety of the equipment prior toaccepting an order. This information shall include, atleast, the following where relevant:

P

a) an height clearance and space required to operatethe equipment safely;

P

b) surfacing requirement; P

c) overall packed dimensions and weight; P

d) intended age range or height range; P

e) certification of conformity with this standard. EN 14960 P

6.3 Installation information --

The supplier/manufacturer shall provide installationinformation which shall include, at least, the following:

P

a) list of equipment; P

b) method of anchorage and number of anchor points; N

c) maximum safe wind speed; P

d) siting, height and space requirement; P

e) maximum allowable slope of the site; P

f) crowd control measures; P

g) need to keep users off of the inflatable duringinflation and deflation;

P

h) type and size of blower required. P

6.4 Operating information --

The supplier/manufacturer shall provide operatinginformation which shall include, at least, the followinginformation and instructions:

P

Need for/to: --

a) constant supervision; P

b) admit users to the inflatable in a controlled and safemanner;

P

c) restrict the maximum height of the user to the designheight;

P

d) restrict the maximum number of users at one time tothe design number;

P

e) use at least the minimum number of operatingpersonnel;

P

The results shown in this test report refer only to the sample(s) tested unless otherwise stated and the sample(s) are retained for 30 days only. The document isissued by ENC, this document cannot be reproduced except in full with our prior written permission. The document is available on request and the briefinformation for its validation can be assessable and confirmed at http://www.enc-lab.com.

East Notice Certification1/F, Haohui Commercial Building, Zhuji Street, Tel:+86-020-2331 4234 Fax:+86-020-8256 8534

Dongpu Town, Tianhe District, Guangzhou City E-mail: enc@ enc-lab.com Http:// www.enc-lab.com

Report No.: ENC150810GZ48E1Page 14 of 23

EN 14960:2013

Clause Requirement - Test Result Verdict

f) users to remove their footwear; P

g) users to remove hard, sharp or dangerous objectsfrom their person;

P

h) users to remove glasses when practicable; P

i) prohibit the consumption of food, drink and gum; P

j) keep the entrance free from obstruction; P

k) prohibit the users from climbing or hanging on thecontaining walls;

P

l) prohibit somersaults and rough play; P

m) operator and/or attendants to watch the activity onthe inflatable constantly;

P

n) operator and/or attendants to use a whistle or othersignal to attract the attention of the users;

P

o) operator and/or the attendants to separate larger,more boisterous users from smaller ones;

P

p) inflatable to be evacuated during re-fuelling of ablower powered by an internal combustion engine.

P

The supplier/manufacturer shall also provideinformation on what to do in the event of an emergencyor accident

P

6.5 Inspection and maintenance information --

The supplier/manufacturer shall provide information onthe inspection and maintenance of the equipment. Theinformation shall specify the type and frequency ofinspections.

P

7 Inspection, maintenance and alteration --

7.1 Inspection --

Inflatable play equipment shall be inspected at suitableintervals to ensure that deterioration in the equipmentis detected and remedied in good time

P

7.1.1 Routine Inspection --

The controller shall carry out, or appoint a person tocarry out, routine inspection.

P

Routine inspection shall be carried out before useeach time the equipment is made available for use.The check shall include that:

P

- site is suitable; P

The results shown in this test report refer only to the sample(s) tested unless otherwise stated and the sample(s) are retained for 30 days only. The document isissued by ENC, this document cannot be reproduced except in full with our prior written permission. The document is available on request and the briefinformation for its validation can be assessable and confirmed at http://www.enc-lab.com.

East Notice Certification1/F, Haohui Commercial Building, Zhuji Street, Tel:+86-020-2331 4234 Fax:+86-020-8256 8534

Dongpu Town, Tianhe District, Guangzhou City E-mail: enc@ enc-lab.com Http:// www.enc-lab.com

Report No.: ENC150810GZ48E1Page 15 of 23

EN 14960:2013

Clause Requirement - Test Result Verdict

- all anchorages are secure and in place; N

- ancillary equipment is in position (e.g.impact-absorbing mats);

N

- there are no significant holes or rips in the fabric orseams;

P

- correct blower is being used; P

- internal air pressure is sufficient to give a firm andreliable footing;

P

- there are no exposed electrical parts and no wear oncables;

N

- plugs, sockets, switches etc. are not damaged; N

- connection tube and blower are firmly attached toeach other;

N

- blower is safely positioned and its mesh guards areintact.

P

The equipment shall not be used by the public until anydefects identified in the routine inspection have beenrectified.

P

7.1.2 Annual inspection --

The controller shall ensure that an annual inspection iscarried out by an inspection body which shall includeany part of the inflatable and its ancillaries, which mayaffect safe operation of the equipment. It shall includechecks of:

P

- previous inspection reports and certificates whereappropriate;

P

- identification of the inflatable and blower (e.g. serialnumbers);

N

- anchorage system for wear, rips or chafing; N

- type and number of ground anchors or ballast forconformity with the design specification;

N

- inflatable structure for wear or rips in the fabric; P

- walls and towers (when fitted) for firmness anduprightness;

P

- internal air pressure to be sufficient to give a reliableand firm footing;

P

- internal ties for wear and tear, particularly at loose orexposed ends;

P

The results shown in this test report refer only to the sample(s) tested unless otherwise stated and the sample(s) are retained for 30 days only. The document isissued by ENC, this document cannot be reproduced except in full with our prior written permission. The document is available on request and the briefinformation for its validation can be assessable and confirmed at http://www.enc-lab.com.

East Notice Certification1/F, Haohui Commercial Building, Zhuji Street, Tel:+86-020-2331 4234 Fax:+86-020-8256 8534

Dongpu Town, Tianhe District, Guangzhou City E-mail: enc@ enc-lab.com Http:// www.enc-lab.com

Report No.: ENC150810GZ48E1Page 16 of 23

EN 14960:2013

Clause Requirement - Test Result Verdict

- bed seams, wall-to-bed seams and wall-to-towerconnections;

N

- mesh guards at the inlet and outlet of the blower; N

- condition of the impellor and fan casing; N

- condition of electrical wiring and/or installations; N

- presence of the fuel cap (petrol-engined blowers). N

Inspection of some of these items may need to bedone inside the inflatable. The above list is notexhaustive.

P

7.2 Maintenance --

7.2.1 General --

Carrying out of repairs while the equipment is in useshall be avoided.

P

7.2.2 Routine maintenance --

Preventative measures to maintain levels of safety andperformance. Such measures include:

P

- cleaning the inflatable; P

- removal of debris and contaminants; P

- rust control on the blower; P

- cleaning the blower air intake. P

7.2.3 Corrective maintenance --

Measures to correct defects or to re-establish thenecessary levels of safety, such measures include:

P

- replacement of worn or defective parts; P

- repair of splits or delaminated seams; P

- repair of holes and cuts; P

- repair or replacement of defective structuralcomponents.

P

7.3 Alteration --

Alteration to any part of the equipment that could affectits essential safety shall only be carried out afterconsultation with the supplier/manufacturer or acompetent person. The equipment shall only be putinto use again when alterations have been inspectedand passed by an inspection body.

P

8 Marking --

The results shown in this test report refer only to the sample(s) tested unless otherwise stated and the sample(s) are retained for 30 days only. The document isissued by ENC, this document cannot be reproduced except in full with our prior written permission. The document is available on request and the briefinformation for its validation can be assessable and confirmed at http://www.enc-lab.com.

East Notice Certification1/F, Haohui Commercial Building, Zhuji Street, Tel:+86-020-2331 4234 Fax:+86-020-8256 8534

Dongpu Town, Tianhe District, Guangzhou City E-mail: enc@ enc-lab.com Http:// www.enc-lab.com

Report No.: ENC150810GZ48E1Page 17 of 23

EN 14960:2013

Clause Requirement - Test Result Verdict

Each inflatable shall be legibly and permanentlymarked with, at least, the following:

--

- type and size of the blower; P

- maximum height of the user; P

- maximum number of users; P

- unique identifying number(s); P

- year of the manufacture; 2015 P

- name and address of one or either thesupplier/manufacturer, importer or authorisedrepresentative;

Xia men Aoqile InflatableProducts CO.,LTD

P

- number and date of this European Standard; EN 14960:2013 P

Connection tube(s) shall be marked so as not to beconfused with any other tube(s) e.g. inspection tubes,deflation tubes.

P

These markings shall all be clearly visible when theequipment is in use.

P

Each blower shall be legibly and permanently markedwith, at least, the following:

P

- type and size; P

- unique identifying number; P

- year of manufacture; P

- name and address of the supplier/manufacturer; P

- number and date of this European Standard. P

These markings shall all be clearly visible when theequipment is in use.

P

9 Documentation --

The controller shall keep available documentation andrecords relating to the safety of the equipment. Theseshall include:

P

- information provided by the supplier/manufacturer; P

- certificate of inspection and testing; P

- records of inspection; P

- records of maintenance; P

- records of alteration; P

- accident reports. P

The results shown in this test report refer only to the sample(s) tested unless otherwise stated and the sample(s) are retained for 30 days only. The document isissued by ENC, this document cannot be reproduced except in full with our prior written permission. The document is available on request and the briefinformation for its validation can be assessable and confirmed at http://www.enc-lab.com.

East Notice Certification1/F, Haohui Commercial Building, Zhuji Street, Tel:+86-020-2331 4234 Fax:+86-020-8256 8534

Dongpu Town, Tianhe District, Guangzhou City E-mail: enc@ enc-lab.com Http:// www.enc-lab.com

Report No.: ENC150810GZ48E1Page 18 of 23

APPENDIX

PHOTOGRAPH(S) OF SAMPLE(S)

The results shown in this test report refer only to the sample(s) tested unless otherwise stated and the sample(s) are retained for 30 days only. The document isissued by ENC, this document cannot be reproduced except in full with our prior written permission. The document is available on request and the briefinformation for its validation can be assessable and confirmed at http://www.enc-lab.com.

East Notice Certification1/F, Haohui Commercial Building, Zhuji Street, Tel:+86-020-2331 4234 Fax:+86-020-8256 8534

Dongpu Town, Tianhe District, Guangzhou City E-mail: enc@ enc-lab.com Http:// www.enc-lab.com

Report No.: ENC150810GZ48E1Page 19 of 23

The results shown in this test report refer only to the sample(s) tested unless otherwise stated and the sample(s) are retained for 30 days only. The document isissued by ENC, this document cannot be reproduced except in full with our prior written permission. The document is available on request and the briefinformation for its validation can be assessable and confirmed at http://www.enc-lab.com.

East Notice Certification1/F, Haohui Commercial Building, Zhuji Street, Tel:+86-020-2331 4234 Fax:+86-020-8256 8534

Dongpu Town, Tianhe District, Guangzhou City E-mail: enc@ enc-lab.com Http:// www.enc-lab.com

Report No.: ENC150810GZ48E1Page 20 of 23

The results shown in this test report refer only to the sample(s) tested unless otherwise stated and the sample(s) are retained for 30 days only. The document isissued by ENC, this document cannot be reproduced except in full with our prior written permission. The document is available on request and the briefinformation for its validation can be assessable and confirmed at http://www.enc-lab.com.

East Notice Certification1/F, Haohui Commercial Building, Zhuji Street, Tel:+86-020-2331 4234 Fax:+86-020-8256 8534

Dongpu Town, Tianhe District, Guangzhou City E-mail: enc@ enc-lab.com Http:// www.enc-lab.com

Report No.: ENC150810GZ48E1Page 21 of 23

The results shown in this test report refer only to the sample(s) tested unless otherwise stated and the sample(s) are retained for 30 days only. The document isissued by ENC, this document cannot be reproduced except in full with our prior written permission. The document is available on request and the briefinformation for its validation can be assessable and confirmed at http://www.enc-lab.com.

East Notice Certification1/F, Haohui Commercial Building, Zhuji Street, Tel:+86-020-2331 4234 Fax:+86-020-8256 8534

Dongpu Town, Tianhe District, Guangzhou City E-mail: enc@ enc-lab.com Http:// www.enc-lab.com

Report No.: ENC150810GZ48E1Page 22 of 23

The results shown in this test report refer only to the sample(s) tested unless otherwise stated and the sample(s) are retained for 30 days only. The document isissued by ENC, this document cannot be reproduced except in full with our prior written permission. The document is available on request and the briefinformation for its validation can be assessable and confirmed at http://www.enc-lab.com.

East Notice Certification1/F, Haohui Commercial Building, Zhuji Street, Tel:+86-020-2331 4234 Fax:+86-020-8256 8534

Dongpu Town, Tianhe District, Guangzhou City E-mail: enc@ enc-lab.com Http:// www.enc-lab.com

Report No.: ENC150810GZ48E1Page 23 of 23

------END OF REPORT------


Recommended